Home Occupations and Principal Arterial Office Use

Total Page:16

File Type:pdf, Size:1020Kb

Home Occupations and Principal Arterial Office Use 37-418: HOME OCCUPATIONS AND PRINCIPAL ARTERIAL OFFICE USE: *** B. Principal arterial office use requirements: 1. The principal arterial office use shall be limited to business, governmental, medical and professional office uses only. Wholesale or retail sales, repair activities, warehousing, material fabrication, or any other industrial activity shall be prohibited. 2. The principal arterial office use may be conducted in any dwelling unit within the R-1, R- 2, R-3 and R-4 single-family residential zoning districts subject to the following qualifications: a. The property which contains the principal arterial office use, must front on a designated principal arterial roadway as defined by the year 2005 DuPage County transportation plan. These roadways include but are not limited to Illinois Route 59, county Farm Road, Main Street - Wheaton between Illinois Route 38 (Roosevelt Road) and Illinois Route 64 (North Avenue), Naperville-Wheaton Road, Naper Boulevard, Illinois Route 53 south of Illinois Route 38 (Roosevelt Road), Illinois Route 83 (Kingery Highway), Illinois Route 19 (Irving Park Road), U.S. Route 20 (Lake Street), Illinois Route 64 (North Avenue), Illinois Route 38 (Roosevelt Road), 22nd Street from Interstate 294 to Illinois Route 56 (Butterfield Road), Illinois Route 56 (Butterfield Road) from 22nd Street west to the DuPage-Kane county line, U.S. Route 34 (Ogden Avenue) from DuPage-Cook county line to North Aurora Avenue and from 75th Street to the DuPage-Kane county line, North Aurora Avenue from U.S. Route 34 (Ogden Avenue) to Illinois Route 59, and 75th Street from U.S. Route 34 (Ogden Avenue) to Illinois Route 83, Army Trail Road from U.S. Route 20 (Lake Street) to the DuPage-Kane County line. b. The vehicular access to the property is exclusively from the principal arterial roadway. c. The property is not defined as a reserve lot. d. The parcel is not part of a planned unit development. e. The principal building is oriented toward the primary arterial roadway. f. The principal building for which the principal arterial office will be located must have been constructed before January 1, 1999. 3. The principal arterial office use shall be subject to all of the following site requirements. a. The principal buildings or structures in which the principal arterial office is located shall be subject to the front, side and rear setbacks of the applicable single-family residential zoning district. b. The principal arterial office use shall be conducted completely within the principal building. c. The principal arterial office use may be open to the public Monday through Saturday no earlier than eight o'clock (8:00) A.M. and no later than seven o'clock (7:00) P.M. d. Principal arterial office uses must be owned and operated exclusively by the owner of the property. Leasing of office space to second parties shall be prohibited. e. Any residence with a principal arterial office use on the site must be occupied by the owner of the property. f. All building facades of the principal building must maintain the existing single-family residential character of the structure. The exterior of the single-family residence may be altered or rehabilitated provided the alteration is a nonstructural repair of the building including the replacement of the roof covering, veneering or outer walls and incidental repairs which do not extend or intensify the existing dimensions of the building. The building however, shall not be enlarged, expanded, or extended. Repairs and alterations may be made to the exterior or interior of the building to return the building to a safe condition in accordance with the county codes. g. Existing landscaping on the site shall be preserved and maintained. h. Excluding provisions as outlined in article XII, "Off Street Parking And Loading Requirements", of this chapter, storage of any materials related to the principal arterial office use outside of the principal structure is prohibited. i. Parking requirements shall be based upon the gross floor area of the principal building and shall be determined separately for that portion of the building used for the principal arterial office use and for that portion of the building used for the dwelling. All other parking and loading requirements for the principal arterial office use shall be provided per the minimum requirements of article XII, "Off Street Parking And Loading Requirements", of this chapter, Principal Arterial Office Use. The minimum and maximum parking space requirement is 3.3 spaces per thousand feet of office space. j. The principal arterial office use shall be subject to landscape review. All driveways, parking areas and refuse containers shall require a full landscape screen and the remainder of the property shall maintain at least a partial landscape screen around the structures on the property used for the principal arterial office use as well as any additional landscape requirements within the respective single-family residential zoning district. k. Signage shall be limited to those permitted in the applicable single-family residential zoning district in accordance with article XI, "Sign Requirements", of this chapter as a single-family residential use in a residential district. l. The principal arterial office use shall meet all performance standard requirements including: (1) The office use shall not produce noise, obnoxious odors, toxic material, vibrations, glare, fumes, nuisance, or electrical interference detectable to normal sensory perception outside the structure. (2) Mechanical equipment which emits an unreasonable odor, noise radio interference or other nuisance is prohibited. (3) On site storage of dangerous substances is prohibited. m. The building and use shall meet all DuPage County building codes. 4. Property owners meeting the aforementioned requirements and qualifications and intending to conduct a principal arterial office use on their premises shall require a building permit form the DuPage County department of economic development and planning. (2005 Code) .
