Information Memo to Council

Total Page:16

File Type:pdf, Size:1020Kb

Information Memo to Council INFORMATION MEMO TO COUNCIL Ci ty of Delta Engineering To: Mayor & Council From: Steven Lan, P.Eng., Director of Engineering Date: July 16, 2019 Subject: TransLink's Summer Bus Servi ce Changes File No.: 52 20-25/TL cc: Sean McGill, City Manager On June 24,2019 TransLink implemented the summer bus service changes (Attachment A), funded by Phase One of the 10-YearVision. Bus service changes are implemented every April, June, September and December, both to reflect seasonal changes in demand and to respond to customer feedback. TransLink's website has been updated to include detailed service information, which can be found at www.translink.ca/servicechanges. The changes in service through Delta are as follows: Seasonal: 620 Tsawwassen Ferry/Bridgeport Station Extra late-night trips available everyday as needed to accommodate ferry service schedules. Permanent: 104 22 nd Street Station/Annacis Island Increased northbound service on weekday afternoons to every 12 minutes from 2:00 p.m. to 3:00 p.m. (previously every 15 minutes to reduce overcrowding. 301 Newton Exchange/Richmond-Brighouse Station Service doubled all day Sundays to every 30 minutes (previously every 60 minutes) to reduce overcrowding. 319 Scott Road Station/Newton Exchange Increased service every day to reduce overcrowding. • Weekdays: o Every 6 to 10 minutes from 5:00 p.m . to 11 :30 p.m. (previously every 8 to 12 minutes) / City of Delta Enginee ring Subject: TransLink's Summer Bus Service Changes Page 2 of 2 File No: 5220-25!TL o Every 20 minutes from 11 :30 p.m. to 1 :00 a.m. (previously every 20 to 30 minutes) • Saturdays: o Every 10 minutes from 6:00 a.m. to 9:00 a.m. (previously every 12 minutes) o Every 10 minutes from 5:00 p.m. to 7:00 p.m. (previously every 12 minutes) o Every 10 minutes northbound from 7:00 p.m. to 9:00 p.m. (previously every 12 minutes) • Sundays: o Every 10 to 12 minutes from 1 :00 p.m . to 8:00 p.m. (previously every 15 minutes) 340 Scottsdale/22nd Street Station Increased service on Saturdays to reduce overcrowding. • Saturdays: o Every 20 minutes from 5:30 a.m. to 9:00 a.m. (previously every 30 minutes) o Every 20 minutes from 4:00 p.m. to 6:00 p.m. (previously every 30 minutes) o Every 20 minutes, eastbound from 6:00 p.m. to 7:00 p.m. (previously every 30 minutes) 640 Scott Road Station/Ladner Exchange Increased service all day on Saturdays to every 30 minutes (previously every 60 minutes in the morning and evening) to reduce overcrowding. Please contact me if you have any questions at 604-946-3299. Steven Lan, P.Eng., Director of Engineering Attachment: A. TransLink's 2019 Summer Service Changes Summary KU/bm f:\eng\20"19 docs\kll\memos\translink serv ice cha llge\info rmation memo to cOli nciUinal.docx Attachment A Page 1 of 11 2019 Summer Bus Service Changes by Municipality translink.ca/servicechanges Effective une 2 ,2019 TransLink makes bus service changes every April, June, September and December, to reflect seasonal changes in demand and deliver more permanent service where customers need it most. As part of Phase One of the 1O -Year Vi sion, we're able to extend bus service hours and provide more freq uent servi ce with changes taking effect June 24, 2019. TransLink's 2018 Transit Servi ce Performance Review provided data on which bus routes are most in need of add itional service. 52 routes were id entified as overcrowded last year, and TransLink is addressing this by implementing 26 permanent improvements on those routes. Additiona lly, we are adding seasonal capacity on select routes to accommodate in creased summer demand . Highlights of th is Summer Bus Service Changes include: I» Seasonal changes to the 2, 5/6, 15, 19, 23, 25, 50, 150, 179, 227, 236, 262, and 620. o Increases to provide extra service to popular summer destinations o 'IO-Yea r Vision improvements to the 25, 33,41 ,43,84,95 B-Line, 100, 101 , 104, 123,144, 210,240,301, 319,323,324,335,340,34'1, 345,403,430,640, and N19. o Frequency and span of service improvements Attachment A Page 2 of 11 Vancouver and UBC SEASONAL 2 Macdonald/16th AvelDowntown Increased afternoon and evening service. • Saturdays o Service every 8 - 12 minutes from 1 to 10 p.m. (increase from every 10 - 15 minutes) • Sundays o Se rvice every 8 - 12 minutes from 1 to 8 p.m . (in crease from every 10 - 15 minutes) 15 Cambie/Olympic Village Station In creased weekend service to Queen Elizabeth