FROM CREATIVE POWER TO POWER GENERATION Corporate Presentation Moscow, 2018 INTER RAO GROUP

INTERNATIONAL GENERATION SALES TRADING ENGINEERING ASSETS

. 40 TPPs (including 6 . 9 electricity retailers . Leading Russian . 25 new generation and . Operating in mini TPPs), 12 HPPs electricity exporter rehabilitation projects more than 15 countries (including 7 mini . 15.9% share of the with 97% market HPPs), 2 wind farms Russian retail market share. . 7.4 GW combined . 4,3 GW of installed capacity of all facilities capacity . 32.7 GW of installed . 182,6 TWh sold* . 16,7 TWhГруппа exported* «Интер РАО» capacity . Consolidated value of . 5 thousand km of . 6,2 TWh imported* current projects: power lines . 134,8 TWh 188.5 billion RUB generated*

50 825 people 917 billion RUB total staff* 2017 revenue (IFRS)

THE LARGEST ENERGY HOLDING IN FOCUSED ON ELECTRICITY AND HEAT GENERATION AND SALES, ELECTRICITY EXPORT AND IMPORT, AND ENGINEERING SERVICES 2 FROM CREATIVE POWER TO POWER GENERATION * As of 2017 ENGINEERING ASSETS OF INTER RAO GROUP

100% affiliate

A leading engineering service provider focused on construction and rehabilitation of energy facilities in Russia and worldwide • 21 successful new construction projects with 6,4 GW of combined capacity • Current portfolio includes 1 GW of generation capacity spread across 4 projects • A team of 500 highly skilled professionals

100% 25%

Sales of energy equipment Manufactures 6FA gas turbines in Russia and services in the international markets • Joint venture of JSC Inter RAO, and Rostec • 9 active contracts for delivery of energy equipment, spare parts • Established in 2011 and services for heat and hydro power projects • Designed to manufacture 14 gas turbines per year, with potential • Large network of representative offices abroad upgrades up to 20 gas turbines per year • Key markets: Latin America, Africa, Middle East & Southeast • Manufacturing site: Rybinsk, Yaroslavl Oblast Asia

3 FROM CREATIVE POWER TO POWER GENERATION INTER RAO – ENGINEERING IN FIGURES AND FACTS

Participation in the implementation of the Program for the Construction of New GW Generating Capacities for the Purpose of 6,4 7 branches Ensuring the Energy Security of the of implemented generating in different regions of the Russian Federation Kaliningrad Region capacities

1 GW of generating capacities to be implemented

Participation in the implementation of the 4 projects Program for the Construction of Olympic Venues and the Development of the City of The size of current portfolio of new construction Sochi as a Mountain Climatic Resort: and modernization projects Construction of the Dzhubginskaya TPP

Experience of implemented projects based on the equipment of The presence major world and home producers such of its own 21 as , GE Energy, Power, project unit Completed projects ABB, Power Machines, EMAlliance, etc.

4 FROM CREATIVE POWER TO POWER GENERATION OUR VALUES

Inter RAO – Engineering pays particular attention to The Company takes full responsibility for 01 02 assurance of sustainable development and safety carrying out its activities along the whole of production processes. The Company’s overriding process chain – from designing a specific facility and priority is an assurance of its activity compliance with the ordering the maximum efficient and safe equipment best international practices in the sphere of the quality to strict supervision of construction and installation management, ecological safety and labor protection. and construction waste disposal.

03 Inter RAO – Engineering considers it mandatory that 04 The company is a member of the SRO - all production processes comply with international Association "Urban Planning and Design requirements and it is currently certified according to the Association" and the Association "Association of following standards: OHSAS 18001:2007 — Occupational General Contractors in Construction", and has the health and safety management systems, ISO 14001:2015 — necessary permits for works that affect the safety Environmental management systems, ISO 9001:2015 — of capital construction facilities. Quality management systems