Recommended publications
  • Copy of Chipotle Restuarant List
    Restaurant Name Restaurant City State Zipcode Restaurant Phone Address Addison - Lake 53 - 1819 1078 N. Rohlwing Rd Addison IL 60101 630-282-7220 Algonquin - 399 412 N. Randall Road Algonquin IL 60102 847-458-1030 Arlington Heights - 131 338 E. Rand Road Arlington Heights IL 60004 847-392-8328 Fox Valley - 624 848 N. Route 59, Suite 106 Aurora IL 60504 630-851-3271 Aurora Orchard - 1462 1480 N Orchard Road, Suite 114-116 Aurora IL 60506 630-723-5004 Aurora Kirk & Butterfield - 1888 2902 Kirk Road, Unit 100 Aurora IL 60504 630-429-9437 Berwyn - 1753 7140 West Cermak Road Berwyn IL 60402 708-303-5049 Bloomingdale - 858 396 West Army Trail Rd. Bloomingdale IL 60108 630-893-2108 Fairfield and Lake Street - 2884 170 E Lake Street Suite C Bloomingdale IL 60108 630-529-5128 Bloomington Veterans Prkwy - 305 N. Veterans Pkwy., Suite 101 Bloomington IL 61704 309-661-7850 1035 Bolingbrook - 529 274 S. Weber Road Bolingbrook IL 60490 630-759-9359 Bradley - 2609 1601 Illinois State Route 50 Bradley IL 60914 815-932-3225 Bridgeview 87th & Harlem - 3047 8813 S. Harlem Ave Bridgeview IL 60455 708-598-1555 Champaign - 771 528 East Green Street, STE 101 Champaign IL 61820 217-344-0466 Champaign Prospect - 1837 903 West Anthony Drive #A Champaign IL 61820 217-398-0997 Broadway & Belmont - 36 3181 N. Broadway Chicago IL 60657 773-525-5250 Clybourn Commons - 42 2000 N. Clybourn Ave. Chicago IL 60614 773-935-5710 Orchard - 52 2256-58 N. Orchard Ave. Chicago IL 60614 773-935-6744 Jackson - 88 10 E.
    [Show full text]
  • Corporate Overview & Statement of Qualifications
    Corporate Overview & Statement of Qualifications TRANSPORTATION To Our Prospective Client, I founded Milhouse Engineering & Construction, Inc. with the goal of building the best engineering company in the country. It was based on the belief that if I hired great people, challenged them to excel, and maintained laser focus on the needs of our clients, success would come; and so it has. Our portfolio of successful projects continues to grow; our family of highly satisfied clients continues to expand, and our staff, now numbering over 150 strong, just gets better and better. One of the things of which I am most proud is our 11th consecutive selection as one of the “101 Best and Brightest Companies to Work For” by The National Association of Business Resources. As you review this description of our company’s qualifications, please note that I have based our business model on combining the wisdom and experience of senior experts with the energy, vitality, and creativity of young professionals. The resulting powerful project teams have proven they can meet any challenge and produce great projects on schedule and under budget. I am proud of our people, and I know that Milhouse can present a project team that equals or exceeds the capabilities of any team from any competitor, be they new or old, large or small. We will listen carefully to your needs. We will work tirelessly to see that those needs are fulfilled. We will hold ourselves to the highest standards of integrity and professionalism. We understand the importance of your projects, and we know that we must earn your trust every day.
