Safouh Soufi, P. Eng

Total Page:16

File Type:pdf, Size:1020Kb

Safouh Soufi, P. Eng Safouh Soufi, P. Eng. EXPERIENCE Client: Cenovus Energy Project: Foster Creek Cogeneration Plant, 80 MW CHP Review plant electrical and protection systems. Investigate plant Services: islanding issues and recommend potential solutions. Client: Cabot Canada Ltd. Project: Cabot Tail-Gas CHP Project, 20 MW Tail-Gas fired CHP Project engineering development including interconnection, Services: preliminary design cycle, project statement of work documents and cost estimates. Client: Ontario Power Authority Project: Feed-In-Tariff Program Independent Engineer providing advice on metering plans and COD Services: related matters for wind, solar, biomass, biogass and landfill gas projects. Client: Ontario Power Authority Project: Potential DG and CHP in Ontario Independent Engineer providing advice on areas related to the technical assessment of NUG facilities’ role post PPA term expiry Services: and surveying the technical potential of CHP/Distributed generation in Ontario. Client: PPC Project: Caracol Knits Cogeneration Plant, Cortés, Honduras, Central A. Independent Engineer review of damaged waste heat recovery Services: boiler at the cogeneration plant and established the quantity of fuel oil required to displace generated steam from the facility. Client: Greenfield Ethanol Project: Chatham Cogeneration Plant Owner’s Engineer providing advice on development options and Services: economic viability of a 100 – 150 MW Cogeneration facility. Client: TEMBEC Project: Tembec CHP Project Owner’s Engineer providing advice on possible development of a Services: combined gas-fired and biomass-fired project. Client: Ontario Power Authority Project: OPA CHP Valuation Independent Engineer conducting a study on appropriate pricing for Services: CHP projects in Ontario. Qualified and where applicable quantified the cost-benefits of CHP projects in Ontario. Client: St. Marys Paper Corp. 2 Safouh Soufi, P. Eng. Project: St. Marys Renewable Energy Centre Owner’s Engineer developing a 35 MW Biomass CHP project at the site of St. Marys Paper Corp. in Sault Ste. Marie, Ontario, including Services: basic design parameters, main equipment, major systems, fuel supply sources and other relevant information. Several Projects: Thorold Cogeneration Project, 236 MW, combined cycle cogeneration plant; Algoma Energy Cogeneration Facility, 63 MW, waste-gas-fired conventional thermal cycle plant; East Windsor Cogeneration Centre, 84 MW, combined cycle cogeneration plant; Durham College District Energy, 2.3 MW, reciprocating engine cogeneration plant; Project: Great Northern Tri-Gen Facility, 11 MW, reciprocating engine tri- generation plant; London Cogeneration Facility, 12 MW, combined and conventional cycles cogeneration plant; Warden Energy Centre, 5 MW, reciprocating engine cogeneration plant; North York Energy Centre, 393 MW, Peaking facility; Halton Hills Generating Station, 600 MW, combined cycle plant; TransAlta Sarnia, 506 MW, combined cycle cogeneration plant. Independent Engineer’s project review and due diligence. Review and approval of metering plans and performance test protocols and Services: performance check tests. Annual review of CHP Useful Heat Output. Client: St. Marys Paper Corp. Project: St. Marys Paper Mill, 30 MW Biomass Fired CHP Owner Engineer’s providing assistance for completing applications Services: to participate in the IESO-Administered market. Client: SMP Algoma Cogeneration Project Project: 105 MW Waste Heat Cogeneration Plant Independent Engineer’s review and project due diligence. Reviewed all projects technical parameters and assessed the benefits of Services: incorporating a biomass boiler. Carried out capital costs and project economic analysis. Client: PPC – Comision Federal de Electricidad, Baja California, Mexico Project: CFE Cerro Prieto III Geothermal Power Plant, 220 MW Independent Engineer responsible for inspection, investigation and Services: assessment of costs and damages resulting from an earthquake at the Mexicali plant. Client: Brookfield Power, Sault Ste. Marie, Ontario Project: Brookfield-IESO’s ASP Agreement Services: Owner’s Engineer providing technical & strategic advice for Ancillary 3 Safouh Soufi, P. Eng. Service Provider (ASP) Agreement between IESO