TENDER NOTICE its development projed pertaining District Couocil lnteods to call sealed t€nders for D.G.Khan for the financial year 2016-17 . to lop zori-rt {rom coltractors who are enlisted in zla council

per bid document by the Head Oerk (l&S 1. The bid documents will be issued on charges of Rs.5OO/- publication of tender notice till to Branch) on written r+quest of contractors from the date of 03-05- 2017 accompanyilrg the followine documents'

2016-2017 from zila council Dera i- Enlistment letler along with Govt Fee deposit slip for financialyear ii. Partnership dLed io case of limited company

iii. No Litiga-tion certificate on letter head pad' -

the shape of call deposlt from any 2. The sealed bid document alongwith 5/o earnest money in D'6'Khan from date of publication to date 1006 scheduled bank in Punjab in favour of chair;an District Council 2017 at 01:00Pm.

at o1:Oo pm in the office of 3, All the received / Sealed bids will be opened on dated 12-0G2017 presence of available contractores or their ir,r,", ao"n",r o.n.*iJn iv arr" ,*a* opening comnittee in the authorized rePresentatives-

to quote their rates in Nos as will as in ivords on above 4. lt i5 Eompulsiry on all participated contractors o; below the estimate oin percentage basis'

( amount adiusting 5% of earnest 5. Additional performance guarantee 10% of tender cost balance approved by the competent autiourity within 7 money) should be deposited by the bidder whose rates are wilt be forefeited by the Distrist Ci'uncil .lavs lf he does not dedosit the required amount, his 5% CDR deposited This action cannot be ;;; ;;; ;" ,,]irt r" ,"j""t"0 and process of re-tendering wi, be initiated. challenBed in anY court of Law. bids will be dealt as reiected' 6. Conditional, unsigned, incomPlete, cutting, over written and doubtful

any time prior to the approval / acceptanc'e of the 7- The competent authourity may reject all bids at tender rate. agreement with department on 8. when work 6rder issued to approved contractor, he has to make the stamp paper ofvalue sfecified by Government-

in work order after appro!'al of rates of 9. The period lpr completion of each project will be mentioned the lower bidder-

getting receipt from Head Clerk will be dealt 10- The bid5 poqred by contractores within 5% CDR without cancelled. not issued from the olfice of Head 1L. The sealed ds should be with orignal Lux.cDR. Thelne bid.documentsDl challenge it' Clerkwill be consi,lerr as rejected. The bidder has no right to to Gonduct the required quality control 72. The contra rres to Whom work order are issued, are bound is as below' tests on their own ext rces. The detail ofwork to be tendered

Lalt dato for feod€iS Eamest Tender Sr. is6ue of ,rBcairt Name ot DeYelobment Schemes cost loney Time No. tendeas opening dato

& ,j2{6.2,f, diiiiiiin or sorins, o'aili Boundarv warr curverts 5000@ 25000 500 6+oay5 1 Be..lpt r2r0 ruff nle rn u/c (otani 10-{1620t7 Tile Basti Opening Construciron of Drain, SoliP€; culvetts fufl 500000 25mO 500 6GDays 2 (nfl Milhay waliU/C Kotani- Pifi :onstruction of orain dani J3 50@o it50@ 5m 6Goays of Soring A Ci,lverts at Bani lallo wali & :on**aion 500000 25000 5m 6GOay! :holaf,i in u/C.,allo wbli Construction of Culverts in U/C (aloo Wala 500000 25000 500 60Davr

6 Corstrsction of orain, Sllng'& Culven in u/C Katoo wala 200000 10000 500 6(}oays

7 Const uction ol Dr.in Soling bani Azeem U/C PunjgEhain 5om(n 250m 5@ 6GDay5 Connrudion of Drain Iuff Tile, CulverG Mou2a Mari 8 500000 25@O 500 60'Days oa.mi.ni U/C PuniEr.hain Connruction of Soling oedo wali s6nches 56hool tc 9 568345 24500 soo SGrrays Mdhell,h l?(ha.i U/C Aubbi- ,:L$;Xt\1 construclion oI Drain, Soling & TuffTile culvert uf,k Road 10 557000 3looo 5@ SGDays nacclpt 12:@ A:*i Barou.h xhen t,/C Aubdi. LO{6.XB7 Upto pm 'libbi Coostruction oF Solifl& gaiti Qaisr.ni Mohallah O3:OO PM op.ltlrrg 11 l04t70 L55@ 500 @Oays Ahutla wala U/C- Bubbi Otlll PM

