EnviCons®

Company Portfolio and Project Summaries

EnviCons Srl Headquarters: Lungo Po Antonelli 21 – 10153, Torino P.IVA: 10189620015 Phone: (+39) 011.81.28.684 - Fax: (+39) 011.81.27.528 www.envicons.com – [email protected] Company Portfolio (2009 – 2016) 2009 I. Preliminary Environmental Study and authorization development for the V. Vocational training services for the course “Technician for the installation of realization of the ground-mounted solar farms: “Castellaccio” (15688,26 kWp photovoltaic systems”. [Client: C.I.O.F.S. – F.P. Piemonte] – 22,5 ha) “Parrizzo” (998,66 kWp – 14,24 ha), “Lagaccione” (2036 kWp – 4,86 VI. Preliminary Environmental Study and authorization development of the ha), “Ternavasso” (7405,2 kWp – 21,1 ha), “I Pianeti” (34468,2 kWp – 83 ha), solar farms: “Adelchi” (5166,62 kWp - 16 ha), and “Ageltrude” (1985,36 kWp “SulPiano Cross” (2532 kWp – 8,08 ha). Municipalities of Fiumicino (RM), - 5 ha). Municipalities of Macerata (MC) and Pollenza (MC). [Clients: Globalsun Nicosia (EN), Lagaccione (VT), (TO), Montalto di Castro (VT), Montà 3 Srl, Globalsun 2 Srl] (CN). [Clients: Solesa Green Power, Solesa Srl, Settimasun Srl] VII. Landscape analysis for the realization of a solar installation (2326,5 kWp) on the roof of an industrial building (CRAB) in the municipality of (TO). [Client: Solesa]

2010 I. Environmental Impact Study and authorization development for the realization of the ground-mounted solar farms: “Achillea” and “Artemisia” VIII. Geotechnical surveys in the installation areas of the ground-mounted solar (6159,4 kWp - 12 ha), “I Girasoli” (1429,22 kWp - 4 ha), “Sassacci” (6110 kWp farms “Banna” (9115,2 kWp – 26,23 ha), “Ternavasso” (7405,2 kWp – 21,1 ha) – 12,6 ha), “Anatrino” (992,68 kWp – 2,5 ha), “Lagaccione - lot 2” (2574 kWp and “SulPiano Cross” (2532 kWp – 8 ha). Municipalities of: Poirino (TO), Riva – 7,3 ha) “Banna” (9115,2 kWp – 16 ha), “Gli Elementi” (24057 kWp – 71,5 Presso (TO), Montà (CN). [Client: Solesa Green Power] ha), “Prometeo” (992,68 kWp – 5 ha), “Poggio Solar” (923,91 kWp – 1,8 ha), “Isolina” (4999 kWp – 19,5 ha). Municipalities of: (AL), (AL), IX. Feasibility study for the realization of ground-mounted solar farms. Civita Castellana (VT), Anagni (FR), Lagaccione (VT), (TO), Municipalities of: Torre De’ Picenardi (CR), (AL), Salussola (BI), Casale Colleferro (RM), Palestrina (RM), Poggio San Marcello (AN), Torre De Picenardi Monferrato (AL), Imola (BO), Massa Lombarda (RA), Mordano (BO), Lugo (RA), (CR). [Clients: Solesa Green Power, Fotoquattordici Srl] Alagna (PV), Crevalcore (BO), Cassano d’Adda (MI), Pozzuolo Martesana (MI). [Client: Fotowatio Italia Srl] II. Agronomic and vegetation report concerning the installation areas of the ground-mounted solar farms “Achillea” and “Artemisia” (6159,4 kWp - 12 ha), “I Girasoli” (1429,22 kWp - 4 ha). Municipalities of Carentino (AL) and Oviglio (AL). [Client: Ventunesimasun Srl] III. Landscape analysis for the authorization development of the solar farm “Sassacci” (6110 kWp – 12,6 ha). [Client: Solesa Green Power] X. Environmental Impact Study, preparation of the environmental IV. Landscape analysis for the realization of roof-mounted photovoltaic documentation and authorization development of the solar farm“Solar installations on residential buildings in the municipalities of Rivoli (TO) and Lakes” (37637,6 kWp – 118,6 ha). Municipality of Ardea (RM). [Client: Solesa Zimone (BI). [Clients: Pagliasso Orlando, Raviglione Alba] Green Power]