    [Show full text]
  • STRUCTURE GEOTECHNICAL REPORT Ramp D Bridge Interstate
    STRUCTURE GEOTECHNICAL REPORT Ramp D Bridge Interstate 294 and Interstate 57 Interchange Project IDOT Job: P-91-186-08 (PTB 146, ITEM 1) Proposed SN 016-4102 Cook County, Illinois STRUCTURAL ENGINEER: Mr. Spiro Pantazis, P.E., S.E. T. Y. Lin International 200 South Wacker Drive Suite 1400 Chicago, Illinois 60606 (312) 777-2900 Prepared by: Geo Services, Inc. 805 Amherst Court Suite 204 Naperville, Illinois 60565 (630) 305-9186 JOB NO. 08015 05/23/14 May 23, 2014 T. Y. Lin International 200 South Wacker Drive Suite 1400 Chicago, Illinois 60606 Attn: Mr. Spiro Pantazis, P.E., S.E. Job No. 08015 Re: Structure Geotechnical Report Proposed Ramp D Bridge Interstate 294 and Interstate 57 Interchange Project Proposed SN 016-4102 IDOT Job Number: P-91-186-08 PTB 146, Item #1 Cook County, Illinois Dear Mr. Pantazis: The following report presents the geotechnical analysis and recommendations for the proposed bridge structures for the proposed Ramp D Bridge. A total of five (5) structural soil borings (SB-01 through SB-05) were completed. Copies of these boring logs, along with plan and profiles are included in this report. If there are any questions regarding the information submitted herein, please do not hesitate to contact us. Very truly yours, GEO SERVICES, Inc. Kiran Adhikary, P.E. Andrew J. Ptak, P.E. Senior Project Engineer Office Manager enc. 805 Amherst Court, Suite 204 Naperville, IL 60565-3448 Phone (630) 305-9186 Fax (630) 355-2838 www.geoservicesinc.net TABLE OF CONTENTS SECTION 01: INTRODUCTION ...................................................................................... 2 SECTION 02: PROJECT DESCRIPTION ....................................................................... 2 SECTION 03: SUBSURFACE INVESTIGATION PROCEDURES ................................
    [Show full text]
  • River Mileages and Drainage Areas for Illinois Streams—Volume 2, Illinois River Basin
    RIVER MILEAGES AND DRAINAGE AREAS FOR ILLINOIS STREAMS—VOLUME 2, ILLINOIS RIVER BASIN U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 79-111 Prepared in cooperation with the U.S. ARMY CORPS OF ENGINEERS RIVER MILEAGES AND DRAINAGE AREAS FOR ILLINOIS STREAMS—VOLUME 2, ILLINOIS RIVER BASIN By R. W. Healy U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 79-111 Prepared in cooperation with the U.S. ARMY CORPS OF ENGINEERS 1979 CONTENTS Conversion Table . .iv Abstract . .1 Introduction . .1 Methods . .2 Explanation of tables . .2 References . .3 Index . .291 ILLUSTRATIONS Figure 1. Map showing Illinois counties . .4 2. Map showing stream systems, hydrologic units, and major cities in Illinois. .6 TABLE Table 1. River mileages and drainage areas for Illinois streams . .8 i CONVERSION TABLE Multiply inch-pound unit By To obtain SI (metric) unit mile (mi) 1.609 kilometer (km) square mile (mi2) 2.590 square kilometer (km2) iv RIVER MILEAGES AND DRAINAGE FOR ILLINOIS STREAMS— Volume 2, Illinois River Basin By R. W. Healy ABSTRACT River mileages are presented for points of interest on Illinois streams draining 10 square miles or more. Points of interest include bridges, dams, gaging stations, county lines, hydrologic unit boundaries, and major tributaries. Drainage areas are presented for selected sites, including total drainage area for any streams draining at least 100 square miles. INTRODUCTION Expansion of water-resource investigations within the State of Illinois has amplified the need for a common index to locations on streams. A common index would aid in the coordination of various stream-related activities by facilitating data collection and interpretation.