Park. • Saturdays o Service every 12 minutes from 11 to 8 p.m. (Increase from every 15 minutes) Sundays o Service every 12 minu tes from noon to 7 p.m. (In crease from every 15 minutes) 19 Metrotown Station/Stanley Park In creased weekd ay service betwe en Main Street-Science World and Stanley Park Weekdays o Service every 5 - 7 minutes from 10 a.m . to 5 p.m. between Main Street­ Science World Station and Stanl ey Pa rk (t his is an add ition al shuttle service) 50 Waterfront Station/Fa lse Creek South Increased weekend service to Granville Island. Saturdays o Service every 12 minutes from 11 a. m. to 8 p.m . (increase from every 15 minutes) Sundays o Service every 12 minutes from noon to 7 p.m. (increase from every 15 minutes) Attachment A Page 3 of 11 PERMANENT 25 Brentwood Station/UBC Increased afternoon servi ce on Saturdays to reduce overcrowd in g. o Saturdays • Increased to every 10 minutes from 3 to 6 p.m . (from every 12 minutes) 33 29th Avenue Station/UBC Increa sed mornin g service on Saturd ays to red uce overcrowding . • Saturdays o Increased to every 20 minutes from 9 to 11 a. m. (from every 30 minutes) 41 Joyce Station/UBC In creased evening servi ce on weekends to reduce overcrowding. • Satu rdays o Increased to every 10 to 12 minutes from 6 to 8 p.m. (from every 12 - 15 minu tes) o Increased to every '12 mi nutes, westbound 8 to 9 p.m . (from every 15 mi nutes) • Sundays o Increased to every 10 min utes, westbound from 6 to 7 p.m. (from every '12 minutes) 84 VCC -Clar~\ Station/USC Extra eastbound eveni ng service added on Saturdays to reduce overcrowding. • Saturdays () Increased to every 20 minutes, eastbound from 6 to 7 p.m . (from every 20- 30 minutes) 100 Marpole/22nd Street Station Increased se rvice on weekdays and weekends to reduce overcrowding. • Weekdays o All morn in g trips novv ru n th e full ro ute between Mari ne Drive -Gateway Stati on and 22nd Street Station (trips from 4 a. m. - 5 a.m. previo Li sly beg an at Ma rine and Knight Street) e Saturdays o In creased to every 12 minutes from 7 a. m. to 7 p.m. (from every 15 minutes) • Sundays o Eastbound tri ps depart ing Marpo le Loop at 6:25 p.m. and 9: 03 p.m . will now run al l th e way to 22nd Street (previously term inated Marin e and Kn ight Street) Attachment A Page 4 of 11 Burnaby and New Westminster E 0 No seasonal changes planned in this service change. PERMANENT 95 SFU/Burrard Station In creased afternoon and evening service on Sundays to reduce overcrowding. • Sundays o In creased to every 12 minutes from 2 to 9 p.m. (from every 15 minutes) o Increased to every 15 minutes from 9 to 10 p.m. (from every 20 minutes) All tnps now run full route between Burrarc1 Station and SFU Burnaby. 101 Lougheed Station/22nd Street Station Weekday morning im provements to reduce overcrowding. • Weekdays o All trip s now run the full route between Lougheed Town Centre Station and 22nd Street Station (formerly beg an at 8th and 8th) o Increased to every 20 minutes from 5:30 to 7 a.m. (from every 30 minutes) 104 22nd Street Station/Annacis Island Increased service on weekday afternoons to reduce overcrowdin g. • Weekdays o In creased to every 12 minutes, northbound from 2 to 3 p.m. 123 Brentwood Stationl Jew West Station Increased evening service on weekdays to reduce overcrowding. • Weekdays o Increased to every 10 minutes from 6 to 7 p.m. (from every 15 minutes) 144 Metrotown Station/SFU In creased even ing service on Sa turdays to reduce overcrowding. • Saturdays o Increased to every 20 minutes from 5 to 8 p.m. (from every 30 minutes) Attachment A Page 5 of 11 Richmond, Delta, and Tsawwassen SEASONAL 620 Tsawwassen Ferry/Bridgeport Station • Everyday o Extra late-night tri p avail able as needed to accommodate ferry service schedules. PERMANENT ' 104 22nd Street Station/Annacis Island In creased northbound servi ce weekday afternoons to reduce overcrowd ing. • Weekdays o Increased to every 12 minutes, northbound from 2 to 3 p.m. (from every 15 minutes) 301 Newton Exchange/Richmond-Brighouse Station Increased service on Sundays to reduce overcrowding. o Sundays o Increased to every 30 minutes all day. (from every 60 minutes du ring some parts of the day) 403 Three Road/Bridgeport Station In creased southbound serv ice weekday evenings to redu ce overcrowding. Weekdays o Increased to every 12 minutes, southbound from 6 to 7 p.m. (from every 15 minutes) 430 Metrotown Station/Brighouse Station Increased early morning service weekd ays and Saturdays to reduce overcrowdi ng.
