21-09-2019

Presentation - Olympia Technology Park

By BALAJI A J CEO

1. About Olympia Group

1 21-09-2019

Background:

The Olympia Group was born out of the alliance of Two strong business houses – The Khivraj Group & The MK Group.

The -based renowned Khivraj Group, has over 5 decades of successful business history spanning various industries such as Real Estate, Automobile, Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & Mr Bharat Kumar Chordia.

Mr Ajit Kumar Chordia, the Managing Director is also an Founding member of IGBC and actively involved in IGBC.

The MK Group Kolkata have an impressive track record of large-scale property development in several sectors of Real Estate - MSB Residential Apartments, Clubhouses and Shopping Malls among others represented by Mr Chandrakant Kankaria.

Mr. Ajit Kumar Mr. Chandrakant Mr. Bharat Chordia Kankaria Kumar Chordia

Green Ethos of Olympia Group

Sl. No Project Status USGBC LEED Gold – Certified, 1 Olympia Technology Park Under Certification - Attempting for IGBC Platinum Rating 2 Olympia-Merlin Reflection IGBC Pre- certified Platinum

3 Olympia Platina Under Certification – Attempting for IGBC Gold Rating Achieved IGBC Gold Rating. 4 Olympia Park Residences Expect to receive the certificate on 27.09.2019 5 Olympia – Teknos Under Certification – Attempting for IGBC Gold Rating

6 Olympia – National Under Certification – Attempting for IGBC Gold Rating Olympia – Goodwood 7 Pre-certified IGBC Platinum Rating Residence Under Certification – Attempting for LEED BD+C 8 Olympia – Inspire Platinum Rating

2 21-09-2019

Projects – A snap shot

OLYMPIA TECH PARK OLYMPIA PLATINA OLYMPIA TEKNOS OLYMPIA NATIONAL OLYMPIA INSPIRE • 100,000 sq.ft. of completed space • 130,000 sq.ft. of completed space TOWERS GUINDY • Structure of B+S+10 • Sprawling 2 million sq.ft. campus • Adjacent to Olympia Technology • Total Area – 72,904 Sq.ft • Total Area – 2,00,000 Sq.ft • Typical floor Plate (sft) 13,000 • LEED Certified Gold rated Green Park • Building Structure – 2B+Stilt+10 • Building Structure – 2B+Stilt+10 - Fully Occupied Bldg. • Fully Occupied • Typical floor Plate 2 – 10 – 7,424 Sq.ft • Awaiting CC • In operation for the past 13 years - Fully Occupied • USGBC LEED Gold Certified

OLYMPIA OPALINE OLYMPIA OPALINE OLYMPIA SKY VILLAS PARK RESIDENCES • Types of Flats: 4 BHK • Types of Flats: 2, 3 BHK SEQUEL BY OLYMPIA • Apartment Range: 6150 sq.ft – 6300 • Project Status: Completed • Types of Flats: 3 & 4 BHK • Total Area – 1,05,000 Sq.ft sq.ft - No of Flats – 1200 • Apartment Range: 1145 sq.ft – 2343 • Luxury Apartments Sq.ft • No. of Flats: 18 Luxury Duplex • Project Completed and Occupied • No. of Flats: 608 - Project completed & Occupied - Project completed

Education Projects – A snap shot

VELAMMAL NEXTGEN SCHOOL KC HIGH SCHOOL • State of Art school for Velammal group of • School for KC High run by Mrs Valli to have schools designed by expats working at RSP. their school to get relocated and The concept of learning street is the major cater for expansion. highlight of the design. • School affiliated to Cambridge International • Total Area is 90KSF on 1.35 Acres of land. Board. • Project delivered and school is in operations • Total Area of 1.3 lakh sqft on 3.25 Acres of for last couple of years. land. • Amenities like Basket ball court, Auditorium, Mini Soccer Field, Swimming pool etc. • Project delivered and school is in operations for last couple of years.

