WEST CONNECTS TO PROGRESS The State of , a key centre for trade with South East Asian countries, had a total length of 2,908 km of National Highways till May 2014. In 2018, the total length of NH in West Bengal including in principle National Highways has reached 3,565 km. Significant investments are being made to transform National Highway infrastructure in West Bengal. This is adding to the overall socio-economic growth of the State. “When a network of good roads is created, the economy of the country also picks up pace. Roads are veins and arteries of the nation, which help to transform the pace of development and ensure that prosperity reaches the farthest corners of our nation.”

NARENDRA MODI Prime Minister “In the past four years, we have expanded the length of Indian National Highways network to 1,26,350 km. The highway sector in the country has seen a 20% growth between 2014 and 2018. Tourist destinations have come closer. Border, tribal and backward areas are being connected seamlessly. Multimodal integration through road, rail and port connectivity is creating socio economic growth and new opportunities for the people. In the coming years, we have planned projects with investments worth over Rs 6 lakh crore, to further expand the world’s second largest road network.” NITIN GADKARI Union Minister, Ministry of Road Transport & Highways, Shipping and Water Resources, River Development & Ganga Rejuvenation Fast tracking National Highway development in West Bengal

NH + IN PRINCIPLE NH LENGTH UPTO YEAR 2018 3,565 km

NH LENGTH UPTO YEAR 2014 2,908 km Adding new National Highways in West Bengal

668.6 km 334 km

Yr 2014 - 2018 Yr 2010 - 2014

New NH New NH & In principle NH length

6 Construction of roads in West Bengal

940 km 338 km

Yr 2014 - 2018 Yr 2010 - 2014

Constructed Constructed length length

940 km of National Highways have been built in 4 years

7 Road Projects awarded in West Bengal

Yr 2010 - 2014 Yr 2014 - 2018

759 km 1,039 km

Total Cost Total Cost Rs. 5,257 Cr Rs. 11,765 Cr

Growth of 124% in the awarded cost of road projects over last 4 years with investments worth Rs. 11,765 Cr

8 Accelerated NH Development under Central Road Fund (CRF) in West Bengal

Yr 2010 - 2014 Yr 2014 - 2018

12 23 Projects Projects

Total Cost Total Cost Rs. 141 Cr Rs. 1,197 Cr

Significant increase of 749% in cost of CRF works sanctioned for the upgradation & improvement of roads & bridges in the State

9 Landmark Projects in West Bengal Hatania-Doania Bridge

A major high level bridge is being built along NH117 on the Hatania-Doania river in the South 24 Pargana district of West Bengal. Upon completion it will bridge the distance between and Bakkhali, while adding convenience for commuters and tourists travelling to the Sunderbans, by reducing travel time and cost.

At a Glance Rs. 226 Cr Total Cost

Main Bridge Approach Viaduct 340 m Length 960 m Length Foundation: Well Foundation: Pile Super Structure: Super Structure: Extradosed PSC Girder 10.5 m Carriageway 10.5 m Carriageway

10 Fulahar River Bridge

A 2.997 km long Bridge is being constructed on river Fulahar at Nakatti Point, to seamlessly connect Mahanandatola and Belaimari with in West Bengal as well as the district HQ in .

At a Glance Rs. 290 Cr Total Cost

Main Bridge 2 Viaducts 816m Length Foundation: Pile Foundation: Well Super Structure: Super Structure: Cast-in-Situ Cast-in-Situ RCC Deck Slab PSC I-Girder 10.5 m long 2 Lane 10.5 m long 2 Lane Carriageway Carriageway

11 Asian Highway 2

Enhancing sub-regional connectivity between , and Bangaldesh, a cross border road corridor worth Rs. 721 Cr will connect Kakarvitta at the Nepal border with in via - in West Bengal. It will promote cross border motoring, trade and tourism, while creating new socio economic growth for the people of this region. It will pass through NH-327B, NH-31C, NH-31 & NH-10.

Cross Border Road corridor along AH-48

Enhancing sub-regional road connectivity between Bangladesh, , India and Nepal, a cross border road corridor worth Rs. 938 Cr has been proposed. It will pass through NH-717, NH-31, NH-31C and NH-317A.