Construction of Oraln Soling in Bani gotani U/C Mor€ 12 5000@ :5000 500 6&Days

13 ..n+.n.ri.n of oBin solinElu/C Tabbi Oaisraoi 500000 25000 500 50-Oays

14 Constructiofl of DrJin Type-t at 6ani Nari U/C Nai lanubi s00fi)o 5000 500 6GDays

!_onnruction of Orain Solin8 Sanl ooura. Sohra U^ 15 500000 25000 500 6&oays

16 Constructioo ofNala at Basti Tub U/C Bindi s00m 25000 5m 6Goays t7 aonslru.l'on of Drain Tvoe.l 500000 L5000 500 6GDays

18 Conitru.tion ofDrdin Type-l at BaniSanjar in U/C Cholani 500000 2500{) 500 6GDayr

:onstruciion of Drain, Soling Moula Kaniu Wala Str€€l 19 Bahadur Ahfrad, aanj lihdani, Bastj Nahelini ur 500mo 300fi) 500 6GDays PardhanSharql

2D Consrruction of Soling in U/CSok3r 1000m0 50000 500 5GDays Connruction ol Drain €arrlworl & Sollng Sant Buzdar 2t 700000 350@ 500 6ODays U/C Sani 8u2dar. Construction of Culvens at ManSrotha Sharqi Bani Rid 22 500000 25000 5m 60-Days

23 Connruction of Soling aani 5hE€r Grah u/c Kot Oaitrani 500000 25000 500 6GDays CorSrudioo ot Dnin, Soling Basti Boodo u/C lhok€ 24 sooom 25000 5m 50-Oays

E construction of solirg at 8a5ti oupha U/c U/c l"itre 5000m 250m s00 6&oays

Connruction of Solina Mollrh Ssltan Nor.ng vehova Citl 26 500m 60@ 500 6SDays u/Cveh(M ChakJanubi, Connru.tion ot Soling at B'bni Aelvdni DaE Wala Ul( 71 5mo 6000 vx) m{ays veh6€ ChatShumali

Coon.uction ofSoling Moura Kandi wala U/CAhmadani. 5500m 775@ 5m 6GDays

Construction of Orain Sol It Nai Abadi shadun Lund 29 550000 27500 sm 6GDays (kPet Allah wasav U/C Shai Construction ofSolins at Basti Chahywala Mouza Sikhani 30 550000 aTdi 5m 6O-Duys 72{,6.7at7 const,uction of solin8 BaJIi Rind. Basti akbar xhosa, to-o6-20t7 ircdFr2O 31 a{oooo 29000 500 SGOays pn Eastj Narar Khan, Sani lbraheem u/C Chak Ramin Upto tllfl Pt @rE Connruction of Soling Cba[ lattaY wala, Basti Athtet Or:q) P 12 Eait , Aani Chah BarS wala, Bani xareem Bathsh, 8an 6000@ 3dt00 5m 6+Days H:ii allrh Aakhrh U/CSh.rc Dani- Cornruc$on of Dr.inSoling Cutuent Easi Meva sallel, Mohallah Anwar Hussaln, Bas! Mohallah abdul Rasheed, 33 s068m 255m 5m 6GDayj gani Sami ullah Dani, chah Kha, wala, Mohallah sadal l,,ta Shrh lrdrr Din

Construclion of Solin& orain Typei Basti ohandla, Eanr Sheer wala, loosa Markeet, aa$i Mushlaq Dasti, B3ni 34 64m68 32100 s00 6GDays Ramo Wala, Basti (alif wala , Mohallah Hazoor 8akhsh Mohalla Sadat, Sani SamiUIah oani U/C

Connruction of Brldgdat Bani Ghulab qEla Consttuttlon 50fim 25000 500 6GOayt of Soling Bani Fidda Hussaln Jarwar U/C Marhatta.

