Sc WEEKLY OPERATING NOTICE

Total Page:16

File Type:pdf, Size:1020Kb

Sc WEEKLY OPERATING NOTICE PRIVATE AND NOT FOR PUBLICATION B.R.31119/4 British Rail /1220, 6 , 4 Sc ; EASTERN REGION 24 WEEKLY OPERATING NOTICE CONTAINING TEMPORARY SPEED RESTRICTIONS TEMPORARY ENGINEERING WORKS SIGNALLING AND PERMANENT W A Y ALTERATIONS GENERAL INSTRUCTIONS AND NOTICES SATURDAY 14 JUNE TO FRIDAY 20 JUNE 1980 INCLUSIVE Trainmen must pay particular attention to works contained in this notice and keep a good look-out for handsignals which may be exhibited in accordance with the Rules and Regu- lations. Workat places other than those mentioned may be in progress and Drivers must be on the look-out and be prepared to stop or run at reduced speed when, and where, handsignals may be exhibited. SC-2 SECTION A TEMPORARY SPEED RESTRICTIONS (Until further notice unless otherwise specified) Warning Boards and indicators provided unless otherwise shown. Portable magnets provided for temporary speed restrictions on all sections of line equipped with Automatic Warning System as shown in Table Z of the Sectional Appendix. In the case of items marked * the Warning Boards and Indicators will be moved as the work progresses and the restriction will not operate over more than 3 A m i l e a t o n e tIn thi e cmase ofe ite.ms marked t the Warning Boards will be lit by propane-gas. Where two speeds are shown for a restriction e.g. t h e Rule Book, Section T. Clause 21.2 applies. Mileage Lines a t or between Re s tric tion Location affected M. Chs. M. Chs. m.p.h. Remarks STAYTHORPE CROSSING LMR TO LINCOLN PELHAM ST. JN. Newark Castle and Down Up 17 03 17 06 20 Trackwork. Newark Crossing (80/15) Thorpe On the Hill Down Up 29 25 29 45 20 Trackwork. and Hykeham (80/18) PYEWIPE G.C. M. TO SHIREBROOK EAST JN. Skellingthorpe L.C. S i n g l e 30 00 3 0 40 1 0 Co n d it io n of and High Marnham track. (80/10) Tuxford West Jn. Up 26 50 2 7 50 3 0 C o n d i t i o n of and Skellingthorpe track.(80/12) Tuxford West Jn. and Up 25 19 25 40 20 Trackwork. High Marnham (79/24) Tuxford West Jn. Down 24 45 24 40 30 Condition of and Tuxford Central track.(80/12) Boughton Jn. and Up 23 60 24 40 30 Condition of Tuxford West Jn. track.(80/12) Thoresby Colliery „In. • Up 18 15 21 50 30 Condition of and Tuxford Central track.(80/12) 011erton Colliery and Down 18 04 17 17 20 Trackwork. Clipstone (East Jri.) (80/10) Thoresby Colliery „In. Down Up 15 50 15 10 30 Condition of and Welbeck Colliery Jn. track.(80/12) Clipstone (West Jn.) and D o w n U p 14 50 14 35 20 Subsidence. Welbeck Colliery Jn. (80/10) SC-3 SECTION A — TEMPORARY SPEED RESTRICTIONS — continued Mileage Lines at or between Restriction Location affected M. Chs. M. Chs. m.p.h. Remarks PYEWIPE G.C. M. TO SHIREBROOK EAST JAL — continued Clipstone (West Jn.) Down 13 70 13 35 20 Condition of and Welbeck Colliery Jn. track.(79/48) Welbeck Colliery Jn. Down 13 09 10 68 30 Condition of and Warsop Jn. track.(80/12) MANSFIELD COLLIERY TO CLIPSIONE (EAST JUNCTION) Clipstone (South Jn.) Down 10 68 11 05 20 Trackwork. and Clipstone (East Jn.) (80/18) SHERWOOD COLLIERY SIDINGS SOUTH (L.M.R.)1TO SHIREOAKS EAST JN. (REGIONAL BOUNDARY AT 143m.140chsa Shirebrook Jn. and Down 147 00 147 15 20 Earthwork. Elmton & Creswell Jn. (80/11) Shirebrook Down 147 27 149 30 20 Condition of (East Jn.) and track.