Corrib Gas Project

Total Page:16

File Type:pdf, Size:1020Kb

Corrib Gas Project CORRIB GAS PROJECT PUBLIC INFORMATION NOTICE Throughout June the following activities are expected to take place: AUGHOOSE • Preparation for installation of pipeline and services within the tunnel. • Ongoing preparation works in stringing area to support the installation of pipeline and services within the tunnel. • Removal of associated tunnelling equipment. GLENGAD • Landfall Valve Installation (LVI) mechanical and electrical installation of equipment and ongoing civil works. • Testing of construction completed electrical, control and instrumentation systems. • Removal of the tunnel boring machine is ongoing. • Reinstatement works and surface water and services management. PIPELINE WAYLEAVE • Removal of temporary construction materials. Installation of services, equipment and systems. • Pipeline reinstatement and restoration of peat lands continues. TERMINAL SITE • Construction activities within terminal site including civils, instrumentation, mechanical and electrical works. • Testing of construction completed electrical, control and instrumentation systems. • Connection of services and reinstatement works at onshore pipeline/terminal interface. • Concrete cutting & breaking works will be ongoing. Use of rock breaking equipment during ROUTES civil works may be required for a short period. • Landscaping/Reinstatement works. R313 to L1204 to R314 to L1202 • N2He (Nitrogen/Helium) leak testing is MATERIALS BEING HAULED ongoing at the terminal. • Operational Shift Work – 24/7 working (day & Tunnelling equipment, water, arisings, bentonite, night shift) continues. mortar, stone, peat, concrete, pipeline materials, general construction plant and equipment. TRAFFIC MOVEMENTS • Movements of construction-related materials to Projected average number JUNE JULY licensed facilities including Tallagh, Belmullet of one-way HCV movements on the L1201, and Mount Jubilee, south west of per day 131 98 Bangor Erris off the L1206. • Haulage traffic to the construction compounds Dated this 10th day of June, 2014. of Aughoose, Glengad (max 24 one-way HCV movements per day), the pipeline wayleave, the Bellanaboy Bridge Gas Terminal site and Shell E&P Ireland Limited, licensed facilities. Corrib House, • Approved peak number of daily movements 52 Lower Leeson Street, is 236. Dublin 2. If you have any comments or queries with regard to our operations, please contact our Corrib Project Information Office in Belmullet on097 27100 or Corrib Freephone 1800 201 525..
Recommended publications
  • Irish Landscape Names
    Irish Landscape Names Preface to 2010 edition Stradbally on its own denotes a parish and village); there is usually no equivalent word in the Irish form, such as sliabh or cnoc; and the Ordnance The following document is extracted from the database used to prepare the list Survey forms have not gained currency locally or amongst hill-walkers. The of peaks included on the „Summits‟ section and other sections at second group of exceptions concerns hills for which there was substantial www.mountainviews.ie The document comprises the name data and key evidence from alternative authoritative sources for a name other than the one geographical data for each peak listed on the website as of May 2010, with shown on OS maps, e.g. Croaghonagh / Cruach Eoghanach in Co. Donegal, some minor changes and omissions. The geographical data on the website is marked on the Discovery map as Barnesmore, or Slievetrue in Co. Antrim, more comprehensive. marked on the Discoverer map as Carn Hill. In some of these cases, the evidence for overriding the map forms comes from other Ordnance Survey The data was collated over a number of years by a team of volunteer sources, such as the Ordnance Survey Memoirs. It should be emphasised that contributors to the website. The list in use started with the 2000ft list of Rev. these exceptions represent only a very small percentage of the names listed Vandeleur (1950s), the 600m list based on this by Joss Lynam (1970s) and the and that the forms used by the Placenames Branch and/or OSI/OSNI are 400 and 500m lists of Michael Dewey and Myrddyn Phillips.
