Client: Cenovus Energy Project: Foster Creek Cogeneration Plant, 80 MW CHP Review plant electrical and protection systems. Investigate plant Services: islanding issues and recommend potential solutions.

Client: Cabot Canada Ltd. Project: Cabot Tail-Gas CHP Project, 20 MW Tail-Gas fired CHP Project engineering development including interconnection, Services: preliminary design cycle, project statement of work documents and cost estimates.

Client: Power Authority Project: Feed-In-Tariff Program Independent Engineer providing advice on metering plans and COD Services: related matters for wind, solar, biomass, biogass and landfill gas projects.

Client: Ontario Power Authority Project: Potential DG and CHP in Ontario Independent Engineer providing advice on areas related to the technical assessment of NUG facilities’ role post PPA term expiry Services: and surveying the technical potential of CHP/Distributed generation in Ontario. Client: PPC Project: Caracol Knits Cogeneration Plant, Cortés, Honduras, Central A. Independent Engineer review of damaged waste heat recovery Services: boiler at the cogeneration plant and established the quantity of fuel oil required to displace generated steam from the facility.

Client: Greenfield Ethanol Project: Chatham Cogeneration Plant Owner’s Engineer providing advice on development options and Services: economic viability of a 100 – 150 MW Cogeneration facility.

Client: TEMBEC Project: Tembec CHP Project Owner’s Engineer providing advice on possible development of a Services: combined gas-fired and biomass-fired project.

Client: Ontario Power Authority Project: OPA CHP Valuation Independent Engineer conducting a study on appropriate pricing for Services: CHP projects in Ontario. Qualified and where applicable quantified the cost-benefits of CHP projects in Ontario.

Client: St. Marys Paper Corp.

2 Safouh Soufi, P. Eng.

Project: St. Marys Renewable Energy Centre Owner’s Engineer developing a 35 MW Biomass CHP project at the site of St. Marys Paper Corp. in Sault Ste. Marie, Ontario, including Services: basic design parameters, main equipment, major systems, fuel supply sources and other relevant information. Several Projects:  Thorold Cogeneration Project, 236 MW, combined cycle cogeneration plant;  Algoma Energy Cogeneration Facility, 63 MW, waste-gas-fired conventional thermal cycle plant;  East Windsor Cogeneration Centre, 84 MW, combined cycle cogeneration plant;  Durham College District Energy, 2.3 MW, reciprocating engine cogeneration plant; Project:  Great Northern Tri-Gen Facility, 11 MW, reciprocating engine tri- generation plant;  London Cogeneration Facility, 12 MW, combined and conventional cycles cogeneration plant;  , 5 MW, reciprocating engine cogeneration plant;  North , 393 MW, Peaking facility;  Halton Hills Generating Station, 600 MW, combined cycle plant;  TransAlta Sarnia, 506 MW, combined cycle cogeneration plant.

Independent Engineer’s project review and due diligence. Review and approval of metering plans and performance test protocols and Services: performance check tests. Annual review of CHP Useful Heat Output.

Client: St. Marys Paper Corp. Project: St. Marys Paper Mill, 30 MW Biomass Fired CHP Owner Engineer’s providing assistance for completing applications Services: to participate in the IESO-Administered market.

Client: SMP Algoma Cogeneration Project Project: 105 MW Waste Heat Cogeneration Plant Independent Engineer’s review and project due diligence. Reviewed all projects technical parameters and assessed the benefits of Services: incorporating a biomass boiler. Carried out capital costs and project economic analysis.

Client: PPC – Comision Federal de Electricidad, Baja California, Mexico Project: CFE Cerro Prieto III Geothermal Power Plant, 220 MW Independent Engineer responsible for inspection, investigation and Services: assessment of costs and damages resulting from an earthquake at the Mexicali plant. Client: Brookfield Power, Sault Ste. Marie, Ontario Project: Brookfield-IESO’s ASP Agreement Services: Owner’s Engineer providing technical & strategic advice for Ancillary

3 Safouh Soufi, P. Eng.

Service Provider (ASP) Agreement between IESO and Brookfield covering several generating facilities within the GLP transmission system.

Client: Economic Development Corporation , Toronto, Ontario Project: Combined Cycle Plant, 550 MW Independent Engineer providing an expert opinion as to whether or not the plant is “cogeneration ready”. The plant is not anticipated to Services: have a thermal heat host when it enters commercial operations. The plant owner’s claim that the facility is designed to operate in a cogeneration mode.