12 - section The Bankura-Purulia section of NH-60A has been upgraded to 2 lane with paved shoulders at a total cost of Rs. 340 Cr. The road, adorned with Terracotta sculptures will ensure smooth and unhindered flow of tra¤c between the two districts. Infrastructure enroute includes a Toll plaza, ROB, bus bays, improvement of junctions and green plantations along medians.

13 Pundibari-Baxirhat section

The Pundibari to Baxirhat section of NH-31 at West Bengal- border is being upgraded to 2 lanes with paved shoulders.

At a Glance

46 km length

Rs. 399 Cr total cost

14 Nandakumar- section The upgradation of NH-116B has been taken up at a cost of Rs. 397 Cr for e¤cient and safe mobility of tra¤c between Nandakumar-Digha section. It will facilitate local, commercial as well as tourist vehiles enroute to the popular travel destination of Digha.

Hasimara-Salsalabari section

The 46 km -Salsalabari section of NH-31C in district is being upgraded to 2 lane with paved shoulders in the district of Alipurduar in West Bengal.

15 Construction of ROBs under 20 ROBs worth Rs. 2,294 Cr have been sanctioned for upgradation of level crossings for safe, speedy and seamless movement of tra¤c.

16 Ongoing projects of MoRTH in West Bengal

Sl. Project Name NH No. Total Sanctioned Date of Likely No. constituency (New) Length Cost/TPC Start Date of (km) (Cr) Completion

1 Coochbehar/ Proposed development for road AH-48 90.57 971.40 May-15 Dec-18 / corridor component of AH-48 Alipurduar involving NH-717, NH-31, NH-31C, NH-317A on Sub-regional Road Connectivity among Bangladesh, Bhutan, Indian & Nepal under the loan assistance from ADB.

2 & Proposed development for road AH-02 38.14 720.97 May-15 Dec-18 Jalpaiguri corridor component of AH-02 involving NH-327B, NH-31C, NH- 31 & NH-10 on Sub-regional Road Connectivity among Bangladesh, Bhutan, Indian & Nepal under the loan assistance from ADB

3 Rehabilitation and upgradation of 31 46 279.70 Aug-15 Dec-18 (SC) Pundibari to Baxirhat (WB/Assam Border) section to 2 lanes with paved shoulders under NHDP-IV on EPC basis

4 Rehabilitation & upgradation 116B 49.20 396.86 Sep-17 Sep-19 Kanthi to 2-lane with paved shoulder configuration of Nandakumar- -Chandeshwar road

5 Bankura/ Rehabilitation and Improvement 60A 84.00 340.34 Sep-15 Jun-18 Purulia to 2 lanes/2lane with paved shoulders configuration of Bankura-Purulia Section under Phase-I of NHIIP

6 Malda uttar Construction of new road at 81 13.15 271.17 Nov-16 Mar-19 the missing link along with approved alignment between and Eastern approach of Kalindri Bridge in the Malda Distt.

7 Malda uttar Construction of a major bridge 131A Major 289.69 Sep-15 Sep-18 on the river Flhar at Nakatti point Bridge for connecting Mahanandatola and Belaimari with main land of Malda District

8 Mathurapur Construction of High Level Major 117 Major 225.93 Dec-14 Dec-18 Bridge on river Hatania - Doania on Bridge EPC mode

9 Jalpaiguri Upgradation with a minimum 31C 40.50 202.69 Nov-17 Nov-19 of 2-lane with paved shoulder configuration in Jalpaiguri on EPC mode

10 Alipurduar Up-gradation from Hashimara to 327,17 46.00 176.00 Oct-16 Oct-18 (ST) Salsalabari & 27

11 Bankura & Upgrading to 2 Lane with 14 (Old 32.24 149.55 May-16 Dec-18 Bishnupur Paved Shoulders Configuration NH-60) and Strengthening of Existing Carriageway from km 232.00 to km 260.00, & km 266.00 to km 271.00 including re-construction of two major bridges at km 213.050 & km 219.250

12 Darjeeling Rehabilitation of 55 Road 137.53 Dec-16 Dec-18 location with slope protection Safety and drainage improvement at

13 Alipurduar Widening to 2 lane paved 27 (Old 24.50 117.73 Mar-17 Feb-18 shoulder of - NH-31) section

14 Malda uttar Development of alignment of 131A 3.53 109.36 Nov-17 Nov-18 Fulahar Bridge approach on newly declared NH-131A in Malda distt.

