Pegasus West Development Environmental Statement

Total Page:16

File Type:pdf, Size:1020Kb

Pegasus West Development Environmental Statement Pegasus West Development Environmental Statement [This page is intentionally left blank] [This page is intentionally left blank] Pegasus West Development ES Standard Information Sheet INFORMATION SHEET Project Name: Pegasus West Development Development Location: Blocks 43/13b, 43/14, 43/15, 44/11 and 44/12 Licence No.: P1724, P1727 and P2128 Project Reference No.: D/4227/2018 Type of Project: Tie-back Development Undertaker: Spirit Energy Resources Limited Spirit Energy Resources Limited 55% Licencees/Owners: Third Energy Offshore Limited 45% The Pegasus field will be developed via tie-back of the Pegasus West well 43/13b-7 to the existing Neptune Energy-operated Cygnus gas development. The proposed development comprises: The completion for production of the Pegasus West 43/13b-7 well; The installation of an uninsulated 10” nominal bore carbon steel production pipeline, and a 180 mm outer diameter (OD) electro-hydraulic-chemical umbilical, Short Description: each approximately 56.8 km in length, to the existing Cygnus development; The installation of subsea production infrastructure including a Xmas tree and wellhead protection structure (WPS) at Pegasus West and a subsea isolation valve (SSIV) at Cygnus; Modifications to the Cygnus topside facilities; and Processing of Pegasus West hydrocarbons at Cygnus with onward export to Bacton gas terminal. Cygnus topside modifications Q2 2020 – Q4 2021 Well re-entry and completion Q2 2021 Key Dates: Subsea infrastructure installation Q3 2021 Offshore testing and commissioning Q3-Q4 2021 First Gas Q4 2021 – Q4 2023 The significance of the impacts of all planned activities, following the application of control and mitigation measures, was considered low, with the exception of those associated with the permanent physical presence of installed seabed infrastructure and seabed disturbance, the impacts of which are considered medium and ‘as low as reasonably practicable’. Significant Environmental The significance of the risk associated with an unplanned (accidental) large Impacts Identified: hydrocarbon release, again following control and mitigation, is considered medium and ‘as low as reasonably practicable’. Generally, the impacts identified are considered localised and short term with low potential for long term or transboundary and cumulative impacts. The proposed Pegasus West Development does not contradict any marine planning objectives or marine planning oil and gas policies. Statement Prepared By: Genesis Oil and Gas Consultants Ltd. and Spirit Energy Company: Job Title Relevant Qualifications/Experience Spirit Energy Production Senior Environmental Advisor 25 years in industry UK Limited Genesis Oil and Gas 16 years’ of experience in Consultant Environmental Engineer Consultants Ltd environmental/oil and gas Pegasus West Development ES i [This page is intentionally left blank] Pegasus West Development ES ii Table of Contents TABLE OF CONTENTS INFORMATION SHEET………………………………………………………………………………………………..i TABLE OF CONTENTS………………………………………………………………………………………………iii NON-TECHNICAL SUMMARY……………………………………………………………………………………...vii ACRONYMS AND ABBREVIATIONS ....................................................................................................... .xvii GLOSSARY .................................................................................................................................................. xxi 1. INTRODUCTION ............................................................................................................................. 1-1 1.1 Overview of the Pegasus West Development ................................................................................. 1-2 1.2 Purpose of the Environmental Statement ........................................................................................ 1-2 1.3 Scope of the Environmental Statement ........................................................................................... 1-2 1.4 Document Layout ............................................................................................................................. 1-4 1.5 Regulatory Context .......................................................................................................................... 1-5 1.6 Spirit Energy Management System ................................................................................................. 1-9 1.7 Areas of Uncertainty ...................................................................................................................... 1-10 1.8 Consultation Process ..................................................................................................................... 1-10 2. PROJECT DESCRIPTION .............................................................................................................. 2-1 2.1 Nature of the Reservoir.................................................................................................................... 2-1 2.2 Option Selection .............................................................................................................................. 2-2 2.3 Schedule of Activities ....................................................................................................................... 2-4 2.4 Well Completion ............................................................................................................................... 2-5 2.5 Subsea Infrastructure Installation .................................................................................................... 2-7 2.6 Cygnus Overview and Topside Modifications................................................................................ 