Client: Ontario Power Authority Project: Clean Energy Standard Offer Program (CESOP) Provided capital and O&M cost estimates for several distributed generation technologies and combined heat & power applications up Services: to 10 MW in size. Also provided capital and O&M costs for a simple cycle LM6000 .

Client: Mperial Power Ltd, Thailand SIPCO Power Project, Thailand Project: Combined Cycle Plant, 120 MW Owner’s Engineer responsible for front-end project development Services: engineering, connection to national grid, connection to nearby steel mill and review of EPC proposal.

Client: PPC – Comision Federal de Electricidad (CFE), Mexico Project: CFE Salamanca Power Plant, Mexico Independent Engineer responsible for inspection, investigation and Services: assessment of damage costs resulting from Boiler# 1 explosion during routine maintenance outage.

Client: Ontario Power Authority Portlands Energy Centre, Toronto, Ontario Project: Combined Cycle Plant, 550 MW Independent Engineer providing a review of project EPC and O&M costs. Evaluation of cost adjustments, impact on Net Revenue Services: Requirement and comparison with similar project. Review of project performance parameters (heat rate & capacity) and the proposed temporary generation option.

Client: Maine Pointe LLC Project: Solutia Cogeneration Facility, Indian Orchard, MA, USA Independent Engineer providing a due diligence of owner’s proposal to improve/upgrade power generation facility to enhance steam Services: production, efficient distribution of thermal heat and augmentation with a new larger cogeneration plant.

Client: Ontario Power Authority Project: Combined Heat & Power RFP

4 Safouh Soufi, P. Eng.

Provided technical advice and assistance for the design framework Services: and process development of the OPA’s CHP RFP. Provided capital and O&M cost estimates for several CHP applications.

Client: Confidential Project: Cogeneration Plant, 110 MW Performed comparative assessment of capital costs and heat rates Services: for a select list of projects whose proponents may submit proposals in response to the Ontario 2,500 MW RFP process for clean power.

Client: St. Marys Paper, Sault Ste. Marie Project: Biomass Cogeneration Plant, 30 MW Completed feasibility study, preliminary engineering, capital costs, grid interconnection study, project proforma and environmental Services: review analysis for 30 MW wood-waste fired conventional thermal plant.

Client: AES Ras Laffan Power Company Ras Laffan Power Project Project: 800 MW Combined Cycle Plant Plant performance testing. Review of EPC plant performance test Services: procedure and developed thermodynamic model to assess plant output and heat rate.

Client: EnCana Power, Calgary, Alberta Cavalier , Strathmore, Alberta Project: 110 MW Combined Cycle Power plant Plant performance testing. Developed test procedure together with Services: a thermodynamic model to assess overall plant and main equipment performance.

Client: EnCana Power, Calgary, Alberta Balzac Power Station, Calgary, Alberta Project: 110 MW Combined Cycle Power plant Plant performance testing. Developed test procedure together with Services: a thermodynamic model to assess overall plant and main equipment performance.

Client: PanCanadian Power Services, Calgary, Alberta Project: Cavalier Power Station, 110 MW Investigation of main steam pipe failure. Mechanical review of pipe Services: support design and stress analysis.

Client: Nusantara Steel Power, Malaysia Project: Nusantara Power Plant, 350 MW Owner’s engineer. Responsible for preliminary design & feasibility assessment of a 350 MW captive power station for a proposed 1.2 MTPA compact steel mill. Work included the development of Services: thermodynamic cycles for a number of options to facilitate their technical analysis. Compiled capital cost estimates for all options to enable their economic analysis and for the development of project

5 Safouh Soufi, P. Eng.

proforma.

Client: Piper Rudnick, New York, USA Termovalle S.C.A.E.S.P, Cali, Colombia Project: Combined Cycle Power Plant, 200 MW Independent engineer providing expert opinion at an arbitration hearing held to resolve disputes arising from project EPC Contract. Reviewed the engineering design relevant to the systems from which Services: the disputes have arisen. Reviewed the claims, evidence, and the pre-filed expert reports. Submitted a pre-filed expert report and provided testimony.

Client: Babcock & Wilcox Canada Java Power Station, Indonesia Project: 415 MW -Fired Power plant Balance of plant equipment engineering and capital cost for cooling Services: water, make-up water treatment, compressed air and waste water treatment systems.