17 Ongoing projects of MoRTH in West Bengal

Sl. Lok sabha Project Name NH No. Total Sanctioned Date of Likely No. constituency (New) Length Cost/TPC Start Date of (km) (Cr) Completion

15 Darjeeling & Improvement to 2 lane with 27 (Old 36.00 89.53 Mar-16 Mar-18 Jalpaiguri paved shoulders configuration NH-31) from km 598 to km 634 of NH-31

16 Jalpaiguri Construction of twins 2-lane ROB 27 ROB 88.19 Sep-18 Mar-20 at and its approaches in replacement of Level Crossing

17 Bishnupur Construction of ROB at 14 (Old ROB 78.84 Nov-17 Nov-19 Bishnupur and its approaches in NH-60) lieu of level crossing No. KA-61

18 Widening and Strengthening of 12 5.30 64.62 Feb-17 Dec-18 existing carriageway for 4-laning of NH-34 for the stretch from Km. 25.700 to Km. 31.00

19 Birbhum Construction of PSC Girder 14 (Old Major 47.82 Oct-15 Oct-18 bridge over river Sal & Hinglow NH-60) Bridge in place of damaged vented causeway

20 Darjeeling Rehabilitation of landslide 110 Road 44.66 Jan-17 Jul-18 location along with slope Safety protection and drainage improvement at Paglajhora

21 Construction of 5 no. of Minor 14 (Old Minor 43.82 Sep-17 Sep-18 Medinipur Bridges NH-60) Bridge

22 Darjeeling Strengthening of road stretches 10 Road 40.13 Mar-17 Sep-18 along with provision for Safety Retaining walls, Breast walls & hillside drains

23 Bankura Construction of ROB at Mejia 14 (Old ROB 38.33 Feb-17 Feb-19 and its approaches in lieu of NH-60) existing LC no. DVC/17/SPL

24 Bankura Re-Construction of a new bridge 14 Minor 29.14 Oct-17 Apr-19 across river Shali Bridge

25 Darjeeling Rehabilitation of landslide 27 Road 16.80 Sep-17 Sep-18 location along with slop Safety protection and drainage improvement at

26 Darjeeling Road safety works along with 110 Road 16.13 Sep-17 Sep-18 reconstruction and widening of Safety narrow culverts in 10 locations in Darjeeling distt.

27 Darjeeling Restoration of damaged valley 10 Road 15.03 Sep-17 Sep-18 side road bench along with Safety provision for hill side drain works and road safety works in Darjeeling distt.

28 Bankura Re-Construction of a new bridge 14 (Old Minor 14.62 Oct-17 Apr-19 across river Tarapur in Bankura NH-60) Bridge distt.

29 Paschim Construction of 7nos. Of culverts 14 Minor 8.46 Sep-17 Jul-18 Medinipur/ in Paschim Medinipur distt. Bridge /

30 Construction of minor bridge 14 (Old Minor 8.07 Oct-17 Apr-19 over river Dobrana NH-60) Bridge

31 Jalpaiguri Construction of 14m wide 27 ROB 5.46 Aug-17 May-18 approaches to existing RUB in lieu of existing LC No. ND/1A near

18 Ongoing projects of NHAI in West Bengal

Sl. Lok Sabha Project Stretch NH No. Project Length Start Likely No. Constituency Cost (in km) Date date of (Rs Cr) completion 1 Asansol, Barwa Adda- 2 1,665 122.88 Apr-14 Jun-19 , 2 Purulia, JH / WB Border 32 708.3 73 awarded Singhbhum -Purulia - Balrampur - JH / WB Border at Chandil 3 Islampur By pass 31 277 10.31 Jan-16 Jan-20