    [Show full text]
  • Transportationtransportation
    Transportationtransportation City of Elmhurst Comprehensive Plan TransporTATion Elmhurst’s transportation system consists of an extensive roadway network, including direct access to Interstate High- ways I-290, I-294, and I-88, an extensive commuter rail and bus transit system, as well as a well-connected pedestrian and bike network. This transportation network allows for easy and accessible travel within the City and excellent con- nections to the surrounding metropolitan area. Elmhurst’s interstate highway and commuter rail access are among its strongest assets, making it a very desirable community for living and conducting business. Therefore, maintain- ing a well-functioning and efficient transportation system is critical to sustaining the high quality-of-life in the com- munity. A review of existing conditions, including average daily traffic and transit ridership history, formed the basis for the development of the transportation framework and functional street classification. Through this analysis, pri- Commuter and freight rail tracks ority improvement areas were identified, as well as general improvements or suggestions to manage population and employment growth, relative to a functional and efficient 8. Improve wayfinding signage throughout the city to aid transportation system. This section provides an overview pedestrians, bicyclists and motorists in locating and of the transportation network in Elmhurst and offers some accessing key community facilities. recommendations to sustain and strengthen community mobility. Goal 2: Maintain and determine adequate parking facilities to serve land uses throughout the city. Goals AND OBJECTIVES Objectives: Goal 1: Continue to enhance mobility within the City by 1. Actively monitor, manage and address on-street and effectively managing local traffic issues and anticipating the off-street parking needs within the city to ensure ad- impact of future development on current traffic patterns.
    [Show full text]
  • 2020 Final Budget Book.Indb
    456 PAGE INTENTIONALLY LEFT BLANK The Government Finance Offi cers Association of the United States and Canada (GFOA) presented a Distinguished Budget Presentation Award to the Illinois State Toll Highway Authority for the Annual Budget beginning January 2019. In order to receive this award, a governmental unit must publish a budget document that meets program criteria as a policy document, operations guide, fi nancial plan and communications device. For questions regarding the 2020 Budget Book, please contact: Michael Colsch Cathy Williams Sam Samra Chief Financial Offi cer Deputy Chief of Finance Capital Budget Manager Phone: 630-241-6800 TABLE OF CONTENTS TABLE OF CONTENTS Section Page Executive Lett er .......................................................................................................................................................................... 1 Executive Summary ................................................................................................................................................................... 3 Tollway Organization and Background ................................................................................................................................. 7 Revenue Sources and Underlying Assumptions ................................................................................................................. 13 Fund Structure .........................................................................................................................................................................
    [Show full text]
  • THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY Administration Building 2700 Ogden Avenue Downers Grove, Illinois 60515 Governor Br
    THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY Administration Building 2700 Ogden Avenue Downers Grove, Illinois 60515 Governor Bruce Rauner Director David Gonzalez Acting Secretary Randall Director Mark Peterson Blankenhorn Director Jim Banks Director Jeff Redick Director Terry D’Arcy Director James Sweeney Director Earl S. Dotson Director Tom Weisner Pursuant to the requirements of the Authority’s By-Laws, Notice is hereby given of the Bo ard Meeting of the Authority to be held on Thursday, May 28, 2015 at 9:00 a.m. in the Boardroom of the Administration Building in Downers Grove, Illinois. Paula Wolff, Chair This meeting will be accessible to individuals with disabilities in compliance with Executive Order #5, and pertinent state and federal laws, upon notification of anticipated attendance. Persons with disabilities planning to attend and needing accommodations should contact the Americans with Disabilities Act Coordinator of The Illinois State Toll Highway Authority at (630) 241-6800, Ext. 1010 in advance of the meeting at 2700 Ogden Avenue, Downers Grove, IL, to inform of their anticipated attendance. There will be live feed Webcasting of the Board Meeting while in session. An audio file will be available five business days after the meeting at www.illinoistollway.com THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY Administration Building 2700 Ogden, Downers Grove, IL 60515 BOARD MEETING AGENDA May 28, 2015 9:00 a.m. 1.0 CALL TO ORDER 2.0 ROLL CALL 3.0 PUBLIC COMMENT 4.0 CHAIR 1. Approval of the minutes of the Regular Board Meeting and Executive Session held April 23, 2015. 2. Review and approve Executive Session minutes for public release.