Client: National Power Development Inc. Project: Termovalle Power Plant, Cali, Colombia, 195 MW Intake and circulating water system design review and modification. Proposed corrective design modifications for design flaws in the Services: circulating water system that could not operate continuously for more than few hours at a time.

Client: National Power Development Inc. Project: Termovalle Power Plant, Cali, Colombia, 195 MW Intake hydraulic modelling. Built and tested two hydraulic models Services: (1/50 and 1/10 scale) to investigate sedimentation problems as well as the high influx of debris.

Client: AES Canada Limited, Kingston, Ontario AES Kingston Cogeneration, Kingston, Ontario Project: 120 MW Combined Cycle Cogeneration Plant Owner's engineer for this 120 MW CC cogeneration project. Responsible for performance test procedure and plant acceptance Services: test. Developed cycle models and provided plant performance analysis before and after plant testing. Identified areas to improve plant efficiency.

Client: PanCanadian Petroleum Limited, Calgary, Alberta Project: Kingston Cogeneration, Bath, Ontario Performance analysis for a 110 MW combined cycle cogeneration Services: plant for design and off-design conditions. Developed steam and power profiles for use as basis for project proforma analysis.

Client: Chase Manhattan Bank, Toronto, Ontario Project: Confidential Banker's engineer for this 53 MW based cogeneration Services: and load displacement project. Performed due diligence and

6 Safouh Soufi, P. Eng.

complete analysis of the project technical viability for the purpose of financing and implementation

Client: PetroCanada, Mississauga, Ontario Project: Mississauga Lubricants Centre Independent engineer retained by both PetroCanada and Ontario Hydro to review and resolve technical/contractual issues pertaining Services: to an RTP II contract that PetroCanada wishes to sign with Ontario Hydro. Reviewed plant loads, plant operations and recommended a contractual CBL.

Client: Ontario Hydro, Toronto, Ontario Project: Strathcona Paper, Napanee, Ontario Review of boiler plant upgrades and capital cost estimates. Services: Proposed an upgrade strategy and discussed EPC document to identify OH's scope of liability from this undertaking.

Client: IPL International Inc., Calgary, Alberta Project: Confidential Front-end engineering for a 380 MW Combined Cycle Power Plant in Pakistan. Developed target for plant performance, schedule and O & Services: M and capital cost estimates. Identified operation and maintenance requirements.

Client: Marubeni Corporation, Tokyo, Japan Project: Phetburi IPP (Thailand), Bangkok, Thailand Front-end engineering for 2 x 700 MW coal-fired thermal power plant. Work included capital cost estimate, project services, bid Services: review & tabulation of EPC proposals and the selection of the best suited EPC contractor.

Client: Marubeni Corporation, Manila, Philippines Project: NPC Batangas-Calaca II, Calaca, Philippines Performed all design modifications for the 230 kV substation in this 300 MW coal-fired plant. Assisted in the commissioning of the Services: station, coordinated with the client's engineer and developed the operating manuals.

Client: Westinghouse, Hamilton, Ontario Project: Jiangsu Ligang Electric Power, China Provided project engineering for the package of steam turbine driven Services: boiler feed pumps for 2 X 350 MW thermal units.

Client: Northland Power, Toronto, Ontario Project: Iroquois Falls Cogen Project, Iroquois Falls, Ontario One of the project owner's engineers. Responsibility included cycle design and analysis for this 120 MW combined cycle cogeneration Services: project. Provided steam and power profiles for design and off- design conditions for use in project proforma and in EPC document. Provided a capital cost estimate to assist in contract negotiations.

7 Safouh Soufi, P. Eng.

Client: Rigel Energy, Calgary Alberta Project: Bruce Cogeneration Project Developed and proposed several design alternatives for a 700 MW gas-fired cogeneration plant to be installed at an existing nuclear Services: power plant site. Based on these alternatives EPC proposals were solicited. Reviewed EPC bids as well as plant performance, project schedule and capital cost. Issued recommendations to client.

Client: Pacific Electric Power Project: Jamshoro(Phase II) Combined Cycle Power Plant, Sindh, Pakistan Completed a pre-feasibility study for an 840 MW plant proposed to be built in Sindh, Pakistan. The study included selection of gas Services: turbine as well as major equipment, plant performance analysis for design and off-design conditions, and the development of an order of magnitude capital cost estimate.