© 2017 EnviCons Srl www.envicons.com Company Portfolio (2009 – 2016) 2011 XI. Realization of plano-altimetric models in the installation areas of the solar I. Environmental regulations analysis for the realization of gound-mounted farms: “ Ternavasso” (7405,2 kWp – 21,1 ha), “Banna” (9115,2 kWp – 16 ha), solar farms. Works performed in the municipalities of: Pomezia (RM), “SulPiano Cross” (2532 kWp – 8 ha). Municipalities of Poirino (TO), Riva Presso Genzano di Roma (RM), Larino (CB), Rottofreno (PC), Tarquinia (VT), San Chieri (TO), Montà (CN). [Client: Solesa Green Power] Giovanni al Natisone (UD), (AL), (AL), (TO), Mondovi (CN), Grosseto (GR), Cavallermaggiore (CN), Fiumicello (UD), Atessa (CH), (AL), Mede (PV), Massa Lombarda (RA), Costigliole (AT), Mongrando (BI). [Clients: Solesa Srl, Fotowatio Italia Srl, Biellasun Srl] II. Topographic surveys and realization of plano-altimetric models in the installationn areas of the ground-mounted solar farms: “Cortiglione Green” (791,2 kWp – 2,09 ha), “Incisa Scapaccino Green” (593,4 kWp – 1,94 ha), XII. Project “Comuni Green” Preparation of the environmental documents for “ Green” (593,4 kWp – 1,46 ha), “Castello di Annone Green 3” (593,4 the installation of the ground-mounted solar farms: “Incisa Scapaccino Green kWp – 2 ha), “Castelnuovo Belbo Green” (395,6 kWp – 1,45 ha), 2” (593,4 kWp – 1,9 ha), “Cortiglione Green” (791,2 kWp – 2,1 ha), “Terzo “ Green” (791,2 kWp – 2,5 ha. Municipalities of: Montemarzino Green” (791,2 kWp – 2 ha), “Castelnuovo Belbo Green” (395,6 kWp – 1,45 (AL), Cortiglione (AT), Incisa Scapaccino (AT), Avolasca (AL), Castello di Annone ha), “Avolasca Green” (593,4 kWp – 1,5 ha), “Montemarzino Green” (791,2 (AT), Castelnuovo Belbo (AL). [Clients: Vermessungsburo, SGP, Flyren group ]. kWp – 2,5 ha), “ Green” (395,6 kWp – 2 ha), “ Green” (197,8 III. Design, realization and construction supervision of the mitigative and kWp – 1 ha), “Castello di Annone Green 3” (593,4 kWp – 2 ha), “San Martino compensation works of the solar farm “Cortiglione Green” (791,2 kWp – 2,09 in Strada Green” (593,4 kWp – 3,6 ha), “Castelnuovo Bocca d’Adda Green 2” ha). Municipality of Cortiglione (AL). [Client: Solarhybrid AG] (395,6 kWp – 1,2 ha), “Castelnuovo Bocca d’Adda Green 3” (395,6 kWp – 1,2 ha), “Caselle Landi Green” (593,4 kWp – 3 ha). Municipalities of: Incisa Scapaccino (AT), Cortiglione (AT), Terzo (AT), Castelnuovo Belbo (AT), Avolasca (AL), Montemarzino (AL), Felizzano (AL), Cartosio (AL), Castello di Annone (AT), San Martino in Strada (LO), Castelnuovo Bocca d’Adda (LO), Caselle Landi (LO). [Clients: Solesa Green Power, Flyren group] IV. Design, realization and construction supervision of the mitigative and compensation works of the solar farms: “Montemarzino Green” (791,2 kWp – 2,5 ha), “Avolasca Green” (791,2 kWp – 2 ha), “Castello di Annone Green 3” (593,4 kWp – 2 ha), Castelnuovo Belbo Green” (395,6 kWp – 1,2 ha), “Incisa Scapaccino Green 2” (1384,6 kWp – 1,94 ha). Municipalities of: Montemarzino (AL), Avolasca (AL), Castello di Annone (AT), Castelnuovo Belbo (AT), Incisa Scapaccino (AT). [Clients: SGP Srl, CP Contract Power Srl, Terza Contract Srl] V. Topographic survey and stacking of the installation area of a solar farm in the Municipality of Barge (CN). [Client: Draka Service]