2-11 2.7 Production Phase .......................................................................................................................... 2-13 2.8 Key Permits and Consents ............................................................................................................ 2-17 2.9 Decommissioning .......................................................................................................................... 2-19 2.10 Summary of Principal Planned Activities and Aspects .................................................................. 2-19 3. ENVIRONMENTAL BASELINE ...................................................................................................... 3-1 3.1 Introduction ...................................................................................................................................... 3-1 3.2 Physical Environment ...................................................................................................................... 3-2 3.3 Marine Flora and Fauna ................................................................................................................ 3-17 3.4 Habitats and Species of Conservation Concern ............................................................................ 3-38 3.5 Socio-Economic Baseline .............................................................................................................. 3-43 4. ENVIRONMENTAL IMPACT ASSESSMENT METHOD ................................................................ 4-1 4.1 Overview .......................................................................................................................................... 4-1 4.2 Definitions ........................................................................................................................................ 4-1 4.3 Significance of Planned Activity Impacts ......................................................................................... 4-1 4.4 Risk of Impacts from Unplanned Events ......................................................................................... 4-3 Pegasus West Development ES iii Table of Contents 4.5 Assessing Project Impacts and Risks .............................................................................................. 4-5 5. PHYSICAL PRESENCE .................................................................................................................. 5-1 5.1 Sources ............................................................................................................................................ 5-1 5.2 Impacts and Receptors .................................................................................................................... 5-1 5.3 Control and Mitigation Measures ..................................................................................................... 5-5 5.4 Conclusion ....................................................................................................................................... 5-6 6. ENERGY USE AND ATMOSPHERIC EMISSIONS ....................................................................... 6-1 6.1 Sources ............................................................................................................................................ 6-1 6.2 Impacts and Receptors .................................................................................................................... 6-2 6.3 Control and Mitigation Measures ..................................................................................................... 6-3 6.4 Conclusion ....................................................................................................................................... 6-4 7. UNDERWATER SOUND ................................................................................................................
Recommended publications
  • The DA GHGI Improvement Programme 2009-2010 Industry Sector Task
    The DA GHGI Improvement Programme 2009-2010 Industry Sector Task DECC, The Scottish Government, The Welsh Assembly Government and the Northern Ireland Department of the Environment AEAT/ENV/R/2990_3 Issue 1 May 2010 DA GHGI Improvements 2009-2010: Industry Task Restricted – Commercial AEAT/ENV/R/2990_3 Title The DA GHGI Improvement Programme 2009-2010: Industry Sector Task Customer DECC, The Scottish Government, The Welsh Assembly Government and the Northern Ireland Department of the Environment Customer reference NAEI Framework Agreement/DA GHGI Improvement Programme Confidentiality, Crown Copyright copyright and reproduction File reference 45322/2008/CD6774/GT Reference number AEAT/ENV/R/2990_3 /Issue 1 AEA Group 329 Harwell Didcot Oxfordshire OX11 0QJ Tel.: 0870 190 6584 AEA is a business name of AEA Technology plc AEA is certificated to ISO9001 and ISO14001 Authors Name Stuart Sneddon and Glen Thistlethwaite Approved by Name Neil Passant Signature Date 20th May 2010 ii AEA Restricted – Commercial DA GHGI Improvements 2009-2010: Industry Task AEAT/ENV/R/2990_3 Executive Summary This research has been commissioned under the UK and DA GHG inventory improvement programme, and aims to research emissions data for a group of source sectors and specific sites where uncertainties have been identified in the scope and accuracy of available source data. Primarily this research aims to review site-specific data and regulatory information, to resolve differences between GHG data reported across different emission reporting mechanisms. The research has comprised: 1) Data review from different reporting mechanisms (IPPC, EU ETS and EEMS) to identify priority sites (primarily oil & gas terminals, refineries and petrochemicals), i.e.