1990 - 1994 SNC-LAVALIN, Oakville, Ontario, Canada Project: Lakeview Generating Station, Mississauga Task: Design Review Board Services: Overall design and rehabilitation of Units 4 & 3 (350 MW each) Project: Bosnor Projects, Mexico Task: Project Manager Assisted a European-Mexican developer in the evaluation of several "load displacement" projects in Mexico. Initiated the plant conceptual design and selected equipment and systems suitable for each Services: project specific needs. Developed capital, operations and maintenance cost estimates, which were used as basis for projects evaluation and economic analysis.

Project: Kingston District Energy Project, Kingston, Ontario Task: Engineering Manager Provided the client with technical assistance necessary to develop the preliminary design and capital cost estimate of a 150 MW combined cycle cogeneration plant. The plant is to be built as part of a comprehensive district energy system in the city of Kingston, Services: Ontario. Supervised and completed the heat load marketing survey for the subject city. The purpose of the survey was to establish the potential magnitude and location of thermal loads suitable for district heating and cooling in the down town and surrounding areas.

Project: TP Projects (Confidential) Task: Project Manager Headed a team of senior engineers and professional estimators to carry out a due diligence exercise for two cogeneration projects. Project "A" is 120 MW combined cycle cogeneration plant with a condensing steam turbine. Project "B" is 105 MW combined cycle Services: cogeneration plant with a backpressure steam turbine and a 110,000 lb/hr bark boiler. The team has reviewed, investigated and analyzed all available data to establish the viability of the overall plant design and particularly the design of the steam cycles, capital cost estimates, operations & maintenance costs, steam & power

8 Safouh Soufi, P. Eng.

purchase agreements, the integrity of project schedules and proforma.

Project: Ministry of Energy Study, Toronto, Ontario Task: Study Director Directed a study which discussed the principal power production technologies and investigated the environmental approvals and impacts of non-utility power generation (NUG) projects in Ontario. The study was initiated by the Ontario Ministry of Energy and aimed at developing a reference handbook of atmospheric emissions for several power production technologies and to depict the environmental benefits of gas-fired power plants compared to Services: conventional coal-fired or other fuel-fired plants. This reference document is intended to be used to provide information ranging from the environmental regulatory process in Ontario as it relates to NUG developers, atmospheric emissions of several utility and non-utility power production technologies and technology selection. The study was concluded in a report and several hundred copies of this report were published by the Ministry in Ontario.

Project: Cardinal Power Project, Cardinal, Ontario Task: Project Manager Responsible for directing a team of senior engineers and all the project management activities including schedule, manhour and cost controls. The task was to provide the client with technical assistance Services: to establish the preliminary design of the electrical single line and transmission line routing for the 150 MW cogeneration plant to be built by Sithe Energies in Cardinal, Ontario.

Project: Several Independent Power Producer projects Task: Engineering Manager Provided a range of technical assistance to several private power developers. This included the development of the steam cycle, cycle performance analysis based on the use of different gas turbines for design and off-design conditions, capital and O&M cost estimates, project economic analysis, assessment and development of liquidated damages and buy-down schemes, due diligence, steam and power purchase contracts and in the general development of power projects. Projects included:  Port Klang Power Project, 1000 MW, combined cycle plant Services:  Northland Power Project, 350 MW, combined cycle cogen plant  Tembec Cogen Project, 140 MW, combined cycle cogen plant  Project X (Confidential), 300 MW, combined cycle plant  Kapuskasing Power Plant, 60 MW, combined cycle plant (LM6000)  SNC/GE Project , 150 MW, combined cycle plant  CP Forest Products, 100 MW, combined cycle cogen plant  Saskoil Cogen Project, 10 MW, "cheng" cycle plant  NCPO Cogen Project, 25 MW, cogeneration plant

9 Safouh Soufi, P. Eng.

Project: Brockwest Power Plant, Pickering, Ontario Task: Engineering Manager Responsible for the direction and coordination of all engineering activities for this turnkey 25 MW thermal power project. The plant is fired with landfill gas produced in a nearby dump site and consisted of two boilers, steam turbine generator, wet surface air cooled Services: condensers and balance of plant equipment. Due to involvement in the latter stages of the project, the chief responsibility was to initiate and implement design modifications and troubleshoot problems as they arose during the construction, commissioning and start up phases of the project.