© 2017 EnviCons Srl www.envicons.com Company Portfolio (2009 – 2016)

VI. Agronomical report and preventive soil survey in the installation areas of XII. Development and realization of a thematic cartography for the detection of the solar farms: “Ternavasso” (7405,2 kWp – 21,1 ha) and “Banna” (9115,2 the suitable areas for the installation of ground-mounted solar farms in the kWp – 16 ha). Municipalities of Poirino (TO) and Riva Presso Chieri (TO). Piemonte Region. [Client: SGP Srl] [Clients: Quattordicesimasun Srl, Quindicesimasun Srl] XIII. Topographic and plano-altimetric surveys in the installation areas of the VII. Design, realization and construction supervision of the mitigative and solar farms: “Achillea”, “Incisa Scapaccino Green 3”, “Incisa Scapaccino Green compensation works of the solar farm “Banna” (9115,2 kWp – 16 ha). 2”. [Clients: Ventunesimasun Srl, SGP Srl] Municipality of Riva Presso Chieri (TO). [Client: Solesa Srl] XIV. Hydraulic study and design of a water drainage system in the installation VIII. Design, realization and construction supervision of the mitigative and areas of the solar farm “Banna” (9115,2 kWp – 16 ha). [Client: Solarhybrid compensation works of the solar farm “Ternavasso” (7405,2 kWp – 21,1 ha). AG] Municipality of Poirino (TO) [Clients: Quattordicesima Srl, Quindicesimasun Srl] IX. Topographic and plano-altimetric surveys in the installation area of a solar farm in the municipality of (TO). [Client: Newcon Energy Deutschland GmbH] XV. Report on the wildlife within the municipality of Civita Castellana (VT) - district of “Piano di Santa Maria”. [Client: Ventitreesimasun Srl] XVI. Writing of the environmental analysis, perception analysis and photosimulations concerning the authorization of a solar farm in the municipality of Collegno (TO). [Client: Solesa Srl] X. Environmental Impact Study and authorization development for the XVII. Agrometeorological survey for the evaluation of the influence of realization of ground-mounted solar farms: “Odorisio” (1985,36 kWp – 8,4 photovoltaic structures on the microclimatic conditions of the solar farm ha), “Teatino” (992,7 kWp – 4,8 ha), “Bisenzio” (4982 kWp – 8,9 ha), “I “Banna” (9115,2 kWp – 16 ha). [Client: Solesa Srl] Canneti” (14917,8 kWp – 30,2 ha), “Chiaroni” (4145,4 kWp – 13,2 ha).

Comuni di Furci (CH), San Buono (CH), Capodimonte (VT), Rovigo (RO), San 35

30 C)

Martino di Venezze (RO). [Clients: Ventiseiesimasun Srl, Ventisettesimasun ° Srl, Ventottesimasun Srl, Trentunesimasun Srl, Trentaduesimasun Srl] 25

20 Temperaturadel suolo ( Banna_in -0.05 m (sole) 15 Banna_in -0.05 m (ombra) XI. Preventive soil survey in the installation areas of the solar farms: Banna_out -0.1 m (sole) 10 “Cortiglione Green” (791,2 kWp – 2,09 ha), “Montemarzino Green” (791,2 6/7/12 16/7/12 26/7/12 5/8/12 15/8/12 25/8/12 kWp – 2,5 ha), “Avolasca Green” (593,4 kWp – 1,46 ha). Municipalities of: XVIII.Executive design of a gabion retaining wall for the stabilization of a slope Cortiglione (AT), Montemarzino (AL), Avolasca (AL). [Clients: TerzaContract near to the solar farm “Avolasca Green” (593,4 kWp – 1,46 ha). [Client: Srl, SGP Srl] Flyren Group]

© 2017 EnviCons Srl www.envicons.com Company Portfolio (2009 – 2016)