    [Show full text]
  • Download Original Attachment
    Operator Name Location Name Address Name Address Street Address Town Address County Address Postcode 1 Address Postcode 2 Incumbent Duty Type Text Previous Name LA Code Local Authority Country AMG Superalloys UK Limited Rotherham Fullerton Road Rotherham South Yorkshire S60 1DL COMAH Upper Tier Operator (was London & Scandinavian Metallurgical Co Ltd) 4415 Rotherham England Anglian Water Services Limited Wing Water Treatment Works Morcott Road Oakham Rutland LE15 8SA COMAH Upper Tier Operator 2470 Rutland UA England Arch Timber Protection Limited Huddersfield Huddersfield Works Leeds Road Huddersfield West Yorkshire HD2 1YU COMAH Upper Tier Operator (was Arch UK Biocides Ltd) 4715 Kirklees England Argenta Dundee Limited Dundee Dunsinane Industrial Estate Kinnoull Road Dundee Angus DD2 3XR COMAH Upper Tier Operator (was Vericore Limited) 9059 Dundee UA Scotland Associated British Ports Immingham Dock Immingham Dock Immingham Lincolnshire DN40 2NS COMAH Upper Tier Operator 2002 North East Lincolnshire England Associated Petroleum Terminals (Immingham) Limited Immingham Main Terminal Queens Road Immingham North East Lincolnshire DN40 2PN COMAH Upper Tier Operator 2002 North East Lincolnshire England Avanti Gas Limited Ellesmere Port Britannia Road Ellesmere Port Cheshire CH65 4HB COMAH Upper Tier Operator (was Shell Gas Limited) 4325 Wirral England Avara Avlon Pharma Services Limited Avlon Works Severn Road Bristol South Gloucestershire BS10 7ZE COMAH Upper Tier Operator (was AstraZeneca UK Limited) 0119 South Gloucs UA England BAE Systems
    [Show full text]
  • Key Inputs Required
    BAIRD GAS STORAGE PROJECT ONSHORE ENVIRONMENTAL STATEMENT ON BEHALF OF BACTON STORAGE COMPANY LTD IN RESPECT OF A PLANNING APPLICATION FOR THE ONSHORE ELEMENTS OF THE BAIRD GAS STORAGE PROJECT AT SITE ENCOMENCOMPASSING A CORRIDOR OF LAND RUNNING FROM MLWM WESTWARDS AND TO THE NORTH OF THE SHELL UK TERMINAL TO THE PERENCO UK TERMINAL; THE PERENCO UK TERMINAL; A CORRIDOR OF LAND ACROSS PASTON ROAD BETWEEN THE PERENCO UK TERMINAL AND NATIONAL GRID GAS DISTRIBUTION STATION; AND AREAS OF LAND TO THE NORTH-WEST OF SEAGULLS FIELD; OFF PASTON ROAD, BACTON, NORFOLK Client Ref: BD-017-EV-RPT-005 February 2010 COPYRIGHT THE CONTENTS OF THIS DOCUMENT MUST NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT OF RPS Baird Gas Storage Project Onshore Environmental Statement CLIENT REF ES BD-017-EV-RPT-005 FEBRUARY 2010 Synergy House, Unit 1 Calverton Business Park Hoyle Road, Calverton, Nottingham, UK NG14 6QL Telephone: +44 (0) 115 965 6700 Facsimile: +44 (0) 115 965 5282 www.cra.co.uk BAIRD GAS STORAGE PROJECT ONSHORE ENVIRONMENTAL STATEMENT CLIENT REF ES BD-017-EV-RPT-005 PREPARED FOR BACTON STORAGE COMPANY LIMITED FEBRUARY 2010 CLIENT REFERENCE BD-017-EV-RPT-005 CRA REFERENCE 933841 (1) This report is printed on recycled paper TABLE OF CONTENTS Page 1.0 INTRODUCTION................................................................................................................... 1 1.1 PROJECT BACKGROUND................................................................................ 1 1.2 BACTON STORAGE COMPANY LIMITED .................................................