5 FROM CREATIVE POWER TO POWER GENERATION OUR SERVICES

EPC/EPCM project management

BOT/BOO project Design of energy organization facilities

Sales of core and auxiliary Owner's equipment Engineering

Decommissioning Integrated offer of obsolete equipment based on 6FA gas Start-up and turbines adjustment of new facilities 6 FROM CREATIVE POWER TO POWER GENERATION INTEGRATED SOLUTIONS BASED ON 6FA TURBINES

Inter RAO – Engineering is a supplier of integrated solutions based on the 6FA turbines, which involve the full range of work and services for all life cycle stages of a power generation facility:

• full cycle engineering – from development of design documentation to project implementation on a turnkey basis • use of flexible financing schemes in project implementation • standard design solutions to cut costs and time required for design, construction and servicing of power generation facilities; • full delivery list of main and auxiliary equipment on optimum commercial conditions • equipment integration into a unified process diagram with a common guarantee of capacity and efficiency of the entire facility • long-term servicing of power island equipment, which includes development of a comprehensive service schedule, spare parts delivery, maintenance, repair, and reconstruction

Inter RAO – Engineering experts have main configurations of thermal developed standard engineering solutions for 28 power plants.

7 FROM CREATIVE POWER TO POWER GENERATION PROJECT GEOGRAPHY

Completed projects with RUSSIAN FEDERATION combined capacity of 6,4 GW 21

Projects in progress with combined capacity of 1 GW 4 20 Tajikistan Afghanistan 23 RUSSIAN PROJECTS 21-22 Bangladesh 1. Sochinskaya, 80 MW 16,19 2. Kaliningradkaya SDPP-2, 450 MW 02,17,18 3. Urengoyskaya SDPP-2, 491 MW 4. Kharanorskaya SDPP-2, 225 MW Moscow 05 5. Ivanovskiye CPP, 325 MW 03 RUSSIAN 6. Tomskaya TPP-1, 15 MW 10 УКРАИНА 7. Omskaya TPP-3, 85 MW 14 FEDERATION 12 8. Gusinoozyorskaya SDPP, 210 MW 15 13 9. Dzhubginskaya TPP, 180 MW 09 11 06 10. Cherepetskaya SDPP, 2*225 MW 01 07 11. Yuzhnouralskaya SDPP-2, 2*400 MW 04 12. Nizhnevartovskaya SDPP, 413 MW 08 13. Verhhnetagilskaya SDPP, 447 MW 14. Permskaya SDPP, 861 MW 15. Zatonskaya TPP, 440 MW PROJECTS ABROAD 16. Pregolskaya TPP, 456 MW 20. Tajikistan 22. Bangladesh 17. Talakhovskaya TPP, 156 MW Projects in progress Sangtuda HPP-1, 670 MW Siddhirganj TPP, 210 MW 21. Bangladesh 23. Afghanistan 18. Mayakovskaya TPP, 156 MW Completed projects Ghorasal TPP, 210 MW Naglu HPP, 2*25 MW 19. Primorskaya TPP, 195 MW 8 FROM CREATIVE POWER TO POWER GENERATION PARTNERSHIP BENEFITS

Long-term partnerships Proven project with the leading equipment manufacturers, financing options project managers and contractors

Optimized project timelines Comprehensive network and costs of branches and sales offices

In-house design center Standardization programs for projects and technology solutions

9 FROM CREATIVE POWER TO POWER GENERATION OUR PROJECTS CONSTRUCTION OF GENERATING CAPACITY IN KALININGRAD REGION

. Construction of four power plants with a total capacity of 1 GW is the largest investment project in the Kaliningrad region. The projects are implemented in accordance with the approved Resolution of the Government of the Russian Federation of October 20, 2015 No. 1116 and Order of the Government of the Russian Federation of October 20, 2015 No. 2098-p. . New power sources will ensure the energy security of the Kaliningrad region and make its energy system more maneuverable.