and Brookfield covering several generating facilities within the GLP transmission system. Client: Toronto Economic Development Corporation Portlands Energy Centre, Toronto, Ontario Project: Combined Cycle Plant, 550 MW Independent Engineer providing an expert opinion as to whether or not the plant is “cogeneration ready”. The plant is not anticipated to Services: have a thermal heat host when it enters commercial operations. The plant owner’s claim that the facility is designed to operate in a cogeneration mode. Client: Ontario Power Authority Project: Clean Energy Standard Offer Program (CESOP) Provided capital and O&M cost estimates for several distributed generation technologies and combined heat & power applications up Services: to 10 MW in size. Also provided capital and O&M costs for a simple cycle LM6000 gas turbine. Client: Mperial Power Ltd, Thailand SIPCO Power Project, Thailand Project: Combined Cycle Plant, 120 MW Owner’s Engineer responsible for front-end project development Services: engineering, connection to national grid, connection to nearby steel mill and review of EPC proposal. Client: PPC – Comision Federal de Electricidad (CFE), Mexico Project: CFE Salamanca Power Plant, Mexico Independent Engineer responsible for inspection, investigation and Services: assessment of damage costs resulting from Boiler# 1 explosion during routine maintenance outage. Client: Ontario Power Authority Portlands Energy Centre, Toronto, Ontario Project: Combined Cycle Plant, 550 MW Independent Engineer providing a review of project EPC and O&M costs. Evaluation of cost adjustments, impact on Net Revenue Services: Requirement and comparison with similar project. Review of project performance parameters (heat rate & capacity) and the proposed temporary generation option. Client: Maine Pointe LLC Project: Solutia Cogeneration Facility, Indian Orchard, MA, USA Independent Engineer providing a due diligence of owner’s proposal to improve/upgrade power generation facility to enhance steam Services: production, efficient distribution of thermal heat and augmentation with a new larger cogeneration plant. Client: Ontario Power Authority Project: Combined Heat & Power RFP 4 Safouh Soufi, P. Eng. Provided technical advice and assistance for the design framework Services: and process development of the OPA’s CHP RFP. Provided capital and O&M cost estimates for several CHP applications. Client: Confidential Project: Cogeneration Plant, 110 MW Performed comparative assessment of capital costs and heat rates Services: for a select list of projects whose proponents may submit proposals in response to the Ontario 2,500 MW RFP process for clean power. Client: St. Marys Paper, Sault Ste. Marie Project: Biomass Cogeneration Plant, 30 MW Completed feasibility study, preliminary engineering, capital costs, grid interconnection study, project proforma and environmental Services: review analysis for 30 MW wood-waste fired conventional thermal plant. Client: AES Ras Laffan Power Company Ras Laffan Power Project Project: 800 MW Combined Cycle Plant Plant performance testing. Review of EPC plant performance test Services: procedure and developed thermodynamic model to assess plant output and heat rate. Client: EnCana Power, Calgary, Alberta Cavalier Power Station, Strathmore, Alberta Project: 110 MW Combined Cycle Power plant Plant performance testing. Developed test procedure together with Services: a thermodynamic model to assess overall plant and main equipment performance. Client: EnCana Power, Calgary, Alberta Balzac Power Station, Calgary, Alberta Project: 110 MW Combined Cycle Power plant Plant performance testing. Developed test procedure together with Services: a thermodynamic model to assess overall plant and main equipment performance. Client: PanCanadian Power Services, Calgary, Alberta Project: Cavalier Power Station, 110 MW Investigation of main steam pipe failure. Mechanical review of pipe Services: support design and stress analysis. Client: Nusantara Steel Power, Malaysia Project: Nusantara Power Plant, 350 MW Owner’s engineer. Responsible for preliminary design & feasibility assessment of a 350 MW captive power station for a proposed 1.2 MTPA compact steel mill. Work included the development of Services: thermodynamic cycles for a number of options to facilitate their