    [Show full text]
  • Corrib Gas Onshore Pipeline Community Information
    CORRIB GAS ONSHORE PIPELINE COMMUNITY INFORMATION EXCELLENCE. TRUST. RESPECT. RESPONSIBILITY. Corrib Gas Onshore Pipeline p1 Community Information CORRIB GAS ONSHORE PIPELINE COMMUNITY INFORMATION CONTENTS Introduction Background to this document 3 Onshore pipeline & landfall valve installation External Emergency Response Plan 4 Onshore pipeline details Location of the onshore pipeline 7 Map 8 Emergency services response Command and control arrangements on location 11 Inner and Outer Cordon 11 Traffic Cordons 12 Rendezvous Points (RVPS) 12 Rendezvous Point 1 Traffic Cordon 13 Rendezvous Point 2 Traffic Cordon 13 Rendezvous Point 3 Traffic Cordon 13 Rendezvous Point 14 Information to the public 15 How neighbours will be notified of an incident 15 How the public will be kept informed 16 Emergency response exercises 16 Excavating in the vicinity of the pipeline 16 Do’s and Don’ts 17 1 HSE...EVERYWHERE. EVERYDAY. EVERYONE. Corrib Gas Onshore Pipeline p3 Community Information INTRODUCTION Our Health, Safety and Environment (HSE) Vision is an extension of our core values of Excellence, Trust, Respect and Responsibility, and reflects our commitment to conducting our activities in a manner that will protect the health and safety of our employees, contractors and communities. This is Vermilion’s highest priority. At the core of our business is our purpose: we believe that producing energy for the many people and businesses that rely upon it to meet their daily needs and sustain their quality of life is both a great privilege and a great responsibility. Nothing is more important to us than the safety of the public and those who work with us, and the protection of our natural surroundings.
    [Show full text]
  • WHO's WHO Shell Brian Foley, Contracts Manager, Corrib Project
    OSSL SHELL CORRIB SAGA - WHO'S WHO Shell Brian Foley, Contracts Manager, Corrib Project: [email protected] Julia Busby, Head of Shell Legal: [email protected] Frances van Dam, from Shell's business integrity department: [email protected] Charles Hornsby, Ethics and Compliance Officer at Shell Downstream [email protected] Bridgit Lowe, head of Shell Legal, Ireland [email protected] John Gallagher: [email protected] (Exec VP Shell Global Upstream) Alan Mee: Assistance Mayo Manager: [email protected] Ann Hamilton, Shell Corrib Financial Director: [email protected] Wim-Peter Vanbel, [email protected] (regional head Business Integrity Dept Europe & Russia Christy Loftus, Shell Ireland Communications: Christy Loftus [email protected] Michiel Brandjes, Company Sec. & General Counsel: [email protected] Agnes Mclaverty, Permits and Consents Manager for Shell E&P Ireland Limited: [email protected] Mary Barrett, Emergency Response Co-Ordinator Shell [email protected] Peter Voser, RDS PIc CEO: [email protected] Conner Byrne, Shell EP Ireland" (said to have demanded that invoices be falsified and diverted to Roadbridge to avoid any direct connection with Shell - also said to have threatened that OSSL would never work again in oil and gas industry if it revealed any of the activity) Terry Nolan, former CEO, Shell E&P Ireland Michael Crothers, CEO Shell E&P Ireland: [email protected] (said to have "personally felt some moral obligation ..." ) Roadbridge (Main Contractor on Corrib Project?) OSSL people Desmond Kane: [email protected] Amanda Kane Neil Rooney: [email protected] OSSL Supporter/agent/employee? - GEORGE HAMILTON George Hamilton: georgehamiltoneollve.ie Sent email in support of OSSL to Shell to Sea, also made several postings on our "Shell Blog", all supportive of OSSL.