Recommended publications
  • For Transit Information, Including Real-Time Next Bus, Please Call 604.953.3333 Or Visit Translink.Ca
    Metro Vancouver Transit Map Effective Until Dec. 19, 2016 259 to Lions Bay Ferries to Vancouver Island, C12 to Brunswick Beach Bowen Island and Sunshine Coast Downtown Vancouver Transit Services £ m C Grouse Mountain Skyride minute walk SkyTrain Horseshoe Bay COAL HARBOUR C West End Coal Harbour C WEST Community Community High frequency rail service. Canada Line Centre Centre Waterfront END Early morning to late Vancouver Convention evening. £ Centre C Canada Expo Line Burrard Tourism Place Vancouver Millennium Line C Capilano Salmon Millennium Line Hatchery C Evergreen Extension Caulfeild ROBSON C SFU Harbour Evelyne Capilano Buses Vancouver Centre Suspension GASTOWN Saller City Centre BCIT Centre Bridge Vancouver £ Lynn Canyon Frequent bus service, with SFU Ecology Centre Art Gallery B-Line Woodward's limited stops. UBC Robson Sq £ VFS £ C Regular Bus Service Library Municipal St Paul's Vancouver Carnegie Service at least once an hour Law Edgemont Hall Community Centre CHINATOWN Lynn Hospital Courts during the daytime (or College Village Westview Valley Queen
    [Show full text]
  • Translink Application April 6, 2017
    dd,DEd To: CarolMason,ChiefAdministrativeOfficer,MetroVancouver From: CathyMcLay,ChiefFinancialOfficerandExecutiveVicePresident,Financeand CorporateServices Date: March23,2017(revisedonApril6,2017) Subject: ApplicationforFederalGasTaxFundingfromtheGreaterVancouverRegional Fund PURPOSE TransLink is requesting the Greater Vancouver Regional District (Metro Vancouver) approve $121.280millioninFederalGasTaxFund(FGTF)FundingfromtheGreaterVancouverRegional Fund (GVRF) for expansion vehicles and a pilot electricͲbattery bus project. The expansion includes105buses,whichwilldelivera6%increaseinservicebytheendof2018,comparedto 2016.Thisexpansioniscriticaltodeliveringtheserviceexpansionandsupportingdevelopment ofaLowͲcarbonfleetstrategy,asoutlinedinthe2017InvestmentPlan.The2017Investment Plan advances the goals identified in TransLink’s longͲterm Regional Transportation Strategy and to support goals identified in Metro Vancouver’s Regional Growth Strategy, Metro Vancouver 2040. The expansion buses are critical to meet overcrowding and latent demand TransLink’s busiest routes and during peak periods. In developing and approving the 2017 Investment Plan, the TransLink Board of Directors and the Mayors’ Council on Regional Transportation reviewed the approach for allocating GVRF within the plan. The 10 Year InvestmentPlancommitstodevelopingaLowͲcarbonfleetstrategytoreduceemissionsfrom transitvehiclesacrosstheregion,includingevaluationoflowandzeroͲemissionsvehicles,such as electricͲbattery buses. The information gathered from the electricͲbattery bus
    [Show full text]
  • Information Manual – 2016
    INFORMATION MANUAL – 2016 Contents Events 1. 2016 Schedule of Events ............................................................................................................................................................................................... 3 2. 2016 Events ................................................................................................................................................................................................................... 4 3. What’s New in 2016? .................................................................................................................................................................................................... 5 4. The Vancouver International Marathon Society ........................................................................................................................................................... 6 5. History of the BMO Vancouver Marathon .................................................................................................................................................................... 9 6. Charity Program: RUN4HOPE ...................................................................................................................................................................................... 11 7. Community Awards ....................................................................................................................................................................................................
