EXPRO Electricity Weekly
Total Page:16
File Type:pdf, Size:1020Kb
Electricity №14 JUNE 25 - JULY 01.2018 GENERATION Two companies of DTEK change tom” is conducting an UAH 147.1 mn bid form. The bid proposals were accepted their JSC types for procurement of supercompactor for by March 18, 2018, and the competition PJSC “DTEK Dniproenergo” and PJSC SE "Khmelnitsky NPP" to process nuclear was held the next day. It was allocated “DTEK Zakhidenergo” changed their JSC wastes, as stated by the Prozorro electronic UAH 178 mn for all lots. The wires and types from public to private, as reported by sales platform. interruptors should be procured by No- the National Securities And Stock Market The company is accepting bid proposals vember 30, 2018. The Holduct Sp. z Commission. from prospect suppliers until June 9, 2018, o.o also competed in the bid, however This change to private joint stock own- and will open competitive bidding on Au- their UAH 124,5 mn offer was reject- ership was approved by the companies’ gust 1, 2018 with a bid security of UAH 1.47 ed. Other two competitors , the relay- shareholders on June 21, 2018 to comply mn. According to the bid requirements, the export Ltd(UAH 177,3 mn offer) and with the Ukrainian legislation on securities winner should accomplish the procure- the TOSHELECTROAPPARAT LLC (UAH market. ment by December 31, 2019. 177,6 mn) were not successful in the bid as well. PJSC "Centrenergo" buys 50 thd The Consortium “Scientific ton of gas coal at the commodity Production Association Skhidniy Uranium Ore Dressing exchange “Ukrhydroenerhobud” spends UAH Plant (VostGOK) increases On June 25, 2018 PJSC "Centrenergo" 172.6 mn for high-voltage current production by 19.3 % to 528.7 ton bought 50 thousand ton of gas coal at leads and disconnectors to build over the last five months the Dniester Pumped Storage the commodity exchange for the start- The State Enterprise Skhidniy Uranium Power Station ing price of 2,350 UAH/t and totally Ore Dressing Plant increased production worth UAH 126,5 mn, as reported by The Consortium “ Scientific Produc- by 19.3% , as compared to January-May of the Ukrainian Energy Exchange. The tion Association “Ukrhydroenerhobud”, 2017, and produced 528.7 ton of of uranium seller to the deal is not disclosed. while bulding the Dniester Pumped oxide concentrate over the first five months Storage Power Station (located in Chr- of FY2018, according to press service of the “Energoatom” announces nivtsi Oblast and operated by the PrJSC plant. UAH 147.1 mn bid for supply ”Ukrhydroenerho”), buys from ALIT Ltd The plant manufactured products worth of supercompactor for SE (founded and run by Ms. Yulia Stern) UAH 1.622 billion over the first five months "Khmelnitsky NPP" 15,75kWt current leads and disconnec- of 2018. Alone in May 2018, the production The State Enterprise “National Nuclear tors worth UAH 172,6 mn, according to increase was 13,9%, or 67 ton worth UAH Energy Generating Company “Energoa- the the Prozorro electronic sales plat- 199.7 mn. Power generation, GW Copyright © 2018 Exploration & Production Ltd 1 Electricity JUNE 25 - JULY 01.2018 Energoatom purchases services for pretend for the state support only after the The Centrenergo company expects the valuation of capital assets state audits as justifying the need for mod- government to decrease their divident The SE NNEGC Energoatom announces ernization to enhance competitiveness in claims, thus enabling the company to have tender for independent valuation of their the newly-shaped electricity market. If the extra means for enhancing its competitive- capital assets. The expected cost of valu- audits do not justifify such a need, then the ness. Currently, the Centrenergo company ation is set at UAH 50,38 mn, as publishe CHPPs’ facilities must consider hosting is investing to transfer their generator’s in the nationwide Prozorro electronic sales highly-maneuverable generators. consumption feed of costly imported an- platform. “The sources of finance will be determined thracite coal to local and less expensive The Energoatom expects to have the prop- by the NCSREU- these could be company’s gas coal being widely mined in Ukraine. erty valuation report to determine real own finances, or credits from banks (as market value of assets as of January 1, being negotiated with the stae-owned Os- The Khmelnitskiy NPP spends 2018, the peer review and data base of the chadbank and Ukrgazbank), fractions from UAH 125,6 mn to buy Turboatom’s company’s main assets. the custom-tailored tariffs”, as explaine by turbine blades The company’s capital assets number 145 Ms. Buslavets. Formerly the government On June 23, 2018, the Khmelnitskiy NPP, thd of units, and should valuated within 7 supported CHPPs by setting high prices on apart of Energoatom, entered into the UAH months from the date of signing of the electricity, but this practice in unacceptable 