    [Show full text]
  • E Corrib Gas Project: the Deposition of 450,000 Tonnes of Peat
    PEAT IN ENERGY e Corrib gas project: the deposition of 450,000 tonnes of peat B. Moyles Bord na Móna Energy Ltd, Leabeg, Tullamore, Co. Offaly, Ireland Phone: +353-87-9612077, e-mail: [email protected] Summary As part of Shell’s Corrib gas project to construct an onshore gas terminal at Bellanaboy, North-west Mayo, Ireland it was necessary to remove approximately 450,000 m³ of peat from the terminal footprint. The excavation works were carried out by a civil engineering contractor (Roadbridge Ltd.) and this excavated peat was then transported by a road haulier (Iggy Madden Transport Ltd.) a distance of 11km by road to a specially constructed deposition site owned and operated by Bord na Móna. This peat deposition site, where the removed peat was received, re-loaded for internal site haulage and finally placed, is located on industrial cutaway peatlands in Srahmore, near Bangor-Erris in Co. Mayo, Ireland. The peat deposition process was included as part of the planning application for Shell E&P Ireland Ltd (SEPIL) to construct a gas terminal for the reception and separation of gas from the Corrib gas field. The deposition was governed by numerous planning conditions, also separate conditions imposed as part of the waste licence as issued by the EPA. The peat was received at Srahmore and spread over low areas (bays) to depths of on average 1.4m - 1.8m. The deposited peat was then profiled allowing for water run off. Following deposition activities and the im - plementation of the agreed monitoring programme vegetation was allowed to establish naturally, primarily soft rush ( Juncus effusus ) as well as other native peatland species.
    [Show full text]
  • Assessing the Corrib Gas Controversy: Beyond ‘David and Goliath’ Analyses of a Resource Conflict
    Assessing the Corrib gas controversy: Beyond ‘David and Goliath’ analyses of a resource conflict Slevin, A. (2019). Assessing the Corrib gas controversy: Beyond ‘David and Goliath’ analyses of a resource conflict. The Extractive Industries and Society, 6(2), 519-530. https://doi.org//10.1016/j.exis.2018.11.004 Published in: The Extractive Industries and Society Document Version: Peer reviewed version Queen's University Belfast - Research Portal: Link to publication record in Queen's University Belfast Research Portal Publisher rights © 2018 The Authors. This manuscript version is made available under the CC-BY-NC-ND 4.0 license http://creativecommons.org/licenses/by-nc-nd/4.0/,which permits distribution and reproduction for non-commercial purposes, provided the author and source are cited. General rights Copyright for the publications made accessible via the Queen's University Belfast Research Portal is retained by the author(s) and / or other copyright owners and it is a condition of accessing these publications that users recognise and abide by the legal requirements associated with these rights. Take down policy The Research Portal is Queen's institutional repository that provides access to Queen's research output. Every effort has been made to ensure that content in the Research Portal does not infringe any person's rights, or applicable UK laws. If you discover content in the Research Portal that you believe breaches copyright or violates any law, please contact [email protected]. Download date:26. Sep. 2021 Assessing the Corrib gas controversy: Beyond ‘David and Goliath’ analyses of a resource conflict Abstract Since its discovery offshore Ireland in 1996, Corrib gas has become synonymous with controversy and social- ecological upheaval.
    [Show full text]
  • Corrib Gas Onshore Pipeline Community Information
    CORRIB GAS ONSHORE PIPELINE COMMUNITY INFORMATION September 2015 Corrib Gas Onshore Pipeline p1 Community Information CORRIB GAS ONSHORE PIPELINE COMMUNITY INFORMATION CONTENTS Introduction Background of this document 3 Onshore pipeline & landfall valve installation Emergency Response Plan 4 Onshore pipeline details Location of the onshore pipeline 7 Map 8 Emergency services response Command and control arrangements on location 11 Inner and Outer Cordon 11 Traffic Cordons 12 Rendezvous Point 1 Traffic Cordon 12 Rendezvous Point 2 Traffic Cordon 13 Rendezvous Point 3 Traffic Cordon 13 Rendezvous Point (RVP) 13 Information to the public 15 How neighbours will be notified of an incident 15 How the public will be kept informed 16 Emergency response exercises 16 Excavating in the vicinity of the pipeline 16 Do’s and Don’ts 17 p2 Corrib Gas Onshore Pipeline Community Information PART1 Corrib Gas Onshore Pipeline p3 Community Information INTRODUCTION The safety and security of our employees, contractors and the communities in which we operate, is Shell’s number one priority. Safety is at the core of everything we do in our business. The performance target we set ourselves is Goal Zero, which means ensuring we have no incidents that might put our people, our neighbours or facilities at risk. We believe that safe and reliable operations are the foundations upon which a sustainable and responsible business is built. As operator of the Corrib natural gas facilities, Shell Ireland is committed to keeping our neighbours informed of specific information pertaining to the Corrib gas onshore pipeline. This booklet relates to the landfall valve installation (LVI) and onshore pipeline only and does not cover the Bellanaboy Bridge Gas Terminal for which a separate booklet is available.