Mayakovskaya TPP, Gusev Talakhovskaya TPP , Sovetsk

Construction of power plants on the Construction of power plants on the basis of two gas turbines with basis of two gas turbines with power capacity of 156 MW each power capacity of 156 MW each

Key components : Key components : . Two gas turbines PG6111 (FA) . Two gas turbines PG6111 (FA) manufactured by LLC Russian Gas manufactured by LLC Russian Gas Completed in 2018 Completed in 2018 Turbines Turbines

Primorskaya TPP , Svetliy Pregolskaya TPP , Kaliningrad

Construction of the power plant Construction of power plants on the consisting of three steam power basis of four combined cycle with plants with total capacity of 195 MW total capacity of 456 MW

Key components : Key components : . Three steam turbines UTZ K-65-12,8 . Four gas turbines PG6111 (FA) manufactured manufactured by CJSC Ural Turbine Plant; by LLC Russian Gas Turbines . Three turbine-generators TF-65-2UHL4, . Four generators TF-90G-2UZ manufactured manufactured by CJSC ELSIB by CJSC ELSIB . Two steam boilers E-240-13,8-560KT, . Four steam turbines K-38-8,0 manufactured manufactured by JSC Podolsk Machine- by JSC Power Machines; Building Plant . Four heat recovery steam generators PK-116 manufactured by JSC Podolsk Machine- Expected project completion: Expected project completion: Building Plant 2020 2019 11 FROM CREATIVE POWER TO POWER GENERATION WORK IN PROGRESS

Zatonskaya TPP Russian Federation Siddhirganj TPP Bangladesh

Construction of 440 MW thermal Оverhaul of Unit, 210 MW in power plant capacity

Key components: Key components: Two Power Machines GTE-160 gas turbines; • Power Machines K-210-130-8 steam turbine; Two Kaluga Turbine Works Т-60/73 • TKZ (Power Machines Group) TGME- steam turbines; 206/BCO boiler; • Two EMAlliance Е-220 boilers. • State Enterprise Electrotyazmash () generator TGV-200MTZ.

Expected project completion: Completed in 2018 2018

Naglu HPP Afghanistan

Rehabilitation of Unit No.1 and overhaul of Unit No.3, capacity of each Unit is 25 MW

Key components: • Four Turboatom РО 75-В-225 water turbines; • Four Energomash (Ekaterinburg)- Uralelectrotyazhmash VGS 525/110-24 generators.

Expected project completion: 2018 12 FROM CREATIVE POWER TO POWER GENERATION COMPLETED PROJECTS

Permskaya SDPP Russian Federation Verkhnetagilskaya Russian Federation SDPP Construction of 861 MW Construction of 447 MW combined cycle combined cycle Power Generation Unit #4 Power Generation Unit #12

Key components: Key components: • 283 MW Siemens SST5-5000 steam Siemens SGT5-4000F gas turbine with Sgen5- turbine; 1200A generator; • Two 289 MW Siemens SGT5-4000F gas • Power Machines K-130 steam turbine with turbines; TZFP-160 generator. • Two EMAlliance heat recovery boilers

Completed in 2017 Completed in 2017

Cherepetskaya Russian Federation Yuzhnouralskaya Russian Federation SDPP SDPP-2

Construction of two 225 MW Construction of power plants on the Pulverized Coal Boilers, basis of two combined cycle power #8 and #9 capacity of 400 MW each

Key components: Key components: • Two Power Machines K-225-12.8-4P • Two Siemens SGT-4000F gas turbines; steam turbines; • Two Siemens SSТ-3000 condenser turbines; • Two EMAlliance Еp-630-13.8-565/570KТ • Two Atomenergomash P-140 heat recovery boilers. steam boilers.

Completed in 2014-2015 Completed in 2014 13 FROM CREATIVE POWER TO POWER GENERATION COMPLETED PROJECTS

Nizhnevartovskaya Russian Federation Dzhubginskaya Russian Federation SDPP TPP Construction of 413 MW Construction of 180 MW thermal combined cycle power plant Power Generation Unit #3.1

Key components: Key components: • General Electric PG9351(FA) gas turbine • Two GE ENERGY LMS100 gas turbines. with 324H 50 Hz generator; • General Electric D12 steam turbine with 9А5 generator; • Atomenergomash P-143 heat recovery steam boiler.

