A-1 Appendix a Workload Data, Required
Total Page:16
File Type:pdf, Size:1020Kb
APPENDIX A WORKLOAD DATA, REQUIRED MEETINGS, TDYs 1. This data describes past experience and projected scenarios which may not necessarily be indicative of the future. 1.1. Aircraft Data 2014 96th TEST WING 53rd WING F15 F16 Misc. F15 F16 1 – F15C 2 – F16C 2 – UH-1N 5 – F15C 4 - F16CJ 5 – F15E 3 – F16CG 1 – A-10C 1 – F15E 1 - F16DG 1 – F16CJ 1 – GF-15C 2 - F16DJ 2 – F16DG 1 - GF-16C 2 – F16DJ 1.2. Workload Estimates Frequencies listed below are historical averages based upon workload experienced during the years 2008-2013, if available. This data is provided as reasonable estimates or as examples of past workload that demonstrates the extent of effort that can reasonably be expected. Specific duration of time that individual frequency calculation was based upon is as follows: PWS REF TASK FREQUENCY (Per year unless otherwise noted) AIRCRAFT PHASE INSPECTION F-15 Aircraft Look Portion 5.8 Accomplish hourly post flight (HPO) inspection/look/fix/follow-on portion: 11 Management and accomplishment of all tasks. 5.8 Accomplish periodical (PE) inspection/look/fix/follow-on portion: Management and 2 accomplishment of all tasks. Fix Portion/Follow-on Maintenance 5.8 Remove/Install FOM: Engine 7 5.8 Remove/Install FOM: Jet fuel start (JFS) 4 5.8 Remove/Install FOM: Central gear box (CGB) 8 5.8 Remove/Install FOM: Stabilizer torque box assy. 2 5.8 Remove/Install FOM: Hydraulic reservoir 5 5.8 Remove/Install FOM: Main landing gear cam assy. 3 5.8 Perform airframe special inspection 4 5.8 Perform engine bay inspection 7 5.8 Perform engine run-up/ leak check 22 A-1 PWS REF TASK FREQUENCY (Per year unless otherwise noted) 5.8 Perform engine special inspections 11 5.8 Perform engine borescope inspection 8 5.8 Tow aircraft to NDI pad for vari-ramp inspection 11 5.8 Tow aircraft to Phase Inspection area 11 5.8 Jack aircraft for Nose and Main Landing Gear inspection 11 5.8 Perform operational check of Nose and Main Landing Gear 11 5.8 Remove aircraft from Jacks 11 5.8 Perform aircraft inspection 11 5.8 Perform Quality Verification Inspection 11 5.8 Tow aircraft to engine run area 11 5.8 Service aircraft systems (engine oil, hydraulic, pneudraulic, fuel) 11 5.8 Remove and install aircraft panels for inspection 11 5.8 Perform flight control operational checks 11 5.8 Maintain & Repair (M&R) Line Replacement Units (LRUs) 10 5.8 Perform phase inspection requirements for E&E, Avionics, and Weapons 11 F-16 Aircraft Look Portion 5.8 Accomplish phase inspection/look/fix/follow-on portion: Management and 17 accomplishment of all tasks. Fix Phase/Follow-on Maintenance 5.8 Perform aircraft defuel 24 5.8 Tow aircraft to fuel hanger 14 5.8 Tow aircraft from fuel hanger 14 5.8 Perform aircraft refuel 14 5.8 Tow aircraft to Phase inspection area 14 5.8 Tow aircraft to AMU parking area 14 5.8 Jack aircraft for Nose and Main Landing Gear Inspection 14 5.8 Perform operational checks of landing gear 14 5.8 Perform Main Landing Gear Brake Redundancy check 14 5.8 Engine special