** STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 1 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT NY 2 BRIDGE OVER NY 22, BRIDGE REPLACEMENT NHPP 2020 0.173 PRELDES 0.173 NFA 2020 0.043 PRELDES 0.043 100132 TOWN OF PETERSBURG, RENSSELEAR COUNTY, BIN 1000250. R313 NHPP 2023 0.189 CONINSP 0.189 NFA 2023 0.047 CONINSP 0.047 NHPP 2023 1.828 CONST 1.828 NFA 2023 0.456 CONST 0.456 NHPP 2021 0.048 DETLDES 0.048 NFA 2021 0.012 DETLDES 0.012 NHPP 2021 0.260 PRELDES 0.260 NFA 2021 0.065 PRELDES 0.065 AQC:A19P RENSSELAER TPC : $2-$4 M TOTAL 4YR COST : 3.121 0.216 0.385 0.000 2.520

NYSDOT NY RT. 2 BRIDGE OVER THE POESTENKILL, BRIDGE REPLACEMENT NHPP 2020 0.031 ROWACQU 0.031 NFA 2020 0.007 ROWACQU 0.007 100136 TOWN OF BRUNSWICK, RENSSELAER COUNTY, BIN 1000190. R316 NHPP 2020 0.001 ROWINCD 0.001 NFA 2020 0.001 ROWINCD 0.001 NHPP 2020 0.160 DETLDES 0.160 NFA 2020 0.040 DETLDES 0.040 NHPP 2020 0.266 CONINSP 0.266 NFA 2020 0.067 CONINSP 0.067 NHPP 2020 2.660 CONST 2.660 NFA 2020 0.665 CONST 0.665 AQC:A19 RENSSELAER TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.898 3.898 0.000 0.000 0.000

NYSDOT NY RT. 144 BRIDGE OVER HANNACROIS CREEK, BRIDGE REPLACEMENT NHPP 2021 0.056 ROWACQU 0.056 NFA 2021 0.014 ROWACQU 0.014 100716 TOWN OF COEYMANS, ALBANY COUNTY, BIN 1038070. A576 NHPP 2021 0.125 DETLDES 0.125 NFA 2021 0.031 DETLDES 0.031 NHPP 2021 0.004 ROWINCD 0.004 NFA 2021 0.001 ROWINCD 0.001 NHPP 2021 0.224 CONINSP 0.224 NFA 2021 0.056 CONINSP 0.056 NHPP 2021 2.255 CONST 2.255 NFA 2021 0.564 CONST 0.564 AQC:A19P ALBANY TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.330 0.000 3.330 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 2 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ROUTE 196 OVER DIKE ROAD (), BRIDGE REPAIR, TOWN OF NHPP 2020 0.050 DETLDES 0.050 KINGSBURY, WASHINGTON COUNTY, BIN 4039820 NFA 2020 0.012 DETLDES 0.012 102409 NHPP 2020 0.140 CONINSP 0.140 NFA 2020 0.035 CONINSP 0.035 NHPP 2020 1.650 CONST 1.650 NFA 2020 0.412 CONST 0.412 NHPP 2020 0.050 PRELDES 0.050 NFA 2020 0.012 PRELDES 0.012 NHPP 2021 0.200 DETLDES 0.200 NFA 2021 0.050 DETLDES 0.050 AQC:N/A WASHINGTON TPC : $2-$4 M TOTAL 4YR COST : 2.611 2.361 0.250 0.000 0.000

NYSDOT US ROUTE 9W OVER CSX/CP RAIL, BRIDGE REPLACEMENT STBG FLEX 2023 0.800 DETLDES 0.800 NFA 2023 0.200 DETLDES 0.200 103955 TOWN OF BETHLEHEM, ALBANY COUNTY, BIN 1007570. A598 STBG FLEX 2021 0.800 PRELDES 0.800 NFA 2021 0.200 PRELDES 0.200 STBG FLEX 2023 0.738 CONINSP 0.738 NFA 2023 0.184 CONINSP 0.184 STBG FLEX 2023 7.380 CONST 7.380 NFA 2023 1.845 CONST 1.845 AQC:A19Z ALBANY TPC : $9.5-15.5 M TOTAL 4YR COST : 12.147 0.000 1.000 0.000 11.147

NYSDOT RT. 9 OVER I-87 AT EXIT 17 BIN 1005679, BRIDGE REPLACEMENT AND NHPP 2021 1.600 CONINSP 1.600 INTERCHANGE REALIGNMENT ; TOWN OF MOREAU , SARATOGA NFA 2021 0.200 CONINSP 0.200 104342 COUNTY SAR115 NHPP 2021 11.200 CONST 11.200 NFA 2021 2.800 CONST 2.800 NHPP 2020 0.160 PRELDES 0.160 NFA 2020 0.040 PRELDES 0.040 NHPP 2021 1.120 DETLDES 1.120 NFA 2021 0.280 DETLDES 0.280 AQC:EXEMPT SARATOGA TPC : $15-$25 M TOTAL 4YR COST : 17.400 0.200 17.200 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 3 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT US BRIDGE OVER I-90 (EXIT 11), BRIDGE REPLACEMENT NHPP 2021 0.400 DETLDES 0.400 NFA 2021 0.100 DETLDES 0.100 104357 TOWN OF SCHODACK, RENSSELAER COUNTY, BIN 1092730. R315 NHPP 2021 0.400 PRELDES 0.400 NFA 2021 0.100 PRELDES 0.100 NHPP 2022 0.748 CONINSP 0.748 NFA 2022 0.187 CONINSP 0.187 NHPP 2022 7.185 CONST 7.185 NFA 2022 1.797 CONST 1.797 AQC:A19P RENSSELAER TPC : $9.5-15.5 M TOTAL 4YR COST : 10.917 0.000 1.000 9.917 0.000

TN OF EAST US RT. 9 AND 20 SIDEWALK CONSTRUCTION FROM BRUEN COURT TO NFA 2021 0.006 CONST 0.006 GREENBUSH THE RENSSELAER CITY LINE. STBG LG URB 2021 0.070 CONINSP 0.070 104358 NFA 2021 0.018 CONINSP 0.018 TOWN OF EAST GREENBUSH, RENSSELAER COUNTY. R309 STBG LG URB 2021 0.470 CONST 0.470 NFA 2021 0.117 CONST 0.117 AQC:C2P RENSSELAER TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.681 0.000 0.681 0.000 0.000

NYSDOT ROUTE 9 OVER ROGERS BROOK, BIN 1005790, BRIDGE REPAIR OR NHPP 2021 0.110 PRELDES 0.110 REPLACEMENT. TOWN OF SCHROON, ESSEX COUNTY. E NFA 2021 0.027 PRELDES 0.027 104360 NHPP 2022 0.154 CONINSP 0.154 NFA 2022 0.038 CONINSP 0.038 NHPP 2022 1.182 CONST 1.182 NFA 2022 0.295 CONST 0.295 NHPP 2021 0.110 DETLDES 0.110 NFA 2021 0.027 DETLDES 0.027 AQC:EXEMPT ESSEX TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.943 0.000 0.274 1.669 0.000

NYSDOT NY RT 378 OVER HUDSON, BRIDGE PAINTING STBG LG URB 2023 0.456 CONINSP 0.456 NFA 2023 0.114 CONINSP 0.114 104517 VILLAGE OF MENANDS AND CITY OF TROY, ALBANY COUNTY AND STBG LG URB 2023 4.582 CONST 4.582 RENSSELAER COUNTY, BIN 1062850. A600 NFA 2023 1.146 CONST 1.146 STBG LG URB 2021 0.204 PRELDES 0.204 NFA 2021 0.051 PRELDES 0.051 STBG LG URB 2022 0.240 DETLDES 0.240 NFA 2022 0.060 DETLDES 0.060 AQC:A19Z MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 6.853 0.000 0.255 0.300 6.298 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 4 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT NY 378 TROY MENANDS BRIDGE STUDY NHPP 2021 0.693 PRELDES 0.693 NFA 2021 0.173 PRELDES 0.173 104518 BRIDGE REPLACEMENT STUDY: EVALUATE OPTIONS TO RELOCATE THE BRIDGE TO A LOCATION TBD. BIKE/PED ACCOMMODATIONS WILL BE EVALUATED.

VILLAGE OF MENANDS AND CITY OF TROY, ALBANY & RENSSELAER COUNTY, A605 & R344 AQC:C3Z MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.866 0.000 0.866 0.000 0.000

NYSDOT I-787 NB RAMP TO SOUTH MALL EXPRESSWAY WESTBOUND, ELEMENT NHPP 2020 0.900 CONINSP 0.900 SPECIFIC BRIDGE REPAIR TO ADDRESS CONDITION RATING NFA 2020 0.100 CONINSP 0.100 105177 NHPP 2020 8.675 CONST 8.675 CITY OF ALBANY, ALBANY COUNTY, BIN 109299A. A572 NFA 2020 0.964 CONST 0.964 AQC:A19P ALBANY TPC : $9.5-15.5 M TOTAL 4YR COST : 10.639 10.639 0.000 0.000 0.000

NYSDOT ALBANY SKYWAY (ALBANY CORNING PRESERVE BICYCLE & HPP 2020 1.920 CONST 1.920 PEDESTRIAN CONNECTOR RAMP). NFA 2020 0.480 CONST 0.480 105182 NFA 2020 2.800 CONST 2.800 CONVERTS NB I-787 RAMP FROM QUAY STREET TO CLINTON AVENUE NHPP 2020 0.572 CONST 0.572 TO A LINEAR PARK, CONNECTING BROADWAY TO THE CORNING NFA 2020 0.143 CONST 0.143 TAP FLEX 2020 0.640 CONINSP 0.640 PRESERVE NFA 2020 0.160 CONINSP 0.160 TAP FLEX 2020 4.360 CONST 4.360 CITY OF ALBANY, ALBANY COUNTY. A588 NFA 2020 1.090 CONST 1.090 STBG LG URB 2021 0.240 CONINSP 0.240 REPURPOSED DEMO ID NY060 PROGRAM CODE RPS0 NFA 2021 0.060 CONINSP 0.060 STBG LG URB 2021 1.108 CONST 1.108 NFA 2021 0.277 CONST 0.277 AQC:K1P ALBANY TPC : $12.5-$19 M TOTAL 4YR COST : 13.850 12.165 1.685 0.000 0.000

NYSDOT I-787 PAVEMENT CORRECTIVE MAINTENANCE, FROM EXIT 3B TO EXIT 7 NHPP 2020 0.383 CONINSP 0.383 NFA 2020 0.043 CONINSP 0.043 105183 CITY OF ALBANY AND VILLAGE OF MENANDS, ALBANY COUNTY. A597 NHPP 2020 3.825 CONST 3.825 NFA 2020 0.425 CONST 0.425 AQC:A10Z ALBANY TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.676 4.676 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 5 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT DUNN BRIDGE WB TO I-787 SB: ELEMENT SPECIFIC REPAIRS NHPP 2020 0.640 PRELDES 0.640 NFA 2020 0.160 PRELDES 0.160 105185 THE REDUCTION IN NHPP REFLECTS CDTC TRADING $4.65M OF NHPP NHPP 2021 0.640 DETLDES 0.640 FOR HSIP NFA 2021 0.160 DETLDES 0.160 NHPP 2023 1.958 CONINSP 1.958 2023 0.218 CONINSP 0.218 CITY OF ALBANY, ALBANY COUNTY, BIN 109294A. A595 NFA NHPP 2023 16.200 CONST 16.200 NFA 2023 1.800 CONST 1.800 AQC:A19Z ALBANY TPC : $21-$31 M TOTAL 4YR COST : 21.776 0.800 0.800 0.000 20.176

NYSDOT CARMAN ROAD SAFETY ENHANCEMENTS HSIP 2020 0.297 PRELDES 0.297 NFA 2020 0.033 PRELDES 0.033 108540 TWO (ONE AT CARMAN ROAD AND LYDIUS STREET AND HSIP 2021 0.675 CONINSP 0.675 ONE AT CARMAN ROAD AND THE RAMP TO I-890/I-90) NFA 2021 0.075 CONINSP 0.075 HSIP 2021 4.500 CONST 4.500 NFA 2021 0.500 CONST 0.500 TOWNS OF GUILDERLAND & ROTTERDAM, ALBANY & SCHENECTADY HSIP 2021 0.225 DETLDES 0.225 COUNTY, A583 & S272 NFA 2021 0.025 DETLDES 0.025 HSIP 2021 0.562 ROWACQU 0.562 THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE NFA 2021 0.062 ROWACQU 0.062 BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER HSIP 2020 0.051 ROWINCD 0.051 AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER NFA 2020 0.005 ROWINCD 0.005

ALL BUT $4.650M OF THESE FUNDS ARE FROM A STATEWIDE SOLICITATION AND DO NOT COUNT AGAINST CDTC - ' CORE' FUNDING. THE $4.65M HSIP REFLECTS CDTC TRADING $4.65M OF NHPP FOR HSIP. AQC:D2P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 7.010 0.386 6.624 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 6 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT NY RT.146 AND CLIFTON COUNTRY ROAD INTERSECTION: SAFETY HSIP 2020 0.450 PRELDES 0.450 PROJECT (RM 146 1504 1063-1068), HIGH ACCIDENT LOCATION NFA 2020 0.050 PRELDES 0.050 108544 HSIP 2021 0.315 DETLDES 0.315 INCLUDES RECONSTRUCTING THE INTERSECTION AND REBUILDING NFA 2021 0.035 DETLDES 0.035 HSIP 2023 0.327 CONINSP 0.327 THE SIGNAL, IMPROVED PEDESTRIAN ACCOMMODATIONS, AND 2023 0.036 CONINSP 0.036 RESURFACING AND RESTRIPING FROM TALLOW WOOD TO PLANK ROAD. NFA HSIP 2023 3.272 CONST 3.272 NFA 2023 0.364 CONST 0.364 THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER

TOWN OF CLIFTON PARK, SARATOGA COUNTY. SA319 AQC:A6Z SARATOGA TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.849 0.500 0.350 0.000 3.999

TN OF CLIFTON NY 146 AND NY 146A BICYCLE AND PEDESTRIAN ACCESS STBG FLEX 2022 0.073 DETLDES 0.073 PARK IMPROVEMENTS, INTERSECTION OF NY 146 AND NY 146A (VISCHER NFA 2022 0.018 DETLDES 0.018 108548 FERRY RD). STBG FLEX 2022 0.073 PRELDES 0.073 NFA 2022 0.018 PRELDES 0.018 1) NEW CURBING AND SIDEWALK & 10-FOOT WIDE MULTI-USE PATH ON NY 146 NORTH SIDE 2) 10-FOOT WIDE MULTI-USE PATH ON EAST SIDE OF VISCHER FERRY RD (CR 90) 3) ADD RECTANGULAR RAPID FLASHING BEACONS AT TWO INTERSECTIONS 4) PEDESTRIAN COUNTDOWN TIMERS WITH PUSH BUTTONS AT NY 146 AND SCHOOL DRIVE 5) BICYCLE SYMBOLS ON NY 146 SHOULDERS.

TOWN OF CLIFTON PARK, SARATOGA COUNTY, SA323 AQC:C2Z SARATOGA TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.182 0.000 0.000 0.182 0.000

TN OF CARMAN ROAD SIDEWALKS, OKARA DRIVE TO JUST SOUTH OF EAST OLD STBG LG URB 2022 0.035 PRELDES 0.035 GUILDERLAND STATE ROAD. NFA 2022 0.009 PRELDES 0.009 108549 STBG LG URB 2023 0.046 CONINSP 0.046 CONSTRUCT A 5-FOOT CONCRETE SIDEWALK ON THE EAST SIDE OF NFA 2023 0.012 CONINSP 0.012 STBG LG URB 2023 0.385 CONST 0.385 CARMAN ROAD. NFA 2023 0.097 CONST 0.097 STBG LG URB 2022 0.035 DETLDES 0.035 TOWN OF GUILDERLAND, ALBANY COUNTY. A604 NFA 2022 0.009 DETLDES 0.009 AQC:C2Z ALBANY TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.628 0.000 0.000 0.088 0.540 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 7 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ROUTE 4 CULVERT C180001, ROUTE 4 OVER SLOCUM CREEK. LARGE STBG FLEX 2020 0.080 DETLDES 0.080 CULVERT REPLACEMENT PROJECT - CURRENTLY CIN C180001, FUTURE NFA 2020 0.020 DETLDES 0.020 108977 STRUCTURE WILL EXCEED 20’ CLEAR SPAN AND BE CLASSIFIED AS A STBG FLEX 2021 0.080 CONINSP 0.080 BRIDGE. LOCATED AT RM ROUTE 4 1803-1018, TOWN OF GREENWICH, NFA 2021 0.020 CONINSP 0.020 STBG FLEX 2021 0.904 CONST 0.904 WASHINGTON COUNTY. NFA 2021 0.226 CONST 0.226 AQC:EXEMPT WASHINGTON TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.330 0.100 1.230 0.000 0.000

NYSDOT US 4 & I-90 INTERSECTION SAFETY ENHANCEMENTS HSIP 2020 0.263 PRELDES 0.263 NFA 2020 0.029 PRELDES 0.029 108979 THE LOCAL FUNDS WERE ADDED AS DEVELOPER MITIGATION FUNDING HSIP 2021 0.263 DETLDES 0.263 FOR CAPACITY ENHANCEMENTS AT THE FOLLOWING INTERSECTIONS: NFA 2021 0.029 DETLDES 0.029 2021 0.015 ROWACQU 0.015 US 4 & HAMPTON INN DRIVE, US 4 & NY 151, AND NY 151 & TEMPEL NFA HSIP 2021 0.315 CONINSP 0.315 LANE NFA 2021 0.035 CONINSP 0.035 HSIP 2021 3.150 CONST 3.150 THE REGION 1 SAFETY EVALUATION ENGINEER HAS EVALUATED THE NFA 2021 0.350 CONST 0.350 ROUTE 4/I-90 INTERSECTION SAFETY ENHANCEMENT AND THE REGION NFA 2021 0.350 CONINSP 0.350 1 TRAFFIC ENGINEER APPROVES THE USE OF HSIP FUNDS FOR THIS NFA 2021 1.900 CONST 1.900 PORTION OF THE PROJECT.

TOWN OF EAST GREENBUSH, RENSSELAER COUNTY. R340 AQC:D1Z RENSSELAER TPC : $6-$9.4 M TOTAL 4YR COST : 6.699 0.292 6.407 0.000 0.000

NYSDOT PHASE TWO OF NEW YORK'S FIRST EVER COMPREHENSIVE PEDESTRIAN HSIP 2020 0.350 CONINSP 0.350 SAFETY ACTION PLAN. THIS FIVE-YEAR, MULTI-AGENCY INITIATIVE HSIP 2020 2.200 CONST 2.200 10PS02 PROVIDES NEW YORK STATE DEPARTMENT OF TRANSPORTATIONS' REGION ONE (ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, AND WASHINGTON COUNTIES) WITH $3.2 MILLION TO IMPROVE SAFETY FOR PEDESTRIANS THROUGH INFRASTRUCTURE IMPROVEMENTS, PUBLIC EDUCATION EFFORTS, AND INCREASED LAW ENFORCEMENT EFFORTS, AND INSTALL SYSTEMIC PEDESTRIAN SAFETY FEATURES AT LOCATIONS IDENTIFIED IN THE PEDESTRIAN SAFETY ACTION PLAN (PSAP). THE NEW YORK STATE DEPARTMENT OF HEALTH AND THE GOVERNOR'S TRAFFIC SAFETY COMMITTEE ARE PARTNERS WITH NYSDOT IN THIS INITIATIVE. AQC:EXEMPT MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.550 2.550 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 8 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT CULVERT REPLACEMENT (BRIDGE PROJECT): ROUTE 74 CULVERT STBG FLEX 2020 0.280 PRELDES 0.280 C120086, ROUTE 74 OVER EAGLE LAKE CHANNEL. THIS IS LOCATED AT NFA 2020 0.070 PRELDES 0.070 111002 RM ROUTE 74 1201-1113, TOWN OF CROWN POINT, ESSEX COUNTY. STBG FLEX 2021 0.224 CONINSP 0.224 THIS LARGE CULVERT IS GOING TO BE REPLACED WITH A BRIDGE (THE NFA 2021 0.056 CONINSP 0.056 STBG FLEX 2021 1.600 CONST 1.600 NEW CLEAR SPAN IS (Formerly PIN: 104359) NFA 2021 0.400 CONST 0.400 STBG FLEX 2021 0.160 DETLDES 0.160 NFA 2021 0.040 DETLDES 0.040 AQC:EXEMPT ESSEX TPC : $2-$4 M TOTAL 4YR COST : 2.830 0.350 2.480 0.000 0.000

NYSDOT US ROUTE 20 OVER , ELEMENT SPECIFIC REPAIRS NHPP 2020 0.215 PRELDES 0.215 NFA 2020 0.054 PRELDES 0.054 111141 INCLUDES ADA UPGRADES TO CURBS AND SIDEWALKS. NHPP 2021 0.215 DETLDES 0.215 NFA 2021 0.054 DETLDES 0.054 NHPP 2022 0.164 CONINSP 0.164 TOWN OF DUANESBURG, SCHENECTADY COUNTY, BIN 1054370. S260 NFA 2022 0.041 CONINSP 0.041 NHPP 2022 1.636 CONST 1.636 THESE FUNDS ARE FROM THE DOT MAIN OFFICE, NOT CDTC/REGION NFA 2022 0.409 CONST 0.409 ONE. AQC:A19Z SCHENECTADY TPC : $2-$4 M TOTAL 4YR COST : 2.788 0.269 0.269 2.250 0.000

NYSDOT ROUTE 9N OVER STYLES BROOK, BIN 1007000. TOWN OF KEENE, ESSEX NHPP 2022 0.091 PRELDES 0.091 COUNTY. BRIDGE REPLACEMENT PROJECT. NFA 2022 0.023 PRELDES 0.023 111659 NHPP 2023 0.091 DETLDES 0.091 NFA 2023 0.023 DETLDES 0.023 AQC:EXEMPT ESSEX TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.228 0.000 0.000 0.114 0.114

NYSDOT RT. 23 OVER CSX RR, BRIDGE REPLACEMENT, BIN 1017810. TOWN OF NHPP 2022 0.400 DETLDES 0.400 CATSKILL, GREENE COUNTY. NFA 2022 0.100 DETLDES 0.100 112057 NHPP 2023 0.615 CONINSP 0.615 NFA 2023 0.155 CONINSP 0.155 NHPP 2023 4.401 CONST 4.401 NFA 2023 1.099 CONST 1.099 NFA 2020 2.066 PRELDES 2.066 AQC:N/A GREENE TPC : $7.5-$12 M TOTAL 4YR COST : 8.836 2.066 0.000 0.500 6.270 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 9 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT ROUTE 23A OVER , BIN 1018020. TOWN OF NHPP 2020 0.480 PRELDES 0.480 CATSKILL, GREENE COUNTY. BRIDGE REPLACEMENT PROJECT. NFA 2020 0.120 PRELDES 0.120 112442 NHPP 2023 0.294 CONINSP 0.294 NFA 2023 0.073 CONINSP 0.073 NHPP 2023 2.098 CONST 2.098 NFA 2023 0.524 CONST 0.524 NHPP 2022 0.210 DETLDES 0.210 NFA 2022 0.052 DETLDES 0.052 AQC:EXEMPT GREENE TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.851 0.600 0.000 0.262 2.989

NYSDOT BIN 1017210, RT. 22 OVER BOQUET RIVER, WHALLONSBURG BRIDGE, NHPP 2022 0.140 DETLDES 0.140 TOWN OF ESSEX, ESSEX COUNTY. BRIDGE REPAIR PROJECT. NFA 2022 0.035 DETLDES 0.035 113074 NHPP 2023 0.423 CONINSP 0.423 NFA 2023 0.106 CONINSP 0.106 NHPP 2023 2.800 CONST 2.800 NFA 2023 0.700 CONST 0.700 NFA 2020 0.200 PRELDES 0.200 AQC:EXEMPT ESSEX TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.404 0.200 0.000 0.175 4.029

ALBANY CO NY 155/CR 157 NEW KARNER ROAD CORRIDOR REHABILITATION, FROM STBG LG URB 2023 0.368 CONINSP 0.368 US 20 TO WATERVLIET SHAKER ROAD. NFA 2023 0.092 CONINSP 0.092 113216 STBG LG URB 2023 3.681 CONST 3.681 INCLUDES SAFETY AND COMPLETE STREETS IMPROVEMENTS. NFA 2023 0.920 CONST 0.920 STBG LG URB 2022 0.184 PRELDES 0.184 NFA 2022 0.046 PRELDES 0.046 TOWNS OF GUILDERLAND AND COLONIE, CITY OF ALBANY AND STBG LG URB 2022 0.184 DETLDES 0.184 VILLAGE OF COLONIE, ALBANY COUNTY. A295 NFA 2022 0.046 DETLDES 0.046 AQC:A10Z ALBANY TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.521 0.000 0.000 0.460 5.061

NYSDOT ROUTE 67 OVER B&M RR BRIDGE REPLACEMENT. NHPP 2022 0.360 PRELDES 0.360 NFA 2022 0.090 PRELDES 0.090 118839 TOWN OF SCHAGHTICOKE, RENSSELAER COUNTY. BIN 1303390. R330 NHPP 2023 0.360 DETLDES 0.360 NFA 2023 0.090 DETLDES 0.090 NHPP 2022 0.040 ROWINCD 0.040 NFA 2022 0.010 ROWINCD 0.010 NHPP 2023 0.160 ROWACQU 0.160 NFA 2023 0.040 ROWACQU 0.040 AQC:A19Z RENSSELAER TPC : $6-$9.4 M TOTAL 4YR COST : 1.150 0.000 0.000 0.500 0.650 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 10 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT RT. 9L PAVING FROM THE CITY LINE TO QUAKER RD. AND FROM HPP 2020 0.120 CONINSP 0.120 SUNNYSIDE RD. TO CLEMENTS RD. TOWN OF QUEENSBURY, WARREN NFA 2020 0.030 CONINSP 0.030 121807 COUNTY. REPURPOSE EARMARK DEMO ID NY060, FUND RPS0 HPP 2020 0.880 CONST 0.880 NFA 2020 0.220 CONST 0.220 STBG FLEX 2020 0.032 CONINSP 0.032 NFA 2020 0.008 CONINSP 0.008 STBG FLEX 2020 0.320 CONST 0.320 NFA 2020 0.080 CONST 0.080 AQC:N/A WARREN TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.690 1.690 0.000 0.000 0.000

NYSDOT I-87 EXIT 6 INTERCHANGE SAFETY IMPROVEMENTS HSIP 2021 0.155 DETLDES 0.155 NFA 2021 0.019 DETLDES 0.019 130682 STATE ROUTE 7 INTERCHANGE WITH INTERSTATE-87. ADD MERGE HSIP 2021 0.155 PRELDES 0.155 LANE ON BOTH ON-RAMPS TO I-87. NFA 2021 0.019 PRELDES 0.019 HSIP 2022 0.159 CONINSP 0.159 NFA 2022 0.018 CONINSP 0.018 THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE HSIP 2022 1.326 CONST 1.326 BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER NFA 2022 0.147 CONST 0.147 AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER

TOWN OF COLONIE, ALBANY COUNTY. A602 AQC:A19Z ALBANY TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.998 0.000 0.348 1.650 0.000

NYSDOT REPLACE THE BRIDGE CARRYING ROUTE 81 OVER TEN MILE CREEK (BIN NFA 2021 0.002 ROWINCD 0.002 1031010), TOWN OF DURHAM, GREENE COUNTY. REPLACE BRIDGE STBG FLEX 2020 0.200 PRELDES 0.200 135013 CARRYING STATE ROUTE 9W OVER (BIN 1007560), NFA 2020 0.300 PRELDES 0.300 TOWN OF COEYMANS, ALBANY COUNTY. NFA 2021 0.005 ROWACQU 0.005 STBG FLEX 2021 0.240 CONINSP 0.240 NFA 2021 0.360 CONINSP 0.360 STBG FLEX 2021 1.200 CONST 1.200 NFA 2021 1.800 CONST 1.800 STBG FLEX 2021 0.080 DETLDES 0.080 NFA 2021 0.120 DETLDES 0.120 AQC:N/A GREENE TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.307 0.500 3.807 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 11 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT IMPROVE THE RESILIENCY AND SAFETY OF THE STATE ROUTE 73 STBG FLEX 2021 0.800 DETLDES 0.800 CORRIDOR IN THE VICINITY OF THE CASCADE LAKES, STABILIZATION NFA 2021 0.200 DETLDES 0.200 138320 OF ROADSIDE SLOPES, INSTALLATION OF PERMANENT RAIL WITH STBG FLEX 2021 2.400 CONINSP 2.400 APPROPRIATE DEFLECTION DISTANCE BASED ON THE LOCATION, AND NFA 2021 0.600 CONINSP 0.600 STBG FLEX 2021 12.000 CONST 12.000 REHABILITATION OF THE PAVEMENT. REHABILITATION OF NFA 2021 3.000 CONST 3.000 DETERIORATED RETAINING WALLS, SLOPES, AND SECTIONS OF ROUTE STBG FLEX 2021 0.004 ROWINCD 0.004 73 PRONE TO EROSION AND POTENTIAL WASHOUT IN HEAVY NFA 2021 0.001 ROWINCD 0.001 PRECIPITATION. OTHER ISOLATED LOCATIONS TO BE INCLUDED STBG FLEX 2022 0.160 ROWACQU 0.160 BETWEEN ROUTE 9 AND THE CASCADE LAKES TO REPAIR SIMILAR NFA 2022 0.040 ROWACQU 0.040 DETERIORATED BARRIER. TOWNS OF KEENE AND NORTH ELBA, ESSEX COUNTY. AQC:N/A ESSEX TPC : $15-$25 M TOTAL 4YR COST : 19.205 0.000 19.005 0.200 0.000

