Annex 1: Bhutan CPS Results Matrix

Total Page:16

File Type:pdf, Size:1020Kb

Annex 1: Bhutan CPS Results Matrix Document of The World Bank Group FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No. 88597-BT INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL FINANCE CORPORATION Public Disclosure Authorized COUNTRY PARTNERSHIP STRATEGY FOR THE KINGDOM OF BHUTAN FOR THE PERIOD FY2015–19 Public Disclosure Authorized August 25, 2014 Bhutan Country Management Unit South Asia Region Public Disclosure Authorized International Finance Corporation Asia Region This document has restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS Date of last Country Partnership Strategy: October 27, 2010 (Exchange Rate Effective as of April 4, 2014) Currency Unit: Bhutanese Ngultrum US$1.00 = BTN 60 GOVERNMENT’S FISCAL YEAR: (July 1–June 30) ABBREVIATIONS AND ACRONYMS AAA Analytical and Advisory Activities KPIs Key Performance Indicators ADB Asian Development Bank MDGs Millennium Development Goals BHU Basic Health Units MDTF Multi-Donor Trust Fund BNB Bhutan National Bank MIC Middle Income Country BISP Benazir Income Support Program MIGA Multilateral Investment Guarantee Agency BTFEC Bhutan Trust Fund for environmental Conservation MSME Micro, Small, and Medium Enterprise CPIA Country Policy and Institutional Assessment NKRA National Key Result Area CPS Country Partnership Strategy NLTA Non-Lending Technical Assistance CPSPR Country Partnership Strategy Progress Report NMES National Monitoring and Evaluation System DFID UK - Department of International Development NORAD Norwegian Agency for Development Cooperation DPC Development Policy Credit PDP People’s Democratic Party DPL Development Policy Loan PEFA Public Expenditure and Financial Accountability DPs Development Partners PER Public Expenditure Review DRM Disaster Risk Management PFM Public Financial Management DSA Debt Sustainability Analysis PHRD Japan Policy and Human Resource Development EDP Economic Development Policy PPP Public-Private Partnership EFTCS Electronic Funds Transfer Clearing System PPPD Public Procurement Policy Division FCPF Forest Carbon Partnership Facility REDD Reduced Emissions form Deforestation and Forest FDI Foreign Direct Investment Degradation GDP Gross Domestic Product RGoB Royal Government of Bhutan GEF Global Environment Facility RMA Royal Monetary Authority GFDRR Global Facility for Disaster Reduction RTM Round Table Meeting and Recovery RUB Royal University of Bhutan GNH Gross National Happiness SDC Swiss Development Corporation GNI Gross National Income SME Small and Medium Enterprise GTP Graduate Training Program SOE State-Owned Enterprise IBRD Int’l Bank for Reconstruction and Development TA Technical Assistance ICR Implementation Completion and Results Report TAP Technical Assistance Program IDA International Development Association TTF Trade and Transport Facilitation IDF Institutional Development Fund UCS Use of Country Systems IEG Independent Evaluation Group UNDP United Nations Development Programme IFC International Finance Corporation UNICEF United Nations Children’s Fund IMF International Monetary Fund WAVES Wealth Accounting and Valuation of Ecosystems JICA Japan International Corporation Agency Services WBG World Bank Group IDA IFC Vice President: Philippe Le Houérou Vice President: Karin Finkelston Country Director: Johannes Zutt Regional Director: Serge Devieux Country Manager: Kyle F. Kelhofer Task Team Leader: Genevieve Boyreau Task Team Leader: Om Bhandari/Junko Oikawa TABLE OF CONTENTS I. EXECUTIVE SUMMARY ......................................................................................................... I II. COUNTRY CONTEXT ............................................................................................................ 1 A. Social and Political Context ....................................................................................... 1 B. Bhutan’s Progress on Poverty Reduction and the MDGs........................................... 2 C. Recent Economic Developments ................................................................................ 3 D. Economic Prospects and Medium-Term Outlook ...................................................... 6 E. Private Sector Development and Jobs ...................................................................... 8 F. Spatial and Green Development ................................................................................ 