Parking and Valet Information

Total Page:16

File Type:pdf, Size:1020Kb

Parking and Valet Information Security Security is available to escort you to your vehicle. Parking and Valet To call security, dial: 952-292-2947. Please observe the posted signs about Information parking at the Southdale Medical Building. This building is not part of Fairview Southdale Hospital Fairview Health Services. Parking office The Parking Office is in Room 125 on the first floor of the hospital, in the main hallway between the elevators and the Skyway Lobby. Hours: 7:30 a.m. to 4:30 p.m. Monday-Friday Phone: 952-924-5016 Fairview Southdale Hospital Parking Department 6401 France Ave. S., Room 125 Edina, MN 55435 Phone: 952-924-5016 Fax: 952-924-5654 Email: [email protected] Visit fairview.org ©2018 Fairview Health Services. Mktg. 553883. SW 500901. DOD 5.18 Parking in the Skyway Ramp Fully Automated Parking The Skyway Ramp is across from the hospital, Ramps on the other side of France Avenue. It connects There is no attendant on duty in either to the hospital by a skyway on Level C. ramp. Pay stations accept credit cards The entrance and first level of the Skyway (Visa, MasterCard, Discover or American Ramp have a height clearance of 9'9". Beyond Express) as well as cash. level A, the height limit is 6'11". • If you would like a receipt, please The ramp is open 4 a.m.-9 p.m. If you arrive push the Receipt button at the pay station. outside of these hours, please park in the East Ramp. • If you need help please push the button labeled "Press for Parking in the East Ramp Assistance." The East Ramp is located on the east side of • Insert bills one at a time. the hospital, near the Emergency Room. A • Change is dispensed in dollar bills. tunnel connects the East Ramp to the hospital Parking Rates You will find cash machines (ATMs) in the and the 6363 Physicians Building. This tunnel 0 to 15 minutes $0 hospital: is open Monday-Friday, 6 a.m. -6 p.m. 15 to 30 minutes $3 • Near the elevators on the main floor. The height limit in the East Ramp is 6'9". • On the lower level on the west side. Oversized vehicles should park in the Skyway 30 minutes to 1.5 hour $4 Ramp - Level A. 1.5 to 2 hours $5 Five-Day Pass 2 to 3 hours $6 The five-day pass allows one car to Valet Parking 3 to 5 hours $7 come and go for five days in a row. The You may use valet parking Monday-Friday, 5 to 7 hours $8 pass costs $30 ($6 a day) plus a $15 6 a.m.-6 p.m. Go to Door 2 at the Skyway deposit. Once the pass is returned, you 7 to 8 hours $9 will receive a $15 refund. Lobby. To reach the valet, call 952-915-8898. 8 to 24 hours $10 If you have already paid for parking and The cost is $7 per use (includes parking and Each additional 24 hours $5 would like to purchase a five-day pass, valet). If you leave your vehicle for more than Maximum $25 the Parking Office can give credit for up 24 hours, the cost is $7 per day. We accept to two days worth of self-parking fees. cash, Visa, MasterCard, Discover and American Lost ticket $25 Receipts must be provided to receive Express. Pay when you drop off the car. Price is credit. subject to change. Extensions to the five-day pass cost $6 per day. Monthly passes are also available; please see the Parking Office for details. There is no reimbursement for parking fees already paid..
Recommended publications
  • ABSTRACT the Main Feature of a Conventional Terraced Housing Development Is Rows of Rectangular Shaped Houses with the Narrow Fa
    MAKING A RETURN ON INVESTMENT IN PASSIVE ARCHITECTURE TERRACED HOUSES DEVELOPMENT Wan Rahmah Mohd Zaki Universiti Teknologi Malaysia(UiTM) Malaysia E-mail: [email protected] Abdul Hadi Nawawi Universiti Teknologi MalaysiaQJiTM) Malaysia E-mail: [email protected] Sabarinah Sh Ahmad Universiti Teknologi MalaysiaQJiTM) Malaysia E-mail: [email protected] ABSTRACT The main feature of a conventional terraced housing development is rows of rectangular shaped houses with the narrow facade as the frontage. Consequently, this limits natural cross ventilation and daylight penetration into the middle of the houses; and cause for unnecessary energy consumption on mechanical cooling and artijicial lighting to make the living spaces comfortable for occupants. Such inconsideration is mainly attributed to the optimum configuration of houses which offers the most economic return desired by the developer. Passive Architecture (PA) design strategies can make terraced houses more conducive for occupants as well as gives reasonable returns to the developer. The idea is demonstrated on a hypothetical double storeys terraced scheme in a 2.5 acre site whereby it is transformed intofour types of PA terraced houses development. The Return on Invesfment of the PA terraced houses is ascertained for two situations, ie., (i) fwed sales price for all types of house; and (ii) added premium to PA terraced houses due to the positive unintended effects such as low density housing, etc. If critical criteria for demand and supply in housing remain constant, it is found that PA terraced housing development offers competitive returns to the developer relative to the returns for conventional terraced housing scheme. Keyworh: Orientation, Indoor Comfort and Operational Energy 1.0 INTRODUCTION 1.1 Housing and Energy The recent public awareness on sustainability calls for housing to not only serves as a basic shelter but also to be energy efficient, i.e., designed to make occupants need low operational energy.
