56 FEBRUARY 2020 WWW.MOTA-ENGIL.COM

SUSTAINABILITY AT THE CORE OF MOTA-ENGIL

10 YEARS OF START@ME: MOTA-ENGIL 10.ª EDITION GROOMING ON THE EUROPEAN OF THE MANUEL ANTÓNIO NEW LEADERS TOP 25 DA MOTA AWARD A World of Inspiration

Founded by Manuel António da Mota on 29 June 1946, in the past 73 years, the Mota-Engil Group has carved a path of constant growth, diversification of activities and international expansion, marked by a culture of entrepreneurship and innovation in the permanent search for new horizons.

A journey that makes us proud and that motivates for a future that challenges us.

Calueque Dam Wroclaw S8 Motorway Tuxpan Tampico Road POLAND MEXICO

Antamina Energy Recovery Plant Nacala Corridor Sena Railway Line PERU MALAWI

Kassuende Base Bridge Acsiopolis MOZAMBIQUE SOUTH AFRICA

Lisbon Oceanarium Foz Tua Dam PORTUGAL PORTUGAL

Wielicka-Lipska Railway Line POLAND

Cusco Road Quillabamba Douro Interior Great East Road Guadalajara Light Train Bay of Luanda PERU PORTUGAL ZAMBIA MEXICO ANGOLA INDEX

A World of Inspiration 06 06 Sustainability as a priority INSTITUTIONAL MOTA-ENGIL BUILDS for the Mota-Engil Group A BREAKWATER Founded by Manuel António da Mota on 29 June 1946, in the past 73 years, at port of Cabinda 66 SUSTAINABILITY as a priority for the Group 06 the Mota-Engil Group has carved a path of constant growth, diversification of activities SUSTAINABILITY and international expansion, marked by a culture of entrepreneurship and innovation applied in Rwanda 76 10 YEARS OF in the permanent search for new horizons. Start@ME Programme 12

MOTA-ENGIL AMONG A journey that makes us proud and that motivates the 25 largest in Europe 80 for the first time 18 for a future that challenges us. LATIN AMERICA MOTA-ENGIL as Top Pick for 2020 24 A LOOK AT SUSTAINABILITY In Mota-Engil Latin america 80 64 MOTA-ENGIL MEXICO PROUD The sustainability of hospital MEMBER OF UN'S GLOBAL CLUSTER buildings in Angola 28 of business Innovators 82

EUROPE ECB IN THE TOP 10 Company consolidates its position In the brazilian infrastructure MOTA‑ENGIL CENTRAL EUROPE market. 95 is building an ecological hotel in Szczecin, Poland 28

W ALGARVE Hotel & Residences 32 Calueque Dam Wroclaw S8 Motorway Tuxpan Tampico Road 96 ANGOLA POLAND MEXICO VIBEIRAS 2.0 TECHNOLOGY Vision of the future 36 AND INNOVATION

SUMA CELEBRATES MOTA-ENGIL LEVERAGES 98 25 years of existence 52 EFFICIENCY Antamina Energy Recovery Plant Nacala Corridor Sena Railway Line through robotics 96 Manuel António da Mota PERU PORTUGAL MALAWI MOZAMBIQUE Award 2019 62 98 Kassuende Base Bridge Acsiopolis MOZAMBIQUE SOUTH AFRICA AFRICA

MOTA-ENGIL AFRICAN INITIATIVES AWARD in Malawi 62 Manuel António da Mota 2019 98

Lisbon Oceanarium Foz Tua Dam PORTUGAL PORTUGAL

MASTHEAD

DIRECTOR EDITING PUBLICATION PRINTER LEGAL DEPOSIT ONLINE EDITION Wielicka-Lipska Railway Line Gonçalo Moura Martins Mota‑Engil, SGPS, SA Mota‑Engil, SGPS, SA Grafisol 307551/10 POLAND EDITOR HEAD OFFICE DESIGN PRINT RUN DISTRIBUTION Available at: Pedro Arrais Rua do Rego Lameiro, 38 White Way® 850 copies FREE OF CHARGE 4300-454 Porto www.mota‑engil.com

THE FOLLOWING CONTRIBUTED IN THIS EDITION Alexandra Pericão · Ana Loureiro · Ana Pires · Bernardo Carnall · Danilo Prado · Elisabete Ramos · Filipe Morla · Hector Fonseca · Hugo Maçãs · Joana Viegas ·Jorge Alvares · José Pedro Freitas · Loide Almeida · Luís Filipe Monteiro · Luís Moreira Silva · Luís Sousa · Maria Inês Gaspar · Cusco Road Mário Barros · Mário Lacerda · Monika Dąbek · Nair Pires · Regina Sequeira · Sally Ordonez · Sandra Regufe ·Sónia Tenreiro · Susana Quillabamba Douro Interior Great East Road Guadalajara Light Train Bay of Luanda Guerreiro · Vieira Simões PERU PORTUGAL ZAMBIA MEXICO ANGOLA OPENING MESSAGE

CEO MESSAGE SUSTAINABILITY AS THE BASIS FOR THE TRANSFORMATION OF THE WORLD AS WE KNOW IT

he theme of this edition of SINERGIA is Sustainability, the pivotal focus T of the Mota-Engil Group's development strategy. Having devoted special attention in our last two editions to the questions of Innovation and Social Responsibility, Sustainability now deserves to be highlighted as an example of just how truly committed the Mota-Engil Group is to its stakeholders.

The future of the next generations needs to be safeguarded in a mission that companies, as the cornerstone of society, must undertake in a strategic fashion, jointly ” fostering the prosperity of their businesses and the related parts. The future of the next generations At Mota-Engil, and in line with the Sustainable Development Goals (SDG), our aim is to contribute to the pillars of a balanced society; a society capable of needs to be generating employment and wealth while simultaneously respecting nature and safeguarded in Human Rights – and reinforcing our commitment to the sustainability of our clients, a mission that communities and employees. companies, as With this in mind, Mota-Engil will be targeting the following five areas from 2018-2020: the cornerstone of society, must • Investment in the Community undertake in a • Safety • The Environment strategic fashion. • Ethics and Compliance • Diversity and Inclusion

Thus, and with a strategic vision of a firm commitment to these principles, we firmly believe that we are preparing the Organisation for the ongoing changes that will result in significant alterations to the recently implemented business models that are seen as “ examples to follow. We are also preparing for a world that is more inclusive, respectful of differences and ethically committed to the society's mutual well-being.

Today, the adoption of a true sustainability strategy supported by practical actions is something that our global society demands and acknowledges as a differentiating aspect for companies. Indeed, such strategies are increasingly a driving force behind consumer preference.

04 GONÇALO MOURA MARTINS Chief Executive Officer

Consequently, one of the things I really want to highlight in this issue of SINERGIA is the 10th anniversary of the Start@ME Programme. This is a trainee programme that we have been increasingly investing in because we consider it an extremely ” important means of qualifying the young people who will be the next leaders of our Building the future in Organisation. It has resulted in concrete examples of professional growth that are this new era requires the source of considerable pride as we watch our young people take on positions of well-prepared leadership ever-greater responsibility within the Organisation. and cohesive Lastly, I would like to say a final word about the 10th anniversary of the Manuel communities and António da Mota Award, at which we were honoured to have the presence of organisations supported Portuguese Prime Minister, António Costa. This is an event that has been making a name for itself in Portugal for its support of different institutions in the fields of by shared principles of education, culture and social solidarity, and it is an important part of the Mota-Engil tolerance and Group's social responsibility policy. respect with a strategic vision. Building the future in this new era requires well-prepared leadership and cohesive communities and organisations supported by shared principles of tolerance and respect. A strategic vision based on sustainable policies capable of keeping pace with and spearheading the transformation of the world as we know it is essential. “ SINERGIA 56 FEBRUARY 2020 05 INSTITUTIONAL

MOTA-ENGIL SUSTAINABILITY AS A PRIORITY FOR THE MOTA-ENGIL GROUP

MOTA-ENGIL’S PRIORITY FOR THE 2018-2020 PERIOD IS TO INVEST IN THE COMMUNITY, SAFETY, ENVIRONMENT, ETHICS AND COMPLIANCE, AS WELL AS DIVERSITY AND INCLUSION.

he multi-sectoral nature of the reflected annually in the Group’s geographies and assuming a fundamental T Group’s activities and its Sustainability Report. role in this matter. presence in multiple geographic contexts are now reflected Following the multiple legal requirements, In line with the Sustainable Development on an added responsibility regarding the preparation and elaboration of the Goals (SDG) – the pillars of a balanced sustainability, raising the corresponding Sustainability Report, as an official and society, capable of generating employment level of complexity to a global scale. institutional document, in light of GRI’s and wealth while respecting nature and international guidelines, has been going Human Rights – and reinforcing the Along with the expansion and complexity through several stages and adaptations. commitment to sustainability of its clients, of Mota-Engil’s businesses, sustainability It is now a multidisciplinary project, communities and employees, Mota-Engil in the Group is materialised through under the responsibility of the Human has defined five operational areas for the achievement of a set of strategic Resources and Sustainability Corporate 2018-2020, based on the Group’s growth, objectives, in which the Group seeks to Department, fulfilled with crucial support internationalisation and diversification: embody and provide a practical response and collaboration from a wide range of • Investment in the Community to the numerous sustainability challenges, teams, covering the Group’s multiple • Safety

06 ”

The global world in which we live, and which today represents Mota-Engil Group’s natural affirmation space, is faced with unprecedented sustainability challenges.

ANTÓNIO MOTA CEO of Mota-Engil Group

• Environment in the same geography (Portugal). This MOTA-ENGIL HAS DEFINED • Ethics and Compliance report underwent a step change in 2016, FIVE OPERATIONAL AREAS • Diversity and Inclusion when it incorporated information from FOR 2018-2020: the larger markets, a reality that would • Investment in the PATH TO SUSTAINABILITY quickly gain new scope the following Community AT MOTA-ENGIL year, from then on representing the The Mota-Engil Group began sustainability initiatives underway in the • Safety implementing a sustainability and Group’s universe. • Environment social responsibility strategy in 2006, • Ethics and Compliance which culminated in the publication Despite the important road not yet of its first Sustainability Report in travelled, the progress felt in recent years • Diversity and Inclusion 2007. This was the first element of regarding the Group’s journey towards corporate communication in terms of sustainability is remarkable, with an sustainability, initially reporting on only emphasis on the monitoring, processing two of the Group’s business areas, both and reporting of consistent information

SINERGIA 56 FEBRUARY 2020 07 INSTITUTIONAL

1

in accordance with the guidelines of this matter and committing to innovate CEO GUIDE the Global Reporting Initiative (GRI), in practices aimed at improving TO HUMAN RIGHTS with the Group constantly evolved in the living conditions not only of its the implementation of good practices employees, but also of the communities related to sustainability and its reporting, impacted by the Group’s activity. in a transparent manner towards shareholders, with all documents As regulation becomes increasingly produced on the subject over the years demanding and aligned with the available on the website. expectations of investors and society in Knowledge general, this Guide identifies important SUBSCRIPTION TO THE CEO GUIDE aspects of Human Rights, challenging TO HUMAN RIGHTS companies to act accordingly and extend Since the publication of the United their actions to their value chain. Nations Guiding Principles on Business Leadership and Human Rights, there has been As CEO of Mota-Engil, Gonçalo Moura a growing concern among business Martins joined this international managers to respect Human Rights. challenge in 2019, becoming a signatory of this document on behalf of the Group, To that effect, and publicly confirming raising the necessary efforts to guarantee Involvement its commitment to promoting the defence Human Rights at the highest level in the of Human Rights and improving people’s different contexts and geographies in living conditions, Mota-Engil subscribes which the Group is present, reinforcing to the CEO Guide to Human Rights of the incorporation of respect for Human BCSD Portugal (Business Council for Rights in Mota-Engil’s operations and Collaboration Sustainable Development), confirming business relations. the Group’s corporate responsibility on

08 CHARTER OF PRINCIPLES BCSD Portugal

Principle 1 LEGAL COMPLIANCE AND ETHICAL CONDUCT

Principle 2 HUMAN RIGHTS

CHARTER OF PRINCIPLES Mota-Engil takes on the Principle 3 commitment to three WORKING RIGHTS fundamental strategic axes Principle 4 PREVENTION, HEALTH 2 AND SAFETY

Principle 5 ENVIRONMENT SUBSCRIPTION TO BCSD PORTUGAL’S international tenders that currently CHARTER OF PRINCIPLES include requirements associated with BCSD Portugal’s Charter of Principles the companies’ sustainability practices Principle 6 establishes the principles that constitute as selection criteria, Mota-Engil MANAGEMENT the guidelines for good business becomes a company that subscribes management practices, encompassing to the Charter of Principles, being a set of standards and procedures in a reference for the commitment to line with management, ethical, social, sustainability throughout its value chain environmental and quality standards, in and in the relationships it maintains any context of the global economy. with its stakeholders.

Inspired by the Universal Declaration With the subscription of the Charter of Human Rights, by the Fundamental of Principles, Mota-Engil takes on the Principles and Rights at Work of the commitment to three fundamental International Labour Organisation strategic axes: (ILO) and by the United Nations Global 1 Compact (UNGC), this document • recognition of the importance of Sustainability Report 2018 - seeks to encourage commitment sharing sustainability information with Communication of social and environmental performance and transparency in the reporting stakeholders; is fundamental to the Group's sustainability strategy. of company performance, encouraging the massification of sustainable • orientation of the entire value chain management practices, a factor according to the principles of this 2 of competitiveness. Charter; Local communities in Peru - Corporate responsability on the improvement of living conditions of the communities impacted by he Group's activity. Identifying with these principles, • alignment and commitment to the and with numerous domestic and Sustainable Development Goals.

SINERGIA 56 FEBRUARY 2020 09 INSTITUTIONAL

For Gonçalo Moura Martins, Chief the challenges in the field of poverty Concessions, Energy and Mining”, Executive Officer, due to the areas in eradication, covering a wide range of placing the Group “in a privileged which it operates, Mota-Engil Group interrelated topics in the economic, position in contributing to the pursuit of “is a fundamental agent for the social and environmental dimensions of the Sustainable Development Goals”. sustainable development of the sustainable development. communities and clients it serves, for As an organisation with multinational the partners with whom it relates and The United Nations 2030 Agenda for activity, Mota-Engil has reiterated its for the people who ensure the quality Sustainable Development consists of commitment to the SDG, aligning its and reliability of the solutions it delivers 17 SDG and is the result of the joint work strategy with the 2030 Agenda and every day”, thus striving to contribute of governments and citizens around the adapting its sphere of action to the in a socially responsible way to the world to create a new global model to end various geographies in which it operates, SDG, “seeking to make a difference in poverty, promote prosperity and well- in close connection with the specificities the decisions, options and actions” it being for all, protect the environment and operational reality of each market. develops, promoting the generation of and combat climate change. value from an economic, environmental INTERNAL TRAINING AND and social perspective. According to António Mota, Chairman of AWARENESS: SUSTAINABILITY the Board of Directors, Mota-Engil has AS A COMPETITIVENESS FACTOR COMMITMENT AND ALIGNMENT “stood out as a Group of reference in the In order to leverage the topic of TO THE SUSTAINABLE provision of a service of public interest, sustainability in the Mota-Engil Group, DEVELOPMENT GOALS geared towards the construction and a number of initiatives are underway to Following the Millennium Development management of infrastructure in areas train the executive and technical staff Goals (MDG), the Sustainable such as Engineering and Construction, regarding the criticality of sustainability Development Goals (SDG) extend Environment and Services, Transport as a factor in transforming the Group’s

SUSTAINABLE DEVELOPMENT GOALS is composed of 17 SDGs

[The Group] is a fundamental agent for the sustainable development of the communities and clients it serves, for the partners with whom it relates and for the people who ensure the quality and reliability of the solutions it delivers every day.

GONÇALO MOURA MARTINS Chief Executive Officer

10 3

business and role in the pursuit of the With these initiatives, Mota-Engil Sustainable Development Goals, among aims to achieve a double objective: on which stand out: the one hand, to raise awareness and deepen employees’ knowledge on the • An event for the Group’s high-level matter in question; and, on the other, management and senior management, to widely promote the dissemination within the scope of the disclosure of the of the vision, values and strategic goals Sustainability Report, in partnership aspired to by the Group regarding with the BCSD sustainability issues.

• Training accessible to all of the Group’s personnel, under the topic SUSTAINABILITY of “Sustainability as a factor of AS A FACTOR OF competitiveness” COMPETITIVENESS • Provision of training on sustainability, on topics such as Sustainable Development Goals, diversity and inclusion and circular economy

3 Aerial view of the Perote-Xalapa bridge in Mexico

SINERGIA 56 FEBRUARY 2020 11 INSTITUTIONAL

INSTITUTIONAL

10 YEARS OF THE START@ME PROGRAMME

MOTA-ENGIL TRAINING THE LEADERS OF THE FUTURE

he Corporate Human Resources professional evolution, providing his from a personal point of view. These T Department organised a own example at the beginning of his relationships can also be seen between commemorative session in career, with the responsibility that he colleagues who shared the beginning of Coimbra for the 10th anniversary of the embraced in the Azores, and which their journeys in the Company. A spirit Trainee Programme, called Start@ME, from then on advanced his journey of sharing was also present, even by a project that has been enabling the in the Group. those who joined the Group through integration of young interns with Start@ME and are now already training a model of selection, hosting and Under the responsibility of Luís their younger colleagues. continuous training and monitoring Monteiro and with active participation of the career that seeks to prepare new by the corporate human resources team, There were testimonials by João Lala, generations to be potential leaders in different panels were established, with who, via video, shared his experience the future of the Organization. tutors and young people who were in from Mozambique, in the Port of Maputo, the different editions of the Trainee as did Flávio Costa. They are examples The session was opened by Eduardo Programme sharing their experience. of international careers developed at Pimentel, Executive Director in charge Mota-Engil after finishing the Start@ME of Human Resources, who set the tone Those who had the opportunity to Programme, where they remembered for the session, conveying his vision attend the event witnessed, first hand, their initial journey as trainees. on the construction of a Career Plan, something truly special that has been the Company’s willingness to attract created with this programme – the Ricardo Encarnação then showed and retain the talent that will come, cultural identification of young people that the journey is not only built from above all, from the dedication and with the company and the recognition of success, talking about his adventures commitment that each person places in the support that existed by their tutors, and about the importance of making giving the best of themselves for their creating strong and lasting relationships mistakes to make progress and thus

12 2

1 3

grow professionally, thanking the Being a diversified Group, next came This project has been Group’s investment in his skills, now the testimony of Rui Nabuco, transport enabling the integration having many relevant works in Portugal production manager, and João Venes, in his curriculum. head of the Research, Planning and of young interns with Control area, both from Takargo, who a model of selection, João Afonso, currently responsible for showed how, after a common journey in hosting and continuous Road Engineering in Portugal after a the same edition of the programme, they few international experiences, was also had different paths, but, at a certain point, training. present. During the session he shared, they met again in the same company, and with enthusiasm, his professional managed teams with a close alignment, experience and the fact that, having reinforcing the knowledge they have of participated in the 2009 edition, he the people they work with and the passion attended as a tutor in 2017, a fact he they created for railways. embraced with full availability for 1 knowledge sharing, in particular with After a tour through the railways, we Commemorative session for the 10th Sara Cardoso, who also participated in got to Francisco Paisana, who showed anniversary of the Trainee Programme. the session and who was joined by Luís us his path in the area of Audit and Gomes, João Afonso’s tutor, who thus Compliance, the growth he had and his 2 demonstrated the positive way in which vision of what we must strive for when Victor Pais shared his experience. knowledge, but also the culture and crafting a Career Plan. 3 identity of what it is to be and belong to António Solheiro Mota-Engil, has been transmitted to each Moving to Latin America, we got to know new generation. the path of Luís Machado, who told us

SINERGIA 56 FEBRUARY 2020 13 INSTITUTIONAL

4

how he moved to Peru in 2011, where he Couto in his initial integration, his tutor is today, and the progress he achieved, at the time and still, the person he looks with sacrifice, sometimes at 4,000 metres to for advice and with whom he shares of altitude, and how he was rewarded each professional achievement, the with new career opportunities. company joined in the same panel the tutor and the former trainee. This Next spoke Ricardo Capelo, currently is an excellent example of the best that in , as the contract manager at can be created by a programme like ECB, who enthusiastically showed Start@ME, through the personal his professional evolution and his relationships that are built for life perfect adaptation to his country of and the transmission of knowledge residence, revealing satisfaction for that is fostered in a close and efficient the opportunity he had to grow and way, structured under a programme consolidate an international career. specifically designed to retain talent and create the leaders of the future, creating Finally, there was the chance to meet new opportunities for professional Duarte Araújo, who, after starting his development for the young people who career in the paving area in Portugal, embrace this programme, as long as they moved to Angola, where he has been show a superior performance, as did for several years, and where he now those who were presented in this event. coordinates the industrial units, after starting in a role with responsibility The session was closed in a lively and for bituminous materials and paving. inspiring way by Carla Carvalho Dias, Recognising the importance of Mário Rui a guest and Public Speaker.