technical analysis. Compiled capital cost estimates for all options to enable their economic analysis and for the development of project 5 Safouh Soufi, P. Eng. proforma. Client: Piper Rudnick, New York, USA Termovalle S.C.A.E.S.P, Cali, Colombia Project: Combined Cycle Power Plant, 200 MW Independent engineer providing expert opinion at an arbitration hearing held to resolve disputes arising from project EPC Contract. Reviewed the engineering design relevant to the systems from which Services: the disputes have arisen. Reviewed the claims, evidence, and the pre-filed expert reports. Submitted a pre-filed expert report and provided testimony. Client: Babcock & Wilcox Canada Java Power Station, Indonesia Project: 415 MW Coal-Fired Power plant Balance of plant equipment engineering and capital cost for cooling Services: water, make-up water treatment, compressed air and waste water treatment systems. Client: National Power Development Inc. Project: Termovalle Power Plant, Cali, Colombia,
Recommended publications
  • Bdstaff SUB OPG 20071121
    Ontario Energy Board Commission de l’énergie P.O. Box 2319 de l’Ontari o 27th. Floor C.P. 2319 2300 Yonge Street 27e étage Toronto ON M4P 1E4 2300, rue Yonge Telephone: 416-481-1967 Toronto ON M4P 1E4 Facsimile: 416-440-7656 Téléphone: 416-481-1967 Toll free: 1-888-632-6273 Télécopieur: 416-440-7656 Numéro sans frais: 1-888-632-6273 By E-mail November 21, 2007 Ms. Kirsten Walli Board Secretary Ontario Energy Board P.O. Box 2319, 27th Floor Toronto, ON M4P 1E4 Dear Ms. Walli: Re: Ontario Power Generation Inc. Reliability Must-Run Agreement for 2007-08 for Lennox Generating Station Board File No. EB-2007-0715 In accordance with Procedural Order No. 1, please find enclosed Board staff’s submission with respect to Ontario Power Generation Inc.’s application and evidence. Yours truly, Original signed by Keith C. Ritchie Project Advisor - Applications Enclosures cc: Ontario Power Generation Inc. Intervenors of Record Submissions of Board Staff on the Application by Ontario Power Generation Inc. for Approval of a Reliability Must-run Agreement for the Lennox Generating Station Board File No.: EB-2007-0715 The following submissions of Board staff are made further to the Board’s October 16, 2007 Procedural Order No. 1 in relation to an application by Ontario Power Generation Inc. (“OPG”) for approval of a reliability must-run agreement (the “2007-08 RMR Contract”) for the Lennox Generating Station (“Lennox”). Board staff’s submissions are focused on the issue of the term of future reliability must-run agreements that may be entered into between OPG and the Independent Electricity System Operator (the “IESO”) in relation to Lennox.
    [Show full text]
  • Generation Capacity and Production
    GENERATION CAPACITY AND PRODUCTION NET GENERATION NET GENERATION (GWh) HYDROELECTRIC CAPACITY (MW) 2017 2016 2015 2014 2013 Central Operations 124 668 493 564 692 645 Includes 26 stations, headquarters in North Bay. Eastern Operations 2,571 14,517 12,535 12,241 13,281 12,774 Includes 10 stations, headquarters in Renfrew. Niagara Operations 2,278 11,250 12,015 12,547 12,267 12,372 Includes 5 stations, headquarters in Niagara area. Northeast Operations 1,809 3,584 3,779 4,057 3,802 3,359 Includes 14 stations, headquarters in Timmins. Northwest Operations 687 3,065 3,089 3,497 3,448 3,583 Includes 11 stations, headquarters in Thunder Bay. NET GENERATION NET GENERATION (GWh) NUCLEAR CAPACITY (MW) 2017 2016 2015 2014 2013 Darlington Nuclear Generating Station Located on Lake Ontario in the Municipality of Clarington. The 2,634 19,250 25,619 23,293 27,960 25,051 station has four units. One unit was taken offline in October 2016 for refurbishment. Pickering Nuclear Generating Station Located on Lake Ontario in Pickering. The station has six 3,094 21,411 19,958 21,231 20,045 19,642 operating units and two units in a safe shutdown state. NET GENERATION NET GENERATION (GWh) (1) THERMAL CAPACITY (MW) 2017 2016 2015 2014 2013 Atikokan Generating Station Located near the town of Atikokan in northwestern Ontario. The 205 138 149 109 10 -18 station has one biomass unit. The station stopped using coal in 2012. Brighton Beach (2) Located in Windsor. The station is a combined cycle generating 280 60 123 115 100 Not reported station fuelled by natural gas.