    [Show full text]
  • Building a Safe Room Inside Your House COURTESY of NOAA/NSSL Includes Construction Plans and Cost Estimates
    FEMA 320 FIRST EDITION October 1998 COURTESY OF NASA COURTESY Taking Shelter From the Storm: Building a Safe Room Inside Your House COURTESY OF NOAA/NSSL Includes Construction Plans and Cost Estimates Federal Emergency Management Agency Mitigation Directorate 500 C Street, SW. • Washington, DC 20472 www.fema.gov Acknowledgments This booklet and the construction drawings it contains would not have been possible without the pioneering work of the Wind Engineering Research Center at Texas Tech University, the diligent efforts of the design team, and the constructive suggestions of the reviewers. Design Team Reviewers Paul Tertell, P.E. Dennis Lee Project Officer Hurricane Program Manager Program Policy and Assessment Branch Mitigation Division Mitigation Directorate FEMA Region VI FEMA Denton, Texas Washington, DC Bill Massey Clifford Oliver, CEM Hurricane Program Manager Chief, Program Policy and Assessment Branch Mitigation Division Mitigation Directorate FEMA Region IV FEMA Atlanta, Georgia Washington, DC TIm Sheckler, P.E. Dr. Ernst Kiesling, P.E. Civil Engineer Professor of Civil Engineering National Earthquake Program Office Wind Engineering Research Center Mitigation Directorate Texas Tech University FEMA Lubbock, Texas Washington, DC Dr. Kishor Mehta, P.E. Dr. Richard Peterson Director, Wind Engineering Research Center Chairman, Department of Geosciences Texas Tech University Texas Tech University Lubbock, Texas Lubbock, Texas Russell Carter, E.I.T. Larry Tanner, P.E., R.A. Research Associate Research Associate Wind Engineering Research Center Wind Engineering Research Center Texas Tech University Texas Tech University Lubbock, Texas Lubbock, Texas William Coulbourne, P.E. Richard Vognild, P.E Structural Engineer Director, Technical Services Greenhorne & O’Mara, Inc. Southern Building Code Congress International Greenbelt, Maryland Birmingham, Alabama Jay Crandell, P.E.
    [Show full text]
  • New York City Fire Code Guide
    NYC FIRE CODE GUIDE CODE DEVELOPMENT UNIT BUREAU OF FIRE PREVENTION April 28, 2021 Table of Contents GENERAL QUESTIONS ....................................................................................................................... 2 FC CHAPTER 1 - ADMINISTRATION ..................................................................................................... 5 FC CHAPTER 2 - DEFINITIONS .......................................................................................................... 10 FC CHAPTER 3 - GENERAL PRECAUTIONS AGAINST FIRE .................................................................... 11 FC CHAPTER 4 - EMERGENCY PLANNING AND PREPAREDNESS ............................................................ 19 FC CHAPTER 5 - FIRE OPERATION FEATURES..................................................................................... 22 FC CHAPTER 6 - BUILDING SERVICES AND SYSTEMS ......................................................................... 47 FC CHAPTER 8 –INTERIOR FURNISHINGS, DECORATIONS AND SCENERY ............................................. 55 FC CHAPTER 9 - FIRE PROTECTION SYSTEMS .................................................................................... 59 FC CHAPTER 10 - MEANS OF EGRESS ............................................................................................... 68 FC CHAPTER 12 - DRY CLEANING ..................................................................................................... 71 FC CHAPTER 14 - FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND
    [Show full text]
  • Working from Home How to Stay More Organized
    Working from Home How to Stay More Organized Yvonne Glasgow ©2020 by LifeSavvy Media. All rights reserved. No part of this book may be reproduced in any form or by any electronic or mechanical means without permission in writing from the publisher, except by a reviewer, who may quote brief passages in a review. Contents Introduction .................................................................................................................................................. 1 Create a Workspace ...................................................................................................................................... 1 Make Sure Everything Has a Home ............................................................................................................... 2 Keep Your Workspace Tidy ........................................................................................................................... 2 Organize Your Computer Desktop, Too ........................................................................................................ 3 Introduction Working from home fulltime, with multiple projects going on, can leave your home office and the rest of your house looking a mess. Here's how to stay organized when your house is also your office. A disorganized home and office can distract you from getting work done. Luckily, there are some steps you can take to get and stay organized. By keeping your home and office decluttered and neat, you give yourself space where you can get stuff done. More importantly, a
    [Show full text]