14 Star@ME evolution over the 30 20 20 15 30 135 120 last 10 years

(Nº OF TRAINEES)

1st EDITION 2nd EDITION 3rd EDITION 4th EDITION 5th EDITION 6th EDITION 7th EDITION

Present at the event, Sinergia invited and it is now a reference in our strategy the Corporate Director of Human for attracting and developing Resources and Sustainability, high-potential staff. Luís Monteiro, to give a statement. Today is a particularly rewarding HOW DOES IT FEEL TO CELEBRATE moment, because we have managed to 10 YEARS OF START@ME? gather here a very significant sample The feeling is very positive because, of all the young people who, in the 10 years ago, we launched the first meantime, have participated the various edition of the Start@ME programme, editions of the Start@Me programme,

5

10 years ago, we launched the first edition of the Start@ME programme, and it is now a reference 7 in our strategy for attracting and developing high- 4 potential staff. Duarte Araújo and his tutor at the begining of the program, Mário Rui Couto. Both shared their common stories.

5 Relaxed moment at the event.

LUÍS MONTEIRO 6 Corporate Director of Human Resources and Sustainability Luís Gomes and his trainee, João Afonso.

7 6 Luís Monteiro, Corporate Director of Human Resources and Sustainability

SINERGIA 56 FEBRUARY 2020 15 INSTITUTIONAL

8 9 10

11 12 13

Start@ME Program allows in a moment of sharing, exchange of Mota-Engil operates, seeking to prepare the growth of life-long experiences and learning for all. them for international careers. relationships and passes THE GROWTH OF INTERNATIONAL DO YOU SEE FUTURE on knowledge, fostered in CAREERS. WHAT DO YOU EXPECT LEADERS HERE? a closer and more efficient FROM THE COMING EDITIONS? Clearly. I believe that the best proof We started with a small edition, seeking of this is seeing the journey made manner. to recruit 30 young people, and all of them by these young people who began went through the programme in Portugal. in the programme 10 years ago, the However, at the time, the idea and the prominent positions they have reached vision of the programme was already of in important markets for Mota-Engil. it being geared towards preparing young They are truly the best example, and people for international careers. At the that is also what this meeting is about, time, the Group’s dynamics were very them being able to, in their own words, Luís Machado 8 different. Today, and based on what the in their own testimonies, inspire and last editions have been, the programme set an example for younger people 9 Ricardo Encarnação is clearly international, proof of which is who embraced the programme’s recent

João Venes e Rui Nabuco that these 10 young people who remain editions, hoping to be the Group’s 10 from the first edition have predominantly leaders 10 years from now. Ricardo Capelo 11 international careers developed in very important countries and operations for 12 Francisco Paisana Mota-Engil, with the past few editions all already designed to attract young people The 2009 edition 13 was remembered with high potential for the world in which

16 INSTITUTIONAL

MOST REPUTABLE PORTUGUESE BRAND IN THE CONSTRUCTION INDUSTRY

REPSCORE PULSE STUDY GATHERS DATA FROM 40,000 CITIZENS .

The study, conducted by Mota-Engil was recognised as the The study measures different On Strategy, honours most reputable Portuguese brand in parameters, including financial ones, the Engineering and Construction to determine the value of the Portuguese the brands with the highest industry in the RepScore Pulse, a study brands in a ranking which, in 2019, reputation operating conducted by the On Strategy consulting placed Mota-Engil in the Top 15 in Portugal. company, among 40,000 citizens, that of the most valuable brands, honours the brands with the highest with a value of 323 million euros. reputation operating in Portugal.

SINERGIA 56 FEBRUARY 2020 17 INSTITUTIONAL

INSTITUTIONAL

MOTA‑ENGIL AMONG THE 25 LARGEST EUROPEAN COMPANIES FOR THE FIRST TIME

ENR TOP 250 GLOBAL CONTRACTORS RANKING

Mota-Engil Groups ngineering News-Record place respectively as regards overall is in the TOP 10 in (ENR), a prestigious specialist turnover. E publication in the Engineering Latin America for and Construction sector, published its the first time. World Ranking (ENR Top 250 Global • INTERNATIONALISATION RANKING: th Contractors) with final data for 2018, in 46 construction company with the which it ranks companies according to highest turnover outside its domestic st their global turnover to measure the size market (51 place in 2017); of the companies, as well as according • SIZE RANKING: to the turnover outside their domestic 104th in the world in turnover – 24th market to rank companies with higher in Europe (108th in the world and 28th internationalisation indices. in Europe in 2017);

Of particular note is the dominance of • RANKING BY REGION: the Chinese construction companies 5th largest in Latin America (1st time in the ranking, with the first five that the Group is in the Top 10 places. Vinci and ACS are noteworthy in Latin America) at the European level, in 6th and 7th

18 MOTA‑ENGIL GROUP 2019

46th Construction Company WITH THE HIGHEST TURNOVER OUTSIDE ITS DOMESTIC MARKET 24th European IN TURNOVER

(104th worldwide)

5th Largest constructor IN LATIN AMERICA

(first time the Group is in the Top 10 in Latin America)

2019 2018 RANKING LATIN AMERICA/CARIBBEAN

1 1 ACS, Actividades de Construcción y Servicios SA

2 4 SACYR

3 3 VINCI

4 ** Fluor Corp.

5 ** Mota‑Engil

6 5 Acciona Infrastructure

7 6 China Communications Construction Group LTD.

8 2 Odebrecht Engenharia & Construção

9 8 Power Construction Corp. of China LATIN AMERICA 10 9 TECHNIPFMC Mota-Engil's presence

SINERGIA 56 FEBRUARY 2020 19 INSTITUTIONAL

INSTITUTIONAL

MOTA-ENGIL WITH NEW CONTRACTS WORTH 670 MILLION EUROS

HONDURAS IS A NEW MARKET THAT WILL BEGIN IN 2020.

The Mota-Engil Group ith a strategy of commercial Thus, after evaluating the project, announced, at the end revitalisation in the Mota-Engil decided to enter Honduras W infrastructure sector, and with for the first time, signing a contract of 2019, a set of new a special focus on segments of activity worth 195 million euros for 36 months contracts in Angola, with medium and long-term contracts, to build a new hydroelectric plant called Guinea-Conakry, Mexico the Mota-Engil Group announced, at the El Tornillito, with an installed capacity end of 2019, a set of new contracts of 194 MW. and Honduras, the latter in Angola, Guinea-Conakry, Mexico being the first contract and Honduras, the latter being the first NEW CONTRACT IN ANGOLA in Mota-Engil’s history contract in Mota-Engil’s history In Angola, the Group announced, at the in this market. in this market. end of 2019, a new contract amounting to around 115 million euros, with an THE HONDURAS DEBUT estimated duration of 30 months, for In Latin America, a region where the execution of three main activities: the Group has expanded its activity completion of the northern pumping significantly over the last decade, since system, construction of the irrigated it expanded its activity beyond Peru, perimeter of Calueque and construction where it began in 1998, Mota-Engil of a hybrid generation plant. It is is now a regional investor in several expected that this project’s full financing sectors of activity, with a predominance will be ensured by an export credit in Construction, Environment, agency, in line with the model that has Concessions and, more recently, in been increasingly followed in recent Energy, expanding its activity from the years in Angola. most relevant markets such as Mexico, Peru, Brazil and Colombia to other THE STRENGTHENING IN MINING markets in the region. With an accumulated experience and

20 a vast curriculum in the mining sector, infrastructure concessions, Mota-Engil structure concession projects, benefiting Mota-Engil Africa has strengthened México, associated with an investment from the knowledge and experience its operation in this sector in Guinea- fund, has obtained authorisation for accumulated over more than 20 years Conakry, through a new mining services the acquisition of the Cuapiaxtla- operating in this sector in Portugal. contract worth 220 million euros, with Cuacnopalan Autopista Concessionaire, an estimated duration of 6 years and a road with a total length of 63 km, Thus, the award of these new 9 months, for a gold mine owned by of which the existing 26 km will be contracts is yet another example of the Société des Mines de Mandiana, S.A. rehabilitated to improve the conditions commercial momentum of Mota-Engil, of use and safety of users. which, in recent years, has managed Thus, and after the ongoing contract to strengthen its portfolio of projects for Ashanti Gold, this contract award With a total investment of over of significant size, achieving the is yet another relevant example of the 200 million euros, the concession term established goal of maintaining a value commercial momentum of Mota-Engil will be of 30 years after financial closing, equal to or greater than 5 billion euros, in Africa, and in the mining sector including 24 months for construction, an all-time high in Mota-Engil Group’s in particular, ensuring medium and which will represent an investment of more than 73 years of history, thus long-term contracts that will strengthen around 140 million euros. ensuring, in a diversified manner, the African continent as a growing, the capacity for sustainable growth consolidated and sustainable market for This concession is the first infrastructure of Mota-Engil in the coming years. the Group’s consolidated activity. project in the State of Puebla and one of the first in the country in the last NEW CONCESSION IN MEXICO 12 months, attesting the confidence of In Mexico, the largest market in the State of Puebla and of Mexico in the Latin America, where the Group technical and management capabilities has its largest portfolio of transport of the company and in its ability to

MEXICO Cuapiaxtla-Cuacnopalan Autopista: €200 M

HONDURAS GUINEA El Tornillito: €195 M Conacri: €220 M

ANGOLA Calueque: €135 M

SINERGIA 56 FEBRUARY 2020 21 INSTITUTIONAL

INSTITUTIONAL

MOTA‑ENGIL SUCCESSFULLY COMPLETES BOND ISSUE

ISSUE WITH A MATURITY OF FIVE YEARS HAD A DEMAND OF OVER 191 MILLION EUROS, WITH INVESTORS OF DIFFERENT NATIONALITIES

he results of the Mota-Engil The operation also enabled investors of to substantially increase the value to 2019/2024 Public Subscription previous issues to exchange them for the accommodate the market’s interest. T Offering for Mota-Engil Bonds new issue and thus extend the maturity and the Mota-Engil July 2015/February of investment in Mota-Engil’s debt, as in The Group’s CFO, José Pedro Freitas, 2020 Public Exchange Offering for previous operations, and this possibility made a point at the ceremony of leaving Mota-Engil Fixed Rate Bonds and was justified by the strong demand also a message to the investors who trusted “Mota-Engil 2018/2021 Bonds” took shown in this area, with the result of the Mota-Engil Group and made this place at Euronext’s head office in Lisbon, the exchange on Mota-Engil July 2015/ operation a success, mentioning that in an operation whose subscription took February 2020 Fixed Rate Bonds and “an operation of 140 million euros with place between 14 and 25 October. “Mota-Engil 2018/2021 Bonds”, with a maturity of five years and a global orders amounting to 23,280,000 euros. demand close to 200 million euros fully After the traditional Closing Bell ceremony, demonstrates the confidence in the Euronext presented the results, which show Overall, the bond issue with a five-year Group and in the strategy that we have the success of the bond issue, reaching a maturity met all established objectives, been undertaking and will continue to strong demand of 191,469,000 euros, a enabling the Mota-Engil Group to pursue”, adding that “in addition to the ratio of 1.36x on the final value of the refinance its activity, diversifying strong demand, we have renewed with issue, and of 2.55x if we consider the funding sources, optimising average this issue the long term relationship initial value of 75 million euros, with cost and expanding the maturity of with investors who, once again, the fact that the general segment (retail) the debt, achieving a total amount of expressed their interest in favouring the by itself exceeds the total value of the 140 million euros in an operation with exchange of bonds issued in 2015 and issue, with 6,558 investors accounting for an initial value of 75 million euros, who now renew their investment for a a demand of 146,469,000 euros (ratio of but which, due to the strong demand period until 2024, which can only be 1.54x to the value allocated to retail). shown in the first week, led the issuer seen as the greatest sign of confidence,

22 1

We are proud of this operation’s success, but have a sense of responsibility and additional motivation to do increasingly more and better. 2

something that we genuinely have Millennium BCP, Banco Montepio Geral JOSÉ PEDRO FREITAS to thank. We are proud of this and Novo Banco, with Vieira de Almeida CFO of Mota-Engil Group operation’s success, but have a sense of (VdA) as legal advisors. responsibility and additional motivation to do increasingly more and better”. The result of the Issue shows the quality of the financial product and the The operation included Caixa BI, confidence recognised by the financial Haitong, Finantia and Novo Banco as market in the issuer over its 73-year 1 Global Coordinators, with a very broad history and in its development strategy. Gonçalo Moura Martins and José Pedro Freitas with Isabel Ucha (Euronext) and the VdA placement syndicate, including Activo representatives for the leading banks Haitong, Bank, EuroBic, Banco Carregosa, Finantia, Caixa BI and Novo Banco. Finantia, Banco Invest, Bankinter, 2 Banco Best, Banco BIG, Caixa Geral José Pedro Freitas at Closing Bell time. de Depósitos, Crédito Agrícola,

SINERGIA 56 FEBRUARY 2020 23 INSTITUTIONAL

PORTUGAL MOTA‑ENGIL AS TOP PICK FOR 2020

analysts expect the markets to maintain works programme in the coming years” a positive evolution, supported by the in the expectations of the analysts, who expansionist policy of the European recall the projects for the construction Central Bank (ECB) and, in the of the new airport, underground railway Portuguese case, by the decrease in the and railway. Additionally, the company risk premium of the Portuguese Republic. should benefit from its presence in fast- CAIXABI RECENTLY RELEASED growing markets, especially in Africa and THE LIST OF PREFERRED SHARES MOTA-ENGIL: Latin America. With respect to Africa, the FOR 2020 THE “QUEEN OF CONSTRUCTION” bank stresses that “the operation should In accordance with its annual procedure, Considered one of the ‘top picks’ for 2020, benefit from long-term mining contracts CaixaBI released its list of preferred the investment bank set a target price of in markets such as Mozambique (for Vale) shares to invest on the Lisbon Stock 2.20 euros and a ‘buy’ recommendation and Guinea (Ashanti Gold).” Exchange in 2020, selecting Mota-Engil for the construction company, arguing among the investment bank’s four that “Mota-Engil is the leading player in favourites. the Construction & Engineering sector in Portugal, maintaining a solid order book Showing an optimistic scenario for the and track record, which are expected Portuguese stock market, Caixa BI’s to be sustained by the extensive public

PORTUGAL ANTÓNIO MOTA AND MOTA‑ENGIL HONOURED WITH THE 2019 PORTUGUESE-LANGUAGE AWARD

The 2019 Portuguese-Language Awards seek to honour institutions and personalities with a relevant background in economic and cultural affirmation in the community.

Mota-Engil and its Chairman of the The ceremony took place in the Ruy de BUSINESS ACTION AWARD Board of Directors, António Mota, Carvalho Auditorium, in Oeiras, with the António Mota recieves award were honoured with the Business Executive Secretary of the Community of Action Award, an award that sought Portuguese-speaking Countries (CPLP), to highlight the Group’s 73 years of Ambassador Francisco Ribeiro Telles. activity in Africa, in a journey initiated Several people were awarded in the in Angola, with António Mota being ceremony in addition to António Mota, as a recognised businessman with a was the case of José Ramos-Horta, former special focus on the development of the President of Timor-Leste and Nobel Peace Lusophone community. Prize winner in 1996.

24 INSTITUTIONAL

MOTA-ENGIL PRESENTS PLAN FOR EQUALITY A SET OF MEASURES TO BE IMPLEMENTED BY 2020

THE DOCUMENT AIMS TO CONTRIBUTE TO A SOCIALLY RESPONSABLE MANAGEMENT, ANCHORED ON EQUALITY.

Mota-Engil presented its Plan for Equality and Non-Discrimination to the Portuguese Securities Market Commission (CMVM), with a set of measures to be implemented by 2020 that aim to contribute to socially responsible management anchored in equality.

Based on six different areas of intervention – Strategy, Mission and Values; Human Resources; Social dialogue and employee participation; Training; Communication and image; and Harmonisation between professional, family and personal lives – this plan presents objectives and cross-sectional measures for equal opportunities between women and men in the organisation, minimising resources, as well as the promotion of undertakings and of those listed on stock horizontal segregation and promoting support measures for workers in order exchanges in Portugal, to be reported harmonisation between personal, family to enable making professional and annually until 15 September of the year and professional lives at Mota-Engil. personal/family lives compatible. prior to the one they concern.

Among these are the guarantee of The preparation of plans for equality is the conditions of the gender equality provided for in the law that defined the principle in the management of human gender quotas in the boards of public

SINERGIA 56 FEBRUARY 2020 25 INSTITUTIONAL

INSTITUTIONAL

MOTA‑ENGIL AMONG THE MOST ATTRACTIVE COMPANIES TO WORK FOR IN PORTUGAL

4TH PLACE AMONG THE PORTUGUESE COMPANIES IN THE ENGINEERING AREA AND LEADER IN CIVIL ENGINEERING

In the study developed by Universum As this is a ranking defined according to (universumglobal.com/rankings/ operational areas, measuring portugal), Mota-Engil was ranked in the the companies’ employer branding, Top 100 of the annual ranking of the it is worth highlighting the fact most attractive Portuguese companies that the company was ranked 13th to work for, a relevant criterion for in the Engineering area, being the the sentiment related to the career 4th Portuguese company among ambitions of young students. those mentioned.

