±62,500 S.F. for Lease Or Sale

Total Page:16

File Type:pdf, Size:1020Kb

±62,500 S.F. for Lease Or Sale HIGH VISIBILITY ±300 FEET OF FRONTAGE ON ROUTE 17K ±62,500 S.F. FOR LEASE OR SALE 10 Route 17K, Town of Newburgh, NY FOR ADDITIONAL INFORMATION, Located ±1 mile to the NYS Thruway, I-87 CONTACT and less than 1/2 mile to I-84 One story retail/warehouse building in very good condition with new roof. James Martin There is approximately 46,200 sq. ft. used for showroom/retail space Senior Vice President consisting of masonry block construction. The warehouse section is approximately 16,300 sq. ft. and is steel frame, metal panel construction. Exclusive Broker BUILDING SIZE: One level of ±62,500 sq. ft. LOT SIZE: ±4 acres 5 Corporate Dr., Ste 201 CEILING HEIGHTS:18-22 feet in the front retail section 45 feet in the Central Valley, NY 10917 warehouse section Phone: (845) 928-6500 Ext. 15 ELECTRIC: ±800 amp - 120v/240v - 3 phase service provided by Central Hudson Fax: (845) 928-7838 PARKING: 100 car parking (additional parking can be made available at Email: rear of building) [email protected] HVAC: Natural gas-fired forced warm air heat throughout; new 60 ton A/C On the Web: system installed in the 46,200 sq. ft. retail/showroom section. www.McBrideCorpRE.com WATER & SEWER: Municipal, Town of Newburgh Note: Information herein is subject to errors; omissions; changes of price; rental, or other conditions; withdrawal without LOADING: Three tailgate-level loading doors and one drive-in door (14’x 12’) notice; and to any special listing conditions imposed by our principals. All areas and dimensions are approximate. PROPERTY FACT SHEET ___________________________________________________________________________ +/-62,500 SQUARE FEET AVAILABLE FOR LEASE OR SALE RETAIL/WAREHOUSE/MANUFACTURING FACILITY 10 ROUTE 17K, TOWN OF NEWBURGH, NY LOCATION: 10 Route 17K, Town of Newburgh, Orange County, New York. ACCESSIBILITY: •Located ±1 mile to the NY State Thruway, I-87 •Less than ½ mile to I-84 •Approximately ½ mile to Target Shopping Center EXPOSURE: High visibility with over 300 feet of frontage on NY Route 17K BUILDING SIZE: One level of ±62,500 sq. ft. LOT SIZE: ±4 acres DESCRIPTION: One story retail/warehouse building in very good condition with new roof. There is approximately 46,200 sq. ft. used for showroom/retail space consisting of masonry block construction. The warehouse section is approximately 16,300 sq. ft. and is steel frame, metal panel construction. CEILING HEIGHTS: 18-22 feet in the front retail section 45 feet in the warehouse section FLOOR: 42,500 sq. ft. raised floor concrete; 20,000 sq. ft. with ¼“ sleepers over concrete with hard oakwood floors. ELECTRIC: ±800 amp – 120v/240v – 3 phase service provided by Central Hudson PARKING: 100 car parking (additional parking can be made available at rear of building) HVAC: Natural gas-fired forced warm air heat throughout; new 60 ton air-conditioning unit installed in retail/showroom section. 