(80/12) Elmton & Creswell Jn. *Whitwell and Down 151 18 153 67 20 Trackwork. Woodend Jn. (77/49) CLEETHORPES TO WOODHOUSE AL VIA RETFORD Marsh East Jn. Up 108 09 109 14 20 Trackwork and and Wel lowgate earthwork. Crossing L.C. (80/8) Barnetby East Down Up 94 70 94 50 40 Condition of and Barnetby track. (79/45) Clarborough Jn. and Up 70 72 71 61 20 TrackWork. Trent West. Jn. (80/20) Clarborough Jn. and Down 68 01 67 48 20 Trackwork. Clarborough Tunnel Main (80/17) Until 14 00 Monday 16 June. Gringley Road L.C. Down 64 69 64 55 40 Condition of and Thrumpton track and trackwork. (79/36) Retford Thrumpton West Up 63 30 64 60 20 Trackwork• and Thrumpton East (80/16) Worksop West and Down 56 06 55 66 20 Trackwork.1 Shireoaks East Jn. Goods (78/18) SC-4 SECTION A — TEMPORARY SPEED RESTRICTIONS — continued Mileage Lines at or between Re s tric tion Location affected M. C h s . M. Ch s , m . p. h. Remarks CLEETHORPES TO WOODHOUSE ..IN. VIA RETFORD — continued Brookhouse Colliery Up 49 52 5 0 02 20 Co n d it io n of and Kiveton Bridge Main track and track- work.(80/6) Brookhouse Colliery Down 48 27 4 8 10 30 Co n d it io n of and Woodhouse Jn. track.(80/19) IMMINGHAM EASTERN JETTY TO ULCEBY NORTH M. Ulceby North Jn. Up 102 09 1 0 2 42 2 0 Co n d it io n of and Humber Road Jn. track. (79/47) BARNETBY WRAWBY JN. TO LINCOLN PELHAM ST. M. GC North Kelsey LC Up 18 07 17 67 30 Trackwork. and Howsham LC (78/46) North Kelsey L.C. Down 17 77 18 03 3 0 Co n d it io n of track. (79/49) Monks Abbey and Down Up 40 36 40 40 3 0 Co n d it io n of Pelham St. Jn. track. (78/46) COTTAM POWER STATION BRANCH Clarborough Jn. and Up 69 79 7 0 34 10 Co n d it io n of Cottam Power Station track. (80/2) BEIGHTON JNI. TO WOODHEAD L.M.R. l(REGIONAL BOUNDARY AT 22m. 20chs.) Darnall West and — Up 45 03 45 20 20 Condition of Orgreaves Colliery Main track. (80/5) Orgreaves Coll iery and Down — 44 76 44 28 20 Condition of Darnall West Goods track.(80/19) Darnall West and Down 42 55 42 48 10 Condition of Woodburn Jn. Goods track. (8 0 / 4 ) Wadsley Bridge and — Up 38 50 39 00 30 Condition of Sheffield Vic. No.3 track.(80/17) Oughtibridge and Down 36 05 35 00 20 Condition of Deepcar track. (80/11 ) Barnsley Jn. Up 33 15 33 45 30 Cond tion of and Deepcar track.(80/11) SC-5 SECTION A — TEMPORARY SPEED RESTRICTIONS — continued Mileage Lines a t or between Restriction Location affected M . Ch s . M. Ch s . m.p.h. Remarks BEIGHTON JN. TO WOODHEAD L.M.R. (REGIONAL BOUNDARY AT 22m. 20chs. ). — continued Deepcar and Down 32 20 32 07 30 Condition of Barnsley Jn. track.(80/12) Deepcar and Down — 29 40 28 75 20 Condition of Barnsley Jn. track.(79/47) Barnsley Jn. — Up 28 75 29 40 30 Condition of and Deepcar track.(79/47) Huddersfield Jn. and Down Up 28 42 28 30 20 Condition of Penistone Goods track. (79/51) Thurlstone Crossing Down 26 10 26 08 20 Condition of and Dunford East track.(80/12) BARNETBY WRAWBY JN. TO DONCASTER MARSHGATE M. Elsham and Down — 27 10 26 60 20 Trackwork. Appleby L.C. (79/45) Gunhouse „in. and — Up 21 41 21 44 30 Condition of Scunthorpe track. (79/10) Thorne No.1 L.C. and Down 9 53 9 48 30 Earthworks. Thorne South (80/22) Stainforth Jn. Down 6 50 6 14 20 Trackwork. Main (80/6) Stainforth Jn. Down — 6 23 6 14 20 Trackwork. Goons (80/8) Kirk Sandell Jr — Up Slow/ 6 14 8 00 20 Condition of -and Thorne Jri Goods track and track- L work. (80/10) Stainforth Jn. Up Main 6 14 6 50 20 Trackwork. (80/4) Stainforth Jn. and Down Up South 4 18 4 07 20 Trackwork. Kirk Sandell Jn, Main Yorkshire (80/10) The