XIX. Authorization development and preparation of the environmental VI. Environmental regulations analyses for the realization of roof-mounted documents for the realization of the Biogas power plants: “Fraccongiu” (999 photovoltaic installations in the municipalities of: Poirino (TO), Settimo kWe) and “Beimiafattu” (999 kWe). Municipalities of Arborea (OR) and Torinese (TO), Sant’Antonino di Susa (TO), Occhieppo Inferiore (TO), Borgo Terralba (OR). [Clients: Globalsun 2 Srl, Globalsun 3 Srl] Neive (CN), Castiglione Tinella (CN). [Clients: Spsun Srl, Solesa Srl, Agsun Srl] VII. Geotechnical reports and hydrogeological surveys in the industrial areas of 2012 the municipalities of: Poirino (TO), Sant’Antonino di Susa (TO), Settimo I. Geotechnical surveys for the realization of the solar farms: “Castelnuovo Torinese (TO), Castiglione Tinella (CN), Costigliole d’Asti (AT). [Clients: Spsun Belbo Green” (395,6 kWp – 1,45 ha), “Incisa Scapaccino Green” (1384,6 kWp Srl, Solesa Srl] – 1,94 ha), “Castello di Annone Green 3” (593,4 kWp – 2 ha). Municipalities of :Castelnuovo Belbo (AL), Incisa Scapaccino (AL), Castello di Annone (AL). VIII. Landscape reports tp install roof-mounted photovoltaic installations in the [Client: SGP Srl] municipalities of: Poirino (TO), Sant’Antonino di Susa, Mongrando (BI), Castigliole d’Asti (AT), Neive (CN), Castiglione Tinella (CN), Serralunga d’Alba (CN) , Sanremo (IM). [Clients: Spsun Srl, Solesa Srl, Biellasun Srl]

II. Topographic tracking for the realization of the ground-mounted solar farms: “Sulpiano Cross” (2528,6 kWp), “Castello di Annone Green 3” (593,4 kWp – 2 IX. Setup of a hydraulic model for the determination of the minimum ha), “Avolasca Green” (593,4 kWp – 1,46 ha), “Castelnuovo Belbo Green” environmental flow level of a water diversion structure placed in the “Oasi (395,6 kWp – 1,45 ha), “Incisa Scapaccino Green” (1384,6 kWp – 1,94 ha), Zegna” (BI). [Client: 3a Srl] “Castello di Annone Green 3” (593,4 kWp – 2 ha). Municipalities of Montà (CN), Castello di Annone (AT), Avolasca (AL), Castelnuovo Belbo (AL), Incisa X. Topographic tracking works for the realization of six Biogas plants within the Scapaccino (AL), Castello di Annone (AL). [Clients: Ventesimasun Srl, SGP Srl] Alessandria Province. [Client: Sam Engineering Srl] III. Preliminary design for the reactivation of the hydraulic head of the old XI. Topographic survey for the realization of the agricultural shelter “” and water-powered factory “Novarina”, municipality of Bibiana (TO). [Client: the pertaining photovoltaic installation. [Client: SGP Srl] Floema Professionisti Associati] XII. Preparation of the biomass supply plan and technical assistance for IV. Preliminary design and landscape analysis of a right bank earth authorizing the wood biomass cogeneration plant in the municipality of embankment of the Tanaro river in the municipality of Pietra Marrazzi (AL). . [Client: Artepura Srl]. [Client: Brezzi Romano Giorgio e Giuseppe Ss ] V. Topographic survey for the realization of the civil works in the areas outside the ’s Technological Park (TO). [Client: Cauda Strade Srl]

© 2017 EnviCons Srl www.envicons.com Company Portfolio (2009 – 2016)

XIII. Report on the biodiversity of irrigation channels and the mitigation of II. Sylvicultural management of a wood area (3 ha) on the right bank of the impacts on fish and benthonic macroinvertebrates populations. [Client: Tanaro river in the municipality of (AL). [Client: Brezzi Federazione Provinciale Coldiretti - Cuneo] Romano Giorgio e Giuseppe Sas] XIV. Design, and execution of environmental and landscape integration of the III. Design, realization and construction supervision of the mitigative and agricultural shelter “Masio”. [Client: SGP Srl]. environmental compensation works for the landscape integration of 8 Biogas plants in the Alessandria Province. [Clients: Società Agricole XV. Soil survey campaign for the evaluation of nitrogen and organic carbon Ss, Pecora Biogas Ss, Biogas Castelnuovo B.Da Scarl, Biogas content in the agricultural soils of the Lombardia Region “ERSAF Scarl, Piantari Scarl, Ventorino Fulvio, Biogas Monitoraggio 2012”. [Client: Timesis Srl] Società Agricola Ss]