    [Show full text]
  • Chapter 4 Site Selection and Assessment of Alternatives
    Norfolk Boreas Offshore Wind Farm Chapter 4 Site Selection and Assessment of Alternatives Environmental Statement Volume 1 Applicant: Norfolk Boreas Limited Document Reference: 6.1.4 RHDHV Reference: PB5640-006-004 Pursuant to APFP Regulation: 5(2)(a) Date: June 2019 Revision: Version 1 Author: Royal HaskoningDHV Photo: Ormonde Offshore Wind Farm Date Issue Remarks / Reason for Issue Author Checked Approved No. 12/02/2019 01D First draft for Norfolk Boreas Limited review DT CD/RD/AH/JL AD/JL 27/02/2019 02D Second draft for Norfolk Boreas Limited Review DT RA/DT/JL/AH AD/JL 16/04/2019 01F Final for DCO submission DT RA/CD JL Environmental Statement Norfolk Boreas Offshore Wind Farm 6.1.4 June 2019 Page i Table of Contents 4 Site Selection and Assessment of Alternatives ......................................................... 1 4.1 Introduction ........................................................................................................... 1 4.2 Key Components of Norfolk Boreas ......................................................................... 3 4.3 Legislation and Guidance ........................................................................................ 4 4.4 Site Selection Process ............................................................................................. 5 4.5 Project Alternatives ................................................................................................ 9 4.6 Identification of the Offshore Wind Farm Location ................................................ 10 4.7 Identification
    [Show full text]
  • LEE Mapping Analysis Report
    Local Energy East Mapping Analysis Report May 2018 ______________________________________________________ A narrative on conclusions drawn from the mapping work on the Local Energy East area incorporating views on network company forward plans and government policy. Disclaimer While Cornwall Insight considers the information and opinions given in this report and all other documentation are sound, all parties must rely upon their own skill and judgement when making use of it. Cornwall Insight will not assume any liability to anyone for any loss or damage arising out of the provision of this report howsoever caused. The report makes use of information gathered from a variety of sources in the public domain and from confidential research that has not been subject to independent verification. No representation or warranty is given by Cornwall Insight as to the accuracy or completeness of the information contained in this report. Cornwall Insight makes no warranties, whether express, implied, or statutory regarding or relating to the contents of this report and specifically disclaims all implied warranties, including, but not limited to, the implied warranties of merchantable quality and fitness for a particular purpose. Numbers may not add up due to rounding. Contents 1 Executive summary 4 1.1 Geographical extent 4 1.2 Local Energy East’s ambitions 4 1.3 Summary of findings 5 1.4 Structure of document 6 2 Energy data-mapping portal 7 3 High level indicators 11 3.1 Regional energy developments 11 3.2 New Anglia economic plans 11 3.3 Cambridgeshire