5 Corporate Drive, Suite 201, Central Valley, New York 10917 • (845) 928-6500 • Fax (845) 928-7838 New Jersey Office: 240 Frisch Court, Suite 105, Paramus, NJ 07652 • (201) 848-4000 • Fax (201) 891-3565 www.McBrideCorpRE.com PROPERTY FACT SHEET ___________________________________________________________________________ +/-62,500 SQUARE FEET AVAILABLE FOR LEASE OR SALE RETAIL/WAREHOUSE/MANUFACTURING FACILITY 10 ROUTE 17K, TOWN OF NEWBURGH, NY WATER & SEWER: Municipal, Town of Newburgh LOADING: Three tailgate-level loading doors and one drive-in door (14’ high x 12’ wide) FIRE PROTECTION: Sprinklered (wet system); Three Systems: Front retail, rear warehouse and rack system. ZONING: Interchange Business (IB). See attached zoning. POSSESSION: Building is occupied. Possession upon closing of title. 5 Corporate Drive, Suite 201, Central Valley, New York 10917 • (845) 928-6500 • Fax (845) 928-7838 New Jersey Office: 240 Frisch Court, Suite 105, Paramus, NJ 07652 • (201) 848-4000 • Fax (201) 891-3565 www.McBrideCorpRE.com PROPERTY FACT SHEET ___________________________________________________________________________ +/-62,500 SQUARE FEET AVAILABLE FOR LEASE OR SALE RETAIL/WAREHOUSE/MANUFACTURING FACILITY 10 ROUTE 17K, TOWN OF NEWBURGH, NY ADDITIONAL EQUIPMENT: Items: • Cantilevered high bay 40’ racking system with a replacement value of ±$270,000. • 3 Crown High Bay Order Pickers (heavy duty) with a replacement value of ±$107,000 TAXES: $88,066.00 annually (±$1.41 psf) RENTAL: $5.95 psf triple net SALE PRICE: $3,500,000 (±$56.00 psf). Additional racking system valued at ±$270,000 and high bay order pickers valued at ±$107,000 included in sale price. For further information or to arrange a tour, please contact: James Martin, Senior Vice President [email protected] EXCLUSIVE BROKER McBride Corporate Real Estate, Inc. 5 Corporate Drive, Suite 201 Central Valley, NY 10917 845-928-6500 Fax 845-928-7838 E-mail: [email protected] ~ On the Web: McBrideCorpRE.com Note: Information submitted herein is subject to errors; omissions; changes of price; rental, or other conditions; withdrawal without notice; and to any special listing conditions imposed by our principals. All areas and dimensions are approximate. S:\Public\FACT SHEETS\ORANGE\10 Route 17K Newburgh .doc JM/DL 7/26/18 5 Corporate Drive, Suite 201, Central Valley, New York 10917 • (845) 928-6500 • Fax (845) 928-7838 New Jersey Office: 240 Frisch Court, Suite 105, Paramus, NJ 07652 • (201) 848-4000 • Fax (201) 891-3565 www.McBrideCorpRE.com Newburgh, New York, United States 0 mi 0.5 1 1.5 2 Copyright © and (P) 1988–2008 Microsoft Corporation and/or its suppliers. All rights reserved. http://www.microsoft.com/streets/ Certain mapping and direction data © 2008 NAVTEQ. All rights reserved. The Data for areas of Canada includes information taken with permission from Canadian authorities, including: © Her Majesty the Queen in Right of Canada, © Queen's Printer for Ontario. NAVTEQ and NAVTEQ ON BOARD are trademarks of NAVTEQ. © 2008 Tele Atlas North America, Inc. All rights reserved. Tele Atlas and Tele Atlas North America are trademarks of Tele Atlas, Inc. © 2008 by Applied Geographic Systems. All rights reserved. .