XVI. Executive design of stormwater drainage works of the agricultural shelter “Masio” (AL). [Client: Trentasettesimasun Srl] IV. Soil sampling campaign of the solar farm “Banna” (9115,2 kWp – 16 ha) XVII. Study and design of the landscape integration works for the realization of a following the: “Linee guida per il monitoraggio dei suoli su superfici agricole residential complex in the municipality of (TO). [Client: destinate ad impianti fotovoltaici a terra” (Regione Piemonte). Municipality Artepura Srl] of Riva Presso Chieri (TO). [Clients: Chorus Solar Banna 3 Srl & C. Torino Due

XVIII.International development aid project “H2Ortisol”. Design and realization of Sas, Chorus Solar, Banna 5 Srl & C. Torino Uno Sas] solar-powered vegetable gardens in Beud Dieng (Senegal). [Financing body: V. Development of an hydraulic model to assess the discharge of the Fondazione Cariplo] mountain stream named “Torrente Dolca” – Biella. Development of a stage-discharge hydraulic model using the current-meter method. [Client: 3a 2013 Srl] I. Soil sampling campaign of the solar farm “Ternavasso” (7405,2 kWp – 21,1 ha) following the: “Linee guida per il monitoraggio dei suoli su superfici VI. Emerging market analysis and development of investment projects in the agricole destinate ad impianti fotovoltaici a terra” (Regione Piemonte). Balkan area – Serbian Republic . [Client: TerEnCons Doo] Municipality of Poirino (TO). [Clients: Quattordicesimasun Srl, VII. Study, design, and authorization development for the realization of a run- Quindicesimansun Srl] of-the-river hydroelectric power plant in the province of Torino (Pn 893 kW). [Client: HEI-Energy Srl] – Work in progress

© 2017 EnviCons Srl www.envicons.com Company Portfolio (2009 – 2016)

VIII. Evaluation of soil hydraulic parameters and inflow/outflow simulation of a landfill located in the municipality of Porto Torres (SS) – “Cava Gessi”. [Client: Timesis Srl]

II. Pre-feasibility, feasibility, design, and authorization development for the realization of a run-of-the-river hydroelectric power plant on the Sangonetto IX. Technical due-diligence of the authorization of the hydroelectric power stream (Pn < 100 kW). [Client: Spring Srl] – Work in progress plant “”. Technical and administrative historic analysis (1993- 2013) aimed to reconstruct the main steps of the authorization process of the hydroelectric power plant project located in the municipality of Ala di Stura (TO). [Client: Partecipazioni Srl] X. Conception and development of the U.H.T. (Urban Hydro Technologies) feasibility study for the energetic restoration of the channel network of the City of Torino, in collaboration with local SMEs and the Polytechnic of Torino. III. Conception and co-founding of a company under the laws of the Serbian [Financing body: Finpiemonte Spa] Republic for the development of 20 hydro power plants 0,2 MW < Pn > 4 MW, for a total of 20 MW. [Client: e-Ren Energy Group Doo] – Work in progress IV. Flow measurement, installation of three staff gages and elaboration of a stage-discharge curve on the Piantonetto stream, municipality of (TO). [Client: Ente Parco Nazionale Gran Paradiso] XI. Feasibility study for the realization of a wood biomass trade and logistic V. Nivologic report to assess the influence of the widening of a ski slope on center and the development of wood biomass power plants for the potential avalanche dynamics - municipality of (TO). [Client: Frais production (cogeneration) of electric and thermal energy in the Municipality 2010 - Località Pian Fraisian snc] of Mombercelli. (AT) [Client: BIO.MASS.TECH Srl] VI. Technical assistance to obtain a regional grant (Misura 1.2.1) funded by the 2014 PSR 2007-2013 of the Liguria Region. [Client: Azienda Agricola Giovese] I. Pedologic surveying service for the realization of the soil map of the Lazio VII. Develpoment of an hydraulic model to assess water discharge in the Dolca region (1:250.000 scale), including in-depth analyses at 1:50.000 scale. stream (BI). [Client: 3a Srl] [Client: Timesis Srl / Arsial – Agenzia Regionale per lo Sviluppo e l’Innovazione dell’Agricoltura del Lazio (Lazio Region)]