construction oI soling. cuhrens ftom lndus HiSh*ay to 36 934974 z7w 5m 6Gqay! Bani Sh.h s.ib,2 No's Culv€tti SastiShah Saib U/a Palr'

37 .6n

nruciion ot solirS from tlouse Allah Eakhsh lo iain Bakhsh rhah Aig Wala Moula gahadur ?9 4000m 20000 500 AnDays rt uction of orain ln Street Ghsllam s;rwar Haii Saddique tlaii Shafi U/C I nstettation of water SL,pply Pipe Une in U/Csanei 500(m 5000 50() GeDeyr

Consiruction of Soling Chah Kharra wala Maoza Rrki 41 7500@ 37s@ 500 6GDays Dhao shekhani U/C Ohao Construction of Culvert Chih Rut wala Mouri Chal 42 60000 3000 500 6GDays

Connrudron of Nal., solin8 & Culve.t in Baiti sh€khanil 43 1ooOOOO 50fi1o 5@ 60.Oays u/cDhao I yr Connruction of Draln, Solin& Culverts in U/C bdan 500m0 no(b 5@ 6GE

Connruction of Orain,soliog; Culvert in Mao2a Xhalolur 45 ldlm(n 50000 500 @Days ahrk NaGAbad Consrrunion ol Soling Bani ourdhtta wala Bani Haiil 46 5ooooo 25oOO 900 6(!lays s.bhe rrlcchabriaala I :anstruction of Soling Sella,iNoor wah, Tumi, Patti zai 47 500000 ,15000 s00 6GDays u/Csella Construction of orain, soling Culverts in U/C Gadda 48 500000 25000 500 6Goay.

Construction of orain / Sullage catrjer in Eani Gudd Pu, 49 500000 25000 500 6GOays

:onstruction of orain,solind at Sasti xhosa u/c san 50 200000 30500 500 60-Days

Construction of Dr.in,Soting Basti NazarAbad Mau.a Pa 51 200000 10000 500 6Goayt P,mriini in lllanrrti (hosa

l. Corslru.non of Tuff Tile stlpp xhalil Ahm.d to Gtulam s2 5000()0 25000 ' 500 6GD.ys ii Construction of TuIf l'lle M€ro Canal to Residanc€ Docto.abdul Qadeer Bastr ali wala u/cTibbi ftalat

Const uction of Orain, Soling Qasba Sarwar Wali, Eani s3 5000@ 150d) 900 @oays rh,ri a.{i H.iv wala U/C Oi:hma aon{ruction of Drrin, 350 Bft & Construclion of soline 5n 2&50m 14250 500 6Goayr 3sORftU/COrahma- connro€tion of Solin& culvqrt Soomer wah, gani Bubar 55 Wala, Bani Mohana, Bani xdatrywala includins nearest cmo6 250fo 500 6Gorys ah:.lie< i^ lJlC Samina Connruction of Dmin, Solin& Culverts Chah Kalal we'a 56 a(frm 10000 5m SGOays s:min. 6harbi U/C S.mioa. 57 ..nsrrudion of Culverts in UIC Subrd Nachan. 5000@ 2s000 5m 6&Days Construction of Drain Soling Banl Kanday Wal. Mou.a 58 5(x)@ 25000 s00 6GOays Khrri cbarbi u/c Khaki. t2&2m7 12:@ Connructon of Orain Soliog & Cutvertr in Ward No- 1 & 5 $&an1 I R!..1 59 500000 25000 500 60"Days df u/c Gaddai Sharoi upto I n" o3:oo ins lonnrultion of Soling jampu. road to Sasti Ham?a wall Pt, I oF 60 in Front of (hursheed Cotton Factorv U/c Paigah No. 57 500000 250m 5m 6Cldys I oL{oPM.

construdion of SolinE 8ar chara Ahmad aakhsh watto 51 500m0 250,0O 500 6GDays rhoo Huiiwala u/c PaiSah Nb. s8 chak No.2.