NYSDOT I-890 BRIDGES OVER ERIE BLVD AND BROADWAY, ELEMENT SPECIFIC NHPP 2020 0.450 PRELDES 0.450 REPAIRS. NFA 2020 0.050 PRELDES 0.050 152539 NHPP 2021 0.450 DETLDES 0.450 CITY OF SCHENECTADY, SCHENECTADY COUNTY BINS 1049921 AND NFA 2021 0.050 DETLDES 0.050 NHPP 2021 1.350 CONINSP 1.350 1049922. S264 NFA 2021 0.150 CONINSP 0.150 NHPP 2021 11.700 CONST 11.700 $3.5M MATCHED OF CONST IS FROM MAIN OFFICE, NOT CDTC/REGION NFA 2021 1.300 CONST 1.300 ONE AQC:A19Z SCHENECTADY TPC : $12.5-$19 M TOTAL 4YR COST : 15.500 0.500 15.000 0.000 0.000

NYSDOT EVERETT ROAD OVER I-90, ELEMENT SPECIFIC BRIDGE REPAIRS NHPP 2021 0.400 PRELDES 0.400 NFA 2021 0.100 PRELDES 0.100 152883 INCLUDES WIDENEING SHOULDERS AND ADDING SIDEWALKS NHPP 2023 0.400 DETLDES 0.400 NFA 2023 0.100 DETLDES 0.100 CITY OF ALBANY, ALBANY COUNTY, BIN 1034529. A596 AQC:A19Z ALBANY TPC : $9.5-15.5 M TOTAL 4YR COST : 1.000 0.000 0.500 0.000 0.500 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 12 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT I-90 PAVEMENT CORRECTIVE MAINTENANCE NHPP 2020 0.270 DETLDES 0.270 NFA 2020 0.030 DETLDES 0.030 152887 TO EXIT 10 NHPP 2020 0.270 PRELDES 0.270 NFA 2020 0.030 PRELDES 0.030 TOWN OF EAST GREENBUSH, TOWN OF NORTH GREENBUSH, TOWN OF NHPP 2023 0.595 CONINSP 0.595 2023 0.066 CONINSP 0.066 RENSSELAER, TOWN OF SCHODAK, RENSSELAER COUNTY. R342 NFA NHPP 2023 5.946 CONST 5.946 NFA 2023 0.661 CONST 0.661 AQC:A10Z RENSSELAER TPC : $7.5-$12 M TOTAL 4YR COST : 7.868 0.600 0.000 0.000 7.268

NYSDOT I-90 PAVEMENT CORRECTIVE MAINTENANCE NHPP 2021 0.270 DETLDES 0.270 NFA 2021 0.030 DETLDES 0.030 152888 EXIT 10 TO NYS THRUWAY NHPP 2020 0.270 PRELDES 0.270 NFA 2020 0.030 PRELDES 0.030 NHPP 2021 0.666 CONINSP 0.666 TOWN OF SCHODACK, RENSSELAER COUNTY. R341 NFA 2021 0.074 CONINSP 0.074 NHPP 2021 6.480 CONST 6.480 NFA 2021 0.720 CONST 0.720 AQC:A10Z RENSSELAER TPC : $7.5-$12 M TOTAL 4YR COST : 8.540 0.300 8.240 0.000 0.000

NYSDOT I-87 OVER ROUTE 9, BINS 1005741 AND 1005742, BRIDGE REPAIR, TOWN NHPP 2020 0.300 DETLDES 0.300 OF LAKE GEORGE, WARREN COUNTY WAR177 NFA 2020 0.030 DETLDES 0.030 172246 NHPP 2023 0.600 CONINSP 0.600 NFA 2023 0.075 CONINSP 0.075 NHPP 2023 7.000 CONST 7.000 NFA 2023 0.700 CONST 0.700 AQC:N/A WARREN TPC : $7.5-$12 M TOTAL 4YR COST : 8.705 0.330 0.000 0.000 8.375

NYSDOT REHABILITATE THE EXISTING BRIDGE DECK FOR THE I-87 EXIT 32 NB NHPP 2021 0.189 CONINSP 0.189 OFF RAMP. TOWN OF LEWIS, ESSEX COUNTY. NFA 2021 0.021 CONINSP 0.021 172255 NHPP 2021 1.350 CONST 1.350 NFA 2021 0.150 CONST 0.150 NHPP 2021 0.135 DETLDES 0.135 NFA 2021 0.015 DETLDES 0.015 AQC:EXEMPT ESSEX TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.860 0.000 1.860 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 13 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT I-87 RESURFACING EXIT 11 TO SARATOGA SPRINGS CITY LINE (SOUTH) NHPP 2020 0.358 CONINSP 0.358 NFA 2020 0.040 CONINSP 0.040 172257 TOWN OF MALTA, TOWN OF ROUND LAKE, SARATOGA COUNTY. SA321 NHPP 2020 3.778 CONST 3.778 NFA 2020 0.419 CONST 0.419 AQC:A10Z SARATOGA TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.595 4.595 0.000 0.000 0.000

NYSDOT I-87 RESURFACING SARATOGA SPRINGS CITY LINE (SOUTH) TO EXIT 15 NHPP 2020 0.135 DETLDES 0.135 NFA 2020 0.015 DETLDES 0.015 172258 TOWN OF MALTA, CITY OF SARTOGA SPRINGS, TOWN OF WILTON, NHPP 2021 0.333 CONINSP 0.333 SARATOGA COUNTY. SA315 NFA 2021 0.037 CONINSP 0.037 NHPP 2021 3.465 CONST 3.465 NFA 2021 0.385 CONST 0.385 AQC:A10Z SARATOGA TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.370 0.150 4.220 0.000 0.000

NYSDOT I-87 RESURFACING EXIT 15-16 NHPP 2022 0.333 CONINSP 0.333 NFA 2022 0.037 CONINSP 0.037 172259 THE NHPP FUNDS ARE FROM STATEWIDE NHPP, NOT REGION ONE OR NHPP 2022 3.780 CONST 3.780 CDTC NFA 2022 0.420 CONST 0.420 NHPP 2021 0.135 PRELDES 0.135 NFA 2021 0.015 PRELDES 0.015 TOWN OF WILTON, SARATOGA COUNTY. SA316 NHPP 2021 0.120 DETLDES 0.120 NFA 2021 0.030 DETLDES 0.030 AQC:A10Z SARATOGA TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.870 0.000 0.300 4.570 0.000

NYSDOT I-87 EXIT 16 TO CDTC PLANNING AREA BOUNDARY: RESURFACING NHPP 2023 0.135 DETLDES 0.135 NFA 2023 0.015 DETLDES 0.015 172260 TOWN OF WILTON, SARATOGA COUNTY. SA320 NHPP 2023 0.135 PRELDES 0.135 NFA 2023 0.015 PRELDES 0.015 AQC:A10Z SARATOGA TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.300 0.000 0.000 0.000 0.300

NYSDOT PAVEMENT RESURFACING, MEDIAN GUIDERAIL INSTALLATION, AND NHPP 2021 1.485 CONINSP 1.485 RUSTIC GUIDERAIL REPLACEMENT, I-87 FROM EXIT 26 (POTTERSVILLE) NFA 2021 0.165 CONINSP 0.165 172261 TO EXIT 28 (SCHROON LAKE). TOWNS OF CHESTER AND SCHROON, NHPP 2021 10.350 CONST 10.350 WARREN AND ESSEX COUNTIES. NFA 2021 1.150 CONST 1.150 NHPP 2020 0.045 PRELDES 0.045 NFA 2020 0.005 PRELDES 0.005 NHPP 2021 0.045 DETLDES 0.045 NFA 2021 0.005 DETLDES 0.005 AQC:EXEMPT MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 13.250 0.050 13.200 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 14 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT I-87 RESURFACING FROM EXIT 29 (NORTH HUDSON) TO EXIT 31 NHPP 2022 0.630 CONINSP 0.630 (ELIZABETHTOWN), ESSEX COUNTY, IN THE TOWNS OF NFA 2022 0.070 CONINSP 0.070 172262 ELIZABETHTOWN, MORIAH, NORTH HUDSON, WESTPORT. NHPP 2022 6.300 CONST 6.300 NFA 2022 0.700 CONST 0.700 NHPP 2021 0.045 PRELDES 0.045 NFA 2021 0.005 PRELDES 0.005 NHPP 2022 0.045 DETLDES 0.045 NFA 2022 0.005 DETLDES 0.005 AQC:EXEMPT ESSEX TPC : $6-$9.4 M TOTAL 4YR COST : 7.800 0.000 0.050 7.750 0.000

NYSDOT I-87 RESURFACING EXIT 31 (ELIZABETHTOWN) TO CLINTON COUNTY NHPP 2021 0.045 PRELDES 0.045 LINE, ESSEX COUNTY, IN THE TOWNS OF CHESTERFIELD, LEWIS, NFA 2021 0.005 PRELDES 0.005 172263 WESTPORT. NHPP 2023 0.284 CONINSP 0.284 NFA 2023 0.032 CONINSP 0.032 NHPP 2023 2.835 CONST 2.835 NFA 2023 0.315 CONST 0.315 NHPP 2023 0.045 DETLDES 0.045 NFA 2023 0.005 DETLDES 0.005 AQC:EXEMPT ESSEX TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.566 0.000 0.050 0.000 3.516

NYSDOT I87 RESURFACING, EXIT 24-26, TOWN OF BOLTON, WARREN COUNTY NHPP 2023 0.330 CONINSP 0.330 NFA 2023 0.033 CONINSP 0.033 172270 NHPP 2023 3.330 CONST 3.330 NFA 2023 0.315 CONST 0.315 NHPP 2022 0.090 DETLDES 0.090 NFA 2022 0.010 DETLDES 0.010 NHPP 2022 0.090 PRELDES 0.090 NFA 2022 0.010 PRELDES 0.010 AQC:N/A WARREN TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.208 0.000 0.000 0.200 4.008

NYSDOT INTERSTATE 87 RESURFACING, EXIT 16 TO HUDSON RIVER, TOWN OF NHPP 2022 0.160 PRELDES 0.160 MOREAU, SARATOGA COUNTY NFA 2022 0.016 PRELDES 0.016 172271 NHPP 2023 0.160 DETLDES 0.160 NFA 2023 0.016 DETLDES 0.016 AQC:EXEMPT SARATOGA TPC : $4.6-$7.5 M TOTAL 4YR COST : 0.352 0.000 0.000 0.176 0.176 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 15 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT COUNTY ROUTE 11 OVER INTERSTATE 87 (EXIT 24) BRIDGE NHPP 2021 0.400 DETLDES 0.400 REPLACEMENT, BIN 1053680. TOWN OF WARRENSBURG, WARREN NFA 2021 0.100 DETLDES 0.100 172272 COUNTY. NHPP 2023 0.400 CONINSP 0.400 NFA 2023 0.100 CONINSP 0.100 NHPP 2023 3.600 CONST 3.600 NFA 2023 0.900 CONST 0.900 AQC:EXEMPT WARREN TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.500 0.000 0.500 0.000 5.000

NYSDOT SITTERLY RD OVER I-87, BRIDGE REPLACE, BIN 1033210, TOWN OF NFA 2021 1.000 PRELDES 1.000 CLIFTON PARK, SARATOGA COUNTY NFA 2021 0.030 ROWINCD 0.030 172274 NHPP 2021 0.450 DETLDES 0.450 NHPP FUNDS ARE FROM STATEWIDE, NOT CDTC OR REGION ONE NFA 2021 0.050 DETLDES 0.050 NHPP 2021 0.108 ROWACQU 0.108 NFA 2021 0.012 ROWACQU 0.012 NHPP 2021 1.350 CONINSP 1.350 NFA 2021 0.135 CONINSP 0.135 NHPP 2021 5.670 CONST 5.670 NFA 2021 0.630 CONST 0.630 AQC:EXEMPT SARATOGA TPC : $7.5-$12 M TOTAL 4YR COST : 9.435 0.000 9.435 0.000 0.000

CITY OF TROY SOUTH TROY INDUSTRIAL PARK ROAD PHASE I (SOUTHERN END) NFA 2020 1.200 CONST 1.200 STBG FLEX 2020 0.240 CONINSP 0.240 175459 IMPROVE EXISTING EAST INDUSTRIAL PARKWAY FROM MAIN STREET/ NFA 2020 0.060 CONINSP 0.060 BURDEN AVENUE (US 4) TO NORTHERN TERMINUS AND CONSTRUCT A STBG FLEX 2020 2.031 CONST 2.031 NEW TWO-LANE ROAD FROM THERE TO MONROE STREET, INCLUDING NFA 2020 0.508 CONST 0.508 SIDEWALKS AND BIKE LANES.

CITY OF TROY, RENSSELAER COUNTY. FINAL TREATMENTS WILL BE IDENTIFIED IN THE DESIGN PROCESS. R195 AQC:EXEMPT RENSSELAER TPC : $9.5-15.5 M TOTAL 4YR COST : 4.039 4.039 0.000 0.000 0.000

LOCAL BRIDGE REPAIR OR REPLACEMENT TO ADDRESS CONDITION RATING, STBG FLEX 2023 0.232 CONINSP 0.232 CR10 (MIDDLETON BRIDGE) OVER , BIN 3305150, TOWN NFA 2023 0.059 CONINSP 0.059 175527 OF BOLTON AND TOWN OF WARRENSBURG, WARREN COUNTY WAR100 STBG FLEX 2023 2.720 CONST 2.720 NFA 2023 0.680 CONST 0.680 STBG-OFF 2022 0.098 ROWACQU 0.098 NFA 2022 0.028 ROWACQU 0.028 AQC:N/A WARREN TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.817 0.000 0.000 0.126 3.691 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 16 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL BRIDGE SUPERSTRUCTURE REPLACEMENT TO ADDRESS CONDITION STBG-OFF 2022 0.164 CONINSP 0.164 RATING, CR61, SHUSHAN OVER BATTENKILL, BIN 3306450, WASHINGTON NFA 2022 0.041 CONINSP 0.041 175528 COUNTY WAS103 STBG-OFF 2022 1.639 CONST 1.639 NFA 2022 0.410 CONST 0.410 STBG-OFF 2020 0.016 ROWINCD 0.016 NFA 2020 0.004 ROWINCD 0.004 STBG-OFF 2021 0.048 ROWACQU 0.048 NFA 2021 0.012 ROWACQU 0.012 AQC:N/A WASHINGTON TPC : $2-$4 M TOTAL 4YR COST : 2.334 0.020 0.060 2.254 0.000

CDTC CDTC PROJECT DEVELOPMENT SUPPORT NHPP 2020 0.054 PRELDES 0.054 NFA 2020 0.013 PRELDES 0.013 175563 THIS IS FOR PROJECT DEVELOPMENT OF SPECIFIC PROJECTS (UPWP NHPP 2020 0.054 SCOPING 0.054 TASK 5.61). NFA 2020 0.013 SCOPING 0.013 STBG FLEX 2020 0.054 PRELDES 0.054 2020 0.014 PRELDES 0.014 IT INCLUDES TRAFFIC FORECASTS, ALTERNATIVE TESTING AND NFA STBG FLEX 2020 0.054 SCOPING 0.054 REGIONAL AIR QUALITY EVALUATION. NFA 2020 0.014 SCOPING 0.014 NHPP 2021 0.054 SCOPING 0.054 PROJECTS LOCATED IN ALL FOUR COUNTIES. RG29 NFA 2021 0.013 SCOPING 0.013 STBG FLEX 2021 0.054 SCOPING 0.054 NFA 2021 0.014 SCOPING 0.014 NHPP 2022 0.054 SCOPING 0.054 NFA 2022 0.013 SCOPING 0.013 STBG FLEX 2022 0.054 SCOPING 0.054 NFA 2022 0.014 SCOPING 0.014 AQC:EXEMPT MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.540 0.270 0.135 0.135 0.000

LOCAL CULVERT REPAIR OR REPLACEMENT TO ADDRESS CONDITION RATING: STBG-OFF 2020 0.005 ROWINCD 0.005 C.R.57 SOUTH JOHNSBURG RD OVER MILL CREEK, BIN:3305370, TOWN OF NFA 2020 0.002 ROWINCD 0.002 175727 JOHNSBURG, WARREN CO. WAR176 STBG-OFF 2020 0.003 ROWACQU 0.003 NFA 2020 0.001 ROWACQU 0.001 STBG-OFF 2022 0.120 CONINSP 0.120 NFA 2022 0.030 CONINSP 0.030 STBG-OFF 2022 1.226 CONST 1.226 NFA 2022 0.307 CONST 0.307 AQC:N/A WARREN TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.694 0.011 0.000 1.683 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 17 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

RENSSELAER CO CR 68 OVER WYNANTSKILL CREEK STBG LG URB 2022 0.080 CONINSP 0.080 NFA 2022 0.020 CONINSP 0.020 175815 BRIDGE REPAIR OR REPLACEMENT TO ADDRESS CONDITION RATING STBG LG URB 2022 1.129 CONST 1.129 NFA 2022 0.282 CONST 0.282 STBG LG URB 2021 0.028 ROWACQU 0.028 BIN 3303610, RENSSELAER COUNTY R287 NFA 2021 0.006 ROWACQU 0.006 TOWN OF POESTENKILL

COMBINED WITH 1760.48 (R312). AQC:A19P RENSSELAER TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.545 0.000 0.034 1.511 0.000

CITY OF KINGS ROAD (CR 65) OVER CSX, BRIDGE REPLACEMENT STBG LG URB 2021 0.070 DETLDES 0.070 SCHENECTADY CITY OF SCHENECTADY, SCHENECTADY COUNTY, BIN 2203130. S204 NFA 2021 0.017 DETLDES 0.017 175895 STBG LG URB 2021 0.023 ROWACQU 0.023 INCLUDES 5 FOOT SHOULDERS FOR BIKES NFA 2021 0.005 ROWACQU 0.005 STBG LG URB 2022 0.400 CONINSP 0.400 NFA 2022 0.100 CONINSP 0.100 STBG LG URB 2022 3.856 CONST 3.856 NFA 2022 0.964 CONST 0.964 AQC:A19P SCHENECTADY TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.435 0.000 0.115 5.320 0.000

LOCAL BRIDGE REPLACEMENT TO ADDRESS CONDITION RATING, BIN 3305270, STBG-OFF 2021 0.240 CONINSP 0.240 PALISADES ROAD (CR26) OVER BRANT LAKE INLET, TOWN OF HORICON, NFA 2021 0.060 CONINSP 0.060 175928 WARREN COUNTY WAR 154 STBG-OFF 2021 1.229 CONST 1.229 NFA 2021 0.307 CONST 0.307 AQC:N/A WARREN TPC : $2-$4 M TOTAL 4YR COST : 1.836 0.000 1.836 0.000 0.000

tn of halfmoon PROJECT WILL REPLACE EXISTING TRAFFIC SIGNALS WITH UPDATED STBG FLEX 2020 0.134 CONINSP 0.134 INTERCONNECTED SIGNALS AT SITTERLY RDS INTERSECTIONS WITH NFA 2020 0.034 CONINSP 0.034 175984 WOODIN RD AND CROSSINGS BLVD. IT WILL ALSO CONSTRUCT A NEW STBG FLEX 2020 1.225 CONST 1.225 LEFT HAND TURNING LANE ON THE WOODIN RD APPROACH TO NFA 2020 0.306 CONST 0.306 SITTERLY. CLIFTON PARK SA281 NFA 2020 0.061 CONINSP 0.061 NFA 2020 0.170 CONST 0.170 RESULT OF MOU, ALL LOCAL MATCH IS PIT BOND PER REGION ONE AQC:EXEMPT SARATOGA TPC : $2-$4 M TOTAL 4YR COST : 1.930 1.930 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 18 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL BIN 3302960 CR6 (SPRUCETON RD) OVER THE WEST BRIDGE STBG-OFF 2021 0.192 CONINSP 0.192 REPLACEMENT. TOWN OF LEXINGTON, GREENE COUNTY NFA 2021 0.048 CONINSP 0.048 176021 STBG-OFF 2021 1.469 CONST 1.469 NFA 2021 0.367 CONST 0.367 AQC:EXEMPT GREENE TPC : $2-$4 M TOTAL 4YR COST : 2.076 0.000 2.076 0.000 0.000

LOCAL NEW BIKE LANES ALONG CR12 (SOUTH ST.) FROM STATE RT. 296 TO STBG FLEX 2020 0.250 CONINSP 0.250 WINDHAM MOUNTAIN SKI RESORT. TOWN OF WINDHAM, GREENE NFA 2020 0.063 CONINSP 0.063 176022 COUNTY. GREENE STBG FLEX 2020 1.562 CONST 1.562 NFA 2020 0.390 CONST 0.390 STBG FLEX 2020 0.098 ROWACQU 0.098 NFA 2020 0.024 ROWACQU 0.024 AQC:EXEMPT GREENE TPC : $2-$4 M TOTAL 4YR COST : 2.387 2.387 0.000 0.000 0.000

LOCAL CR83 (SKI BOWL RD) CULVERT REPLACEMENT AS WELL AS A POSSIBLE STBG FLEX 2021 0.024 ROWACQU 0.024 NEW PEDESTRIAN BRIDGE. TOWN OF HUNTER, GREENE COUNTY. NFA 2021 0.006 ROWACQU 0.006 176023 GREENE STBG FLEX 2021 0.120 CONINSP 0.120 NFA 2021 0.030 CONINSP 0.030 STBG FLEX 2021 0.600 CONST 0.600 NFA 2021 0.150 CONST 0.150 AQC:EXEMPT GREENE TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.930 0.000 0.930 0.000 0.000

LOCAL BIN 3303280 CR23B (MAIN ST) OVER THE SHINGLEKILL BRIDGE NHPP 2020 0.010 PRELDES 0.010 PRESERVATION PROJECT. TOWN OF CAIRO, GREENE COUNTY. GREENE NFA 2020 0.002 PRELDES 0.002 176024 NHPP 2020 0.068 CONINSP 0.068 NFA 2020 0.017 CONINSP 0.017 NHPP 2020 0.544 CONST 0.544 NFA 2020 0.136 CONST 0.136 AQC:EXEMPT GREENE TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.777 0.777 0.000 0.000 0.000

vil of Green Island HUDSON AVENUE MILL & FILL FROM THE INTERSECTION WITH TIBBITS STBG LG URB 2020 0.068 CONINSP 0.068 AVE TO THE WATERVLIET CITY LINE. INCLUDES IMPROVEMENT TO ADA NFA 2020 0.017 CONINSP 0.017 176029 COMPLIANT CROSSWALKS, INSTALLATION OF HIGH VISIBILITY STBG LG URB 2020 0.616 CONST 0.616 CROSSWALKS, AND IMPROVEMENTS FOR CYCLIST SAFETY. VILLAGE OF NFA 2020 0.154 CONST 0.154 GREEN ISLAND, ALBANY COUNTY. A568 AQC:EXEMPT ALBANY TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.855 0.855 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 19 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

TN OF SAND SAND LAKE HAMLETS SIDEWALKS & MULTI-USE PATH NFA 2021 0.066 CONINSP 0.066 LAKE NFA 2021 0.167 CONST 0.167 176034 1820 FEET OF NEW SIDEWALK IN SAND LAKE, REPLACE 43 PIECES OF STBG LG URB 2021 0.053 CONINSP 0.053 SIDEWALK AND OTHER SIDEWALK REPAIRS IN 33 LOCATIONS IN WEST NFA 2021 0.013 CONINSP 0.013 STBG LG URB 2021 0.526 CONST 0.526 SAND LAKE, 1400 FEET OF NEW MULTI-USE PATH NFA 2021 0.131 CONST 0.131 TOWN OF SAND LAKE, RENSSELAER COUNTY. R310 AQC:C2P RENSSELAER TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.956 0.000 0.956 0.000 0.000

TOWN OF SUNNYSIDE RD COLD RECYCLING PAVING FROM FREEMANS BRIDGE RD STBG FLEX 2021 0.027 CONINSP 0.027 GLENVILLE (NY 911F) TO THE VILLAGE OF SCOTIA LINE. TOWN OF GLENVILLE, NFA 2021 0.007 CONINSP 0.007 176040 SCHENECTADY COUNTY. S240 STBG FLEX 2021 0.238 CONST 0.238 NFA 2021 0.060 CONST 0.060 AQC:EXEMPT SCHENECTADY TPC : < $0.75 M TOTAL 4YR COST : 0.332 0.000 0.332 0.000 0.000

CITY OF BROADWAY MILL & FILL FROM 0.12 MILES SOUTH OF WEAVER STREET NFA 2021 0.175 CONST 0.175 SCHENECTADY TO FOURTH STREET STBG LG URB 2021 0.120 CONINSP 0.120 176042 INCLUDES SIGNAL UPGRADES PAID FOR WITH LOCAL FUNDS NFA 2021 0.030 CONINSP 0.030 STBG LG URB 2021 0.968 CONST 0.968 2021 0.242 CONST 0.242 INCLUDES UPGRADING 8 CROSSINGS TO ADA GUIDELINES NFA

CITY OF SCHENECTADY, SCHENECTADY COUNTY. S242 AQC:A10P SCHENECTADY TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.535 0.000 1.535 0.000 0.000

SCHENECTADY MOHAWK-HUDSON BIKE-HIKE TRAIL REHABILITATION STBG LG URB 2021 0.016 CONINSP 0.016 CO NFA 2021 0.004 CONINSP 0.004 176043 TOWN OF ROTTERDAM, SCHENECTADY COUNTY. S243 STBG LG URB 2021 0.141 CONST 0.141 NFA 2021 0.035 CONST 0.035 SHARED JURISDICTION BETWEEN SCHENECTADY COUNTY, TOWN OF ROTTERDAM, AND NYSOGS. AQC:C2P SCHENECTADY TPC : < $0.75 M TOTAL 4YR COST : 0.196 0.000 0.196 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 20 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

SCHENECTADY HIGHBRIDGE ROAD & EAST CAMPBELL ROAD: HOT IN-PLACE STBG LG URB 2020 0.106 CONINSP 0.106 CO RECYCLING & SIDEWALK RECONSTRUCTION/EXTENSION NFA 2020 0.025 CONINSP 0.025 176044 STBG LG URB 2020 0.876 CONST 0.876 HIGHBRIDGE ROAD (CR 48) AND EAST CAMPBELL ROAD (CR 67) FROM NFA 2020 0.219 CONST 0.219 KINGS ROAD TO HAMBURG STREET

INCLUDES FORMER S246.