Recommended publications
  • Planning Board, 12/05/2019, 7:00 PM Minutes
    1 1 2 STATE OF NEW YORK : COUNTY OF ORANGE TOWN OF NEWBURGH PLANNING BOARD 3 - - - - - - - - - - - - - - - - - - - - - - - - - X In the Matter of 4 5 ROCK CUT ESTATES (2019-19) 6 Rock Cut Road 7 Section 47; Block 2; Lots 11, 12, 13.2, 14.2 & 15.2 R-1 Zone 8 - - - - - - - - - - - - - - - - - - - - - - - - - X 9 PUBLIC HEARING AMENDED SUBDIVISION 10 Date: December 5, 2019 11 Time: 7:00 p.m. Place: Town of Newburgh 12 Town Hall 1496 Route 300 13 Newburgh, NY 12550 14 BOARD MEMBERS: JOHN P. EWASUTYN, Chairman 15 STEPHANIE DeLUCA KENNETH MENNERICH 16 DAVID DOMINICK JOHN A. WARD 17 ALSO PRESENT: ROBERT J. DICKOVER, ESQ. 18 SHAWN ARNOTT KAREN ARENT 19 GERALD CANFIELD FRANK FILICIOTTO 20 21 APPLICANT'S REPRESENTATIVE: ROBIN SCOPTEUOLO 22 - - - - - - - - - - - - - - - - - - - - - - - - - X 23 MICHELLE L. CONERO PMB #276 24 56 North Plank Road, Suite 1 Newburgh, New York 12550 25 (845)541-4163 1 ROCK CUT ESTATES 2 2 CHAIRMAN EWASUTYN: Good evening, 3 ladies and gentlemen. We'd like to welcome you 4 to the Town of Newburgh Planning Board meeting of 5 the 5th of December. This evening we have three 6 items on the agenda. 7 At this point I'll ask for a roll call 8 vote starting with Stephanie. 9 MS. DeLUCA: Present. 10 MR. MENNERICH: Present. 11 CHAIRMAN EWASUTYN: Present. 12 MR. DOMINICK: Present. 13 MR. WARD: Present. 14 MR. DICKOVER: Rob Dickover, Counsel, 15 present. 16 MS. CONERO: Michelle Conero, 17 Stenographer. 18 MR. CANFIELD: Jerry Canfield, Town of 19 Newburgh. 20 MR. ARNOTT: Shawn Arnott, McGoey, 21 Hauser & Edsall Consulting Engineers.
    [Show full text]
  • LOCAL IMPACTS and COSTS Exhibit IX. A.2.B Traffic and Roadway
    LOCAL IMPACTS AND COSTS Exhibit IX. A.2.b The proposed Resorts World Hudson Valley is a mixed use development that will incorporate a 600‐room hotel with a full‐service gaming facility and a conference center, along with associated, complementary amenities on an approximate 373‐acre site. Potential impacts include those to traffic and noise, watershed impacts from stormwater and wastewater discharge, and hydrologic impacts to surface waters and wetlands. The design for Resorts World Hudson Valley has been developed in conjunction with LEED® measures to minimize impacts to the greatest extent possible. Where impacts cannot be avoided, RW Orange County LLC has developed a cohesive mitigation strategy as detailed in Exhibit IX.A.3 Mitigation of Impact to Host Municipality and Nearby Municipalities. Traffic and Roadway Infrastructure Preliminary Transportation Demand Impacts Development of the proposed Resorts World Hudson Valley would generate substantial numbers of new vehicular trips by auto, taxi and bus on the roadway system providing access to the project site. The majority of these trips (approximately 90 percent) would arrive and depart via I‐84, with Route 17K, Route 747 and Route 207 providing local access. Most vehicles destined to/from I‐84 would use the I‐84/Route 747 interchange located immediately to the southeast of the project site which was designed to accommodate future demand from expanded use of the nearby Stewart International Airport. As this airport demand has not been realized, the I‐84/Route 747 interchange typically functions with available capacity during peak periods. A new signalized intersection on Route 17K and a new roundabout on Route 747 would provide access to the proposed project’s internal roadway system.
    [Show full text]
  • 51802 2012 Guest Services Guide.Indd 1 7/12/12 7:23:28 AM to NEWBURGH TARGET COUNTDOWN to KICKOFF N HILL HUDSON RIVER 218 FIELD WE
    GUEST SERVICES ADA POLICIES 2012 SCHEDULE ATMS: East side, next to concession stand #1; West side, next to GUESTS WITH DISABILITIES AND LIMITED MOBILITY: Please notify September Site/Event (s) Time concession stand #12. Army box offi ce staff of your needs at the time of ticket purchase. Seating is located inside of Gate 6. Shuttle Service for guests with disabilities 8 at San Diego State San Diego, Calif. 7:30 p.m. CHILD ID BRACELETS/LOST CHILDREN: Child ID Bracelets are and limited mobility is available. Pick-up and drop-off is at H Lot and 15 NORTHERN ILLINOIS Salute to Heroes 12 p.m. available at the Guest Service Tents. Please write your seat location/ Gates 1 and 6. Limited golf cart service for the elderly, persons with 22 at Wake Forest Winston-Salem, N.C. TBA cell phone number for each child. If you become separated from your disabilities, persons in need of extra assistance and fans with special 29 STONY BROOK Hall of Fame Weekend 12 p.m. needs can be arranged through the parking attendant. child during an event please contact the nearest guest service staff Scout Day member, security personnel or visit the Operations Center in Section 24. MOBILE CAPTIONING DEVICES: Mobile devices offering complimentary real time service for the benefi t of the deaf and hard of hearing can CONCESSIONS: Long Gray Line concession stands and carts are be picked up at any of our Guest Service Tents. The device provides October located throughout the concourses of Michie Stadium and Black Knights real time transcription of all audio communications coming over the PA 6 BOSTON COLLEGE West Point Olympians Day 12 p.m.