ENGINEERING - THE MOST ATTRACTIVE EMPLOYERS OF 2019 UNIVERSUM STUDY Mota-Engil was ranked in the 1 Google 16 Infra-Estruturas de Portugal Top 100 of the annual ranking 2 Microsoft 17 Siemens

3 Apple 18 Mota‑Engil

4 Bosch 19 Huawei

5 Samsung 20 Grupo EDP

6 Volkswagen AutoEuropa 21 IKEA

7 TAP 22 Facebook

8 Amazon 23 IBM

9 Emirates 24 ANA Aeroportos de Portugal

10 Galp Energia 25 Grupo Sonae

26 INSTITUTIONAL

MOTA‑ENGIL WINS IN THE INTERNATIONALISATION CATEGORY

CONSTRUIR AWARDS RECOGNISES COMPANIES AND PROJECTS IN PORTUGAL IN ARCHITECTURE, ENGINEERING, CONSTRUCTION AND FURNITURE SECTORS.

With the ceremony held at the Pavilhão do Conhecimento, at Parque das Nações, in Lisbon, many were awarded the trophies that recognise the sector’s merit in Portugal.

Mota-Engil was honoured with the Internationalisation Award and Pedro Arrais received the award for Mota-Engil, having at the time thanked the Award on behalf of more than 32,000 colleagues who are part of the Group and who contribute daily to its collective result, while mentioning that the merit of continuing to promote Portuguese Engineering should be furthered through new projects to be awarded, in Portugal, to Portuguese companies in order to strengthen the capacity of companies to continue training young Portuguese engineers.

Reference should also be made to the prize awarded in the category of best company and which received the prize Pedro Arrais received the office building, awarded to FPM 41, a on behalf of the promoters, making award for Mota-Engil, building located in the centre of Lisbon, a point of highlighting the competence having at the time thanked which was built by the Mota‑Engil of the entire team involved in the / Casais consortium, and which project, and in particular the quality the Award on behalf of more was praised by Rockbuilding at the of the work carried out by the than 32,000 colleagues who ceremony, as the project management construction consortium. are part of the Group

SINERGIA 56 FEBRUARY 2020 27 EUROPE

POLAND

MOTA‑ENGIL CENTRAL EUROPE IS BUILDING AN ECOLOGICAL HOTEL IN SZCZECIN

THE BUILDING IS CONSTRUCTED IN ACCORDANCE WITH THE GREEN BREEAM CERTIFICATION - A MULTI-CRITERIA SYSTEM FOR ASSESSING BUILDINGS IN TERMS OF THEIR ENVIRONMENTAL IMPACT.

ota-Engil Central Europe is the the demand for electricity in the building general contractor of the hotel from renewable sources. M and apartments for the Orbis Group. The project is located in the heart The apartment part of the investment of the Old Town in Szczecin, in the envisages the construction of 58 flats vicinity of the Pomeranian Dukes' Castle. with areas from 30 to 97 m2, with a total Construction works began in January usable area of over 2,800 m2. Commercial 2019 - in March the foundation stone- premises with a total area of 470 m2 will laying ceremony took place. also be commissioned. The building will have 6 floors, including an underground The building is constructed in garage with 24 parking spaces. accordance with with the green BREEAM The internal courtyard was designed certification - a multi-criteria system as a common space - a recreational It will be possible for assessing buildings in terms of their garden with an area of almost 300 m2. environmental impact. The investment will be finished with to reduce energy materials of a high standard. A part of the consumption and The hotel will meet the high standards biologically active surface will be located partially cover the set for ecological buildings. Thanks on the roof - creating an original and demand for electricity to the BMS building control system ecological decoration of the building. and photovoltaic panels for electricity in the building from production, it will be possible to reduce The architectural idea for the apartment renewable sources. energy consumption and partially cover investment was to create

28 a homogeneous character of the building that corresponds to whole city quarter. mainly through the use of uniform material solutions for the facade, the proportion of window openings and the application of facade details. In terms of materials, the focus was on the economic selection of natural, durable facade materials in the form of system cladding made of glass fiber boards, plasters and supplementary elements made of aluminum or steel.

City Mayor Piotr Krzystek announced that the investment is part of the extensive revitalization plans of the Szczecin Old Town. The opening of the hotel is planned for the end of 2020.

POLAND RESI4RENT: THE NEW PROJECT IN GDAŃSK

Mota-Engil Central Europe has signed a contract with Resi4Rent for the construction of a building with rental flats located at Kołobrzeska street in Gdańsk.

Resi4Rent is the first institutional flats for The contract covers the construction of rent platform in Poland, which offers its the building along with comprehensive services in Warsaw, Wrocław, Łódź and finishing of common spaces and PROJECT IN NUMBERS: soon also in Gdańsk. landscape development. Number of floors: 1 underground and The investment consists of a one-story The building will be located next 8 above ground underground garage and eight above- to another project currently under Number of flats: 302 ground floors. There will be 302 flats. Two development by Mota-Engil Central business premises and a rental office will be Europe - Student House for platform 2 Building area: 1,863 m located on the ground floor of the building. of Student Depot.

SINERGIA 56 FEBRUARY 2020 29 EUROPE

POLAND

MOTA-ENGIL CENTRAL EUROPE START SEVERAL WORKS IN POLAND

THE QUALITY OF EXCELLENCE AS THE COMPANY'S OPERATING STANDARD.

The S7 expressway constructed by Mota-Engil Central Europe on the section from Szczepanowice node to Widoma node will be 13.1 km long. The road will consist of two carriageways with two lanes each way, with reserve left for the third lane. Two nodes will be built (Szczepanowice and Widoma) and 10 viaducts, 4 animal crossings, 3 economic crossings under S7 and one flyover in Szczepanowice.

The S7 expressway is being built to improve the north-south transport corridor. It will directly connect Gdańsk, Mota-Engil Central Europe (MECE) in each direction. The route will include Warsaw and Kraków. recently started several works in Poland, 5 bridge structures and two Service Areas having as usual promoted the opening (MOP) located in Janów Lubelski. The new NIEMODLIN BYPASS ceremonies of the works. road will enable fast and safe passage of On the Niemodlin Bypass construction site vehicles between Lublin and Rzeszów. a ground-breaking ceremony took place S19 ROAD - JANÓW LUBELKI BYPASS Also it will significantly improve the living and was attended by the government, At the construction of the 7 km section conditions of the inhabitants and the state general contractors (Mota-Engil Central of the S19 road - Janów Lubelski bypass of the natural environment. Europe and Himmel & Papesch) and - official ground-breaking ceremony was investor representatives. held. The ceremony was attended by CONSTRUCTION OF S7 Deputy Prime Minister Jacek Sasin, SZCZEPANOWICE-WIDOMA Bypass with a length of approximately and the Minister of Infrastructure, In the presence of the Minister of 11.5 km will be made with Andrzej Adamczyk. Infrastructure Andrzej Adamczyk, a GP class road, two road junctions ceremony of official ground-breaking and 18 engineering facilities. As part of the investment, a section of took place at the construction of the S7 The deadline for completion of works expressway will be built with two lanes Szczepanowice-Widoma expressway section. is the end of 2021.

30 PORTUGAL

ELECTROMECHANICS COMPLETES CONTRACT FOR REN

WORK IN THE SINES SUBSTATION

The Electromechanics Department of metal structures and corresponding constituted an added challenge for the of Mota-Engil, Engenharia e Construção foundation masses, as well as the team due to the technical complexity recently completed the upgrading replacement of 400kV circuit breakers, involved, the partial deadlines of the works of the Sines Substation, a facility given the proven capability and strict network and the execution of most of the belonging to REN – Redes Energéticas compliance with safety requirements, works in the vicinity of voltage. Nacionais, located in the parish shown in the course of the work carried of Ermidas – Sado, a municipality out by Mota-Engil Engenharia With the completion of the contract, of Santiago do Cacém, district of Setúbal. e Construção’s employees. all the objectives defined by the client were achieved, particularly regarding The contract now completed provided During the contract, the substation was the defined deadlines, with suitable and for the replacement of disconnectors, always kept in operation, with no power compatible solutions always being found insulating columns and the maintenance or service interruptions, a fact that for the challenges posed by the project.

SINERGIA 56 FEBRUARY 2020 31 EUROPE

PORTUGAL

W ALGARVE HOTEL & RESIDENCES

MOTA-ENGIL IS THE CONSTRUCTION COMPANY RESPONSIBLE FOR THE DEVELOPMENT OF A PROJECT OF SUPERIOR QUALITY AND EXCELLENCE IN ALGARVE’S TOURISM OFFER

ota-Engil is currently building connections between the various blocks, M of one of the largest tourist as well as the resort’s swimming pools. developments in Portugal, the W Algarve Hotel & Residences, located in The W Algarve includes two types of the Algarve, municipality of Albufeira, development, the hotel and tourist in the Galé area, whose project apartments, with several common areas commissioner is Nozul Algarve SA. The such as restaurants and bars, spa, gym, hotel will be operated by the Marriott swimming pools and studios. Group’s renowned international luxury brand – W Hotels. The space, located a few meters from the Evaristo beach, will have 205 units, This contract work started in May 2018 broken down into 110 rooms, king, and is expected to be concluded in May queen, e-wow, wow and handicap, as The W Algarve Hotel 2020, having been awarded for the well as 95 one-bedroom, two-bedroom, amount of 52.2 million euros. three-bedroom and four-bedroom & Residences, located in apartments. the Algarve, municipality The project, under the responsibility of Albufeira, in the Galé of Mota-Engil Engenharia e Construção, Relevant quantities in the execution of area, whose project includes civil construction works, the work include 3,315 m3 of concrete, special technical installations and buried 3,984 m2 of GRC in the facades, 17,439 m2 commissioner is NOZUL infrastructure. In terms of the structural of waterproofing, 26 lifts and ALGARVE SA. component, the three large existing 21 swimming pools, divided between The Hotel will be operated reinforced concrete blocks that were residential and public swimming pools. by the Marriott Group’s previously built by Mota-Engil in 2007 were used/adapted, and the new D block The execution of the contract will be renowned international was built, which will predominantly supported by the internal participation of luxury brand – W Hotels. include service areas and other the divisions of electromechanics in the

32 special technical installations, ornamental for its users to make the most of the The project aims to be rocks in the supply of benches for sinks Algarve’s coastal landscape. a place where the user, and stonework, and also prefabricated, in the execution and assembly of GRC, in a The project aims to be a place where whether a hotel guest demonstration of internal skills, as well the user, whether a hotel guest or or an apartment owner, as of the capacity of execution of different an apartment owner, can enjoy all can enjoy all the amenities technical capabilities existing within the amenities, with the maximum Mota-Engil. comfort and technological modernity of contemporary life, in a context of pure The GRC will feature privacy and relaxation, with the Atlantic Ocean as shading, while the large, modern a neighbour, in a development that will glazing will provide the thermal, soon be a reference in the Algarve region acoustic and optical comfort necessary for the superior quality of its offer.

2

3

1 Public (Wet Deck)

2 Resort’s entrance, block D

3 1 Panoramic swimming pool of the apartments

SINERGIA 56 FEBRUARY 2020 33 EUROPE

PORTUGAL

REHABILITATION AND REINFORCEMENT OF THE UPPER DECK OF THE LUIZ I BRIDGE

MOTA-ENGIL ENSURES WORK IN UNESCO WORLD HERITAGE SITE

he Luiz I Bridge, one of Porto’s one of enormous difficulty and sensitivity, specifications provided for a duration icons, a century-old work and given the bridge’s historic significance and of three weeks, which, once again, T UNESCO world heritage site, the tremendous difficulty in accessing it. attested the level of excellence of inaugurated in 1886, was subjected to a This complexity required the Prestressing the work carried out by Mota-Engil renovation and to a reinforcement of its Operational Unit to perform a detailed Engenharia, with the work of the upper deck, in its southern abutment, by planning of the execution of the various Prestressing Operational Unit, in this the Mota-Engil Engenharia Prestressing activities to be carried out, with the specific case, being supported by Operational Unit. main focus on not restricting, under any Mota-Engil Railway, in the deactivation circumstances, the movement of the and reactivation of the line, before and The classification as world heritage and urban rail train over the bridge. after the nightly load transfer works. the fact that the D-line of the Porto Metro was installed on the top deck of the bridge These activities were carried out in a made this work, already complex, into record period of eight days, when the

34 PORTUGAL CUF TEJO HOSPITAL

Mota-Engil as a national reference in the Prefabricated area.

The new CUF hospital in Lisbon, called The large number of panels to be CUF TEJO, is located in the area of produced and installed requires Alcântara. controlled planning to maintain not only productivity in the factory, but also The involvement of Mota-Engil’s installation yields on site, meeting the Prefabricated Operational Unit in this deadlines set with the client. flagship work has as its main focus the supply and assembly of Studframe This size of this project, which is still and Sandwich facade elements in GRC in the construction phase, clearly shows (Glassfiber Reinforced Concrete) the state of the art of the Mota-Engil with extremely diverse geometries. Engenharia Prefabricated Operational For this purpose, around 3,400 white Unit, regarding the elements of building units are being produced, with a total architecture and facade, being a national area of 17,000 m2. reference in this business area.

SPAIN MOTA-ENGIL ENGENHARIA DISTINGUISHED IN SPAIN

«San Telmo Prize» - Best Civil Engineering Work in Galicia

The College of Engineers of Channels, WINNER: thus marking, once again, its position in Ways and Ports of Galicia biennially • Vigo wastewater purifier this part of the Spanish territory, where it awards the San Telmo Prize to the most is already a reference company in the field representative civil engineering work HONOURABLE MENTION: of special foundations. built in Galicia. This is one of the most • General interceptors on the right bank prestigious awards in the field of Civil of the Ferrol stream As an example, in previous years, Engineering in Spain. • Morrazo motorway Mota-Engil was also honoured • Expansion of AP-9’s capacity, Cangas in the following projects: The 2019 prize was awarded on connection (including the rande Bridge) • A Coruña access motorway and 12 November and corresponds to works connection with the Alvedro airport. completed between 2017 and 2019. Mota-Engil Engenharia e Construção Span: Zapateira – A6 Road – Honourable Three honourable mentions were also – Spanish Branch, as in other years, Mention 2013 awarded, and the following projects participated in the execution of the three • Connection with the third phase were awarded: works awarded with honourable mentions, of a Coruña v-14 – 1st prize 2017

SINERGIA 56 FEBRUARY 2020 35 EUROPE

PORTUGAL

VIBEIRAS 2.0 VISION OF THE FUTURE

VIBEIRAS IS A REFERENCE IN LANDSCAPE ARCHITECTURE AND MAINTENANCE OF GREEN SPACES

Leveraging new business ith over 30 years of history, the importance of sharing a very well- Vibeiras is currently designed, detailed and structured project areas, strengthening W recognised as a reference for the coming years with the employees. awareness, investing in its sector, but like all large in greater profitability organisations, and under penalty “Leveraging new business areas, of being overtaken and wasting its strengthening awareness, investing in and sustainability, competitive advantage, it is in a process greater profitability and sustainability, outlining a New Strategic of restructuring. outlining a New Strategic Plan and Plan and creating creating Measurable Objectives are Measurable Objectives Thus, and seeking to promote a factors for the growth and consolidation reflection on the company’s paths and of Vibeiras”, underlined Pedro Vieira are factors for the growth lines of evolution, and an alignment of Neves, revealing that, to follow this and consolidation ideas through a participatory approach path, it will be fundamental to enhance of Vibeiras of collaboration and sharing, around decentralised management, differentiate 30 management staff participated in through quality, sign commitments and the “Vision of the Future” workshop, partnerships with stakeholders, plan marking the start of the “new” and anticipate problems, as well Vibeiras. CEO Pedro Vieira Neves as identify opportunities. was responsible for initiating the

PEDRO VIEIRA NEVES work session, praising the history and In a relaxed and informal environment, CEO of Vibeiras success of Vibeiras, and highlighting and in an interactive teambuilding

36 1

dynamic of analysis of results very productive, and one where “good The session, which and identification of improvement actions team spirit was very strong, having took place at Lezíria promoted by Mota-Engil Group’s Corporate shown a company that is humane and Parque Hotel in Human Resources, the participants committed to the future”. worked through a few challenges. Vila Franca de Xira, Recognising that it is always more had great involvement The session, which took place at Lezíria advantageous to work as a team, and participation, Parque Hotel in Vila Franca de Xira, had Pedro Vieira Neves also thanked all great involvement and participation, those who collaborated and actively and the common feeling and the common feeling was one of participated in designing the company’s was one of optimism optimism about how to face the changes future, “believing that change will about how to face that lie ahead. certainly be beneficial”. the changes that

The contribution to the thinking on the lie ahead. life of Vibeiras was reflected in the works of the various groups, translated into a plan of commitment and action with specific proposals that will certainly improve the company’s vision. 1 Pedro Pereira, a member of the Board of Teambuilding, Directors, considered the session to be analysis of results

SINERGIA 56 FEBRUARY 2020 37 EUROPE

PORTUGAL

VIBEIRAS RENEWS RELEVANT INFRASTRUCTURE CONTRACTS IN PORTUGAL

THE EXTENSION OF THE WORKS ATTESTS THE ABILITY TO ENSURE COMPETITIVENESS THAT CONTRIBUTES TO REINFORCING LOYALTY IN THE RELATIONSHIP WITH ITS CLIENTS AND PARTNERS

ith a prominent position MONSANTO PARK in the Portuguese market Until 2022, Vibeiras will be responsible for W of landscape architecture the maintenance of Monsanto Park, in Lisbon, and maintenance of green spaces, taking on the challenge of maintaining and Vibeiras has managed to ensure high caring for the largest portuguese forest park, levels of loyalty from its clients with a thousand hectares and entitled the in Portugal. “lung” of the city of Lisbon.

STADIUM OF LEIRIA ANA AEROPORTOS The maintenance of the grass pitch at At the Portuguese airports under the Magalhães Pessoa Stadium, in Leiria, management of ANA Aeroportos, owned for which the company has been by Vinci, Vibeiras has been assisting in the responsible since its construction for rehabilitation of important green spaces, Euro 2004, has been ensured for one renewing their image in Lisbon, Porto more year. Vibeiras is responsible for and Faro. the cutting, fertilisation, scarification, reseeding and marking the lines, as well SEGUNDA CIRCULAR IN LISBON as for works assisting the games and at Recently, the company won the tender the end of the season, such as Verti- for maintenance services and renovation Drain, an activity that is carried out works of green spaces in the parish of annually during the break of the sports São Domingos de Benfica, in the area season, and which aims to provide surrounding the Segunda Circular road, deeper aeration of the grass pitch. one of the busiest in Lisbon.

38 1 Lawn, shrubs and herbacious plants maintenance at Complexo Montebelo in Aguieira

2 Lawn maintenance at Magalhães Pessoa Stadium, in Leiria

3 Rehabilitation of green spaces at Lisbom Airport

1 2

VISABEIRA Vibeiras renewed for another year the three green space maintenance contracts with the company Visabeira: at the company’s head office in Viseu, the Zambeze restaurant in Lisbon, and the Montebelo Complex in Aguieira. The object of the contract includes the ongoing maintenance of lawns, herbaceous plants and shrubs, with permanently assigned teams.

PLANT MAINTENANCE ON MOTORWAYS Vibeira has been providing plant maintenance services for many years to the two largest motorway operators in Portugal, Brisa and Ascendi, carrying out work of crucial importance to road safety.