inspections 11 5.8 Remove aircraft from jacks 17 5.8 Remove/Install FOM: Engine 4 5.8 Remove/Install FOM: Line replaceable units 12 5.8 Remove/Install FOM: Jet fuel starter (JFS) 7 5.8 Remove/Install FOM: Hydraulic system filter bowls 14 5.8 Remove/Install FOM: Hydraulic system engine driven pumps 3 5.8 Remove/Install FOM: Hydraulic system reservoir 3 5.8 Remove/Install FOM: Flaperon integrated servoactuator mount bracket 2 5.8 Remove/Install FOM: Landing gear door actuators 5 5.8 Remove/Install FOM: Accessory drive gear box 2 5.8 Remove/Install FOM: Emergency power unit 1 5.8 Remove/Install FOM: Main/nose landing gear 2 5.8 Remove/Install FOM: Leading edge flap assy. 7 5.8 Remove/Install FOM: Flaperon assembly 12 5.8 Remove/Install FOM: Horizontal stabulator assy. 4 A-2 PWS REF TASK FREQUENCY (Per year unless otherwise noted) 5.8 Perform aircraft inspection 14 5.8 Remove and install panel for inspection 14 5.8 Perform operational check of flight control 20 5.8 Perform Quality Verification Inspection 14 5.8 Service aircraft systems (engine oil, hydraulic, pneudraulic, fuel) 14 5.8 Tow aircraft to engine run area 14 5.8 Removal and installation command servoactuator 7 5.8 Removal and installation of leading edge torque shafts 7 5.8 Removal and installation of angle gear box 7 5.8 Removal and installation of the asymmetry brake 7 5.8 Remove/Install FOM: Rudder assembly 2 5.8 Perform engine borescope inspection 8 5.8 Perform engine bay inspection 8 5.8 Perform engine run-up/ leak check 14 5.8 Perform phase inspection requirements for E&E, Avionics, and Weapons 14 A-10 Aircraft Inspection 5.8 Accomplish phase inspection/look/fix/follow-on portion: Management and 1 accomplishment of all tasks. Fix Phase/Follow-On Maintenance 5.8 Remove/Install FOM: Engine 1 5.8 Remove/Install FOM: Auxiliary power unit (APU) 1 5.8 Remove/Install FOM: Leading edge slats 1 5.8 Remove/Install FOM: Trailing edge flaps 1 5.8 Remove/Install FOM: Rudder assembly 1 5.8 Perform engine bay inspection 1 5.8 Perform aircraft inspection 1 5.8 Perform engine run-up/ leak check 1 5.8 Perform phase inspection requirements for E&E, Avionics, and Weapons 1 5.8 Remove/Install panels for each inspection 1 5.8 Perform engine borescope/special inspection 1 5.8 Perform jacking/towing of aircraft for each inspection 1 PERIODIC AND SPECIAL INSPECTIONS 5.8 Special Inspections Identified at the Pre-dock meeting 27 PROPULSION MAINTENANCE F100-PW-220/220E MAINTENANCE 5.9 Remove & Reinstall (R&R) – NPT 4 5.9 R&R – Inlet fan module 8 5.9 R&R – Fuel oil cooler 4 A-3 PWS REF TASK FREQUENCY (Per year unless otherwise noted) 5.9 R&R - 3rd stage fan blade 5 5.9 R&R – Spray rings after baking 12 5.9 R&R - #1 Bearing area 3 5.9 R&R - 4th stage compressor blade 1 5.9 R&R - #5 Bearing area 3 5.9 R&R - #2 & 3 bearing area 1 5.9 Blend blade 12 5.9 R&R - IGV Case 10 5.9 R&R - 1st Stage fan blades 6 5.9 R&R - CIVV control 2 5.9 R&R - Core engine module 5 5.9 R&R - Rear compressor drive 3 5.9 M&R - Fan drive turbine 6 5.9 R&R - Augmentor module 12 5.9 R&R - Liner seal 6 5.9 M&R - Secondary