    [Show full text]
  • Corrib Gas Pipeline
    Inspector’s Report CORRIB GAS PIPELINE An Bord Pleanála CASE REFERENCE 16. GA.0004 Re-routing of the onshore upstream gas pipeline facility relating to the Corrib Gas Field Project at Glengad, Ros Dumhach, Aghoos, Bellagelly South, Co. Mayo 16. DA.0004 Corrib onshore pipeline Acquisition Order 2009 For inspection purposes only. Consent of copyright owner required for any other use. Applicant RPS, on behalf of Shell E&P Ireland Limited (SEPIL), Corrib House, 52 Leeson St. Lower, Dublin 2. Date of Applications 12th February, 2009 – 16.GA.0004 9th February, 2009 – 16.DA.0004 Inspector Mr. Martin Nolan EPA Export 11-08-2012:00:06:37 Preface This report has been written to stand complete and to provide ABP with a full analysis and assessment of these applications. The report provides firm recommendations on each application. Nevertheless the report is written and provides recommendations on the assessment of the issues considered which will enable the Board to proceed to take whichever decision the Board thinks fit. This report is laid out in five parts as follows: Part 1 Outline of the applications and written submissions received Chapters 1-3 Part 2 Policy Context Chapters 4-9 Part 3 The Oral Hearing Chapters 10-16 Part 4 The Issues to be considered Chapters 17-49 Part 5 Conclusions and Recommendations Chapters 49-51 Appendices 1 to 3 contain the reports of Mr. O’Sullivan Mr. O’Donnell and Mr. Wright 4 to 8 these contain copies of relevant documents The conclusions from each chapter are brought together for both Applications in Chapter 50.
    [Show full text]
  • TECHNICAL REPORT Terrestrial Flora and Fauna
    PROPOSED CORRIB ONSHORE PIPELINE ECOLOGICAL IMPACT ASSESSMENT (EcIA) APPENDIX J(1) TECHNICAL REPORT Terrestrial Flora and Fauna prepared for Shell E & P Ireland Ltd. by Ecological Advisory and Consultancy Services (EACS) and Specialist associates May 2010 Corrib Onshore Pipeline Terrestrial Ecology / Ecological Impact Assessment (EcIA) PERSONNEL INVOLVED IN THE PREPARATION OF THE ECOLOGICAL IMPACT ASSESSMENT: Ecological Advisory and Consultancy Services (EACS): Jenny Neff BSc.(Hons). MSc (Ecol). Dip. Bus. Stud. CEnv. FIEEM Director and Principal Consultant EACS Associate specialists: Vegetation and botanical: Dr. John Conaghan Dr. Janice Fuller MIEEM Fauna: Dr. Chris Smal MIEEM (Ecological Solutions) Bastian Egeter BA (Ecological Solutions) Conor Kelleher AIEEM (Bat specialist) Ger Stanton BSc Birds: (Fehily Timoney & Company Ltd.) Dr. Gavin Fennessy MIEEM Dr. Katherine Kelleher AIEEM Dr. David Rees Dr. Daphne Roycroft EACS/EcIA Report / May 2010 2 Corrib Onshore Pipeline Terrestrial Ecology / Ecological Impact Assessment (EcIA) CONTENTS 1 INTRODUCTION 1.1 Project details 1.2 Ecological Impact Assessment (EcIA) 2 METHODOLOGY 2.1 Introduction 2.2 Habitats and vegetation 2.2.1 Field surveys 2.2.2 Survey constraints 2.3 Fauna (non-avian) 2.3.1 Introduction 2.3.2 Fauna survey 2.3.2.1 2002 to 2005 surveys 2.3.2.2 2007 and 2008 surveys 2.3.2.3 Otter and mammal surveys February and March 2010 2.3.3 Survey constraints 2.3.3.1 Access 2.3.3.2 Dense vegetation 2.3.3.3 Seasonal 2.4 Birds 2.4.1 Introduction 2.4.2 Aquatic surveys 2.4.2.1 Post breeding
    [Show full text]
  • Survey Megalithic Tombs of Ireland