2019 was the company’s year of 3 consolidation in this area in Portugal since, in addition to the 185 km awarded

SINERGIA 56 FEBRUARY 2020 39 EUROPE

in prior years, broken down between and 1,990 km of very-high-voltage A1 and AEDL (Douro Litoral Motorway), power lines in the districts of Beja, 366.5 km were added through additional Évora, Faro, Portalegre, Santarém and services provided to Brisa. The increase Setúbal. in the volume of work awarded in 2019 thus translated into an internal Among other activities, until November reinforcement of human and mechanical 2022 there are plans to contact 5,370 resources, with the company making owners, set up 120 compensation equipment purchases that reinforced the processes, manage fuel, manage 3,630 ha capacity and productivity of the teams of easement corridors for power lines providing this type of services. and 150 ha of easement corridors for gas pipelines, and convert 90 ha of land REN under power lines, with forest species Following the rendering of services that enable the landowner to profit from to REN, the company responsible the land without jeopardising the safety for the overall management of the of people or goods. National Electricity System and of the National Natural Gas System in The contract also provides for the Portugal, Vibeiras provides services creation of a Prevention and Surveillance 4 aimed at ensuring the safety conditions Team, with a vehicle equipped for first Maintenance and renovation of electricity and gas transmission intervention in fighting forest fires, which of green spaces in São Domingos de Benfica, in the area surrounding the Segunda infrastructure, as well as compliance should be on standby duty to support Circular road with the legislation in force on forest fire REN’s dispatch and operation centres, protection. In this context, Vibeiras is 24 hours a day, 7 days a week (including 5 responsible for 174 km of gas pipelines weekends and public holidays). Infrastructure safety services to REN

4

5

40 PORTUGAL VIBEIRAS AND THE INSTITUTE FOR NATURE CONSERVATION AND FORESTS JOINED AGAINST FIRES

In collaboration with Mota-Engil, Vibeiras participated in the operations during the fire season.

MOTA-ENGIL AND VIBEIRAS Vibeiras completed in October the contract October – Vibeiras operated six bulldozers Nature and Forest Conservation for the acquisition of heavy machinery in support of the special fire brigades and using an operator, for the Institute for Nature UEPS/GNR, and in total, the equipment was Conservation and Forests – ICNF, with the activated 105 times to operate in multiple objective of supporting the fight against fire-fighting theatres of operation. rural fires and the preparation of plots for technical fires. The contract ended with the support of the special fire brigade in the preparation of In collaboration with Mota-Engil, during plots for controlled fire in Tapada de Mafra, the fire season – from 1st July to the end of Viana do Castelo and Ponte de Lima.

MOROCCO VIBEIRAS IN MOROCCO ANOTHER GREEN SPACE IN THE FINANCIAL CAPITAL

Works of planting and installing irrigation system completed in Casablanca.

The company’s branch in Morocco allocated to hosting events. A new completed the work of planting and underground car park was also built installing an irrigation system in the under the new plaza, the second of a PLACE RACHIDI Casablanca, Morocco garden areas of Place Rachidi, located set of 15 that will be located in strategic in the heart of Casablanca, near locations of Casablanca’s tramway Mohammed V Square. network.

The work, awarded by Casa Casa Aménagement has been Aménagement, is part of the project to a client of Vibeiras since 2012 and revitalise the area of almost 18,000 m2, is responsible for major urbanisation and includes a skatepark, street and development projects furniture, green spaces, and an area in the Casablanca-Setta region.

SINERGIA 56 FEBRUARY 2020 41 EUROPE

PORTUGAL DRYJECT TECHNOLOGY ÁREAGOLFE RENEWS PARTNERSHIP FOR TEN YEARS

Áreagolfe/Vibeiras reinforced their partnership with the Dryject brand this year, through the purchase of one more piece of equipment and with the renewal of the brand’s representation for the Iberian Peninsula for another ten years. DRYJECT Equipment acquired This is an injection system which, to its application and reaching conditions due to an explosion-in-depth effect, of playability after one hour. creates aeration channels in the soil profile, which are simultaneously filled To promote the equipment, Áreagolfe was with sand and, if desired, an additive present at the Annual Conference of the (mycorrhizae, Profile, Axis, zeolites, Portuguese Greenkeepers Association, at micro-granules, fungicides, wetting the Pine Cliffs Resort, in Albufeira and agents, etc.). at the Annual Conference of the Spanish Greenkeepers Association, in Cabo With Dryject, the surface is smooth Gata – Almería, where it presented and immediately after the work, and is demonstrated the equipment. firmer, avoiding the loss of green fees due

PORTUGAL ÁREAGOLFE JAMOR GOLF COURSE MAINTENANCE

Áreagolfe renewed the maintenance contract for the 9-hole Jamor Golf Course and training areas, signed with the Portuguese Golf Federation in 2013.

Áreagolfe is in charge of the planning, practice of the sport, with the adequate GOLF COURSE execution and control of all the maintenance of all the systems associated Jamor, Lisbon maintenance operations necessary with the Golf Course and ensuring to guarantee the best conditions of the an effective management of resources, lawns, paths and, consequently, the such as water and electricity.

42 PORTUGAL REHABILITATION OF CULATRA ISLAND

Vibeiras ensures the maintenance and restorarion of the ecosytem's natural conditions.

Vibeiras completed the contract for All of the contract’s goals were the work and rehabilitation of Culatra successfully achieved in an area of Island, as part of the Zoning Plan for the particular relevance in the protection CULATRA ISLAND Vilamoura/Vila Real de Santo António of the natural resources of the Algarve Coastal Zone, in Algarve, through the surrounding area. implementation of measures that ensure the maintenance and restoration of the ecosystem’s natural conditions.

PORTUGAL RECOVERY OF THE CRYSTAL PALACE GARDENS, IN PORTO

The landscaping work of Emílio David Garden was completed, in the main entrance of the Crystal Palace Gardens, in Porto.

A reference of its time, the gardens were the layout of the seedbeds, which, through CRYSTAL PALACE designed by Émile David in 1865 within use and adaptations over time, underwent GARDENS the context of the construction of the small changes. Porto building for the International Exhibition of Porto. The work involved the transplanting of large trees, the construction of new roads This rehabilitation sought to maintain and of a drainage network, the restoration the design that still preserves the of fountains and statues, the recovery of characteristics of the original project, rock materials and artistic railings, the respecting the historic heritage of the installation of new urban furniture, the garden worked on. restoration of the old ticket offices, the lighting network, the irrigation network, The design team recommended small and plantations. adjustments that enabled bringing back

SINERGIA 56 FEBRUARY 2020 43 EUROPE

PORTUGAL

SELECTIVE COLLECTION WITH SIGNIFICANT RESULTS

RESULTS FROM THE INVESTMENT IN EQUIPMENT, VEHICLES AND COMMUNICATION

Between 2016 and 2021, he results of 2019 are already cardboard, plastic, metal and glass. Valorsul’s investment impressive – selective This improvement in the region’s T collection is increasing the environmental performance is due to plan amounts to recycling curve, as a result of the a greater environmental awareness, 45 million euros, with investment made in equipment and strong investment in new recycling the aim of improving vehicles, but also through the alliance banks, vehicles and sorting centres, between integrated communication and and campaigns encouraging recycling, the public waste the collection services. There are many which Valorsul and the municipalities management service examples that demonstrate a have been developing together. management dynamic that knows how to make the most of the best the Group has Between 2016 and 2021, Valorsul’s to offer. investment plan amounts to 45 million euros, with the aim of improving the RECYCLING INCREASES 21% public waste management service AT VALORSUL provided by the company, of which Valorsul expects to collect around 16 million are investments in selective 91,000 ton of recyclable materials in collection and sorting of recyclables. In its municipalities by the end of this addition to the environmental benefits, year. Compared to the amount of the increase in selective collection also material collected in 2017, there was represents actual savings for the 19 a significant growth, of about 21%, in municipalities. Thus, around 16,000 ton the separation for recycling of paper, of additional recyclables (triple flow) will

44 be diverted from the undifferentiated containers for commercial premises), In total, around 25,000 households will waste bins in comparison with 2017, 35 self-compactors and 18 new vehicles. be covered, with the delivery of around equivalent to an annual saving of around This substantial reinforcement of means 49,000 120-litre containers. The growth 1.1 million euros in municipal costs of was strengthened with communication in the amount of recyclables in the areas collection and disposal in landfill or actions, and the results did not take where the project was implemented energy recovery. The strategy followed long to materialise – in October 2019, already exceeds 55%. by Valorsul and the municipalities was the increase in selective collection, to bring the number of recycling banks compared to the previous year, is already DOOR-TO-DOOR IN SULDOURO as close as possible to the number of over 17%. ALREADY REACHES MORE THAN undifferentiated waste bins. The results 21,150 HOMES show that the option for collection using AMARSUL EXPANDS DOOR-TO-DOOR Door-to-door collection at Suldouro recycling banks is still a good solution COLLECTIONS continues to expand rapidly – by October and provides families with freedom of In October, Amarsul began expanding 2019 it had reached 21,157 homes and disposal, 24 hours a day, every day. the door to door selective collection already represents 19.3% of the total project “Recycling Sweet Recycling”, selective collection in the municipalities RESINORTE WITH MORE EQUIPMENT in the Municipality of Almada. The of Vila Nova de Gaia and Santa Maria da AND SERVICE Municipalities of Seixal and Sesimbra Feira. This is a consistent investment that Resinorte significantly increased the are also part of the project’s 3rd has enabled an accelerated increase in amount of equipment and vehicles phase, in which approximately 9,000 selective collection in an urban area that available to the population – between awareness actions will be carried out is full of potential. 2018 and 2019, it installed 9,465 new with the delivery of approximately resources (recycling banks and specific 15,000 domestic 120-litre containers.

SINERGIA 56 FEBRUARY 2020 45 EUROPE

PORTUGAL

VALORSUL THE FIRST 25 YEARS

AN EXAMPLE IN THE PROCESSING AND CONVERSION OF WASTE INTO RESOURCES

Valorsul celebrates 25 years. On 16 September 1994, Valorsul, EGF’s concessionaire in the region of Lisbon (North), was born with the ambitious goal of finding a solution and a destination for the thousands of ton of municipal waste produced in Greater Lisbon, and later, in 2010, in the West Region.

Valorsul’s household waste treatment system is a milestone in the history of municipal waste recovery in Portugal.

Over 25 years, Valorsul has invested in the potential of waste as a real resource. It was in Valorsul that Portugal saw the birth of its first energy recovery plant and, years later, the first station to selectively treat collected biowaste.

The result of the work done in the last twenty-five years is remarkable: a yearly production of electrical energy equivalent to 2% of the domestic household consumption using only waste as raw material, a production of more than 600 ton of compost for agriculture, 74,000 ton of materials sent service provided by the company to The territory served by Valorsul covers for recycling, and the achievement of all municipalities and citizens, having been a very diverse geographical area, with environmental goals with less cost the first company to be recognised by the 19 municipalities, where 1.6 million to the citizens. regulatory body with the award of the people live. Each year, it receives and “ERSAR Excellence Award” for the quality treats almost one million ton of waste, The priority continues to be improving of municipal waste management services, recovering 20% of all domestic waste the public waste management in 2018. produced in Portugal.

46 PORTUGAL

SYNERGIES GENERATE MORE RESULTS

COLLABORATION AND EFFICIENCY MEAN A CROSS-SECTION AND MULTIDISCIPLINARY TEAM IN THE EGF OPERATIONS.

The coordination between cross-sectional areas and the scale that joint action allows has led EGF to a remarkable efficiency and to better performance. The coordination between the technical, financial, procurement, communication and human resources areas are just a few examples of the persistent work of several teams and working groups. Among these, we should note:

1. Harmonisation of concepts, namely to fill in the Municipal Waste Registration Map, and harmonisation of technical and financial concepts to ensure the consistency of the information; 5. The SAP implementation in Resinorte and intra-group collaboration is noteworthy, 2. The realisation and implementation Valorsul, available from 01/01/2020, date enabling better response and coordination of the practical guide for the reduction from which all of the Group’s companies on several fronts, such as landfill cell of the energy bill; will already be using this system, which construction services, specialised enables standardising processes and technical maintenance, transport of goods, 3. Standardisation of containers harmonising the information. planning and design of infrastructure, and in the Group; procurement of goods and services, in 4. Preparation and submission of multiple In addition to the synergies between EGF a centralised manner. applications for European funds; and the concessionaires, the growing

SINERGIA 56 FEBRUARY 2020 47 EUROPE

PORTUGAL

COMMUNICATION MARRIED SELECTIVE COLLECTION

EGF'S COMMUNICATION STRATEGY SEEKS TO CONTRIBUTE FOR ENVIRONMENTAL EDUCATION - GOOD EXAMPLES ARE THE ECOPRAIAS AND ECOVALOR PROJECTS.

he success of EGF’s 22,700 children and 91,400 people in communication actions has a total. The collection of packaging was T secret – the marriage between carried out with a network of recycling the planned communication action and banks, together with Amarsul’s the selective collection operation –, “backpackers”, who travelled along the revealing what is obvious: more beaches. This made it possible to collect coordination, more focus and more 50 ton of plastic and metal, 35 ton of results. An example of this is the paper and cardboard, and 80 ton Ecopraias campaign “Let’s Recycle at the of glass. Seafront”, promoted by EGF’s concessionaire, Amarsul, which collected NATIONWIDE ECOVALOR a total of 165 ton of waste for recycling PROGRAMME this summer. This unprecedented Following this strategy of continuously campaign promoted, for the first time, contributing to the population’s the collection and recycling of waste on environmental education, EGF has 33 beaches in the regions of Almada, already launched the new edition of Sesimbra and Setúbal, from the Ecovalor programme. During the 22 June to 15 September. Aimed at the current school year, this initiative is general population, but with a special devoted to making good environmental focus on children going to the beach on practices known to the school holiday camps, the initiative raised community, awarding a cash prize awareness regarding good environmental to good environmental behaviour. practices and the importance of proper For each bag of plastic, metal and separation of packaging waste for over beverage packaging, properly separated 400 entities organising holiday camps, and delivered, schools joining this

48 awareness programme will receive festivals. 2019 is marked as the year the implementation of good waste €0.50. The schools in each municipality in which the number of EcoEvents management practices, which included that recycle the most will be rewarded exceeded all expectations from the prevention, reuse and recycling with a higher value. north to the south of the country, measures. showing the interest and concern for ECOEVENTS MARKED THE SUMMER environmental performance by all event The EcoEvents campaign has gained a organisers. EGF’s concessionaires went life of its own and is already a necessity above and beyond to be able to respond at all parties, fairs and summer to all contacts and requests, ensuring

RELEVANT FIGURES ECOPRAIAS

THE ECOPRAIAS CAMPAIGN «LET'S RECYCLE AT THE SEAFRONT»,DURING THE SUMMER OF 2019, COMPRISED OF:

165 tons of waste for recycling:

33 beaches in Almada, Sesimbra and Setúbal regions;

More than 400 entities that organise summer camps

22,700 children

91,400 people, in total.

EGF’s concessionaires went above and beyond to be able to respond to all contacts and requests, ensuring the implementation of good waste management practices

SINERGIA 56 FEBRUARY 2020 49 EUROPE

PORTUGAL

NEW INFRASTRUCTURE IN VALORMINHO

NEW UNIT INTEGRATED IN INFRASTRUCTURE SHARING MODEL

This unit, taking into ithin the scope of PERSU 2020, This is a simple mechanical treatment account the objectives and in order to meet the targets line for municipal waste that promotes W for reducing the deposit of the separation of undifferentiated of PERSU2020+, seeks Biodegradable Municipal Waste (BMW) municipal waste from Valorminho, where to increase the preparation in landfills, the Municipal Waste the fraction of recyclables is sent to the for reuse and recycling Preparation for Composting (MWPC) unit company’s sorting station, and a fraction was built. It is located in an area adjacent of biodegradable waste is sent to the and the quality to the sorting station located at the Mechanical and Biological Treatment of recyclables. Valença Sanitary Landfill. (MBT) unit of Resulima, in Paradela.

50 Recently in operation, this is a crucial organic fraction from the undifferentiated • Objective of increasing the preparation unit within the new technical model waste and to send it for organic recovery, for reuse, the recycling and the quality to be structured in the geographical thus contributing to achieving the of recyclables areas of Valorminho and Resulima. environmental goals. It has a maximum processing capacity of • Objective of reducing disposal 34,000 ton/year and allows the fraction This unit, taking into account the of municipal waste in landfills smaller than 80 mm, which is estimated to objectives of PERSU2020+, seeks to be 60% of the processed municipal waste, The unit seeks to respond to the national increase the preparation for reuse and to be separated through a Dynamic Disc priority of meeting the community targets, Sieve (DDS). In addition, the unit enables recycling and the quality of recyclables, namely the diversion of Biodegradable Valorminho to recover recyclable materials and to reduce the disposal of municipal Municipal Waste (BMW) from landfill and present in undifferentiated waste. With waste in landfills. For each of the the preparation for reuse and recycling the start-up of this mechanical treatment objectives, the following measures are target, included in PERSU2020. unit, it becomes possible to separate the planned to be implemented:

PORTUGAL SUCCESS FACTORS IN ALL OF EGF

The newly implemented human resources managment solution, MEuPortal: Success Factors, reflects EGF's current digital strategy.

In coordination with Mota-Engil Group’s out the management and performance human resources corporate area, a assessment processes. strategy of digital HR transformation has been implemented, seeking an evolution Following the upgrade to the MEuPortal: towards an integrated solution for the SuccessFactors, which will seek to management of people, available through maintain the entire learning management the MEuPortal: SuccessFactors. process, made available an e-learning functionality in the meantime, with a This solution is now implemented in our compliance programme having been companies and is already accessible in provided to all active employees in the most of the Group’s sizable companies. platform, in management, technical and It enables the leadership, employees administrative roles. and HR teams to have an overview of the organisational charts by areas; to access employee profiles and CVs; to recruit, select and manage talent; and to carry

SINERGIA 56 FEBRUARY 2020 51 EUROPE

PORTUGAL

SUMA CELEBRATES 25 YEARS OF EXISTENCE

THE COMPANY CELEBRATED IN THE CITY OF BATALHA, WHERE IT BEGAN ITS ACTIVITY IN 1995

elebrating a quarter of a century In the form of theatrical animation, of ambitious journey and SUMA’s 25 years were revisited C remarkable challenges overcome in 25 minutes, creating parallels between was the reason that led SUMA to gather the Iberian partnership that constitutes about two hundred guests at Mosteiro da it, the most relevant dates of its journey Batalha. The choice of location was and the battle of Aljubarrota that, in 1385, especially significant, with the municipality opposed Portuguese troops commanded of Batalha being the company’s first by D. João I of Portugal and his constable contract, in 1995, and the site where the D. Nuno Álvares Pereira, and the Castilian “SUMA project” began to take shape. army and its allies, led by John I of Castile, with the success of the Portuguese side Characterised by a programme dedicated to leading to the construction of the place strengthening corporate bonds and values, where the event is hosted. the presentation of the faces of workers, former staff, and teams from the various Addressing those present as CEO geographies in which SUMA services are of SUMA, Manuel Costa also had the deployed – representing those who every opportunity to mention the “Iberian day are the face of the company – was marriage” from which the company stems, complemented by the performance of coach highlighting the support of shareholders, Pedro Vieira on the topic of problem solving the vision of the previous and present and the importance of insight in personal management teams, and the dedication and organisational development processes. and adaptability of the human mass that

52 composes it as factors for its success. The excellence of the services provided, proven by the awarding of national and international prizes, and the relationships of trust and fruitful coordination between public and private services created between the company and its clients were also highlighted in this speech.

Messages of reinforcement and recognition were also delivered by António Mota, Chairman of the Board of Directors of Mota-Engil, and by José María Lopéz Piñol, CEO of Urbaser, as shareholders.