8 G. Policy and Institutions ............................................................................................... 9 III. THE GOVERNMENT PROGRAM ......................................................................................... 10 IV. WORLD BANK GROUP PARTNERSHIP STRATEGY FY2015-19 ......................................... 11 A. Lessons Learned from the last CPS and Stakeholder Consultation ........................ 11 B. Proposed WBG Partnership Strategy ...................................................................... 12 C. Implementing the CPS ............................................................................................. 20 V. MANAGING RISKS.............................................................................................................. 24 Figures Figure 1: Growth is strong and poverty has dropped ...................................................................... 2 Figure 2: Growth and revenues are expected to pick up with the commissioning of hydro-projects ......................................................................................................................................................... 7 Figure 3: Bhutan CPS Results Chain – Results Areas and Outcomes .......................................... 13 Tables Table 1: Selected Macroeconomic Indicators (FY09-FY13) .......................................................... 4 Table 2: Indicative Non-lending Program .................................................................................... 21 Table 3: Indicative Financing Program......................................................................................... 21 Table 4: Donor Engagement in Bhutan ........................................................................................ 23 Table 5: WBG Engagement Risks and Mitigation Measures ....................................................... 24 ANNEXES Annex 1: Bhutan CPS Results Matrix .......................................................................................... 26 Annex 2: Bhutan CPS Completion Report FY11-14 .................................................................... 29 Annex 3A: Summary of CPS Program Program and Self Evaluation .......................................... 44 Annex 3B: Bhutan CPS Planned Lending Program and Actual Delivery .................................... 54 Annex 4: Bhutan Status of Millennium Development Goals ....................................................... 56 Annex 5: Poverty and Shared Prosperity ...................................................................................... 58 Annex 6: Gender Aspects in Bhutan ............................................................................................. 61 Annex 7: Selected Indicators of Bank Portfolio Performance and Management ......................... 63 Annex 8: IDA Operations Portfolio .............................................................................................. 64 Annex 9: IFC Investment Operation Program .............................................................................. 65 Annex 10: Bhutan Active Recipient and Bank Executed Trust Fund .......................................... 66 Annex 11: Bhutan at a Glance ...................................................................................................... 68 Map of Bhutan: IBRD 33373R2 The World Bank Group greatly appreciates the close collaboration of Bhutan’s authorities in the preparation of this Country Partnership Strategy and the feedback from stakeholders. The preparation of the document involved extensive discussions with government representatives, as well as other stakeholders, for example, the private sector, parliamentarians, the academia, youth groups and civil society. The strategy is a result of a team effort and the document received many useful contributions from the Bhutan Country Team and individuals across the WBG. Although it is impossible to name them all, we gratefully acknowledge and thank them for sharing their guidance, knowledge, and experience. I. EXECUTIVE SUMMARY i. Bhutan is a (lower) Middle Income Country (MIC) with a good record in reducing poverty and making progress towards achieving the Millennium Development Goals (MDGs). Its per capita income is US$2,400 and its estimated annual GDP growth over the next five years is 8 percent. After two successive elections, including a peaceful transfer of power, Bhutan continues to transition toward democracy within a constitutional monarchy and continues to enjoy political stability. Its policy makers are ambitious and reform-oriented and have outlined a unique development vision, where GDP is just one element among other non-monetary aspects to measure people’s well-being. The country’s mountainous terrain provides a considerable potential for the generation of hydroelectricity, for which India is the main financier and buyer. ii. To build on this progress, Bhutan needs to sustain macroeconomic stability while creating a business environment to promote private sector growth and job
