** NEW YORK STATE DEPARTMENT of TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01

** NEW YORK STATE DEPARTMENT of TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 01

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 1 of 83 for REGION 01 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT NY 2 BRIDGE OVER NY 22, BRIDGE REPLACEMENT NHPP 2020 0.173 PRELDES 0.173 NFA 2020 0.043 PRELDES 0.043 100132 TOWN OF PETERSBURG, RENSSELEAR COUNTY, BIN 1000250. R313 NHPP 2023 0.189 CONINSP 0.189 NFA 2023 0.047 CONINSP 0.047 NHPP 2023 1.828 CONST 1.828 NFA 2023 0.456 CONST 0.456 NHPP 2021 0.048 DETLDES 0.048 NFA 2021 0.012 DETLDES 0.012 NHPP 2021 0.260 PRELDES 0.260 NFA 2021 0.065 PRELDES 0.065 AQC:A19P RENSSELAER TPC : $2-$4 M TOTAL 4YR COST : 3.121 0.216 0.385 0.000 2.520 NYSDOT NY RT. 2 BRIDGE OVER THE POESTENKILL, BRIDGE REPLACEMENT NHPP 2020 0.031 ROWACQU 0.031 NFA 2020 0.007 ROWACQU 0.007 100136 TOWN OF BRUNSWICK, RENSSELAER COUNTY, BIN 1000190. R316 NHPP 2020 0.001 ROWINCD 0.001 NFA 2020 0.001 ROWINCD 0.001 NHPP 2020 0.160 DETLDES 0.160 NFA 2020 0.040 DETLDES 0.040 NHPP 2020 0.266 CONINSP 0.266 NFA 2020 0.067 CONINSP 0.067 NHPP 2020 2.660 CONST 2.660 NFA 2020 0.665 CONST 0.665 AQC:A19 RENSSELAER TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.898 3.898 0.000 0.000 0.000 NYSDOT NY RT. 144 BRIDGE OVER HANNACROIS CREEK, BRIDGE REPLACEMENT NHPP 2021 0.056 ROWACQU 0.056 NFA 2021 0.014 ROWACQU 0.014 100716 TOWN OF COEYMANS, ALBANY COUNTY, BIN 1038070. A576 NHPP 2021 0.125 DETLDES 0.125 NFA 2021 0.031 DETLDES 0.031 NHPP 2021 0.004 ROWINCD 0.004 NFA 2021 0.001 ROWINCD 0.001 NHPP 2021 0.224 CONINSP 0.224 NFA 2021 0.056 CONINSP 0.056 NHPP 2021 2.255 CONST 2.255 NFA 2021 0.564 CONST 0.564 AQC:A19P ALBANY TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.330 0.000 3.330 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 2 of 83 for REGION 01 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT ROUTE 196 OVER DIKE ROAD (CANAL), BRIDGE REPAIR, TOWN OF NHPP 2020 0.050 DETLDES 0.050 KINGSBURY, WASHINGTON COUNTY, BIN 4039820 NFA 2020 0.012 DETLDES 0.012 102409 NHPP 2020 0.140 CONINSP 0.140 NFA 2020 0.035 CONINSP 0.035 NHPP 2020 1.650 CONST 1.650 NFA 2020 0.412 CONST 0.412 NHPP 2020 0.050 PRELDES 0.050 NFA 2020 0.012 PRELDES 0.012 NHPP 2021 0.200 DETLDES 0.200 NFA 2021 0.050 DETLDES 0.050 AQC:N/A WASHINGTON TPC : $2-$4 M TOTAL 4YR COST : 2.611 2.361 0.250 0.000 0.000 NYSDOT US ROUTE 9W OVER CSX/CP RAIL, BRIDGE REPLACEMENT STBG FLEX 2023 0.800 DETLDES 0.800 NFA 2023 0.200 DETLDES 0.200 103955 TOWN OF BETHLEHEM, ALBANY COUNTY, BIN 1007570. A598 STBG FLEX 2021 0.800 PRELDES 0.800 NFA 2021 0.200 PRELDES 0.200 STBG FLEX 2023 0.738 CONINSP 0.738 NFA 2023 0.184 CONINSP 0.184 STBG FLEX 2023 7.380 CONST 7.380 NFA 2023 1.845 CONST 1.845 AQC:A19Z ALBANY TPC : $9.5-15.5 M TOTAL 4YR COST : 12.147 0.000 1.000 0.000 11.147 NYSDOT RT. 9 OVER I-87 AT EXIT 17 BIN 1005679, BRIDGE REPLACEMENT AND NHPP 2021 1.600 CONINSP 1.600 INTERCHANGE REALIGNMENT ; TOWN OF MOREAU , SARATOGA NFA 2021 0.200 CONINSP 0.200 104342 COUNTY SAR115 NHPP 2021 11.200 CONST 11.200 NFA 2021 2.800 CONST 2.800 NHPP 2020 0.160 PRELDES 0.160 NFA 2020 0.040 PRELDES 0.040 NHPP 2021 1.120 DETLDES 1.120 NFA 2021 0.280 DETLDES 0.280 AQC:EXEMPT SARATOGA TPC : $15-$25 M TOTAL 4YR COST : 17.400 0.200 17.200 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 3 of 83 for REGION 01 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT US ROUTE 9 BRIDGE OVER I-90 (EXIT 11), BRIDGE REPLACEMENT NHPP 2021 0.400 DETLDES 0.400 NFA 2021 0.100 DETLDES 0.100 104357 TOWN OF SCHODACK, RENSSELAER