3 21-09-2019

2. OTP Energy Consumption

Energy Source Profile 2018-19

TNEB GRID WIND ENERGY (12.02%) (76.33%)

OLYMPIA ENERGY PROFILE

DG – CAPTIVE ROOF TOP SOLAR (6.36%). (5.29%)

4 21-09-2019

Energy Consumption Overview 2018-19

Building Energy Profile FY 2018-19 Units in Description % Source of Energy Units in KWh % Kwh TNEB Energy 3597864 12.02% Green Energy 24433628 81.6% Diesel Generators 1904570 6.36% Solar Energy 1582834 5.29% Non-Green Energy 5502434 18.4% Wind Energy 22850794 76.33% Total 29936062 100% Total 29936062 100%

12.02% 6.36% 5.29% 18.40%

76.33% 81.60%

TNEB Energy DG Energy Solar Engery Wind Energy Green Energy Non-Green Energy

Energy Consumption Profile 2018-19

Description of Energy Usage Units in Kwh %

Occupant Lighting, Power & UPS 21184969 71 % Chiller Consumption 6722986 22 % Common Area Lighting Consumption & Losses 2028107 7 % Total Energy Consumption 29936062 100%

7% 22% Occupant Lighting, Power & UPS Consumption in Kwh Chiller Consumption in Kwh 71% Common Area Consumption & Losses in Kwh

5 21-09-2019

3. OTP Specific Energy Consumption

Specific Energy Consumption – past 3 years

Parameters Units 2016-17 2017-18 2018-19 Total Annual Electricity KWh 33308334 31163261 29852736 Consumption Built Up Area Sq. m 167227 181631 181631 Specific Electrical Energy KWh / Sq. 199.18 171.57 164.36 Consumption

2016-17 199.18

171.57 2017-18

2018-19 164.36

6 21-09-2019

Year on Year Improvement of Specific Energy Consumption

Description 2016-17 2017-18 2018-19

Specific Energy Consumption 199.18 171.57 164.36 Variation - 27.61 7.21

Improvement % - 16.09% 4.39%

Reasons for Variations of Area :

• We have constructed one floor additionally in 2017 -18. Hence there is a increase of 14,404 Sq.Mtr area in Built Up Area.

Reasons for Improvement in SEC :

• Installed one additional water-cooled chiller and reduced air-cooled chiller operation.

• Conversion of DX Units to Chilled Water Unit in Common Area & Food Court.

• Conversion of PL Light Fittings into LED light fittings in Common Area & Office Premises of various clients.

• Implementation VFD for HVAC Equipment's.

4. Information on Competitors, National & Global Benchmark

7 21-09-2019

Information on Competitors, National & Global Benchmark

SEC Benchmark - Competitor:

Sl.No Competitor Name SEC

1 Tata Consultancy Services, Cochin 82.2

National SEC Bench Mark ( BEE ):

EPI Bench Mark for Office Buildings ➢ Property EPI depends upon multiple factors like climate zone, operating hours, occupancy trends etc.. Climate Zone Less than More than 50% AC 50% AC ➢ Olympia Tech Park Campus comes under mixed category. Combination of Office, Data labs, Food Warm & Humid 101 182 court & Amenities, Banks, ATM and GYM etc with 95% Air conditioned space. Composite 85 179 ➢ Chennai comes under Warm & Humid Climate Zone and our campus comes under the category of more Hot & Dry 90 173 than 50 % Airconditioned area. Hence EPI Bench Mark -182. Moderate 94 179 ➢ Our EPI FY 2018-19 - 164.36

Road Map for Further Improvement of SEC

➢ Maximize utilization of Day Light effectively and reduce the lighting consumption in day time.

➢ Greater Use of Energy Efficient Equipment's

➢ Optimum Utilization of HVAC System

➢ Greater Use of energy efficient lights

➢ Continuous Monitoring and audits of energy.

➢ Inclusion of digital technologies in operations of building and management of energy.