Recommended publications
  • Current Status of Road Transport Policies, Systems and Projects in Bhutan
    CURRENT STATUS OF ROAD TRANSPORT POLICIES, SYSTEMS AND PROJECTS IN BHUTAN Jangchuk Yeshi Chief Engineer (Design Division) Department of Roads Ministry of Works & Human Settlement Royal Government of Bhutan Brief background of road transport in Bhutan Being a landlocked mountainous country, road is the primary mode of transport in Bhutan and therefore the life line of country’s economy. Royal Government has accorded top priority to the development of the road network in the country since the start of the 1st Five Year Plan in 1961. The country’s first mororable road , Thimphu – Phuentsholing Highway, was completed in 1961. Expansion of road network over the years 10578 km today ~2300 km in late 1980s ~1500 km in mid 1970s Classifications of roads National Highways; International/Asian Highways Primary National Highways (PNH) DoR’s jurisdiction Secondary National Highways (SNH) Dzongkhag Roads; Thromde (Urban) Roads – Respective Municipalities Farm Roads – MoA and Dzongkhags Access Roads – Beneficiaries/DoR Motorization level and trend Motorization trend in the past decade The motorization level in the 80000 • country has been increasing 70000 rapidly 60000 50000 • In the past decade, the vehicle 40000 ownership has increased by 30000 137% - from 29,941 in 2005 to Vehicle Ownership 20000 70,805 as of Feb. 2015. 10000 0 • The vehicle per 1000 population 2004 2006 2008 2010 2012 2014 in the country has increased from Year Source: RSTA) about 45 in 2005 to about 100 in 2014 Motorization level – comparison with other countries in the region Source: Word bank development indicators (Internet) • Bhutan has the highest vehicle ownership per 1000 population among the SARRC countries • The vehicle ownership in Asia is typically in the range of 10 to 30 per 1000 population and between 600 and 800 in advanced countries Projected motorization trend Source: Bhutan Transport 2040, ADB • As per “Bhutan Transport 2040” document developed by ADB, the motorization per 1000 population is expected touch 400 by 2040.
    [Show full text]
  • In Pursuit of Happiness, Bhutan Opens to Globalization and Business
    In Pursuit of Happiness, Bhutan Opens to Globalization and Business Kimberly A. Freeman, Ph.D. Mercer University Katherine C. Jackson Mercer University ABSTRACT The Kingdom of Bhutan, a small country situated on the border between China and India, has in recent years become a constitutional democratic monarchy. As part of its 2008 constitution, Bhutan committed to promote conditions that would enable the pursuit of Gross National Happiness. The country thus initiated an effort to improve the quality of life and happiness for its citizens and has embraced globalization far more than previously through attracting business, tourism, and communications. The author’s herein address some of the initiatives provide the context within which these efforts have arisen. Keywords: Bhutan; Gross National Happiness (GNH); Globalization; Constitutional democratic monarchy 1. Introduction In 2006, the 4th King of Bhutan, Jigme Singye Wangchuck, decided he wanted to open Bhutan up to the world and usher in modernization. Forty years ago, in 1972, Bhutan’s fourth king stated that “Bhutan should pursue Gross National Happiness (GNH) rather than Gross National Product (GNP)…with an emphasis not only on economic growth, but also on culture, mental health, social values, compassion, and community” (Sachs, 2011, p. 2) He chose to abdicate the throne to his eldest son and announced Bhutan would hold its first general elections in 2008. His son, King Jigme Khesar Namgyal Wangchuck, took the throne of the new democratic Bhutan on December 14, 2006. Jigme Yoser Thinley was elected prime minister in the election, and Bhutan’s constitution was ratified on July 18, 2008. The concept of GNH has a very long history in Bhutan.