TOWN OF ROTTERDAM, SCHENECTADY COUNTY. S244

PROGRESSED AS ONE PROJECT WITH 176061 (S246) AQC:A10P SCHENECTADY TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.226 1.226 0.000 0.000 0.000

TN OF WEST OLD STATE ROAD NEW SIDEWALKS STBG LG URB 2021 0.024 ROWACQU 0.024 GUILDERLAND NFA 2021 0.006 ROWACQU 0.006 176045 SOUTH SIDE OF THE ROAD FROM GARDEN VIEW TERRACE TO REGINA STBG LG URB 2021 0.019 ROWINCD 0.019 DRIVE, AND FROM AN EXISTING WALKWAY ON VICTORIA DRIVE TO NFA 2021 0.004 ROWINCD 0.004 STBG LG URB 2021 0.020 CONINSP 0.020 LYNWOOD ELEMENTARY SCHOOL NFA 2021 0.005 CONINSP 0.005 STBG LG URB 2021 0.162 CONST 0.162 TOWN OF GUILDERLAND, ALBANY COUNTY. A581 NFA 2021 0.040 CONST 0.040 AQC:C2P ALBANY TPC : < $0.75 M TOTAL 4YR COST : 0.280 0.000 0.280 0.000 0.000

SARATOGA CO ASHDOWN ROAD BRIDGE OVER THE DHRR, BRIDGE REPLACEMENT STBG FLEX 2021 0.152 CONINSP 0.152 NFA 2021 0.038 CONINSP 0.038 176046 TOWN OF CLIFTON PARK, SARATOGA COUNTY, BIN 2202570. SA297 STBG FLEX 2021 1.592 CONST 1.592 NFA 2021 0.398 CONST 0.398 AQC:A19P SARATOGA TPC : $2-$4 M TOTAL 4YR COST : 2.180 0.000 2.180 0.000 0.000

RENSSELAER CO TAMARAC ROAD (CR 129) LARGE CULVERT REPLACEMENT STBG FLEX 2022 0.041 CONINSP 0.041 NFA 2022 0.010 CONINSP 0.010 176049 REPLACE WITH AN ALUMINUM BOX CULVERT. LOCATION IS BETWEEN STBG FLEX 2022 0.370 CONST 0.370 STATE ROUTE 7 AND STORM HILL ROAD. NFA 2022 0.092 CONST 0.092

TOWN OF PITTSTOWN, RENSSELAER COUNTY. R314 AQC:A19P RENSSELAER TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.513 0.000 0.000 0.513 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 21 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL WATER ST. OVER THE BRANCH, BIN 3301700, ELIZABETHTOWN, ESSEX STBG-OFF 2020 0.014 ROWACQU 0.014 COUNTY. BRIDGE REPAIR PROJECT. NFA 2020 0.004 ROWACQU 0.004 176051 STBG-OFF 2021 0.220 CONINSP 0.220 NFA 2021 0.055 CONINSP 0.055 STBG-OFF 2021 1.440 CONST 1.440 NFA 2021 0.360 CONST 0.360 AQC:EXEMPT ESSEX TPC : $1.2-$2.5 M TOTAL 4YR COST : 2.093 0.018 2.075 0.000 0.000

LOCAL ALEXANDRIA AVE OVER LAKE GEORGE OUTLET, BIN 3301870, TOWN OF STBG-OFF 2023 0.200 CONINSP 0.200 TICONDERGOA, ESSEX COUNTY. BRIDGE REPAIR PROJECT. NFA 2023 0.050 CONINSP 0.050 176052 STBG-OFF 2023 1.984 CONST 1.984 NFA 2023 0.496 CONST 0.496 STBG-OFF 2020 0.020 ROWACQU 0.020 NFA 2020 0.005 ROWACQU 0.005 STBG-OFF 2020 0.140 DETLDES 0.140 NFA 2020 0.035 DETLDES 0.035 STBG-OFF 2020 0.140 PRELDES 0.140 NFA 2020 0.035 PRELDES 0.035 STBG-OFF 2020 0.008 ROWINCD 0.008 NFA 2020 0.002 ROWINCD 0.002 AQC:EXEMPT ESSEX TPC : $2-$4 M TOTAL 4YR COST : 3.115 0.385 0.000 0.000 2.730

WASHINGTON REPLACEMENT OF CHURCH STREET BRIDGE OVER THE METTAWEE NHPP 2021 0.332 CONINSP 0.332 COUNTY RIVER, VILLAGE OF GRANVILLE, WASHINGTON COUNTY. BIN #3-20366-0. NFA 2021 0.083 CONINSP 0.083 176055 SPAN CONSTRUCTED IN 1920. SUPPLEMENTAL PROJECT THROUGH NHPP 2021 3.458 CONST 3.458 STATE MOU. NFA 2021 0.864 CONST 0.864 NHPP 2020 0.016 ROWINCD 0.016 NFA 2020 0.005 ROWINCD 0.005 NHPP 2020 0.023 ROWACQU 0.023 NFA 2020 0.006 ROWACQU 0.006 AQC:EXEMPT WASHINGTON TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.787 0.050 4.737 0.000 0.000

SARATOGA CO CR 13 (BARKERSVILLE FAYVILLE ROAD) OVER CADMAN CREEK, BRIDGE STBG-OFF 2020 0.144 CONINSP 0.144 REPLACEMENT NFA 2020 0.036 CONINSP 0.036 176056 STBG-OFF 2020 0.720 CONST 0.720 TOWN OF PROVIDENCE, SARATOGA COUNTY, BIN 3304740. SA302 NFA 2020 0.180 CONST 0.180 AQC:A19P SARATOGA TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.080 1.080 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 22 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CITY OF BRANDYWINE AVENUE, I-890 TO STATE STREET: SAFETY HSIP 2021 0.102 CONINSP 0.102 SCHENECTADY ENHANCEMENTS, CITY OF SCHENECTADY NFA 2021 0.011 CONINSP 0.011 176057 HSIP 2021 0.919 CONST 0.919 SIGNAL UPGRADES, PEDESTRIAN IMPROVEMENTS, CORRIDOR LIGHTING NFA 2021 0.102 CONST 0.102 (CITY SHARE) & LANE RECONFIGURATION (MODIFICATION TO STRIPING)

THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER AQC:EXEMPT SCHENECTADY TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.134 0.000 1.134 0.000 0.000

CDTA WASHINGTON/WESTERN BRT PHASE 1, 2017, CITY OF ALBANY NHPP 2021 0.200 CONST 0.200 NFA 2021 0.050 CONST 0.050 176059 BUS STOP WORK, ENHANCED LIGHTING, RAISED MEDIANS, TURN STBG FLEX 2021 0.200 CONST 0.200 LANES, ON-STREET PARKING, SIGNALIZED MID-BLOCK PEDESTRIAN NFA 2021 0.050 CONST 0.050 CROSSINGS, CURB EXTENSIONS AND BUMP OUTS. THE DESIGN WORK WAS COMPLETED UNDER PROJECT T90 . (FORMERLY PIN: 1760.59)

SOME HSIP, NHPP & STP-FLEX FUNDS IN 2016-17 ARE DUPLICATED AS FTA MISC IN ORDER TO ALLOW CDTA TO OBLIGATE THE FUNDS IN 17-18, BUT DON’T REPRESENT ADDITIONAL FUNDS. AQC:EXEMPT ALBANY TPC : $50-$85 M TOTAL 4YR COST : 0.500 0.000 0.500 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 23 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

SCHENECTADY NOTT STREET/BALLTOWN ROAD INTERSECTION: SAFETY HSIP 2021 0.093 CONINSP 0.093 CO ENHANCEMENTS NFA 2021 0.010 CONINSP 0.010 176060 HSIP 2021 0.900 CONST 0.900 REDESIGN INTERSECTION WITH NEW TURN LANE. INCLUDES MILL AND NFA 2021 0.100 CONST 0.100 2021 0.250 CONST 0.250 FILL OF NOTT STREET FROM BALLTOWN ROAD TO CLIFTON PARK NFA ROAD.

TOWN OF NISKAYUNA, SCHENECTADY COUNTY. S249

THE STATE CERTIFIES THAT THIS PROJECT AND SCOPE OF WORK HAVE BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER AQC:D1P SCHENECTADY TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.353 0.000 1.353 0.000 0.000

CITY OF ROSA RD, WENDELL AVE AND NOTT ST INTERS. IMPROVEMENTS NFA 2021 0.160 CONST 0.160 SCHENECTADY 5-LEG SIGNAL, PED ACCOMMODATIONS, REFUGE ISLANDS, HIGH STBG LG URB 2021 0.040 CONINSP 0.040 176062 VISIBILITY CROSSWALKS, IMPROVED STRIPING. S245 NFA 2021 0.010 CONINSP 0.010 STBG LG URB 2021 0.350 CONST 0.350 2021 0.087 CONST 0.087 CITY OF SCHENECTADY, SCHENECTADY COUNTY NFA AQC:EXEMPT SCHENECTADY TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.647 0.000 0.647 0.000 0.000

TN OF THIS PROJECT WILL CONSTRUCT APPROXIMATELY 2,250 FEET OF ADA CMAQ 2021 0.025 ROWACQU 0.025 GUILDERLAND COMPLIANT SIDEWALK ON THE SOUTHERN SIDE OF STATE ROUTE 20 NFA 2021 0.006 ROWACQU 0.006 176079 (WESTERN AVENUE) FROM DEVONSHIRE DRIVE TO MERCY CARE LANE. CMAQ 2021 0.078 CONINSP 0.078 TOWN OF GUILDERLAND, ALBANY COUNTY. NFA 2021 0.019 CONINSP 0.019 CMAQ 2021 0.482 CONST 0.482 NFA 2021 0.120 CONST 0.120 THIS INCLUDES CURBS AND INTERSCTION RAMPS.

A586 AQC:EXEMPT ALBANY TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.730 0.000 0.730 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 24 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

TN OF US NY 9W / FEURA BUSH ROAD / GLENMONT ROAD (NY 910A): CMAQ 2021 0.320 CONINSP 0.320 BETHLEHEM NFA 2021 0.080 CONINSP 0.080 176080 CMAQ 2021 2.755 CONST 2.755 INCLUDES SIDEWALK EXTENSION ON GLENMONT ROAD TO GLENMONT NFA 2021 0.689 CONST 0.689 CMAQ 2020 0.263 ROWACQU 0.263 ELEMENTARY SCHOOL. NFA 2020 0.066 ROWACQU 0.066 TOWN OF BETHLEHEM, ALBANY COUNTY. A587

THESE FUNDS ARE CAPPED AQC:D1P ALBANY TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.173 0.329 3.844 0.000 0.000

TN OF CLIFTON MOE ROAD MULTI-USE PATH CMAQ 2021 0.043 DETLDES 0.043 PARK NFA 2021 0.011 DETLDES 0.011 176082 THIS PROJECT WILL CLOSE AN EXISTING GAP ON THE MOE ROAD CMAQ 2021 0.013 PRELDES 0.013 MULTI-USE PATH BY CONSTRUCTING AN EXTENSION THAT WILL NFA 2021 0.004 PRELDES 0.004 CMAQ 2021 0.056 ROWACQU 0.056 CONNECT OKTE ELEMENTARY SCHOOL TO HOUSING DEVELOPMENTS NFA 2021 0.014 ROWACQU 0.014 LOCATED OFF OF MOE ROAD AND TERMINATE AT THE INTERSECTION CMAQ 2021 0.029 ROWINCD 0.029 WITH SUGARBUSH ROAD. NFA 2021 0.007 ROWINCD 0.007 NFA 2021 0.043 PRELDES 0.043 TOWN OF CLIFTON PARK, SARATOGA COUNTY. SA306 CMAQ 2022 0.076 CONINSP 0.076 NFA 2022 0.019 CONINSP 0.019 THESE FUNDS ARE CAPPED CMAQ 2022 0.631 CONST 0.631 NFA 2022 0.158 CONST 0.158 NFA 2022 0.011 CONINSP 0.011 AQC:C2P SARATOGA TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.115 0.000 0.220 0.895 0.000

CITY OF RENSSELAER RIVERFRONT MULTI-USE TRAIL TAP LG URBAN 2021 0.018 ROWACQU 0.018 RENSSELAER NFA 2021 0.005 ROWACQU 0.005 176084 THIS PROJECT CONSTRUCTS 3750 FEET OF MULTI-USE TRAIL AND 100 TAP LG URBAN 2021 0.160 CONINSP 0.160 FEET OF BIKE/PED ACCOMODATIONS BETWEEN DELAETS LANDING AND NFA 2021 0.040 CONINSP 0.040 TAP LG URBAN 2021 0.960 CONST 0.960 RIVERFRONT PARK. NFA 2021 0.240 CONST 0.240 CITY OF RENSSELAER, RENSSELAER COUNTY, R323

THESE FUNDS ARE CAPPED AQC:C2P RENSSELAER TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.423 0.000 1.423 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 25 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CITY of SARATOGA GREENBELT DOWNTOWN CONNECTOR, SARATOGA SPRINGS, NFA 2021 0.421 CONST 0.421 SARATOGA SPR SARATOGA COUNTY TAP LG URBAN 2021 0.195 CONINSP 0.195 176086 NFA 2021 0.049 CONINSP 0.049 THE PROJECT BEGINS AT LAKE AVENUE, TAP LG URBAN 2021 1.073 CONST 1.073 2021 0.269 CONST 0.269 EXTENDS ALONG HIGH ROCK AND EXCELSIOR NFA TAP LG URBAN 2020 0.118 ROWACQU 0.118 AVENUES AND CONNECTS TO THE BICYCLE- NFA 2020 0.029 ROWACQU 0.029 PEDESTRIAN BRIDGE I-87 EXIT 15.

NEW SIDEWALKS, MULTI-USE TRAILS, BIKE LANES, BE (FORMERLY PIN: 176084) AQC:EXEMPT SARATOGA TPC : $2-$4 M TOTAL 4YR COST : 2.154 0.147 2.007 0.000 0.000

NYSOPRHP GREENWAY TRAIL ENHANCEMENT REC TRAILS 2022 0.008 CONINSP 0.008 NFA 2022 0.002 CONINSP 0.002 176087 FIRST PHASE OF A PROPOSED 2.2-MILE TRAIL INCLUDES A 700-FOOT REC TRAILS 2022 0.076 CONST 0.076 TRAIL EXTENSION FROM THE CURRENT TERMINUS TO SEWER PLANT NFA 2022 0.019 CONST 0.019 REC TRAILS 2020 0.012 DETLDES 0.012 ROAD, INSTALLATION OF A 5-CAR TRAILHEAD PARKING LOT, AND NFA 2020 0.003 DETLDES 0.003 TRAILHEAD AMENITIES

RENSSELAER CO, TN OF HOOSICK FALLS, S236 AQC:EXEMPT RENSSELAER TPC : < $0.75 M TOTAL 4YR COST : 0.120 0.015 0.000 0.105 0.000

LOCAL BRIDGE REPLACEMENT, CR 22 OVER THE , BIN 3303120, STBG-OFF 2022 0.100 CONINSP 0.100 TOWN OF DURHAM, GREENE COUNTY NFA 2022 0.025 CONINSP 0.025 176089 STBG-OFF 2022 0.776 CONST 0.776 NFA 2022 0.195 CONST 0.195 STBG-OFF 2020 0.004 ROWACQU 0.004 NFA 2020 0.001 ROWACQU 0.001 STBG-OFF 2020 0.041 DETLDES 0.041 NFA 2020 0.011 DETLDES 0.011 STBG-OFF 2020 0.087 PRELDES 0.087 NFA 2020 0.021 PRELDES 0.021 STBG-OFF 2020 0.007 ROWINCD 0.007 NFA 2020 0.001 ROWINCD 0.001 AQC:EXEMPT GREENE TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.269 0.173 0.000 1.096 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 26 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT TAHAWUS ROAD BRIDGE REPLACEMENT OVER SANFORD LAKE (BIN STBG FLEX 2021 0.240 DETLDES 0.240 3302690), TOWN OF NEWCOMB, ESSEX COUNTY NFA 2021 0.060 DETLDES 0.060 176090 STBG FLEX 2021 0.240 PRELDES 0.240 NFA 2021 0.060 PRELDES 0.060 STBG FLEX 2022 0.032 ROWACQU 0.032 NFA 2022 0.008 ROWACQU 0.008 STBG FLEX 2022 0.008 ROWINCD 0.008 NFA 2022 0.002 ROWINCD 0.002 STBG FLEX 2023 0.264 CONINSP 0.264 NFA 2023 0.066 CONINSP 0.066 STBG FLEX 2023 2.359 CONST 2.359 NFA 2023 0.590 CONST 0.590 AQC:EXEMPT ESSEX TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.929 0.000 0.600 0.050 3.279

CITY OF ALBANY CITY OF ALBANY SOUTH END CONNECTOR LOWLINE REC TRAILS 2021 0.025 CONINSP 0.025 NFA 2021 0.025 CONINSP 0.025 176091 THIS IS A 1.5 MILE SHARED USE PATH THAT WILL CONNECT THE REC TRAILS 2021 0.137 CONST 0.137 EXISTING ALBANY COUNTY HUDSON-HELDERBERG RAIL TRAIL AT ITS NFA 2021 0.138 CONST 0.138 TRAIL HEAD IN THE CITY OF ALBANY’S SOUTH END, APPROXIMATELY A QUARTER MILE FROM THE INTERSECTION OF SOUTH PEARL STREET AND MOUNT HOPE DRIVE AND THE MOHAWK HUDSON BIKE HIKE TRAIL AT ITS TRAIL HEAD IN ALBANY AT THE INTERSECTION OF BROADWAY AND QUAY STREET

CITY OF ALBANY, ALBANY COUNTY, A589

OPRHP PROJECT NUMBER “175160”

LOCAL MATCH IS 50% AQC:EXEMPT ALBANY TPC : < $0.75 M TOTAL 4YR COST : 0.325 0.000 0.325 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 27 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CITY OF ALBANY CITY OF ALBANY PSAP HSIP 2020 0.104 PRELDES 0.104 HSIP 2021 0.149 DETLDES 0.149 176092 PEDESTRIAN SAFETY ENHANCEMENTS AT: 20 UNCONTROLLED HSIP 2022 0.222 CONINSP 0.222 CROSSWALKS & 12 SIGNALIZED INTERSECTIONS. HSIP 2022 1.011 CONST 1.011

CITY OF ALBANY, ALBANY COUNTY. A590

PROJECT IS 100% FEDERALLY FUNDED UTILIZING 10% TOLL CREDIT MATCH

THE STATE CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER. AQC:C2P ALBANY TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.486 0.104 0.149 1.233 0.000

TN OF CLIFTON CLIFTON PARK PSAP HSIP 2021 0.053 CONINSP 0.053 PARK HSIP 2021 0.285 CONST 0.285 176093 PEDESTRIAN SAFETY ENHANCEMENTS AT: 3 UNCONTROLLED NFA 2021 0.067 CONST 0.067 CROSSWALKS & 5 SIGNALIZED INTERSECTIONS ON CLIFTON PARK CENTER ROAD AND CLIFTON COUNTY ROAD

TOWN OF CLIFTON PARK, SARATOGA COUNTY. SA312

PROJECT IS 100% FEDERALLY FUNDED UTILIZING 10% TOLL CREDIT MATCH

THE STATE CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER. AQC:C2P SARATOGA TPC : < $0.75 M TOTAL 4YR COST : 0.405 0.000 0.405 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 28 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CITY OF CITY OF RENSSELAER PSAP HSIP 2021 0.048 CONINSP 0.048 RENSSELAER HSIP 2021 0.402 CONST 0.402 176094 PEDESTRIAN SAFETY ENHANCEMENTS AT 6 SIGNALIZED INTERSECTIONS.

CITY OF RENSSELAER, RENSSELAER COUNTY. R327

PROJECT IS 100% FEDERALLY FUNDED UTILIZING 10% TOLL CREDIT MATCH

THE STATE CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER. AQC:C2P RENSSELAER TPC : < $0.75 M TOTAL 4YR COST : 0.450 0.000 0.450 0.000 0.000

CITY OF CITY OF SCHENECTADY PSAP HSIP 2021 0.100 CONINSP 0.100 SCHENECTADY HSIP 2021 1.000 CONST 1.000 176095 PEDESTRIAN SAFETY ENHANCEMENTS AT: 10 SIGNALIZED NFA 2021 0.641 CONST 0.641 INTERSECTIONS

CITY OF SCHENECTADY, SCHENECTADY COUNTY. S257

PROJECT IS 100% FEDERALLY FUNDED UTILIZING 10% TOLL CREDIT MATCH

THE STATE CERTIFIES THAT THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER. AQC:C2P SCHENECTADY TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.741 0.000 1.741 0.000 0.000

CITY OF GLENS PAVEMENT PRESERVATION, SPOT REPAIRS, SIDEWALK REPLACEMENT NFA 2020 0.114 CONINSP 0.114 FALLS AND 21 ADA RAMPS ALONG 0.64 MILES OF DIX AVENUE FROM RIDGE NFA 2020 1.111 CONST 1.111 176096 STREET TO PLATT STREET, CITY OF GLENS FALLS, WARREN COUNTY. STBG FLEX 2020 0.109 CONINSP 0.109 PROJECT AWARDED FROM A/GFTC LOCAL HIGHWAY PAVEMENT NFA 2020 0.027 CONINSP 0.027 PRESERVATION PROGRAM SETASIDE. STBG FLEX 2020 0.859 CONST 0.859 NFA 2020 0.215 CONST 0.215 AQC:EXEMPT WARREN TPC : $2-$4 M TOTAL 4YR COST : 2.435 2.435 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 29 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT CR 46 PAVEMENT CORRECTIVE MAINTENANCE FROM US 4 TO PLUM STBG FLEX 2020 0.040 CONINSP 0.040 ROAD. 1.77 MILES. TOWN OF FORT EDWARD, WASHINGTON COUNTY NFA 2020 0.010 CONINSP 0.010 176097 STBG FLEX 2020 0.450 CONST 0.450 NFA 2020 0.112 CONST 0.112 AQC:EXEMPT WASHINGTON TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.612 0.612 0.000 0.000 0.000

LOCAL CR 28 PAVEMENT CORRECTIVE MAINTENANCE, PART 1, CR27 TO STBG FLEX 2020 0.094 CONINSP 0.094 RESERVOIR RD (1.6 MILES) AND PART 2, RESERVOIR ROAD TO NYS NFA 2020 0.023 CONINSP 0.023 176098 ROUTE 197 (1.0 MILES), TOWN OF MOREAU, SARATOGA COUNTY. TOWN STBG FLEX 2020 0.670 CONST 0.670 OF MOREAU, SARATOGA COUNTY. THIS PIN NOW INCLUDES PIN 176139. NFA 2020 0.167 CONST 0.167 STBG FLEX 2020 0.016 DETLDES 0.016 NFA 2020 0.004 DETLDES 0.004 AQC:EXEMPT SARATOGA TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.974 0.974 0.000 0.000 0.000

WARREN PAVEMENT REHABILITATION PROJECT TO RESTORE CONDITION FOR STBG FLEX 2020 0.103 CONINSP 0.103 COUNTY 1.05 MILES OF CR 39 (SUNNYSIDE EAST) FROM NYS 9L (RIDGE ROAD) TO NFA 2020 0.026 CONINSP 0.026 176099 WASHINGTON COUNTY LINE, AND 0.96 MILES OF CR 54 (SUNNYSIDE STBG FLEX 2020 1.278 CONST 1.278 ROAD) FROM NYS 9L (RIDGE ROAD) TO CR 7 (BAY ROAD), TOWN OF NFA 2020 0.319 CONST 0.319 QUEENSBURY, WARREN COUNTY. PROJECT AWARDED FROM A/GFTC LOCAL PAVEMENT PRESERVATION PROGRAM SETASIDE (1TO427). THIS PIN NOW INCLUDES 176100. AQC:EXEMPT WARREN TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.726 1.726 0.000 0.000 0.000

LOCAL SARATOGA COUNTY BRIDGE PRESERVATION: CLARK ROAD OVER SNOOK STBG-OFF 2020 0.032 CONINSP 0.032 KILL (BIN 3304130) AND CR 29 (RIVER RD) OVER SNOOK KILL (BIN NFA 2020 0.008 CONINSP 0.008 176102 3304140), TOWN OF MOREAU, SARATOGA COUNTY. THIS PIN NOW STBG-OFF 2020 0.176 CONST 0.176 INCLUDES PIN 176104. NFA 2020 0.044 CONST 0.044 AQC:N/A SARATOGA TPC : < $0.75 M TOTAL 4YR COST : 0.260 0.260 0.000 0.000 0.000

WASHINGTON WASHINGTON COUNTY BRIDGE PRESERVATION: DR. JOHNSON RD OVER STBG-OFF 2020 0.044 CONINSP 0.044 COUNTY (BIN 3306080) AND CEMETERY RD OVER BLACK CREEK NFA 2020 0.011 CONINSP 0.011 176103 (BIN 3203730). TOWNS OF JACKSON AND SALEM, WASHINGTON COUNTY. STBG-OFF 2020 0.297 CONST 0.297 WAS 164 NFA 2020 0.074 CONST 0.074 AQC:EXEMPT WASHINGTON TPC : < $0.75 M TOTAL 4YR COST : 0.426 0.426 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 30 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CITY OF FRANCIS AVE OVER I-890, BRIDGE REHAB OR REPLACEMENT NHPP 2021 0.285 CONINSP 0.285 SCHENECTADY NFA 2021 0.015 CONINSP 0.015 176118 CITY OF SCHENECTADY, SCHENECTADY COUNTY, BIN 2203080. S258 NHPP 2021 2.501 CONST 2.501 NFA 2021 0.132 CONST 0.132 NHPP 2020 0.171 PRELDES 0.171 95% FEDERAL AID WITH A 5% LOCAL MATCH (UTILIZING 15% TOLL NFA 2020 0.009 PRELDES 0.009 CREDITS), BRIDGE NY NHPP 2021 0.209 DETLDES 0.209 NFA 2021 0.011 DETLDES 0.011 AQC:A19P SCHENECTADY TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.333 0.180 3.153 0.000 0.000

CITY OF TROY CAMPBELL AVE OVER WYNANTSKILL BRIDGE REHAB NFA 2021 0.307 CONST 0.307 NHPP 2021 0.285 CONINSP 0.285 176119 CITY OF TROY, RENSSELAER COUNTY, BIN 2202290. R328 NFA 2021 0.015 CONINSP 0.015 NHPP 2021 2.686 CONST 2.686 2021 0.141 CONST 0.141 95% FEDERAL AID WITH A 5% LOCAL MATCH (UTILIZING 15% TOLL NFA NHPP 2020 0.309 DETLDES 0.309 CREDITS), BRIDGE NY NFA 2020 0.016 DETLDES 0.016 NHPP 2020 0.309 PRELDES 0.309 NFA 2020 0.016 PRELDES 0.016 AQC:A19P RENSSELAER TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.084 0.650 3.434 0.000 0.000

SARATOGA CO HANS CREEK RD OVER HANS CREEK, REHAB OR REPLACE STBG-OFF 2021 0.060 DETLDES 0.060 NFA 2021 0.003 DETLDES 0.003 176120 THE SCOPE HAS BEEN DETERMINED TO BE STBG-OFF 2021 0.060 PRELDES 0.060 SUPERSTRUCTURE REPLACEMENT NFA 2021 0.003 PRELDES 0.003 STBG-OFF 2021 0.057 CONINSP 0.057 NFA 2021 0.003 CONINSP 0.003 STBG-OFF 2021 0.522 CONST 0.522 TOWN OF PROVIDENCE ,SARATOGA COUNTY, BIN 2202820. SA313 NFA 2021 0.028 CONST 0.028

95% FEDERAL AID WITH A 5% LOCAL MATCH (UTILIZING 15% TOLL CREDITS), BRIDGE NY AQC:A19P SARATOGA TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.736 0.000 0.736 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 31 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL BRIDGE NY TIMBER LAKE RD OVER BROAD ST., GREENE COUNTY, BIN STBG-OFF 2021 0.112 DETLDES 0.112 3201240. 95% FEDERAL (USING 15% TOLL CREDITS), 5% LOCAL. BRIDGE NFA 2021 0.006 DETLDES 0.006 176121 REPLACEMENT PROJECT. STBG-OFF 2021 0.018 ROWINCD 0.018 NFA 2021 0.001 ROWINCD 0.001 STBG-OFF 2020 0.120 PRELDES 0.120 NFA 2020 0.030 PRELDES 0.030 STBG-OFF 2022 0.152 CONINSP 0.152 NFA 2022 0.008 CONINSP 0.008 STBG-OFF 2022 1.395 CONST 1.395 NFA 2022 0.073 CONST 0.073 AQC:EXEMPT GREENE TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.915 0.150 0.137 1.628 0.000

TN OF EDINBURG FOX HILL RD OVER LITTLE HANS CREEK, BRIDGE REHAB OR REPLACE STBG-OFF 2021 0.060 DETLDES 0.060 NFA 2021 0.003 DETLDES 0.003 176122 THE SCOPE HAS BEEN DETERMINED TO BE SUPERSTRUCTURE STBG-OFF 2021 0.060 PRELDES 0.060 REPLACEMENT NFA 2021 0.003 PRELDES 0.003 STBG-OFF 2021 0.057 CONINSP 0.057 NFA 2021 0.003 CONINSP 0.003 TOWN OF EDINBURG, SARATOGA COUNTY, BIN 2202670. SA314 STBG-OFF 2021 0.537 CONST 0.537 NFA 2021 0.028 CONST 0.028 95% FEDERAL AID WITH A 5% LOCAL MATCH (UTILIZING 15% TOLL CREDITS), BRIDGE NY AQC:A19P SARATOGA TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.751 0.000 0.751 0.000 0.000