Warning Board located at lm. 1 1the5 Dcohwns A. v oidoingn Lin e. t h e D o w n LSAUGcHTOuN EnASTt JNh. TOo KIRrK SpANDALL JN. e aLaughtonp Eastp Jn. andl iSinglee 3 41 5 31 20 Trackwork. sMaltby Colliery South (79/24) oLow Ellersn Curve Jnl. Single 16 63 18 60 20 Condition of yand Thorne Lane track. (79/37) t o t r a i n s p r o c e e d i n g o v e r SC-6 SECTION A — TEMPORARY SPEED RESTRICTIONS — continued Mileage Lines a t or between Re s tr i c ti on Location affected M. Chs. M. Chs. m.p.h. Remark POTTERIC CARR M. TO MARSHGATE ..IN. tPotteric Carr Jn. and — U p East Slow 1 5 4 00 1 5 2 40 4 0 Tra c k wo rk . Loversall Carr Jn. (79/20) VVarnin Board locate a t Signal D238, Bridge Jn. and Down 155 56 156 24 20 Trackw rk. Marshgate Jn. Fast ( 9/25) (See S ction 'D'). BENTLEY M. TO HEXTHORPE JN. DONCASTER AVOIDING LINE Bentley Jn. and Down 3 22 0 00 20 Track ork. Hexthorpe Jn. ( 0/19) DONCASTER SOUTH YORKSHIRE M. TO SHEFFIELD WOODBURN JN. Hexthorpe Jn. Down Up 21 09 20 65 20 Track ork. Sheffield Sheffield ( 0110) Main Main Conisborough Tunnel and Down — 19 00 18 50 30 Trackwork. Cadeby Colliery Ma in 78/36) Cadeby Colliery and — Up 18 50 19 00 20 Condition of Conisborough Tunnel Main track. 78/36) Mexborough and — U p Main 1 6 05 1 6 50 2 0 T r a c k w iDenaby Crossing (80/24) Comm ncing o r k .
Recommended publications
  • To Registers of General Admission South Yorkshire Lunatic Asylum (Later Middlewood Hospital), 1872 - 1910 : Surnames L-R
    Index to Registers of General Admission South Yorkshire Lunatic Asylum (Later Middlewood Hospital), 1872 - 1910 : Surnames L-R To order a copy of an entry (which will include more information than is in this index) please complete an order form (www.sheffield.gov.uk/libraries/archives‐and‐local‐studies/copying‐ services) and send with a sterling cheque for £8.00. Please quote the name of the patient, their number and the reference number. Surname First names Date of admission Age Occupation Abode Cause of insanity Date of discharge, death, etc No. Ref No. Laceby John 01 July 1879 39 None Killingholme Weak intellect 08 February 1882 1257 NHS3/5/1/3 Lacey James 23 July 1901 26 Labourer Handsworth Epilepsy 07 November 1918 5840 NHS3/5/1/14 Lack Frances Emily 06 May 1910 24 Sheffield 30 September 1910 8714 NHS3/5/1/21 Ladlow James 14 February 1894 25 Pit Laborer Barnsley Not known 10 December 1913 4203 NHS3/5/1/10 Laidler Emily 31 December 1879 36 Housewife Sheffield Religion 30 June 1887 1489 NHS3/5/1/3 Laines Sarah 01 July 1879 42 Servant Willingham Not known 07 February 1880 1375 NHS3/5/1/3 Laister Ethel Beatrice 30 September 1910 21 Sheffield 05 July 1911 8827 NHS3/5/1/21 Laister William 18 September 1899 40 Horsekeeper Sheffield Influenza 21 December 1899 5375 NHS3/5/1/13 Laister William 28 March 1905 43 Horse keeper Sheffield Not known 14 June 1905 6732 NHS3/5/1/17 Laister William 28 April 1906 44 Carter Sheffield Not known 03 November 1906 6968 NHS3/5/1/18 Laitner Sarah 04 April 1898 29 Furniture travellers wife Worksop Death of two
    [Show full text]
  • Agenda Item 7G