    [Show full text]
  • 2017 Master Plan Final .Pdf
    TOWN OF CRAWFORD COMPREHENSIVE PLAN UPDATE DATED JANUARY 1, 2017 Our vision is to create a strong, vibrant and inviting community that reflects its diversity, history and culture with a sense of place and destination that facilitates economic opportunity and enhances the quality of life. The Town of Crawford envisions the creation of a mixed-use, environmentally friendly, walkable community integrated within the historic framework of Pine Bush and taking advantage of the rich agricultural environment. We pledge to work in partnership with our residents to foster community pride, to develop a vibrant, diversified economy, to plan for the future, to support the health and well-being of all residents and to preserve and enhance the natural beauty of our environment through strong relationships between residents, the Town, businesses, educators, non-profits, and our faith- based community. The Town of Crawford will facilitate a forward-looking, people –friendly community that champions our community’s diversity and results in a better place to live, work, play and raise families. Revised and Finalized by the Town of Crawford Master Plan Committee on March 16, 2017. For referral to Town Board Adopted by Resolution of the Town of Crawford Town Board on May 18, 2017. TABLE OF CONTENTS Introductions. 4 Background. 5 Location. 5 History. 5 Natural and cultural Resources. 7 Rivers and Streams. 7 Floodplains. 7 Wetlands and Aquifers. 8 Special Habitats and Plant Communities. 8 Scenic Resources. 8 Archeological Sites and Historic Features. 9 People. 9 Land Use. 13 Agriculture. 14 Public Lands. 14 Town Lands. 14 County Lands. 15 State Lands.
    [Show full text]
  • COUNTY of ORANGE TOWN of NEWBURGH PLANNING BOARD 3 ------X in the Matter of 4
    1 1 2 STATE OF NEW YORK : COUNTY OF ORANGE TOWN OF NEWBURGH PLANNING BOARD 3 - - - - - - - - - - - - - - - - - - - - - - - - - X In the Matter of 4 5 ELM FARM SUBDIVISION (2000-09) 6 Request for an Extension of Final Approval 7 from April 20, 2017 to April 20, 2018 8 - - - - - - - - - - - - - - - - - - - - - - - - - X 9 BOARD BUSINESS 10 Date: April 20, 2017 11 Time: 7:00 p.m. Place: Town of Newburgh 12 Town Hall 1496 Route 300 13 Newburgh, NY 12550 14 BOARD MEMBERS: JOHN P. EWASUTYN, Chairman 15 FRANK S. GALLI STEPHANIE DELUCA 16 KENNETH MENNERICH DAVID DOMINICK 17 JOHN A. WARD 18 ALSO PRESENT: MICHAEL H. DONNELLY, ESQ. 19 PATRICK HINES GERALD CANFIELD 20 KENNETH WERSTED 21 22 - - - - - - - - - - - - - - - - - - - - - - - - - X MICHELLE L. CONERO 23 10 Westview Drive Wallkill, New York 12589 24 (845)895-3018 25 1 ELM FARM SUBDIVISION 2 2 CHAIRMAN EWASUTYN: Good evening, 3 ladies and gentlemen. I'd like to welcome 4 you to the Town of Newburgh Planning Board 5 meeting of April 20th. This evening we have 6 seven items on the agenda. The last two 7 items are public hearings. 8 At this time I will call the meeting 9 to order with a roll call vote starting with 10 Frank Galli. 11 MR. GALLI: Present. 12 MS. DeLUCA: Present. 13 MR. MENNERICH: Present. 14 CHAIRMAN EWASUTYN: Present. 15 MR. DOMINICK: Present. 16 MR. WARD: Present. 17 MR. DONNELLY: Michael Donnelly, 18 Planning Board Attorney. 19 MS. CONERO: Michelle Conero, 20 Stenographer. 21 MR. CANFIELD: Jerry Canfield, Code 22 Compliance Supervisor. 23 MR. HINES: Pat Hines with McGoey, 24 Hauser & Edsall Consulting Engineers.