WARREN REPLACEMENT OF BRIDGE (BIN 3360320) CARRYING WARREN COUNTY NHPP 2021 0.038 ROWACQU 0.038 COUNTY ROUTE 7 (BAY ROAD) OVER HALFWAY CREEK (BROOK), TOWN OF NFA 2021 0.002 ROWACQU 0.002 176123 QUEENSBURY, WARREN COUNTY. PROJECT IS A BRIDGE NY PROGRAM NHPP 2022 0.257 CONINSP 0.257 AWARD. TOLL CREDITS TO PROVIDE 15% SHARE. NFA 2022 0.014 CONINSP 0.014 NHPP 2022 2.144 CONST 2.144 NFA 2022 0.113 CONST 0.113 AQC:EXEMPT WARREN TPC : $2-$4 M TOTAL 4YR COST : 2.568 0.000 0.040 2.528 0.000

TN OF SAND STOP 13 RD OVER WYNANTSKILL, BRIDGE REPAIR OR REPLACE STBG-OFF 2021 0.095 CONINSP 0.095 LAKE NFA 2021 0.005 CONINSP 0.005 176124 TOWN OF SAND LAKE, RENSSELAER COUNTY, BIN 2201960. R329 STBG-OFF 2021 0.843 CONST 0.843 NFA 2021 0.044 CONST 0.044 STBG-OFF 2020 0.037 ROWACQU 0.037 95% FEDERAL AID WITH A 5% LOCAL MATCH (UTILIZING 15% TOLL NFA 2020 0.002 ROWACQU 0.002 CREDITS), BRIDGE NY AQC:A19P RENSSELAER TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.026 0.039 0.987 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 32 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL BRIDGE NY BLOOMER RD OVER GOOSEBERRY CREEK, GREENE COUNTY, NHPP 2021 0.013 ROWACQU 0.013 BIN 3200960 . 95% FEDERAL (USING 15% TOLL CREDITS), 5% LOCAL. NFA 2021 0.001 ROWACQU 0.001 176125 BRIDGE REPLACEMENT PROJECT. NHPP 2020 0.143 DETLDES 0.143 NFA 2020 0.007 DETLDES 0.007 NHPP 2020 0.143 PRELDES 0.143 NFA 2020 0.007 PRELDES 0.007 NHPP 2020 0.019 ROWINCD 0.019 NFA 2020 0.001 ROWINCD 0.001 NHPP 2022 0.143 CONINSP 0.143 NFA 2022 0.007 CONINSP 0.007 NHPP 2022 1.243 CONST 1.243 NFA 2022 0.065 CONST 0.065 AQC:EXEMPT GREENE TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.792 0.320 0.014 1.458 0.000

CITY OF TROY SOUTH TROY INDUSTRIAL PARK ROAD PHASE II (NORTHERN END) STBG LG URB 2020 0.240 DETLDES 0.240 NFA 2020 0.060 DETLDES 0.060 176130 CONSTRUCT A NEW TWO-LANE ROAD FROM MONROE STREET TO STBG LG URB 2022 0.320 CONINSP 0.320 ADAMS STREET, INCLUDING SIDEWALKS, BIKE LANES A NEW BRIDGE NFA 2022 0.080 CONINSP 0.080 STBG LG URB 2022 3.558 CONST 3.558 OVER THE POESTENKILL. NFA 2022 0.889 CONST 0.889 STBG LG URB 2020 0.960 ROWACQU 0.960 CITY OF TROY, RENSSELAER COUNTY. R195A NFA 2020 0.240 ROWACQU 0.240 STBG LG URB 2020 0.056 ROWINCD 0.056 THIS PIN INCLUDES A PORTION OF PIN 175459 THAT WAS SPLIT NFA 2020 0.014 ROWINCD 0.014 AQC:K1P RENSSELAER TPC : $9.5-15.5 M TOTAL 4YR COST : 6.417 1.570 0.000 4.847 0.000

LOCAL CR 28 PAVEMENT PRESERVATION PROJECT - PART 2, RESERVOIR ROAD STBG FLEX 2020 0.022 PRELDES 0.022 TO NYS ROUTE 197 (1.0 MILES), TOWN OF MOREAU, SARATOGA COUNTY. NFA 2020 0.005 PRELDES 0.005 176139 THIS PIN WAS MERGED INTO PIN 176098 AQC:EXEMPT SARATOGA TPC : < $0.75 M TOTAL 4YR COST : 0.027 0.027 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 33 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL CR 31 (FORTSVILLE RD) OVER NORTH BRANCH CREEK (LIN# 250), STBG FLEX 2021 0.120 CONINSP 0.120 REPLACE CULVERT WITH BRIDGE, TOWN OF MOREAU, SARATOGA NFA 2021 0.030 CONINSP 0.030 176140 COUNTY STBG FLEX 2021 0.760 CONST 0.760 NFA 2021 0.190 CONST 0.190 STBG FLEX 2020 0.030 DETLDES 0.030 NFA 2020 0.008 DETLDES 0.008 STBG FLEX 2020 0.010 ROWACQU 0.010 NFA 2020 0.002 ROWACQU 0.002 STBG FLEX 2020 0.070 PRELDES 0.070 NFA 2020 0.018 PRELDES 0.018 STBG FLEX 2020 0.014 ROWINCD 0.014 NFA 2020 0.004 ROWINCD 0.004 AQC:EXEMPT SARATOGA TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.256 0.156 1.100 0.000 0.000

LOCAL CR 24 (SPIER FALLS ROAD) OVER HUDSON RIVER TRIBUTARY (LIN# 251), STBG FLEX 2023 0.008 ROWINCD 0.008 REPLACE CULVERT, TOWN OF MOREAU, SARATOGA COUNTY NFA 2023 0.002 ROWINCD 0.002 176141 STBG FLEX 2023 0.034 DETLDES 0.034 NFA 2023 0.008 DETLDES 0.008 STBG FLEX 2023 0.076 PRELDES 0.076 NFA 2023 0.019 PRELDES 0.019 AQC:EXEMPT SARATOGA TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.147 0.000 0.000 0.000 0.147

LOCAL Johnsburg Bridges over Glen Creek, Bridge Replacements, Dippikill Road (3305490) STBG FLEX 2022 0.222 CONINSP 0.222 and Glen Creek Road (3305500). Town of Johnsburg, Warren County WAR187 NFA 2022 0.055 CONINSP 0.055 176143 STBG FLEX 2022 1.583 CONST 1.583 NFA 2022 0.396 CONST 0.396 STBG FLEX 2020 0.158 DETLDES 0.158 NFA 2020 0.040 DETLDES 0.040 STBG FLEX 2020 0.158 PRELDES 0.158 NFA 2020 0.040 PRELDES 0.040 STBG FLEX 2020 0.014 ROWINCD 0.014 NFA 2020 0.003 ROWINCD 0.003 STBG FLEX 2022 0.047 ROWACQU 0.047 NFA 2022 0.013 ROWACQU 0.013 AQC:N/A WARREN TPC : $2-$4 M TOTAL 4YR COST : 2.729 0.413 0.000 2.316 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 34 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL County Route 19 (Olmstedville Road) Reconstruction, Hidden Lake Road to County STBG FLEX 2021 0.060 ROWACQU 0.060 Line (2.7 miles) 2.588 NFA 2021 0.015 ROWACQU 0.015 176144 Town of Chester WAR188 STBG FLEX 2020 0.075 DETLDES 0.075 NFA 2020 0.019 DETLDES 0.019 STBG FLEX 2023 0.310 CONINSP 0.310 NFA 2023 0.078 CONINSP 0.078 STBG FLEX 2023 3.102 CONST 3.102 NFA 2023 0.775 CONST 0.775 STBG FLEX 2020 0.190 PRELDES 0.190 NFA 2020 0.047 PRELDES 0.047 STBG FLEX 2020 0.022 ROWINCD 0.022 NFA 2020 0.005 ROWINCD 0.005 AQC:EXEMPT WARREN TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.698 0.358 0.075 0.000 4.265

LOCAL County Route 63 Oxbow / Moon Hill Road Reconstruction, NYS 149 to CR 7 (Bay STBG FLEX 2021 0.160 CONINSP 0.160 Road) (1.17 miles) 0.742 NFA 2021 0.040 CONINSP 0.040 176145 Town of Queensbury, Warren County WAR189 STBG FLEX 2021 1.593 CONST 1.593 NFA 2021 0.399 CONST 0.399 STBG FLEX 2020 0.078 PRELDES 0.078 NFA 2020 0.020 PRELDES 0.020 STBG FLEX 2021 0.038 DETLDES 0.038 NFA 2021 0.010 DETLDES 0.010 AQC:EXEMPT WARREN TPC : $2-$4 M TOTAL 4YR COST : 2.338 0.098 2.240 0.000 0.000

LOCAL CR 16 ( Drive) and CR 32 (Call Street) Rehabilitation, Warren County STBG FLEX 2021 0.196 CONINSP 0.196 Line to Hawk Road (3.7 miles), NFA 2021 0.049 CONINSP 0.049 176146 Town of Lake Luzerne, Warren County WAR190 STBG FLEX 2021 1.968 CONST 1.968 NFA 2021 0.492 CONST 0.492 STBG FLEX 2020 0.034 DETLDES 0.034 NFA 2020 0.008 DETLDES 0.008 STBG FLEX 2020 0.086 PRELDES 0.086 NFA 2020 0.022 PRELDES 0.022 AQC:EXEMPT WARREN TPC : $2-$4 M TOTAL 4YR COST : 2.855 0.150 2.705 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 35 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL CR 47 & CR 70 (QUAKER ROAD) PAVEMENT PRESERVATION, US 9 TO NHPP 2021 0.216 DETLDES 0.216 LOWER WARREN STREET (3.96 MILES) NFA 2021 0.054 DETLDES 0.054 176147 TOWN OF QUEENSBURY, WARREN COUNTY WAR191 NHPP 2021 0.216 PRELDES 0.216 NFA 2021 0.054 PRELDES 0.054 NHPP 2022 0.277 CONINSP 0.277 NFA 2022 0.069 CONINSP 0.069 NHPP 2022 2.465 CONST 2.465 NFA 2022 0.616 CONST 0.616 AQC:EXEMPT WARREN TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.967 0.000 0.540 3.427 0.000

LOCAL HUDSON STREET OVER MILL CREEK, BRIDGE REPLACEMENT (3305340) STBG FLEX 2023 0.064 DETLDES 0.064 0.809 NFA 2023 0.016 DETLDES 0.016 176148 TOWN OF JOHNSBURG, WARREN COUNTY STBG FLEX 2023 0.011 ROWACQU 0.011 NFA 2023 0.003 ROWACQU 0.003 STBG FLEX 2023 0.064 PRELDES 0.064 NFA 2023 0.016 PRELDES 0.016 STBG FLEX 2023 0.005 ROWINCD 0.005 NFA 2023 0.001 ROWINCD 0.001 AQC:N/A WARREN TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.180 0.000 0.000 0.000 0.180

LOCAL COUNTY ROUTE 15 (ADIRONDACK ROAD) OVER MILL BROOK, BRIDGE STBG FLEX 2022 0.086 DETLDES 0.086 REPLACEMENT (3305280), TOWN OF HORICON, WARREN COUNTY NFA 2022 0.021 DETLDES 0.021 176149 STBG FLEX 2022 0.086 PRELDES 0.086 NFA 2022 0.021 PRELDES 0.021 STBG FLEX 2022 0.026 ROWINCD 0.026 NFA 2022 0.007 ROWINCD 0.007 AQC:N/A WARREN TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.247 0.000 0.000 0.247 0.000

LOCAL STATES ROAD EAST OVER STONY CREEK, BRIDGE REPLACEMENT (BIN STBG FLEX 2023 0.065 DETLDES 0.065 3305610), TOWN OF STONY CREEK, WARREN COUNTY NFA 2023 0.016 DETLDES 0.016 176150 STBG FLEX 2022 0.065 PRELDES 0.065 NFA 2022 0.016 PRELDES 0.016 STBG FLEX 2022 0.014 ROWINCD 0.014 NFA 2022 0.003 ROWINCD 0.003 AQC:EXEMPT WARREN TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.179 0.000 0.000 0.098 0.081 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 36 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

LOCAL CR 35 and CR 36 Pavement Preservation, US 4 to Warren County line, Town of STBG FLEX 2021 0.058 CONINSP 0.058 Kingsbury, Washington County WAS167 NFA 2021 0.015 CONINSP 0.015 176152 STBG FLEX 2021 1.313 CONST 1.313 NFA 2021 0.328 CONST 0.328 STBG FLEX 2020 0.026 DETLDES 0.026 NFA 2020 0.007 DETLDES 0.007 STBG FLEX 2020 0.027 PRELDES 0.027 NFA 2020 0.007 PRELDES 0.007 AQC:EXEMPT WASHINGTON TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.781 0.067 1.714 0.000 0.000

LOCAL CR 61 OVER BATTEN KILL (BATTEN-DUGAN) BRIDGE REPLACEMENT, STBG-OFF 2022 0.264 PRELDES 0.264 BIN 3306370, TOWNS OF GREENWICH AND JACKSON, WASHINGTON NFA 2022 0.066 PRELDES 0.066 176153 COUNTY. CONSTRUCTION ANTICIPATED FOR FFY 2023-2024. STBG-OFF 2023 0.240 DETLDES 0.240 NFA 2023 0.060 DETLDES 0.060 STBG-OFF 2023 0.032 ROWACQU 0.032 NFA 2023 0.008 ROWACQU 0.008 STBG-OFF 2023 0.001 ROWINCD 0.001 NFA 2023 0.001 ROWINCD 0.001 AQC:N/A WASHINGTON TPC : $4.6-$7.5 M TOTAL 4YR COST : 0.672 0.000 0.000 0.330 0.342

LOCAL COUNTY ROUTE 74 OVER FLY CREEK, BRIDGE REPLACEMENT (BIN STBG-OFF 2023 0.141 CONINSP 0.141 3306170), TOWN OF EASTON, WASHINGTON COUNTY AND HICKORY HILL NFA 2023 0.035 CONINSP 0.035 176155 ROAD OVER CAMDEN VALLEY CREEK, BRIDGE REPLACEMENT (BIN STBG-OFF 2023 1.064 CONST 1.064 3306600), TOWN OF SALEM, WASHINGTON COUNTY . THIS PIN NOW NFA 2023 0.266 CONST 0.266 STBG-OFF 2022 0.128 DETLDES 0.128 INCLUDES 176156. WAS170 NFA 2022 0.032 DETLDES 0.032 STBG-OFF 2022 0.116 PRELDES 0.116 NFA 2022 0.030 PRELDES 0.030 STBG-OFF 2022 0.008 ROWINCD 0.008 NFA 2022 0.002 ROWINCD 0.002 STBG-OFF 2023 0.026 ROWACQU 0.026 NFA 2023 0.006 ROWACQU 0.006 AQC:N/A WASHINGTON TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.854 0.000 0.000 0.316 1.538 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 37 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CITY OF MISSING LINKS PROGRAM: CITY OF SARATOGA SPRINGS STBG LG URB 2021 0.087 DETLDES 0.087 SARATOGA SPR NFA 2021 0.023 DETLDES 0.023 176158 ADD CONCRETE SIDEWALK, ADA CROSSWALKS, AMENITIES AND SOME STBG LG URB 2022 0.144 CONINSP 0.144 CURBING AND DRAINAGE IN SEVERAL LOCATIONS. NFA 2022 0.036 CONINSP 0.036 STBG LG URB 2022 1.200 CONST 1.200 NFA 2022 0.300 CONST 0.300 CITY OF SARATOGA SPRINGS, SARATOGA COUNTY. SA322 STBG LG URB 2020 0.087 PRELDES 0.087 NFA 2020 0.023 PRELDES 0.023 AQC:C2Z SARATOGA TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.900 0.110 0.110 1.680 0.000

TN OF FREEMANS BRIDGE ROAD MULTI-USE PATH STBG LG URB 2022 0.112 CONINSP 0.112 GLENVILLE NFA 2022 0.028 CONINSP 0.028 176159 FROM THE SCOTIA-GLENVILLE LOOP SEGMENT OF THE STBG LG URB 2022 0.934 CONST 0.934 MOHAWK-HUDSON TRAIL TO DUTCH MEADOWS LANE NFA 2022 0.233 CONST 0.233 STBG LG URB 2021 0.091 DETLDES 0.091 NFA 2021 0.023 DETLDES 0.023 CONSTRUCT A 4,800 FOOT LONG AND 10 FOOT WIDE PROTECTED STBG LG URB 2021 0.092 PRELDES 0.092 MULTI-USE PATH WITH 3 NEW CROSSWALKS. NFA 2021 0.023 PRELDES 0.023 STBG LG URB 2021 0.045 ROWINCD 0.045 TOWN OF GLENVILLE, SCHENECTADY COUNTY. S265 NFA 2021 0.011 ROWINCD 0.011 STBG LG URB 2021 0.194 ROWACQU 0.194 NFA 2021 0.048 ROWACQU 0.048 AQC:C2Z SCHENECTADY TPC : $2-$4 M TOTAL 4YR COST : 1.834 0.000 0.527 1.307 0.000

CITY OF FRANKLIN STREET CYCLE TRACK, CITY OF SCHENECTADY STBG LG URB 2023 0.038 CONINSP 0.038 SCHENECTADY NFA 2023 0.009 CONINSP 0.009 176160 INSTALL A PROTECTED TWO-WAY CYCLE TRACK ON FRANKLIN STBG LG URB 2023 0.319 CONST 0.319 STREET FROM NOTT TERRACE TO JAY STREET. NFA 2023 0.080 CONST 0.080 STBG LG URB 2022 0.030 DETLDES 0.030 NFA 2022 0.007 DETLDES 0.007 CITY OF SCHENECTADY, SCHENECTADY COUNTY. S266 STBG LG URB 2022 0.030 PRELDES 0.030 NFA 2022 0.007 PRELDES 0.007 AQC:C2Z SCHENECTADY TPC : < $0.75 M TOTAL 4YR COST : 0.520 0.000 0.000 0.074 0.446 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 38 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CITY OF TROY NY 2 CORRIDOR PROJECT, NY 2 (CONGRESS AND FERRY STREETS) FROM STBG LG URB 2021 0.227 DETLDES 0.227 11TH STREET WEST TO THE CONGRESS STREET BRIDGE RAMPS NFA 2021 0.057 DETLDES 0.057 176161 STBG LG URB 2021 0.227 PRELDES 0.227 CORRIDOR IMPROVEMENTS, INCLUDES: MILL & FILL, RESTRIPING TO NFA 2021 0.057 PRELDES 0.057 ONE DRIVING LANE EACH, REPAIR 50% OF SIDEWALKS, ADD CURB EXTENSIONS AND BIKE LANES

CITY OF TROY, RENSSELAER COUNTY. R339 AQC:A10Z RENSSELAER TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.568 0.000 0.568 0.000 0.000

VIL OF SCOTIA SUNNYSIDE ROAD OVER AMTRAK, BRIDGE REHABILITATION STBG LG URB 2021 0.276 DETLDES 0.276 NFA 2021 0.069 DETLDES 0.069 176162 REPAIR CONCRETE PIERS, CAP BEAMS, AND STEEL STRUCTURAL STBG LG URB 2021 0.276 PRELDES 0.276 MEMBERS, REPLACE STEEL BEARINGS AND DECK INCLUDING RAILINGS, NFA 2021 0.069 PRELDES 0.069 STBG LG URB 2022 0.292 CONINSP 0.292 BIKE LANES, AND SIDEWALK ON SOUTH SIDE. NFA 2022 0.073 CONINSP 0.073 STBG LG URB 2022 2.994 CONST 2.994 VILLAGE OF SCOTIA, SCHENECTADY COUNTY, BIN 2257170. S263 NFA 2022 0.748 CONST 0.748 AQC:A19Z SCHENECTADY TPC : $7.5-$12 M TOTAL 4YR COST : 4.797 0.000 0.690 4.107 0.000

CITY OF ALBANY HENRY JOHNSON BOULEVARD MILL & FILL, FROM SHERIDAN AVENUE TO STBG LG URB 2022 0.071 CONINSP 0.071 LIVINGSTON AVENUE NFA 2022 0.018 CONINSP 0.018 176163 STBG LG URB 2022 0.592 CONST 0.592 CITY OF ALBANY, ALBANY COUNTY. A593 NFA 2022 0.148 CONST 0.148 STBG LG URB 2021 0.054 DETLDES 0.054 NFA 2021 0.014 DETLDES 0.014 STBG LG URB 2021 0.054 PRELDES 0.054 NFA 2021 0.014 PRELDES 0.014 AQC:A10Z ALBANY TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.965 0.000 0.136 0.829 0.000

CITY OF ALBANY LARK STREET MILL & FILL, FROM MADISON AVENUE TO WASHINGTON STBG LG URB 2022 0.055 CONINSP 0.055 AVENUE NFA 2022 0.014 CONINSP 0.014 176164 STBG LG URB 2022 0.456 CONST 0.456 ADA-COMPLIANT PEDESTRIAN AMENITIES FOR ALL SIDEWALKS AND NFA 2022 0.115 CONST 0.115 STBG LG URB 2021 0.042 DETLDES 0.042 CROSSWALKS. REPLACE 1,200 SQUARE FEET OF SIDEWALK. NFA 2021 0.010 DETLDES 0.010 STBG LG URB 2021 0.042 PRELDES 0.042 CITY OF ALBANY, ALBANY COUNTY. A594 NFA 2021 0.010 PRELDES 0.010 AQC:A10Z ALBANY TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.744 0.000 0.104 0.640 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 39 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CITY OF CITY OF RENSSELAER THIRD AVENUE PAVEMENT REHABILITATION & STBG LG URB 2021 0.032 DETLDES 0.032 RENSSELAER BIKE/PED IMPROVEMENTS, FROM THE BRIDGE TO CITY/TOWN LINE NFA 2021 0.008 DETLDES 0.008 176165 STBG LG URB 2021 0.043 CONINSP 0.043 CITY OF RENSSELAER, RENSSEALER COUNTY. R338 NFA 2021 0.011 CONINSP 0.011 STBG LG URB 2021 0.354 CONST 0.354 NFA 2021 0.088 CONST 0.088 STBG LG URB 2020 0.032 PRELDES 0.032 NFA 2020 0.008 PRELDES 0.008 AQC:A10Z RENSSELAER TPC : < $0.75 M TOTAL 4YR COST : 0.576 0.040 0.536 0.000 0.000

SCHENECTADY GUILDERLAND AVENUE MILL & FILL FROM CURRY ROAD (NY 7) TO THE STBG LG URB 2021 0.040 DETLDES 0.040 CO SCHENECTADY CITY LINE NFA 2021 0.010 DETLDES 0.010 176166 STBG LG URB 2021 0.045 PRELDES 0.045 ADD 8 CURB RAMP NODES AT ALL THE TOWN INTERSECTIONS WITHIN NFA 2021 0.011 PRELDES 0.011 STBG LG URB 2021 0.080 CONINSP 0.080 THE PROJECT LIMITS, ADD APPROXIMATELY 100 FEET OF SIDEWALK NFA 2021 0.020 CONINSP 0.020 AND CONCRETE CURBING IN FRONT OF THE BELLEVUE GOSPEL STBG LG URB 2021 0.721 CONST 0.721 CHAPEL, IMPROVE THE TWO EXISTING CURB RAMPS AT THE CURRY NFA 2021 0.180 CONST 0.180 ROAD/GUILDERLAND AVENUE INTERSECTION.

AND HELDERBERG AVENUE MILL & FILL, FROM CURRY ROAD (STATE ROUTE 7) TO CITY OF SCHENECTADY MUNICIPAL LINE (NEAR AMELIA STREET)

SIDEWALK: REPLACE OR REPAIR 750 LINEAR FEET, ADD 200 FEET NEW, INSTALL 28 ADA CURB RAMPS, IMPROVE PAVEMENT MARKINGS & SIGNAGE WHERE NEEDED.

TOWN OF ROTTERDAM, SCHENECTADY COUNTY. S261 THIS PIN NOW INCLUDES PIN 176167 (S262) AQC:A10Z SCHENECTADY TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.107 0.000 1.107 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 40 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

TN OF DELAWARE AVENUE COMPLETE STREETS TAP FLEX 2021 0.150 DETLDES 0.150 BETHLEHEM NFA 2021 0.038 DETLDES 0.038 176168 MILL & FILL FROM ELSMERE AVENUE TO BRIDGE, TAP FLEX 2021 0.295 PRELDES 0.295 COMPLETE STREETS & ROAD DIET PROJECT NFA 2021 0.074 PRELDES 0.074 TAP FLEX 2021 0.004 ROWINCD 0.004 NFA 2021 0.001 ROWINCD 0.001 TOWN OF BETHLEHEM, ALBANY COUNTY. A601 TAP FLEX 2022 0.036 ROWACQU 0.036 NFA 2022 0.009 ROWACQU 0.009 FUNDING FOR PAVEMENT PRESERVATION IS NOT INCLUDED HERE AND TAP FLEX 2023 0.514 CONINSP 0.514 WILL BE PAID FOR BY THE NYSDOT PAVEMENT PRESERVATION NFA 2023 0.128 CONINSP 0.128 SET-ASIDE TAP FLEX 2023 1.912 CONST 1.912 NFA 2023 0.478 CONST 0.478 AQC:A2Z,A10Z ALBANY TPC : $4.6-$7.5 M TOTAL 4YR COST : 3.639 0.000 0.562 0.045 3.032

CITY OF CRAIG STREET PAVEMENT REHABILITATION, FROM ALBANY STREET TO STBG LG URB 2022 0.025 DETLDES 0.025 SCHENECTADY WYLLIE STREET NFA 2022 0.006 DETLDES 0.006 176169 STBG LG URB 2022 0.025 PRELDES 0.025 INCLUDES SELECT FULL DEPTH REPAIRS, ADA NON-COMPLIANT NFA 2022 0.006 PRELDES 0.006 STBG LG URB 2023 0.062 CONINSP 0.062 INTERSECTIONS WILL BE MADE COMPLIANT. HIGH VISIBILITY, LADDER NFA 2023 0.015 CONINSP 0.015 BAR STYLE, CROSSWALKS WILL BE INSTALLED AT EVERY CROSSING. STBG LG URB 2023 0.516 CONST 0.516 NFA 2023 0.129 CONST 0.129 CITY OF SCHENECTADY, SCHENECTADY COUNTY. S259 AQC:A10Z SCHENECTADY TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.784 0.000 0.000 0.062 0.722

RENSSELAER CO EASTERN UNION TURNPIKE (CR 49) OVERLAY, GLASS LAKE ROAD TO NY STBG FLEX 2021 0.002 DETLDES 0.002 43 STBG FLEX 2022 0.018 CONINSP 0.018 176170 NFA 2022 0.004 CONINSP 0.004 TOWN OF SAND LAKE, RENSSELAER COUNTY. R333 STBG FLEX 2022 0.149 CONST 0.149 NFA 2022 0.037 CONST 0.037 STBG FLEX 2021 0.002 PRELDES 0.002 AQC:A10Z RENSSELAER TPC : < $0.75 M TOTAL 4YR COST : 0.212 0.000 0.004 0.208 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 41 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

RENSSELAER CO PERSHING AVENUE (CR 68) OVERLAY, FROM TROY AVENUE TO PECK STBG LG URB 2021 0.002 DETLDES 0.002 ROAD STBG LG URB 2021 0.060 CONINSP 0.060 176171 NFA 2021 0.015 CONINSP 0.015 AND STBG LG URB 2021 0.590 CONST 0.590 NFA 2021 0.147 CONST 0.147 STBG LG URB 2020 0.002 PRELDES 0.002 SNYDERS LAKE ROAD (CR 68) FROM CR 65 (BLOOMINGROVE DRIVE) TO TROY AVENUE: OVERLAY

TOWN OF NORTH GREENBUSH, RENSSELAER COUNTY. R335

INCLUDES C & CI PHASES OF PIN 176176 (R337) AQC:A10Z RENSSELAER TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.816 0.002 0.814 0.000 0.000

RENSSELAER CO FOGARTY ROAD (CR 126) OVERLAY, FROM WETSEL ROAD TO STBG FLEX 2021 0.002 DETLDES 0.002 PITTSTOWN TOWN LINE STBG FLEX 2022 0.013 CONINSP 0.013 176172 NFA 2022 0.003 CONINSP 0.003 TOWN OF SCHAGHTICOKE, RENSSELAER COUNTY. R334 STBG FLEX 2022 0.106 CONST 0.106 NFA 2022 0.027 CONST 0.027 STBG FLEX 2020 0.002 PRELDES 0.002 AQC:A10Z RENSSELAER TPC : < $0.75 M TOTAL 4YR COST : 0.153 0.002 0.002 0.149 0.000