    [Show full text]
  • Power Workers Union
    October 20, 2020 Independent Electricity System Operator 1600-120 Adelaide Street West Toronto, ON M5H 1T1 Via email to [email protected] Re: Resource Adequacy Engagement CANADIAN UNION OF PUBLIC EMPLOYEES, The Power Workers’ Union (“PWU”) represents a large portion of the employees LOCAL 1000, C.L.C. working in Ontario’s electricity industry. Attached please find a list of PWU employers. 244 EGLINTON AVE. E. TORONTO, ONTARIO The PWU appreciates the opportunity to provide input on the Resource Adequacy M4P 1K2 Engagement. The PWU is a strong supporter and advocate for the prudent and TEL.: (416) 481-4491 rational reform of Ontario’s electricity sector and recognizes the importance of low- FAX: (416) 481-7115 cost, low-carbon energy to the competitiveness of Ontario’s economic sectors. PRESIDENT Jeff Parnell The PWU believes that IESO processes and initiatives should deliver energy at the lowest reasonable cost while stimulating job creation and growing the province’s gross VICE PRESIDENTS Andrew Clunis domestic product (GDP). We are respectfully submitting our detailed observations Mike Hambly and recommendations. Tom Chessell We hope you will find the PWU’s comments useful. Yours very truly, Jeff Parnell President Printed on recycled and recyclable paper List of PWU Employers Abraflex (2004) Ltd. Alectra Utilities Algoma Power Aptum Atlantic Power Corporation - Calstock Power Plant Atlantic Power Corporation - Kapuskasing Power Plant Atlantic Power Corporation - Nipigon Power Plant Atura - Halton Hills Generating Station Atura - Napanee Generating Station Atura - Portlands Energy Centre Atura – Brighton Beach Generating Station Bracebridge Generation Brookfield Power Wind Operations Brookfield Renewable Power - Mississagi Power Trust Bruce Power Inc.
    [Show full text]
  • OPA Sub Appl Evid 20090305
    Updated: March 5, 2009 EB-2008-0312 Table of Contents Page 1 of 2 ONTARIO POWER AUTHORITY 2009 REVENUE REQUIREMENT SUBMISSION TABLE OF CONTENTS Description Exhibit Schedule Tab A – ADMINISTRATION A 1 1 Submission A 2 1 2009-2011 Business Plan A 3 1 CECO Annual Report 2008 A 4 1 Supplement to CECO Annual Report 2007 dated May 2008 A 5 1 2007 Annual Report A 6 1 Organizational Charts A 7 1 List of Directives and Letters from the Minister of Energy & Infrastructure 2 Directives from the Minister of Energy & Infrastructure (February 25, 2008 to September 17, 2008) 3 Directives from the Minister of Energy & Infrastructure (December 19, 2008 to January 23, 2009) B – STRATEGIC OBJECTIVES B 1 1 Strategic Objective 1 Plan for an adequate, reliable and sustainable system that integrates conservation, generation and transmission B 2 1 Strategic Objective 2 Plan, procure and manage conservation resources to meet the requirements identified in the IPSP and promote sustainable conservation practices that contribute to a culture of conservation B 3 1 Strategic Objective 3 Plan and design procurement processes and enter into procurement contracts for generation resources to meet the requirements identified in the IPSP and to embed “best-in-class” contracting practices that support investment in necessary infrastructure and contribute to a sustainable electricity system Updated: March 5, 2009 EB-2008-0312 Table of Contents Page 2 of 2 Description Exhibit Schedule Tab B 4 1 Strategic Objective 4 Identify and assess barriers to the development of economically
    [Show full text]
  • A Clean Path to Ozone Annex Compliance: Phasing out Ontario’S Coal-Fired Power Plants
    A Clean Path to Ozone Annex Compliance: Phasing Out Ontario’s Coal-Fired Power Plants Prepared by: Cliff Chen, Bruce Biewald, and David White Synapse Energy Economics 22 Pearl Street, Cambridge, MA 02139 www.synapse-energy.com 617-661-3248 Prepared for: The OntAIRio Campaign March 21, 2003 THE OntAIRio CAMPAIGN The production of this report was made possible though the generous financial support of the Salamander Foundation and the Walter and Duncan Gordon Foundation. We would also like to express our appreciation for the support of the Climate Action Network of Canada (CANet). For additional copies of this report, please contact: Sierra Club of Canada 24 Mercer Street, Suite 102 Toronto, ON M5V 1H3 (416) 960-9606 [email protected] Table of Contents 1. Introduction................................................................................................................. 