    [Show full text]
  • Newburgh Area Transit Improvement Plan, December 2010
    Newburgh Area Transportation & Land Use Study Short Term Transit Improvement Program Recommended Plan Submitted to: Orange County Department of Planning Submitted by: December 2010 Newburgh Area Transportation and Land Use Study Short Term Transit Improvement Program TABLE OF CONTENTS Page Introduction 1 Recommended Plan 3 Service Alternatives 3 Service Plan 6 Local Service 6 Newburgh-Beacon Shuttle 13 Forecasts 16 Operating Statistics 17 Ridership 18 Financial 19 Operating Assistance and Funding 22 Capital Program 25 Marketing Program 30 Appendix A: Initial Alternatives - Routings 33 Appendix B: Initial Alternatives - Forecasts 34 Appendix October 20, 2010 Public Meeting Notes 36 Draft Interim Report: Recommended Plan Page 1 Newburgh Area Transportation and Land Use Study Short Term Transit Improvement Program LIST OF FIGURES Page 1 Recommended Local Bus Service 7 2 Recommended Northside Route 8 3 Recommended Southside Route 9 4 Recommended Mid-Valley Mall to Vails Gate/Cornwall 11 5 Recommended Newburgh-Beacon Shuttle 15 6 Sample Bus Shelter Designs 27 7 Bus Stop Sign Example 28 8 Examples of Information Kiosks 29 Draft Interim Report: Recommended Plan Page 2 Newburgh Area Transportation and Land Use Study Short Term Transit Improvement Program LIST OF TABLES Page 1 Initial Local Service Alternatives 4 2 Northside Route Timing and Transfer Opportunities 12 3 Southside Route Timing and Transfer Opportunities 13 4 Mid-Valley Mall to Vails Gate/Cornwall Route Timing 13 and Transfer Opportunities 5 Newburgh-Beacon Shuttle Route Timing and
    [Show full text]
  • Newburgh Area Transportation & Land Use Study
    Newburgh Area Transportation & Land Use Study May 2012 Newburgh Area Transportation & Land Use Study Prepared for the Orange County Transportation Council • Edward A. Diana, OCTC Chairman & County Executive • David Church, AICP, Commissioner of Planning • John Czamanske, AICP, Deputy Commissioner of Plan- ning, OCTC Staff Director, Study Project Manager OCTC Study Advisory Group Consultant Team • Town of Cornwall AKRF, Inc. • Village of Cornwall-on-Hudson • Village of Maybrook • Graham L. Trelstad, AICP, Project Manager • Richard Klusek, AICP, Deputy Project Manager • Town of Montgomery Abrams-Cherwony Group of Gannett Fleming • Village of Montgomery • Walter Cherwony • City of Newburgh • Joshua B. Diamond • Town of Newburgh Arch Street Communications, Inc. • Town of New Windsor • Cyd Averill, Public Outreach Lead • Village of Walden • Virginia Mold, Public Outreach Liaison • Metropolitan Transportation Authority Cambridge Systematics, Inc. • New York State Department of Transportation • Brian ten Siethoff, AICP, Transportation Planning • New York State Thruway Authority • Shawn Pope, Transportation Simulation • Port Authority of New York and New Jersey Eng-Wong, Taub & Associates/VHB • Martin Taub, PE, Transportation Studies Director • Janet Jenkins, AICP, Transportation Planning Studies This report was prepared with funding provided through the Manager County of Orange, NY, as host agency of the Orange County • Amir Rizavi, PE, Senior Traffic Analyst Transportation Council using, in whole or in part, local and • Noah Bernstein, AICP, Senior Transportation Planning State matched Federal transportation planning funds. These Analyst funds are provided through grants to the State of New York from the Federal Highway Administration and Federal Transit Lochner Engineering, P.C. Administration, U.S. Department of Transportation, under the • Mark Pawlick, PE, Vice President State Planning and Research Program, Section 505 [or Metro- • Kyle Snyder, EIT, Project Engineer politan Planning Program, Section 104(f )] of Title 23, U.S.