© 2017 EnviCons Srl www.envicons.com Company Portfolio (2009 – 2016)

VIII. Ante-operam monitoring of soil hydraulic properties in the municipalities of III. Development of the ERDF research project “CIRCE” (Cooperative Internet-of- Paullo and Gessate for the construction of the new Milano’s bypass. [Client: Data Rural-alpine Community Environment) to implement an ICT platform to Seacoop Scarl] acquire, store and manage agrometeorological, hydrological data for research, soil conservation, water management and crop protection. [Financing body: Finpiemonte Spa] IV. Technical assistance to obtain a regional grant (Misura 4.2.1) funded by the PSR 2014-2020 of the Lombardia Region. [Client: Società Agricola S. Giuseppe s.s. dei F.lli Ferrari]

IX. Technical assistance for the submission of a funding request (ERDF funds) V. Post-operam monitoring of soil hydraulic properties in the municipalities of: for the sustainable development of mountain areas by means of a wood- Paullo, Comazzo, Pozzuolo Martesana, Trucazzano, Mulazzano, Liscate, energy supply chain. [Client: Municipality of Robilante] Gorgonzola, Dresano, Vizzolo Predabissi and Cerro al Lambro (MI) for the construction of the new Milano’s bypass. [Client: Seacoop Scarl] X. Geological survey for the authorization development of the hydroelectric power plant “Ar.mo” on the Lusignetto stream, within the municipality of Ala VI. Geoelectric and electromagnetic soil survey to map inorganc pollutants in di Stura. [Client: CAFE Industriale Srl] the sites of “San Giuseppiello” and "Ecobat" (NA). [Client: Università degli Studi di Napoli - Federico II] XI. Consultancy and support for the exploitation of hydroelectric opportunities within the Serbian Republic. [Client: TerEnCons Doo] XII. Extraordinary maintenance of the environmental mitigation works in the solar farms “Montemarzino Green” and "Cortiglione Green“. [Client: TERZACONTRACT Srl]

2015 VII. Green areas management services in the solar farms “Banna 1” and “Banna I. Photointerpretation, classification and quality control of the terrestrial 2”. Municipality of Riva Presso Chieri (TO). [Clients: Chorus Solar Banna 5 Srl & habitats of the Republic of Croatia. [Client: TIMESIS Srl] C., Chorus Solar Banna 3 Srl & C.] VIII. Development of the Agrifoodie App, project funded by the Fractals Call (FP7) to create a mobile app to shorten supply chains in the agrifood sector and foster direct selling of local food products. [Financing body: Fractals Bank]

II. Consultancy and support for the preparation of tender documents to make safe the “Lago d'Idro“ lake (BS). [Client: GEODATA Engineering Spa]

© 2017 EnviCons Srl www.envicons.com Company Portfolio (2009 – 2016)

IX. Chemical, physical and biological water quality survey (IBE, STAR_ICMi) for V. Development of the ERDF research project “CIRCE” (Cooperative Internet-of- the authorization of a SHPP on the mountain stream "Tesso" (TO). [Client: Data Rural-alpine Community Environment) to implement an ICT platform to Hei-Energy Srl] acquire, store and manage agrometeorological, hydrological data for research, soil conservation, water management and crop protection. [Financing body: Finpiemonte Spa] VI. Coordination, support and consultancy for the development of hydroelectric projects in the Serbian Republic. [Client Studio Frosio Srl] VII. Topographical and bathymetric survey, preliminary design and cost estimation of the works to restore and consolidate the shore of the X. Consultancy and support to prepare the technical-environmental "Commende Bianche" basin in the municipality of (TO). [Client: documentation to authorize two SHPP projects on the mountain stream Azienda Agricola Salvi del Pero di Luzzano Lodovico] "Enza". [Client: Hei-Energy Srl] XI. Consultancy and support for the botanical classification of urban vegetation of Istanbul for the construction of the new subway line. [Client: Geodata Engineering Spa - Merkezi Italiya Ankara Şubesi]