1 2. Ontario’s Aging Coal Fleet .......................................................................................... 3 3. A Clean Alternative ...................................................................................................... 6 4. Coal Phase Out Scenario............................................................................................ 10 5. Conclusion ...................................................................................................................15 References........................................................................................................................ 17 Appendix A: Explanation
    [Show full text]
  • Developing North America's Energy Future
    DEVELOPING NORTH AMERICA’S ENERGY FUTURE 12 2012 Annual Report TransCanada Corporation 2012 Financial Highlights Net Income Attributable to Common Shares | $1.30 billion or $1.84 per share Comparable Earnings ­£® | $1.33 billion or $1.89 per share «>À>LiÊ >À}ÃÊLivÀiÊÌiÀiÃÌ]Ê/>ÝiÃ]Ê i«ÀiV>ÌÊ>`ÊÀÌâ>ÌÊ­£® | $4.2 billion Funds Generated from Operations ­£® | $3.3 billion >«Ì>Ê Ý«i`ÌÕÀiÃ]Ê µÕÌÞÊÛiÃÌiÌÃÊ>`ÊVµÕÃÌÃÊ NÊ $3.5 billion Ê- >ÀiÊ Û`i`ÃÊ iV>Ài`Ê NÊ $1.76 per share Net Income Attributable Comparable Earnings(1) Comparable EBITDA(1) Funds Generated from Capital Expenditures, Equity to Common Shares (millions of dollars) (millions of dollars) Operations(1) (millions of dollars) Investments and Acquisitions (millions of dollars) (millions of dollars) 2,000 2,000 5,000 5,000 8,000 4,544 4,245 1,526 1,559 1,600 1,600 4,000 3,686 4,000 6,400 1,357 3,451 1,299 1,330 3,284 1,233 3,161 4,973 1,200 1,200 3,000 3,000 4,800 3,146 3,461 800 800 2,000 2,000 3,200 400 400 1,000 1,000 1,600 0 0 0 0 0 2010 2011 2012 2010 2011 2012 2010 2011 2012 2010 2011 2012 2010 2011 2012 Net Income per Share Comparable Earnings Dividends Declared Common Shares Market Price – Close (1) – Basic (dollars) per Share (dollars) per Share (dollars) Outstanding – Average Toronto Stock Exchange (millions of shares) (dollars) 3 3 3 1,000 50 47.02 44.53 2.22 37.99 2.17 800 40 691 702 705 1.96 1.89 2 1.84 2 2 1.77 1.76 1.68 1.60 600 30 400 20 1 1 1 200 10 0 0 0 0 0 2010 2011 2012 2010 2011 2012 2010 2011 2012 2010 2011 2012 2010 2011 2012 (1) Non-GAAP measure that does not have any standardized meaning prescribed by generally accepted accounting principles (GAAP).
    [Show full text]
  • NATURAL GAS-FIRED RESOURCES 1.0 INTRODUCTION the Purpose
    EB-2007-0707 Exhibit D Tab 8 Schedule 1 Page 1 of 30 1 NATURAL GAS-FIRED RESOURCES 2 1.0 INTRODUCTION 3 The purpose of this exhibit is to describe how natural gas-fired resources are used in the 4 Plan. 5 2.0 SUPPLY MIX DIRECTIVE 6 Q. What does the Supply Mix Directive (the “Directive”) state with respect to natural 7 gas-fired resources? 8 A. The Directive states the following: “Maintain the ability to use natural gas capacity at 9 peak times and pursue applications that allow high efficiency and high value use of the 10 fuel”. 11 Q. Which natural gas-fired applications were considered by the OPA in developing 12 the IPSP? 13 A. The OPA considered the following natural gas applications for generating electricity: 1 14 x New generation located close to loads, of various technologies (simple cycle, 2 3 4 15 combined cycle, combined heat and power and fuel cells ); 16 x Continued operation of, or extension to, current facilities, some under contract to the 17 Ontario Electricity Finance Corporation (“OEFC”) or the OPA, and the Lennox 5 18 generating station; and 19 x Conversion of some of the coal-fired generating units to operate on natural gas. 1Simple cycle gas turbines (SCGT) produce electricity from the combustion of natural gas to drive a turbine generator. This is a single-stage process. 2 Combined cycle gas turbines (CCGT) produce electricity from the combustion of natural gas to drive a turbine generator, with the heat produced in this process producing steam that drives a second turbine generator, and thereby produces additional electricity.