8 21-09-2019

5. Energy Savings Projects Implemented in last 3 Years.

Energy Savings Projects Implemented in last 3 years

Important Projects in 2016-17, 2017- 18 and 2018-19

➢ Conversion of MH light fittings into LED light fitting for street light & utility block.

➢ Installation of additional one water cooled chiller.

➢ Conversion of PL light fittings into LED light fitting in various locations of Office Premises.

Investments Savings Payback Year No of Proposals ( in Million INR) ( in Million INR ) ( Months )

2016 -17 7 1.762 1.185 17

2017 -18 7 31.68 17.59 21

2018 -19 4 9.48 3.91 29

9 21-09-2019

Addition of 1 x 750TR Water Cooled Chiller in 2017-18

➢ Addition of one new energy efficient 750 TR WCC Chiller.

➢ Optimization achieved by the above addition of an WCC there by reducing the energy consumption of the Chiller System.

➢ Energy Saved - 9.47 Lakhs Units / Year

➢ Cost Saving of – INR 75.78 Lakhs / Year

Chiller Energy Consumption in KWH Before Installation of Chiller Energy Consumption in KWH After Installation of one Additional 750TR Water Cooled Chiller Additional 750 TR Water-Cooled Chiller

Period PH-1 Feeder PH-2 Feeder Total Period PH-1 Feeder PH-2 Feeder Total

Q1 2016-17 1710610 865500 2576110 Q1 2017-18 1652110 405087 2057197

Q2 2016-17 1543940 624816 2168756 Q2 2017-18 1479730 426298 1906028

Q3 2016-17 1211640 548179 1759819 Q3 2017-18 1315530 308161 1623691

Q4 2016-17 1170240 241334 1411574 Q4 2017-18 1138940 243037 1381977 Total Energy Consumption of Chiller & Pumps Total Energy Consumption of Chiller & Pumps 7916259 6968893 FY 2016-17 FY 2017-18 Energy Saving / Year in Kwh - 947366 . Cost Saving / Year in INR - 75,78,928/- Investment Cost for WCC in INR - 1,10,00,000/- ROI ( in Months ) - 22 Months

6. Innovative Projects Implemented.

10 21-09-2019

Installation of 1.1 MW Roof Top Solar Power System

PROJECT DETAILS

Capacity 1.1 MW

Type Direct Online Grid

Make of Solar PV Panel Trina

Rating & Qty. of Solar PV 315 Watts, 3510 Nos Panel

Make of Inverter Delta

Rating & Qty. of Inverter 50 KW , 19 Nos

Energy Generation / Year 1582834 ( in KWh )

Investment Cost ( in INR ) 5.08 Cr

ROI ( Months ) 46 Replication Potential :

➢ Reduction of heat ingress below terrace floors.

➢ Generation of Green Power through natural resource

➢ HVAC heat load reduction in below floors of solar.

7. Utilisation of Renewable Energy Sources.

11 21-09-2019

Utilisation of Renewable Energy Sources

Installed Capacity Generation % of Overall Type of RE Type of Energy Onsite/Off site (MW) (Million Units) Electrical Energy

Solar PV Electrical Onsite 1.1 1.58 5.29%

Wind Electrical Off site 15.6 22.85 76.3%

Wind - 76.3% (22.85 Million units))

Solar - 5.29% (1.58 Million units)

8. GHG Inventorisation.

12 21-09-2019

GHG Inventorisation

Energy Cosumption Details ( in Kwh ) Ton of CO 2 Emission Year TNEB Wind Solar DG Total TNEB DG Total

2016 -17 13664421 17856243 0 1787670 33308334 11204.8 1019.0 12223.8

2017-18 11153209 17898006 658436 1453610 31163261 9145.6 828.6 9974.2

2018-19 3725848 22639484 1582834 1904570 29852736 3055.2 1085.6 4140.8

Renewable Energy Usage ( in KWh ) Reduction of CO 2 Emission ( in Ton ) 30000000 20000.0 18000.0 18695.1 25000000 24222318 16000.0 20000000 14000.0 17856243 18556442 12000.0 12223.8 15000000 10000.0 9974.2 8000.0 10000000 9632040 6000.0 4140.8 5000000 4000.0 2000.0 0 0.0 2015 -16 2016 -17 2017-18 2018-19 2015 -16 2016 -17 2017-18 2018-19