COUNTY, BIN 1092730. R315 NHPP 2021 0.400 PRELDES 0.400 NFA 2021 0.100 PRELDES 0.100 NHPP 2022 0.748 CONINSP 0.748 NFA 2022 0.187 CONINSP 0.187 NHPP 2022 7.185 CONST 7.185 NFA 2022 1.797 CONST 1.797 AQC:A19P RENSSELAER TPC : $9.5-15.5 M TOTAL 4YR COST : 10.917 0.000 1.000 9.917 0.000 TN OF EAST US RT. 9 AND 20 SIDEWALK CONSTRUCTION FROM BRUEN COURT TO NFA 2021 0.006 CONST 0.006 GREENBUSH THE RENSSELAER CITY LINE. STBG LG URB 2021 0.070 CONINSP 0.070 104358 NFA 2021 0.018 CONINSP 0.018 TOWN OF EAST GREENBUSH, RENSSELAER COUNTY. R309 STBG LG URB 2021 0.470 CONST 0.470 NFA 2021 0.117 CONST 0.117 AQC:C2P RENSSELAER TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.681 0.000 0.681 0.000 0.000 NYSDOT ROUTE 9 OVER ROGERS BROOK, BIN 1005790, BRIDGE REPAIR OR NHPP 2021 0.110 PRELDES 0.110 REPLACEMENT. TOWN OF SCHROON, ESSEX COUNTY. E NFA 2021 0.027 PRELDES 0.027 104360 NHPP 2022 0.154 CONINSP 0.154 NFA 2022 0.038 CONINSP 0.038 NHPP 2022 1.182 CONST 1.182 NFA 2022 0.295 CONST 0.295 NHPP 2021 0.110 DETLDES 0.110 NFA 2021 0.027 DETLDES 0.027 AQC:EXEMPT ESSEX TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.943 0.000 0.274 1.669 0.000 NYSDOT NY RT 378 OVER HUDSON, BRIDGE PAINTING STBG LG URB 2023 0.456 CONINSP 0.456 NFA 2023 0.114 CONINSP 0.114 104517 VILLAGE OF MENANDS AND CITY OF TROY, ALBANY COUNTY AND STBG LG URB 2023 4.582 CONST 4.582 RENSSELAER COUNTY, BIN 1062850. A600 NFA 2023 1.146 CONST 1.146 STBG LG URB 2021 0.204 PRELDES 0.204 NFA 2021 0.051 PRELDES 0.051 STBG LG URB 2022 0.240 DETLDES 0.240 NFA 2022 0.060 DETLDES 0.060 AQC:A19Z MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 6.853 0.000 0.255 0.300 6.298 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 4 of 83 for REGION 01 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT NY 378 TROY MENANDS BRIDGE STUDY NHPP 2021 0.693 PRELDES 0.693 NFA 2021 0.173 PRELDES 0.173 104518 BRIDGE REPLACEMENT STUDY: EVALUATE OPTIONS TO RELOCATE THE BRIDGE TO A LOCATION TBD. BIKE/PED ACCOMMODATIONS WILL BE EVALUATED. VILLAGE OF MENANDS AND CITY OF TROY, ALBANY & RENSSELAER COUNTY, A605 & R344 AQC:C3Z MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.866 0.000 0.866 0.000 0.000 NYSDOT I-787 NB RAMP TO SOUTH MALL EXPRESSWAY WESTBOUND, ELEMENT NHPP 2020 0.900 CONINSP 0.900 SPECIFIC BRIDGE REPAIR TO ADDRESS CONDITION RATING NFA 2020 0.100 CONINSP 0.100 105177 NHPP 2020 8.675 CONST 8.675 CITY OF ALBANY, ALBANY COUNTY, BIN 109299A. A572 NFA 2020 0.964 CONST 0.964 AQC:A19P ALBANY TPC : $9.5-15.5 M TOTAL 4YR COST : 10.639 10.639 0.000 0.000 0.000 NYSDOT ALBANY SKYWAY (ALBANY CORNING PRESERVE BICYCLE & HPP 2020 1.920 CONST 1.920 PEDESTRIAN CONNECTOR RAMP). NFA 2020 0.480 CONST 0.480 105182 NFA 2020 2.800 CONST 2.800 CONVERTS NB I-787 RAMP FROM QUAY STREET TO CLINTON AVENUE NHPP 2020 0.572 CONST 0.572 TO A LINEAR PARK, CONNECTING BROADWAY TO THE CORNING NFA 2020 0.143 CONST 0.143 TAP FLEX 2020 0.640 CONINSP 0.640 PRESERVE NFA 2020 0.160 CONINSP 0.160 TAP FLEX 2020 4.360 CONST 4.360 CITY OF ALBANY, ALBANY COUNTY. A588 NFA 2020 1.090 CONST 1.090 STBG LG URB 2021 0.240 CONINSP 0.240 REPURPOSED DEMO ID NY060 PROGRAM CODE RPS0 NFA 2021 0.060 CONINSP 0.060 STBG LG URB 2021 1.108 CONST 1.108 NFA 2021 0.277 CONST 0.277 AQC:K1P ALBANY TPC : $12.5-$19 M TOTAL 4YR COST : 13.850 12.165 1.685 0.000 0.000 NYSDOT I-787 PAVEMENT CORRECTIVE MAINTENANCE, FROM EXIT 3B TO EXIT 7 NHPP 2020 0.383 CONINSP 0.383 NFA 2020 0.043 CONINSP 0.043 105183 CITY OF ALBANY AND VILLAGE OF MENANDS, ALBANY COUNTY.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    83 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us