    [Show full text]
  • Medline Scoping Session
    Vol. 36, No. 51 3 WEDNESDAY, DECEMBER 19, 2018 3 ONE DOLLAR PB girls Last roll minute Page 32 gifts WWW .W ALLKILL V ALLEY T IMES . NE T Medline scoping Gift of the magi session Larkin delivers one final gift to Walden Proposed warehouse facility prompts concerns from Montgomery residents By LAURA FITZGERALD [email protected] The public expressed numerous concerns about a proposed 1.3-million- square-foot Medline facility in the Town of Montgomery at a public scoping session on Dec. 12. The planning board issued a positive declaration for the project, finding that the project may have a potentially significant adverse environmental impact and that a Draft Environmental Impact Statement (DEIS) must be prepared. The purpose of the Dec. 12 scoping session was to consider public and agency comments on the potential significant adverse environmental impacts which must be evaluated in the DEIS. State Senator Bill Larkin greets carolers from the Fox Hill Community last Thursday in Walden. He was there to deliver a $300,000 state Concerns brought up at the crowded meeting include impacts on traffic, the grant to be used towards the construction of a new community center at Olley Park. Wallkill River, visual impact, Medline’s request for tax abatements and impacts The carolers from the Fox Hill Senator Bill Larkin, bearing one think it’s fitting that he saved the best on the overall quality of life in the town Community were ready for their special oversized check. for last.” of Montgomery. guest last Thursday at the Walden The senator, about to end a four- The check will cover about half Several residents questioned the need Municipal Building.
    [Show full text]
  • Emagin the FUTURE
    How can I finance new equipment and STOP maximize cash flow? GO KNOW Talk to bankers who understand the Hudson Valley, its streets, and its business climate. We’ll help you know. Where the brightest bankers live. 845-341-5000 orangebanktrust.com OBTC-HVMFG2019-FALL-final.indd 1 9/12/19 2:25 PM How can I finance CONTENTS new equipment and STOP HV MFG • SPRING 2020 COUNCILOFINDUSTRY.ORG FEATURES IN THIS ISSUE maximize cash flow? 10 HV MANUFACTURERS STEP UP 5 LETTER FROM THE PRESIDENT Many Hudson Valley Manufacturers Manufacturing is Essential. Provide What is Needed During This Crisis. 6 MANUFACTURING NEWS BRIEFS 25 LOOKING AT THE FUTURE OF ROBOTICS Policy Priorities for Manufacturers. HV Pathways Prepares for Competition. GO 20 CHALLENGES AND GROWTH 30 COMPANY PROFILE Restarting After COVID-19 eMagin Leads in OLED Microdisplays. With Advice from Skip Weisman. 39 APPRENTICE SPOTLIGHT 34 TECHNOLOGY AND INNOVATION Rob Papale Finds a Career at Zierick. AI and the Future of Manufacturing. 45 MEMBER DIRECTORY A Current Listing of Council of Industry Members. COMPANY PROFILE 58 ASSOCIATE MEMBER DIRECTORY KNOW A Current Listing of Council of Industry Associate Members. Talk to bankers ON THE COVER who understand Rob Papale shares his experiences and career path from FIRST Robotics the Hudson Valley, to mentoring apprentices at Zierick its streets, and its Manufacturing Corporation in Mt. Kisco, NY. business climate. Cover photo by Tom LeBarbera Picture This Studios We’ll help Members of the staff at eMagin, Hopewell Junction, NY. you know. MANUFACTURING
    [Show full text]
  • Municipal Lawyer a Joint Publication of the Municipal Law Section of the New York State Bar Association and the Edwin G
    NYSBA SPRING 2009 | VOL. 23 | NO. 2 Municipal Lawyer A joint publication of the Municipal Law Section of the New York State Bar Association and the Edwin G. Michaelian Municipal Law Resource Center of Pace University A Message from the Chair This is my last message leaders with more diverse backgrounds, to refl ect from the chair. Allow me to the perspectives and promote the interests of a more indulge in some observa- diverse membership. To this end, as reported in my tions about our Section over last message from the chair, we have amended our the last two years. Section bylaws to increase the number of Executive Committee members. We are actively interview- In the face of stiff ing candidates interested