    [Show full text]
  • Phase Two of the 10-Year Vision 2018 – 2027 INVESTMENT PLAN
    Phase Two of the 10-Year Vision 2018 – 2027 INVESTMENT PLAN APPROVED JUNE 28, 2018 tenyearvision.translink.ca TRANSLINK MAYORS’ COUNCIL BOARD OF DIRECTORS ON REGIONAL TRANSPORTATION Lorraine Cunningham, Chair Derek Corrigan, Chair Lois Jackson Mayor, City of Burnaby Mayor, City of Delta Larry Beasley Richard Walton, Vice-chair Greg Moore Jim Chu Mayor, District of North Vancouver Mayor, City of Port Coquitlam Sarah Clark Wayne Baldwin John McEwen Derek Corrigan Mayor, City of White Rock Mayor, Village of Anmore Mayor, City of Burnaby John Becker Darrell Mussatto Murray Dinwoodie Mayor, City of Pitt Meadows Mayor, City of North Vancouver Anne Giardini Malcom Brodie Nicole Read Mayor, City of Richmond Mayor, District of Maple Ridge Tony Gugliotta Karl Buhr Gregor Robertson Karen Horcher Mayor, Village of Lions Bay Mayor, City of Vancouver Marcella Szel Mike Clay Ted Schaffer Mayor, City of Port Moody Mayor, City of Langley Richard Walton Mayor, District of Jonathan Coté Murray Skeels North Vancouver Mayor, City of New Westminster Mayor, Bowen Island Municipality Ralph Drew Michael Smith Mayor, Village of Belcarra Mayor, District of West Vancouver Jack Froese Richard Stewart Mayor, Township of Langley Mayor, City of Coquitlam Maria Harris Bryce Williams Director, Electoral Area ‘A’ Chief, Tsawwassen First Nation Linda Hepner Mayor, City of Surrey For the purpose of the South Coast British Columbia Transportation Authority Act, this document constitutes the investment plan prepared in 2017 and 2018 for the 2018-27 period. This document will serve as TransLink’s strategic and financial plan beginning July 1, 2018, until a replacement investment plan is approved.
    [Show full text]
  • 1 the Phibbs Bus Exchange Redesign
    The Phibbs Bus Exchange Redesign: From Concrete and Asphalt to Raingardens and Bridges! Michelle Babiuk, Project Manager, Infrastructure and Network Management, TransLink Bernard Abelson, Transportation Planning Business Sector Lead, McElhanney (previously CH2M HILL) Paper prepared for presentation at the session: What are Transit-Supportive Environments? Innovative Indicators and Methodologies to Evaluate Transit Supportiveness of the 2016 Conference of the Transportation Association of Canada Toronto, ON 1 Abstract The Phibbs Exchange is a major bus Exchange located at the northern foot of the Second Narrows Bridge on the TransCanada Highway in the District of North Vancouver (DoNV). It serves 18 bus routes and 15,700 daily passenger trips. The Exchange provides connections between buses running to East Vancouver and Burnaby, and across the North Shore. Due to its poor passenger environment and its existing and long-term operational and capacity deficiencies, the Exchange was identified as a priority for upgrade in TransLink’s North Shore Area Transit Plan (NSATP), as well as DoNV’s Lower Lynn Transportation Strategy and Master Transportation Plan. The Exchange has a number of safety and operational deficiencies and challenges, exacerbated by the following: • Capacity - The Exchange does not have enough bus bays to accommodate the current bus services that operate at the Exchange, resulting in buses double-parking in bays. • Transit Circulation – The current transit circulation result in numerous conflict points and unsafe conditions for pedestrians, passengers, operators and cyclists. • Passenger Environment - Phibbs Exchange has long been perceived by passengers as unsafe and unwelcoming. This is partly due to the Exchange’s configuration which locates passenger areas on an island separated from the adjoining neighbourhood by bus drive aisles and a Highway 1 off-ramp.