  • Technical Memo.Pdf
    COMMITMENT & INTEGRITY 35 New England Business Ctr. T 866.702.6371 DRIVE RESULTS Suite 180 T 978.557.8150 Andover, Massachusetts 01810 F 978.557.7948 www.woodardcurran.com TECHNICAL MEMORANDUM TO: Donald Robinson FROM: Jeffrey Hamel DATE: May 15, 2009 SUBJECT: Summary Data Report – Window Glazing and Existing Indoor Sample Data Lederle Graduate Research Center, Amherst, Massachusetts INTRODUCTION In March 2009 a limited hazardous building materials investigative survey and assessment was conducted by Environmental Health & Engineering, Inc. (EH&E) for Fitzemeyer & Tocci, Inc., to identify asbestos- containing materials, lead in paint, polychlorinated biphenyls (PCBs), and other hazardous building materials in anticipation of renovations planned at the Lederle Graduate Research Center (LGRC) low rise building. A report documenting the survey was submitted to the University on March 25, 2009. During the assessment, a sample of the interior window glazing from the third floor conference room of the Science Library was collected and analyzed for PCBs. This sample and a duplicate of this sample detected total PCBs at concentrations of 12,000 parts per million (ppm) and 11,000 ppm, respectively. Given that these concentrations exceed regulatory thresholds per Federal regulations (40 CFR 761) for PCBs in a non-totally enclosed manner, the University retained the services of Woodard& Curran to work with the University to develop an approach and plan to address these conditions. This memorandum presents the results from an initial assessment of the window glazing performed in April/May 2009 and summarizes existing indoor sample data collected within the LGRC building. INITIAL ASSESSMENT This initial assessment included an inspection and inventory of the windows in the low rise and Tower A of the LGRC followed by the collection of representative samples for PCB analyses.
    [Show full text]
  • HOME OFFICE SOLUTIONS Hettich Ideas Book Table of Contents
    HOME OFFICE SOLUTIONS Hettich Ideas Book Table of Contents Eight Elements of Home Office Design 11 Home Office Furniture Ideas 15 - 57 Drawer Systems & Hinges 58 - 59 Folding & Sliding Door Systems 60 - 61 Further Products 62 - 63 www.hettich.com 3 How will we work in the future? This is an exciting question what we are working on intensively. The fact is that not only megatrends, but also extraordinary events such as a pandemic are changing the world and influencing us in all areas of life. In the long term, the way we live, act and furnish ourselves will change. The megatrend Work Evolution is being felt much more intensively and quickly. www.hettich.com 5 Work Evolution Goodbye performance society. Artificial intelligence based on innovative machines will relieve us of a lot of work in the future and even do better than we do. But what do we do then? That’s a good question, because it puts us right in the middle of a fundamental change in the world of work. The creative economy is on the advance and with it the potential development of each individual. Instead of a meritocracy, the focus is shifting to an orientation towards the strengths and abilities of the individual. New fields of work require a new, flexible working environment and the work-life balance is becoming more important. www.hettich.com 7 Visualizing a Scenario Imagine, your office chair is your couch and your commute is the length of your hallway. Your snack drawer is your entire pantry. Do you think it’s a dream? No! Since work-from-home is very a reality these days due to the pandemic crisis 2020.
    [Show full text]
  • Indoor Air Quality Guidelines for Multifamily Building Upgrades
    Publication No. EPA 402/K-16-/01 January 2016 Preface How to protect public health, save energy and reduce climate change impacts — all at the same time These Energy Savings Plus Health: Indoor Air Quality Guidelines for Multifamily Building Upgrades are part of EPA’s approach to addressing three of our most pressing environmental and public health priorities: reducing asthma and other health disparities, our reliance on fossil fuels, and climate change impacts. These guidelines will be a valuable tool in helping to ensure the health, comfort and safety of the many Americans living in multifamily buildings. More than 80 million Americans, about 25 percent of the U.S. population, live in multi-unit homes. About one-quarter of these residents live below the poverty line and a large percentage of residents of affordable housing are children, the elderly or disabled. These groups are the most vulnerable, and they are disproportionately impacted by diseases like asthma and commonly exposed to serious health risks from secondhand tobacco smoke, usually at home. Heating and cooling buildings uses a lot of energy — about 43 percent of all energy use in the United States! Producing this energy requires us to burn fossil fuels like coal and oil, which contributes to air pollution and generates large amounts of greenhouse gases that contribute to climate change. Improving the energy efficiency of buildings usually involves tightening the buildings through air sealing and other weatherization techniques to reduce the escape of air that we have just spent money to heat or cool. That’s a very good thing.