    [Show full text]
  • National Transport Policy of Bhutan 2017 – Policy Protocol Report (Final Draft)
    National Transport Policy of Bhutan 2017 – Policy Protocol Report (Final Draft) National Transport Policy 2017 POLICY PROTOCOL REPORT National Transport Policy of POLICY PROTOCOL REPORT FINAL DRAFT Bhutan 2017 1 United Nations Development Programme June 2017 National Transport Policy of Bhutan 2017 – Policy Protocol Report (Final Draft) Disclaimer • The information contained herein is of a general nature and is not intended to address the circumstances of any particular individual or entity. No one should act on such information without appropriate professional advice after a thorough examination of the particular situation. • We have prepared this report solely for the purpose of providing select information on a confidential basis to the United Nations Development Programme (UNDP) [in accordance with the contract dated 27 October 2016 executed between UNDP and us (“Contract”). • This report is confidential and for the use of UNDP and other Government Ministries and Government Agencies of Bhutan only. It is not to be distributed beyond the management nor is to be copied, circulated, referred to or quoted in correspondence, or discussed with any other party, in whole or in part, without our prior written consent. • This report sets forth our views based on the completeness and accuracy of the facts stated to KPMG and any assumptions that were included. If any of the facts and assumptions is not complete or accurate, it is imperative that we be informed accordingly, as the inaccuracy or incompleteness thereof could have a material effect on our conclusions. • We have not performed an audit and do not express an opinion or any other form of assurance.
    [Show full text]
  • Bhutan Sector Assessment (Summary): Transport
    Country Partnership Strategy: Bhutan, 2014–2018 SECTOR ASSESSMENT (SUMMARY): TRANSPORT Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Landlocked Bhutan faces unique development challenges and opportunities. The country’s small population of about 720,000 is dispersed through mountainous terrain where seismic risks are high and weather conditions formidable.1 This makes it difficult to achieve economy of scale in service delivery and costly to build and maintain vital infrastructure, particularly the road network. Bordered by India in the east, west, and south, Bhutan is heavily reliant on its much larger neighbor for international trade. India is the destination of 84% of Bhutan’s exports, including electricity, and the source of 73% of its imports. However, poor border crossing infrastructure has hampered trade and logistic flows. Consequently, the country’s economic and social development has been constrained by high transport costs and poor accessibility. 2. Land transport. Most passengers and freight transport in Bhutan and the neighboring states of India is done by road, but the road density and coverage of Bhutan’s road network is limited. It comprises about 10,578 kilometers (km) of roads divided into six major classes: (i) 2,438 km of national highways, (ii) 6 km of expressway, (iii) 1,178 km of feeder roads, (iv) 350 km of urban roads, (v) 5,375 km of farm roads, and (vi) 1,230 km of access roads. The national highways are single-lane or two-lane roads. All of the expressways and 93% of national highways and 90% of urban roads are sealed, as are about 20% of the feeder roads and access roads.
    [Show full text]
  • Application Title Bhutan Green Transport Program Country
    Application Title Bhutan Green Transport Program Country/ Region Kingdom of Bhutan Accredited Entity The World Bank Approval Date 27 January 2019 Project Preparation Facility GREEN CLIMATE FUND | PAGE 1 OF 55 Version 2.0 Notes • The PPF supports the development of projects and programs and enhance their quality at entry into the Fund’s pipeline. With a view to enhancing the balance and diversity of the project pipeline, the PPF is designed to especially support Direct Access Entities for projects in the micro-to-small size category. International Accredited Entities seeking project preparation support from the PPF are encouraged to do so especially for LDCs, SIDS and African countries where no Direct Access Entity is accredited. All Accredited Entities are encouraged to articulate counterpart support for project preparation within their requests for support from the PPF. • A PPF submission should include below documents: 1. PPF request (this form) 2. PPF No-Objection letter1 3. Concept Note • Please copy the National Designated Authority (ies) when submitting this PPF request. • Requests for support from the PPF should be submitted at the same time or following submission of a GCF Concept Note for a project or program. • Further information on GCF PPF can be found on GCF website Project Preparation Facility Guidelines. 