2016 VIII. Soil sampling campaign according to the “Linee guida per il monitoraggio dei I. Coordination and technical-administrative consultancy for the preparation suoli su superfici agricole destinate ad impianti fotovoltaici a terra” (Regione of a grant request (Programma PAR FSC 2007-2013, Asse III “Riqualificazione Piemonte), in the solar farms “Banna1”, "Banna2", "Ternavasso 1" e territoriale” – Linea d’Azione 2: “Messa in sicurezza dell’ambiente montano” "Ternavasso 2" (TO). [Clients: Chorus Solar Banna 3 Srl & C. Torino Due Sas, Interventi di “Sviluppo della filiera bosco energia"). [Client: Seacoop Scarl] Chorus Solar Banna 5 Srl & C. Torino Uno Sas, Chorus Solar Toscana 5 Srl & C. II. Ante-operam monitoring of soil hydraulic properties in the municipalities of: Ternavasso Uno Sas, Chorus Solar Toscana 5 Srl & C. Ternavasso Due Sas] Casalmaiocco, Vizzolo Predabissi and Cerro al Lambro (MI) for the IX. Collaboration for the development of the project "Chiomonte 2025", and construction of the new Milano’s bypass. [Client: Seacoop Scarl] implementation of the integrated development land plan aimed to a social and economic relaunch of the "Frais" hamlet. [Client: Chiomonte Imprend'Oc] III. Calculation of the Minimum Vital Flow of an agricultural water diversion structure on the "Bealera Marghera" channel - Municipality of Savigliano (CN) X. Consultancy for the elaboration of the "Update reports" of the photovoltaic [Client: Azienda Agricola Allasia Franco] power plants “GHIARO” and “GHIARO 2”. [Client: MEG contractor] XI. Geoelectrical mapping of soil resistivity whithin the fields of the «Centro di Bealera Marghera - Regime delle portate 500 ricerca per le produzioni foraggere e lattiero-casearie di Lodi» (CREA-CFP). Anno idrologico medio 400 Anno idrologico scarso 300 [Client: Dipartimento di scienze della terra e dell’ambiente e del territorio -

200 Portata (l/s) 100 Università Milano Bicocca]

0 GEN FEB MAR APR MAG GIU LUG AGO SET OTT NOV DIC

© 2017 EnviCons Srl www.envicons.com Company Portfolio (2009 – 2016)

IX. Ante-operam monitoring, technical and administrative consultancy for the authorization development of a run-of-the-river hydroelectric power plant on the Sangonetto stream. [Committente: Spring Srl]

© 2017 EnviCons Srl www.envicons.com Index

Solar Farms Authorization Development

Authorization Development of Wood Biomass Power Plants

Design and Authorization Development of Hydroelectric Power Plants

Reactivation of an Hydraulic Head

Hydraulic Study and Design of a River Embankment

Landscape Integration Study

Environment and Landscape Mitigative Works

Plano–Altimetric Models

Terrestrial Habitat Mapping and Classification

Soil Bioengineering

Geotechnical Surveys

Geophysical Surveys Environmental Monitoring Project Summaries Soil Surveys

Biological Surveys

International Cooperation

© 2017 EnviCons Srl www.envicons.com Authorization Development of Solar Farms clients FlyRen / SunEdison place date 2009-2011 installed power ≈ 40.5 MW status completed value ≈ 100 M€

Solar farm: “Gli Elementi” - Pn 24 MW, Colleferro (RM)

Solar farm: “Ternavasso” - Pn 7.4 Mw, Poirino (TO) PERFORMED WORKS Environmerntal Impact Study authorization development landscape study cumulated impacts study geotechnical survey Solar farm: “Banna” - Pn 9.1 MW, Riva di Chieri (TO)

© 2017 EnviCons Srl www.envicons.com Authorization of Development of Wood Biomass Power Plants client Artepura Srl place Provincia di Torino date 2012 installed power ≈ 1 MW status completed

PERFORMED WORKS authorization development biomass supply plan topographic survey

© 2017 EnviCons Srl www.envicons.com Design and Authorization Development of Hydroelectric Power Plants client HEI-Energy Srl place provincia di Torino project name date “Tesso” 2013-2015 installed power ≈ 600 kW status under development value ≈ 2 M€

project name “Eva” installed power PERFORMED WORKS 70 kWp detailed technical report status hydraulic study under development sizing of civil and hydraulic value works ≈ 250 k€ landscape report Environmental Impact Study geologic report environmental and biological water monitoring discharge monitoring detailed design