    [Show full text]
  • Meeting Toronto's Electricity Supply Needs
    ONTARIO CLEAN AIR QUALITY ISSUES FACT SHEET #19 AIR ALLIANCE A comparison of the Meeting Toronto’s ▼ Portlands Energy www.cleanairalliance.org Electricity Supply Centre and the Needs: Toronto Waterfront Clean Energy Centre Toronto is one of the largest cities in North America that has no significant electricity generation capacity within its own vicinity — the city generates just 1.2% of the power used within its boundaries while using close to 20% of the power produced in Ontario. Currently, the central city south of Eglinton (between Hwy. 427 and Victoria Park) receives almost its entire electricity supply via two Hydro One transmission corridors. This leaves the city highly reliant on large centralized supply sources outside of the city, such as the Pickering and Darlington nuclear stations and the giant Nanticoke coal-fired station on Lake Erie. It has been widely recognized that this current power structure leaves the city highly vulnerable to power disrup- tions while also creating serious system inefficiencies. To address this imbalance, efforts are underway to locate new generation capacity within the city, while also improving overall energy efficiency (Toronto Hydro, for exam- ple, has set a goal of reducing peak demand in Toronto by 5% by 2007). This, in turn, has led to two proposals to build new generation facilities on the eastern waterfront: • The Portlands Energy Centre (PEC) is a joint venture of Ontario Power Generation and TransCanada that is proposing to build a 550 megawatt (MW) combined-cycle* natural gas power plant near the site of the mothballed Hearn Generating Station. The PEC plan has undergone a complete environmental assess- ment.
    [Show full text]
  • MRP Report V4
    GENERATING CHANGE: SUSTAINABLE ADAPTIVE REUSE OF URBAN POWER PLANTS IN-DEPTH CASE STUDIES AND PLANNING IMPLICATIONS FOR THE HEARN, TORONTO by Julia Smith MA, Maastricht University, 2011 BA, University of Toronto, 2009 A Major Research Paper presented to Ryerson University in partial fulfillment of the requirements for the degree of Master of Planning in Urban Development Toronto, Ontario, Canada, 2015 © Julia Smith 2015 Author’s Declaration for Electronic Submission of a MRP I hereby declare that I am the sole author of this MRP. This is a true copy of the MRP, including any required final revisions. I authorize Ryerson University to lend this MRP to other institutions or individuals for the purposes of scholarly research. I further authorize Ryerson University to reproduce this MRP by photocopying or by other means, in total or in part, at the request of other institutions or individuals for the purpose of scholarly research. I understand that my MRP may be made electronically available to the public. ii GENERATING CHANGE: SUSTAINABLE ADAPTIVE REUSE OF URBAN POWER PLANTS IN-DEPTH CASE STUDIES AND PLANNING IMPLICATIONS FOR THE HEARN, TORONTO © Julia Smith 2015 Master of Planning in Urban Development Ryerson University ABSTRACT Cities across the western world are making the transition away from coal energy, and towards greener methods of power generation; as a result, abandoned power plants, including Toronto’s Richard L. Hearn Power Generation Station, are now features of many post-industrial urban landscapes. Largely out of use since 1983, the Hearn has seen a variety of redevelopment concepts over the last 30 years, but recent initiatives to revitalize Toronto’s Waterfront and industrial Port Lands have spurred renewed interest in the site.
    [Show full text]
  • Generating Capacity and Production
    GENERATING CAPACITY AND PRODUCTION GENERATING ELECTRICITY PRODUCTION (GWh) CAPACITY (MW) at Dec. 31, 2019 2019 2018 2017 2016 2015 HYDROELECTRIC, SOLAR & WIND Central Operations − Hydroelectric − − − 668 493 564 OPG moved from five to four Ontario operating regions in 2018. Eagle Creek Renewable Energy Includes 85 hydroelectric stations and minority shareholdings in 13 hydroelectric 627 1,239 105 − − − stations and two solar facilities. Headquarters in Morristown, New Jersey. OPG acquired Eagle Creek in 2018. Eastern Operations − Hydroelectric 2,625 13,218 13,185 14,517 12,535 12,241 Includes 22 hydroelectric stations. Headquarters in Renfrew, Ontario. Nanticoke Solar 44 58 − − − − Solar facility located in Haldimand County, Ontario. In−service as of 2019. Northeast Operations − Hydroelectric 1,846 3,243 4,019 3,584 3,779 4,057 Includes 21 hydroelectric stations. Headquarters in Timmins, Ontario. Northwest Operations − Hydroelectric 687 3,367 2,892 3,065 3,089 3,497 Includes 11 hydroelectric stations. Headquarters in Thunder Bay, Ontario. Pickering Wind Turbine (Retired) − 0 2 2 3 3 Previously located in Pickering, Ontario. The turbine was dismantled in 2019. South Central Operations − Hydroelectric 2,319 12,534 12,174 11,250 12,015 12,547 Includes 12 hydroelectric stations. Headquarters in Niagara area, Ontario. NUCLEAR Darlington Nuclear Generating Station Located in the Municipality of Clarington, Ontario. The station has four units. One 2,634 19,860 20,029 19,250 25,619 23,293 unit was taken offline in October 2016 for refurbishment. Pickering Nuclear Generating Station Located in Pickering, Ontario. The station has six operating units and two units in 3,094 23,605 20,850 21,411 19,958 21,231 a safe shutdown state.