SAUDI CONSOLIDATED ELECTRIC COMPANY (SCECO-EAST), 1983 - 1990 KSA Project: Qurayyah Power Plant (4 x 600 MW) Position: Senior Mechanical Engineer Review and approval of contractor design and drawings, evaluation of contractor proposals to verify their qualification and compliance with specified codes and standards (e.g. ASME Boiler and Pressure Vessels Code), the start-up and commissioning of the boiler plants, turbine-generator plants, demineralization plants, plant data acquisition and computer systems, and plant control systems as they relate to mechanical equipment. Set up and developed procedures necessary for the control of contractors works in the course of start- Responsibility: up and commissioning of the plant. Witnessed and accepted commissioning trial tests which included dynamic response testing, combustion control tuning and load rejection testing of each Boiler- Turbine-Generator unit. Supervised the start-up and commissioning of the plant training simulator and examined its dynamic response and overall operations. Worked as a member of the plant performance testing committee which was responsible for the acceptance of the overall plant performance, heat rate and power output.

Project: Qurayyah Power Plant (4 x 600 MW) Position: Acting Principal Engineer, Thermal Plant Engineering Division Headed a team of multi-discipline engineers responsible for all engineering activities in the plant including, design modifications, Responsibility: evaluation and improvement of plant performance, inspection during outages, analyzing unit trips and improving plant reliability.

Project: Qurayyah Power Plant (4 x 600 MW) Position: Acting Chief Commissioning Engineer Responsible for all commissioning activities for Units 1-2. Reviewed contractor’s daily commissioning schedule and assigned engineering Responsibility: personnel to witness the commissioning of the various systems in the plant.

Project: Qurayyah Power Plant (4 x 600 MW) Position: Acting Operations Superintendent Responsibility: Supervised a team of shift engineers and operators responsible for

10 Safouh Soufi, P. Eng.

the day to day operation of the plant. Reviewed shifts schedule and developed operators training program. Conducted the plant operations meetings to resolve outstanding issues with the plant maintenance and system operations department.

Project: Ghazlan Power Plant (4 x 400 MW) Position: Lead Performance Engineer Responsible for the gathering of plant data for the calculation of monthly plant performance, reporting deficiencies and recommending corrective action to the plant operations department. Designed and developed the necessary software to calculate unit’s Responsibility: heat rate and produce the monthly performance report. Compiled operations reference manual to train graduate engineers joining the company giving them introduction to the operations of thermal power plants in general and Ghazlan Power Plant in particular.

Project: Ghazlan Power Plant (4 x 400 MW) Position: Plant Engineer Member of a team of multi-discipline engineers whose responsibilities included the evaluation and implementation of plant improvements revamps and upgrades to extend plant life, providing engineering and technical assistance to the plant maintenance and operations divisions and the design and implementation of engineering modifications aimed at improving plant reliability and efficiency. The engineering modifications varied in degree of complexity from minor alterations to existing systems, to the development and implementation of new designs to overcome inherent plant deficiencies. Performed detailed studies of large boiler Responsibility: feed pump systems design, operating modes and modulations problems. Investigated the life extension of boiler superheater and reheater tubes. Reviewed some of the major plant equipment control philosophy and modified to suit new plant requirements. Investigated equipment and instrumentation responsible for the deviation in plant performance. Supervised the implementation of all engineering modifications carried out during the plant annual shut downs. Developed the complete specification for the upgrade of the plan main process computers and was totally responsible for contract negotiations and placement of order with the successful vendor.

1982 - 1983 POLYFAB COMPANY, KSA Position: System Engineer, Engineering and Design Department Design and development of Computer Aided Design (CAD) software for use on the company's latest type of industrialised building systems, (Composite Modular 3, CM3). The software was developed, configured and operated on HP computers, fully configured with digitisers, plotters, printers and various other Responsibility: peripheries. Investigated the use of solar energy panels for the heating/cooling of the CM3 building. The purpose of the investigation was to make the CM3 building system self-sufficient for energy, which makes it ideal to use in hot and remote desert areas. The investigation included HVAC, hot water storage techniques and

11 Safouh Soufi, P. Eng.

evaluation of the environmental effects on the solar panels.

1981 – 1982 LEEDS UNIVERSITY, Leeds, England Conducted a combustion research project under the direction of the Head of the Fuel and Energy Department at Leeds University. The project aimed at investigating combustion properties and combustion characteristics of heavy fuel oils, coal derived oils and water-in-oil emulsions (orimulsion) for industrial and power station boilers. Research Project: Assessment of combustion characteristics was based on the free moving and suspended droplet techniques. Assisted in the investigation of other projects involved in the field of fire spread and hazard in combustion processes, aerodynamics of combustion and flame structure and spectroscopy.

12