© 2017 EnviCons Srl www.envicons.com Reactivation of an Hydraulic Head client HEI-ENERGY Srl place province of Torino date 2012 installed power 35 kW status under development value 200 k€

PERFORMED WORKS preliminary design sizing of civil works hydrogeological and hydraullic study topographic survey

project Novarina - “Hydro 35 kW”

© 2017 EnviCons Srl www.envicons.com Hydraulic Study and Design and of a River Embankment client Azienda Agricola Brezzi Romano Giorgio e Giuseppe Ss place Pietra Marrazzi (AL) date 2012 status completed

PERFORMED WORKS sylvicultural operations landscape integration study hydraulic compatibility study preliminary design of water conteinment works

© 2017 EnviCons Srl www.envicons.com Landscape Integration Study clients FlyRen Srl; Artepura Srl place Piemonte project name: date “Ricovero agricolo 2012 Masio” status place completed Masio (AL) valore ≈ 2 M€

PERFORMED WORKS project name: landscape integration study “7 ville San mitigative works Mauro” topographical survey place hydraulic study San Mauro (TO) detailed design of hydraulic works vegetation analysis visual cones study green areas design

© 2017 EnviCons Srl www.envicons.com Environmental and Landscape Mitigative Measures clients FlyRen Srl, Solesa Srl place Italy date 2011-2013

PERFORMED WORKS Environmental Impact Study landscape study vegetation analysis soil analysis topographical survey environmental mitigative measures

© 2017 EnviCons Srl www.envicons.com Plano-altimetric Models client Solesa Srl place Poirino (TO) date 2010-2013

PERFORMED WORKS pedologic surveys geotechnical surveys topographic survey tracking of civil works plano-altimetric models

© 2017 EnviCons Srl www.envicons.com Terrestrial Habitat Mapping and Classification client Timesis Srl place Croatia date 2014-2015 status completed value 20 k€

PERFORMED WORKS photointerpretation habitat classification quality control

© 2017 EnviCons Srl www.envicons.com Soil Bioengineering client SGP Srl place Avolasca (AL) date 2011 status completed

PERFORMED WORKS landscape study topographical survey tracking of civil works environmental mitigative measures executive design of gabion retaining wall

© 2017 EnviCons Srl www.envicons.com Geotechnical Surveys client Solesa Srl place Riva di Chieri (TO) date 2010

PERFORMED WORKS penetrometric tests hydraulic tests sismic tests piezometric tests

© 2017 EnviCons Srl www.envicons.com Geophysical Surveys client Università degli Studi di Napoli - Federico II place Campania date 2015

raw data processed data resistivity map PERFORMED WORKS geoelectrical surveys with ARP technology analysis and elaboration of acquired data mapping of soil contamination throughout electric resistivity surveys

© 2017 EnviCons Srl www.envicons.com Environmental Monitoring clients various place Northern Italy date 2011-2016

PERFORMED WORKS installation of monitoring stations 35

sensors calibration 30 C) discharge measurement ° wildlife surveys 25 assessment of biologic water quality 20

data analysis Temperaturadel suolo ( Banna_in -0.05 m (sole) 15 environmental modelling Banna_in -0.05 m (ombra) Banna_out -0.1 m (sole)

10 6/7/12 16/7/12 26/7/12 5/8/12 15/8/12 25/8/12

© 2017 EnviCons Srl www.envicons.com Soil Surveys client Timesis Srl place Lazio date 2012-2014 status completated value 20 k€

PERFORMED WORKS logistic coordination elaboration of the sampling plan field soil survey profiles classification data analysis

© 2017 EnviCons Srl www.envicons.com Biological surveys client HEI-Energy place provincia di Torino (TO) date 2015-2016 status in corso

PERFORMED WORKS elaboration of the sampling plan identification of mesohabitats physical and chemical analysis biological surveys macroinvertebrates classification elaboration of biological indices IBE and STAR_ICMi

© 2017 EnviCons Srl www.envicons.com International Cooperation – Project “H2Ortisol” financing body Fondazione Cariplo place Beud Dieng - Senegal date 2012 status completed

PERFORMED WORKS fund rising hydrological analysis preliminary design detailed design supervision of works

© 2017 EnviCons Srl www.envicons.com