Coflnructron of Culverts Mduza Paigah Chak No 1 U^ 6a 2000@ 10m 500 6GDays

Conitrlctioo of Drain Soling to Residan e Sairad Alyanito Residance Muhammad qb;l BoYs Primary khool to Residance Fida Husstin to Besidance Haii Shablr to 63 Residance Abdul xareem tb Ee5idance Ghulam Qadir s00000 25mO 500 6GDays Khumar to Sesidan(e allah wasaya to Residance atta Hus$io Hair Dreise. io Residance Muhamm.d Umar to Masiid Shareef Q.tba aaliwala u/C Mlt wala

construction of orain Soling Maio road Clasba Re€kn 64 5000@ 25000 500 6Goays Basti Kaleem abad {vaiay wAla) u/c HaiderQure5hi.

Connructron of Drain, Soli;g gasti Ghousa Abad ,Ba5ti 65 vania. aani Peer wala, Easii Adal wala, old Eid Gaha 5000m 25000 500 6&Days

Construction ot Draln Soling Culvert aasti Jaal wala Ban 66 RanSay wala sasti Soopai wala Bani 8an 500000 25000 5m 6GOays Hudaiee. Malana U/C Hazara Conrtruction of orein Solinb chah shary wala, Cutven 67 Hiran wata / ,hoke Dinry culverts Dolway wala chan 5oooo 25000 500 6GDays Mubli Wale U/C lhok€ Utra

i. Connructiod ofSolne road JatharlmamShah to office union Cooncil R€gidence Muhammad Nasir 58 500m 25000 500 @[rays ii. CoosiruEtion of solin8 ro-ad Rinda, to Sani Ghrloo (amad wala wrth including Nearest Fbadi€s U/C Haii connruction of SolinB , cdnnruction of Kalcha Track 69 500000 250@ 500 6GDays .6..rru.tion of Culvens U/CBeit Sait wala :onstruction of Draio, Soliilg, Culvert io U/C aeit Bail 70 200m0 10000 500 6&0ays ruction of solin0 Bani aabray Wali B.sti K Easti Mula wali Bati xhumran Bani ,akhar -5m 7l Eani Syed Muhmmad tlamld Shah BaniTbar. smo 25000 6GDays Oaim wala Bani chaBra wala u/c Jakhar Cor'tt',,.rion ot Orain Soling Bani Dadwani U/C sanil 72 s{)m 25000 500 50-Oays culverts in U/C *ro,l Const.uEtion of Drain, Solin& ,ooo* 10000 500 5(}Day5 71 Malena- l-

Construction of Cutuerts Badi Hail Haider ala Khosa girmaniAbid Ramdani Malit Ria! Mulauim BirmaoiSaieed 25000 5m 6GDay5 74 5000m Mahr oimani Kamaljatalad iareem Bakhsh Mehrov.ani shanan lalalanl (ora xhan U/q sani Ja/n

Co*t-ction of Orain Soling Basti Julbani Basti Shatt 6GDays 7S 5mqx) 25mO s00

500 610-Day! 76 Connruction ol Drain. soling in u/c Mehmeed 500000 25000

25000 500 60'oz,ts TT Connruction o, Orain SolinEU lC Na lafa( 5ooom 6i! ai- .t o.i" & soling street Molana Ghulam Fareed 5tr€et Maner Bafidue Ahmad t ngha Basti 500 @oays 78 500000 u50@ ghandoo wali Sireet Bilal K[an Luri Mohallah Havdn colonv u/C Mana ahmdani Mana Co.strualon of Drdin, Soling & Culvert u/C 1fi100 500 SGOays 79 200000

Consttuc!'on of O.ai. Soling Bani ChaEy Wala B.st 25000 5m @Dayr 80 Fouia, Sasti Khamisy wala, Bbsti Shumasabad U/C aan 500000

Pur consrru.tioo of Oraln,isolins, Ctiuens U/C ftan 25000 500 6GDays 81 5mo@ lznubi

Construdion of solin!, Nawan Shar Road to Eani Yar s00 6GDays 82 750000 17500 MohmmadAEin Chah Narh Wala U/C Mutaffarch.han . Providing and Firin8 water Supply Pipe Line Bani Bnmani B?ni5amundri 500 SGDays a3 5000m 5000 ii. Connruction ol Soling Basti Snmani U/' Th:la