    [Show full text]
  • Frequent Transit Network in Metro Vancouver
    Frequent Transit Network in Metro Vancouver Legend Frequent Transit Network The Frequent Transit Network (FTN) is a network of corridors that have transit service every minutes or better, during Park Royal at least all of the following times: Capilano University R • Monday to Friday: a.m. to p.m • Saturday: a.m. to p.m. • Sunday and holidays a.m. to p.m. FTN Stops on these streets have combined Regular Bus services at FTN levels as Stanley Park Loop Lonsdale Quay described above Phibbs Exchange Frequent bus service with limited stops RapidBus Burrard and transit priority. Lafarge Lake– Granville Waterfront Douglas B-Line Frequent bus service, with limited stops. Vancouver Stadium– Kootenay Loop Lincoln Canada Line High frequency rail service. Early City Centre R Chinatown SFU Exchange morning to late evening. Coquitlam Yaletown– High frequency rail service. Early Main Street– Roundhouse Central Expo Line Science World morning to late evening. Brentwood Inlet Centre UBC Loop Moody Centre Town Centre High frequency rail service. Early Commercial– Millennium Line Broadway morning to late evening. VCC–Clark Sperling– Gilmore Frequent passenger ferry service. Burnaby Lake SeaBus Burquitlam Early morning to late evening. Olympic Village Rupert Holdom Lake City Way Port Coquitlam Nanaimo Broadway– Renfrew R General
    [Show full text]
  • Corporate Report
    CORPORATE REPORT NO: R120 COUNCIL DATE: June 24, 2019 REGULAR COUNCIL TO: Mayor & Council DATE: June 20, 2019 FROM: Acting General Manager, Engineering FILE: 8740-01 SUBJECT: Future of Rapid Transit in Surrey RECOMMENDATION The Engineering Department recommends that Council: 1. Receive this report for information; 2. Endorse the principles attached as Appendix “I” to this report; and 3. Authorize staff to develop a Long-Range Rapid Transit Vision for input into TransLink’s Transport 2050 plan. INTENT The intent of this report is to inform Council on TransLink’s update of the Regional Transportation Strategy (now called Transport 2050), outline recommended principles for future rapid transit expansion in Surrey, and request support from Council for the development of a long-range rapid transit vision for Surrey’s submission to TransLink for inclusion in the Transport 2050 plan development process. BACKGROUND The Success of Previous Regional Transportation Plans Transportation and land use are integrally linked, as demonstrated by Metro Vancouver’s long history of coordinating land use and transportation investments. Many of the first coordinated efforts to integrate transit and land use were identified as part of Metro Vancouver’s (at that time known as Greater Vancouver Regional District or “GVRD”) first “Livable Region Plan” that, in 1975, established an urban land use pattern aimed at focusing growth and development in compact urban centres supported by an integrated, multi-modal transportation network. In 1993, prior to the creation of TransLink, the GVRD prepared “A Long-Range Transportation Plan for Greater Vancouver”, known as Transport 2021. This plan was instrumental in identifying an end-state vision for transportation that included policies and capital improvements aligned with regional land use goals.
    [Show full text]
  • Translink Launches Historic New Bus Sevice
    MEDIA RELEASE TransLink launches historic new bus service RapidBus brings faster, more frequent service to eight Metro Vancouver communities January 6, 2020 COQUITLAM, B.C. – TransLink launches RapidBus on four routes – bringing customers up to 20 per cent faster bus service with higher frequencies, fewer stops, dedicated bus lanes, bus priority changes to intersections, and all-door boarding. RapidBus provides a more reliable bus service that can move more than 10,000 people per hour at peak times. The new service is made possible through investments from Phase One of the Mayors’ Vision, the Government of Canada, and the Province of BC. “We’re stepping up our bus game,” says TransLink CEO Kevin Desmond. “RapidBus is a crucial part of improving the region’s bus service through the Mayors’ Vision. These RapidBus routes will benefit eight communities and bring our customers a more reliable bus service that they deserve.” Coming every 10 minutes or better during peak hours and every 15 minutes or better in non-peak hours, customers can now catch a RapidBus on these four routes: • R1 King George Blvd – (Guildford Exchange/Newton Exchange) o Every eight minutes during peak hours • R3 Lougheed Hwy (Coquitlam Central Station/Haney Place) o Every ten minutes during peak hours • R4 41st Ave (UBC/Joyce-Collingwood Station) o Every three to six minutes during peak hours • R5 Hastings St (SFU/Burrard Station) o Every four to five minutes during peak hours RapidBus customers will enjoy new customer amenities such as softer seats, more space on 60-foot articulated buses, real-time digital signage, and audio next-bus information at RapidBus stops.
