ANNEXURE 2(e) COMPLETED BRIDGE UNDER BADP Year of Amount Sl. Name of Name of Bridge Span Construc- ( Rs. in lakh No Block tion ) 12 3456 1 Constn. of Suspension foot bridge over Tuisumpui River between Tuipang 42.00 m 2004 – 05 5.00 Riasikah and Saiha 2 Constn. of RCC Jeepable Bridge Tuipang 20.00 m -do- 15.00 over R. Palak near Phura 3 Constn. of Suspension foot bridge over R. Tuisumpui at Tuipui Tuipang 80.00 ft -do- 4.00 Ferry 4 Constn. of RCC Foot Bridge between Vety Veng and Govt. Tuipang 28.00 m 2005 – 06 3.00 High School, Tuipang 5 Construction of J/Suspension bridge over Vathlo River near Tuipang 30.00 m 2006-07 10.00 Phura 6 Constn. of Suspension foot bridge over Tuichawng ( Parva) Chawngte 45.00 ft 2004 – 05 5.00 7 Constn. of RCC Truckable bridge over Tuichawng Near Kalikumar’s residence, Chawngte Chawngte 25.00 m 2005 – 06 15.00

8 Const. of R.C.C Jeepable/ Bridge at Kamalanagar- III near ICDS Chawngte 15.00 m -do- 10.00 Complex 9 Continuing Construction of Bridge over Beka Begya CADC near Rev. Office at Boropansury Chawngte 30.00 m 2006-07 15.00

10 Constn. of RCC Foot Bridge over Phivawk Lui along cemetery at Lungsen 10.00 m 2004 – 05 3.00 Zodin, Tlabung 11 Constn. of RCC J/Bridge between CPWD road at Tiperghat Lungsen 30.00 m -do- 10.00

12 Constn. of Suspension Foot Bridge over R. Kau Between Lungsen 30.00 m 2006-07 3.00 Tuisenchhuah and Bolia 12 3456 13 Construction S/foot bridge over R. Kau between Putlunga Sih and Lungsen 60.00 m 2005-06 4.00 Kauchhuah 14 Constn. of Suspension Foot Bridge over Hnahchang Between Hnahthial 50.00 m 2005 - 06 3.00 Tuipui ‘D’ and Lungleng ‘S’ 15 Construction of S/bridge between Pangzawl to Phaileng ‘S’ Hnahthial 55.00 m 2006-07 4.50

16 Constn. Cemented foundation hanging Foot Bridge over R. Lawngtlai 35.00 ft 2004 – 05 3.00 Saibawh near Saibawh Village 17 Construction of S/bridge over Leitelui between Tuikhurlui and Lawngtlai 28.00 m 2006-07 2.00 Sumsi lui 18 Construction of S/Bridge over H.C Pianga’s Leilet Luite at Lawngtlai 20.00 m -do- 0.50 Chawngte ‘P’ 19 Construction of S/Bridge over Bungtlang Bedsury between Vathuampui 20.00 m 2006-07 2.00 and Tuichawng-tlang 'S' 20 Construction of S/Bridge over Bungtlang Chikhurlui between Chamdur ‘P’ 20.00 m -do- 2.00 'S' and Balisora 21 Construction of S/Bridge over Bungtlang Bedsury River Ngunling Khua 20.00 m -do- 1.00 and Tuisentlang 'S' 22 Construction of S/Bridge over Zawlnuam 70 m 2004-05 4.00 Sazuklui, Belkhai 23 Construction of S/Bridge over Zawlnuam 65 m -do- 3.50 Amsuri, Belkhai 24 Construction of S/Bridge over KhawchhungLui near Mission Zawlnuam 50 m -do- 2.00 Compound, Tuipuibari II 25 Construction of S/Bridge over R. Langkaih Zawlnuam Zawlnuam 60 m -do- 3.00 26 Construction of S/Bridge over R. Zawlnuam 65 m -do- 3.00 Langkaih at Zawlpui 27 Construction of S/Bridge over Bawrailui between Rengdil and Zawlnuam 65 m -do- 3.00 Zawlpui 12 3456 28 Construction of S/Bridge over R. Amsuri at Zawlnuam 65 m -do- 3.00 Tuipuibari-II 29 Construction of S/Bridge between and Khawbung 30 m 2006-07 2.00

30 Construction of R.C.C Bridge between and at Khawbung 8 m -do- 5.00 Khuailui 31 Construction of R.C.C Bridge between Sesih and Bulfekzawl at Khawbung 8 m -do- 5.00 Maubuang 32 Construction of R.C.C Bridge between and Khankawn Khawbung 5 m -do- 2.00 33 Construction of Bridge across Teireilui between Chuhvel and W. Phaileng 50 m 2006-07 2.00 Kananthar 34 Construction of S/Bridge over Saichallui between Saichal and 20 ft 2005-06 2.50 35 Construction of S/Bridge over Tuila between N.E Khawdungsei Ngopa 50 m -do- 2.00 and 36 Construction of RCC Bridge over Khawlhringlui near Ngopa 50 m -do- 2.00

37 Construction of RCC Bridge over Ngopa 50 m -do- 2.00 Sabual Kawr near Lamzawl 38 Construction of S/Bridge with RCC piller over R. Tuimuk Khawzawl 75 m 2005-06 5.00 between Khawzawl and