    [Show full text]
  • BACTON 021799 Asset Fact Sheets MARKETING
    BACTON SEAL TS (BP) CA TEESSIDE CUTTER SOLE PIT CARRACK BARQUE GALLEON SHAMROCK CARAVEL EASINGTON CLIPPER BRIGANTINE SKIFF STANLOW INDE AMELAND INDE FIELD CORVETTE SEAN GRIJPSKERK SEAN FIELD LEMAN BACTONBACTON BBL DEN HELDER GREAT YARMOUTH INTERCONNECTOR BALGZAND EMMEN THE HAGUE SCHIEDAM LONDON BACTON ZEEBRUGGE BACTON The Bacton gas terminal is located on the Norfolk coast, 32km (19 miles) north of Great Yarmouth. The site is four terminals within one. Perenco, Shell and Eni each operate a separate gas reception and processing facility. The Transco Entry Facility provides a direct link to the UK - Continent Interconnector (a separate asset report for the Interconnector is available). KEY FACTS Location 32km North of Great Yarmouth Hydrocarbons Produced Gas Export Method The Shell operated terminal accepts gas from five main offshore lines. These include the Leman West area, the Sean area and the Sole Pit area (Barque and Clipper). Bacton (Shell) also accepts production from the Shearwater Elgin Area Line (SEAL). Operated/Non Operated Operated Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2016 BACTON INFRASTRUCTURE INFORMATION Entry Specification: GSV 37-44.5MJ/sm3, Oxygen <0.2%, CO2 Max 2 mol%, H2S <3.3ppm, Total Sulphur <15ppm, WI 48-51.5 MJ/Sm3, Inerts <7%, N2 <5% Outline details of primary separation Refrigeration Gas processing and Condensate stabilization processing facilities Facility, No Compression Outline details of gas treatment facilities: Gas HC and Water Dew Point delivered by propane refrigeration
    [Show full text]
  • Shell U.K. Limited Leman BH Decommissioning Programme FINAL
    LEMAN BH DECOMMISSIONING PROGRAMME Shell U.K. Limited Leman BH Decommissioning Programme FINAL Shell Report Number: LBT-SH-AA-7180-00001-001 Rev A10 Date: 05 April 2017 Page 1 LEMAN BH DECOMMISSIONING PROGRAMME Contents INST 1 Executive Summary 7 1.1 Decommissioning Programme 7 1.2 Requirement for Decommissioning Programme 7 1.3 Introduction 7 1.4 Overview of Installation/Pipeline Being Decommissioned 8 1.5 Summary of Proposed Decommissioning Programme 9 1.6 Field location including field layout and adjacent facilities 10 1.7 Industrial implications 15 2 Description of items to be decommissioned 15 2.1 Installation: Surface Facilities (Topsides/Jacket) 15 2.2 Installation: Subsea including Stabilisation Features 15 2.3 Pipelines Including Stabilisation Features 15 2.4 Wells 15 2.5 Drill cuttings 15 2.6 Inventory Estimates 15 3 Removal and disposal methods 16 3.1 Topsides 16 3.2 Jacket 20 3.3 Subsea Installation and Stabilisation Feature 22 3.4 Pipelines 22 3.5 Pipeline Stabilisation Feature 22 3.6 Wells 22 3.7 Drill cuttings 22 3.8 Waste Streams 22 4 Environmental Impact Assessment 24 4.1 Environmental Sensitivities 24 4.2 Potential Environmental Impacts and their Management 26 5 Interested party consultation 29 6 Programme management 31 6.1 Project Management and Verification 31 6.2 Post-Decommissioning Debris Clearance and Verification 32 6.3 Schedule 32 6.4 Costs 32 6.5 Close Out 33 6.6 Post Decommissioning Monitoring and Evaluation 33 7 Supporting documents 33 8 Partner letter of support 34 Appendix 1. Copies of Public Notices 35 Appendix 2.
