Martin Place
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Built Pedagogy
Above any other faculty, the very fabric of the New Building Built for the Faculty of Architecture, Building and Planning must Pedagogy function as an experiential resource for research, teaching and knowledge transfer. This presents a rare opportunity for profound, intrinsic and meaningful links between building programme and architectural expression Cultural resources can engage communities in collective experiences, providing opportunities for reflection and conversation on the never-ending questions of how we make our lives meaningful, our work valuable and our values workable. 05.1.1 Growing Esteem, 2005 The Gallery Building reinforces the horizontal lines in the landscape and respects, engages with and reinforces the character of the Collections and Research Building Urban Design Exemplar Precinct established by the High Court and the National Gallery of Australia; Australian Museum, Sydney Integration with Environment Seeking to learn about sustainable build- ing through study of the natural world, Enduring, High Quality, Timeless the double skin façade is a collaboration Distinctive Materials and Detailing with the Museums scientists - a visible, intrinsic and poetic link between architec- National Portrait Gallery tural expression and the institution’s iden- Canberra, Australia tity. Nature’s golden ratio and the filigree of a moth’s wing scale, seen through a Won in open international scanning electron microscope, inspire the competition and completed in glazing pattern. Innovative inventive use 2008, the National Portrait Gallery of dichroic glass and advanced concealed is the most significant new national edgelighting produces dynamic colours institution in the Parliamentary through optical interference as do irides- Triangle for almost 20 years. cent butterflies. Canberra - City and Environs, Griffin Legacy Framework Plan, NCA, 2004. -
Endorsement City & Southwest
ENDORSEMENT CITY & SOUTHWEST ACOUSTIC ADVISOR Review of Construction Noise and Document Construction Noise and Vibration Impact Vibration Impact Statement for reference: Statement Portion 3 – Martin Place and Pitt Line-Wide works Portion 3 Street Stations Martin Place and Pitt Street Prepared by Renzo Tonin and Associates for Stations Systems Connect. Prepared Larry Clark, Alternate Acoustics by: Advisor TK685-03-14F01 CNVIS C2S_P3 MPL_PIT Date of 9 March 2021 (r5) issue: Dated 22 February 2021 As approved Alternate Acoustics Advisor for tHe Sydney Metro City & SoutHwest project, I Have reviewed the Construction Noise and Vibration Impact Statement (CNVIS) for Line-Wide works Portion 3 – Martin Place and Pitt Street Stations, as reQuired under A27 (d) of tHe project approval conditions (SSI 15-7400). I reviewed and provided comment on revisions of the CNVIS. Revision 5 of tHe document Has been updated since tHe last endorsed version of tHe CNVIS (r3) to address EPA Notice of Variation reQuirements. I am satisfied tHat revision 5 of the CNVIS is technically valid, and includes appropriate noise and vibration mitigation and management. On tHis basis I endorse revision 5 of the CNVIS for Line-Wide works in respect of the Martin Place and Pitt Street Station works. Larry Clark, City & SoutHwest Alternate Acoustics Advisor Acoustic Studio: 20210309 LW CNVIS Martin Place and Pitt Street Stations (r5) AltAA endorsement.docx - 1 - Acoustics Vibration Structural Dynamics SYDNEY METRO CITY AND SOUTH WEST - LINE-WIDE WORKS Construction Noise and -
Annual Report 2016-17 Delivering Sustainable and World-Leading Public Parklands About Centennial Centennial Parklands 5 the Hon
Centennial Parklands Annual Report 2016-17 Delivering sustainable and world-leading public parklands About Centennial Centennial Parklands 5 The Hon. Gabrielle Upton MP Acknowledgement of Parklands Chairman’s report 6 Traditional Owners 04 Executive Director’s report 7 The Hon. Gabrielle Upton MP We acknowledge the Gadigal clan as the Highlights for 2016-2017 8-9 Minister for Environment, traditional custodians of the country on which Botanic Gardens & Minister for Local Government Centennial Parklands has been constructed. and Minister for Heritage Centennial Parklands Strategic Plan 10 52 Martin Place SYDNEY NSW 2000 Statement of Record 24 October 2017 Managing Resources for Sustainability 13 This Annual Report for 2016-17 complies with the Environmental Annual Reporting requirements for NSW Government, Performance Managing our Environment 14 Dear Minister, and contains the Centennial Park and Moore Park 12 Planning and development issues 15 Trust’s performance against the strategies of the In accordance with the Annual Reports (Statutory Bodies) Centennial Parklands Plan of Management 2015-20. Sustainable Parklands Program 15 Act 1984, the Public Finance and Audit Act 1983 and the Regulations under those Acts, we have pleasure in submitting the Annual Report for 2016-17 of the Centennial Park and Moore Park Trust. Social Visitation 17 16 Performance Sports in the Parklands 18 Education and community programs 19 Volunteering 19 Venue management 20 Tony Ryan Adam Boyton Community Consultative Committee 21 Chairman Trustee Financial Fees and charges 23 22 Performance Economic performance 24 Payment performance 24 Accounts payable 24 Investment performance 25 Financial Statement by Members of the Trust 27 26 Statements Independent Audit Report 28 Statement of Comprehensive Income 30 Statement of Financial Position 31 Statement of Changes in Equity 32 Statement of Cash Flows 33 Appendices Governance and organisational matters 59 58 The Trustees 60 Risk management 62 Organisational Matters 65 The Executive team 66 Did you know.. -
Martin Place Event Guidelines Contents
Martin Place Event Guidelines Martin Place Mall Event Guidelines April 2020 Martin Place Event Guidelines Contents Introduction 3 1. Planning Events in Martin Place 4 2. Application and Approval Process 11 3. Further Details and Contacts 15 2 Martin Place Event Guidelines Introduction This Martin Place Event Guidelines document is designed to assist applicants with detailing the regulations and procedures associated with staging events in Martin Place and gaining approvals from the City of Sydney for such events. From here on the City of Sydney will be referenced as ‘the City’ for the purpose of this document. This document provides an outline of the process required to take your event enquiry from application to approval for Martin Place and should be read in conjunction with the City’s overarching Event Guidelines document and other planning provision documents where applicable. Responsibility as an Event Owner An event organiser is defined as a legal entity responsible for the event, that is, the entity who has taken out and possesses public liability insurance covering the event and all associated activities (extending to any contracted services with third parties) and the stated applicant detailed on the Event Application submitted to the City. Legal liability and responsibilities are not diminished if the event is a community or not-for-profit event. The event organiser may or may not also be an employer. An employer has specific duties and responsibilities under Work Health and Safety legislation. All event organisers have a duty of care to provide a safe event for patrons as well as staff employed to produce the event. -