in being members of our competition from lower Executive Committee and chairs of our committees, cost Bar Associations and and we have accepted several. If you are interested in private purveyors of CLE getting the most out of your membership, I invite you credits, as well as tough to contact me or any other Section offi cer listed on the economic times, our Section back page of this publication. The Section programs membership continues to you attend, the Section articles you read, the Section grow. While the growth is Robert B. Koegel people you meet and get to know, all refl ect work moderate, it is steady, and done by Section leaders. We thank all of those mem- I’m confi dent, in light of the factors described below, bers who have given of their time to be leaders for it will continue.
    [Show full text]
  • I STATE ENVIRONMENTAL QUALITY REVIEW ACT (“SEQRA”) FINDINGS STATEMENT Project Sailfish Lead Agency: Town of Montgomery Plann
    STATE ENVIRONMENTAL QUALITY REVIEW ACT (“SEQRA”) FINDINGS STATEMENT Project Sailfish Lead Agency: Town of Montgomery Planning Board Date Adopted: September 24, 2019 TABLE OF CONTENTS 1.0 INTRODUCTION ..........................................................................................................................1 2.0 DESCRIPTION OF THE PROPOSED ACTION....................................................................................2 2.1 Project Description.............................................................................................................................2 2.2 Purpose and Need..............................................................................................................................3 2.3 Project SEQRA History........................................................................................................................4 2.4 SEQRA Findings ..................................................................................................................................8 3.0 FINDINGS CONCERNING POTENTIAL ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES.... 9 3.1 Land Use, Zoning, and Public Policy...................................................................................................9 3.2 Visual Character...............................................................................................................................17 3.3 Infrastructure and Utilities...............................................................................................................24
    [Show full text]
  • DESCRIPTION of LAND Exhibit VIII. C.1.C
    DESCRIPTION OF LAND Exhibit VIII. C.1.c The Resorts World Hudson Valley project site is approximately 75 miles, or one and a half hour’s drive, from New York City, and approximately 6.4 miles from the City of Newburgh. Figure VIII. C.1.c-1, illustrates the project site in relation to New York and other cities in the New York metro area. The project site is located in the Town of Montgomery in northeastern Orange County, New York. Figure VIII. C.1.c-2, illustrates the project site within Orange County. The Town of Montgomery is adjacent to the Town of Shawangunk to the north, Towns of Walkill, Hamptonburgh and New Windsor to the South, Town of Crawford to the west, and Town of Newburgh to the east. Nearby communities include the Village of Walden to the northwest, Village of Montgomery to the west, Village of Maybrook to the southwest, and Village of Washingtonville to the South. The project site is located directly north of Interstate 84 (I-84), west of New York State Route 747 (Route 747), directly south of New York State Route 17K (Route 17K), and generally east of Maple Avenue. Stewart International Airport is located approximately 2,000 feet southeast of the project site and is accessible from New York State Route 747. Figure VIII. C.1.c-3 illustrates the project site in relation to nearby towns and villages and transportation infrastructure. A Draft Environmental Impact Statement (DEIS) was prepared in 2009 for a proposed development on part of the Resorts World Hudson Valley project site, known as the Hudson International Business Center (HIBC).
    [Show full text]