    [Show full text]
  • 2005 Analyst Day UK Business Unit
    2005 Analyst Day UK Business Unit Building a balanced portfolio of Exploration and Production Assets Introduction – Paul McDade 2005 Analyst Day – Bacton Gas Terminal The Tullow footprint NW Europe □Leading Gas Producer □Mature basin Operator □Growth through exploration, development and acquisition Africa □Pan-African E&P business □High impact exploration □Growth through exploration, development and acquisition Asia □Materiality through organic growth □High impact exploration □Growth through exploration and development 2005 Analyst Day – Bacton Gas Terminal Tullow Growth Strategy Exploitation and expansion of Tullow’s current reserve base PRODUCTION & 1H Reserve Replacement 97% before acquisitions DEVELOPMENT Ongoing development progress in Africa, UK and Asia 2005/6: Organic growth to over 70,000 boepd by end 2006 Broad portfolio with proven skills, knowledge and database H1 – Two successes from 3 wells in SNS, 1 success in Gabon on Niungo EXPLORATION Next – High impact programme due to start including Mauritania and Uganda. 2006 onwards - continuing to build a high impact portfolio Selective acquisitions within core areas 2001: £200 million of Southern North Sea assets acquired from BP ACQUISITIONS 2004: $570 million acquisition of Energy Africa 2005: £200 million acquisition of Schooner and Ketch in the S. North Sea Active Portfolio Management PORTFOLIO Focus on assets where we can add value and upside potential exists MANAGEMENT Build positions where we have a material influence 2005: Sale of UK oil and Congo (Brazzaville)
    [Show full text]
  • Annual Environmental Statement for Shell U.K. Limited Upstream
    2019 ANNUAL ENVIRONMENTAL STATEMENT FOR SHELL U.K. LIMITED UPSTREAM 2019 ANNUAL ENVIRONMENTAL STATEMENT for Shell U.K. Limited Upstream 1 2019 ANNUAL ENVIRONMENTAL STATEMENT FOR SHELL U.K. LIMITED UPSTREAM 2019 ANNUAL ENVIRONMENTAL STATEMENT FOR SHELL U.K. LIMITED UPSTREAM CONTENTS INTRODUCTION This is the 2019 annual environmental statement for Shell U.K. Limited (Shell UK). The statement summarises the INTRODUCTION ..................................................................................................................................................3 environmental performance in 2019 of our upstream offshore and onshore facilities operated by Shell in the UK. TERMINOLOGY IN THIS STATEMENT ....................................................................................................................3 Shell UK has been producing oil and gas from the North Sea for over 50 years and makes a significant contribution to the UK economy; we supply around 10% of the UK’s oil and gas, with interests in over 50 fields, 25 platforms and WHAT WE DO .....................................................................................................................................................4 1 Floating Production and Storage Offshore (FPSO) vessel operated on our behalf. Oil and gas production is from our offshore platforms and vessels, while onshore we operate two gas processing plants responsible for delivering more OUR ENVIRONMENTAL GOALS AND OBJECTIVES ................................................................................................5
    [Show full text]
  • Decision Document Provides a Record of the Decision Making Process
    Permitting decisions Surrender We have decided to accept the surrender of the permit for Western Bacton Gas Terminal operated by ENI Hewett Ltd. The permit number is EPR/VP3637SB. We are satisfied that the necessary measures have been taken to avoid any pollution risk and to return the site to a satisfactory state. We consider in reaching that decision we have taken into account all relevant considerations and legal requirements. Purpose of this document This decision document provides a record of the decision making process. It summarises the decision making process in the decision checklist to show how all relevant factors have been taken in to account. This decision document provides a record of the decision making process. It: • highlights key issues in the determination • summarises the decision making process in the decision checklist to show how all relevant factors have been taken into account and Unless the decision document specifies otherwise we have accepted the applicant’s proposals. EPR/VP3637SB/S003 Date issued: 23/08/17 1 Key issues of the decision The Site was issued with a Pollution Prevention and Control (PPC) permit (Reference VP3637SB) in May 2007 when the Site was owned by Tullow Oil UK Ltd (Tullow). The permit was transferred to ENI Hewett Ltd in November 2008. Following implementation of the Environmental Permitting (England and Wales) Regulations 2007, the permit became an Environmental Permit (Reference EPR/VP3637SB). The gas refining operations ceased at the Site on 17 August 2011 and some of the activities are now leased and operated by Perenco UK Ltd (Perenco) under their permit.