    SURVEY OF THE MEGALITHIC TOMBS OF IRELAND Ruaidhri de Valera and Sean O Nuallain VOLUME II COUNTY MAYO DUBLIN PUBLISHED BY THE STATIONERY OFFICE 1964 To be purchased from the GOVERNMENT PUBLICATIONS SALE OFFICE, G.P.O. ARCADE, DUBLIN 1 or through any Bookseller SURVEY OF THE MEGALITHIC TOMBS OF IRELAND Ruaidhri de Valera and Sean O Nuallain VOLUME II COUNTY MAYO DUBLIN PUBLISHED BY THE STATIONERY OFFICE 1964 To be purchased from the GOVERNMENT PUBLICATIONS SALE OFFICE, G.P.O. ARCADE, DUBLIN 1 or through any Bookseller W PRINTED BY DUNDALGAITPRESS ( - TEMPEST) LTD., DUNDALK CONTENTS ALPHABETICAL INDEX TO DESCRIPTIONS, PLANS AND PHOTOGRAPHS OF TOMBS ........... v NUMERICAL LIST OF TOMBS ......... viii ALPHABETICAL INDEX TO SITES IN APPENDIX ...... vii INTRODUCTION ........... ix Previous Accounts of Co. Mayo Tombs ...... ix Scope and Plan of Present Volume ....... xiii Conventions Used in Plans ........ xv PART I. DESCRIPTIONS Descriptions of the Megalithic Tombs of Co. Mayo .... i Appendix: (a) Destroyed sites probably to be accepted as genuine Megalithic Tombs ......... 93 (b) Sites marked " Cromlech," etc., on O.S. Maps which are not accepted as Megalithic Tombs ..... 94 PART 2. DISCUSSION 1. MORPHOLOGY .......... 103 Court Cairns: Cairn and Revetment ....... 103 Courts .......... 104 Main Gallery ......... 106 Transepted Galleries and related forms .... 109 Orientation ......... no Portal Dolmens ......... no Wedge-shaped Gallery Graves: Main Chamber ........ in Portico .......... 112 Outer-walling . 112 Cairn .......... 112 Orientation ......... 113 2. DISTRIBUTION 113 Topography of Co. Mayo ....... 113 Court Cairns ......... 115 Portal Dolmens ......... 116 Wedge-shaped Gallery Graves . - . • 117 iii IV CONTENTS 3. THE PLACE OF THE MAYO TOMBS IN THE IRISH SERIES Court Cairns .....
    [Show full text]
  • Glengad Landfall Intertidal Survey Report (Summer 2008)
    GLENGAD LANDFALL INTERTIDAL SURVEY REPORT (SUMMER 2008) For inspection purposes only. Consent of copyright owner required for any other use. SHELL E&P IRELAND LTD P40036 January 2009 (Rev 01) EPA Export 20-02-2014:23:29:24 RSK Environment Ltd Glengad Landfall Intertidal Survey Report RSK General Notes Project No: P40036 Title: Glengad Landfall Survey Report Client: Shell E&P Ireland Ltd. Issue Date: January 2009 Issuing Office: Helsby Authorised by: David Watson Project Manager Date: 23rd January 2009 Authorised by: Alec Moore Project QA Rep Date: 23rd January 2009 For inspection purposes only. Consent of copyright owner required for any other use. AM AB January E 01 Final 2009 AM DW January E 00 Draft 2009 AUTHOR CHECKED DATE ISSUED POST REV PURPOSE OF ISSUE ISSUED / ELECTRONIC RSK/H/P/P40036/Landfall survey June 2008_rev01 i January 2009 EPA Export 20-02-2014:23:29:24 RSK Environment Ltd Glengad Landfall Intertidal Survey Report CONTENTS 1. Introduction...............................................................................1 1.1 Background.................................................................................................1 1.2 2005 survey..................................................................................................1 1.3 2008 survey..................................................................................................1 2. Methods.....................................................................................2 2.1 General........................................................................................................2
    [Show full text]