125,6 mn contract with the Turboatom Pub- contract. The deadline for bid submission is for shaping totally new and competitive lic Joint Stock Company for supply of Tur- July 23, 2018, and competition will start on electricity market. The government sup- boatom’s blades for the К-1000-60/3000 August 28, 2018. It was reported earlier, the port is justified by the high social impor- turbines, as reported by the Prozorro Energoatom is undergoing corporatisation, tance of CHPPs- they generate heat for electronic sales platform. According to the and independent valuation of capital assets warming numerous towns and villages contract, the Turboatom company, as the is needed to accomplish this process and during cold seasons. Ukrhydroenerho paid manufacturer, shall supply 276 turbine create the Supervisory Board. in 2017 the UAH 439,7 mn as dividents to blades during July-August 2018. The man- the State Budget ufacturer shall ensure 100K hour warranty Modernization of subsidized CHPPs The Ukrhydroenerho Private Joint Stock for their turbine blades. will last until June 1, 2024 Company paid the UAH 439,7 mn as div- There were no bid for the purchase, since The central heating and power plants idents to the State Budget over 2017, as the Turboatom company is the sole man- (CHPPs) with favorable technical audits will stated by the company’s press service. ufacturer of this type of blades. The justifi- enjoy state support to adjust to competition According to the Cabinet of Minister’s De- cation notice stated that К-1000-60/3000 conditions of the newly shaped electricity cree № 139 from February 28, 2018, 30 % turbines are produced by the Russia-based market and to modernize their facilities by of Ukrhydroenerho’s annual profits shall be Silovie Mashiny OJSC, and the blades are July 1, 2024. this was announced by Ms. directed for payments of dividents. manufacturer is the Leningrad Mechan- Olga Buslavets, General Director of the ical Plant, which is also located in Russia. Directorate for Energy Markets under the Centrenergo paid UAH 1.1 bln In 2013-2014, the Energoatom company Ministry of Energy and Coal of Ukraine. as FY2017 dividents to the State negotiated with the Leningrad Mechanical “Those provided with the state support Budget Plant for the supply of turbine blades, but based on individually-tailored tariffs set by The Centrenergo Public Joint Stock Compa- the price and supply terms were not ac- the NCSREU state energy regulator, should ny paid FY2017 due to allof their sharehold- ceptable. Since that time, the Turboatom have their modernization projects been ers, including the UAH 1.1 bln as dividents company managed to engineer an original accomplished by July 1, 2024” said Ms. to the State as major shareholder, the UAH construction of the turbine blades, thus be- Buslavets. 269.7 mn to other minor shareholders, as coming the sole manufacturer in Ukraine Ms. Buslavets also noted that CHPPs can stated by the company’s press service. for this type of blades. Copyright © 2018 Exploration & Production Ltd 2 Electricity JUNE 25 - JULY 01.2018 ALTERNATIVE GENERATION The Uriadoviy Kurier newspaper cases of unauthorized waste dumping. pacity to 5,755.3 MW. On June 26, 2018, the informs about 0.75% increase in The power generated from wastes is sold NCSREU did the corespondent adjustment “green” tariffs for power surplus at the “green” tariff rate of 12.4 euro cents to their National Power Output Register to sales by household generators per kWh, while the heat is bought at fluctu- record this increase. The current produc- On June 23, 2018 the official media of the ating incentive rates. tion output of the Kaniv HPS now reaches Cabinet of Minister of Ukraine, the Uri- 493 MW. adoviy Kurier newspaper, published Res- Estimated 12.5 bln kWh can olution №359 which was passed by the annually be produced by small Ukrainian renewable power National Committee on State Regulation hydrogenerators generators commissioned new in Energy and Utilities (NCSREU) on March The prospects of using small rivers for hy- 109.6 MW facilities in the 23, 2018. The Resolution №359 increases drogeneration is estimated at 12.5 bln kWh 2nd Q of 2018 “green” tariffs for power surplus sales by per year, as stated by the State Agency of In April- June 2018, additional new 109.6 household generators by 0.75% to be in Water Resources of Ukraine. “Small rivers MW renewable energy generating facilities effect starting June 24, 2018. can yield 12.5 bln kWh annually, or 28 % of were commissioned in Ukraine. As report- According to the Resolution №359, the av- the nation’s hydrogeneration capacity’ , as ed the NCSREU’s press service, this is the erage tariff for surplus sale of solar power reported by the Agency. 1.7 times increase, if compared with the is UAH 5,91 per 1kWh for all solar power At the begging of the 50s of the past century, corresponding period of 2017.