4 Cooch Behar, - 31D 1,030 42 awarded Salsalabari (Pkg IIA) Ghoshkpukur - Salsabari 5 Medinipur, Chichra - 6 613.08 55.5 Mar-17 Sep-19 Jhargram including rehabilitation of existing four Lane 6 Darjeeling, Ghoshpukur - 31-D 1,133.02 83.78 Dec-15 Mar-19 Jalpaiguri Salsalabari

7 Tamluk Construction 41 128 1.39 May-16 Nov-18 of ROB -flyover at Ranichak, 8 , , Dhankuni- 6 1,396 111.4 Apr-12 May-19 Medinipur Khargpur 9 Krishnanagar, Krishnagar - 34 Rev. 78 Feb-12 Dec-18 Baharampur 1154.5

10 Raiganj Dalkola Bypass 34 105 5.96 Oct-17 Apr-19

11 Baharampur, Brahampore- 34 999 100.62 Feb-11 Dec-19 Jangipur Faraka

12 Maldaha Uttar, Faraka-Raiganj 34 1079 100.23 Feb-11 Aug-18 Raiganj, Maldaha Dakshin

Ongoing projects of NHIDCL in West Bengal

Sl. Lok sabha Project Name NH No Sanctioned Total Date of Likely No. constituency (New) Cost/TPC Length Start date of (in Rs Cr) in km completion 1 Darjeeling Construction of Mechi 327B 158.65 1.5 Jan-18 Jan-21 River Bridge on Indo-Nepal border

19 In-Principle declared NH in West Bengal

Sl. Stretch Tentative No. Length (km) As on 30/11/2017

1 Starting from Chandil (on NH-18) in - Patamda-Banduan - 95.00 - - - - Bankura on NH-14 in West Bengal (Length in Jharkhand = 55 Km, West Bengal = 95 km)

2 Purulia- Chandankiyari- Jharia –Dhanbad Road (Length in Jharkhand = 48 9.00 Km, West Bengal = 9 Km)

3 -Tatisilwai- Silli-Muri-- and ending at junction with NH- 40.00 18 in West Bengal (Length in Jharkhand = 57 Km, West Bengal = 40 km)

4 Stretch from (NH-114A) - Masalia-Kundhit Nala - Maheshmunda 15.00 Ghat (Jharkhand)-Asansol in west Bengal (Length in JH=65.20 km, In WB =15 km) 5 Stretch from Matigara on NH-31 (new NH No. 27 near Siliguri) to Teesta 110.50 Bazar on NH 31A (new NH No. 10) via , Ghum, Peshak (SH-12) except Ghum to Jore Bangalow (0.90 kms) which is part of NH-55.

6 Stretch from Notun Rasta More (Kashipur More) i.e. junction point with 22.00 NH-117 (new NH No. 12) at km 94.5 to proposed port near Harinbadi village via and Kachuberia.

7 Dakshin Mechgram - Ranirbazar 35.20

8 Ranirbazar - Arambagh 30.10

9 Arambagh - Burdwan 42.50

10 Belut - 9.10

11 Memari - Satgachia Market 11.20

12 Satgachia Market - Dhatriagram 19.20

13 Dhatriagram - Hematpur, Srirampur 15.90

14 Hematpur, Srirampur - Krishnanagar 14.20

15 From jn of NH-10- –Thode–Metalli–Chalsa near NH-31C 124.00

16 near NH-317 –BuxaDuar 15.00

20 Key Indian National Highways

SRINAGAR

Jalandhar

DELHI Gurgaon Jaipur Gorakhpur Ajmer Muzaffarpur Jhansi Purnea UdaipurShivpuri SILCHAR Barhi Panagarh Lakhnadon Kharagpur PORBANDAR Bhubaneshwar Satara Vishakhapatnam Arabian Sea Eluru Belgaum LEGEND Chilakaluripet Tumkur Hosur Ranipet North South Corridor Selam Krishnagiri East West Corridor COCHIN KANYAKUMARI Indian Ocean

21 National Highways - India Story Fast tracking National Highway Development

Building National Highways A new Pace of Progress

NH LENGTH NH LENGTH 91,287 km 1,26,350 km Yr 2010-2014 Yr 2014-2018

New National Highways being built 86,371.5 km of New and In-Principle National Highways added in 4 years