  • Specific Instance Against Royal Dutch Shell, Statoil and Marathon Oil Corporation for the Violation of the Oecd Guidelines ______
    SPECIFIC INSTANCE AGAINST ROYAL DUTCH SHELL, STATOIL AND MARATHON OIL CORPORATION FOR THE VIOLATION OF THE OECD GUIDELINES ________________________________________________________________________ The Corrib Gas project in Ireland To: Trade Policy Department Ministry of Economic Affairs PO Box 20102 NL-2500 EC The Hague From: Pobal Chill Chomain, Rossport, Ballina, Co Mayo Contact person : Vincent McGrath Subject : Specific Instance against Royal Dutch Shell, Statoil and Marathon Oil Corporate for the violations of the OECD Guidelines for Multinational Companies Probal Chill Chomain comes respectfully to submit a specific instance in light of the fact that: the company ROYAL DUTCH SHELL , transnational corporation with home office in the Hague/ The Netherlands, being that the Irish subsidiary is controlled in its entirety by Shell E&P Ireland. the company STATOIL , transnational corporation with home office in Stavanger/ Norway, being that the Irish subsidiary is controlled in its entirety by Statoil Exploration Ireland the company MARATHON OIL CORPORATION , transnational corporation with home office in Houston/ State of Texas/ United States, being that the Irish subsidiary is controlled in its entirety by Marathon International Petroleum Hibernia Limited have formed a consortium for the Corrib gas field's exploitation in: Ballinaboy, Glenamoy, County Mayo, Ireland Local offices at 4, Udarás na Garltachta, Belmullet, Co Mayo Registered Office of Shell E&P Ireland , Corrib House, 52 Lower Leeson St, Dublin 2. This Corrib gas project comprises
    [Show full text]
  • Marine Mammal Monitoring in the Waters of Broadhaven Bay & Northwest Mayo: 2001-2002 Final Report to EEI, Ltd
    Marine mammal monitoring in the waters of Broadhaven Bay & northwest Mayo: 2001-2002 Final Report to EEI, Ltd. Marine mammal monitoring in the waters of Broadhaven Bay & northwest Mayo: 2001-2002 Final project report to Enterprise Energy Ireland Ltd. March 2003 COASTAL & MARINE RESOURCES CENTRE ENVIRONMENTAL RESEARCH INSTITUTE UNIVERSITY COLLEGE CORK Marine mammal monitoring in the waters of Broadhaven Bay & northwest Mayo: 2001-2002 Final Report to EEI, Ltd. Marine mammal monitoring in the waters of Broadhaven Bay & northwest Mayo: 2001-2002 Oliver Ó Cadhla Anneli Englund Evelyn Philpott Mick Mackey Simon Ingram COASTAL & MARINE RESOURCES CENTRE, Environmental Research Institute, University College, Old Presentation Building, Western Road, Cork. IRELAND Citation: Ó Cadhla, O., Englund, A., Philpott, E., Mackey, M. & Ingram, S. (2003). Marine mammal monitoring in the waters of Broadhaven Bay & northwest Mayo: 2001-2002. Report to Enterprise Energy Ireland, Ltd. Coastal & Marine Resources Centre, University College, Cork. 74pp. © University College Cork, 2003 1 Marine mammal monitoring in the waters of Broadhaven Bay & northwest Mayo: 2001-2002 Final Report to EEI, Ltd. CONTENTS Page Summary 3 Introduction 4 1 - Visual monitoring for marine mammals 9 1.1 Introduction 9 1.2 Methods 10 1.2.1 Cliff-based surveys 10 1.2.2 Boat-based surveys 12 1.2.3 Data collection & analysis 12 1.3 Results & Discussion 13 1.3.1 Cliff- & boat-based survey effort 13 1.3.2 Marine mammal sighting data 13 A. Cetaceans 15 B. Seals & otters 29 C. Unidentified marine
    [Show full text]