    Agenda Item 7g Case Number 18/02802/FUL (Formerly PP-07138683) Application Type Full Planning Application Proposal Demolition of existing buildings and erection of a Class A1 retail foodstore including car parking, access, landscaping, ball stop netting and supporting structures and sportsfield parking facility (amended plans and description) Location Tudor Gates Unit 1 Parkers Yard Stannington Road Sheffield S6 5FL Date Received 20/07/2018 Team West and North Applicant/Agent GVA Recommendation Grant Conditionally Subject to Legal Agreement Time limit for Commencement of Development 1. The development shall be begun not later than the expiration of three years from the date of this decision. Reason: In order to comply with the requirements of the Town and Country Planning Act. Approved/Refused Plan(s) 2. The development must be carried out in complete accordance with the following approved documents: Site Location Plan - 7195-SMR-00-XX-DR-A-2200-S4-P4 Existing Site Plan - Foodstore - 7195-SMR-00-XX-DR-A-2201-S4-P4 Proposed Site Plan - 7195-SMR-00-XX-DR-A-2202-S4-P17 Building Floor Plan - 7195-SMR-00-GF-DR-A-2301-S4-P4 Site Sections - 7195-SMR-00-XX-DR-A-2203-S4-P7 External Works Plan - 7195-SMR-00-XX-DR-A-2204-S4-P10 Cycle Parking and Trolley Bay - 7195-SMR-00-XX-DR-A-2205-S4-P6 Roof Plan - 7195-SMR-00-XX-DR-A-2302-S4-P3 Elevations - 7195-SMR-00-XX-DR-A-2303-S4-P5 Landscape Details - R/2103/1N Topographical Survey - D510-001 Page 175 Topographical Survey - D510-002 Highway Markings & Outbound Bus Stop Re-location - 7195-SMR-00-ZZ-DR-A-2211-
    [Show full text]
  • Green Routes - November 2015 Finkle Street Old Denaby Bromley Hoober Bank
    Langsett Reservoir Newhill Bow Broom Hingcliff Hill Pilley Green Tankersley Elsecar Roman Terrace Upper Midhope Upper Tankersley SWINTON Underbank Reservoir Midhopestones Green Moor Wortley Lea Brook Swinton Bridge Midhope Reservoir Hunshelf Bank Smithy Moor Green Routes - November 2015 Finkle Street Old Denaby Bromley Hoober Bank Gosling Spring Street Horner House Low Harley Barrow Midhope Moors Piccadilly Barnside Moor Wood Willows Howbrook Harley Knoll Top Cortworth Fenny Common Ings Stocksbridge Hoober Kilnhurst Thorncliffe Park Sugden Clough Spink Hall Wood Royd Wentworth Warren Hood Hill High Green Bracken Moor Howbrook Reservoir Potter Hill East Whitwell Carr Head Whitwell Moor Hollin Busk Sandhill Royd Hooton Roberts Nether Haugh ¯ River Don Calf Carr Allman Well Hill Lane End Bolsterstone Ryecroft Charltonbrook Hesley Wood Dog Kennel Pond Bitholmes Wood B Ewden Village Morley Pond Burncross CHAPELTOWN White Carr la Broomhead Reservoir More Hall Reservoir U c Thorpe Hesley Wharncliffe Chase k p Thrybergh Wigtwizzle b Scholes p Thorpe Common Greasbrough Oaken Clough Wood Seats u e Wingfield Smithy Wood r Brighthorlmlee Wharncliffe Side n Greno Wood Whitley Keppel's Column Parkgate Aldwarke Grenoside V D Redmires Wood a Kimberworth Park Smallfield l o The Wheel l Dropping Well Northfield Dalton Foldrings e n Ecclesfield y Grange Lane Dalton Parva Oughtibridge St Ann's Eastwood Ockley Bottom Oughtibridg e Kimberworth Onesacr e Thorn Hill East Dene Agden Dalton Magna Coldwell Masbrough V Bradgate East Herringthorpe Nether Hey Shiregreen
    [Show full text]
  • The Economic Development of Sheffield and the Growth of the Town Cl740-Cl820