Rasool xhen Connruction of Drain, Soling Basti Ghulam 500 6Goays 84 2m000 10000 Ramdaoi U/cThala Gaboolan. 5GOays 85 ..n

ot soling from Dajal Road to Madrsa Razakia 162000 8100 500 6GOays 92 lconslruction *li-o*oa. r.r*rtl u/c oarkhan Jamat Khan Gha,bi 500000 25000 5m 6GOays

1a.."-"." of Solinc Bastr (hai., xhan Ahmad.ni, 9a 50@ :5mo 500 SGOayr u/c DarkhastJamal KhanGharbi lt'la*",rltrnuarni oI Soling Thol Alo construction of 2 No': 95' l-c*st*alon 500000 ?5000 5m 6Goay5 l.,tuon. in r,/a Bakhr.wah.

or orain, sorins & culvert in u/c aakhar . SODays * lff;*".^ 2000@ rxrco 5m connrudion ol Cuben SCttiMureed Hussain Eu8hlani li- lu/CChalDodhard 97 500000 2s000 5m 6GDays lii. conr..u"r,on ot ruf{ nb $reet HiBh school choli Bala

98 Solint & culverts U/C Chakoodhara. 5UmO 25000 soo 6&Days lconstru.tiono,

Constructio'l of Brids€ on Manka Caoal, solin8 at Sohla) 99 750m f7500 5@ 6GDays wala U/C Nawan shumali.

lconstruction of Soling Tibba Eughal chor Rord Oasba 1@ 500000 2s000 5m 6GDays ls.tr,i s,*.. u/c srkhi seui"rsahroi.

construction of Draln soliJE Putta Kot and choti 8ah 101 s00000 2s000 5m 6GDays Road Qatba $lhi Sarwar U/C Sakhi SaBar 6harbi

7o2 a66

Coartruction of Katcha ledpabt€ Track Rutchani to sat€ 6GOays 104 500ooo 250@ 500 & carunge to Mu4a u/C Eaioot Mundwani.

tnsruttition r lo n"napr-p at Darbar Ameer sh.h 9b 144\n 5@ 60'Day. 10s 288000 r l/a A.rmr Mu.dwani- Top Sani Coflstructioo of Jeepable TECk Q.dkah to 25000 5@ 6GOays 106 somoo ["m l,/a Fizta t(at h. 5m 6GDays 107 Co^nructon of Jeepabl€ T, cks in u/C Ba.thi- 500000 25mO i. Construction rca of Ponds 10000 500 ii.,nstallaiion of waterSupptyptpe Uoe in U/C Barthi. zw 6GDays

Connrudion of Jeepabte gotiari g;;j t09 tnctt to t Thetai U/CIhel(ar' 5000m 25mo 500 60.Days Construction of Jeepabte 110 Tract qt ea+i SaiU-r,aeer to Band 5uth U/C thlkar. s00000 25000 5m WDay. 111 Coostryction of ,eepabte Tr.ck in i/C Mubarti 595000 2980{t 500 Coan.uctior' peer 1L2 of ,eepabte Tract fiom Xoro to Straf Nawa., Moura Ka.oo 12@mO 6mo 500 SGDays xt{l6.:M7 n elptr:Lo Constrctu€tion o, JeepBbte Track 70-lr6.2Xn7 tp 113 Grack GhurdSh Tat pm Maora Oulana. 128IXXD 64000 5m 6GOays to Ir3{lO prn U/C Tuman Xhoe oFnltE(}r-O Connruction Pr'l 114 of ,eepabte Track in U/C Tum.n Leenan Zareen 5([oan 250m 500 6GOays

Connructdn of Jeepabte Trlak {rom Xotla lo .laddi 115 Gharbi Aani Noor Muhamrhad ihan, U/C 25@nO 125m 5m 6GDays

119 Hours rent 716 of auEozer for Connructio, of Jeep.btc tracls in U/CTuman teBhari Bati 500000 25d]o 5@ @-Days

i ch. SardarAbdul Qadir Khan Xho3a wl Chairman O.G-Khan Dislrict Councit O.G.Khan