1 Please note that the PPF No-Objection Letter is different from the Funding Proposal No-Objection Letter. PPF No-Objection Letter template can be downloaded from here. Project Preparation Facility GREEN CLIMATE FUND |
    [Show full text]
  • Chapter 5 Spatial Pattern and Environmental Conditions of Bhutan
    The Project for Formulation of Comprehensive Development Plan for Bhutan 2030 Final Report CHAPTER 5 SPATIAL PATTERN AND ENVIRONMENTAL CONDITIONS OF BHUTAN 5.1 Existing Land Cover 5.1.1 Land Cover in 2010 Collected existing land cover data from the Ministry of Agriculture and Forestry (MoAF) was generated by a supervised classification method using satellite images from ALOS AVNIR-2, acquired between 2006 and 2009. The collected land cover data can be broken down into 11 main classes and 15 sub-classes. A list and map of the land cover classes are shown below. Table 5.1.1 List of Land Cover Classes (1) Class Sub-Class Category Symbol Area (ha) % Forests Conifer Forest Fir Forest FCf 183,944 4.74 Mixed Conifer Forest FCm 614,545 15.85 Blue Pine Forest FCb 77,398 2.00 Chir Pine Forest FCc 107,353 2.77 Broadleaf Forest Broadleaf Forest FB 1,688,832 43.56 Broadleaf and Conifer Forest FBc 31,463 0.81 Shrubs - - SH 419,128 10.81 Meadows - - GP 157,238 4.06 Cultivated Chhuzhing Land - AC 31,127 0.80 Agricultural Land Kamzhing Land - AK 69,487 1.79 Horticultural Apple Orchard HA 2,039 0.05 Land Citrus Orchard HC 5,086 0.13 Areca Nut Plantation HAa 984 0.03 Cardamom Plantation HCo 3,398 0.09 Others HO 17 0.00 Built-Up Area - - BA 6,194 0.16 Non-Built Up Area - - NB 330 0.01 Snow Cover - - OS 299,339 7.72 Bare Areas Rocky Outcrops - RR 107,539 2.77 Scree - RS 23,263 0.60 Bare Soils - BS 27 0.00 Water Bodies Lakes - WL 4,751 0.12 Reservoirs - WRe 131 0.00 Rivers - WR 22,563 0.58 Marshy Areas - - MA 319 0.01 Degraded Areas Landslides - DL 6,999 0.18
    [Show full text]
  • Project Document for Nationally Implemented Projects Financed by the GEF Trust Funds
    United Nations Development Programme Project Document for nationally implemented projects financed by the GEF Trust Funds Project title: Bhutan Sustainable Low-emission Urban Transport Systems Country: Bhutan Implementing Partner: Ministry of Management Arrangements: Information and Communications (MoIC) National Implementation Modality (NIM) UNDAF/Country Programme Outcome: “Sustainable and green economic growth that is equitable, inclusive, climate and disaster resilient and promotes poverty reduction, and employment opportunities particularly for vulnerable groups enhanced”. UNDP Strategic Plan Output 1.4 (2014-2017) “Scaled up action on climate change adaptation and mitigation across sectors which is funded and implemented” UNDP Strategic Plan Output 2.5.1 (2019-2023) “Solutions developed, financed and applied at scale for transformation to clean energy and zero-carbon development, for poverty eradication and structural transformation” UNDP Social and Environmental Screening Category: UNDP Gender Marker: Moderate GEN2: Gender equality as a significant objective Atlas Project ID/Award ID number: 00094488 Atlas Output ID/Project ID number: 00098606 UNDP-GEF PIMS ID number: 5563 GEF ID number: 9367 Planned start date: March 2018 Planned end date: February 2021 LPAC date: 4 January 2018 Brief project description: The objective of the project is to facilitate low-carbon transition in the Bhutan’s urban transport sector by promoting wider uptake of low emission vehicles (LEVs), in particular electric vehicles (EVs), as the preferred fuel source for transport in Bhutan. Component 1 “Policy support for low-emission transport” will remove policy and regulatory barriers hampering growth of LEV market. Component 2 “Awareness and capacity development” aims at addressing awareness, misperception and capacity gaps and constraints regarding 1 | Page LEVs among wide range of transport market stakeholders.