    The Economic Development of Sheffield and the Growth of the Town cl740-cl820 Neville Flavell PhD The Division of Adult Continuing Education University of Sheffield February 1996 Volume One THE ECONOMIC DEVELOPMENT OF SHEFFIELD AND THE GROWTH OF THE TOWN cl740-c 1820 Neville Flavell February 1996 SUMMARY In the early eighteenth century Sheffield was a modest industrial town with an established reputation for cutlery and hardware. It was, however, far inland, off the main highway network and twenty miles from the nearest navigation. One might say that with those disadvantages its future looked distinctly unpromising. A century later, Sheffield was a maker of plated goods and silverware of international repute, was en route to world supremacy in steel, and had already become the world's greatest producer of cutlery and edge tools. How did it happen? Internal economies of scale vastly outweighed deficiencies. Skills, innovations and discoveries, entrepreneurs, investment, key local resources (water power, coal, wood and iron), and a rapidly growing labour force swelled largely by immigrants from the region were paramount. Each of these, together with external credit, improved transport and ever-widening markets, played a significant part in the town's metamorphosis. Economic and population growth were accompanied by a series of urban developments which first pushed outward the existing boundaries. Considerable infill of gardens and orchards followed, with further peripheral expansion overspilling into adjacent townships. New industrial, commercial and civic building, most of it within the central area, reinforced this second phase. A period of retrenchment coincided with the French and Napoleonic wars, before a renewed surge of construction restored the impetus.
    [Show full text]
  • Sheffield Development Framework Core Strategy Adopted March 2009
    6088 Core Strategy Cover:A4 Cover & Back Spread 6/3/09 16:04 Page 1 Sheffield Development Framework Core Strategy Adopted March 2009 Sheffield Core Strategy Sheffield Development Framework Core Strategy Adopted by the City Council on 4th March 2009 Development Services Sheffield City Council Howden House 1 Union Street Sheffield S1 2SH Sheffield City Council Sheffield Core Strategy Core Strategy Availability of this document This document is available on the Council’s website at www.sheffield.gov.uk/sdf If you would like a copy of this document in large print, audio format ,Braille, on computer disk, or in a language other than English,please contact us for this to be arranged: l telephone (0114) 205 3075, or l e-mail [email protected], or l write to: SDF Team Development Services Sheffield City Council Howden House 1 Union Street Sheffield S1 2SH Sheffield Core Strategy INTRODUCTION Chapter 1 Introduction to the Core Strategy 1 What is the Sheffield Development Framework about? 1 What is the Core Strategy? 1 PART 1: CONTEXT, VISION, OBJECTIVES AND SPATIAL STRATEGY Chapter 2 Context and Challenges 5 Sheffield: the story so far 5 Challenges for the Future 6 Other Strategies 9 Chapter 3 Vision and Objectives 13 The Spatial Vision 13 SDF Objectives 14 Chapter 4 Spatial Strategy 23 Introduction 23 Spatial Strategy 23 Overall Settlement Pattern 24 The City Centre 24 The Lower and Upper Don Valley 25 Other Employment Areas in the Main Urban Area 26 Housing Areas 26 Outer Areas 27 Green Corridors and Countryside 27 Transport Routes 28 PART
    [Show full text]
  • South Yorkshire