    [Show full text]
  • Transportation Advisory Committee Meeting
    Mission Statement In carrying out its mandate, Bowen Island Municipality will work towards conducting operations in a way that: • Improves the economic, environmental and social well-being for present and future generations; • Encourages and fosters community involvement; • Enhances the small, friendly, caring character of the community; • Maintains an open, accountable and effective operation; and • Preserves and enhances the unique mix of natural ecosystems and green spaces that Bowen Island possesses. NOTICE: That a Transportation Advisory Committee Meeting will be held at Municipal Hall, 981 Artisan Lane on Tuesday, March 28, 2017 at 7:15 PM for the transaction of business listed below. Stefania Shortt, Committee Clerk REVISED AGENDA Transportation Advisory Committee Meeting (Revised to Include Late and On-Table Items) Tuesday, March 28, 2017 Page Timing OPENING OF COMMITTEE MEETING 1. APPROVAL OF AGENDA 1.1 Introduction of Late Items Recommendation: That the Transportation Advisory Committee approve the agenda and Late Items agenda (if applicable) for the March 28, 2017 committee meeting. 2. ADOPTION OF MINUTES 2.1 Minutes of the Transportation Advisory Committee meeting held 4 - 9 February 28, 2017 Recommendation: That the minutes of the Transportation Advisory Committee meeting held February 28, 2017 be adopted. Bowen Island Municipality March 28, 2017 Transportation Advisory Committee Meeting Page 1 of 33 3. PUBLIC COMMENTS Public Comment is an opportunity for members of the Public to comment regarding items on the agenda or any other comments or issues they may wish to bring to the Committee's attention. 4. BUSINESS ARISING FROM THE MINUTES 4.1 Richard Campbell, Executive Director, BC Cycling 4.2 David Hocking re: Car2Go and Horseshoe Bay: Review of steps taken and 10 - 14 discussion of further opportunities 4.3 Emma Chow, Island Community Planner 1, re: Integrated Transportation Master Plan maps for review and discussion 4.4 Rob Wynen re: Ferry Fact Sheet 5.
    [Show full text]
  • Burrard SKYTRAIN STATION 635 Burrard Street, Vancouver, BC SUMMARY Burrard Skytrain Station Is Located in the Heart of the Vancouver Central Business District
    BURRARD SKYTRAIN STATION 635 Burrard Street, Vancouver, BC SUMMARY Burrard SkyTrain Station is located in the heart of the Vancouver central business district. Its close proximity to major bus lines, hotels, and restaurants mean that there is heavy traffic throughout the week. The opportunity is located in exterior of a covered station courtyard. This courtyard provides direct pedestrian access to both the Royal Centre and Bentall Centre office and retail complexes, making this station a busy pedestrian area. This location sees 44,200 daily riders while the nearby and highly desirable Robson Street shopping district sees 9,341 pedestrians per day. DETAILS + 470 SF Retail Space + Available: TBD + Rent: Contact Listing Agent +Part of the Top 10 busiest stations DEMOGRAPHICS 13 Bus Routes Serving this Area 0.5 KM Ring CONTACT 2016 Population 5,974 Trains Run Every 2-3 Minutes 2011 Population 4,893 During Peak Hours Dan Clark Nick Fisher 604.628.2577 604.628.2581 2016 Avg HHIncome $74,750 [email protected] [email protected] 44,200 Daily Ridership 2016 Daytime Pop. 45,580 BURRARD skytrain STATION Vancouver, BC NightBus Service Late-night bus service Key Regional Transit Connections (seven days a week). This map shows key transit services Horseshoe Bay Ferry Lynn Valley Centre Capilano University connecting regional centres in the To Langdale, Nanaimo Metro Vancouver region. and Bowen Island Park Royal SkyTrain ­ Lonsdale Quay High frequency rail service. Canada Line Early morning to late evening, SeaBus Phibbs Exchange seven days a week. Expo Line ZONE ­ Millennium Line Burrard Station ZONE Lafarge Lake– Waterfront West Coast Express Bus Burrard Douglas Cambie St– Willingdon Ave– Bus routes providing fast and W Hastings Hastings St Duthie Ave– B-Line ­ ­ ­ Hastings St frequent service.