RENSSELAER CO RIVER ROAD (CR 120) OVERLAY, FROM CR 125 TO WASHINGTON COUNTY STBG FLEX 2022 0.013 CONINSP 0.013 LINE NFA 2022 0.003 CONINSP 0.003 176173 STBG FLEX 2022 0.103 CONST 0.103 TOWN OF SCHAGHTICOKE, RENSSELAER COUNTY. R336 NFA 2022 0.027 CONST 0.027 STBG FLEX 2022 0.002 PRELDES 0.002 STBG FLEX 2022 0.002 DETLDES 0.002 AQC:A10Z RENSSELAER TPC : < $0.75 M TOTAL 4YR COST : 0.150 0.000 0.000 0.150 0.000

VIL OF GREEN COHOES AVENUE, ARCH STREET TO THE COHOES CITY LINE: MILL & STBG LG URB 2022 0.074 CONINSP 0.074 ISLAND FILL NFA 2022 0.018 CONINSP 0.018 176174 STBG LG URB 2022 0.615 CONST 0.615 INSTALL CONCRETE SIDEWALKS FROM ARCH STREET TO TIBBITS NFA 2022 0.155 CONST 0.155 STBG LG URB 2021 0.075 DETLDES 0.075 AVENUE AND REPAIR ALL SIDEWALK RAMPS TO MEET ADA STANDARDS. NFA 2021 0.019 DETLDES 0.019 STBG LG URB 2021 0.075 PRELDES 0.075 VILLAGE OF GREEN ISLAND, ALBANY COUNTY. A599 NFA 2021 0.019 PRELDES 0.019 AQC:A10Z ALBANY TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.050 0.000 0.188 0.862 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 42 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CITY OF SOUTH STREET BRIDGE REPLACEMENT & PEDESTRIAN IMPROVEMENTS, STBG LG URB 2021 0.022 ROWACQU 0.022 RENSSELAER SOUTH STREET BETWEEN 2ND AVENUE AND AIKEN AVE NFA 2021 0.006 ROWACQU 0.006 176175 STBG LG URB 2020 0.120 PRELDES 0.120 CITY OF RENSSELAER, RENSSELAER COUNTY, BIN 2202200. R331 NFA 2020 0.030 PRELDES 0.030 STBG LG URB 2021 0.120 DETLDES 0.120 NFA 2021 0.030 DETLDES 0.030 STBG LG URB 2021 0.018 ROWINCD 0.018 NFA 2021 0.004 ROWINCD 0.004 STBG LG URB 2022 0.175 CONINSP 0.175 NFA 2022 0.044 CONINSP 0.044 STBG LG URB 2022 1.300 CONST 1.300 NFA 2022 0.326 CONST 0.326 AQC:A19Z RENSSELAER TPC : $2-$4 M TOTAL 4YR COST : 2.195 0.150 0.200 1.845 0.000

RENSSELAER CO SNYDERS LAKE ROAD (CR 68) FROM CR 65 (BLOOMINGROVE DRIVE) TO STBG LG URB 2021 0.002 DETLDES 0.002 TROY AVENUE: OVERLAY STBG LG URB 2020 0.002 PRELDES 0.002 176176 TOWN OF NORTH GREENBUSH, RENSSELAER COUNTY. R337

C & CI TO BE ET UNDER PIN 1761.71 (R335) AQC:A10Z RENSSELAER TPC : < $0.75 M TOTAL 4YR COST : 0.004 0.002 0.002 0.000 0.000

RENSSELAER CO BEST ROAD (CR 55) : OVERLAY, FROM SAND LAKE TOWN LINE TO NY 150 STBG FLEX 2021 0.002 DETLDES 0.002 STBG FLEX 2022 0.032 CONINSP 0.032 176177 TOWN OF SAND LAKE, RENSSELAER COUNTY. R332 NFA 2022 0.008 CONINSP 0.008 STBG FLEX 2022 0.278 CONST 0.278 NFA 2022 0.070 CONST 0.070 STBG FLEX 2021 0.002 PRELDES 0.002 AQC:A10Z RENSSELAER TPC : < $0.75 M TOTAL 4YR COST : 0.392 0.000 0.004 0.388 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 43 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

SARATOGA CO COONS CROSSING ROAD OVER ANTHONY KILL BRIDGE REPLACEMENT STBG-OFF 2021 0.008 ROWINCD 0.008 NFA 2021 0.003 ROWINCD 0.003 176178 TOWN OF HALFMOON, SARATOGA COUNTY, BIN 2202750.SA317 STBG-OFF 2022 0.101 CONINSP 0.101 NFA 2022 0.025 CONINSP 0.025 STBG-OFF 2022 0.840 CONST 0.840 NFA 2022 0.210 CONST 0.210 STBG-OFF 2021 0.061 DETLDES 0.061 NFA 2021 0.015 DETLDES 0.015 STBG-OFF 2021 0.006 ROWACQU 0.006 NFA 2021 0.002 ROWACQU 0.002 STBG-OFF 2021 0.086 PRELDES 0.086 NFA 2021 0.021 PRELDES 0.021 AQC:A19Z SARATOGA TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.378 0.000 0.202 1.176 0.000

SARATOGA CO LASHER ROAD BRIDGE OVER THE MOURNING KILL REHABILITATION, STBG FLEX 2022 0.046 DETLDES 0.046 ELEMENT SPECIFIC REPAIRS NFA 2022 0.011 DETLDES 0.011 176179 STBG FLEX 2022 0.046 PRELDES 0.046 TOWN OF BALLSTON, SARATOGA COUNTY, BIN 3304700. SA318 NFA 2022 0.011 PRELDES 0.011 STBG FLEX 2023 0.063 CONINSP 0.063 NFA 2023 0.016 CONINSP 0.016 STBG FLEX 2023 0.526 CONST 0.526 NFA 2023 0.131 CONST 0.131 AQC:A19Z SARATOGA TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.850 0.000 0.000 0.114 0.736

TN OF COLONIE ALBANY SHAKER ROAD (CR 151), WOLF ROAD TO EVERETT ROAD: HSIP 2022 0.045 CONINSP 0.045 SAFETY IMPROVEMENTS NFA 2022 0.005 CONINSP 0.005 176180 HSIP 2022 0.411 CONST 0.411 SPEED LIMIT REDUCTION, ADDITIONAL PEDESTRIAN IMPROVEMENTS NFA 2022 0.046 CONST 0.046 2022 0.285 CONST 0.285 AT SELECT INTERSECTIONS & A NEW TRAFFIC SIGNAL AT SHAKER NFA HSIP 2021 0.031 DETLDES 0.031 ELEMENTARY . NFA 2021 0.003 DETLDES 0.003 HSIP 2021 0.031 PRELDES 0.031 TOWN OF COLONIE, ALBANY COUNTY. A603 NFA 2021 0.003 PRELDES 0.003 AQC:K1Z ALBANY TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.860 0.000 0.068 0.792 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 44 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

TN OF NY ROUTE 5S PEDESTRIAN/BICYCLE ACCESS IMPROVEMENTS FROM NY TAP FLEX 2022 0.180 CONINSP 0.180 ROTTERDAM 103 / BRIDGE STREET TO PARKIS STREET AND ON IROQUOIS STREET NFA 2022 0.045 CONINSP 0.045 176182 TAP FLEX 2022 1.796 CONST 1.796 INCLUDES: CONCRETE SIDEWALK; PAVED, COLORED BIKE LANES; NFA 2022 0.449 CONST 0.449 TAP FLEX 2021 0.114 DETLDES 0.114 HIGH-VISIBILITY CROSSWALKS; SIGNS; SHARROWS; INTERPRETIVE NFA 2021 0.029 DETLDES 0.029 SIGNAGE; AND LANDSCAPING. TAP FLEX 2021 0.115 PRELDES 0.115 NFA 2021 0.028 PRELDES 0.028 TOWN OF ROTTERDAM, SCHENECTADY COUNTY. S267 AQC:C2 SCHENECTADY TPC : $2-$4 M TOTAL 4YR COST : 2.756 0.000 0.286 2.470 0.000

CITY OF RENSSELEAR BICYCLE & PEDESTRIANS ACCESS IMPROVEMENTS TAP FLEX 2022 0.221 CONINSP 0.221 RENSSELEAR NFA 2022 0.055 CONINSP 0.055 176183 1.8 MILE PAVED, OFF-ROAD TRAIL THROUGH THE HOLLOW, 0.81 MILES TAP FLEX 2022 1.987 CONST 1.987 OF ON-ROAD SHARROWS & SIGNAGE, & PEDESTRIAN CROSSING NFA 2022 0.497 CONST 0.497 TAP FLEX 2020 0.124 PRELDES 0.124 PROVEMENTS AT FIVE INTERSECTIONS. NFA 2020 0.031 PRELDES 0.031 TAP FLEX 2021 0.124 DETLDES 0.124 CITY OF RENSSELEAR, RENSSELEAR COUNTY. R345 NFA 2021 0.031 DETLDES 0.031 AQC:C2 RENSSELAER TPC : $2-$4 M TOTAL 4YR COST : 3.070 0.155 0.155 2.760 0.000

VIL OF SCOTIA WASHINGTON AVENUE BIKE/PED CONNECTION TAP FLEX 2022 0.072 CONINSP 0.072 NFA 2022 0.018 CONINSP 0.018 176184 INCLUDES A MULTI-USE PATH, SIDEWALK & CROSSWALKS CONNECTING TAP FLEX 2022 0.489 CONST 0.489 RESIDENTIAL NEIGHBORHOODS TO THE COLLINS LAKE ACCESS AREA NFA 2022 0.122 CONST 0.122 TAP FLEX 2021 0.120 DETLDES 0.120 AND TO AN EXISTING TRAIL CONNECTOR. NFA 2021 0.030 DETLDES 0.030 TAP FLEX 2021 0.032 PRELDES 0.032 VILLAGE OF SCOTIA, SCHENECTADY COUNTY. S268 NFA 2021 0.008 PRELDES 0.008 AQC:C2 SCHENECTADY TPC : $2-$4 M TOTAL 4YR COST : 0.891 0.000 0.190 0.701 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 45 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

SCHENECTADY ROSENDALE ROAD/OLD RIVER ROAD INTERSECTION IMPROVEMENTS CMAQ 2021 0.055 PRELDES 0.055 CO NFA 2021 0.014 PRELDES 0.014 176186 TRAFFIC SIGNAL, WIDER TRAVEL LANES AND SHOULDERS, AND TURN CMAQ 2020 0.100 PRELDES 0.100 LANES. PROVIDE STANDARD STOPPING SIGHT DISTANCES & WIDER NFA 2020 0.025 PRELDES 0.025 CMAQ 2020 0.032 AREAS FOR ERRANT VEHICLES. 0.032 ROWINCD NFA 2020 0.008 ROWINCD 0.008 CMAQ 2021 0.112 DETLDES 0.112 TOWN OF NISKAYUNA, SCHENECTADY COUNTY. S269 NFA 2021 0.028 DETLDES 0.028 CMAQ 2021 0.168 ROWACQU 0.168 NFA 2021 0.041 ROWACQU 0.041 CMAQ 2022 0.213 CONINSP 0.213 NFA 2022 0.053 CONINSP 0.053 CMAQ 2022 1.155 CONST 1.155 NFA 2022 0.289 CONST 0.289 AQC:D1 SCHENECTADY TPC : $2-$4 M TOTAL 4YR COST : 2.293 0.165 0.418 1.710 0.000

TOWN OF REPLACEMENT OF 6100 FT OF DETERIORATED SIDEWALK AND 2,900 FT TAP RURAL 2020 0.075 DETLDES 0.075 WARRENSBURG NEW SIDEWALK ON RIVER STREET BETWEEN PERRY LANE AND NFA 2020 0.019 DETLDES 0.019 176187 JOHNSON DRIVE, TOWN OF WARRENSBURG, WARREN COUNTY. TAP RURAL 2020 0.100 PRELDES 0.100 INCLUDES CROSSWALKS AND ADA DETECTABLE WARNING PLATES AND NFA 2020 0.025 PRELDES 0.025 PEDESTRIAN SIGNING AND STRIPING. TAP RURAL 2022 0.092 CONINSP 0.092 NFA 2022 0.023 CONINSP 0.023 TAP RURAL 2022 0.548 CONST 0.548 NFA 2022 0.137 CONST 0.137 AQC:EXEMPT WARREN TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.019 0.219 0.000 0.800 0.000

CITY OF GLENS NEW CONNECTIONS BETWEEN THE CITY OF GLENS FALLS AND TAP FLEX 2020 0.042 DETLDES 0.042 FALLS REGIONAL TRAIL INFRASTRUCTURE INCLUDING THE WARREN COUNTY NFA 2020 0.011 DETLDES 0.011 176188 BIKEWAY AND THE FEEDER CANAL. TAP FLEX 2020 0.064 PRELDES 0.064 NFA 2020 0.016 PRELDES 0.016 TAP FLEX 2022 0.060 CONINSP 0.060 NFA 2022 0.015 CONINSP 0.015 TAP FLEX 2022 0.823 CONST 0.823 NFA 2022 0.206 CONST 0.206 AQC:EXEMPT WARREN TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.237 0.133 0.000 1.104 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 46 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

ESSEX COUNTY TAHAWUS ROAD BRIDGE (BIN 3302690) OVER SANFORD LAKE, TOWN OF STBG FLEX 2021 0.240 PRELDES 0.240 ELIZABETHTOWN, ESSEX COUNTY, BRIDGE REPLACEMENT NFA 2021 0.060 PRELDES 0.060 176190 STBG FLEX 2021 0.008 ROWINCD 0.008 NFA 2021 0.002 ROWINCD 0.002 STBG FLEX 2021 0.240 DETLDES 0.240 NFA 2021 0.060 DETLDES 0.060 STBG FLEX 2021 0.032 ROWACQU 0.032 NFA 2021 0.008 ROWACQU 0.008 STBG FLEX 2022 0.264 CONINSP 0.264 NFA 2022 0.066 CONINSP 0.066 STBG FLEX 2022 2.360 CONST 2.360 NFA 2022 0.590 CONST 0.590 AQC:EXEMPT ESSEX TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.930 0.000 0.650 3.280 0.000

NYSDOT CR 61 RIVER ROAD BRIDGE (BIN 3302910) REPLACEMENT OVER STBG FLEX 2021 0.128 DETLDES 0.128 , NEW , GREENE COUNTY NFA 2021 0.032 DETLDES 0.032 176191 STBG FLEX 2021 0.128 PRELDES 0.128 NFA 2021 0.032 PRELDES 0.032 STBG FLEX 2022 0.008 ROWACQU 0.008 NFA 2022 0.002 ROWACQU 0.002 STBG FLEX 2022 0.008 ROWINCD 0.008 NFA 2022 0.002 ROWINCD 0.002 STBG FLEX 2023 0.160 CONINSP 0.160 NFA 2023 0.040 CONINSP 0.040 STBG FLEX 2023 1.240 CONST 1.240 NFA 2023 0.310 CONST 0.310 AQC:EXEMPT GREENE TPC : $1.2-$2.5 M TOTAL 4YR COST : 2.090 0.000 0.320 0.020 1.750

NYSDOT CR 40 MAPLECREST RD BRIDGE OVER BATAVIA KILL (BIN 3302860) STBG FLEX 2021 0.128 DETLDES 0.128 REPLACEMENT OVER THE BATAVIA KILL. TOWN OF WINDHAM, GREENE NFA 2021 0.032 DETLDES 0.032 176192 COUNTY STBG FLEX 2021 0.128 PRELDES 0.128 NFA 2021 0.032 PRELDES 0.032 STBG FLEX 2022 0.160 ROWACQU 0.160 NFA 2022 0.040 ROWACQU 0.040 STBG FLEX 2022 0.016 ROWINCD 0.016 NFA 2022 0.004 ROWINCD 0.004 STBG FLEX 2023 0.144 CONINSP 0.144 NFA 2023 0.036 CONINSP 0.036 STBG FLEX 2023 1.280 CONST 1.280 NFA 2023 0.320 CONST 0.320 AQC:EXEMPT GREENE TPC : $2-$4 M TOTAL 4YR COST : 2.320 0.000 0.320 0.220 1.780 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 47 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE STREET BRIDGE (BIN 3201430) REPLACEMENT OVER SCHOHARIE STBG FLEX 2021 0.128 DETLDES 0.128 CREEK, TOWN OF HUNTER, GREENE COUNTY NFA 2021 0.032 DETLDES 0.032 176193 STBG FLEX 2021 0.128 PRELDES 0.128 NFA 2021 0.032 PRELDES 0.032 STBG FLEX 2022 0.016 ROWACQU 0.016 NFA 2022 0.004 ROWACQU 0.004 STBG FLEX 2022 0.016 ROWINCD 0.016 NFA 2022 0.004 ROWINCD 0.004 STBG FLEX 2023 0.144 CONINSP 0.144 NFA 2023 0.036 CONINSP 0.036 STBG FLEX 2023 1.296 CONST 1.296 NFA 2023 0.324 CONST 0.324 AQC:EXEMPT GREENE TPC : $2-$4 M TOTAL 4YR COST : 2.160 0.000 0.320 0.040 1.800

CITY OF GLENS PAVEMENT REHABILITATION OF 2600' OF WEBSTER AVENUE FROM GLEN STBG FLEX 2021 0.048 DETLDES 0.048 FALLS STREET TO BAY STREET, CITY OF GLENS FALLS, WARREN COUNTY, NY. NFA 2021 0.012 DETLDES 0.012 176200 REPLACEMENT OF APPROXIMATELY 1100' OF SUBSTANDARD SIDEWALK STBG FLEX 2021 0.048 PRELDES 0.048 AND 12 CURB RAMPS. OPERATION AND PEDESTRIAN ACCESSIBILITY NFA 2021 0.012 PRELDES 0.012 STBG FLEX 2023 1.072 CONST 1.072 UPGRADES TO THE TRAFFIC SIGNALS AT THE FIRE RD / GLEN ST AND NFA 2023 0.268 CONST 0.268 WEBSTER AVE / GLEN ST INTERSECTIONS. AQC:EXEMPT WARREN TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.460 0.000 0.120 0.000 1.340

NYSDOT SLOPE REPAIR SFY 24, TO ADDRESS SPECIFIC NEEDS ON VARIOUS STBG FLEX 2023 0.151 PRELDES 0.151 FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 NFA 2023 0.035 PRELDES 0.035 180902 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, STBG FLEX 2023 0.149 DETLDES 0.149 SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE NFA 2023 0.037 DETLDES 0.037 STBG FLEX 2023 0.020 SCOPING 0.020 DETERMINED). NFA 2023 0.005 SCOPING 0.005 AQC:EXEMPT MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.397 0.000 0.000 0.000 0.397

NYSDOT TMC ITS PROJECTS NHPP 2020 0.120 MISC 0.120 NFA 2020 0.030 MISC 0.030 180950 WITHIN ALBANY, RENSSELAER, SARATOGA AND SCHENECTADY NHPP 2022 0.120 MISC 0.120 COUNTIES. RG37C NFA 2022 0.030 MISC 0.030 NHPP 2021 0.120 MISC 0.120 NFA 2021 0.030 MISC 0.030 AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.450 0.150 0.150 0.150 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 48 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT CULVERT REPAIR OR REPLACEMENT SFY19 AT THE FOLLOWING NHPP 2020 0.181 CONINSP 0.181 LOCATIONS IN REGION 1. NFA 2020 0.045 CONINSP 0.045 181014 NHPP 2020 2.463 CONST 2.463 CULVERTS REPLACED: NFA 2020 0.616 CONST 0.616 C170024 (WILL BE STBG FLEX 2020 0.025 CONINSP 0.025 2020 0.006 CONINSP 0.006 REPLACED WITH A 4-SIDED BOX) NFA STBG FLEX 2020 0.175 CONST 0.175 9N-1702-1325, HAGUE, WARREN NFA 2020 0.044 CONST 0.044 COUNTY. CULVERTS REPAIRED: CA00335, 9-1211-2369, NORTH HUDSON, ESSEX COUNTY C120145, 87I-1211-1175, NORTH HUDSON, ESSEX COUNTY C120149, 87I-1211-1194, NORTH HUDSON, ESSEX COUNTY C120158, 87I-1211-1225, NORTH HUDSON, ESSEX COUNTY C120177, 87I-1211-1265, ELIZABETHTOWN, ESSEX COUNTY C180011, 4-1803-1269, FORT ANN, WASHINGTON COUNTY C180031, 22-1808-1610, DRESDEN, WASHINGTON COUNTY, C120198, 87I-1211-1458SB, LEWIS, ESSEX COUNTY AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.555 3.555 0.000 0.000 0.000

NYSDOT TRAFFIC SIGNALS REBUILD SFY21 (WAS 1T0852) ON VARIOUS FEDERAL NHPP 2021 0.030 CONINSP 0.030 AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: NFA 2021 0.007 CONINSP 0.007 181016 ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, NHPP 2021 0.200 CONST 0.200 WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NFA 2021 0.050 CONST 0.050 STBG FLEX 2021 0.040 CONINSP 0.040 NFA 2021 0.010 CONINSP 0.010 STBG FLEX 2021 0.400 CONST 0.400 NFA 2021 0.100 CONST 0.100 NHPP 2020 0.014 DETLDES 0.014 NFA 2020 0.003 DETLDES 0.003 STBG FLEX 2020 0.028 DETLDES 0.028 NFA 2020 0.007 DETLDES 0.007 STBG FLEX 2020 0.004 ROWACQU 0.004 NFA 2020 0.001 ROWACQU 0.001 AQC:EXEMPT MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.894 0.057 0.837 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 49 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT NY 911F (FREEMANS BRIDGE) OVER THE / NHPP 2020 0.225 CONINSP 0.225 NFA 2020 0.056 CONINSP 0.056 181026 BRIDGE REHAB TO ADDRESS CONDITION RATING, AND ADDITION OF A NHPP 2020 2.415 CONST 2.415 MULTI-USE PATH ON THE BRIDGE NFA 2020 0.604 CONST 0.604

TOWN OF GLENVILLE, SCHENECTADY COUNTY, BIN 4050330. S238 AQC:A19P SCHENECTADY TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.300 3.300 0.000 0.000 0.000

NYSDOT ADA COMPLIANCE ON NY 4 AND NY 9/20 HSIP 2020 0.122 CONST 0.122 NFA 2020 0.013 CONST 0.013 181029 UPGRADE PEDESTRIAN FACILITIES TO ADA COMPLIANCE, UPGRADE STBG LG URB 2020 0.120 CONINSP 0.120 TRAFFIC SIGNAL AT NY 9/20 AND ELLIOT ROAD, & INSTALL SAFETY NFA 2020 0.030 CONINSP 0.030 FEATURES IDENTIFIED IN PSAP. STBG LG URB 2020 1.120 CONST 1.120 NFA 2020 0.280 CONST 0.280 STBG LG URB 2020 0.216 ROWACQU 0.216 NY 4: NY 9/20 TO GENET ELEMENTARY SCHOOL NFA 2020 0.054 ROWACQU 0.054 STBG LG URB 2020 0.030 ROWINCD 0.030 NY 9/20: HAYS ROAD TO NY 4 NFA 2020 0.007 ROWINCD 0.007

EAST GREENBUSH, RENSSELAER COUNTY, R349 AQC:EXEMPT RENSSELAER TPC : $2-$4 M TOTAL 4YR COST : 1.992 1.992 0.000 0.000 0.000

NYSDOT BRIDGE PRESERVATION SFY19 ON FEDERAL AID ELIGIBLE STATE NHPP 2020 0.200 CONINSP 0.200 HIGHWAYS: RT 140 OVER ALBANY RAIL TRAIL (BIN 1095909), TOWN OF NFA 2020 0.122 CONINSP 0.122 181034 BETHLEHEM, ALBANY COUNTY. WASHINGTON AVE EXT OVER I-87 (BIN NHPP 2020 3.200 CONST 3.200 1093209), CITY OF ALBANY, ALBANY COUNTY. NFA 2020 0.800 CONST 0.800 NHPP 2020 0.408 DETLDES 0.408 NFA 2020 0.102 DETLDES 0.102 AQC:EXEMPT ALBANY TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.832 4.832 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 50 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT CULVERT REPAIR/REPLACE SFY 20 ON VARIOUS FEDERAL AID ELIGIBLE STBG FLEX 2020 0.254 DETLDES 0.254 STATE HIGHWAYS: CA00265 (DESIGN APPROVAL 1810.09) IN WARREN NFA 2020 0.064 DETLDES 0.064 181035 COUNTY AND C120192 (DESIGN APPROVAL 1810.14), C120207 (DESIGN STBG FLEX 2020 0.010 ROWINCD 0.010 APPROVAL 1810.14), C120213 (DESIGN APPROVAL 1810.14), C120020, NFA 2020 0.002 ROWINCD 0.002 C120022, C120092 IN ESSEX COUNTY. STBG FLEX 2020 0.016 ROWACQU 0.016 NFA 2020 0.004 ROWACQU 0.004 NHPP 2021 0.235 CONINSP 0.235 NFA 2021 0.059 CONINSP 0.059 NHPP 2021 1.565 CONST 1.565 NFA 2021 0.391 CONST 0.391 STBG FLEX 2021 0.225 CONINSP 0.225 NFA 2021 0.056 CONINSP 0.056 STBG FLEX 2021 1.500 CONST 1.500 NFA 2021 0.375 CONST 0.375 AQC:EXEMPT MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.756 0.350 4.406 0.000 0.000

NYSDOT TMC OPERATIONS 19-20 (WAS PIN 180948) NHPP 2020 0.320 MISC 0.320 NFA 2020 0.080 MISC 0.080 181046 11/1/2019-10/31/2020

PERSONNEL, OPERATIONS CONTRACTS, REPAIRS EQUIPING A NEW TMC BUILDING, AND OTHER RECURRING COSTS. RG37A AQC:A7P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.400 0.400 0.000 0.000 0.000

NYSDOT FUNDING TMC ENGINEERING SUPPORT FROM 9/1/2020 TO 7/31/21 NHPP 2020 1.080 MISC 1.080 (REPLACED PIN 180949). RG37B NFA 2020 0.270 MISC 0.270 181051 AQC:A7P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 1.350 1.350 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 51 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT RUSTIC RAIL REPLACEMENT SFY20, ROUTE 73 AND ROUTE 3 IN ESSEX NHPP 2020 0.012 DETLDES 0.012 COUNTY; AND ROUTES 9N, 418 AND 912Q IN WARREN COUNTY. EMPIRE NFA 2020 0.003 DETLDES 0.003 181055 STATE TRAIL SIGN INSTALLATION IN ALBANY, SARATOGA, AND STBG FLEX 2020 0.012 DETLDES 0.012 WASHINGTON COUNTIES UTILIZING NON-FEDERAL FUNDS RG119 NFA 2020 0.003 DETLDES 0.003 NFA 2020 0.006 CONINSP 0.006 NFA 2020 0.061 CONST 0.061 NHPP 2020 0.309 CONINSP 0.309 NFA 2020 0.078 CONINSP 0.078 NHPP 2020 1.842 CONST 1.842 NFA 2020 0.460 CONST 0.460 STBG FLEX 2020 0.309 CONINSP 0.309 NFA 2020 0.078 CONINSP 0.078 STBG FLEX 2020 1.729 CONST 1.729 NFA 2020 0.432 CONST 0.432 AQC:EXEMPT MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.334 5.334 0.000 0.000 0.000

NYSDOT DURABLE PAVEMENT MARKINGS SFY20 ON VARIOUS FEDERAL AID HSIP 2020 0.024 CONINSP 0.024 ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, NFA 2020 0.003 CONINSP 0.003 181057 ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, HSIP 2020 0.224 CONST 0.224 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE NFA 2020 0.025 CONST 0.025 UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED NFA 2020 0.014 CONINSP 0.014 2020 0.124 CONST 0.124 ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC NFA NHPP 2020 0.192 CONINSP 0.192 COUNTERMEASURE. NFA 2020 0.048 CONINSP 0.048 NHPP 2020 1.748 CONST 1.748 NFA 2020 0.437 CONST 0.437 STBG FLEX 2020 0.098 CONINSP 0.098 NFA 2020 0.024 CONINSP 0.024 STBG FLEX 2020 0.896 CONST 0.896 NFA 2020 0.224 CONST 0.224 NHPP 2020 0.112 DETLDES 0.112 NFA 2020 0.028 DETLDES 0.028 NHPP 2020 0.048 PRELDES 0.048 NFA 2020 0.012 PRELDES 0.012 STBG FLEX 2020 0.112 DETLDES 0.112 NFA 2020 0.028 DETLDES 0.028 STBG FLEX 2020 0.048 PRELDES 0.048 NFA 2020 0.012 PRELDES 0.012 AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.481 4.481 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 52 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT SLOPE REPAIR SFY 25, PREVENTIVE AND/OR DEMAND, TO ADDRESS NHPP 2021 0.084 DETLDES 0.084 SPECIFIC NEEDS ON VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS NFA 2021 0.021 DETLDES 0.021 181058 IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, STBG FLEX 2021 0.084 DETLDES 0.084 RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON NFA 2021 0.021 DETLDES 0.021 NHPP 2022 0.120 CONINSP 0.120 (EXACT LOCATIONS TO BE DETERMINED). NFA 2022 0.030 CONINSP 0.030 NHPP 2022 1.200 CONST 1.200 NFA 2022 0.300 CONST 0.300 STBG FLEX 2022 0.120 CONINSP 0.120 NFA 2022 0.030 CONINSP 0.030 STBG FLEX 2022 1.200 CONST 1.200 NFA 2022 0.300 CONST 0.300 NHPP 2021 0.036 PRELDES 0.036 NFA 2021 0.009 PRELDES 0.009 STBG FLEX 2021 0.036 PRELDES 0.036 NFA 2021 0.009 PRELDES 0.009 AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.600 0.000 0.300 3.300 0.000

