Igeosis the Technical Excellence…
Total Page:16
File Type:pdf, Size:1020Kb
Form-1, Pre-Feasibility Report& Environment Management Plan of Proposed Seethalahari Building Stone Quarry Project Area 2-00 Acres At Sy No. 58/A, Seethalahari Village, Gadag Taluk, Gadag District, Karnataka State. of Sri. N. H. V. Ramarao # 5/26, Shirhatti, Shirahatti Taluk, Gadag District of Karnataka State. Prepared By: S.B. NAGANUR RQP/GOA/052/87/A Address: Igeosis The Technical Excellence….. Geology, Survey, Mining, Environmental Consultants Door. No. 293/4, Plot No. 30, 2nd Floor, Nanjundeshwara Complex, Canal Road, Basaveshwara Badavane, Hosapete-583201, Ballari District, Karnataka. Cell: +91 9880641510, 9686046667 & 9986836114 Email: [email protected] CONTENTS Sl No. Particulars 1 Form-1 2 Pre-Feasibility Report, 3 Environment Management Plan including Monitoring Report List of Drawing Sl No. Particulars DWG No. 1 Location Map showing location of the proposed 1 project and its surroundings, List of Annexure Sl No. Particulars Annexure No. 1 Approval letter with Approved Quarrying Plan, I 2 Copy of RTC II 3 Copy of Forest NOC III 4 Copy of Tashildhar NOC IV 5 Copy of Lease deed V APPLICATION FORM–1 [AS PER EIA NOTIFICATION 2009] (I) Basic Information Sl. No. Item Details 1 NameoftheProject SeethalahariBuilding Stone Quarry 2 S.No in theschedule Project Activity 1(a) - 4: “B Category project ” (As per New EIA Notification dated 14.09.2006) 3 Proposed capacity/ area/ length/tonnage to Proposed Capacity: 15,005tonnes per be handled /commandarea/leasearea/noof annum wells to bedrilled Area:2-00 acres 4 New/Expansion/Modernization Renewal 5 Existing Capacity/ Area etc. Area:2-00 acres 6 CategoryofProject i.e.'A'or'B' B2 (<25Haall the minor mineral miningleaseareasare considered as B2, as per MoEF, GoI, Office Memorandum No. J-13012/12/2013-IA-II (I), dated: 24-12- 2013). non coal minelease) 7 Does it attract the general condition? If yes, No pleasespecify. 8 Does it attract the specific condition? If No yes, pleasespecify. 9 Location : N15°14’ 21.3”to N15° 14’ 24.9”Latitude and E75°32'28.3"to E75°32'34.4"Longitude. Topo mapof 10kmradiusfrom proposedsite is given as Drawing No.1. Plot/ Surveyno/khasrano Sy.No:58/A Village Seethalahari Taluk Gadag District Gadag State Karnataka 10 Nearest railwaystation/airport along Nearest RailwayStation:GadagRailway with distancein kms. Station~31.50 km(NE) Nearest Airport:Hubballi Air Port~62.50 km (SW) 11 Nearest Town,city,District Headquarters NearestTown:Shirhatti about 5.00 Km(SE) along with distance in kms. NearestCity&DistrictHQ:Gadagabout 30.0Km(NE) 12 Village Panchayats,ZillaParishad, Village:Seethalahari MunicipalCorporation, Local body (complete Taluk:Gadag postal addresseswith telephone nos.to District:Gadag begiven) State:Karnataka 13 Nameoftheapplicant Sri. N. H. V. Ramarao. 14 Registered Address Sri. N. H. V.Ramarao H.No.5/26, Shirahatti, Taluk: Shirahatti, Form-1Page 1 of 9 Dist: Gadag, State :Karnataka Mobile No. +91 9448463164. 15 Address forcorrespondence Sri. N. H. V.Ramarao H.No.5/26, Shirahatti, Taluk: Shirahatti, Dist: Gadag, State :Karnataka Mobile No. +91 9448463164. Name Sri. N. H. V. Ramarao. Designation (Owner / Partner / CEO) Owner Address H.No.5/26, Shirahatti, Taluk: Shirahatti, Dist: Gadag, State :Karnataka Mobile No. +91 9448463164 Pin code 582120. E-mail -- Telephone No Contact No: +91 9448463164 FaxNo -- 16 Details of Alternative Sites No alternativesites areexamined. examined,ifany.Locationofthese sites should be shown on a topo sheet 17 InterlinkedProjects No 18 Whetherseparate applicationof interlinked No projecthas been submitted? 19 If yes date ofsubmission Not Applicable 20 Ifno,reason The proposedproject is for quarrying building stone. 21 Whether theproposalinvolves approval / No clearanceunder: if yes detailsofsameandtheirstatusto begiven (a)TheForest(Conservation)Act, 1980? (b)TheWildLife(Protection)Act, 1972? (c) TheCRZNotification,1991? 22 Whetherthereisany Government Order/Policy No relevant/relating to thesite? 23 Forest landinvolved(ha.) No 24 Whether there is any litigating No pendingagainsttheprojectand/ or l a n d i n w h i c h t h e p r o j e c t i s proposeto set up? NameoftheCourtCaseNoOrders /directionsofthecourt,ifanyand its relevance with the proposed project Form-1Page 2 of 9 (II) Activity 1. Construction,operationordecommissioningoftheProjectinvolvingactionswhichwill cause physical changes inthe locality (topography, landuse, changes inwater bodies etc.) Sl. Information/Checklist confirmation Yes/ Details thereof(withapproximate quantities No No /rates wherever possible) with source ofinformation 1.1 Permanent or temporary change in Yes The Topography of the core zone willbe land use, land cover or topography changedduetothequarryoperationinthe includingincreaseinintensityofland formofexcavationsetc. use(with respect to local land use plan) 1.2 Clearanceofexistingland,vegetation No Not Applicable andbuildings? 