With a unique profile, SUMA is the company of reference in the Portuguese waste market. Operating from the north to the south of the country, the company currently names a group of about five dozen organisations, operating in five countries, distributed over four continents.

The support of shareholders, the vision of the previous and present management teams, and the dedication and adaptability of the human mass that composes it as factors for its success.

MANUEL COSTA CEO of SUMA

1 Manuel Costa, CEO of SUMA at the company's th 1 25 anniversary event.

SINERGIA 56 FEBRUARY 2020 53 EUROPE

PORTUGAL

SUMA DOOR-TO-DOOR CAMPAIGN

SUMA SUCCESSFULLY IMPLEMENTS AWARENESS CAMPAIGNS TO SUPPORT MULTI-MATERIAL COLLECTION ON A DOOR-TO-DOOR BASIS

UMA has been developing (Recycling is Giving +) campaign, Given the very positive prognosis for awareness campaigns to support accounting for 25,000 homes, 1,416 days expansion actions with regard to geography S multi-material collection on a of awareness-raising technical work, out of and target collection flows, in November door-to-door basis as a way of enhancing a total of 38,280 contact attempts. SUMA began a new process of the “Reciclar and operationalising the growing é Dar +” campaign, lasting 36 months, implementation of these systems and The results obtained attest to SUMA’s which involves dedicated actions to responding to the challenges launched by intervention profile as a widely verifiable raise awareness and deliver qualitative municipalities to meet the specific targets success with membership rates reaching equipment (containers with capacities of PERSU 2020. 97% (average value of 90%) and between 7 and 140 litres and, occasionally, overcoming local targets reaching 288% minibags for green waste), a crucial support In addition to a few municipalities of (average value of 174%), with the indicator for the promotion of multi-material and Algar and Valorsul, with membership of growth in three-flow waste share biowaste recycling. rates ranging from 71.5% to 85% between between the pre and post campaign period February 2018 and September 2019, recording the value of 136% (average This second phase includes the eight SUMA intervened in seven of Lipor’s value of 71%), which corresponds municipalities in Lipor and provides for municipalities with the “Reciclar é Dar +” to an inhabitant share/year reaching 53 kg. the coverage of 33,000 homes through the

54 pre-campaign phases, intervention on the two municipalities, where the collection hangers, waste and composting guides, ground – with visits and appointments –, service is carried out by SUMA. In informational flyers, decoration of panels strengthening participation, consolidation, Buarcos, Figueira da Foz, the action for collection vehicles, absence cards, monitoring and evaluation. covered 400 homes for door-to-door stickers and containerisation labels collection of the three domestic types were produced. As support, several materials will be of recyclables, in bags; and, in São João produced, among which hangers, flyers, da Madeira, the contact was made with The intervention in São João da Madeira stickers, absence cards, institutional 1,600 single and two-family homes, in should extend to other work cycles, and letters of attachment and stickers of ten pilot areas, for collection in domestic the expansion of the awareness-raising to recognition and belonging. containers of undifferentiated waste composting and to the future delivery of and recyclables. domestic composters is expected. Devoted to the same topic, the “Dou Valor” (I Give Value) campaign To support these interventions, materials was also the target of intervention in such as billboards, posters, key

OMAN SUMA WORKING IN CLOSE PARTNERSHIP ON ENVIRONMENTAL EDUCATION IN OMAN

Ecovision, SUMA's company in Oman market, contracted technical consultancy servives on environmental education

ENVIRONMENTAL EDUCATION Oman The recognition of the excellence of the The diagnosis of current and previous environmental literacy heritage held programmes; the discussion of innovative by SUMA as a waste operator, and the solution improvement and design testimony of the various monitoring processes; the training of the technical visits to projects and awareness-raising team and mentoring processes; the campaigns in Portugal by be’ah, a client planning, co-development and support of Ecovision – a SUMA company for for the implementation of programmes, the Omanite market – have led to the campaigns and activities; as well as the contracting of technical consultancy implementation of evaluation methods services in this area of intervention. seeking to create an effective methodology and a guide to environmental education Designed to convey the SUMA model procedures, are some of the features with the necessary cultural and social included in this service provision. adaptations to the reality of an Arab The focus of the topics country, the negotiated intervention Covering diverse target audiences – the forecasts the introduction of waste school community, consumers and to be worked on prevention policies with targets for society in general – the focus of the topics resides mainly on the reducing the average share, and the to be worked on resides mainly on the management of municipal technical supervision and educational management of municipal waste and waste and the correct monitoring of the environmental education the correct conditioning and disposal plan be’ah – the entity responsible for the behaviour, also covering issues such as conditioning and national waste strategy in the country. combating food waste and pests. disposal behaviour.

SINERGIA 56 FEBRUARY 2020 55 EUROPE

PORTUGAL

MANVIA CONDUTAS CARRIES OUT FIRST WORK OF THE LISBON GENERAL DRAINAGE PLAN

MANVIA CONDUTAS IS THE FIRST CONTRACTOR TO BE ASSIGNED TO EXECUTE A WORK UNDER THE GENERAL DRAINAGE PLAN DEVELOPED BY THE LISBON MUNICIPAL COUNCIL.

the Lisbon Drainage bout the ongoing works, executed without opening any trench, Luís Correia, General Director at depths ranging from 6 to 9 metres. Plan Office seeks to A of Manvia Condutas, promote works that mentioned that “the Lisbon Drainage “The main challenge is to build a small solve the city’s drainage Plan Office seeks to promote works tunnel that is at a great depth and that solve the city’s drainage problems, difficult to get to, so if anything prevents problems, this being the this being the first contract to find a the microtunnel machine from doing first contract to find a solution for this area”. its job, we have to recover the machine. solution for this area. But there are other challenges, namely, The work included the execution the work on the machine’s access and of a new rain water collector under arrival shafts, all the components Av. Infante D. Henrique, built using the that involved the installation of this microtunneling method. This collector collector, and even the selection of the has an outer diameter of 1.5 meters pipes themselves, their design and the LUÍS CORREIA General Director of Manvia Condutas and a total length of 320 metres, and is material of which they are made.”

56 Luís Correia also highlighted the much”, he stresses, revealing that this is diversion of traffic and the deadlines of the tenth microtunneling work carried the contract as constraints, as the aim out in Portugal. is to minimise this nuisance for the population. “And from that point “We started doing this in 2004, and These are always very of view, the work is also important.” these are always very challenging challenging works, works, with a great impact on the with a great impact on Within the scope of the Lisbon General involvement they have for our staff, and the involvement they Drainage Plan, very important from that point of view, the work itself, investments are expected in the the technology and what it requires have for our staff, (...) construction and upgrading of the city’s from Manvia Condutas is also a very the work itself, the rainwater drainage network, with the interesting challenge”. technology and what it expectation that Manvia Condutas may participate in some of these investments. Included in the contract are also other requires upgrading and repair works of existing from Manvia Condutas “Manvia Condutas is a small contractor canals and collectors, such as the is also a very and as such, more suited to smaller upgrading of a transition chamber near works. Therefore, these engineering Altice Arena and the construction of interesting challenge. works are obviously very challenging five new flow distribution chambers at for us, and we enjoy doing them very various points of this drainage basin.

LUÍS CORREIA General Director of Manvia Condutas

Within the scope of the Lisbon General Drainage Plan, very important investments are expected in the construction and upgrading of the city's rainwater drainage network, with the expectation that Manvia Condutas may participate in some of these investments.

1 Improvement and repairing works. 1

SINERGIA 56 FEBRUARY 2020 57 EUROPE

CÔTE D'IVOIRE MANVIA IN CÔTE D'IVOIRE

Operation and maintenance of reverse osmosis for leachate treatment .

Manvia signed a 24-month contract bacteriologically drinkable water, The waste centre is operated by for the operation and maintenance of free of contaminants, is obtained. Mota-Engil through the company three reverse osmosis units at a waste The reverse osmosis units are installed Eco Eburnie, serving a population collection and treatment centre in in a 40” shipping container, and contain of approximately 4.5 million people. Kossihouen, approximately 50 km from all the necessary components for the Abidjan, the capital of Côte d'Ivoire. process, namely pumps, piping, valves, filters, instrumentation and electrical Reverse osmosis is a treatment equipment. The treatment capacity of process through which a chemically and each unit is 200 m3/day.

PORTUGAL MANVIA ENSURES THE MAINTENANCE OF TWO OTHER PORTOBAY GROUP HOTELS

Manvia's hotel sector portfolio grows through maintenance services.

After PortoBay Liberdade Hotel and of 15 hotel units: 12 in Portugal and 3 The hotel equipment is particularly PortoBay Marquês Hotel, in Lisbon, in Brazil (Rio de Janeiro, Búzios and sensitive in terms of the management of Manvia sees its portfolio grow in the São Paulo) with about 3,200 beds in the its comfort conditions, seeking for the hotel sector with the provision of 4 and 5-star segments. guests’ experience to be as pleasant as maintenance services for the HVAC possible. In this context, these contracts and hot water supply equipment The contract, with a duration of one year, are always challenging for Manvia, in the facilities of PortoBay Teatro Hotel includes periodic preventive maintenance which continuously strives for its clients’ and Porto Bay Flores, which opened of the equipment, in order to avoid its total satisfaction. in 2019 in the city of Porto. deterioration, increasing the facility’s level of trust and safety, extending its service These two hotels are the most recent life at the lowest operating and investment acquisition of the PortoBay Group, costs, ensuring permanent environmental which is responsible for the management comfort for the users.

58 PORTUGAL

DISCLOSURE SESSION ON “WORK ACCIDENTS: LET’S PREVENT THEM TOGETHER”

DEPARTMENT OF QUALITY, ENVIRONMENT AND SAFETY (DQAS) PROMOTES DISCLOSURE SESSIONS ABOUT ACCIDENTS IN THE COMPANY.

Seeking to convey information and raise awareness for the prevention of occupational accidents and occupational diseases, through a culture of safety, Manvia promoted disclosure sessions about accidents in the company.

Under the topic of “Work Accidents: Let’s Prevent Them Together”, and promoted by the Department of Quality, Environment and Safety (DQAS – Direção de Qualidade, Ambiente e Segurança), with the cooperation of the administrador Pedro Ana Anselmo, from the Department Conditions (ACT – Autoridade para as Vieira Neves, who made it a point to of Quality, Environment and Safety Condições de Trabalho), since 2015 there mention: “We want to improve, and, in (DQAS), highlighted a few indicators of has been an increase in the number of this sense, we must all be very attentive Accidents and Trends, also showing that accidents, particularly regarding fatal and concerned about establishing this is, unfortunately, a recurring topic in and serious accidents in 2018. increasingly strict goals and procedures Portugal, with the session also including to avoid and reduce the frequency Isabel Serra, a specialist in occupational In Manvia, indicators have remained of accidents”, stressing the importance medicine from Atlanticare, who helped stable, with a slight improvement in 2018 of investing in prevention “with a view frame the topic of occupational diseases. compared to the last three-year period, to reducing accidents and contributing illustrating the effort and investment to the well-being of all of us, at the According to data provided by the carried out. personal, family and company levels”. Portuguese Authority for Working

SINERGIA 56 FEBRUARY 2020 59 EUROPE

PORTUGAL

TECHNICAL AUDIT SOFTWARE STREAMLINES PROCESSES AND PROMOTES INFORMATION TRANSPARENCY

WITH THE NEED TO STREAMLINE, SIMPLIFY PROCESSES, ACCELERATE AND PROMOTE THE TRANSPARENCY OF INFORMATION, MANVIA HAS TECHNICAL AUDIT SOFTWARE AT ITS DISPOSAL.

The implementation he maintenance area requires already had with the customer, since the of this software has compliance with a set of audits take place by internal initiative lightened the way the T activities and legal obligations, and the customer knows the exact state and, in order to verify the fulfilment of of its facility. auditors work, enabling all these obligations, Manvia has the audit to be finished implemented a programme of technical 2. EFFICIENCY on the same day, with audits, divided by specialities and The audits enable maintenance teams automatic issuance performed by engineers (mechanical, to correct and improve working methods, electrotechnical, electronic and civil), optimising them. They also enable the of the report. not belonging to the same department, management to determine where there in order to guarantee suitability in the are inefficiencies and to design training evaluation, resulting in a technical plans appropriate to each team. report that is made available to the customer. 3. SHARING The fact that the auditors come from The project contributed to the the company enables the procedural Organisation in three key areas: formalities to be overcome, facilitating the exchange of experiences between 1. CREDIBILITY peers, as well as proactivity, since the Cementing the credibility Manvia audits, besides alerting to points of

60 improvement, also have a pedagogical aspect for those audited. Lastly, it enables auditors to have a wider knowledge of the various types of facilities, making them technically more skilled.

The implementation of this software has lightened the way the auditors work, enabling the audit to be finished on the same day, with automatic issuance of the report; it promotes transparency throughout the process; it increases the number of audited contracts; it increases the number of audits carried out annually, which tripled in number, and it is also the cause of a 10% improvement in the assessment of Customer satisfaction.

PORTUGAL MANVIA CARRIES OUT LUBRICATION SERVICES AT SOMINCOR

Lubricant application services and periodic preventive maintenance services.

Manvia will ensure surface and mine that also collect reliable information, lubricant application services for which enables a critical view on Somincor, Minas de Neves Corvo, maintenance plans, lubrication and NEVES CORVO MINE Castro Verde as well as the equipment’s periodic incidence of breakdowns. preventive maintenance, in order to avoid its premature deterioration, The lubrication activities have a prolonging its service life with the fundamental contribution to ensuring lowest operational cost and the lowest the highest levels of safety and investment. continuity of service in the operation of an industrial unit, and at the same Manvia’s large and proven experience time achieving the best levels of amounts of metals such as copper, in this industrial area since 2014, as performance. tin and zinc. Following its acquisition well as previous work in this facility, by Lundin Mining, management has make it the ideal partner, one that has Somincor – Sociedade Mineira de Neves focused on improving the mine’s developed processes and procedures Corvo S.A. was formed on 24 July 1980, operating performance and on the that not only guarantee an adequate after the discovery in 1977 of a deposit exploitation of new resources performance of lubrication tasks, but of sulphides containing significant and reserves in adjacent areas.

SINERGIA 56 FEBRUARY 2020 61 AFRICA

MALAWI

MOTA-ENGIL AFRICAN INITIATIVES

THE VISIT OF THE AFRICA COMMITTEE OF THE MANUEL ANTÓNIO DA MOTA FOUNDATION SEEKS TO STRENGTHEN THE POLICY OF SOCIAL RESPONSIBILITY DEVELOPED IN MALAWI.

he Africa Committee of the the Africa Committee was to include the Manuel António da Mota visited school in the “school sponsorship” T Foundation (MAMF), programme, alongside what is already represented in this initiative by Teresa happening in other schools in Angola and Mota Neves and Alexandra Romão Mota, Mozambique, reinforcing this structure’s MALAWI visited the Malawi market as part of the support in the country and creating a “Mota-Engil African Initiatives” project, vehicle for a permanent relationship with whose programme is essentially this academic institution. supported by two pillars of action: support for better health and education For Mota-Engil Malawi and MAMF, this conditions. initiative developed by Teresa Mota Neves and Alexandra Romão Mota, Among the work programme developed in a market in which the Group has and coordinated with the structure been present since 1990, with great of Mota-Engil Malawi, in which the involvement with the local communities, The MAMF seeks market’s CEO, António Pimenta da Silva, is another reason for the Group to be to fulfil the vision was present, several institutions such as extremely proud for achieving its goals, hospitals and schools were visited, and a and one which will be continued. of its founder. donation of books, textbooks and sports equipment was carried out at the school In this way, the MAMF seeks to fulfil in the Nkhotakota region. the vision of its founder in supporting the social development of the local With the visit of the promoters of the communities where Mota-Engil “African Initiatives” project, the goal of operates.

62 1

2 3

1 2 3 Teresa Mota Neves and Alexandra Romao Mota,were in Malawi, involved in several social solidarity initiatives in schools and 4 hospitals, such as the donation of books, textbooks and sports equipment at a school in the Nkhotakota region.

SINERGIA 56 FEBRUARY 2020 63 AFRICA

ANGOLA

THE SUSTAINABILITY OF HOSPITAL BUILDINGS IN ANGOLA

MOTA-ENGIL ANGOLA DEVELOPS AN EXEMPLARY PROJECT AT THE NEW CABINDA GENERAL HOSPITAL

he 1st phase of the Cabinda consisting of nine suitably T General Hospital, located in equipped floors. Chibodo, Cabinda province, will have as its main function to provide Applying the most modern design the population with proper full medical and construction expertise, the Cabinda ANGOLA assistance, preventive and curative, as General Hospital project sought to well as to respond to requests for ensure the incorporation of sustainable specialised services in order to avoid practices, favouring a better economic transferring patients to other locations in and social efficiency. the country and abroad. The organisation and equipping of This project is highly Characterised as a modern project spaces, the creation of optimised working relevant to the company's stemming from the advances in medicine environments for doctors, nurses and in terms of procedures to meet the needs assistants, as well as the creation of history and symbolizes of the population, the future hospital environments suitable for isolation / the strong ties of mutual will have capacity for 110 inpatient beds hospitalisation of patients in relation trust between Mota- (1st phase), including areas of imaging, to the outer space, provides them with internal medicine service, paediatrics, greater peace of mind about their state of Engil and Angola. surgery, gynaecology and obstetrics, health, improving comfort and providing intensive-care unit, emergency room, a better recovery. physiotherapy and morgue. The construction itself is committed to The construction is done in a lot of about reducing the environmental impact by five hectares, and includes all road prioritising the use of materials coming infrastructure, emergency power, water from local production and extraction, supply, drainage and hospital building the reuse of materials, the recycling and

64 1 2

recovery of construction waste in the execution of highly complex projects and • Delivery of school kits and toys surrounding communities, the use of catalysts for the sustainable development to schools and orphanages; certified organic-based products, and of construction. • Renovation of the class rooms the creation of large green areas with of Simindele Elementary School; planting of native plants in the building’s As part of the project’s development, surroundings. Mota-Engil Angola has been carrying • Renovation of the Chibodo Police out several social activities with Station; Sustainability can also be seen in the the communities around the new • Cleaning / renovation of the local correct orientation of the building to hospital on a monthly basis. This community football pitch; provide adequate lighting and ventilation social responsibility initiative has two with lower energy consumption. The purposes: • Creation of a library at the Simindele facade is characterised by cladding Elementary School, including book in recyclable aluminium and glass • Supporting the social development of donation. materials, maximising the potential of the sites close to the contract with the Mota-Engil Angola, in partnership with exposure to natural light. Visual comfort support and guidance of the Manuel MAMF, is thus fulfilling the vision of its over the surrounding landscape, thermal António da Mota Foundation (MAMF); founder, Manuel António da Mota, in and acoustic comfort through the • Ensuring compliance with the supporting the social development of the modernisation of the system of special Corporate Social Responsibility Policy communities where Mota-Engil operates. technical facilities, the existence of areas in force for the contract and monitored with indoor and outdoor recreational by ASGC, the facilitating company of spaces, leisure spaces and green spaces the project’s financier, the British UKEF. with public access are aspects to be highlighted. 2 Among the social actions carried out to General view date, the following stand out: This project highlights Mota-Engil’s 1 capacity as a general contractor for the • Reuse of civil construction waste; Project, after completion

SINERGIA 56 FEBRUARY 2020 65 AFRICA

ANGOLA

MOTA-ENGIL BUILDS A BREAKWATER AT PORT OF CABINDA

BRIEF DESCRIPTION OF THE WORK, AND ITS IMPORTANCE FOR THE DYNAMISATION OF THE ECONOMY IN THE PROVINCE OF CABINDA..

abinda is one of the 18 To that effect, EPC – Empresa Portuária C provinces of Angola, located de Cabinda decided to build a breakwater in the north of the country, west of the floating dock already present being the northernmost and also the in the Port of Cabinda. The purpose of nation’s only enclave. this work will be to ensure adequate ANGOLA shelter conditions that will result in the Bordering the Republic of Congo to the improvement of the operating conditions north, the Democratic Republic of Congo of the current floating dock. For this to the east and south and the Atlantic purpose, EPC promoted the basic studies Ocean to the west, one of the province’s and commissioned the project (reference main limitations is precisely its isolation, project) necessary for the construction due to the lacking road network (which of this work. is almost non-existent) connecting this province to the rest of Angola. In this The reference project was developed in context, the maritime route assumes an July 2014, and the planned structural The dredging and sand even greater relevance in the province’s solution consisted of a sheet-pile curtain supply works should development, since it can be the enabler acting as a breakwater, locked by a in the transport of people and goods, reinforced concrete platform supported be carried out in a phased thus reducing its insularity. by piles. The adopted solution, to the manner, leading detriment of a traditional solution of to an actual operation In order to increase the maritime building a slope breakwater, in rock-fill, period of approximately flow in the province, it became clear is justified by the strong limitation in that the port needed to be equipped obtaining good quality rock-fill in the 12 months. with conditions that would enable the area of Cabinda. On the other hand, the operation. nature of the chosen structural solution

66 CONTRACT DATA: Overall value of the contract Date of award 29/09/2016 Date of consignment 1/11/2016 Contract start date 04/04/2017 Contract value 42.7 million dolars Advance 15% = 6,405 thousand dolars Contract construction period – 22 months. 1st extension of the deadline for carrying out the work to 10 June 2019. 2nd extension of the deadline for carrying out the work to 31 October 2020.

makes it possible to use it as a pier along its inner edge. This pier will complement the Port of Cabinda and replace the current floating dock, which, by its nature, will have a reduced service life.