NYSDOT TRAFFIC SIGNALS REBUILD SFY22, ON VARIOUS FEDERAL AID ELIGIBLE NHPP 2021 0.020 CONINSP 0.020 STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, NFA 2021 0.005 CONINSP 0.005 181063 GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, NHPP 2021 0.200 CONST 0.200 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NFA 2021 0.050 CONST 0.050 STBG FLEX 2021 0.110 CONINSP 0.110 NFA 2021 0.028 CONINSP 0.028 STBG FLEX 2021 0.500 CONST 0.500 NFA 2021 0.125 CONST 0.125 STBG FLEX 2020 0.022 PRELDES 0.022 NFA 2020 0.006 PRELDES 0.006 STBG FLEX 2020 0.022 DETLDES 0.022 NFA 2020 0.006 DETLDES 0.006 STBG FLEX 2021 0.004 ROWACQU 0.004 NFA 2021 0.001 ROWACQU 0.001 STBG FLEX 2021 0.004 ROWINCD 0.004 NFA 2021 0.001 ROWINCD 0.001 AQC:EXEMPT MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.104 0.056 1.048 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 53 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT DURABLE PAVEMENT MARKINGS SFY21 ON VARIOUS FEDERAL AID HSIP 2021 0.036 CONINSP 0.036 ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, NFA 2021 0.004 CONINSP 0.004 181065 ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, HSIP 2021 0.360 CONST 0.360 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE NFA 2021 0.040 CONST 0.040 NHPP 2021 0.200 CONINSP 0.200 UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED NFA 2021 0.050 CONINSP 0.050 ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC NHPP 2021 1.500 CONST 1.500 COUNTERMEASURE. NFA 2021 0.375 CONST 0.375 STBG FLEX 2021 0.050 CONINSP 0.050 NFA 2021 0.012 CONINSP 0.012 STBG FLEX 2021 0.600 CONST 0.600 NFA 2021 0.150 CONST 0.150 STBG LG URB 2021 0.016 CONINSP 0.016 NFA 2021 0.004 CONINSP 0.004 STBG LG URB 2021 0.160 CONST 0.160 NFA 2021 0.040 CONST 0.040 NHPP 2021 0.095 PRELDES 0.095 NFA 2021 0.024 PRELDES 0.024 NHPP 2021 0.095 DETLDES 0.095 NFA 2021 0.024 DETLDES 0.024 AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.835 0.000 3.835 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 54 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PAVEMENT MAINTENANCE SFY20A: NFA 2020 0.205 CONINSP 0.205 ROUTE 86 S.H. 1151, 1177, 1178 RM 86-1202-1017 (-543) TO RM NFA 2020 2.053 CONST 2.053 181066 86-1202-1085 (-400) (TOWN OF NORTH ELBA & VILLAGE OF LAKE NHPP 2020 0.240 CONINSP 0.240 PLACID) NFA 2020 0.060 CONINSP 0.060 ROUTE 196 S.H. 9312, 1080, 720, 720A RM 196-1801-1001 (-509) TO RM NHPP 2020 2.401 CONST 2.401 2020 0.600 CONST 0.600 196-1801-1013 (+154) (VILLAGE OF HUDSON FALLS AND TOWN OF NFA STBG FLEX 2020 0.261 CONINSP 0.261 KINGSBURY) NFA 2020 0.065 CONINSP 0.065 ROUTE 9N S.H. 843, 418 RM 9N-1702-1133 (-685) TO RM 9N-1702-1222 STBG FLEX 2020 2.607 CONST 2.607 (+625) (TOWNS OF LAKE GEORGE AND BOLTON) NFA 2020 0.652 CONST 0.652 ROUTE 149 S.H. 9359 RM 149-1701-1006 (-300) TO RM 149-1701-1026 (+30) NHPP 2020 0.085 DETLDES 0.085 (TOWN OF QUEENSBURY) NFA 2020 0.021 DETLDES 0.021 ROUTE 149 S.H. 104, 5404, 9320 RM 149-1802-1251 (-370) TO RM 149-1802-1260 (+26) AND RM 149-1802-1262 TO RM 149-1802-1265 (+624) (VILLAGE OF GRANVILLE) HSIP WILL BE UTILIZED TO ADDRESS SPECIFIC LOCATIONS EVALUATED BY THE REGIONAL SAFETY ENGINEER AND APPROVED BY THE REGIONAL TRAFFIC ENGINEER. LOCATIONS ARE DETERMINED CONTINUALLY AND WILL BE CERTIFIED TO MEET THE HSIP CRITERIA FOR INCLUSION IN THIS PROJECT. AQC:EXEMPT MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 9.250 9.250 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 55 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PAVEMENT MAINTENANCE SFY20 - ON FEDERAL AID ELIGIBLE STATE NFA 2020 0.455 CONINSP 0.455 HIGHWAYS: NFA 2020 4.554 CONST 4.554 181067 NY FROM RM 1033 TO RM 1036, TOWN OF COLONIE NHPP 2020 0.488 CONINSP 0.488 US 9W FROM RM 1104 TO RM 1121, TOWN OF BETHLEHEM NFA 2020 0.122 CONINSP 0.122 NY 397 FROM RM 1000 TO RM 1031, TOWN OF GUILDERLAND/VILLAGE NHPP 2020 4.876 CONST 4.876 2020 1.219 CONST 1.219 OF ALTAMONT NFA STBG FLEX 2020 0.079 CONINSP 0.079 NY 910B (WOLF ROAD) FROM RM 1000 TO RM 1018, TOWN OF NFA 2020 0.020 CONINSP 0.020 COLONIE/VILLAGE OF COLONIE STBG FLEX 2020 0.793 CONST 0.793 NY 296 FROM RM 1000 TO RM 1028, TOWNS OF JEWETT AND NFA 2020 0.198 CONST 0.198 HUNTER/VILLAGE OF HUNTER STBG FLEX 2020 0.084 DETLDES 0.084 US 20 FROM RM 1000 TO RM 1039, TOWN OF DUANESBURG NFA 2020 0.022 DETLDES 0.022 NY 32 FROM RM 1000 TO RM 1060, TOWNS OF WESTERLO AND COEYMANS US 9W FROM RM 1000 TO RM 1060, TOWN OF CATSKILL/VILLAGE OF CATSKILL NY 406 FROM RM 1000 TO RM 1035, TOWNS OF PRINCETOWN AND ROTTERDAM AQC:EXEMPT MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 12.910 12.910 0.000 0.000 0.000

NYSDOT PAVEMENT MAINTENANCE AT THE FOLLOWING SITES: US ROUTE 9 NFA 2020 0.756 CONINSP 0.756 FROM LANSING LANE TO STATE ROUTE 146 IN THE TOWN OF NFA 2020 6.872 CONST 6.872 181068 HALFMOON AND STATE ROUTE 9N FROM MYRTLE STREET TO NORTH NHPP 2020 0.209 CONINSP 0.209 GREENFIELD ROAD/SPIER FALLS ROAD IN THE CITY OF SARATOGA NFA 2020 0.052 CONINSP 0.052 SPRINGS AND TOWN OF GREENFIELD; SARATOGA COUNTY. AND US NHPP 2020 1.896 CONST 1.896 2020 0.474 CONST 0.474 ROUTE 2 FROM STEWART ROAD TO THE MASSACHUSETTS STATE LINE NFA STBG FLEX 2020 0.245 CONINSP 0.245 IN THE TOWN OF PETERSBURGH AND STATE ROUTE 150 FROM US NFA 2020 0.061 CONINSP 0.061 ROUTES 9/20 TO BEST ROAD IN THE TOWNS OF SAND LAKE AND STBG FLEX 2020 2.231 CONST 2.231 SCHODACK; RENSSELAER COUNTY. HSIP WILL BE UTILIZED TO ADDRESS NFA 2020 0.558 CONST 0.558 SPECIFIC LOCATIONS EVALUATED BY THE REGIONAL SAFETY ENGINEER AND APPROVED BY THE REGIONAL TRAFFIC ENGINEER. LOCATIONS ARE DETERMINED CONTINUALLY AND WILL BE CERTIFIED TO MEET THE HSIP CRITERIA FOR INCLUSION IN THIS PROJECT. AQC:EXEMPT MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 13.354 13.354 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 56 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PAVEMENT MAINTENANCE SFY21 2ND PROJECT - ON VARIOUS FEDERAL NHPP 2021 0.560 CONINSP 0.560 AID ELIGIBLE STATE HIGHWAYS:PAVEMENT MAINTENANCE SFY21 2ND NFA 2021 0.140 CONINSP 0.140 181069 PROJECT: NHPP 2021 5.811 CONST 5.811 RT 9 FROM DUNNING ST TO SARATOGA SPRINGS CITY LIMIT, TOWN OF NFA 2021 1.453 CONST 1.453 STBG FLEX 2021 0.400 CONINSP 0.400 MALTA AND CITY OF SARATOGA SPRINGS, SARATOGA COUNTY; NFA 2021 0.100 CONINSP 0.100 NY 8 FROM SUMMIT DR TO NY 9N, TOWN OF HAGUE, WARREN COUNTY; STBG FLEX 2021 4.116 CONST 4.116 NY 9L (RIDGE RD) FROM RT 254 (QUAKER RD) TO SUNNYSIDE RD, TOWNS NFA 2021 1.029 CONST 1.029 OF QUEENSBURY AND LAKE GEORGE, WARREN COUNTY; NHPP 2021 0.086 DETLDES 0.086 NY 9L (RIDGE RD) FROM CLEMENTS RD TO PILOT KNOB RD, TOWNS OF NFA 2021 0.022 DETLDES 0.022 QUEENSBURY AND LAKE GEORGE, WARREN COUNTY; NHPP 2020 0.086 PRELDES 0.086 NY 149 (ANN ST) FROM WASHINGTON COUNTY LINE TO RT 4, TOWN OF NFA 2020 0.022 PRELDES 0.022 KINGSBURY, WARREN COUNTY; NY 29 (SPRING ST) FROM BRYANT BRIDGE RD TO ROUTE 4/32, TOWN OF SARATOGA, SARATOGA COUNTY AQC:EXEMPT MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 13.825 0.108 13.717 0.000 0.000

NYSDOT TMC OPERATIONS 20-21 (WAS PIN 180948) NHPP 2021 0.800 MISC 0.800 NFA 2021 0.200 MISC 0.200 181070 11/1/2020-10/31/2021

PERSONNEL, OPERATIONS CONTRACTS, REPAIRS EQUIPING A NEW TMC BUILDING, AND OTHER RECURRING COSTS. RG37A AQC:A7P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 1.000 0.000 1.000 0.000 0.000

NYSDOT FUNDING TMC ENGINEERING SUPPORT FROM 8/1/2021 TO 4/30/2022 NHPP 2021 0.600 MISC 0.600 (REPLACED PIN 180949). RG37B NFA 2021 0.150 MISC 0.150 181071 AQC:A7P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.750 0.000 0.750 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 57 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT RUSTIC RAIL SFY21 VARIOUS LOCATIONS ON VARIOUS FEDERAL AID NHPP 2021 0.305 CONINSP 0.305 ELIGIBLE STATE HIGHWAYS: ROUTE 73 FROM RM 73-1201-1539 (GILMORE NFA 2021 0.034 CONINSP 0.034 181073 HILL ROAD) TO 1656 (NEWMAN ROAD), ESSEX COUNTY NHPP 2021 2.540 CONST 2.540 I-87 FROM RM 87I-1211-1133 (BLUE RIDGE ROAD) TO 1572 (BRIDGE OVER NFA 2021 0.282 CONST 0.282 STBG FLEX 2021 0.100 CONINSP 0.100 AUSABLE RIVER), ESSEX COUNTY NFA 2021 0.025 CONINSP 0.025 I-87 EXITS 21, 22, 23, AND 24, WARREN COUNTY STBG FLEX 2021 0.782 CONST 0.782 ROUTE 22 FROM RM 22-1209-1000 (WASHINGTON COUNTY LINE) TO 1021 NFA 2021 0.196 CONST 0.196 (LAWSON LANE), ESSEX COUNTY STBG FLEX 2020 0.038 PRELDES 0.038 ROUTE 22 FROM RM 22-1808-1736 (ESSEX COUNTY LINE) TO 1570 NFA 2020 0.009 PRELDES 0.009 (CATDEN ROAD), WASHINGTON COUNTY STBG FLEX 2020 0.038 DETLDES 0.038 NFA 2020 0.009 DETLDES 0.009 AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.358 0.094 4.264 0.000 0.000

NYSDOT MENANDS BIKE/PED CONNECTOR & NY 32 RESURFACE NHPP 2020 0.160 CONINSP 0.160 NFA 2020 0.040 CONINSP 0.040 181074 NY 32 RESURFACING, INCLUDES ROAD DIET AND AN UPGRADED TRAFFIC NHPP 2020 2.200 CONST 2.200 SIGNAL, AND IS A DRAWDOWN ON RG136 . NFA 2020 0.550 CONST 0.550 STBG FLEX 2020 0.400 CONINSP 0.400 2020 0.100 CONINSP 0.100 CONSTRUCT TRAIL CONNECTION WITH BIKE/PED BRIDGE OVER I-787 NFA STBG FLEX 2020 3.400 CONST 3.400 ALONG NY 913T (ACCESS RAMPS TO I-787) FROM NY 32 TO MOHAWK NFA 2020 0.850 CONST 0.850 HUDSON BIKE HIKE TRAIL STBG FLEX 2020 0.032 ROWACQU 0.032 NFA 2020 0.008 ROWACQU 0.008 MENANDS, ALBANY COUNTY, AQC:EXEMPT ALBANY TPC : $7.5-$12 M TOTAL 4YR COST : 7.740 7.740 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 58 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE PRESERVATION SFY 20, BIN 1017930 RT. 23A OVER . NHPP 2020 0.175 PRELDES 0.175 TOWN OF JEWETT, GREENE COUNTY. NFA 2020 0.044 PRELDES 0.044 181081 BIN 1038670 RT. 156 OVER BEAVERDAM CREEK. TOWN OF BERNE, NFA 2021 0.080 CONINSP 0.080 ALBANY COUNTY. NFA 2021 0.800 CONST 0.800 NHPP 2021 0.439 CONINSP 0.439 BIN 1033210 SITTERLY RD. OVER I-87. TOWN OF CLIFTON PARK, 2021 0.110 CONINSP 0.110 SARATOGA COUNTY. NFA NHPP 2021 4.393 CONST 4.393 BIN 1033441 I-87 SB OVER THE HUDSON RIVER. TOWN OF MOREAU, NFA 2021 1.098 CONST 1.098 SARATOGA COUNTY. NHPP 2021 0.175 DETLDES 0.175 BIN 1033442 I-87 NB OVER THE HUDSON RIVER. TOWN OF MOREAU, NFA 2021 0.044 DETLDES 0.044 SARATOGA COUNTY. BIN 1020661 I-87 SB OVER ROUTE 29. CITY OF SARATOGA SPRINGS, SARATOGA COUNTY. BIN 1020662 I-87 NB OVER ROUTE 29. CITY OF SARATOGA SPRINGS, SARATOGA COUNTY. AQC:EXEMPT MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 7.358 0.219 7.139 0.000 0.000

NYSDOT BRIDGE PRESERVATION SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE NHPP 2021 0.175 DETLDES 0.175 STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, NFA 2021 0.044 DETLDES 0.044 181082 GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, NHPP 2020 0.175 PRELDES 0.175 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NFA 2020 0.044 PRELDES 0.044 NHPP 2022 0.868 CONINSP 0.868 NFA 2022 0.217 CONINSP 0.217 NHPP 2022 5.200 CONST 5.200 NFA 2022 1.300 CONST 1.300 AQC:EXEMPT MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 8.023 0.219 0.219 7.585 0.000

NYSDOT BRIDGE PRESERVATION SFY 22, ON VARIOUS FEDERAL AID ELIGIBLE NHPP 2022 0.175 DETLDES 0.175 STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, NFA 2022 0.044 DETLDES 0.044 181083 GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, NHPP 2021 0.175 PRELDES 0.175 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NFA 2021 0.044 PRELDES 0.044 NHPP 2023 0.868 CONINSP 0.868 NFA 2023 0.217 CONINSP 0.217 NHPP 2023 3.200 CONST 3.200 NFA 2023 0.800 CONST 0.800 AQC:EXEMPT MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.523 0.000 0.219 0.219 5.085 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 59 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE PRESERVATION SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE NHPP 2023 0.175 DETLDES 0.175 STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, NFA 2023 0.044 DETLDES 0.044 181084 GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, NHPP 2022 0.175 PRELDES 0.175 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NFA 2022 0.044 PRELDES 0.044 AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.438 0.000 0.000 0.219 0.219

NYSDOT BRIDGE PRESERVATION SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE NHPP 2023 0.175 PRELDES 0.175 STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, NFA 2023 0.044 PRELDES 0.044 181085 GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). AQC:EXEMPT MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.219 0.000 0.000 0.000 0.219

NYSDOT CULVERT REPAIR/REPLACE SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE NHPP 2021 0.127 DETLDES 0.127 STATE HIGHWAYS: REPAIRS: CA00456, RT 443, TOWN OF NEW SCOTLAND, NFA 2021 0.032 DETLDES 0.032 181088 ALBANY COUNTY; BIN 1092840, I-90 EXIT RAMP 4, CITY OF ALBANY, NHPP 2021 0.380 ROWACQU 0.380 ALBANY COUNTY; BIN 1092850, I-90 EXIT RAMP 4, CITY OF ALBANY, NFA 2021 0.009 ROWACQU 0.009 STBG FLEX 2021 0.127 DETLDES 0.127 ALBANY COUNTY; BIN 1092870, I-90 EXIT RAMP 4, CITY OF ALBANY, NFA 2021 0.032 DETLDES 0.032 ALBANY COUNTY; C160049, RT 50, TOWN OF GLENVILLE, SCHENECTADY STBG FLEX 2021 0.038 ROWACQU 0.038 COUNTY; C130089, RT 81, TOWN OF DURHAM, GREENE COUNTY; NFA 2021 0.009 ROWACQU 0.009 C160027, US 20, TOWN OF DUANESBURG, SCHENECTADY COUNTY. NHPP 2020 0.127 PRELDES 0.127 NFA 2020 0.032 PRELDES 0.032 REPLACEMENTS: C130071, RT 23A, TOWN OF HUNTER, GREENE COUNTY; STBG FLEX 2020 0.127 PRELDES 0.127 C130084, RT 42, TOWN OF LEXINGTON, GREENE COUNTY; C130085, RT NFA 2020 0.032 PRELDES 0.032 42, TOWN OF LEXINGTON, GREENE COUNTY; C130271, RT 81, TOWN OF NHPP 2022 0.178 CONINSP 0.178 COXSACKIE, GREENE COUNTY; C140039, RT 22, TOWN OF NFA 2022 0.044 CONINSP 0.044 STEPHENTOWN, RENSSELAER COUNTY; C160030, US 20, TOWN OF NHPP 2022 2.225 CONST 2.225 2022 0.556 CONST 0.556 DUANESBURG, SCHENECTADY COUNTY. NFA STBG FLEX 2022 0.025 CONINSP 0.025 NFA 2022 0.006 CONINSP 0.006 DRAINAGE IMPROVEMENTS AT ROUTE 4 AT WRIGHT'S LOOP PARALLEL STBG FLEX 2022 0.175 CONST 0.175 TO THE OLD , TOWN OF STILLWATER, SARATOGA NFA 2022 0.044 CONST 0.044 COUNTY. STBG FLEX 2021 0.040 ROWINCD 0.040 NFA 2021 0.010 ROWINCD 0.010 AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.375 0.318 0.804 3.253 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 60 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT CULVERT REPAIR/REPLACE SFY 22, ON VARIOUS FEDERAL AID ELIGIBLE NFA 2022 0.159 DETLDES 0.159 STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, NHPP 2022 0.127 DETLDES 0.127 181089 GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, NFA 2022 0.032 DETLDES 0.032 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NHPP 2021 0.127 PRELDES 0.127 NFA 2021 0.032 PRELDES 0.032 STBG FLEX 2021 0.127 PRELDES 0.127 NFA 2021 0.032 PRELDES 0.032 NFA 2023 0.031 CONINSP 0.031 NFA 2023 1.500 CONST 1.500 NHPP 2023 0.178 CONINSP 0.178 NFA 2023 0.044 CONINSP 0.044 NHPP 2023 3.600 CONST 3.600 NFA 2023 0.900 CONST 0.900 NFA 2022 0.005 ROWINCD 0.005 NHPP 2022 0.004 ROWINCD 0.004 NFA 2022 0.001 ROWINCD 0.001 AQC:EXEMPT MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 6.899 0.000 0.318 0.328 6.253

NYSDOT CULVERT REPAIR/REPLACE SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE NHPP 2023 0.254 DETLDES 0.254 STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, NFA 2023 0.064 DETLDES 0.064 181090 GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, NHPP 2022 0.254 PRELDES 0.254 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NFA 2022 0.064 PRELDES 0.064 NHPP 2023 0.008 ROWINCD 0.008 NFA 2023 0.002 ROWINCD 0.002 AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.646 0.000 0.000 0.318 0.328

NYSDOT CULVERT REPAIR/REPLACE SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE NHPP 2023 0.254 PRELDES 0.254 STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, NFA 2023 0.064 PRELDES 0.064 181091 GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). AQC:EXEMPT MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.318 0.000 0.000 0.000 0.318 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 61 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT GUIDERAIL REPLACEMENT ON STATE ROUTE 9N FROM SARATOGA NHPP 2020 0.024 PRELDES 0.024 SPRINGS CITY LINE TO WARREN COUNTY LINE IN SARATOGA COUNTY, NFA 2020 0.006 PRELDES 0.006 181093 THE ENTIRE LENGTH OF STATE ROUTE 157 IN ALBANY COUNTY, AND STBG FLEX 2020 0.024 PRELDES 0.024 THE ENTIRE LENGTH OF STATE ROUTE 160 IN SCHENECTADY COUNTY. NFA 2020 0.006 PRELDES 0.006 RUSTIC GUIDERAIL REPLACEMENT ON STATE ROUTE 9N FROM THE NFA 2021 0.092 CONINSP 0.092 2021 0.920 CONST 0.920 SARATOGA SPRINGS CITY LINE TO THE WARREN COUNTY LINE IN NFA STBG FLEX 2021 0.106 CONINSP 0.106 SARATOGA COUNTY. NFA 2021 0.015 CONINSP 0.015 STBG FLEX 2021 1.060 CONST 1.060 NFA 2021 0.100 CONST 0.100 NHPP 2020 0.024 DETLDES 0.024 NFA 2020 0.006 DETLDES 0.006 STBG FLEX 2020 0.024 DETLDES 0.024 NFA 2020 0.006 DETLDES 0.006 AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.413 0.120 2.293 0.000 0.000

NYSDOT GUIDERAIL REPLACEMENT SFY 22, ON VARIOUS FEDERAL AID ELIGIBLE STBG FLEX 2021 0.048 PRELDES 0.048 STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, NFA 2021 0.012 PRELDES 0.012 181094 GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, NHPP 2022 0.064 CONINSP 0.064 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NFA 2022 0.016 CONINSP 0.016 NHPP 2022 0.400 CONST 0.400 NFA 2022 0.100 CONST 0.100 STBG FLEX 2022 0.064 CONINSP 0.064 NFA 2022 0.016 CONINSP 0.016 STBG FLEX 2022 0.400 CONST 0.400 NFA 2022 0.100 CONST 0.100 STBG FLEX 2021 0.048 DETLDES 0.048 NFA 2021 0.012 DETLDES 0.012 AQC:EXEMPT MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.280 0.000 0.120 1.160 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 62 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT GUIDERAIL REPLACEMENT SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STBG FLEX 2022 0.048 PRELDES 0.048 STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, NFA 2022 0.012 PRELDES 0.012 181095 GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, NHPP 2023 0.064 CONINSP 0.064 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NFA 2023 0.016 CONINSP 0.016 NHPP 2023 0.360 CONST 0.360 NFA 2023 0.090 CONST 0.090 STBG FLEX 2023 0.064 CONINSP 0.064 NFA 2023 0.016 CONINSP 0.016 STBG FLEX 2023 0.440 CONST 0.440 NFA 2023 0.110 CONST 0.110 STBG FLEX 2022 0.048 DETLDES 0.048 NFA 2022 0.012 DETLDES 0.012 AQC:EXEMPT MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.280 0.000 0.000 0.120 1.160

NYSDOT GUIDERAIL REPLACEMENT SFY 24, ON VARIOUS FEDERAL AID ELIGIBLE STBG FLEX 2023 0.048 PRELDES 0.048 STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, NFA 2023 0.012 PRELDES 0.012 181096 GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, STBG FLEX 2023 0.048 DETLDES 0.048 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NFA 2023 0.012 DETLDES 0.012 AQC:EXEMPT MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.120 0.000 0.000 0.000 0.120

NYSDOT DURABLE PAVEMENT MARKINGS SFY 22, ON VARIOUS FEDERAL AID HSIP 2022 0.360 CONST 0.360 ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, NFA 2022 0.040 CONST 0.040 181098 ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, NHPP 2022 0.200 CONINSP 0.200 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE NFA 2022 0.050 CONINSP 0.050 NHPP 2022 1.500 CONST 1.500 UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED NFA 2022 0.375 CONST 0.375 ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC STBG FLEX 2022 0.050 CONINSP 0.050 COUNTERMEASURE. NFA 2022 0.012 CONINSP 0.012 STBG FLEX 2022 0.600 CONST 0.600 NFA 2022 0.150 CONST 0.150 STBG LG URB 2022 0.020 CONINSP 0.020 NFA 2022 0.005 CONINSP 0.005 STBG LG URB 2022 0.300 CONST 0.300 NFA 2022 0.075 CONST 0.075 NHPP 2021 0.095 PRELDES 0.095 NFA 2021 0.024 PRELDES 0.024 NHPP 2022 0.095 DETLDES 0.095 NFA 2022 0.024 DETLDES 0.024 AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.975 0.000 0.119 3.856 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 63 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT DURABLE PAVEMENT MARKINGS SFY 23, ON VARIOUS FEDERAL AID HSIP 2023 0.360 CONST 0.360 ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, NFA 2023 0.040 CONST 0.040 181099 ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, NHPP 2023 0.200 CONINSP 0.200 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE NFA 2023 0.050 CONINSP 0.050 NHPP 2023 1.500 CONST 1.500 UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED NFA 2023 0.375 CONST 0.375 ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC STBG FLEX 2023 0.050 CONINSP 0.050 COUNTERMEASURE. NFA 2023 0.012 CONINSP 0.012 STBG FLEX 2023 0.600 CONST 0.600 NFA 2023 0.150 CONST 0.150 STBG LG URB 2023 0.020 CONINSP 0.020 NFA 2023 0.005 CONINSP 0.005 STBG LG URB 2023 0.300 CONST 0.300 NFA 2023 0.075 CONST 0.075 NHPP 2022 0.095 PRELDES 0.095 NFA 2022 0.024 PRELDES 0.024 NHPP 2023 0.095 DETLDES 0.095 NFA 2023 0.024 DETLDES 0.024 AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.975 0.000 0.000 0.119 3.856

NYSDOT DURABLE PAVEMENT MARKINGS SFY 24, ON VARIOUS FEDERAL AID NHPP 2023 0.095 PRELDES 0.095 ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, NFA 2023 0.024 PRELDES 0.024 181100 ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). HSIP WILL BE UTILIZED TO INSTALL CARDS ON AT NEW LOCATIONS IDENTIFIED ELIGIBLE, AND OTHERWISE HAVE NOT PREVIOUSLY HAD THIS SYSTEMIC COUNTERMEASURE. AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.119 0.000 0.000 0.000 0.119

NYSDOT FUNDING TMC ENGINEERING SUPPORT FROM 2/1/22 TO 10/31/22 NHPP 2022 0.600 MISC 0.600 (REPLACED PIN 180949). RG37B NFA 2022 0.150 MISC 0.150 181102 AQC:A7P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 0.750 0.000 0.000 0.750 0.000