    [Show full text]
  • Fao Investment Centre
    Bhutan Agricultural sector review Volume 2 Working papers FAO INVESTMENT CENTRE COUNTRY HIGHLIGHTS FAO INVESTMENT CENTRE Bhutan - Agricultural sector review Working papers Bhutan Agricultural sector review Volume 2 Working papers Garry Christensen Senior Agricultural Economist Turi Fileccia Senior Agronomist, Investment Centre Division, FAO Aidan Gulliver Senior Economist, Investment Centre Division, FAO COUNTRY HIGHLIGHTS prepared under the FAO/World Bank Cooperative Programme Food and Agriculture Organization of the United Nations The designations employed and the presentation of material in this information product do not imply the expression of any opinion whatsoever on the part of the Food and Agriculture Organization of the United Nations (FAO) or the World Bank concerning the legal or development status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. The mention of specific companies or products of manufacturers, whether or not these have been patented, does not imply that these have been endorsed or recommended by FAO or the World Bank in preference to others of a similar nature that are not mentioned. The views expressed in this information product are those of the author(s) and do not necessarily reflect the views of FAO or the World Bank. All rights reserved. FAO encourages reproduction and dissemination of material in this information prod- uct. Non-commercial uses will be authorized free of charge, upon request. Reproduction for resale or other commercial purposes, including educational purposes, may incur fees. Applications for permission to reproduce or disseminate FAO copyright materials, and all queries concerning rights and licences, should be addressed by e-mail to: Director Investment Centre Division Food and Agriculture Organization of the United Nations (FAO) Viale delle Terme di Caracalla, 00153 Rome, Italy or by e-mail to: [email protected] © FAO 2012 Photo on the cover, ©FAO/P.
    [Show full text]
  • Energy Efficiency in Transport Sector
    Energy Efficiency in Transport Sector Department of Renewable Energy Ministry of Economic Affairs Royal Government of Bhutan December 2015 Energy Efficiency in Transport Sector This report is a part of the studies conducted for the formulation of the draft Energy Efficiency and Conservation Policy of the Royal Government of Bhutan. The studies were conducted by Ernst and Young LLP, India as part of the Energy Plus Program:Promoting Clean Energy Development in Bhutan. This project was funded by the Government of Norway and administered by the Asian Development Bank under ADB TA- 8630 BHU: F-003 Energy Efficiency. Disclaimer: This report is intended solely for the purpose of drafting the Bhutan Energy Efficiency and Conservation Policy. It provides an outline of energy consumption in the Transport Sector. Relevant agencies may use this report as a source of information on Energy Efficiency in Transport Sector in Bhutan. However, professional advice must be sought for making decisions or implementing the recommendations. The Department of Renewable Energy and Ernst & Young LLP accepts no responsibility for any loss arising from any action taken or not taken by anyone using this report. 1 Energy Efficiency in Transport Sector Acknowledgement This report on Energy Efficiency in Transport Sector for Bhutan was initiated by Department of Renewable Energy (DRE), Ministry of Economic Affairs (MoEA), Royal Government of Bhutan (RGoB) with assistance from Government of Norway and Asian Development Bank (ADB) under the Energy Plus Programme. DRE and Ernst & Young LLP (EY) are thankful to ADB for providing the opportunity to conduct this study. DRE, EY and iTrans team express their sincere gratitude to all representatives of Department of Roads under Ministry of Works and Human Settlement, Phuentsholing Thromde, Policy and Planning Division under Ministry of Information and Communications, Road Safety & Transport Authority, and Thimphu Thromde for their valuable inputs and support.