In 2016, the Mota-Engil Angola / Seth Angola consortium proposed an alternative solution for the construction of the breakwater and of the pier. The solution proposed by this consortium is the construction of an embankment with the material resulting from the dredging of the access channel and manoeuvre basin. The embankment’s containment will be carried out using two cable-stayed metal sheet-pile curtains. The embankment platform to be created inside the sheet piling will establish the breakwater and will constitute the platform to support the piers.

The proposed solution also allows using the inner front of the breakwater as a pier.

SINERGIA 56 FEBRUARY 2020 67 AFRICA

1

The alternative solution presents strongly conditioned by the breakwater environmental benefits, as it promotes work in progress, which is why we the use of dredging sand, as well as consider that the fact that both works are economic benefits, since it implies lower managed by the same company greatly maintenance costs. facilitates coordination, resulting in fewer DREDGING problems and minimising intervention AND SAND SUPLY The new breakwater will be located off for the project commissioner; is strongly conditioned by Cabinda Bay, and east of the existing port the work in progress at the infrastructure, near the bay entrance. The maintenance of the access channel breakwater. and manoeuvre basin will be crucial This is why we consider that the fact The dredging work for the creation of to ensure the port’s regular operation. that both works are managed by the the berths, manoeuvre basin and access Breakwaters are structures that, by same company greatly facilitates channel are outside the scope of this their nature, prevent the normal cycle of coordination, resulting in fewer problems and minimising intervention project. passage of the sands, and are therefore for the project commissioner. dependent on a periodic maintenance On 31 October 2019, MEA was awarded consisting of dredging the bottoms the dredging works at the Port of Cabinda throughout their lives. for an estimated volume of 1,500,000 m3. This optimisation of means involves The dredging and sand supply works a significant advance on the date of should be carried out in a phased inauguration of the new breakwater of manner, leading to an actual operation the Port of Cabinda, as well as all the period of approximately 12 months. social and financial advantages linked to The dredging and the supply of sands is the start of its operation, considering that

68 MAIN MATERIALS AND QUANTITIES Port of Cabinda

MAIN MATERIALS AND QUANTITIES INVOLVED IN THE CONTRACTS:

8,750 m3 of C30/37 Concrete in crown beams;

1,448 metric tons of steel;

5,770 metric tons of piles, including girders, tie rods and anchoring curtains;

3,800 m2 of squared Concrete paving with a thickness of 200 mm;

2 12,000 m2 of 8 cm paver;

180,000 m3 of embankment between the sheet piling, including the deep vibro- compacting; this infrastructure will have an operating to the direction of the section of the capacity well above the existing floating access path. 7,600 m3 of crushed graded pontoon, especially in periods of strong aggregate, treated with cement (AGEC); undulation. The type of structure of the breakwater will be similar along both sections, Pier furniture: 23 pneumatic Mota-Engil Angola will not only offer composed of two metal sheet-pile curtains protective barriers, the dredger at the end of the work, but connected by an anchoring system 33 SX600 protective barriers, will also promote, during the course composed of steel circular-section tie rods. and 28 mooring bollards; of the work, the training of the Port’s Volume of sand to be dredged technicians, which will be acquired • Road access with a width of 12.25 m / supplied to embankment of continuously on site for 10 months. and a length of 295 m (1st phase). sand inside the Breakwater Light pier with a depth of 5 m and 187,000 m3. Breakwater a berthing capacity for vessels up to 1,700 metric tons (passenger terminal); The breakwater will be approximately 660 m long, extending from the beach • It will be necessary to build a floating towards the sea, to an area where dock compatible with the current the sea bottom level is approximately project for this pier to allow the 1 -6.00 m (LAT). The breakwater berthing of passenger ferryboats; Current aerial view of the Work is defined by two distinct sections, the initial section, establishing the access • Mole with a width of 40 m and a length 2 path, arranged in the S-N direction, and of 365 m and roll-on/roll-off ramp with Aerial view of the existing port infrastructure the next section, on the sea side, deviated a width of 25 m, a length of 30 m and a in approximately 50º to NE in relation slope of 10% (2nd phase). This is a 9 m

SINERGIA 56 FEBRUARY 2020 69 AFRICA

EXECUTION METHODOLOGY FOR THE 1ST PHASE: 1. HZM combined wall driving (currently PK 235) – 100%; 2. Digging of the inside of the breakwater (currently PK235) – 100% 3. Placement of tie rods (currently PK235) – 100% 4. Embankment with sand from the beach to level +3.50 (currently PK235) – 100% 5. Vibro-compaction of the embankment at level +3.50 – (currently PK235) – 100%

EXECUTION METHODOLOGY FOR THE 2ND PHASE:

Given that it is presently 3 impossible to have a dredger for the supply of sand and the creation of the following embankment platforms, in order to proceed with the execution depth pier with berthing capacity for In the soffit of the breakwater, of the sheet piling in the 360 m vessels up to 15,000 metric tons in the area of inflection, in the transition of pier (width of 40 m). (cargo terminal); between the two sections of the breakwater, a roll-on/roll-off (Ro-Ro) The access path section will be 295 m ramp will be built. Estimated dredging volume long and 12.25 m wide. The length of the required for the 2nd phase section on the sea side will be 365 m and The ramp will be 25 m wide and 30 m (phase 2 and 3 in the following drawings) = 150,000 m3. its width will be 39.80 m. long, and it will have a 10% slope. At the end of July, the driving The inner containment curtain of the of piles planned for the first breakwater will be used as a docking phase was completed. structure along two piers with different depths. The soffit of the initial section of the breakwater will be used as a pier with an operating level of -5.00 m (LAT) and a length of 180 m. The main pier will be located on the soffit section of the side facing the sea. This pier will have an operating bottom level of -9.00 m (LAT) 3 and a length of 340 m. Aerial view of the breakwater.

70 ANGOLA

PROJEKTA 2019

MOTA-ENGIL ANGOLA WAS PRESENT IN THE 16TH EDITION

The 16th edition of Projekta, the years, the second sector that has created and topography, in addition to the International Fair of Equipment and the most jobs in the country, also taking participation of its affiliate Vista Waste, Services for Civil Construction, Public the opportunity to encourage investors to a renowned operator of the Mota-Engil Works, Urban Planning, Architecture continue to invest in the transformation Group in Angola in waste collection and Interior Decoration, took place in of local raw material to serve the and urban cleaning and promoter of Luanda under the motto “Designing the domestic market: “We are encouraging environmental education and awareness. Future, Building the Present”, an event the industry by creating innovative of recognised relevance to the sector projects and appealing to private Mota-Engil Angola’s stands were widely in Angola. initiative so that it uses the local market visited by the public, with visits from and develops the construction materials clients, partners and multiple companies The 16th edition had the participation and projects industry”, he stressed. in the sector. of around 100 companies (120 stands), with about 5,000 visitors of multiple The 16th edition of Projekta and the Finally, it should be noted that Mota-Engil nationalities, having taken place in the 1st edition of the Angolan Real Estate Angola’s stand was nominated for the SEZ (Special Economic Zone in Viana), Fair are initiatives of the Ministries of category of “Best Participation in Services in an area of approximately 5,000 m2. Construction and Public Works and for Civil Construction and Public Works” Spatial Planning and Housing, and are (central laboratory and topography), The opening ceremony was attended by held in partnership with the company acknowledging the company’s active the Minister of Construction and Public Eventos Arena. involvement in this important event Works, Manuel Tavares de Almeida, who for the sector in Angola. pointed out that the Civil Construction Mota-Engil Angola was present with and Public Works sector has generated two sectors of the company’s technical over 28 thousand new jobs in the last two area, namely the central laboratory

SINERGIA 56 FEBRUARY 2020 71 AFRICA

ANGOLA

NEW DATA CENTER IN ANGOLA

THE NEW ITA DATA CENTRE PROJECT, CALLED DATA CENTRE 2, IS A BUILDING BUILT INSIDE THE ITA COMPANY COMPLEX.

he New Data Centre is an of two reinforced concrete walkways with extension/expansion of Data rain water drainage channels. T Centre 1, which is intended for data processing and storage. The entire building has access control, CCTV, fire sealing, fire and intrusion The building, with a footprint area alarms, and fire extinguishing equipment. of 1,450 m2, has three floors and is composed of a reception, lobbies, a The fire protection measures are testing room, technical areas, UPS guaranteed by smoke removal and gaseous rooms, crisis rooms, sanitary facilities, fire suppression systems. The building freight elevators, unloading platforms is equipped with 13 gas bottles, totalling and emergency stairs. about 2,000 kg of NOVEC, available to ensure fire extinction. The entire system The exterior walls are made of exposed is fully automated to ensure the protection concrete with visually attractive surfaces, of the equipment.This being a technical created by the careful stereotomy of building, the air conditioning is specific the formwork, the texture given to the to this type of solution and is carried out concrete and the creation of moulded by close control air conditioning units. patterns, coated on their interior face by The Data Centre is equipped with 12 a sandwich panel with rock wool. units with a total air-conditioning power The technical areas were adequately of 720 kW, with electronic control of covered with technical flooring, walls temperature and humidity. in fireproof sandwich panels with acoustic characteristics and ceilings in The Data Centre has over 170 racks removable metal plates. installed, enabling space rental for at least 160 clients to accommodate their The technical area of the roof houses all the equipment. Communication with the necessary equipment for cooling and air outside is guaranteed by more than 9 km renewal of the Data Centre. It is composed of fibre-optic cables.

72 The building is fully automated and monitored in real time by security and data centre management systems. Its supervision and management is carried out locally and is remotely customised by each client.

This guarantees its clients the ability to host their own equipment and to store their digital information in a totally secure and reliable way in all of the building’s aspects, such as air conditioning, physical security, energy, electronic security and fire prevention measures.

ANGOLA AUTHORIZED ECONOMIC OPERATOR CERTIFICATE

Mota-Engil Angola reduces expenses on stays at terminals.

On October 31st a ceremony was held Toyota, Total, Coca-Cola, Big Mills, where the Executive Secretary of the Nova Agrolider and Stylus Distribuição. Trade Facilitation Committee (CNFC) granted the Authorized Economic This certification is of utmost importance, Operator Certificate to the company as the OAS (Authorized Economic Mota-Engil Angola, which fulfills the Operator) has priority treatment for mandatory requirements of the rules customs clearance and inspection, and legislation of the international which allows for the reduction of expenses trade. Representing the company on their stay at terminals, contributing was present the head of logistics, to trade facilitation and strengthening Filomeno Viriato. logistics chain security.

Of the 400 major contributors, Undoubtedly, an asset to the process in addition to Mota-Engil, 6 more of accreditation and credibility of renowned companies were certified: Mota-Engil's operation in Angola.

SINERGIA 56 FEBRUARY 2020 73 AFRICA

ANGOLA

3RD CONFERENCE OF THE ORDER OF ENGINEERS OF ANGOLA

MOTA-ENGIL ANGOLA AS AN ACTIVE PARTICIPANT IN KNOWLEDGE AND EXPERIENCE SHARING.

Mota-Engil has actively s part of the initiative Secretary of the President of the designated as the 4th Republic for the production sector, contributed by sharing A rd Industrial Revolution, the 3 as well as Lucrécio Costa, Secretary of knowledge and professional Conference of the Order of Engineers of State for Energy and Water, who, with experience. Angola and the 4th Conference on their presence, reinforced the Occupational and Environmental Health importance of the event, which had and Safety took place in Angola. These as its main objective to provide initiatives were attended by leading a vision of the impact of the new figures from Angola, such as paradigms and transformations that Diamantino Pedro Azevedo, Minister of the new industrial era will bring Mineral Resources and Petroleum of the to the development and evolution Republic of Angola, Isaac dos Anjos, of societies.

74 Among the various topics covered, In these events, which were also • Risks and safety practices in mining, the following stand out: attended by the Presidents of the presented by António Vieira, Order of Engineers of Angola, Brazil, Vice-President of the College of • New frontiers of engineering and Portugal, Mota-Engil Geotechnical Engineering and Mining, in the 21st century; Angola participated with a speech and responsible for the mining area • Diversification of the economy on two topics: at Mota-Engil Africa. and digitisation; • Instability and erosion of slopes Mota-Engil has thus actively contributed • Tourism and structuring conditions in the fields of security, prevention, by sharing knowledge and professional for its development; protection, reconstruction and experience in a continuous concern and preservation, presented by Fernando • Urban renovation; commitment to the technical evolution of Pereira, responsible for the area the various engineering areas, maintaining • Organisational health and safety of foundations and geotechnics its commitment to participate in training in industry 4.0; of Mota-Engil Africa, and actions for the society in which it operates.

ANGOLA MAMF AND MOTA-ENGIL ANGOLA PROMOTE SOCIAL DEVELOPMENT IN LUANDA

Design, construction and resourcing of the Paediatric Haematological Institute of Luanda.

Within the scope of the construction • Rehabilitation of the buildings of the REHABILITATION OF THE of the Paediatric Haematological Institute Leprosy Community of Funda-Luanda; NEONATOLOGY AREA David Bernardino Paediatric of Luanda, Mota-Engil Angola has Hospital, Luanda been carrying out multiple social • Rehabilitation of the Neonatology area activities with the surrounding of the David Bernardino Paediatric communities and beyond. Hospital building; This initiative has two purposes: • Rehabilitation of the waterproofing • Supporting the social development of the roof of the David Bernardino of the locations close to the project Paediatric Hospital; and where Mota-Engil Angola’s • Rehabilitation and repairs of the sewage contribution is necessary, with the pumping systems and extinguisher support and guidance of the Manuel networks of the head office building of António da Mota Foundation (MAMF); the Ministry of Health, including supply • Ensuring compliance with the and installation of air-conditioning Corporate Social Responsibility Policy appliances in offices. in force for the contract and monitored Mota-Engil Angola, in partnership with by ASGC, the facilitating company MAMF, is fulfilling the vision of its founder of UKEF, the financier. and supporting the social development Among the social actions carried of the domestic and foreign communities out to date, the following stand out: where Mota-Engil operates.

SINERGIA 56 FEBRUARY 2020 75 AFRICA

RWANDA

SUSTAINABILITY APPLIED IN RWANDA

THE ECONOMIC, ENVIRONMENTAL AND SOCIAL DIMENSION IN THE ACTIVITY’S FOCUS

Mota-Engil Rwanda has implemented activities, such as the collection of industrial oils, use of water treatment and recovery systems, sorting of waste with separation of paper and plastics RUANDA for subsequent processing, as well as ensuring the internal adoption of laws and procedures related to environmental policy in force in the country.

SOCIAL SUSTAINABILITY AND THE RELATIONSHIP WITH LOCAL S ince 2015, Mota-Engil in COMMUNITIES Rwanda has been implementing a policy Within the scope of the support of social responsibility in line with the to social and humanitarian institutions, pillars of the Group. As an example, and essential goods were distributed to users throughout 2019, an extensive and of the paediatric services of Kigali diversified programme was developed Central Hospital. within this scope, highlighting actions to promote environmental and social In a cross-cutting practice of relationship sustainability, materialised through and interaction with the local communities support to social and humanitarian in which Mota-Engil operates, this concern institutions and direct support to local was also a central axis of the operation communities, through initiatives, such as in Rwanda during 2019, with a series of the promotion of inclusive sports events activities such as awarding scholarships and even voluntary actions. to eight children from a deprived neighbourhood of Kigali, covering all ENVIRONMENTAL SUSTAINABILITY their school expenses for the current With regard to initiatives aimed at school year, as well as supporting social promoting environmental sustainability, awareness campaigns on HIV – AIDS.

76 Seeking to promote the debate on the participants, who we must note are sexuality and sexually transmitted employees of the company, their spirit of diseases, the company has developed mutual help and fair play. several actions to raise awareness / reinforce information on HIV/AIDS VOLUNTEERING and the adoption of informed and aware Mota-Engil’s banner in Rwanda, the behaviours and attitudes. The project support to the communities became included the screening of films and part of the company’s DNA and, as a presentations to the entire community consequence, of its employees, with 1 surrounding the New Bugesera voluntary work as the company’s International Airport (NBIA) project, foundation in initiatives such as the followed by a discussion distribution of clothes and footwear and clarification session. to children or the participation in Umuganda, community day, usually Other initiatives included the creation of on the last Saturday of each month and drinking water distribution locations, as reserved for improvement actions in well as the expansion and maintenance the localities, and where it is possible of road accesses in local communities. to see the dedication of the company’s employees, who did not hesitate to give INTERCHANGE WITH LOCAL up their times of rest to participate and COMMUNITIES THROUGH SPORT join the people living in the vicinity 2 Nelson Mandela said that “sport can of the worksite and take part in small bring people together like no other works to improve access, maintenance activity. Sport can generate hope where and also cleaning of ditches, thus there was despair. Sport eliminates racial constituting a reference and example obstacles. Sport laughs at discrimination. of Mota-Engil Group’s values Sport speaks to people in a language that and ethical principles. everyone can understand.”