NYSDOT TMC OPERATIONS 21-22 NHPP 2022 0.800 MISC 0.800 NFA 2022 0.200 MISC 0.200 181107 PERSONNEL, OPERATIONS CONTRACTS, REPAIRS EQUIPING A NEW TMC BUILDING, AND OTHER RECURRING COSTS. RG37A AQC:A7P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 1.000 0.000 0.000 1.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 64 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE SFY 21A: RT 32 FROM NFA 2021 1.040 DETLDES 1.040 WATERVLIET CITY LINE TO COHOES CITY LINE, TOWN OF COLONIE, STBG FLEX 2020 0.448 PRELDES 0.448 181112 ALBANY COUNTY; NFA 2020 0.112 PRELDES 0.112 RT 396 FROM RT 144 (RIVER ROAD) TO BLODGETT HILL ROAD, TOWN OF NHPP 2021 0.134 CONINSP 0.134 2021 0.034 CONINSP 0.034 BETHLEHEM, ALBANY COUNTY; RT 296 FROM RT 23A TO RT 23, TOWN NFA NHPP 2021 1.328 CONST 1.328 OF HUNTER, GREENE COUNTY; US 9W FROM THRUWAY TO RT 32, TOWN NFA 2021 0.332 CONST 0.332 OF BETHLEHEM, ALBANY COUNTY; NY 67 FROM HUNT ROAD TO STBG FLEX 2021 0.094 CONINSP 0.094 WASHINGTON COUNTY LINE, TOWN OF HOOSICK, RENSSELAER COUNTY; NFA 2021 0.023 CONINSP 0.023 US 20 FROM MUDGE ROAD TO NY 7, TOWN OF DUANESBURG, STBG FLEX 2021 5.294 CONST 5.294 SCHENECTADY COUNTY NFA 2021 1.323 CONST 1.323 AQC:EXEMPT MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 10.162 0.560 9.602 0.000 0.000

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE 22A: RT 9 LATHAM CIRCLE TO NHPP 2021 0.448 PRELDES 0.448 CENTURY HILL DRIVE, TOWN OF LATHAM, ALBANY COUNTY; RT 85 NFA 2021 0.112 PRELDES 0.112 181113 CHERRY AVE EXT ROUNDABOUT TO ROUTE 85A CLOSER TO THATCHER NHPP 2023 0.111 CONINSP 0.111 PARK, TOWN OF NEW SALEM, ALBANY COUNTY; RT 85A RTE 85 NEW NFA 2023 0.028 CONINSP 0.028 NHPP 2023 1.111 CONST 1.111 SALEM TO CROW RIDGE ROAD, TOWN OF NEW SCOTLAND, ALBANY NFA 2023 0.278 CONST 0.278 COUNTY; RT 23 ROUTE 23A TO SOUTH ST (CR 12), TOWN OF STBG FLEX 2023 0.546 CONINSP 0.546 PRATTSVILLE/ASHLAND, GREENE COUNTY; RT 2 MAPLE AVE TO NFA 2023 0.136 CONINSP 0.136 GARFIELD ROAD, TOWN OF EAGLE MILLS, RENSSELAER COUNTY; RT 9J STBG FLEX 2023 5.462 CONST 5.462 VILLAGE OF CASTLETON LINE TO RENSSELAER CITY LINE, TOWN OF NFA 2023 1.366 CONST 1.366 SCHODACK, RENSSELAER COUNTY; RT 7 FROM NORMANSKILL TO PAST STBG LG URB 2023 0.375 CONINSP 0.375 PANGBURN RD, TOWN OF ROTTERDAM, SCHENECTADY COUNTY; RT 7 NFA 2023 0.094 CONINSP 0.094 BECKER RD TO ROUTE 159, TOWN OF ROTTERDAM, SCHENECTADY STBG LG URB 2023 3.754 CONST 3.754 COUNTY; RT 147 ROUTE 5 TO RIDGE RD, TOWN OF GLENVILLE, NFA 2023 0.938 CONST 0.938 NHPP 2022 0.832 DETLDES 0.832 SCHENECTADY COUNTY. RT 911G (UNION ST) FROM RT 7 TO RT 146, NFA 2022 0.208 DETLDES 0.208 CITY OF SCHENECTADY, SCHENECTADY COUNTY. AQC:EXEMPT MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 15.799 0.000 0.560 1.040 14.199 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 65 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE 22B: RT 29 VILLAGE OF STBG FLEX 2021 0.832 PRELDES 0.832 SCHUYLERVILLE LINE TO RT 4/32, TOWN OF SARATOGA, SARATOGA NFA 2021 0.208 PRELDES 0.208 181114 COUNTY; RT 32 MENNEN ROAD TO US ROUTE 4/BROAD STREET, TOWN NHPP 2023 0.832 DETLDES 0.832 OF STILLWATER/SARATOGA, SARATOGA COUNTY; RT 50 RAILROAD NFA 2023 0.208 DETLDES 0.208 BRIDGE TO SARATOGA SPRINGS CITY LIMITS, TOWN OF SARATOGA SPRINGS, SARATOGA COUNTY; RT 67 STATE FARM ROAD TO ROUTE 9, TOWN OF MALTA, SARATOGA COUNTY; RT 9L PILOT KNOB ROAD TO CLEVERDALE, TOWN OF QUEENSBURY/ LAKE GEORGE, WARREN COUNTY; RT 9N STREETER HILL TO ESSEX COUNTY LINE, TOWN OF HAGUE, WARREN COUNTY; RT 4 HUDSON FALLS VILLAGE LINE TO KINGSBURY ROAD, TOWN OF KINGSBURY, WASHINGTON COUNTY; RT 149, TOWN OF VILLAGE OF GRANVILLE, WASHINGTON COUNTY; STATE ROUTE 4 FROM ROUTE 22 COMSTOCK TO VILLAGE OF WHITEHALL, FT. ANN / WHITEHALL, WASHINGTON COUNTY AQC:EXEMPT MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 2.080 0.000 1.040 0.000 1.040

NYSDOT TRAFFIC SIGNALS REBUILD SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE NHPP 2023 0.104 DETLDES 0.104 STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, NFA 2023 0.026 DETLDES 0.026 181116 GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, NHPP 2023 0.056 PRELDES 0.056 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NFA 2023 0.014 PRELDES 0.014 AQC:EXEMPT MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.200 0.000 0.000 0.000 0.200

NYSDOT SIGN REPLACEMENT PROJECT SFY 21 ON VARIOUS FEDERAL AID NHPP 2021 0.054 CONINSP 0.054 ELIGIBLE INTERSTATES IN THE FOLLOWING 8 COUNTIES: ALBANY, NFA 2021 0.006 CONINSP 0.006 181120 ESSEX. RENSSELAER, SARATOGA, SCHENECTADY, WARREN (EXACT NHPP 2021 0.450 CONST 0.450 LOCATIONS TO BE DETERMINED). NFA 2021 0.050 CONST 0.050 NHPP 2021 0.023 PRELDES 0.023 NFA 2021 0.003 PRELDES 0.003 NHPP 2021 0.036 DETLDES 0.036 NFA 2021 0.004 DETLDES 0.004 AQC:EXEMPT MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.626 0.000 0.626 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 66 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT SIGN REPLACEMENT PROJECT SFY 22 ON VARIOUS FEDERAL AID NHPP 2021 0.023 PRELDES 0.023 ELIGIBLE INTERSTATES IN THE FOLLOWING 8 COUNTIES: ALBANY, NFA 2021 0.003 PRELDES 0.003 181121 ESSEX. RENSSELAER, SARATOGA, SCHENECTADY, WARREN (EXACT NHPP 2022 0.054 CONINSP 0.054 LOCATIONS TO BE DETERMINED). NFA 2022 0.006 CONINSP 0.006 NHPP 2022 0.460 CONST 0.460 NFA 2022 0.051 CONST 0.051 NHPP 2021 0.036 DETLDES 0.036 NFA 2021 0.004 DETLDES 0.004 AQC:EXEMPT MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.637 0.000 0.066 0.571 0.000

NYSDOT SIGN REPLACEMENT PROJECT SFY 23 ON VARIOUS FEDERAL AID NHPP 2023 0.036 DETLDES 0.036 ELIGIBLE INTERSTATES IN THE FOLLOWING 8 COUNTIES: ALBANY, NFA 2023 0.004 DETLDES 0.004 181122 ESSEX. RENSSELAER, SARATOGA, SCHENECTADY, WARREN (EXACT NHPP 2022 0.023 PRELDES 0.023 LOCATIONS TO BE DETERMINED). NFA 2022 0.003 PRELDES 0.003 NHPP 2023 0.046 CONINSP 0.046 NFA 2023 0.005 CONINSP 0.005 NHPP 2023 0.460 CONST 0.460 NFA 2023 0.051 CONST 0.051 AQC:EXEMPT MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.628 0.000 0.000 0.026 0.602

NYSDOT NAVIGATIONAL LIGHTS PROGRAM SFY 21, ON VARIOUS FEDERAL AID NHPP 2021 0.036 DETLDES 0.036 ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, NFA 2021 0.004 DETLDES 0.004 181123 ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, NHPP 2021 0.135 CONINSP 0.135 WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NFA 2021 0.015 CONINSP 0.015 NHPP 2021 1.350 CONST 1.350 NFA 2021 0.150 CONST 0.150 AQC:EXEMPT MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.690 0.000 1.690 0.000 0.000

NYSDOT RUSTIC RAIL REPLACEMENT ON VARIOUS FEDERAL AID ELIGIBLE STATE NHPP 2022 1.100 CONST 1.100 HIGHWAYS IN ESSEX, WARRENT AND WASHINGTON COUNTIES: NFA 2022 0.275 CONST 0.275 181124 (EXACT LOCATIONS TO BE DETERMINED). STBG FLEX 2022 0.506 CONINSP 0.506 NFA 2022 0.126 CONINSP 0.126 STBG FLEX 2022 2.500 CONST 2.500 NFA 2022 0.625 CONST 0.625 STBG FLEX 2021 0.253 PRELDES 0.253 NFA 2021 0.063 PRELDES 0.063 STBG FLEX 2021 0.253 DETLDES 0.253 NFA 2021 0.063 DETLDES 0.063 AQC:EXEMPT MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.764 0.000 0.632 5.132 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 67 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT RUSTIC RAIL REPLACEMENT AT VARIOUS LOCATIONS, ON VARIOUS NHPP 2023 1.100 CONST 1.100 FEDERAL AID ELIGIBLE STATE HIGHWAYS IN ESSEX, GREENE, WARREN, NFA 2023 0.275 CONST 0.275 181125 AND WASHINGTON COUNTIES STBG FLEX 2023 0.506 CONINSP 0.506 (EXACT LOCATIONS TO BE DETERMINED). NFA 2023 0.126 CONINSP 0.126 STBG FLEX 2023 2.500 CONST 2.500 NFA 2023 0.625 CONST 0.625 STBG FLEX 2021 0.253 PRELDES 0.253 NFA 2021 0.063 PRELDES 0.063 STBG FLEX 2022 0.253 DETLDES 0.253 NFA 2022 0.063 DETLDES 0.063 AQC:EXEMPT MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.764 0.000 0.316 0.316 5.132

NYSDOT INTERSTATE OVERHEAD SIGN STRUCTURE REPLACEMENT, SFY 21: 11 NFA 2021 0.236 DETLDES 0.236 SIGNS: ALONG I-90 FROM EXIT 2 TO EXIT 12 (90I 1101 1012 TO 90I 1402 NHPP 2021 0.460 CONINSP 0.460 181126 2127) AND I-787 NEAR EXIT 1 SOUTHBOUND (787I 1101 1006). CITY OF NFA 2021 0.050 CONINSP 0.050 ALBANY AND TOWN OF SCHODACK. ALBANY AND RENSSELAER NHPP 2021 3.214 CONST 3.214 2021 0.357 CONST 0.357 COUNTIES. NFA AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.317 0.000 4.317 0.000 0.000

NYSDOT INTERSTATE OVERHEAD SIGN STRUCTURE REPLACEMENT, SFY 21, ON NHPP 2021 0.212 DETLDES 0.212 VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING NFA 2021 0.024 DETLDES 0.024 181127 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, NHPP 2022 0.428 CONINSP 0.428 SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE NFA 2022 0.048 CONINSP 0.048 NHPP 2022 2.843 CONST 2.843 DETERMINED). NFA 2022 0.316 CONST 0.316 AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.871 0.000 0.236 3.635 0.000

NYSDOT BRIDGE WASHING SFY 21, ON VARIOUS FEDERAL AID ELIGIBLE STATE NHPP 2021 0.126 CONINSP 0.126 HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, NFA 2021 0.032 CONINSP 0.032 181128 RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON NHPP 2021 0.800 CONST 0.800 (EXACT LOCATIONS TO BE DETERMINED). NFA 2021 0.200 CONST 0.200 NHPP 2021 0.063 PRELDES 0.063 NFA 2021 0.016 PRELDES 0.016 NHPP 2021 0.063 DETLDES 0.063 NFA 2021 0.016 DETLDES 0.016 AQC:EXEMPT MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.316 0.000 1.316 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 68 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE WASHING SFY 23, ON VARIOUS FEDERAL AID ELIGIBLE STATE NHPP 2023 0.126 CONINSP 0.126 HIGHWAYS IN THE FOLLOWING 8 COUNTIES: ALBANY, ESSEX, GREENE, NFA 2023 0.032 CONINSP 0.032 181129 RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON NHPP 2023 0.800 CONST 0.800 (EXACT LOCATIONS TO BE DETERMINED). NFA 2023 0.200 CONST 0.200 NHPP 2021 0.063 PRELDES 0.063 NFA 2021 0.016 PRELDES 0.016 NHPP 2023 0.063 DETLDES 0.063 NFA 2023 0.016 DETLDES 0.016 AQC:EXEMPT MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.316 0.000 0.079 0.000 1.237

NYSDOT BRIDGE WEATHERING STEEL WASHING, SFY 22, ON VARIOUS FEDERAL NHPP 2022 0.126 CONINSP 0.126 AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: NFA 2022 0.032 CONINSP 0.032 181130 ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, NHPP 2022 1.600 CONST 1.600 WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NFA 2022 0.400 CONST 0.400 NHPP 2020 0.063 PRELDES 0.063 NFA 2020 0.016 PRELDES 0.016 NHPP 2022 0.063 DETLDES 0.063 NFA 2022 0.016 DETLDES 0.016 AQC:EXEMPT MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.316 0.079 0.000 2.237 0.000

NYSDOT BRIDGE DECK REPLACEMENT PROJECT SFY 23, ON VARIOUS FEDERAL NHPP 2023 0.400 CONINSP 0.400 AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: NFA 2023 0.100 CONINSP 0.100 181131 ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, NHPP 2023 2.000 CONST 2.000 WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NFA 2023 0.500 CONST 0.500 NHPP 2021 0.253 PRELDES 0.253 NFA 2021 0.063 PRELDES 0.063 NHPP 2022 0.253 DETLDES 0.253 NFA 2022 0.063 DETLDES 0.063 AQC:EXEMPT MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 3.632 0.000 0.316 0.316 3.000

NYSDOT BRIDGE DECK REPLACEMENT PROJECT SFY 24, ON VARIOUS FEDERAL NHPP 2022 0.253 PRELDES 0.253 AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: NFA 2022 0.063 PRELDES 0.063 181132 ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, NHPP 2023 0.253 DETLDES 0.253 WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). NFA 2023 0.063 DETLDES 0.063 AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.632 0.000 0.000 0.316 0.316 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 69 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE DECK REPLACEMENT PROJECT SFY 25, ON VARIOUS FEDERAL NHPP 2023 0.253 PRELDES 0.253 AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING 8 COUNTIES: NFA 2023 0.063 PRELDES 0.063 181133 ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE DETERMINED). AQC:EXEMPT MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.316 0.000 0.000 0.000 0.316

NYSDOT INTERSTATE OVERHEAD SIGN STRUCTURE REPLACEMENT, SFY 23, ON NHPP 2023 0.288 CONINSP 0.288 VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING NFA 2023 0.032 CONINSP 0.032 181134 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, NHPP 2023 2.700 CONST 2.700 SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE NFA 2023 0.300 CONST 0.300 NHPP 2021 0.108 PRELDES 0.108 DETERMINED). NFA 2021 0.012 PRELDES 0.012 NHPP 2022 0.108 DETLDES 0.108 NFA 2022 0.012 DETLDES 0.012 AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.560 0.000 0.120 0.120 3.320

NYSDOT INTERSTATE OVERHEAD SIGN STRUCTURE REPLACEMENT, SFY 24, ON NHPP 2023 0.108 DETLDES 0.108 VARIOUS FEDERAL AID ELIGIBLE STATE HIGHWAYS IN THE FOLLOWING NFA 2023 0.012 DETLDES 0.012 181135 8 COUNTIES: ALBANY, ESSEX, GREENE, RENSSELAER, SARATOGA, NHPP 2023 0.108 PRELDES 0.108 SCHENECTADY, WARREN, WASHINGTON (EXACT LOCATIONS TO BE NFA 2023 0.012 PRELDES 0.012 DETERMINED). AQC:EXEMPT MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.240 0.000 0.000 0.000 0.240

NYSDOT HIGHWAY EMERGENCY LOCAL PATROL (HELP) PROGRAM NHPP 2020 0.480 OPER 0.480 NFA 2020 0.120 OPER 0.120 181136 PROVIDES ASSISTANCE TO STRANDED MOTORISTS ON SELECTED NHPP 2022 0.480 OPER 0.480 PORTIONS OF INTERSTATE ROADS IN THE CAPITAL DISTRICT. RG37 NFA 2022 0.120 OPER 0.120 NHPP 2021 0.480 OPER 0.480 (Formerly PIN: 180661) NFA 2021 0.120 OPER 0.120 AQC:A7P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 1.800 0.600 0.600 0.600 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 70 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE DECK PRESERVATION PROJECT SFY NHPP 2020 0.080 PRELDES 0.080 21, ON THE FOLLOWING LOCATIONS: BIN 1033611 I-87 S.B. OVER UPPER NFA 2020 0.020 PRELDES 0.020 181138 VALLEY FARM RD. – SITE 1A AND BIN 1033612 I-87 N.B. OVER UPPER NHPP 2021 0.080 DETLDES 0.080 VALLEY FARM RD. – SITE 1B, TOWN OF CHESTER, WARREN COUNTY; BIN NFA 2021 0.020 DETLDES 0.020 NHPP 2021 0.192 CONINSP 0.192 1017130 ROUTE 22 OVER S. BAY – SITE 2, TOWN OF 2021 0.048 CONINSP 0.048 WHITEHALL, WASHINGTON COUNTY; BIN 1029650 ROUTE 74 OVER NFA NHPP 2021 1.200 CONST 1.200 SCHROON RIVER – SITE 3, TOWN OF SCHROON, ESSEX COUNTY; BIN NFA 2021 0.300 CONST 0.300 1033711 I-87 S.B. OVER BLUE RIDGE RD. – SITE 4A AND BIN 1033712 I-87 N.B. OVER BLUE RIDGE RD. – SITE 4B, TOWN OF NORTH HUDSON, ESSEX COUNTY; BIN 1033771 I-87 S.B. OVER LEWIS-WADHAMS RD. – SITE 5A AND BIN 1033772 I-87 N.B. OVER LEWIS-WADHAMS RD. – SITE 5B, TOWN OF LEWIS, ESSEX COUNTY; BIN 1005900 ROUTE 9 OVER N. BRANCH BOUQUET RIVER – SITE 6, TOWN OF LEWIS, ESSEX COUNTY; BIN 1032740 ROUTE 86 OVER W. BRANCH AUSABLE RIVER – SITE 7, TOWN OF WILMINGTON, ESSEX COUNTY AQC:N/A MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.940 0.100 1.840 0.000 0.000

NYSDOT WRONG WAY DRIVING INITIATIVE TO ADDRESS @ 250 LIMITED ACCESS HSIP 2021 0.135 DETLDES 0.135 EXIT RAMPS WITH SIGNING AND POSSIBLE PAVEMENT MARKINGS. LOW NFA 2021 0.015 DETLDES 0.015 181139 CLEARANCE BRIDGE INITIATIVE WILL UPGRADE SIGNS TO MEET STBG FLEX 2021 0.056 DETLDES 0.056 SIGNING AND REFLECTIVITY STANDARDS.THIS IS A REGION-WIDE NFA 2021 0.014 DETLDES 0.014 HSIP 2023 0.180 CONINSP 0.180 PROJECT WITH A PORTION OF THE TOTAL LISTED FUNDS TO SPENT NFA 2023 0.020 CONINSP 0.020 WITHIN THE A/GFTC AREA. HSIP 2023 0.900 CONST 0.900 NFA 2023 0.100 CONST 0.100 NHPP 2023 0.024 CONINSP 0.024 NFA 2023 0.006 CONINSP 0.006 NHPP 2023 0.114 CONST 0.114 NFA 2023 0.029 CONST 0.029 STBG FLEX 2023 0.036 CONINSP 0.036 NFA 2023 0.009 CONINSP 0.009 STBG FLEX 2023 0.164 CONST 0.164 NFA 2023 0.041 CONST 0.041 STBG LG URB 2023 0.016 CONINSP 0.016 NFA 2023 0.004 CONINSP 0.004 STBG LG URB 2023 0.082 CONST 0.082 NFA 2023 0.020 CONST 0.020 AQC:EXEMPT MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.965 0.000 0.220 0.000 1.745 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 71 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT BRIDGE PRESERVATION ELEMENT SPECIFIC PAINTING SFY 21 NHPP 2021 0.070 PRELDES 0.070 RENSSELAER COUNTY: BIN 1092611: I-90 OVER ROUTE 43; BIN 1092612: NFA 2021 0.018 PRELDES 0.018 181140 I-90 OVER ROUTE 43; BIN 1092621: I-90 OVER THIRD AVE EXT; BIN NHPP 2021 0.120 DETLDES 0.120 1092622: I-90 OVER THIRD AVE EXT; BIN 1092641: I-90 OVER ROUTE 151; NFA 2021 0.530 DETLDES 0.530 NHPP 2022 0.120 CONINSP 0.120 BIN 1092642: I-90 OVER ROUTE 151; BIN 1092671: I-90 OVER UNFINISHED NFA 2022 0.500 CONINSP 0.500 ROAD; BIN 1092672: I-90 OVER UNFINISHED ROAD; BIN 1092721: I-90 NHPP 2022 1.200 CONST 1.200 OVER KRAFT ROAD; BIN 1092722: I-90 OVER KRAFT ROAD; BIN 1092791: NFA 2022 5.000 CONST 5.000 I-90 OVER VAN HOESEN ROAD; BIN 1092792: I-90 OVER VAN HOESEN ROAD; BIN 1092801: I-90 OVER SAND ROAD; BIN 1092802: I-90 OVER SAND ROAD; BIN 1092630: ROUTE 4 OVER I-90; BIN 1092660: ELLIOT ROAD OVER I-90; BIN 1092770: MAPLE HILL RD OVER I-90 AQC:N/A MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 7.558 0.000 0.738 6.820 0.000

NYSDOT RUSTIC BRIDGE RAIL REPLACEMENT SFY 21: RUSTIC BRIDGE RAIL NFA 2021 0.210 PRELDES 0.210 REPLACEMENT AND DECK REPAIRS ON BIN 1005800 - ROUTE 9 OVER NFA 2021 0.210 DETLDES 0.210 181141 SCHROON RIVER, TOWN OF SCHROON; BIN 1005840 - ROUTE 9 OVER STBG FLEX 2021 0.235 CONINSP 0.235 SCHROON RIVER, TOWN OF NORTH HUDSON; BIN 1033651 - I-87 OVER NFA 2021 0.059 CONINSP 0.059 STBG FLEX 2021 1.680 CONST 1.680 AUSABLE RIVER, TOWN OF CHESTERFIELD; BIN 1033652 - I-87 OVER NFA 2021 0.420 CONST 0.420 AUSABLE RIVER, TOWN OF CHESTERFIELD. ESSEX COUNTY. AQC:N/A ESSEX TPC : $2-$4 M TOTAL 4YR COST : 2.814 0.000 2.814 0.000 0.000

CDTA STAR BUS REPLACEMENT AND EXPANSION FTA 5339 2021 0.504 MISC 0.504 NFA 2021 0.126 MISC 0.126 182037 REPLACEMENT OF STAR (SPECIAL TRANSIT SERVICE AVAILABLE BY FTA 5307 2022 0.083 MISC 0.083 REQUEST) CUSTOM VEHICLES FOR PARATRANSIT USE. INCLUDEDS NFA 2022 0.021 MISC 0.021 FTA 5339 2022 0.533 MISC 0.533 FUNDS FOR EXPANSION OF THE STAR FLEET. T6B NFA 2022 0.133 MISC 0.133 FTA 5307 2023 0.085 MISC 0.085 NFA 2023 0.021 MISC 0.021 FTA 5339 2023 0.543 MISC 0.543 NFA 2023 0.136 MISC 0.136 FTA 5339 2020 0.456 MISC 0.456 NFA 2020 0.114 MISC 0.114 AQC:B10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 2.755 0.570 0.630 0.770 0.785 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 72 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CDTA TRANSIT BUS REPLACEMENT/EXPANSION. NFA 2021 3.461 MISC 3.461 NFA 2021 3.467 MISC 3.467 182048 PURCHASE OR LEASE TRANSIT BUSES IN A MANNER TO MAINTAIN FTA 5339 2020 1.231 MISC 1.231 EXISTING SERVICE LEVELS. T17 NFA 2020 0.307 MISC 0.307 FTA 5339 2021 1.432 MISC 1.432 NFA 2021 0.358 MISC 0.358 FTA 5307 2022 1.794 MISC 1.794 NFA 2022 0.448 MISC 0.448 FTA 5339 2022 0.837 MISC 0.837 NFA 2022 0.209 MISC 0.209 FTA 5307 2023 1.842 MISC 1.842 NFA 2023 0.460 MISC 0.460 FTA 5339 2023 0.854 MISC 0.854 NFA 2023 0.213 MISC 0.213 AQC:B10P MULTI TPC : $32-$50 M TOTAL 4YR COST : 16.913 1.538 8.718 3.288 3.369

CDTA PASSENGER FACILITY IMPROVEMENTS AT VARIOUS LOCATIONS FTA 5307 2022 0.150 MISC 0.150 NFA 2022 0.037 MISC 0.037 182118 IMPROVEMENTS AND ADDITIONS TO PASSENGER AMENITIES INCLUDING FTA 5307 2023 0.153 MISC 0.153 REPAIR, UPGRADE AND REPLACEMENT OF BUS SHELTERS AND BUS STOP NFA 2023 0.038 MISC 0.038 FTA 5307 2020 0.160 MISC 0.160 SIGNAGE. T11 NFA 2020 0.040 MISC 0.040 FTA 5307 2021 0.200 MISC 0.200 NFA 2021 0.050 MISC 0.050 AQC:B8P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.828 0.200 0.250 0.187 0.191

CDTA TRANSIT SUPPORT VEHICLES FTA 5339 2020 0.208 MISC 0.208 NFA 2020 0.052 MISC 0.052 182180 REPLACEMENT OF NON-REVENUE SUPPORT VEHICLES FOR SUPERVISORY FTA 5307 2021 0.288 MISC 0.288 AND MAINTENANCE USE, T16 NFA 2021 0.072 MISC 0.072 FTA 5339 2022 0.166 MISC 0.166 NFA 2022 0.042 MISC 0.042 FTA 5339 2023 0.170 MISC 0.170 NFA 2023 0.042 MISC 0.042 AQC:B2P MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.040 0.260 0.360 0.208 0.212 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 73 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CDTA WASHINGTON/WESTERN BRT PHASE 2 NFA 2020 0.063 CONST 0.063 STBG FLEX 2020 0.080 CONINSP 0.080 182215 CONSTRUCTION TRANSIT, ROADWAY, AND PEDESTRIAN NFA 2020 0.020 CONINSP 0.020 INFRASTRUCTURE FOR THE FUTURE WASHINGTON-WESTERN BUS RAPID STBG FLEX 2020 0.697 CONST 0.697 TRANSIT LINE IN THE CITY OF ALBANY ADJACENT TO THE UNIVERSITY NFA 2020 0.174 CONST 0.174 TAP FLEX 2020 0.400 CONINSP 0.400 AT ALBANY’S DOWNTOWN CAMPUS AND THE NEW ETEC CAMPUS, T122 NFA 2020 0.100 CONINSP 0.100 TAP FLEX 2020 3.184 CONST 3.184 CITY AND COUNTY OF ALBANY NFA 2020 0.796 CONST 0.796

STP-FLEX IS A DRAWDOWN ON THE BRT SET-ASIDE CDTC31. AQC:NON ALBANY TPC : $50-$85 M TOTAL 4YR COST : 5.514 5.514 0.000 0.000 0.000