    [Show full text]
  • Norfolk and Suffolk Economic Strategy
    NORFOLK AND SUFFOLK ECONOMIC STRATEGY A STRATEGY FOR GROWTH AND OPPORTUNITY NOVEMBER 2017 CONTENTS Foreword 3 Norfolk and Suffolk 2017 8 Our Sectors 12 Our Ambitions 16 Priority Themes and Places 18 Making it Happen 30 University of Suffolk Students 2 CONTENTS OUR POTENTIAL 88,000 GROW OUR ECONOMY BY 66% NET NEW JOBS OF THE BY 2036 £17.5 POPULATION BILLION WITH NVQ3+ 140,000 IN REAL TERMS BY 2036 BY 2036 NEW HOMES GVA PER HOUR OF BY 2036 £39 BY 2036 A HIGHER PROPORTION INCREASED OF PEOPLE ENGAGED IN THE MEDIAN WAGES BY LABOUR MARKET THAN ACROSS 30,000 £200 THE UK BY 2036 NEW SUCCESSFUL MORE PER BUSINESSES BY 2036 WEEK BY 2036 FOREWORD 3 94 91 67 75 573.3MW 97.2MW 402MW 88 KEY 316.8MW OUR PLACE Clean Energy Cluster • Sheringham Wells-next- • Finance & Insurance Cluster • Hunstanton the-Sea •• Cromer Digital Cluster Bacton Gas A140 Life Science, Advanced To Lincolnshire, A148 Terminal & the North North Walsham • 1800MW Food Tech & Biotech Cluster Kings • 120 Fakenham Food Enterprise Zone Lynn TBC A17 A149 1800MW University Norwich Enterprise Zone International Airport Wo rldwi de de stin Oil & Gas Rig A47 A47 atio 120 Norwich ns Marham A47 Great an 1800MW Wind Farm Yarmouth d m a Gas Terminal Peterborough Downham rk et s Nuclear Power Station •Market 45 m A11 172 in Airport A10 Lowestoft u te Norwich to London 1200MW s Shipping Port a To the 90 minutes w Midlands Lakenheath Diss a The National Stud • Thetford y Ely Southwold RAF Base Mildenhall • Eye Airfield A12 Rail Europe’s All A11 A140 Energy Coast A14 102 A14 • Bury St Edmunds Sizewell 800MW Cambridge • Newmarket Stowmarket • TBC Ijmuiden TBC 714MW A1307 • Haverhill Aldeburgh 800MW The Sudbury Woodbridge Ipswich Hook M11 Amsterdam Hadleigh A14 A1 Felixstowe 504MW 336MW Rotterdam 196 Harwich • UK’s biggest container Netherlands Stansted port, handling 40% A12 of all trade 48 Zeebrugge M25 Ipswich to London 172.8MW Antwerpen 60 minutes Brugge 175 630MW London Calais M25 Belgium 4 FOREWORD EXECUTIVE SUMMARY 4 France Lille historic market towns and a large rural economy.
    [Show full text]
  • Region Has Crucial Role in Powering UK
    42 business.EDP24.co.uk/guide ENERGY EDP Business Guide EDP Business Guide 2008 RENEWABLE ENERGY business.EDP24.co.uk/guide 43 In the pipeline: North Sea production at Bacton has been Energy boost: East Anglia’s offshore wind industry, like this site at reduced with the Scroby Sands off the coast at Great Yarmouth, is well-placed to cash importing of gas in on a multi-million pound market. from Holland, Big money Scandinavia and Belgium increasing. New projects mean up to 50pc of the UK’s gas could come through Bacton, bonanza in the wind Government plans to dramatically increase the number of offshore wind farms could benefit the environment while sparking a multi-billion-pound bonanza for the region’s energy specialists. East Anglia’s offshore wind energy industry is set to spearhead an energy revolution that could see 7000 wind turbines generating enough electricity to power every home in the UK by 2020. The region is well-placed to cash in on a multi- billion-pound market following the government’s Region has crucial announcement of plans for up to 7000 wind turbines generating a colossal 33 gigawatts of energy. At present just 2pc of our power comes from renewables, and wind is the source for less than 1gw. Yet wind-generated electricity could be powering every home in the UK by 2020 if the proposals unveiled in December come to fruition. The finite nature of fossil fuels and mounting fears role in powering UK over global warming have made it essential that we harness more sustainable and environmentally friendly energy sources.
    [Show full text]