Thus, considering that sport is one of the most important social phenomena promoting the improvement of communication between people, the Rwandan Market also developed, in early 2019, the first Mota-Engil BikeTour, whose route was between Gashora (company worksite) and the Burundian border. Throughout these 30 km, it stood out to everyone the cohesion between

1 MEECA Open

2 First Bike Tour, 30 kms long

3 Expansion and maintenance of roads

4 Raising awareness/reinforce 3 4 information on HIV/AIDS

SINERGIA 56 FEBRUARY 2020 77 AFRICA

UGANDA

BREAST CANCER AWARENESS

BREAST AND CERVICAL CANCER AWARENESS AND SCREENING WORKSHOP ORGANIZED BY MOTA-ENGIL UGANDA

n commemoration of the The highlights of the awareness session breast cancer awareness were that cervical cancer is caused by I month of October, the HSE the human papillomavirus (HPV) which department in partnership with Family is transmitted sexually but the HPV Rescue Initiative (NSP) organised a vaccine successfully prevents it hence UGANDA health workshop for all female sexually active women above 21 years employees on the CIKNB project which of age should get regular screening was attended by 73 women. and testing.

The workshop was centred on teaching While breast cancer is the most common female employees about the most and invasive cancer among women, it common female cancers that include is not subject to age and thus can affect breast cancer and cervical cancer any age group. However, the risk of breast cancer increases with The HSE department This workshop featured specialists from age but can be treated if caught early in partnership with The Uganda National Health Laboratory through regular screening. Services (UNHLS) Community Outreach Family Rescue Initiative Team, Mulago Women’s Hospital and A session of HIV/AIDS awareness was (NSP) organised a Mulago Kawempe Hospital. These also headed by Ms Angella, an advocate health workshop for started out with an awareness and for youth living positively with HIV/ all female employees sensitization where signs, symptoms AIDS. She raised awareness on how to and treatments of breast and cervical live positively with the virus, take ARV’s on the CIKNB project cancer were discussed in-depth with regularly, maintain a balanced diet and which was attended by guidance on how to carry out self- not stigmatise people living positively. seventy-three women. examinations.

78 In conclusion, the workshop was a great initiative to raise awareness about breast and cervical cancer among female staff.

1 A group photo of all the women on the CIKNB project.

2 The health officer and the NSP (FRI) welcoming the women to the workshop.

SINERGIA 56 FEBRUARY 2020 79 LATIN AMERICA

LATIN AMERICA

A LOOK AT SUSTAINABILITY IN MOTA-ENGIL LATIN AMERICA

IN LATIN AMERICA, WE CONSIDER THE WHOLE PICTURE OF OUR BUSINESS, SINCE THE GOAL IS TO CONDUCT OURSELVES IN A COORDINATED AND SUSTAINABLE WAY FROM A SOCIAL, ENVIRONMENTAL AND ECONOMIC PERSPECTIVE.

question that is both simple 2019 has been a year that has seen and complex: what drives great development in social action A business in the long term? programmes, solidarity, culture, Responsible action, care for social and empowerment, support for research environmental aspects, and and promotion of young talent. This has improvement in people’s quality of life enabled us to support various sectors are undoubtedly some key elements in while maintaining our values and any sustainability strategy. altruistic heritage; thus responding to the main challenges facing contemporary A COMPREHENSIVE VISION society. We are proud that this With an estimate of just over 9,000 development is taking place within the employees (nationals and expatriates) framework of solidarity, collaboration Our corporate sustainability in the entire Mota-Engil Latin America and dialogue with vulnerable groups. Group, we have tremendous potential strategy focuses on four main to generate value and create positive FOUR AXES OF DEVELOPMENT areas: environmental care, impacts in all regions where we operate. Therefore, in Latin America we consider social commitment, economic In fact, our diversity makes us rich in the whole picture of our business, since development, and employee expertise, innovation, ways of thinking the goal is to conduct ourselves in a and a host of disruptive characteristics coordinated and sustainable way from well-being. that make up this latitude’s varied and a social, environmental and economic exceptional mosaic. perspective. As a result, our corporate

80 2

1 3

sustainability strategy focuses on four Nations Global Compact where we main areas: environmental care, social affirm our public commitment commitment, economic development, to respect – and promote in our value and employee well-being. In fact, being chain – the ten principles of human a Group focused on the construction rights, within which labour standards, and engineering sector, we understand environmental protection, social the importance of responding to welfare and the fight against corruption current challenges and of joining forces stand out. with other private sector players and international organisations. This way, From this corporate perspective of our path to sustainability results in a sustainability, and evidently through continuous commitment to improve our daily actions, we will continue to every day. work together under the conviction and 1 commitment of contributing to a world Planting of trees in Mexico SIGNATORIES OF THE GLOBAL that is better, fairer and with more and

COMPACT better opportunities for all. 2 Respect for human rights, zero tolerance Local contracting programme for child labour and for discrimination In the following pages you will find our in Peru are always present in our actions and in most recent initiatives, seeking to share 3 the Group’s values; this is why this year a little of the universe of sustainable Event at an educational instituition Mota-Engil Mexico signed the United inspiration in Latin America. in Colombia

SINERGIA 56 FEBRUARY 2020 81 LATIN AMERICA

MEXICO

MOTA-ENGIL MEXICO PROUD MEMBER OF UN’S GLOBAL CLUSTER OF BUSINESS INNOVATORS

THIS PROGRAMME BRINGS TOGETHER A SELECT GROUP OF COMPANIES FROM AROUND THE WORLD

MEXICO

Mota-Engil Mexico was selected by millions of people. The SDG also open and Ukraine that are, or are seeking the United Nations Global Compact the door to substantive innovation and to position themselves, at the forefront to be part of the first generation, new business models to create new of sustainability and social worldwide, of Business Innovators ways of working, new systems and responsibility to generate disruptive for the Sustainable Development Goals. new platforms to adopt new mindsets solutions to global challenges. that will enable the achievement of the The 17 Sustainable Development Goals ambitious vision of the SDG. Mota-Engil Mexico confirms its role (SDG) present the greatest opportunity as an agent of change, promoting of our time. These global goals are the This programme brings together a sustainable and social development guiding stars for understanding what select group of companies from the UK, from the private sector. is needed to solve humanity’s greatest , Mexico, South Africa, Brazil, challenges and improve the lives of USA, Bangladesh, Denmark, Lebanon

82 MEXICO MOTA-ENGIL MEXICO PROMOTES VOLUNTEER PROGRAMME «LET'S GET TO WORK!»

280 children benefited

Yes! The Manos a la Obra (Let’s Get to The recycled material was exchanged Work!) corporate volunteer programme for school kits, tailor-made clothing in Mota-Engil Mexico brought together and even basic necessities, which dozens of employees, who together were given to primary school children managed to help 280 children in Sierra in eight indigenous communities "LET’S GET TO WORK!" Poblana this year. in the Puebla mountains. Serra de Puebla, Mexico It all started with the active recycling Between rains, earthworks, many of paper, newspaper and cardboard that kilometres travelled, endless hours, became educational support. But that wasn’t but above all a lot of emotion, joy and all, because thanks to the 3.3 metric tons commitment, our volunteers found that of material collected by the teams at our the sum of their efforts generates positive Gran Canal and Bordo Poniente worksites impacts on society, creating equal and by the employees at our head offices, opportunities for children and education we helped reduce the ecological footprint in Mexico. by avoiding the cut down of 106 trees and saving 100,000 litres of water.

MEXICO MOTA-ENGIL MEXICO COMMITTED TO WASTE MANAGEMENT

A culture of social responsibility consolidates our core values of sustainability.

For Mota-Engil Mexico, caring for the sustainability. Therefore, aware of the some of the products that were obtained environment is a fundamental pillar in new environmental challenges, we have from the recycling of polystyrene and its internal processes. In fact, a central developed alliances with the Mexican rims that the team at our Bordo Poniente element is the management of waste Government and different private worksite collected. and the evaluation of the impacts of sector actors to recycle the tires of our these products during their life cycle utility vehicles, as well as the resulting Mota-Engil Mexico and its openness to (obtaining raw materials, production, expanded polystyrene to give them a innovate for the sake of the environment distribution, use and end of life). second life, considerably reducing the drives the improvement to the environmental impact of these materials. management systems. The willingness to recycle requires a culture of social responsibility that Frames, car trims, shoe soles, furniture, seeks to consolidate our main values of waterproofing, and acrylic paints are

SINERGIA 56 FEBRUARY 2020 83 LATIN AMERICA

PERU

CEREMONY OF THE 2019 MANUEL ANTÓNIO DA MOTA FOUNDATION AWARD

THE MAMF AWARD SEEKS TO RECOGNISE INNOVATIVE EDUCATIONAL INITIATIVES THAT CONTRIBUTE TO THE IMPROVEMENT OF THE STUDENTS’ LEARNING PROCESS

n 20 November 2019, the 2019 Foundation, Mota-Engil Peru and the MAMF Award ceremony was Regional Education Directorate of Ancash, O held in the city of Huaraz, to promote innovative projects in the Ancash region. Among those attending region’s educational institutions. Various were representatives of the Regional dissemination projects were carried out, PERU Education Directorate, as well as making the contest massive in the representatives of the nine finalist 20 local education management units. educational institutions, teachers, In total, 70 applications were submitted, principals and students. a record number compared to previous editions. The MAMF Award seeks to recognise innovative educational initiatives that FOUR YEARS OF CONSOLIDATION contribute to the improvement of the In this fourth edition, the MAMF Award learning process of students in public honoured three educational institutions primary and secondary schools in the that have stood out for having innovative regions where Mota-Engil Peru operates. initiatives. Thanks to the funding provided by the Foundation, which SYNERGY FOR EDUCATION amounts to more than 80 thousand soles To carry out the competition, during (€ 21,840), each school will be able to 2019 a cooperation agreement was signed implement its projects. between the Manuel António da Mota

84 1

CREATIVITY AND INNOVATION, ICTs as a didactic strategy based on The MAMF Award seeks THE MAIN ASSISTANTS contextualised mathematical problems. to recognise innovative The first place was obtained by educational initiatives I.E No. 86633 with the initiative “Small And the third place was awarded to entrepreneurs produce written texts I.E Patrón San Miguel Arcángel, with the that contribute to the caring for their environment and initiative “By playing I improve improvement of the learning health”. This project promotes the my learning”. This scenario recreates process of students in public habit of reading through the planning, a playroom to optimise students’ reading organisation, and application of activities comprehension, vocabulary and critical primary and secondary such as guinea pig breeding, bread reading, based on communication. schools in the regions where making, and agricultural activities, Mota-Engil Peru operates. among others, encouraging students Additionally, Luz Elizabeth Vergaray to participate in active reading and Charra, the teacher who promoted the to improve their reading frequency. winning initiative, was also acknowledged with the award of a modern laptop and The second place was for I.E. 86953 one year of internet. Quinhuaragra with the initiative “Solving assigned mathematical problems 1 with the curricular connection with Among those attending were representatives theatre and ICTs”, which consists of the Regional Education Directorate, as well as representatives of the nine finalist educational of the incorporation of theatre and institutions, teachers, principals and students.

SINERGIA 56 FEBRUARY 2020 85 LATIN AMERICA

PERU SOCIO-ENVIRONMENTAL RECYCLING CAMPAIGN

Environmental campaign organised by Mota-Engil Peru and by the NGO SOS Children’s Villages Peru

In less than six months, the employees at The amount collected served to cover the Lima headquarters and at the worksite the clothing, education and schooling of the Las Bambas tailings dam collected of four children for one month. almost 1.4 metric tons of recyclable waste thanks to the socio-environmental The campaign will run until the end EMPLOYEES campaign organised by Mota-Engil Peru of the year and is expected to surpass the at Lima headquarters and at and by the NGO SOS Children’s Villages amount collected to continue improving the worksite of the Las Bambas Peru, a social development organisation the quality of life of more children, tailings dam that works for the promotion and defence while raising awareness about caring of children’s rights. for the environment.

PERU BLOOD DONATION CAMPAIGN

Over 100 units of blood were collected

In June, Mota-Engil Peru carried out In total, more than the voluntary blood donation campaign with the slogan “Donate Blood, Save 100 units of blood were Lives” in favour of the National Institute collected, which could "DONATE BLOOD, SAVE LIVES" of Children’s Health. The campaign was help save 400 lives. Blood donation carried out in the facilities of MEP’s headquarters, with the participation of employees from the headquarters in Lima. In total, more than 100 units of blood were collected, which could help save 400 lives.

The initiative was aimed at raising staff awareness to encourage a culture of blood donation, as this is not a common practice in Peru.

86 PERU

CERTIFICATION OF THE ANTI-BRIBERY MANAGEMENT SYSTEM ACCORDING TO ISO 37001 STANDARD

A THOROUGH PROCESS OF REVIEWING INTERNAL CONTROLS, PROCESSES, EVIDENCE AND OBSERVATION OF ACTIVITIES WAS CONDUCTED.

Mota-Engil Peru participated in the first at multiple worksites. During that time, of ethics and values, as a basis for the external audit for the certification a thorough process of reviewing internal prevention of acts of corruption, legal of the Anti-bribery Management System controls, processes, evidence and non-compliance and the continuous of our Organisation, which had as its observation of activities was conducted. improvement of the Organisation. main objective to determine the system’s The result was “Zero Nonconformities” compliance with international standard and the immediate recommendation Mota-Engil Peru becomes one of the ISO 37001:2016. for the certification of the Anti-bribery first companies in the sector to obtain Management System. the Anti-bribery Management System The audit was carried out from 22 to certification. 25 October by the AENOR certification This result highlights the optimal risk company at, the central headquarters management, due diligence, processes (San Isidro), the Ate headquarters and and the strengthening of the code

SINERGIA 56 FEBRUARY 2020 87 LATIN AMERICA

COLOMBIA

MOTA-ENGIL COLOMBIA FOR A MORE SUSTAINABLE FUTURE

CANOAS LIFTING STATION IS A UNIQUE PROJECT IN LATIN AMERICA.

COLOMBIA^

his is what we are committed to The system, made up of the sewage this type of work. Mota-Engil Colombia with Mota-Engil Colombia’s network, the interceptor tunnel, the will carry out the design, the civil T project: to be participants in the Canoas Lifting Station and the Waste and electromechanical construction recovery of the Bogotá river, a project that Water Treatment Plant (WWTP) of of the work, its commissioning will contribute significantly to the Canoas, will treat wastewater in southern and its monitoring. sustainable development goal: clean water Bogotá and Soacha for the first time. This and sanitation, with which we guarantee way, Mota-Engil Colombia is part of the Six pumps will be installed, with the availability of water, its sustainable team that will leave the biggest positive a capacity of 6.4 m3/s each, generating management and sanitation for all. ecological mark in the history of this city, an installed capacity of 38.4 m3/s. with over seven million people, included The Canoas Lifting Station, assigned to in the community of Bogotá and Soacha. This lifting station will receive the Mota-Engil Colombia, is part of a mega- wastewater from the Tunjuelo Canoas project carried out by the Colombian The Canoas Lifting Station is a unique Interceptor to pump it to the future Canoas government to enable the cleaning of the project in Latin America, given the WWTP, making it an important component Bogotá river. technical complexity that characterises of the Bogotá river sanitation program.

88 The scope of the project will bring professionals and companies from around the world, all of them highly specialised in the environmental area. This project will also allow local workers to be hired, adding social and economic value to the community of Soacha and Bogotá.

Thanks to the professional work of Mota-Engil Colombia, the Canoas Lifting Station project obtained its URC (Uniform Registry for Contractors) certification, representing another great milestone in its course with a reliable management model and as a reference for its clients.

1

Mota-Engil Colombia is part of the team that will leave the biggest positive ecological mark in the history of this city, with over seven million people, included in the community of Bogotá and Soacha.

1 Waste Water Treatment Plant (WWTP) in Canoas

2 Pump with a 6.4 m3/s capacity and 38.4 m3/s of installed capacity

2

SINERGIA 56 FEBRUARY 2020 89 LATIN AMERICA

COLOMBIA

MOTA-ENGIL COLOMBIA COMMITTED TO BARRANQUILLA

2.2 KM OF ENJOYMENT FOR ALL INHABITANTS OF BARRANQUILLA AND ITS VISITORS.

arranquilla (Atlántico), also president during his inauguration last known as the ‘Arenosa’, is one Saturday, 23 November. B of the most important cities in Colombia and a reference destination With Barranquilla being a port city, it for national and international tourists. is contradictory that historically it has COLOMBIA^ For this reason and in order to turned its back on the most important strengthen its development, Mota‑Engil river in the country. With the opening built this boardwalk under a clear, of the Gran Malecón, today that reality orderly, visionary and sustainable changes and this will become, without a urbanism perspective. doubt, the most visited tourist attraction in the Caribbean and the favourite AN UNPRECEDENTED WORK location for Colombian families and The construction of this boardwalk tourists visiting the country. (Malecón) assists in one of the great objectives of the government of the This project was delivered in two city’s mayor, Alejandro Char: making phases. The first, in the first half the city once again turning its gaze to of 2018, where work was done on this affluent. In fact, one of the mayor’s stabilising the land, on building a promises was that the city face its river two-way avenue, on river containment and that is why this investment was structures and on the installation of carried out, for the enjoyment underground cabling for lighting and of all of Barranquilla’s citizens. electrical networks. “An unprecedented work”, said the

90 With this work, Mota Engil came through for Barranquilla. We are very pleased to be able to fully deliver everything that was proposed in the initial project and even to exceed expectations.

PEDRO TEIXEIRA CEO of Mota Engil in Colombia

1

The most important concept of the We are very pleased to be able to fully In order to strengthen project was the second phase in which deliver everything that was proposed its development, three football pitches, a recreational in the initial project and even to exceed Mota-Engil built this square, large park areas with games expectations. We are sure that this work for children, exclusive areas for pets, will bring development, well-being boardwalk under a clear, gymnasiums, gardens, cafes, bike and quality of life to the people of orderly, visionary and routes, sports fields and large green Barranquilla, and will project the city sustainable urbanism spaces were delivered. as a tourist destination that will attract foreign investment for its development, perspective. A NEW SYMBOL innovation and sustainability”. Gran Malecón has become the symbol of all the tourist, commercial and business This recovery of the quality public space development that Barranquilla has that Barranquilla deserved to have is had. In addition, it has the Puerta de appreciated by the community and is Oro fairgrounds for the most important perhaps the most transcendental project cultural events in the region and the for the city. 1 Caimán del Río, designed as the new The project includes three football pitches, gastronomic area of the city. a recreational square, large park areas with games for children, exclusive areas for pets, gymnasiums, gardens, cafes, bike routes, sports fields and large green spaces. For Pedro Teixeira, CEO of Mota-Engil in Colombia, “with this work, Mota‑Engil came through for Barranquilla.

SINERGIA 56 FEBRUARY 2020 91 LATIN AMERICA

COLOMBIA

MOTA-ENGIL COLOMBIA COMMITTED TO THE HEALTH AND WELL-BEING OF ITS EMPLOYEES

TAKE CARE OF YOUR HEART CAMPAIGN

The plan was carried he World Heart Day is about healthy habits, high blood out with 72 workers celebrated on the 29th of pressure, high cholesterol, diabetes T September. According to the and others. (53 women and 19 men) Health of the Americas Report, the who were made more leading cause of death in Colombia is This way, Mota-Engil Colombia, in aware of healthy lifestyles cardiovascular disease, responsible for alliance with the occupational hazard and screened for weight, 31% of all deaths each year, insurance company SURA, generated corresponding to 15% more than the the campaign “Take care of your blood pressure and mortality from any kind of cancer. heart” focused on awareness, control oxygen saturation. and empowerment concerning the In Colombia, we have an organisational detection of this disease. culture that leads by example. Therefore, the active participation of The plan was carried out with 72 our directors motivates our employees workers (53 women and 19 men) who regarding the health and well-being were made more aware of healthy campaigns, promoting a healthy life. lifestyles and screened for weight, blood pressure and oxygen saturation. To reduce the rates of these diseases, it Recommendations will be provided is necessary to instil in people the value to each worker, emphasizing the of primary prevention, which focuses on importance of regular medical a mind-set change that enables learning check-ups.