    [Show full text]
  • Freight Can't Wait
    Freight Can’t Wait Third Edition A list of America’s most critical infrastructure projects About the Coalition The Coalition for America’s Gateways and Trade Corridors (CAGTC) is a diverse coalition of more than 60 public and private organizations dedicated to increasing federal investment in America’s multimodal freight infrastructure. In contrast to single mode interests, CAGTC’s main mission is to promote a seamless goods movement transportation system across all modes to enhance capacity tradecorridors.org and economic growth. For more information on the Coalition for America’s Gateways and Trade Corridors, please visit 202.828.9100 www.tradecorridors.org. @CAGTC Freight Can’t Wait. Freight transportation is the backbone of America’s commerce. It is an economic engine, producing millions of jobs and a higher standard of living for our population. Without the ability to quickly and cost effectively move goods, American businesses struggle to remain competitive and the overall health of the economy suffers. A campaign of strategic investment to expand capacity and increase efficiency is needed to maintain – and grow – U.S. productivity and global competitiveness. This book contains a snapshot of freight projects that stand to benefit from federal partnership and investment. Federal support, in the form of a freight-specific competitive grant program, can incentivize states and localities to finance creatively and make use of public-private partnerships. Direct federal investment can leverage the state, local and private dollar, serving as the final piece in a funding package, and make projects like those in Freight Can’t Wait a reality. Third Edition April 2019 CAGTC | Freight Can’t Wait 1 West CAGTC | Freight Can’t Wait 3 Benefits Alameda Corridor-East The project would eliminate crossing collisions, queu- ing and congestion and reduce vehicle emissions at Project the underpass while the corridor improvements would improve safety at all four crossings in Montebello.
    [Show full text]
  • County of Kane
    COUNTY OF KANE Christopher J. Lauzen Kane County Government Center Kane County Board Chai rman 719 South Batavia Avenue Geneva, IL 60134 P: (630) 232-5930 F: (630) 232-9188 [email protected] www.countyofkane.org DOCUMENT VET SHEET for Christopher J. Lauzen Chairman, Kane County Board ~)) Name of Document: I DOT Local Agency Agreement Resolution No.: ...;..1.;:;...3-_..d'.____ _ For the Jurisdictional Transfer of Anderson Road from IL 38 to Prairie Valley Drive from Elburn to the Coun of Kane Submitted by: Linda Haines Date Submitted: June 19 2013 Dept. Head Sign-off Date: j ~ '1.. Lo\ S Examined by: RECEIVED I JUL 2 6 2013 I KANE COUNTY BOARD (Date) Post on the Web: YES / NO ____ Atty. lnitials d Comments: 13 Chairman signed: YES _____ NO _ ____ 1(31/ dfJ (Date) Document returned to: (Name/Department) STATE OF ILLINOIS COUNTY OF KANE RESOLUTION NO. 13- 235 APPROVING LOCAL AGENCY AGREEMENT FOR THE JURISDICTIONAL TRANSFER OF ANDERSON ROAD FROM ILLINOIS ROUTE 38 TO PRAIRIE VALLEY STREET FROM THE VILLAGE OF ELBURN TO THE COUNTY OF KANE WHEREAS, the Illinois Constitution of 1970, Article VII , Section 10 and the Illinois Compiled Statutes (5 IL9S 220/1 et seq.) authorizes the Village of Elburn (Village), the County of Kane (County) and the State of Illinois, acting through its Department of Transportation (lOOT) iO cooperate in the performance of their respective duties and responsibilities by contracts and other agreements; and WHEREAS, the Village has exclusive jurisdiction over Anderson Road and desires to transfer exclusive jurisdiction of Anderson Road from Illinois Route 38 to Prairie Valley Street in its entirety to the County under the terms and conditions as set forth in the Local Agency Agreement for Jurisdictional Transfer (a copy of which is on file with the Kane County Clerk); and WHEREAS, the County and the Village by County Board Resolution No.
    [Show full text]
  • Village of Mundelein
    M U N DEL E I N FOR B U S I NESS. FOR L I FE. 35 MILES NORTHWEST OF CHICAGO EASY ACCESS TO DOWNTOWN CHICAGO AND THREE AIRPORTS W E LCOME T O M UNDE L EIN, I LLI NOI S — VILLAGE OF BUSINE SS MINDE D … F O R W ARD THI NKI N G MUNDELEIN INCORPORATED 1909 The Village of Mundelein, a vibrant and progressive community of nearly 32,000 residents, AN AWARD WINNING has a rather simple approach to economic development—we are on YOUR team and we COMMUNITY are committed to doing everything we can to help your business succeed. Mundelein is situated in the center of beautiful Lake County, Illinois—one of the strongest areas GOVERNOR’S HOMETOWN of commercial and industrial growth in the nation, with excellent housing, recreational, AWARD WINNER educational, and business opportunities. TOP 100 SAFEST CITIES IN AMERICA—RANKED 38 Mundelein is a full-service community with municipal services second to none. The Village provides fire and police protection, water delivery, wastewater treatment, building RECIPIENT NEW URBANISM inspection, engineering design and inspection, street maintenance, and economic CNU MERIT AWARD FOR MASTER REDEVELOPMENT development assistance. Each department’s highest priority is providing exceptional IMPLEMENTATION PLAN customer service. Plus, Mundelein’s award-winning schools, Park and Recreation programs and library services offer residents numerous leisure, recreational, and enrichment options. CALEA ACCREDITED— THE GOLD STANDARD IN PUBLIC If you are seeking assistance relocating or expanding your business, we can answer SAFETY ACCREDITATION your questions and offer advice in the areas of economic development, site selection, MUNDELEIN PARK AND engineering, finance, demographics, construction, and marketing, to name just a few.