    [Show full text]
  • IESO ORO March07 03.Indd
    THE ONTARIO RELIABILITY OUTLOOK MARCH 2007 VOLUME 2 ISSUE 1 ABOVE: IESO Control Room COVER: Melancthon Wind Project, one of Ontario’s new commercial wind farms. CONTENTS 1 EXECUTIVE SUMMARY 4 SUPPLY 9 TRANSMISSION 13 CONSERVATION AND DEMAND MANAGEMENT 16 INTERCONNECTED MARKETS 19 OTHER CONCERNS 20 CONCLUSIONS AND RECOMMENDATIONS Transmission towers at sunset. Image courtesy EXECUTIVE SUMMARY of Hydro One. The province’s future electricity reliability the completion of planned supply facilities picture has improved significantly as a result of or in meeting conservation and demand decisions and actions taken since the release of management (CDM) targets. the previous Ontario Reliability Outlook by the The IESO also implemented a number of new Independent Electricity System Operator (IESO) market mechanisms designed to address in June, 2006. reliability issues that had surfaced in the About 7,000 megawatts (MW) of new or summer of 2005. These included the Day Ahead refurbished generation has been contracted Commitment Process (DACP), intertie failure to come into service by 2011. The new supply charges and the Emergency Load Reduction will address previously identified concerns in Program (ELRP). Overall, these initiatives specific areas such as Toronto and the western resulted in greater certainty of generator part of the Greater Toronto Area (GTA) and availability, fewer transaction failures and will contribute to overall improved resource additional flexibility for the IESO in managing adequacy for the province. the reliability of the system. The decision to have the Ontario Power Consultation is underway with a number of Authority (OPA) and the IESO jointly develop stakeholders related to overall system and a coal transition plan to meet the government’s local reliability needs.
    [Show full text]
  • Annual Report 2004 Corporate Profile
    Annual Report 2004 Corporate Profile Ontario Power Generation Inc. is an Ontario-based electricity generation company whose principal business is the generation and sale of electricity in Ontario and to interconnected markets. Our focus is on the efficient production and sale of electricity from our generation assets, while operating in a safe, open and environmentally responsible manner. In 2004, OPG generated 105 terawatt hours (TWh) of electricity. OPG’s electricity generating portfolio, as of December 31, 2004, had a total in-service capacity of 22,790 megawatts (MW), which consisted of: • three nuclear stations with a capacity of 6,103 MW (excludes Pickering A, Units 2 and 3, which have a capacity of 1,030 MW and are currently laid up) and Pickering A, Unit 1, with a capacity of 515 MW, currently being returned to service; • six fossil-fuelled stations with a capacity of 9,718 MW; • 64 hydroelectric stations with a capacity of 6,962 MW; • three wind power stations (which includes OPG’s 50 per cent interest in the Huron Wind joint venture) with a capacity of 7 MW. OPG co-owns one gas-fired station with ATCO Power Canada Ltd. and ATCO Resources Ltd. In addition, OPG has leased two nuclear stations on a long-term basis to Bruce Power L.P. Contents 2 Message from the Chairman and the President 74 Board of Directors 10 Management’s Discussion and Analysis 74 Governance 44 Consolidated Financial Statements 76 Officers 48 Notes to the Consolidated Financial Statements Ontario Power Generation Facilities – see inside back cover Electricity Terms One megawatt (MW) is one million watts.
    [Show full text]