92 At Mota-Engil Colombia, the “Health and Life” campaign will begin in 2020, including trainings and activities related to healthy eating, sports and self-esteem

At Mota-Engil Colombia, the “Health awareness of the team regarding self- and Life” campaign will begin in 2020, care, confidence and self-esteem, with including trainings and activities a single purpose: to ensure a healthy, related to healthy eating, sports and happy and empowered organisation that self-esteem, seeking to care and raise provides more and better results.

COLOMBIA MOTA-ENGIL COLOMBIA PROMOTING BREAST CANCER PREVENTION

Campanha da Mota-Engil Colômbia em parceria com o CAFAM e a FAMISANAR.

Breast cancer is the most common in We managed to raise awareness among Colombian women, with 13,380 new 65 employees, to whom we gave the PREVENTION cases and 3,702 deaths from the disease CA SENO self-examination (causes, Breast cancer screening in 2018 alone. symptoms, risk factors, protective and awareness campaign factors, treatment and prevention). Thus, Mota-Engil Colombia (seeking to promote and disseminate From 2020, we will join this cause recommendations for early detection, by training the communities near diagnosis and timely treatment of breast the worksites to eventually develop cancer) conducted – in partnership with the a social initiative for the well-being Family Compensation Fund CAFAM and of the people. health provider Famisanar – a campaign of awareness, screening and empowerment on the detection of this disease.

SINERGIA 56 FEBRUARY 2020 93 LATIN AMERICA

BRAZIL

CONSITA STRENGTHENS POSITION IN BRAZIL

COMPANY IN THE ENVIRONMENTAL SECTOR GETS FIVE NEW CONTRACTS

BRASIL

ursuing the goals of expansion company with annual services, which can CONSITA shareholder, who was part in the Brazilian territory, be renewed up to 60 months. of this structure and contributed P CONSITA, a Brazilian to its growth. company operating in waste In October, the company began its management, recently signed five operations in the federal state of Brasilia, At the end of October, the company also important contracts for municipal with a 60-month contract that, in addition started an annual contract in Conceição cleaning and waste collection services. to urban cleaning and waste collection do Mato Dentro, in the state of Minas activities, includes environmental Gerais, which also provides for a renewal The first, starting in June 2019 and lasting awareness-raising campaigns. In this of up to 60 months. 36 months, which can be renewed for up contract, and in order to combine the to 60 months, was signed with the São multiple devices and the more than one Sarandi, in the state of Paraná, and Santa Paulo municipality. Also in June, Itapevi, thousand employees, a local service Luzia, in Minas Gerais, were also added a city near São Paulo, hired CONSITA for centre was created, named Felipe Rezende to CONSITA’s client portfolio, through a period of six months and, in August, Henriques, which thus pays tribute to the annual awarding contracts for MSW Itatiba, in the same state, awarded the late grandson of the founder of ECB, a collection, starting in July.

94 In total, these contracts cover an area securing the company a monthly total These contracts ensure of 45 thousand km2 and a population of 23 million BRL, corresponding to over 2,500 jobs and of 3.5 million inhabitants, totalling around 5.5 million euros, reinforcing 60 thousand km of mechanically and the Group’s presence in Brazil and in a secure to the company manually swept streets and more than sector of activity in which it is the leader a monthly total of 50 thousand ton of monthly waste in Portugal. 5.5 million euros. collected, ensuring over 2,500 jobs and

BRAZIL ECB IN THE TOP 10

Company consolidates its position in the Brazilian infrastructure market.

ECB achieved a prominent position in the Mota-Engil Group as unavoidable brands Brazilian infrastructure market, reaching in supporting the development of the the sixth position among the country’s Brazilian economy. largest construction companies.

This milestone in the company’s history 6TH 3RD 2ND consolidates ECB’s gradual growth cycle Largest Construction Largest in Minas Largest in Minas in the Brazilian market, maintaining Company in Brazil Gerais (Considering Gerais (Considering all types of construction) heavy construction positive expectations for the future only) to continue to affirm ECB and the

BRAZIL MOTA-ENGIL AND ECB CELEBRATE CHILDREN'S DAY IN BRAZIL

Mota-Engil Brasil and ECB spread joy by offering, to local children, 100 tickets for an amusement park.

Children’s Day was celebrated at Worksite Amusement Park facilities for the first 231 COMPERJ / RJ in the Amusement time. In the meeting with the technical Park of Itaboraí / RJ. Mota-Engil Brasil and team, they discussed the importance ECB ensured the happiness of children of ensuring safety and maintenance by buying 100 tickets to be distributed standards. to the children of the region, which were selected by the Association of Residents Children came from the districts of and Friends of Alto do Jacu. Sambaetiba, Caçaba and Alto do Jacu in the state of Rio de Janeiro The amusement park will be present in the city until November, thus the The president of the association thanked Communication and Social Responsibility Mota-Engil and ECB for the action, which department visited the Itaboraí served the children in the region.

SINERGIA 56 FEBRUARY 2020 95 TECHNOLOGY AND INNOVATION

TECHNOLOGY AND INNOVATION

MOTA-ENGIL LEVERAGES EFFICIENCY THROUGH ROBOTICS

IN A CONTEXT OF DIGITAL TRANSFORMATION, THE GROUP’S SHARED SERVICES STRENGTHEN CAPACITY THROUGH ROBOTIC PROCESS AUTOMATION (RPA)

sustainability and digital In this context, MESP (Mota-Engil A transformation are now Serviços Partilhados) has developed considered core vectors of maintenance and execution capabilities competitiveness for business in the within the scope of RPA, currently 21st century. constituting a growing share of its operation. Their interconnection (in a joint vision that balances current and future RPA is a disruptive technology that performance) will enable companies to enables performing routine activities reach new levels of development, in an (24 hours a day, 365 days a year), ecosystem that now includes the most usually performed by humans, in an diverse stakeholders (shareholders, automatic way, making companies customers, suppliers, community, more effective in their processes and environment, investors…). with greater flexibility in the face of volume variations. 1 To that effect, the integration of new technologies in the business or support Processes best suited to implement an processes already enables not only to RPA solution: guarantee a faster and more dynamic production of and access to information • Repetitive (supporting decision making), but • Error-prone also to help employees in their usual • With implemented rules 1 activities – freeing them for activities • With data transfer and transport Sérgio Lopes and Miguel Gomes, • With high administrative burden RPA Developer and RPA Manager with greater added value and enhancing the balance between their personal and professional lives.

96 It should be noted that the benefits of this The adoption of robotics-based processes models, representing savings of 5 FTEs/ solution are not only global (improved is a good example of this and deserves to Year, with robotised activities business results, reduced wage costs, be evaluated not as an isolated fact but in many areas (accounting, taxation, reduced risk), but also in terms of: as a reality that can/should be replicated reporting, treasury, master data, in other areas of the Group. MESP, as reconciliations, HR). • satisfaction by the user of the the internal leader in the adoption and information (reduction of data entry development of this tool, should also be Of note is the need for prior errors and other manual errors, swifter the promoter and partner in this positive systematisation of processes for the availability), contagion effect, so that other areas can robotisation’s success, as well as the • data analysis (better quality, greater replicate the good results obtained so far!” creation of a real-time dashboard scope for collection, reduced effort in of the robotised operation, supported compiling data), SPECIFIC FRAMEWORK in PowerBI. At the end of 2017, MESP concluded the • HR (improved employee satisfaction, process of choosing the RPA platform, EVOLUTION PERSPECTIVES greater ability to manage variations in selecting UiPath (a leading company in • Expansion of the installed base within volume of business, improved business process robotisation, with a market cap the MESP scope, leveraging robotisation reputation), of $7B), for the agility of its solution and as a digital workforce that complements • compliance (minimising human contact reduced levels of investment required. the current teams, with a focus on the with sensitive data, reduction in the management of the monthly activity possibility of fraud and creation of During 2018, the focus was on training cycles, support in extended hours and traceability for audit purposes). the RPA team and choosing (through reinforcement of the scale effect specific business cases) pilot processes Quote from José Pedro Freitas, Chairman and their implementation. • Activation of robots for the operation of MESP: “The adoption of new of business or administrative-financial technologies and innovative processes in In 2019, with total autonomy, MESP areas (in companies supported both front office and back office are now manages over 30 robotised activities by MESP or otherwise), as well as essential steps for the optimisation and in Unattended (scheduled execution) administrative activities within the efficiency of our organisation. and Attended (execution at user request) holding company.

The adoption of new technologies and innovative processes in both front office and back office are now essential steps for the optimisation and efficiency of our organisation.

JOSÉ PEDRO FREITAS Chairman of MESP

SINERGIA 56 FEBRUARY 2020 97 PORTUGAL

MANUEL ANTÓNIO DA MOTA AWARD 2019

THE SUSTAINABLE PORTUGAL CONFERENCE WAS ATTENDED BY THE PORTUGUESE PRIME MINISTER, ANTÓNIO COSTA

nder the topic of the awarded second and third places, Sustainable Development respectively. U Goals in areas such as the environment, mobility and social The ceremony was honoured by the inclusion, the Manuel António da Mota presence of the Portuguese Prime Award had dozens of applications in Minister, António Costa, who presented 2019, thus making it difficult to select the the Award to the finalist institutions, ten finalist applications, due to the merit and by the Minister for the Environment and quality of the work developed by and Climate Action, José Pedro Matos those organisations. Fernandes, who was a speaker at the Conference. After the selection of the finalists, the ceremony for the Manuel António da After the name of the winner was known, Mota Award was held at the Alfândega Patrícia Boura, Chief Executive Officer do Porto. The award was given to of Fundação do Gil, stated: “I thank this Fundação do Gil, an institution devoted Award foremost on behalf of the children to providing home care for children with and families we have supported daily for chronic illnesses, and in this edition 13 years in this project. I want to thank it received an increased amount of 75 my team who every day fight silently with thousand euros, taking into account tremendous resilience to make it possible the fact that it is the 10th edition of to support children with chronic diseases the Manuel António da Mota Award, at home, and now e have extended the with Associação Dignitude and ASAS project to palliative care. This award goes – Associação de Solidariedade being to them, and thank you very much!”

98 In this 10th edition of this Award I want to begin by emphasising the importance of the persistence of the Foundation’s work, its social commitment, and also that in these ten entities that today were duly awarded we see the great social energy in our country.

ANTÓNIO COSTA Portuguese Prime Minister

1

The award was given to Fundação do Gil, an institution devoted to providing home care for children with chronic illnesses, and in this edition it received an increased amount of 75 thousand euros.

1 Portuguese Prime Minister, António Costa

2 Ceremony at Alfândega do Porto's auditorium 2

SINERGIA 56 FEBRUARY 2020 99 For the Manuel António da Mota Foundation [2019] is a very special year because it is the 10th edition of the Award, which is already a reference in Portugal.

RUI PEDROTO Chief Executive Officer of the Manuel António da Mota Foundation

António Mota, Chairman of the Board of Directors of the Mota-Engil Group, highlighted in his speech that “for the Manuel António da Mota Foundation [2019] is a very special year because it is the 10th edition of the Award, which is already a reference in Portugal. The Prime Minister honours us with his presence. It is also a special year because, in 2019, the Manuel António da Mota Award – A life in Angola was awarded for the first time in Luanda. This award was given by the first lady of Angola in the presence of their excellencies, President João Lourenço and President Marcelo Rebelo de Sousa. I can tell you that it has been a full year for me and my sisters, because of the presence of President João Lourenço, President Marcelo Rebelo de Sousa and here today the Prime Minister, bringing back the memory of my father, in a deep 4 feeling for the Mota family”, then saying

100 that: “We, the Mota-Engil Group, will Fernandes praised the work of the Manuel continue on our path, struggling with the António da Mota Foundation in the challenges, but certain that to overcome development of actions related to social them, the example of the past will be responsibility, mentioning, on the topic a reference in the success of the future. of sustainability, that: “We have a huge Thank you very much.” challenge ahead of us and we either take it into our hands or we lose it. Without In turn, the Prime Minister, António an emission-free atmosphere, without Costa, said: “In this 10th edition of this an economy that regenerates resources Award I want to begin by emphasising and leaves for the Earth what is hers, the importance of the persistence and without recognising that the natural of the Foundation’s work, its social capital is much more than something to commitment, and also that in these ten be enjoyed, our life will truly be hellish entities that today were duly awarded in the short term. Drought and rising sea we see the great social energy in our levels are not strange phenomena; they country.”. He then recalled that he was are part of what the present at the 8th edition of the Award, experience every day. This is our time, that year with a "topic alluding to the the time to invest is now, because later fight against poverty and the importance on we will not have the money for it, so of education in the fight against poverty, enormous will the task be”. recalling the work that has been done to eradicate poverty in Portugal", Rui Pedroto, Chief Executive Officer of concluding with the "congratulations the Manuel António da Mota Foundation, to those who competed, congratulations took the stage to present the Foundation’s to the winners, congratulations to the various initiatives over the years, and Manuel António da Mota Foundation”. to recall the work carried out in the area of social responsibility policy in 3 In the Conference under the topic Portugal, as well as in the countries of “Sustainable Portugal”, the Minister where Mota‑Engil is present: “The for the Environment, João Pedro Matos Manuel António

3 António Costa presents the Award to Patrícia Boura, CEO of Fundação do The ceremony was honoured by the presence of the Gil - winning institution. Portuguese Prime Minister, António Costa, who presented the Award to the finalist institutions, and by the Minister 4 for the Environment and Climate Action, José Pedro Matos António da Mota, Chairman of the Board of Directors of the Mota-Engil Group, on stage, to present several initiatives of the Fernandes, who was a speaker at the Conference. Foundation over the years.

JOÃO PEDRO MATOS PATRÍCIA BOURA Minister for the Environment Chief Executive Officer of Fundação do Gil "Drought and rising sea levels are not strange phenomena; they are part of "I thank this Award foremost on what the Portuguese people experience behalf of the children and families every day. This is our time, the time to we have supported daily for 13 years invest is now, because later on we will in this project. I want to thank my not have the money for it, so enormous team who every day fight silently will the task be". with tremendous resilience ".

SINERGIA 56 FEBRUARY 2020 101 5

da Mota Foundation was publicly conference ended this year with the recognised in 2010, and next year it will Chairwoman of the Board of Trustees of have been in existence for a decade. the Manuel António da Mota Foundation, Established by the will of the Mota family Manuela Eanes, who spoke about the and the companies of the Mota-Engil 10 finalists, previous editions and the Group, its patron, the Foundation is the founder of the Mota-Engil Group, Manuel contemporary and natural corollary António da Mota. of the philanthropic matrix and tradition of the Mota-Engil Group, following the The closing of the 10th edition of the 6 legacy of its founder, Manuel António Manuel António da Mota Award was da Mota. By adopting its name, the responsibility of the A –K’ choir the Foundation thus pays tribute to his group, which shows the excellence of example and inspiring memory”. the work they have been carrying out, experientially increased by the quality The Sustainable Portugal award of its members.

5 The 10 finalists of the Manual António da Mota Award Also distinguished were, the Associação Dignitude 6 Manuela Eanes, Chairwoman and ASAS - Associação de Solidariedade, with the of the Board of Trustees of the Manuel António da Mota Foundation second and third places, respectively.

102 Af_200x275_Anuncio_MEEC_2018_Sinergia ENG.pdf 1 19/03/2019 16:55

We are what we do

C

M

Y

CM

MY

CY

CMY

K

Mota-Engil Engenharia holds the leading position nationwide in its area of activity.

The company is increasingly becoming a benchmark in engineering and construction, given its over 70 years of experience in the development of ambitious projects based on the pioneering nature of construction techniques, on the forefront of new technologies and on the skills and abilities of its people.

engenharia.mota-engil.pt A World of Inspiration

EUROPE

LATIN AMERICA AFRICA

EUROPE AFRICA LATIN AMERICA

PORTUGAL ANGOLA ZIMBABWE MEXICO Rua do Rego Lameiro, nº38 Suite 301, Churchill House Rua Joaquim Cordeiro da Mata, 7, Routledge Street Av. Horacio 804 Holanda 100, Of. 1102 4300-454 Porto 120 Bunns Lane nº 61-63 Milton Park Col. Polanco IV Sección Providencia, Santiago Portugal Mill Hill, London Bairro da Maianga Harare Del. Miguel Hidalgo CP 7510021 NW7 2AS Luanda 11550 Ciudad de México CHILE Rua Mário Dionísio, nº2 UGANDA 2799-557 Linda-a-Velha IRELAND MOZAMBIQUE 4, Upper Kololo Terrace PERU ARUBA Portugal Railway House, Station Rd, Edifício Millennium Park, P.O. Box 8453 Av. Nicolás Ayllón 2634 Koningstraat 86, unit 5 Loughrea, Co. Galway 14º/15º Andar Kololo, Código Postal 15022 Oranjestad SPAIN H62 VN56 Avenida Vladimir Lenine, n.º 174 Kampala Calle Julián Camarillo nº10, 1100 Maputo BRAZIL DOMINICAN 2ª planta, despacho 205 Unit 3, 4075 Kingswood RWANDA Rua Santa Catarina, 894 REPUBLIC 28037 Madrid Road, Citywest Business MALAWI KG 415 Avenue, Bairro Lourdes Av. Winston Churchill, Campus, Dublin 24, Co. POLAND Nasra House – City Centre Gate nº6, Gacuriro Belo Horizonte M/G esquina Calle Andrés Dublin Ul. Wadowicka 8 W P.O. Box 31379 P.O Box 2179 CEP: 30170 - 080 Julio Aybar D24 KF85 30-415 Kraków Lilongwe 3 Kigali Torre Acrópolis, Piso 11 COLOMBIA Santo Domingo Distrito SOUTH AFRICA GUINEA CONAKRY Carrera 11 # 87 - 51 Nacional 66 Wierda Road East Immeuble N’Afanta Kaké, Edificio Porvenir Código Postal 10148 Sandton 2146 Av. William Tubman Ofi. 301 Johannesburg Rue KA-032 Bogotá DC Almamya, Kaloum CAPE VERDE Conakry Rua S. Vicente, nº 63, 1º andar Palmarejo 721 IVORY COAST Plateau, Praia Rue de la Cannebière, Cocody Danga Résidence Santa Maria SÃO TOMÉ AND PRÍNCIPE 4éme étage 01 B.P. 7361 ABJ 01 Av. Marginal 12 de Julho, nº 1011 C.P. 167 São Tomé TANZANIA 1403 Bains Singh Avenue, Masaki, ZAMBIA Dar es Salaam DG Office Park 1 Chila Road, Kabulonga CAMEROON P.O. Box: 320337 Woodlands Rue Koloko à Bonapriso, Lusaka Immeuble 4 Étages (Apt. 300), BP 4155 Douala www.mota-engil.com

www.facebook.com/motaengil linkedin.com/company/mota-engil www.youtube.com/motaengilsgps