    [Show full text]
  • THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY Administration Building 2700 Ogden Avenue Downers Grove, Illinois 60515 Governor Br
    THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY Administration Building 2700 Ogden Avenue Downers Grove, Illinois 60515 Governor Bruce Rauner Director Joseph N. Gomez Secretary Randall Blankenhorn Director David Gonzalez Director James Banks Director Craig B. Johnson Director Corey B.Brooks Director Nick Sauer Director Earl S. Dotson, Jr. Director James Sweeney Pursuant to the requirements of the Authority’s By-Laws, Notice is hereby given of the Regular Board Meeting of the Authority to be held on Wednesday, March 23, 2016 at 9:00 a.m. in the Boardroom of the Administration Building in Downers Grove, Illinois. Robert J. Schillerstrom, Chairman This meeting will be accessible to individuals with disabilities in compliance with Executive Order #5, and pertinent state and federal laws, upon notification of anticipated attendance. Persons with disabilities planning to attend and needing accommodations should contact the Americans with Disabilities Act Coordinator of The Illinois State Toll Highway Authority at (630) 241-6800, Ext. 1010 in advance of the meeting at 2700 Ogden Avenue, Downers Grove, IL, to inform of their anticipated attendance. There will be live feed Webcasting of the Board Meeting while in session. A video file will be available five business days after the meeting at www.illinoistollway.com. THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY Administration Building 2700 Ogden, Downers Grove, IL 60515 BOARD OF DIRECTORS MEETING AGENDA March 23, 2016 9:00 a.m. 1.0 CALL TO ORDER / PLEDGE OF ALLEGIANCE 2.0 ROLL CALL 3.0 PUBLIC COMMENT 4.0 CHAIRMAN 1. Approval of the Minutes of the Regular Board of Directors Meeting held February 25, 2016.
    [Show full text]
  • Weekend Closures for Byrne Flyover Work Start Friday
    State of Illinois Bruce Rauner, Governor Illinois Department of Transportation Randall S. Blankenhorn, Secretary FOR IMMEDIATE RELEASE: CONTACT: August 20, 2015 Guy Tridgell 312.793.4199 Weekend Closures for Byrne Flyover Work Start Friday CHICAGO – The Illinois Department of Transportation today reminded motorists that four weekends of lane closures on the expressway system surrounding the Jane Byrne Interchange in Chicago will begin this Friday. “We have worked closely with the City of Chicago to make sure these upcoming weekends run as smoothly as possible,” said Illinois Transportation Secretary Randy Blankenhorn. “We wish to stress that Chicago remains open for business and people should continue to enjoy all the city has to offer. But they do need to plan accordingly, account for some longer travel times and should strongly consider taking alternate routes or public transportation, especially if they are driving during the overnight hours.” The closures are necessary for the installation of steel beams that will support the deck of the new flyover bridge linking the inbound Dan Ryan Expressway (westbound Interstate 90/94) to the outbound Eisenhower Expressway (westbound Interstate 290), part of the larger overhaul of the Jane Byrne Interchange. To stage and store equipment and materials, the inbound Kennedy Expressway (eastbound Interstate 90/94) ramp to inbound Congress Parkway closed Wednesday night and will remain closed until Aug. 31. A detour route is posted utilizing the Roosevelt Road exit, Jefferson Street, Harrison Street and Wells Street to connect with Congress Parkway. Over the next two weekends, the following ramps and lanes will be closed, weather permitting: Aug.
    [Show full text]