    [Show full text]
  • Notice of a Type II Decision on a Proposal in Your Neighborhood
    Date: July 3, 2012 To: Interested Person From: Mark Walhood, City Planner 503-823-7806 NOTICE OF A TYPE II DECISION ON A REVISED PROPOSAL IN YOUR NEIGHBORHOOD The Bureau of Development Services has approved a proposal in your neighborhood. The reasons for the decision are included in the version located on the BDS website http://www.portlandonline.com/bds/index.cfm?c=46429. Click on the District Coalition then scroll to the relevant Neighborhood, and case number. If you disagree with the decision, you can appeal. Information on how to do so is included at the end of this decision. CASE FILE NUMBER: LU 12-113658 DZM GENERAL INFORMATION Applicant: Mike Parich / Generations LLC 8601 SE Causey Ave., Suite 1 / Portland, OR 97266 Property Owner: Portland Adventist Medical 10123 SE Market St / Portland, OR 97216-2532 Additional Owner: Harry Gabriel / Generations Llc 8601 SE Causey Ave., Ste. 1 / Portland, OR 97086 Site Address: 10803 WI/ SE Cherry Blossom Dr. Legal Description: TL 11200 1.02 ACRES, SECTION 03 1S 2E Tax Account No.: R992032990 State ID No.: 1S2E03BD 11200 Quarter Section: 3141 Neighborhood: Mill Park, contact Beverly Tobias at 503-255-8327. Business District: Gateway Area Business Association, Fred Sanchez at 503-256-3910. District Coalition: East Portland Neighborhood Office, Richard Bixby at 503-823-4550. Zoning: CO2d (Office Commercial 2 base zone with Design overlay zone), Gateway Plan District Case Type: DZM (Design Review with a Modification through Design Review) Procedure: Type II, an administrative decision by BDS Staff that can be appealed to the Design Commission. PROPOSAL: The applicant has proposed the construction of a 38-bed memory care facility at a vacant site on the east side of SE Cherry Blossom Drive, just across the street from the Cherrywood Village retirement complex.
    [Show full text]
  • Iii. Housing Constraints
    III. HOUSING CONSTRAINTS The provision of adequate and affordable housing can be constrained by a number of factors. This section assesses the various governmental, market, infrastructure and environmental factors that may serve as a potential constraint to housing development and improvement in Cypress. A. GOVERNMENTAL CONSTRAINTS 1. Land Use Controls The Cypress General Plan and Zoning and Subdivision Ordinance provide for a range of residential land use designations/zones in the City: Low Density Residential (RS-15000; RS-6000) - Provides for development of low density detached single-family dwellings. Maximum density is 5 dwelling units per acre. Medium Density Residential (RS-5000; RM-15) - Provides for development of medium density duplexes, townhomes, condominiums, and apartments. Single- family homes may also be appropriate. Maximum density is 15 dwelling units per acre. High Density Residential (RM-20) - Provides opportunities for development of apartments, condominiums, townhouses, and other group dwellings in addition to single-family development. Maximum density is 20 dwelling units per acre. Mobile Home Park (MHP-20A) - Provides for the development of mobile home parks subject to certain zoning restrictions. Maximum density is 12 spaces per gross acre. Cypress’ residential development standards are summarized in Table III-1. The City’s standards are not excessive, are fairly comparable to other Orange County communities, and do not serve as a constraint to development. 2008-2014 HOUSING ELEMENT III-1 HOUSING CONSTRAINTS TECHNICAL
    [Show full text]
  • Campus Meeting Rooms
    The Summit Location Guide Welcome to The Summit Country Day School Visitors to The Summit must check in at the security desks in the entrances to the Upper and Lower or the Middle School office. Offices & Meeting Rooms Building Floor Head of School US 1 Admission US 1 Business US 1 Development US 1 Montessori LS G Building Floor Lower School LS 1 St. Cecilia Hall US 3 Middle School MS 1 St. Gregory Hall US G Upper School US 2 Knight’s Hall MS 2 College Counseling US 4 Montessori LS G Spirit & Resale Shops US G Conference Room KEY US & MS Dining Halls US G Libraries US = Upper School LS Dining Hall LS G Montessori LS G MS = Middle School Bishop’s Parlor US 1 Lower School LS 1 LS = Lower School Alumni Parlor US 1 Middle School MS 1 G = Ground Floor Leaders of Character Conference Room US 1 Upper School US 2 The Summit Location Guide ADMINISTRATION Business Office: Enter Up- Montessori Office: Enter Middle School Office: Enter Head of School Office: Enter Upper School building. Enter per School building. From foy- Lower School foyer. Enter 1st Middle School foyer. Office is 1st door on right. er, turn left at 1st hallway. En- door on left. on left. Admission Office: Enter Up- ter last door on right Lower School Office: Enter Upper School Office: Enter per School building. From Development Office: Enter Lower School foyer. Take Upper School building. From Mathile Family Foyer, turn right Upper School building foyer. stairs or elevator to 1st floor. foyer, turn left at 1st hallway.