9. Green Supply Chain / Fly Ash Utilisation.

13 21-09-2019

Green Supply Chain / Fly Ash Utilisation

• USAGE OF GREEN MATERIALS : FLY ASH has been extensively utilized in many of our projects and we continue to do so as part of our commitment towards sustanability. S .No Site Name Qty ( in MT ) 1 Olympia Tech Park -10th floor Project 151 2 Goodwood residences 343 3 Jayanthi residences 196 4 Velammal School, 256 5 Velammal School, Thiruvottiyur 196 6 KC School,Panache,Navalur 249 TOTAL 1391

• USAGE OF GREEN CHEMICALS : Switch Over to Green Chemicals usage for House Keeping with Eco -Friendly and low VOC. Green certification for products used.

10. Team Work, Employee Involvement & Monitoring

14 21-09-2019

Building Team Organisation

Management Team

Property Manager

Accounts & Electrical & Mechanical Safety & Security Finance In- Supply Chain Food Court Civil Manager IBMS Manager Manager Manager charge Management Operations In charge

O&M Engineer

Shift Engineers – 3 Help Desk Executives – 4 (Round the Clock (Round the Clock Operations) Operations)

Employee Involvement

• Employees Trained on Energy monitoring and efficiency measures. • Photos showing the involvement of Employees in Energy monitoring.

15 21-09-2019

Monitoring Use of Advanced Equipments and Tools for Monitoring.

Integrated Building Management System for Monitoring and Control.

➢ Implemented Mobile Application for Energy and Water Reading. ➢ Periodic Review Meetings at all levels. ➢ Periodic trainings on Energy monitoring and conservation. ➢ Awareness and guidance to Occupants of the building to adhere to energy conservation measures and initiatives.

11. Implementation of ISO 50001 / Green CO / IGBC Rating

16 21-09-2019

Implementation of ISO 50001 / Green CO / IGBC Rating

ISO 50001 - Engaged an ISO 50001 Certified Agency & Energy Auditor to implement ENMS at site.

IGBC RATING : Documents submitted to obtain the IGBC – Platinum Certification for our site.

12. Long Term Vision on Energy Efficiency

17 21-09-2019

Long Term Vision on Energy Efficiency

LONG TERM TARGET ON ENERGY EFFICIENCY

▪ Increase the usage of renewable energy from 81.6 % to 90 %

▪ Improve the EPI from 164.36 to 150

▪ Enhancement of onsite solar energy from 1.1 MW to 1.2 MW

▪ Optimization of Annual Energy in Chiller Consumption of Chiller – 67.22 Lakhs Units to 60 Lakhs units

ENERGY EFFICIENCY IMPROVEMENT MEASURES FOR UPCOMING YEARS

▪ Installation of Auto Tube Cleaning Systems for Water Cooled Chillers.

▪ Upgradation of existing chillers into magnetic chillers.

▪ Installation of Control Command Center.

▪ Conversion of AHU’s to EC Fan System.

▪ Installation of Motion Detector System for lighting circuits

Other Relevant Information

USGBC LEED Best HVAC Design Best Green Building Certification for GOLD Award Award

Olympia Technology Park Girem Award was was awarded “The BRY conferred upon AIR AWARDS 2008” for the Olympia Technology “Best HVAC Design” and Park for the best green this award is in its 3rd year building in - and considered as 2009. prestigious for it certifies excellence in Energy conservation & Innovative design in HVAC.

18 21-09-2019

Other Relevant Information

Postal Dept. has released the special cover with Olympia Tech Park image on 29.12.2016

19