1.3 Creation ofnewland uses? Yes It will beused forquarryingand related activities 1.4 Pre-construction investigations e.g. No Not Applicable borehouses,soil testing? 1.5 Construction works? Yes Temporarysite services will beconstructed. 1.6 Demolition works? No Not Applicable 1.7 Temporarysites usedfor construction No There is no proposal for using temporary works or housing of construction sites forconstruction works workers? 1.8 Abovegroundbuildings,structuresor Yes Quarry officeof temporary nature will earthworks including linear be constructed structures,cut and fill orexcavations. 1.9 Underground worksincludingmining The proposal is foropencast mining oftunneling? No 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshorestructures? No Not Applicable 1.13 Production and manufacturing Yes Building StoneQuarrying processes? andProcessingDetailsaregivenin Approved Quarry Plan (Enclosed). 1.14 Facilities for storage of goods or Yes Storage sheds of temporary nature will materials? beconstructed. 1.15 Facilitiesfortreatmentordisposalof solid Yes Generation of solid waste is very minimal waste orliquideffluents? which will be used for making approach and haulage roads. There will not be any liquid effluent treatment 1.16 Facilities f o r l o n g t e r m housing o f No No facilities are proposed for long term operational workers? housingfor operational workers. 1.17 New road, rail or seatrafficduring Yes Internal haulageroadswill beconstructed construction oroperation? 1.18 New road, rail, air waterborne or other Therewillnotbeanyclosureordiversionof transport infrastructure including new No existing transport routes orinfrastructure. or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing Therewillnotbeanyclosureordiversionof transport routes or infrastructure No existing Form-1Page 3 of 9 leading to changes in traffic t r a n s p o r t r o u t e s orinfrastructure movements? leadingto changes in traffic movements. 1.20 Newordivertedtransmissionlinesor Theprojectdoesnotinvolveanydiversionin pipelines? No transmission lines orpipelines. 1.21 Impoundment, damming, culverting, No NoImpoundment, damming,culverting, realignmentor other changestothe realignment or other changes to the hydrology of watercourses or aquifers? hydrology of watercourses or aquifers are proposed. 1.22 Stream crossings? No Not Applicable 1.23 Abstractionortransfersofwaterfrom Yes 2.0KLD of water groundorsurfacewaters? w i l l b e e x t r a c t e d f r o m b o r e w e l l nearthesite. 1.24 Changesinwaterbodiesortheland No Nochangeinwaterbodiesorthelandsurface surfaceaffectingdrainageor run-off? affecting drainageorrun-off. 1.25 Transport of personnel or materials for Yes Duringoverburdenremoval,mobilizationand construction,operationor quarrying,10labours arerequired. decommissioning? 1.26 Long-term dismantling or No Theproposedactivityis building decommissioning or restoration works? stonequarryingand itwillbetemporary.No long-termdismantlingordecommissioningor restoration works areinvolved. 1.27 Ongoing activityduring Yes Very little impact on Environment is decommissioning which could have an anticipated impact on theenvironment? 1.28 Influxofpeopletoanareaineither Yes 14local workers will be involved in the temporarilyorpermanently? excavation work 1.29 Introduction ofalienspecies? No No introduction ofalienspecies. 1.30 Loss of native species or genetic There will not be lossof native diversity? No speciesorgenetic diversity. 1.31 Anyotheractions? No None 2.UseofNaturalresourcesforconstructionoroperationoftheProject(suchasland,water, materials or energy, especially any resources which are non-renewable or inshortsupply): Sl. Information/checklist confirmation Yes/ Details thereof(with approximate No No quantities /rates, wherever possible) withsource ofinformationdata 2.1 Land especially undeveloped or Yes Un developed Government Waste land is agricultural land(ha) converted to quarrying purpose and used for building stone quarrying. 2.2 Water (expected source and competing Yes WaterRequirement:2.0KLD users) Source:GroundWater. unit:KLD No competing users. 2.3 Minerals (MT) Yes Building StoneQuarryabout 75044MT (Mineable Reserves) Optimum production 15,005tonnes/annum, 1250 tonnes per month &52tonnes/day 2.4 Constructionmaterial –stone, No No majorconstruction workis involved Form-1Page 4 of 9 aggregates, sand / soil (expected source– MT) 2.5 Forests andtimber(source– MT) No Not Applicable 2.6 Energyincludingelectricityand fuels No Not Applicable (source, competing users) Unit: fuel (MT), energy(MW) 2.7 Any other natural resources (use No Not Applicable appropriate standard