    [Show full text]
  • Craguns Resort Map.Pdf
    GULL LAKE . Steamboat Bay Irma’s Kitchen Dock Parking Grassy Knoll Lake Deck Lake Lake Access North Beach Lake Lake Access Wedding Site Access Access Access Lake Cabana Café Restaurant Access Hilltops Lounge Market 343-345 Lakeview Cabins Hospitality Bayview Villas Lake 684 Room 340 685 686 687 688 Access 689 Photo Opportunity Welcome to Cabin 115 resort on gull lake 1-800-CRAGUNS (1-800-272-4867) . LOCAL: 218-825-2700 . www.craguns.com DINING LAUNDRY FACILITIES MEETING ROOMS u u Lakeside Dining Room Poolside, by Room 230 u Lakeshore (Brown Signs) u Tech Center (Yellow Signs) Located at the Legacy Maps not to scale. Updated 10/17 68-2992 u Cabana Café u Shoreline Suites, One level below dining room One level below 200-211 Courses at Cragun’s: u by Room 280 u Tech 1: By Room 162, Irma’s Kitchen (Seasonal) Paul Bunyan (Blue Signs) u Audubon Room u u By Cabin 651, North of through Door E Bear Trap Lounge One level below indoor pool u Pavilion u Outdoor Pool (Summer Only) u Tech 2: Under Rooms 204-207, Legacy Grille (Seasonal) Pioneer (Black Signs) u Legacy Grille Halfway down dining room through Door D POP MACHINES Turn left at Cragun’s entrance FIREWOOD stairs, on right Tech 3: Under Rooms 200-203, u Lobby through Door C or B onto CR 77 toward Brainerd. Please call Ext. 8700 for u Dutch (Black Signs) u Drive approximately one mile Marina u Shoreline Meeting Room delivery and instructions. Halfway down dining room and turn left onto u The Centre At base of Shoreline Suite stairs, on left, OR halfway down CR 70.
    [Show full text]
  • Building Numbers, Street Addresses, Room Numbers
    www.facilities.ufl.edu BUSINESS AFFAIRS PLANNING DESIGN AND CONSTRUCTION PDC PROJECT MANAGEMENT GUIDE PMG-E14: BUILDING NUMBERS, STREET ADDRESSES, AND ROOM NUMBERS PURPOSE: To communicate guidelines and procedures for numbering facilities, establishing street addresses, and assigning space/room numbers. A. Introduction Planning Design and Construction (PDC) is responsible for numbering, tracking, and reporting facilities-related information for the University. PDC utilizes CAD/BIM technology in the data-basing of facilities information, so a meaningful numbering and CAD/BIM standard must be followed. Additionally, PDC is required to annually submit the Physical Facilities Space File to the Board of Governors and must take necessary actions to ensure the incorporation of required data elements into its operating database. Data elements are based on the Postsecondary Education Facilities Inventory and Classification Manual, 2006. B. Street Addresses A request for a street address should be made by the PDC Project Manager (PM) once a project’s physical locale has been established and before site work begins. At a minimum, the building footprint and major entry doors should be settled to establish an appropriate address. Requests for a new address will be coordinated through PDC Space Management & Analysis (SMA) staff. Upon assignment of the street address, the new address will be entered in UF-STARS for local notification to PeopleSoft, Purchasing, EH&S, and the UF community. The Alachua County E911 office will be responsible for notification to the Alachua County Call Center, USPS, major package carriers, and other external entities. New addresses outside of Alachua County should be requested by the PDC PM through PDC SMA, which will work with the appropriate local authorities.
    [Show full text]