nozzle actuator 6 5.9 M&R - Divergent nozzle seal 12 5.9 R&R - Gearbox module 5 5.9 R&R - Filter element 5 5.9 R&R - Main fuel pump 8 5.9 R&R - Fuel pressure & drain valve 1 5.9 R&R - Main fuel control 4 5.9 R&R - Augmentor fuel control 4 5.9 R&R - DEEC 10 5.9 R&R – AUG Fuel pump controller 10 5.9 R&R - Augmentor fuel pump 8 5.9 R&R - Light off detector 8 5.9 R&R - Fuel oil cooler 4 5.9 R&R - Dual ignition exciter 10 5.9 R&R – Rotor generator 4 5.9 R&R - Stator Generator 4 5.9 R&R - EDU 9 5.9 R&R - Exhaust nozzle control 5 5.9 M&R - Flame holder 10 5.9 R&R - CIVV cylinder 4 5.9 R&R - Compressor bleed cylinder 5 5.9 R&R - Anti-ice valve 10 5.9 M&R - Turbofan power plant 45 5.9 Accomplish 100 hr flight inspection (Borescope) 10 5.9 Accomplish 200 hr flight inspection (Borescope) 10 5.9 Accomplish 400 hr flight inspection (Borescope) 10 5.9 Accomplish Major Receiving Inspection 12 5.9 Accomplish Minor Receiving Inspection 5 5.9 Accomplish Final Insp 15 5.9 Accomplish TCTOs 15 5.9 Pack and wrap engines for shipment 15 5.9 Perform flightline assistance 18 F100-PW-229 MAINTENANCE A-4 PWS REF TASK FREQUENCY (Per year unless otherwise noted) 5.12 Accomplish 50 hr flight inspection (Borescope) 2 5.12 Accomplish 100 hr flight inspection (Borescope) 2 5.12 Accomplish 200 hr flight inspection (Borescope) 2 5.12 Accomplish 400 hr flight inspection (Borescope) 2 5.12 Accomplish Time Change Component Replacement 3 5.12 Accomplish LRU Replacement 2 5.12 Accomplish Minor Receiving Inspection 2 5.12 Accomplish Final Insp 2 5.12 Accomplish TCTOs 3 5.12 Pack and wrap engines for shipment 3 5.12 Perform flightline assistance 2 GE F110/100 5.61 Pack and wrap engine for shipment 3 5.9 Accomplish flight hour inspection (Borescope) 2 5.9 Accomplish Time Change Component Replacement 3 5.9 Accomplish LRU Replacement 12 5.9 Accomplish TCTOs 5 5.9 Perform flightline assistance 3 GE F110/129 5.61 Pack and wrap engine for shipment 5 5.9 Accomplish flight hour inspection (Borescope) 2 5.9 Accomplish Time Change Component Replacement 3 5.9 Accomplish LRU Replacement 12 5.9 Accomplish TCTOs 3 5.9 Perform flightline assistance 3 TF34/100 5.61 Pack and wrap engine for shipment 2 5.9 Accomplish flight hour inspection (Borescope) 2 5.9 Accomplish Time Change Component Replacement 3 5.9 Accomplish LRU Replacement 12 5.9 Accomplish TCTOs 3 5.9 Perform flightline assistance 3 SMALL ENGINE MAINTENANCE 5.15 M&R Jet Fuel Starter (JFS) 8 5.15 M&R AMAD 2 5.15 M&R Central Gearbox (CGB) 8 Equipment 5.9 Perform periodic maintenance/inspection (PPM/I) - Adapter PWA 50473: Annual 2 florescent penetrate inspection 5.9 PPM/I - Adapter PWA 52679: Annual florescent penetrate inspection 1 A-5 PWS REF TASK FREQUENCY (Per year unless otherwise noted) 5.9 PPM/I - Fixture PWA 51543: Annual florescent penetrate inspection 2 5.9 PPM/I - Retainer PWA 50351: Annual florescent penetrate inspection 2 5.9 PPM/I - Sling PWA 53327: Annual florescent penetrate inspection 1 5.9 PPM/I – Adapter PWA 57176: Annual florescent penetrate inspection 2 5.9 PPM/I – Support PWA 8772-101: 3 yr.