PUBLIC INFORMATION NOTICE Throughout June the following activities are expected to take place: AUGHOOSE • Preparation for installation of pipeline and services within the tunnel. • Ongoing preparation works in stringing area to support the installation of pipeline and services within the tunnel. • Removal of associated tunnelling equipment.

GLENGAD • Landfall Valve Installation (LVI) mechanical and electrical installation of equipment and ongoing civil works. • Testing of construction completed electrical, control and instrumentation systems. • Removal of the tunnel boring machine is ongoing. • Reinstatement works and surface water and services management.

PIPELINE WAYLEAVE • Removal of temporary construction materials. Installation of services, equipment and systems. • Pipeline reinstatement and restoration of peat lands continues.

TERMINAL SITE • Construction activities within terminal site including civils, instrumentation, mechanical and electrical works. • Testing of construction completed electrical, control and instrumentation systems. • Connection of services and reinstatement works at onshore pipeline/terminal interface. • Concrete cutting & breaking works will be ongoing. Use of rock breaking equipment during ROUTES civil works may be required for a short period. • Landscaping/Reinstatement works. R313 to L1204 to R314 to L1202 • N2He (Nitrogen/Helium) leak testing is MATERIALS BEING HAULED ongoing at the terminal. • Operational Shift Work – 24/7 working (day & Tunnelling equipment, water, arisings, bentonite, night shift) continues. mortar, stone, peat, concrete, pipeline materials, general construction plant and equipment. TRAFFIC MOVEMENTS • Movements of construction-related materials to Projected average number JUNE JULY licensed facilities including Tallagh, of one-way HCV movements on the L1201, and Mount Jubilee, south west of per day 131 98 Bangor off the L1206. • Haulage traffic to the construction compounds Dated this 10th day of June, 2014. of Aughoose, Glengad (max 24 one-way HCV movements per day), the pipeline wayleave, the Bellanaboy Bridge Gas Terminal site and Shell E&P Ireland Limited, licensed facilities. Corrib House, • Approved peak number of daily movements 52 Lower Leeson Street, is 236. Dublin 2.

If you have any comments or queries with regard to our operations, please contact our Corrib Project Information Office in Belmullet on097 27100 or Corrib Freephone 1800 201 525.