    INDUSTRIAL HISTORY of SOUTH RKSHI E Association for Industrial Archaeology CONTENTS 1 INTRODUCTION 6 STEEL 26 10 TEXTILE 2 FARMING, FOOD AND The cementation process 26 Wool 53 DRINK, WOODLANDS Crucible steel 27 Cotton 54 Land drainage 4 Wire 29 Linen weaving 54 Farm Engine houses 4 The 19thC steel revolution 31 Artificial fibres 55 Corn milling 5 Alloy steels 32 Clothing 55 Water Corn Mills 5 Forging and rolling 33 11 OTHER MANUFACTUR- Windmills 6 Magnets 34 ING INDUSTRIES Steam corn mills 6 Don Valley & Sheffield maps 35 Chemicals 56 Other foods 6 South Yorkshire map 36-7 Upholstery 57 Maltings 7 7 ENGINEERING AND Tanning 57 Breweries 7 VEHICLES 38 Paper 57 Snuff 8 Engineering 38 Printing 58 Woodlands and timber 8 Ships and boats 40 12 GAS, ELECTRICITY, 3 COAL 9 Railway vehicles 40 SEWERAGE Coal settlements 14 Road vehicles 41 Gas 59 4 OTHER MINERALS AND 8 CUTLERY AND Electricity 59 MINERAL PRODUCTS 15 SILVERWARE 42 Water 60 Lime 15 Cutlery 42 Sewerage 61 Ruddle 16 Hand forges 42 13 TRANSPORT Bricks 16 Water power 43 Roads 62 Fireclay 16 Workshops 44 Canals 64 Pottery 17 Silverware 45 Tramroads 65 Glass 17 Other products 48 Railways 66 5 IRON 19 Handles and scales 48 Town Trams 68 Iron mining 19 9 EDGE TOOLS Other road transport 68 Foundries 22 Agricultural tools 49 14 MUSEUMS 69 Wrought iron and water power 23 Other Edge Tools and Files 50 Index 70 Further reading 71 USING THIS BOOK South Yorkshire has a long history of industry including water power, iron, steel, engineering, coal, textiles, and glass.
    [Show full text]
  • 7 7A 8 8A Valid From: 29 January 2017
    Bus service(s) 7 7a 8 8a Valid from: 29 January 2017 Areas served Places on the route Crystal Peaks Crystal Peaks Bus Stn Beighton (7, 7a) Sheffield Interchange Woodhouse (7, 7a) The Moor Market Birley (8, 8a) Owlerton Stadium Manor Sheffield Hillsborough Leisure Centre Hillsborough Sheffield Wednesday FC Owlerton Wadsley Bridge Ecclesfield What’s changed Services 7, 8 and 8a - Minor changes will be made to the timetable to improve punctuality. Operator(s) Some journeys operated with financial support from South Yorkshire Passenger Transport Executive How can I get more information? TravelSouthYorkshire @TSYalerts 01709 51 51 51 Bus route map for services 7, 7a, 8 and 8a 22/09/2015# Rockingham Greasbrough Chapeltown Scholes Thorpe Hesley Parkgate Munsbrough Grenoside Droppingwell Ecclesfield Ecclesfield, Monteney Rd/ Eastwood Monteney Cres 7 Ecclesfield, Monteney Rd/Wordsworth Av 8 8a Kimberworth Wadsley Bridge, East Dene Penistone Rd North/ Shiregreen Blackburn The Gate Inn Masbrough Clifton Fox Hill Ickles Wadsley Bridge, Halifax Rd/ Wincobank Southey Green Rd Broom Owlerton, Penistone Rd/ Meadowhall Canklow Sheeld Wednesday FC Owlerton, Penistone Rd/ Tinsley Hillsborough Leisure Ctr Whiston Owlerton, Carbrook Brinsworth Penistone Rd/ Owlerton Stadium Sheeld, Commercial St Tinsley Park Sheeld, Interchange Catclie Guilthwaite Broomhill, Darnall Glossop Rd/ Waverley Royal Hallamshire Hosp 7aÍ 8 Treeton 7a Ò 7aÑ 8 Ó Littledale Sheeld, Arundel Gate Handsworth Sheeld, Eyre St/Moor Mkt Fence Manor Top, Woodhouse, Cross St/ City Rd/ Tannery St
    [Show full text]
  • Sheffield "!'Hades
    1010 SHEFFIELD "!'HADES. HoTELS, INNS & TAVERNS-CC'ntiriued. Old Bradley 'Veil, Mrs. Sarah Green, Pigeon Cote, Geurge Pearce, 29 Steel st! Monad, John Henry Fletcber,- :Frederick 150 Main road, Darnall, S Holmes, R • ·street & 2 Howard street, R I Old Brown Cow, Alfred Harrison, 3 Plant hotel, George Jones, Watb road. l\<Iontagu Arms; Francis John Law, 1! Radford street, S Mexboro', R High street, Mexborougb., R ! Old Cart & Horses, John 'f. Ca.mpsall, Plough, Hy. Creswick, Low Bradfield, S Mor{leth Arms, Mrs. Mary Eleanorl 2 Wortley rd. Mortomley, High Gm. S Plough, Pat rick Lawlesil, 23 Greasbro' Ren~haw, 108 Upper