Completed in 2014 Completed in 2013

Gusinoozyorskaya Russian Federation Omskaya TPP-3 Russian Federation SDPP

Construction of an 85 MW Rehabilitation of 210 MW combined cycle Pulverized Coal Boiler #4 Power Generation Unit

Key components: Key components: • Steam turbine of К-210-130-3 type, • Two GE ENERGY LM2500+G4 DLE gas manufactured by JSC Power Machines; turbines; • Boiler БКЗ-640-140 ПТ-1, manufactured • Two EMAlliance Е-38.3/8.1-5.5/0.63 heat by JSC Sibenergomash. recovery boilers; • Power Machines-KTZ Т-16.5/22-5.5/0.08 steam turbine.

Completed in 2013 Completed in 2013 14 FROM CREATIVE POWER TO POWER GENERATION COMPLETED PROJECTS

Tomskaya TPP-1 Russian Federation Kharanorskaya SDPP Russian Federation

Construction of a 15 MW power Construction of 225 MW generation unit and a heat Pulverized Coal Boiler #3 recovery boiler

Key components: Key components: • Turbomach TITAN-130 gas turbine; • Power Machines K-225-12.8-3P steam • ZiO Podolsk KUV 23.5/150 boiler. turbine; • EMAlliance Ep-630-13.8 565BT (TPE-216M) boiler.

Completed in 2012 Completed in 2012

Urengoyskaya SDPP Russian Federation Ivanovskiye CPP Russian Federation

Construction of a 460 MW Construction of 325 MW combined cycle combined cycle Power Generation Unit Power Generation Unit #2

Key components: Key components: • Two Power Machines GTE-160 gas • NPO Saturn GTD-110 gas turbine; turbines; • Podolski Machine-Building Plant OJSC Е- • Heat recovery steam generators (2х Е- 148/35-6.7/0.6-493/229 heat recovery 229/52-8/0,6-507/227), manufactured by boiler; JSC EMAlliance under the license of • Power Machines K-110-6.5 110 MW steam Nooter/Eriksen; turbine. • 160 MW Power Machines K-160-7.5 steam turbine. Completed in 2012 Completed in 2012 15 FROM CREATIVE POWER TO POWER GENERATION COMPLETED PROJECTS

Sochinskaya TPP Russian Federation Kaliningradskaya Russian Federation CHPP-2

Construction of a 80 MW Construction of a 450 MW combined cycle combined cycle Power Generation Unit #3 Power Generation Unit #2

Key components: Key components: • Two gas turbines GTE-160 (Siemens • Siemens GT10C gas turbine; SGT5-2000E(3) type), manufactured • Podolski Machine-Building Plant OJSC P- by JSC Power Machines; 103 dual pressure heat recovery boiler; • Two Podolski Machine-Building Plant • Power Machines-KTZ T-10/11-5.2 steam OJSC PK63 heat recovery boilers; turbine. • Power Machines K-150-7.7 steam turbine.

Completed in 2009 Completed in 2011

Sangtuda HPP-1 Tajikistan Gorashal TPP Bangladesh

Оverhaul of Unit No. 5, 210 MW Turnkey construction in capacity of a 670 MW hydro project

Key components: Key components: • Four Power Machines РО 75-В-600 water • Power Machines K-210-130-8 turbines; steam turbine; • Four Power Machines СВ 1260/182-60 • TKZ (Power Machines UHL4 generators; Group) TGME-206 boiler; • Four ABB HECS-80S generator circuit • State Enterprise breakers; Electrotyazmash (Ukraine) • Four AREVA OFAF-200000/230 generator generator TGV-200MTZ. Units 1, 2 and 3 were transformers. launched in 2008; unit 4 was Completed in 2017 launched in 2009 16 FROM CREATIVE POWER TO POWER GENERATION Inter RAO – Engineering, LLC

27 Bolshaya Pirogovskaya, Moscow, Russia, 119435 phone: +7 (495) 664-88-40 fax: +7 (495) 664-88-41 e-mail: [email protected]