    [Show full text]
  • For Sublease Station Tower
    Buntzen Lake Capilano Lake West Vancouver r m D r d h R A g u no n o r a a r l i i o D p d b s a North mar Rd n th n Ave e I u e C ra 99 Upper So v B te Edgemont Blvd S Queens Ave Le Vancouver ve ls Delbrook BC RAIL Mathers Ave d Pitt Lake Highway R E 29th St ur Inglewood Ave o 21st St 11th St 11th m y Fulton Ave 1 Hyannis Dr e S e v Lynn Valley Rd t 15th St A E Riverside Dr M Taylor Wy Taylor l Ma l rin e e F Rd Dr y Mountain Hwy Larson Rd a B 15th St ll e ge Lonsdale Ave d Ave Chestereld d w Harrison Lake i W 13th St Ave St Georges R d r t e B e B Berkley Rd Berkley Welch St Mountain Hwy o e W W 3rd St E Sunnyside Rd Sunnyside E Grand Blvd E Grand t o Mt Seymou r a K l Pkwy Harbourside Dr e l E i G s ith Harbourside Pl p L s l Rd East Rd n an o a E 3rd St i de Rd Cove Deep L Brooksbank Ave ollarton Rd D Dollarton Hwy Main St d E Esplanade Ir l o OW Riverside Dr Port Moody 99 n Rd W il r o p r Burrard Inlet k A e r s Dr a M Panoram e m H o Ioco Rd e r r i it a B a a l r n g CONTACT US B et C.P.R.
    [Show full text]
  • 510 Burrard St Vancouver British Columbia
    2ND FLOOR - 14,463 SF FOR SUBLEASE AVAILABLE IMMEDIATELY A CLASS OFFICE SPACE IN THE HEART OF THE CBD 510 BURRARD ST VANCOUVER BRITISH COLUMBIA VIRTUAL TOUR 2ND FLOOR - 14,643 SF AVAILABLE IMMEDIATELY VANCOUVER’S SEWALL FLOAT PLANES 510 BURRARD ST CONVENTION CENTRE VANCOUVER BRITISH COLUMBIA PREMISES PROFILE BUILDING PROFILE T WATERFRONT JARVIS ST BURRARD STATION T AVAILABLE SPACE 2nd Floor ■ 14 STOREY, 205,055 SF A WEST PENDER ST CLASS OFFICE TOWER SIZE* 14,643 SF BUTE ST *Can be split approx. in half ■ BOMA BEST GOLD AND BURRARD ST T GRANVILLE STATION LEED GOLD CERTIFIED WEST GEORGIA ST ASKING LEASE RATE Contact Listing Agent ■ AMPLE BICYCLE PARKING THURLOW ST ROBSON ST OP. COSTS & TAXES $22.84 PSF (2020 estimate) ■ UNDERGROUND PARKING AVAILABILITY Immediately ■ 1 STALL PER 1,314 SF LEASED TERM To May 30, 2028 ■ RANDOM $300/STALL/MO FURNITURE Negotiable PLUS TAX ■ RESERVED $400/STALL/MO PATIOS 2 large patios exclusive for LOCATION Subtenant’s enjoyment PLUS TAX 510 Burrard Street is located at “center-ice” in Downtown Vancouver on the south-east corner of Burrard and West Pender Street. The Building is a short walk from the major traffic artery of West Georgia Street, and is within immediate proximity of the Burrard Street SkyTrain Station, and all modes of transportation West deck facing Burrard Street East deck facing Hornby Street 10th floor fitness facility that terminate at 601 West Cordova Street (“The Station”). WALKER’S PARADISE RIDER’S PARADISE VERY BIKEABLE Walk Score Transit Score Bike Score 96 100 80 www.walkscore.com Kitchen First Class end of trip facilities Full height glass 2ND FLOOR - 14,643 SF AVAILABLE IMMEDIATELY The 2nd floor was fully improved from shell condition in mid 2018, and is virtually in brand new condition.
    [Show full text]