    [Show full text]
  • Education in Emergency ADAPTED CURRICULUM & PRIORITIZED CURRICULUM KEY STAGE 4: Classes IX - X May 2020
    Education in Emergency ADAPTED CURRICULUM & PRIORITIZED CURRICULUM KEY STAGE 4: Classes IX - X May 2020 Ministry of Education Royal Education Council Bhutan Council for School Examinations and Assessment 1 Published by @MoE, REC & BCSEA 2020 Acknowledgment This curriculum resource is a joint effort of the Ministry of Education (MoE), Royal Education Council (REC) and the Bhutan Council for School Examinations and Assessment (BCSEA) towards facilitating the continuity of learning of our students under the emergency of COVID 19 virus pandemic. This venture would not have materialized without the participation and contribution of various key players in the field of education. We commend the voluntary contribution of teachers from different schools in terms of their professional input in outlining and sequencing of curriculum content and learning objectives. In this hour of emergency, we are thankful to our development partners like UNICEF, HELVETES, Save the Children for their continued support both professionally and financially. The education fraternity remains hopeful that our students gain the optimum benefit from the generous gesture and help us take education to greater heights in realising the national purpose of education. Above all, the wisdom and blessing of the Government has been the impetus, which proved vital in rolling out numerous EiE programs and activities. Without the full support of policy makers and professionals in the country, there is little hope that the EiE outcomes are translated and materialized to fruition. ISBN: …………………….. 2 FOREWORD The detection of the first COVID-19 case on 5th March 2020 resulted in closure of schools and institutes in the proximal zone of Paro, Thimphu and Punakha.
    [Show full text]
  • Bhutan Malaria Control Programme Review: a Report
    Bhutan Malaria Control Programme Review: A Report 23–30 March 2010 Regional Office for South-East Asia SEA-MAL-264 Distribution: General Bhutan Malaria Control Programme Review: A Report 23–30 March 2010 Regional Office for South-East Asia © World Health Organization 2011 All rights reserved. Requests for publications, or for permission to reproduce or translate WHO publications – whether for sale or for noncommercial distribution – can be obtained from Publishing and Sales, World Health Organization, Regional Office for South-East Asia, Indraprastha Estate, Mahatma Gandhi Marg, New Delhi 110 002, India (fax: +91 11 23370197; e-mail: [email protected]). The designations employed and the presentation of the material in this publication do not imply the expression of any opinion whatsoever on the part of the World Health Organization concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. Dotted lines on maps represent approximate border lines for which there may not yet be full agreement. The mention of specific companies or of certain manufacturers’ products does not imply that they are endorsed or recommended by the World Health Organization in preference to others of a similar nature that are not mentioned. Errors and omissions excepted, the names of proprietary products are distinguished by initial capital letters. All reasonable precautions have been taken by the World Health Organization to verify the information contained in this publication. However, the published material is being distributed without warranty of any kind, either expressed or implied. The responsibility for the interpretation and use of the material lies with the reader.
    [Show full text]
  • Construction of Low-Cost Dwellings for Road Workers in Bhutan
    Construction of Low-cost Dwellings for Road Workers in Bhutan B B Gurung Civil Engineer, DOR, Bhutan • Inadequate designs. Summary • Shortage of trained/skilled manpower in the The objective of this paper has been to analyse and organisation. present the reader the various aspects of an on-going • Low level of Information Technology & Computer project, construction of low-cost dwellings for road support system in the organisation. workers, under the Division of Roads in Bhutan. The • Poor Quality Control System in the organisation. paper focuses mainly on identification of various factors • Ignorance and/or lack of knowledge of various actors affecting the progress of the project and deducing some involved in the project formulation and strategies to improve the situation. implementation. This project is a World Food Programme (WFP) • Geographic, topographic and climatic condition of assisted project under the roads sector of Ministry of the country. Communications in Bhutan. To assist the construction Further, in the past, the Life Cycle Economy and the and maintenance of transportation networks, the WFP has maintenance aspects of the project were not given supplied food since 1985 as partial wages for workers in adequate consideration during the designing and planning the Roads Division of the Ministry of Communications. phase of the project. This has led to mounting up of Deductions, constituting partial payment for the WFP various problems related to maintenance and renovation food items, are made from the wages of the workers to of the dwellings. raise a fund called WFP Generated Fund. The funds so In fact, management of properties, mainly the generated are ploughed back into the project, mainly to Government owned apartment buildings, has been improve the living and working conditions of workers emerging as one of the greatest challenges presently through the provision of simple housing and work safety facing the government of Bhutan.
    [Show full text]