CDTA HUDSON RIVER CORRIDOR BRT OPERATIONS CMAQ 2020 4.435 MISC 4.435 NFA 2020 1.109 MISC 1.109 182216 SERVICE AND OPERATIONAL RELATED EXPENSES (SUCH AS DRIVER NFA 2022 3.806 MISC 3.806 SALARIES AND BENEFITS, FUEL, BUS MAINTENANCE, ETC.) OF THE NFA 2023 3.900 MISC 3.900 RIVER CORRIDOR BUS RAPID TRANSIT PROJECT BEGINNING IN THE FALL OF 2020, T124

ALBANY, MENANDS, WATERVLIET, TROY, COHOES, AND WATERFORD ALBANY & RENSSELAER COUNTIES AQC:NON MULTI TPC : $50-$85 M TOTAL 4YR COST : 13.250 5.544 0.000 3.806 3.900

CITY OF GLENS PUBLIC TRANSPORTATION OPERATING ASSISTANCE, GREATER GLENS FTA 5307 2020 1.051 OPER 1.051 FALLS FALLS TRANSIT, FEDERAL SHARE OF LISTED AMOUNT = 50% NFA 2020 1.051 OPER 1.051 182217 FTA 5307 2021 1.072 OPER 1.072 NFA 2021 1.072 OPER 1.072 FTA 5307 2022 1.093 OPER 1.093 NFA 2022 1.093 OPER 1.093 FTA 5307 2023 1.115 OPER 1.115 NFA 2023 1.115 OPER 1.115 AQC:EXEMPT WARREN TPC : $9.5-15.5 M TOTAL 4YR COST : 8.662 2.102 2.144 2.186 2.230 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 74 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CITY OF GLENS FACILITY REHABILITATION, GREATER GLENS FALLS TRANSIT. FTA 5307 2020 0.060 OPER 0.060 FALLS FEDERAL SHARE OF LISTED AMOUNT = 80% NFA 2020 0.015 OPER 0.015 182218 FTA 5339 2020 0.060 OPER 0.060 NFA 2020 0.015 OPER 0.015 FTA 5307 2022 0.060 OPER 0.060 NFA 2022 0.015 OPER 0.015 FTA 5339 2022 0.060 OPER 0.060 NFA 2022 0.015 OPER 0.015 AQC:EXEMPT WARREN TPC : < $0.75 M TOTAL 4YR COST : 0.300 0.150 0.000 0.150 0.000

CITY OF GLENS GGFT PREVENTATIVE MAINTENANCE, GREATER GLENS FALLS TRANSIT. FTA 5307 2020 0.086 OPER 0.086 FALLS FEDERAL SHARE OF LISTED AMOUNT = 80% NFA 2020 0.021 OPER 0.021 182219 FTA 5307 2021 0.087 OPER 0.087 NFA 2021 0.022 OPER 0.022 FTA 5307 2022 0.089 OPER 0.089 NFA 2022 0.022 OPER 0.022 FTA 5307 2023 0.091 OPER 0.091 NFA 2023 0.023 OPER 0.023 AQC:EXEMPT WARREN TPC : < $0.75 M TOTAL 4YR COST : 0.441 0.107 0.109 0.111 0.114

CITY OF GLENS REPLACE ONE (1) 2011 30 FT BUS AND RELATED EQUIPMENT, GREATER FTA 5307 2020 0.184 OPER 0.184 FALLS GLENS FALLS TRANSIT. NFA 2020 0.046 OPER 0.046 182222 FEDERAL SHARE OF LISTED AMOUNT = 80% FTA 5339 2020 0.184 OPER 0.184 NFA 2020 0.046 OPER 0.046 AQC:EXEMPT WARREN TPC : < $0.75 M TOTAL 4YR COST : 0.460 0.460 0.000 0.000 0.000

CITY OF GLENS REPLACE FOUR (4) 2018 MINI BUSES AND RELATED EQUIPMENT, FTA 5307 2022 0.256 OPER 0.256 FALLS GREATER GLENS FALLS TRANSIT. NFA 2022 0.064 OPER 0.064 182223 FEDERAL SHARE OF LISTED AMOUNT = 80% AQC:EXEMPT WARREN TPC : < $0.75 M TOTAL 4YR COST : 0.320 0.000 0.000 0.320 0.000

CITY OF GLENS REPLACE TWO (2) 2018 PARATRANSIT BUSES AND RELATED FTA 5307 2023 0.128 OPER 0.128 FALLS EQUIPMENT, GREATER GLENS FALLS TRANSIT. NFA 2023 0.032 OPER 0.032 182224 FEDERAL SHARE OF LISTED AMOUNT = 80% AQC:EXEMPT WARREN TPC : < $0.75 M TOTAL 4YR COST : 0.160 0.000 0.000 0.000 0.160 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 75 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CITY OF GLENS REPLACE ONE (1) 2014 TROLLEY BUS AND RELATED EQUIPMENT, FTA 5307 2023 0.090 OPER 0.090 FALLS GREATER GLENS FALLS TRANSIT. NFA 2023 0.023 OPER 0.023 182225 FEDERAL SHARE OF LISTED AMOUNT = 80% FTA 5339 2023 0.090 OPER 0.090 NFA 2023 0.023 OPER 0.023 AQC:EXEMPT WARREN TPC : < $0.75 M TOTAL 4YR COST : 0.226 0.000 0.000 0.000 0.226

CDTA ELDERLY AND HANDICAPPED MOBILITY FTA 5310 2020 0.620 MISC 0.620 NFA 2020 0.155 MISC 0.155 182401 INCLUDING VEHICLES, THAT IMPROVE ACCESS AND MOBILITY FOR FTA 5310 2021 0.620 MISC 0.620 SENIORS AND INDIVIDUALS WITH DISABILITIES. OPERATING AND NFA 2021 0.155 MISC 0.155 FTA 5310 2022 0.620 MISC 0.620 ADMINISTRATIVE COSTS ARE ALSO ELIGIBLE UNDER THIS PROGRAM, 2022 0.155 MISC 0.155 T6A NFA FTA 5310 2023 0.620 MISC 0.620 NFA 2023 0.155 MISC 0.155 AQC:B10P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.100 0.775 0.775 0.775 0.775

FORT HUDSON PURCHASE OF ONE (1) NINE PASSENGER VEHICLE TO REPLACE EXISTING FTA 5310 2020 0.058 VEHEQUIP 0.058 NURSING FLEET VEHICLE, FORT HUDSON NURSING CENTER, FOR OPERATION IN NFA 2020 0.014 VEHEQUIP 0.014 182460 WARREN, WASHINGTON, AND SARATOGA COUNTIES. AGFTC FTA SECTION 5310 AWARD. AQC:EXEMPT MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.072 0.072 0.000 0.000 0.000

COMMUNITY, PURCHASE OF TWO (2) REPLACEMENT VEHICLES BY COMMUNITY, FTA 5310 2020 0.162 VEHEQUIP 0.162 WORK, AND WORK, AND INDEPENDENCE, INC. (CWI) FOR OPERATIONS IN WARREN, NFA 2020 0.040 VEHEQUIP 0.040 182461 WASHINGTON, AND SARATOGA COUNTIES. AGFTC FTA SECTION 5310 AWARD. AQC:EXEMPT MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.202 0.202 0.000 0.000 0.000

CDTA WASHINGTON/WESTERN BRT PHASE 3 STBG FLEX 2021 0.980 MISC 0.980 NFA 2021 0.245 MISC 0.245 182462 CONSTRUCT NEW PARKING FACILITIES AND STAGING AREA DUE TO THE STBG FLEX 2021 0.762 ROWACQU 0.762 INCREASE IN CDTA'S FLEET. NFA 2021 0.191 ROWACQU 0.191

FUNDING TO BE TRANSFERRED TO FTA FOR ELIGIBILITY AQC:EXEMPT ALBANY TPC : $70-$130 M TOTAL 4YR COST : 2.178 0.000 2.178 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 76 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT CENTER FOR DISABILITY SERVICES, 4 REPLACEMENT VEHICLES- 1 LOT FTA 5310 2020 0.365 VEHEQUIP 0.365 K (28 SEAT) AND 3 LOT I (20 SEAT) NFA 2020 0.091 VEHEQUIP 0.091 182463 AQC:EXEMPT MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.456 0.456 0.000 0.000 0.000

NYSDOT SCHENECTADY COUNTY CHAPTER, NYSARC, 2 REPLACEMENT VEHICLES FTA 5310 2020 0.164 VEHEQUIP 0.164 - LOT I (30 SEAT) NFA 2020 0.041 VEHEQUIP 0.041 182464 AQC:EXEMPT MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.205 0.205 0.000 0.000 0.000

NYSDOT NORTHEAST HEALTH FOUNDATION, INC., 4 REPLACEMENT VEHICLES - FTA 5310 2020 0.220 VEHEQUIP 0.220 LOT E (11 SEAT) NFA 2020 0.055 VEHEQUIP 0.055 182465 AQC:EXEMPT MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.275 0.275 0.000 0.000 0.000

NYSDOT COLONIE SENIOR SERVICE CENTERS FTA 5310 2020 0.018 MISC 0.018 NFA 2020 0.004 MISC 0.004 182466 1 REPLACEMENT VEHICLE - LOT E (11 SEAT) AND 16 UNITS OF FTA 5310 2020 0.055 VEHEQUIP 0.055 HARDWARE AND SOFTWARE (DISPATCH SOFTWARE AND 16 MOBILE NFA 2020 0.014 VEHEQUIP 0.014 TABLETS) AQC:EXEMPT MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.091 0.091 0.000 0.000 0.000

NYSDOT ST. PETER'S HOSPITAL FOUNDATION, 1 REPLACEMENT VEHICLE - LOT E FTA 5310 2020 0.055 VEHEQUIP 0.055 (11 SEAT) NFA 2020 0.014 VEHEQUIP 0.014 182467 AQC:EXEMPT MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.069 0.069 0.000 0.000 0.000

NYSDOT TOWN OF GUILDERLAND, 1 EXPANSION VEHICLE - LOT J (24 SEAT) FTA 5310 2020 0.116 VEHEQUIP 0.116 NFA 2020 0.029 VEHEQUIP 0.029 182468 AQC:EXEMPT MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.145 0.145 0.000 0.000 0.000

NYSDOT NYSARC, SARATOGA COUNTY CHAPTER, 2 REPLACEMENT VEHICLES – 1 FTA 5310 2020 0.179 VEHEQUIP 0.179 LOT K NFA 2020 0.045 VEHEQUIP 0.045 182469 (28 SEATS) AND 1 LOT G (14 SEATS) AQC:EXEMPT MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.224 0.224 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 77 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CDTA BUS LANE FEASIBILITY STUDY STBG FLEX 2021 0.096 SCOPING 0.096 NFA 2021 0.024 SCOPING 0.024 182470 FUNDS FOR THIS PROJECT WILL BE TRANSFERRED FROM THE TIP TO THE UPWP’S BUS LANE FEASIBILITY STUDY UNDER TRANSIT PLANNING TASK (44.26.6.13). AQC:NON MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.120 0.000 0.120 0.000 0.000

CDTA WASHINGTON/WESTERN BRT PHASE 4 FTA 5309 2021 34.482 CONST 34.482 FTA 5309 2021 10.791 MISC 10.791 182471 MATCH VARIES BY PHASE AND TOTALS $16.796M. FTA 5309 2021 0.837 ROWACQU 0.837 NFA 2021 1.530 ROWACQU 1.530 FTA 5309 2021 12.673 SCOPING 12.673 THIS IS THE FINAL PHASE OF THE BRT . IT INCLUDES CIVIL FTA 5309 2021 2.105 VEHEQUIP 2.105 WORK, SHELTERS AND PYLONS FOR SIX BRT STATIONS; SHELTERS AND NFA 2021 12.775 VEHEQUIP 12.775 PYLONS ONLY FOR FIVE BRT STATIONS; REBRANDING OF FIVE EXISTING BRT STATIONS; BUSES; TRANSIT SIGNAL PRIORITY; QUEUE BYPASS LANES; BUSWAY; PARK & RIDE FACILITIES; MAINTENANCE GARAGE EXPANSION; AND PROFESSIONAL SERVICES. AQC:NON ALBANY TPC : $70-$130 M TOTAL 4YR COST : 77.684 0.000 77.684 0.000 0.000

OTHER BICYCLE/PEDESTRIAN SETSIDE AGFTC, LOCATIONS TO BE DETERMINED STBG FLEX 2023 1.200 MISC 1.200 MTC200 - BLOCK FUNDING NFA 2023 0.300 MISC 0.300 1RB001 AQC:N/A MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.500 0.000 0.000 0.000 1.500

LOCAL RURAL LOCAL BRIDGE SETASIDE -GREENE COUNTY - BLOCK FUNDS STBG FLEX 2023 3.200 MISC 3.200 NFA 2023 0.800 MISC 0.800 1T0430 AQC:EXEMPT GREENE TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.000 0.000 0.000 0.000 4.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 78 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CDTA PREVENTIVE MAINTENANCE FOR TRANSIT PROJECTS FTA 5307 2022 11.424 MISC 11.424 NFA 2022 2.856 MISC 2.856 1TR604 ONGOING ACTIVITIES TO MAINTAIN CAPITAL ASSETS TO ENSURE BUS FTA 5307 2023 11.653 MISC 11.653 FLEET AND OTHER CAPITAL ITEMS OPERATE EFFICIENTLY NFA 2023 2.913 MISC 2.913 FTA 5307 2020 13.355 MISC 13.355 THROUGHOUT THEIR USEFUL LIVES. NFA 2020 3.339 MISC 3.339 FTA 5307 2021 13.095 MISC 13.095 T57 NFA 2021 3.274 MISC 3.274 AQC:B3P MULTI TPC : $70-$130 M TOTAL 4YR COST : 61.909 16.694 16.369 14.280 14.566

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT NFA 2021 0.200 CONINSP 0.200 AT RT 9N FROM RM 1521 (GULF BROOK, KEENE) TO RM 1580 STBG FLEX 2021 0.885 CONST 0.885 1V2121 (TRUMBULLS ROAD UPPER, JAY), ESSEX COUNTY. PROJECT FUNDED NFA 2021 0.221 CONST 0.221 FROM 1V2101 BLOCK. AQC:N/A ESSEX TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.306 0.000 1.306 0.000 0.000

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT NFA 2021 0.235 CONINSP 0.235 AT RT 73 FROM RM 1408 (2 MILES NORTH OF RT 9) TO RM 1469 (MARKET STBG FLEX 2021 1.138 CONST 1.138 1V2122 ST KEENE VALLEY), AND FROM ALAN WASHBOND DRIVE TO AIRPORT NFA 2021 0.285 CONST 0.285 ROAD, TOWN OF KEENE, ESSEX COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK. AQC:N/A ESSEX TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.658 0.000 1.658 0.000 0.000

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT NFA 2021 0.200 CONINSP 0.200 AT RT 74 FROM RM 1143 (PYRAMID ROAD) TO RM 1203 (RT 9), TOWN OF STBG FLEX 2021 0.915 CONST 0.915 1V2123 SCHROON, ESSEX COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK. NFA 2021 0.229 CONST 0.229 AQC:N/A ESSEX TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.344 0.000 1.344 0.000 0.000

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT NFA 2021 0.200 CONINSP 0.200 AT RT 86 FROM RM 1225 (OUTLOOK LANE, WILMINGTON) TO RM 1262 STBG FLEX 2021 0.593 CONST 0.593 1V2124 (DANIELLE ROAD, JAY), ESSEX COUNTY. PROJECT FUNDED FROM 1V2101 NFA 2021 0.148 CONST 0.148 BLOCK. AQC:N/A ESSEX TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.941 0.000 0.941 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 79 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT NFA 2021 0.200 CONINSP 0.200 AT RT 9N FROM RM 1000 (WARREN COUNTY LINE) TO RM 1047 NHPP 2021 0.681 CONST 0.681 1V2125 (TICONDEROGA MONUMENT), ESSEX COUNTY. PROJECT FUNDED FROM NFA 2021 0.170 CONST 0.170 1V2101 BLOCK. AQC:N/A ESSEX TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.051 0.000 1.051 0.000 0.000

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT NFA 2021 0.200 CONINSP 0.200 AT RT 145 FROM RM 1200 (CLAY HILL ROAD) TO RM 1232 (ALBANY STBG FLEX 2021 0.733 CONST 0.733 1V2131 COUNTY LINE), TOWNS OF DURHAM AND CAIRO, GREENE COUNTY. NFA 2021 0.183 CONST 0.183 PROJECT FUNDED FROM 1V2101 BLOCK. AQC:N/A GREENE TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.116 0.000 1.116 0.000 0.000

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT NFA 2021 0.200 CONINSP 0.200 AT RT 23A FROM RM 1255 TO RM 1286 AND FROM RM 1293 TO RM 1319, STBG FLEX 2021 0.840 CONST 0.840 1V2132 TOWN OF CATSKILL, GREENE COUNTY. PROJECT FUNDED FROM 1V2101 NFA 2021 0.210 CONST 0.210 BLOCK. AQC:N/A GREENE TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.250 0.000 1.250 0.000 0.000

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT NFA 2021 0.200 CONINSP 0.200 AT RT 385 FROM RM 1065 (ATHENS) TO RM 1138 (COXSACKIE - RT 9W), STBG FLEX 2021 1.073 CONST 1.073 1V2133 GREENE COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK. NFA 2021 0.268 CONST 0.268 AQC:N/A GREENE TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.541 0.000 1.541 0.000 0.000

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT NFA 2021 0.200 CONINSP 0.200 AT RT 423 FROM RM 1000 (RT 9P) TO RM 1039 (RT 32), TOWN OF STBG FLEX 2021 0.921 CONST 0.921 1V2152 STILLWATER, SARATOGA COUNTY. PROJECT FUNDED FROM 1V2101 NFA 2021 0.230 CONST 0.230 BLOCK. AQC:N/A SARATOGA TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.351 0.000 1.351 0.000 0.000

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT NFA 2021 0.200 CONINSP 0.200 AT RT 8 (GRAPHITE MOUNTAIN ROAD) FROM RM 1377 (SPUYTENDUIVEL STBG FLEX 2021 0.943 CONST 0.943 1V2171 BROOK) TO RM 1418 (NORTH POND) AND FROM RM 1418 TO RM 1443 NFA 2021 0.236 CONST 0.236 (SUMMIT DRIVE), TOWNS OF HORICON AND HAGUE, WARREN COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK. AQC:N/A WARREN TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.379 0.000 1.379 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 80 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT NFA 2021 0.100 CONINSP 0.100 AT RT 313 FROM RM 1000 (RT 22) TO RM 1045 (EAGLEVILLE ROAD), STBG FLEX 2021 0.726 CONST 0.726 1V2181 TOWN OF WHITE CREEK, WASHINGTON COUNTY. PROJECT FUNDED NFA 2021 0.182 CONST 0.182 FROM 1V2101 BLOCK. (Formerly PIN: 1V2182) AQC:N/A WASHINGTON TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.008 0.000 1.008 0.000 0.000

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT NFA 2021 0.400 CONINSP 0.400 AT RT 4 FROM RM 1000 (SARATOGA COUNTY LINE) TO RM 1098 (VILLAGE STBG FLEX 2021 3.233 CONST 3.233 1V2182 OF FORT EDWARD), TOWNS OF GREENWICH AND FORT EDWARD, NFA 2021 0.808 CONST 0.808 WASHINGTON COUNTY. PROJECT FUNDED FROM 1V2101 BLOCK. (Formerly PIN: 1V2183) AQC:N/A WASHINGTON TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.441 0.000 4.441 0.000 0.000

NYSDOT PAVEMENT CORRECTIVE MAINTENANCE UTILIZING A VPP CONTRACT NFA 2021 0.400 CONINSP 0.400 AT RT 149 FROM RM 1088 (RT 4) TO RM 1168 (RT 40), TOWNS OF NHPP 2021 1.962 CONST 1.962 1V2183 KINGSBURY AND HARTFORD, WASHINGTON COUNTY. PROJECT FUNDED NFA 2021 0.491 CONST 0.491 FROM 1V2101 BLOCK. (FORMERLY PIN: 1V2181) AQC:N/A WASHINGTON TPC : $2-$4 M TOTAL 4YR COST : 2.853 0.000 2.853 0.000 0.000

CDTA TRANSIT OPERATIONS SUPPORT FOR SARATOGA SERVICE: PREVENTIVE NFA 2020 0.400 OPER 0.400 MAINTENANCE & OPERATING ASSISTANCE NFA 2021 0.400 OPER 0.400 CDTC08 NFA 2022 0.400 OPER 0.400 SECTION 5307-SAR FUNDS ARE ALLOCATED FOR TRANSIT (CAPITAL OR NFA 2023 0.400 OPER 0.400 FTA 5307 2020 1.146 OPERATING) USE IN SARATOGA SPRINGS DUE TO ITS SMALL URBAN 1.146 MISC 2020 0.286 MISC 0.286 AREA STATUS. MATCH ON OPERATING ASSISTANCE IS 50%. NFA FTA 5307 2021 1.143 MISC 1.143 NFA 2021 0.286 MISC 0.286 TOA FUNDING BEYOND YEAR 1 IS ESTIMATED. FTA 5307 2022 1.170 MISC 1.170 NFA 2022 0.292 MISC 0.292 FTA 5307 2023 1.193 MISC 1.193 NFA 2023 0.298 MISC 0.298 AQC:B1P SARATOGA TPC : $9.5-15.5 M TOTAL 4YR COST : 7.414 1.832 1.829 1.862 1.891 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 81 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CDTA HUDSON RIVER CORRIDOR BRT: PHASE 1 NHPP 2020 0.096 CONST 0.096 NFA 2020 0.024 CONST 0.024 CDTC107 FUNDS FOR THIS PROJECT WERE MOVED INTO PINS CDTC137 AND NHPP 2020 0.800 MISC 0.800 CDTC31 AS PER 9/2021 POLICY BOARD AMENDMENT. NFA 2020 0.200 MISC 0.200 STBG FLEX 2020 0.096 CONST 0.096 2020 0.024 CONST 0.024 PHASE 1 INCLUDES: TRANSIT SIGNAL PRIORITY, STATION SITEWORK, NFA STBG FLEX 2020 1.958 MISC 1.958 PED INFRASTRUCTURE, AND DESIGN WORK FOR THE TROY BUS GARAGE NFA 2020 0.489 MISC 0.489 EXPANSION. THE UNCLE SAM TRANSIT CENTER WAS REMOVED FROM THE PROJECT.

ALBANY, MENANDS, WATERVLIET, TROY AND COHOES. ALBANY & RENSSELAER COUNTY. AQC:EXEMPT MULTI TPC : $50-$85 M TOTAL 4YR COST : 3.687 3.687 0.000 0.000 0.000

CDTA TDM MULTIMODAL IMPLEMENTATION NFA 2021 0.483 SCOPING 0.483 STBG FLEX 2021 0.094 SCOPING 0.094 CDTC108 INCLUDES: GUARANTEED RIDE HOME PROGRAM, TRANSIT PASS NFA 2021 0.023 SCOPING 0.023 SUBSIDIES, PARK & RIDE LEASES, TRY TRANSIT, CAPITAL CARSHARE, AND THE REGIONAL BIKESHARE NETWORK.

THE LOCAL FUNDS REPRESENT A CDTA COMMITTMENT TO MAKING UP FOR THE SAME AMOUNT FUNDING MOVED FROM T108 TO T57 BY AMENDMENT. AQC:EXEMPT MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.600 0.000 0.600 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 82 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CDTA HUDSON RIVER CORRIDOR BRT: FINAL PHASE FTA 5309 SS 2020 14.829 CONST 14.829 NFA 2020 4.324 CONST 4.324 CDTC122 CONNECTS WATERFORD TO DOWNTOWN ALBANY VIA TROY, FTA 5309 SS 2020 4.191 MISC 4.191 WATERVLIET, AND MENANDS. INCLUDES BUSES, STATIONS, TRANSIT NFA 2020 3.194 MISC 3.194 SIGNAL PRIORITY, REPLACEMENT OF 10 TRAFFIC SIGNALS, QUEUE NFA 2020 0.084 MISC 0.084 2020 2.990 MISC 2.990 BYPASS LANES, REAL-TIME BUS ARRIVAL INFORMATION, TWO PARK AND NFA FTA 5309 SS 2020 1.387 ROWACQU 1.387 RIDE FACILITIES, EXPANDING A MAINTENANCE AND STORAGE FACILITY FTA 5339 DIS 2020 5.000 MISC 5.000 AND PROFESSIONAL SERVICES.

FOR 5309, THE DISCRETIONARY ID# IS D2018-NWST-TBD

FOR 5339, THE DISCRETIONARY ID# IS D2018-BUSC-198

ALBANY AND RENSSELAER COUNTIES, T122 AQC:NON MULTI TPC : $50-$85 M TOTAL 4YR COST : 42.513 42.513 0.000 0.000 0.000

CDTA UV DISINFECTING SYSTEM FOR TRANSIT BUSES FTA 5307 2021 0.660 MISC 0.660 NFA 2021 0.165 MISC 0.165 CDTC135 THIS WILL RETROFIT THE EXISTING FIXED-ROUTE FLEET WITH UV DISINFECTING SYSTEMS TO PREVENT THE SPREAD OF COVID-19.

T135, ALBANY, RENSSELAER, SARATOGA & SCHENECTADY COUNTIES AQC:EXEMPT MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.825 0.000 0.825 0.000 0.000

CDTA BUS RAPID TRANSIT EXPANSION STUDY STBG FLEX 2022 0.280 SCOPING 0.280 NFA 2022 0.070 SCOPING 0.070 CDTC136 THIS STUDY WILL IDENTIFY MULTIPLE CORRIDORS AROUND THE REGION FOR THE EXPANSION OF CDTA’S BUS RAPID TRANSIT SYSTEM AND PERFORM CONCEPTUAL DESIGN WORK AT A SUFFICIENT LEVEL OF DETAIL TO ENTER PROJECT DEVELOPMENT UNDER THE FEDERAL TRANSIT ADMINISTRATION’S CAPITAL INVESTMENT GRANTS (CIG) PROGRAM.

ALBANY, RENSSELAER, SARATOGA AND SCHENECTADY COUNTIES AQC:EXEMPT MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.350 0.000 0.000 0.350 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 83 of 83 for REGION 01

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars

CDTA CAPITAL COST OF CONTRACTING FOR COMMUTER SERVICE IN THE FTA 5307 2020 0.500 MISC 0.500 CAPITAL DISTRICT TO POINTS NORTH, WEST AND SOUTH NFA 2020 0.126 MISC 0.126 CDTC20 FTA 5307 2021 1.107 MISC 1.107 THE SUB-RECIPIENT FOR FUNDS IS CURRENTLY ADIRONDACK NFA 2021 0.277 MISC 0.277 FTA 5307 2022 0.480 MISC 0.480 TRAILWAYS NFA 2022 0.120 MISC 0.120 FTA 5307 2023 0.480 MISC 0.480 NFA 2023 0.120 MISC 0.120 AQC:B10P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.210 0.626 1.384 0.600 0.600

CDTA BRT IMPLEMENTATION, NHPP 2020 1.944 MISC 1.944 NFA 2020 0.486 MISC 0.486 CDTC31 DRAWDOWNS FROM THESE BLOCK FUNDS MUST CONSIST OF A NEW TIP NHPP 2021 1.944 MISC 1.944 PROJECT, RG131 NFA 2021 0.486 MISC 0.486 NHPP 2022 1.944 MISC 1.944 NFA 2022 0.486 MISC 0.486 BLOCK FUNDS STBG FLEX 2022 0.393 MISC 0.393 NFA 2022 0.098 MISC 0.098 NHPP 2023 2.400 MISC 2.400 NFA 2023 0.600 MISC 0.600 STBG FLEX 2023 0.800 MISC 0.800 NFA 2023 0.200 MISC 0.200 AQC:NON ALBANY TPC : $40-$60 M TOTAL 4YR COST : 11.781 2.430 2.430 2.921 4.000

CDTA TRAVEL DEMAND MANAGEMENT & MULTIMODAL NFA 2021 0.920 MISC 0.920 STBG FLEX 2021 0.224 MISC 0.224 CDTC32 DRAWDOWNS FROM THESE BLOCK FUNDS MUST CONSIST OF A NEW TIP NFA 2021 0.056 MISC 0.056 PROJECT. RG130 NFA 2022 0.460 MISC 0.460 STBG FLEX 2022 0.112 MISC 0.112 NFA 2022 0.028 MISC 0.028 BLOCK FUNDS NFA 2023 0.460 MISC 0.460 STBG FLEX 2023 0.112 MISC 0.112 NFA 2023 0.028 MISC 0.028 AQC:J1P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.400 0.000 1.200 0.600 0.600