Alien street, S ·Old Cottage, Thomas Leadbeater, Bole road, R Moseley's Arms, Geo. Baxter,8r-83 West Hill road, S Plough, John Lucas, 28 Broad street, S bar & Paradise street, S Old Crab Tree1 L.enry Moore, 137, Plough, John Roddis, Catcliff-e, R · Mulberry Tavern, George Mower, ~lul- Scotland street, S ·Plough, Jn. Arth. Senior, 20 l\lilner rd.S berry street, S Old Cricket Ground Inn, Char~es Tbos. Ploug-h inn, Samuel Lovell, 288 Sandy- Museum, Mrs. Jane E. l\Ioore, 25 Bent, 371 Darnall road, S gate road, Sandygate, S . Orchard street, S Old Cross Daggers, Fredk. Redfearn, Plumpers, \V m. Hazlehurst, 49Duke st.S Nag's Head, Ernest Ibbotson, H-old- l\'Iarket !Jlacc, Woodhouse, S Plumpers, John Hy. 1\Ieades, 'finsley, S. worth, Lnxley, S Old Cross Scythes, Tom Reeves, Totley,S Pomona, Harold Ernest Haycock. 2Il Nag's Head Hotel, George A. Howard, Old Crown, G-eorge De-xter, Green street, Ecelesall road, S Sheffield road, Dronfield, R GreasbrQugh, R Portobello, William Mosforth, 248 P')rto- Napier, Jn.Richd.
    [Show full text]
  • 135 Bus Time Schedule & Line Route
    135 bus time schedule & line map 135 Rotherham - She∆eld View In Website Mode The 135 bus line (Rotherham - She∆eld) has 8 routes. For regular weekdays, their operation hours are: (1) Grenoside <-> Hillsborough: 8:42 AM - 10:42 PM (2) Grenoside <-> She∆eld Centre: 7:51 PM - 10:51 PM (3) High Green <-> Rotherham Town Centre: 4:52 AM (4) High Green <-> She∆eld Centre: 4:54 AM - 7:19 AM (5) Hillsborough <-> Grenoside: 9:25 AM - 11:21 PM (6) Rotherham Town Centre <-> She∆eld Centre: 5:12 AM - 6:12 PM (7) She∆eld Centre <-> Grenoside: 5:10 PM - 11:25 PM (8) She∆eld Centre <-> Rotherham Town Centre: 5:40 AM - 5:40 PM Use the Moovit App to ƒnd the closest 135 bus station near you and ƒnd out when is the next 135 bus arriving.
    [Show full text]
  • Knife Crime Request Date
    Date: Sat 11 November 2017 Reference Number: 20171863 FOI Category: Stats – Crime Title: Knife Crime Request Date: Wednesday, 18 October, 2017 Response Date: Saturday, 11 November, 2017 Request Details: Broken down by areas of the city, how many knife crimes and stabbings have taken place in Sheffield in the following time frames: 1 - Previous six months 2 - 2017 3 – 2016 SYP Response: I contacted our Crime Management System (CMS) Administrator for assistance with your request. She provided me with the enclosed data and the following explanation of her search criteria/result caveats: POSSESSION OFFENCES – this is a count of offences recorded under the Home Office Offence class - POSSESSION OF ARTICLE WITH BLADE OR POINT, broken down by the scene of crime area. Where the offence was recorded on the CMS crime register between the following dates in the District SHEFFIELD - 01-JAN-2016 AND 31-DEC-2016 01-JAN-2017 AND 31-OCT-2017 01-JAN-2017 AND 31-MAY-2017 USED – This is a count of offences where a KNIFE (in accordance with the Home Office Knife crime definition) has been recorded as USED, broken down by the Home Office Offence class and the Scene of Crime Area. Where the offence was recorded on the CMS crime register between the following dates in the District SHEFFIELD - 01-JAN-2016 AND 31-DEC-2016 01-JAN-2017 AND 31-OCT-2017 01-JAN-2017 AND 31-MAY-2017 The requester has not been specific regarding offence types, therefore I have included all offences types where a KNIFE was used. I have provided the data broken down by Home Office class.