New NH 34,391.5 km + In principle NH length 51,980 km New NH Total 20,353.2 km 86,371.5 km

Yr 2010 - 2014 Yr 2014 - 2018

22 National Highways - India Story Adding more National Highways per day Enhancing e¤ciency by building 28 km National 28 Highways per day in 4 years, up from 3 km km 22.5 km 16.6 2017-2018 km 12 2015-2016 km

2016-2017 2 3 2 3 km km km km 2014-2015

2013-2014 2012-2013 Rate of Highway 2010-2011 2011-2012 construction per day

Construction of roads Rs. 3 lakh Cr worth investments in the road sector in 4 years Significant growth of 158% Yr 2014 - 2018

Yr 2010 - 2014 28,532 km 19,444 km

Total Cost Rs. 1.16 lakh Cr Total Cost Rs. 3 lakh Cr

23 National Highways - India Story Road Projects Awarded 100% increase in projects awarded with investments of over Rs. 4.68 lakh Cr Yr 2010-2014

Road Length Total Cost 25,609 km Rs. 1.62 lakh Cr Yr 2014-2018

Road Length Total Cost 51,075.32 km Rs. 4.68 lakh Cr

Accelerated NH development under Central Road Fund (CRF) Significant increase of 207.6% in cost of CRF works sanctioned for the upgradation & improvement of roads /bridges in the Nation

2,876 Yr 2010 - 2014 Projects 935 Projects Total Cost Total Cost Rs. 8,613.51 Cr Rs. 48,186.57 Cr

Yr 2014 - 2018

24 Transforming India’s Transport Sector Key initiatives in 2014 -2018

Over the past four years, various smart initiatives on Indian National Highways have resulted in transparent processes, last mile connectivity, safer roads, upskilling, new opportunities and employment for the people.

Motor Vehicle (Amendment) E Toll - FASTag to enhance Bill 2017: To bring transparency, e¥ciency, and reduce long reduce corruption queues at Toll plazas

E-Rickshaws for last mile Exemption from the connectivity requirement of commercial licence for LMV and LCV drivers

Driving training schools in every 0.2%-15% decrease in road district for skill development accidents and fatalities till 2017

Road Safety Greater Compensation for Partnering with Annual Plan accident victims of upto NGOs to ensure Rs. 5 lakhs road safety

Green buses and electric vehicles have been introduced. Emission standards have been upgraded for vehicles. BS VI norms along with bio fuel B-100, flex-fuel E-85 or E-100 & ethanol ED-95, methanol M-15 or M-100 and methanol MD-95 have been standardised

15% methanol blending can result in the replacement of around 31.9 million tons of crude oil. With crude oil prices at USD 54 per barrel, the use of clean energy biofuels will reduce fuel costs resulting in significant savings. Compared to neat gasoline, M-15 reduces CO and HC emission by 40%. Biofuels will help in reducing vehicle pollution levels in India

25 Anti Lock Braking System Model Automated ensuring vehicle and Centres for checking passenger safety fitness of vehicles

Vehicle Fleet modernization Simplified forms for programme obtaining driving licences

Increasing Speed Limits from Taxi Policy Guidelines to 100 km/h to 120 km/h, at par ensure safe, secure and with the global practices a¨ordable journeys, while reducing congestion as well as pollution in cities

Indian Bridge Management System (IBMS), the world’s largest inventory of bridges, has been created for proper maintenance of these structures. Till date 1,72,519 bridges of all ages and structures have been inventoried across India,and assigned GPS based Location Numbers, Classification Numbers based on features, Structural Rating & Socio-Economic Rating numbers

789 black spots have been identified and assigned unique ID numbers. Guidelines have been prepared and notified for investigation and rectification of these road accident-prone black spots on National Highways. 265 spots have already been rectified

Rectification measures at 318 spots have been sanctioned and are in various stages of implementation. 139 spots are on State Government roads or with other agencies. Remaining 67 spots would be taken up separately or rectified as part of ongoing projects

26 Manzilen Abhi Aur Bhi Hain