II ELECTRIC COOPERATIVE, INC. (ILECO II) Brgy. Cauayan, , llollo Tel Nos. (033)529-8063, (033)529-8981 Email add: [email protected]

SUPPLEMENTAL BID BULLETIN Addendum No.1

For the Project:

SUPPLY OF LABOR, LINE MATERIALS AND HOUSEWIRING MATERIALS FOR BLEP PROJECT LOCATED IN CABATANGAN, , ILOILO; AGLOBONG, , ILOILO; BINOLOSAN PEQUENO, , ILOILO This addendum No. 1 is issued to clarify, modifyor amend item stated below:

ADDENDUM CLARIFICATION AMENDMENT No Invitation to Bid Invitation to Bid

ApprovedBudget for the Contract (ABC) Approved Budget of Project Description (BLEP 2018) Project Description (BLEP 2018) the Contract (ABC) Line Housewiring Total Construction 1. Supply of Labor, Line Materials and 1. Supply of Labor and Materials for BLEP Housewlng Materials for BLEP Project. Project. Project Location: Brgy Cabatangan, Lot 1. Php 8,563,144.65 Project Location: Brgy Cabatangan, 7,992,424.05 570,720.60 8,563,144.65 Larnbunao,lloilo (Silio Proper, llaya and Lambunao, lloilo (Sitio Proper, llaya and llawod). llawod).

2. Supply of Labor, Line Materials and 2. Supply of Labor and Materials for BLEP Housewing Materials for BLEP Project. Lot 2. Project. Project Location: Brgy Aglobong, Php 14,031,445.32 13,270,484.52 760,960.80 14.031,445.32 Project Location: Brgy Aglobong, Janiuay, Janiuay, lloilo (Zone 1,2,3 & 4). lloilo (Zone1 ,2,3 & 4).

3. Supply of Labor, Line Materials and 3. Supply of Labor and Materials for BLEP Housewing Materials for BLEP Project. Project. Project Location: Brgy Binolosan Lot 3. Php 4,317,854.08 Project Location: Brgy Binolosan Pequeno, 3,556,893.28 760,960.80 4,317,854.08 Pequeno, Calinog, lloilo (Sitio Proper,llaya, Calinog, lloilo (SitioProper,llaya, llawod and llawod and Centro). Centro).

This SUPPLEMENTAUBID BULLETIN, ADDENDUM No.1 is issued this 10th day of December 2018 for guidance and information of all concerned.

,- �7 "'"?t

FERNANDO L. LASAFIN Chairperson Bids and Awards Committee a tLotLo il ELECTRTC COOPERATIVE, lNC. (ILECO ll) Brgy. Cauayan, Pototan, lloilo Tel Nos. (033)529€063, (033)529-8981 Email add: [email protected]

m SUPPLEMENTAL BID BULLETIN Addendum No.2

For the Project:

lnstallation of Electric Service Connection (NHA Project). This addendum No. 1 is issued to clarify, modify or amend item stated below: AODENDUM No. CLARIFICATION AMEN DMENT lnvitation to Bid lnvitation to Bid Approved Budget of Approved Budget for the Project Description (NHA Project) Pro.lect Description (NHA Proiect) the Contract (ABC) Contract (ABC) Bolt, Oval Eye,5/8" x L2" Bolt, Oval Eye,5/8" x 12" Washer Square, 2-l/4" x L-L/4" x 73/16 Washer Square, 2-f/4" x l-L/4" x 13/!6 Rod, Ground Steel Galvanized, 5/8"x10", HDG Rod, Ground steel Galvanized,5/8"x10", HDG A Php 55,571.68 Php 68,850.26 Clamp, Ground Rod Clamp, Ground Rod Screw, Lag, 1/2" x6" (2 pcs. Meter module) Screw, Lag, Ll2" x6" (2 pcs. Meter module) Connector, compression, YPC 2A8U Connector, compression, YPC 2A8U Conductor, Bare, ACSR #2 AWG 6/1 (lom/pole) Conductor, Bare, ACSR f2 AWG 5/1 (lOm/pole) B ACSR # 1/0, lnsulated Ph p 463 ,233 .4O ACSR # 1/0, lnsulated Php 486,395.07 Conductor, Duplex Wire # 6 Conductor, Duplex Wire # 6 c Meter Mounting Module, 5 Meter Socket Php 540,000.00 Meter Mounting Module, 5 Meter Socket Php 567,000.00 Supply of Labor for lnstallation of SDI for NHA Supply of Labor for lnstallation of SDI for NHA E Php 264,600.00 Php 317,520.00 Project Project

This SUPPLEMENTAL/BID BULLETIN, ADDENDUM No. l is issu€d this 'l1th day of December 2018 for guidance and information of all concerned

, \'";,, FERNANDO L. LASAFIN Chairperson Bids and Awards Committee