    [Show full text]
  • 765 Bus Time Schedule & Line Route
    765 bus time schedule & line map 765 Grenoside - Bradƒeld School View In Website Mode The 765 bus line (Grenoside - Bradƒeld School) has 4 routes. For regular weekdays, their operation hours are: (1) Parson Cross <-> Worrall: 7:06 AM (2) Wadsley <-> Worrall: 8:04 AM (3) Worrall <-> Ecclesƒeld: 3:10 PM (4) Worrall <-> Hillsborough: 3:23 PM Use the Moovit App to ƒnd the closest 765 bus station near you and ƒnd out when is the next 765 bus arriving. Direction: Parson Cross <-> Worrall 765 bus Time Schedule 37 stops Parson Cross <-> Worrall Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 7:06 AM Creswick Lane/School Driveway, Parson Cross Tuesday 7:06 AM Wheel Lane/Creswick Lane, Grenoside Wheel Lane, She∆eld Wednesday 7:06 AM Wheel Lane/Greenfolds Road, Grenoside Thursday 7:06 AM Friday 7:06 AM Penistone Road/Blacksmith Lane, Grenoside Rojean Road, She∆eld Saturday Not Operational Norfolk Hill/Penistone Road, Grenoside Norfolk Hill/The Frostings, Grenoside 765 bus Info Main Street/Norfolk Hill, Grenoside Direction: Parson Cross <-> Worrall Stops: 37 Main Street/Vicarage Road, Grenoside Trip Duration: 42 min Main Street, She∆eld Line Summary: Creswick Lane/School Driveway, Parson Cross, Wheel Lane/Creswick Lane, Main Street/Salt Box Lane, Grenoside Grenoside, Wheel Lane/Greenfolds Road, Grenoside, Penistone Road/Blacksmith Lane, Grenoside, Fox Hill Road/Cowper Avenue, Fox Hill Norfolk Hill/Penistone Road, Grenoside, Norfolk Hill/The Frostings, Grenoside, Main Street/Norfolk Hill, Grenoside, Main Street/Vicarage Road, Fox
    [Show full text]
  • Early Co-Operatives in Sheffield
    Co-operative Ideas and Experiments in Sheffield 1790 – 1850 And Co-operative Schemes in the Era of mid-Victorian Prosperity 1850 – 1875 By John Baxter Working people had been involved in co-operative schemes for over sixty years before the formation of the societies of the 1860s and early 1870s which came together to produce the modern Sheffield and Ecclesall and Brightside and Carbrook Societies. The following article aims to present the important episodes in local co-operative “pre-history” to help people working for the modern movement find among their “roots” inspiration and extra pride, for their part in building a progressive system of production and distribution. Perhaps it may also serve to make the wider co- operative membership and consumers appreciate the principles of common ownership and distribution of profit. Setting the story of the 1790s, co-operatives in coal, corn, milk, and boot manufacture and distribution, the 1830s and 1840s produce co-ops involving Owenites, Trade Unionists, and Chartists, and the Rochdale inspired groups of the 1850s and 1860s, against a background of Sheffield’s industrial and social development may also add to the understanding of the making of our city in the industrial revolution. Sheffield in the 1790s: The Jacobin City During the 1790s, Sheffield’s population grew from 40,000 to 45,000 (more than twenty times this number live in the modern city). Most of these people were crammed into the warren of workshops and tenements of the central township. Most people owed their living to the fortunes of the cutlery trades and worked in small workshops under control of the merchants or factors to whose warehouses finished work was taken for payment.
    [Show full text]