MIXED-USE REDEVELOPMENT LAND in an OPPORTUNITY ZONE 1230 West 200 South - Salt Lake City, Utah

Total Page:16

File Type:pdf, Size:1020Kb

MIXED-USE REDEVELOPMENT LAND in an OPPORTUNITY ZONE 1230 West 200 South - Salt Lake City, Utah DEVELOPMENT OFFERING CBD and Periphery MIXED-USE REDEVELOPMENT LAND IN AN OPPORTUNITY ZONE 1230 West 200 South - Salt Lake City, Utah HIGHLIGHTS INCLUDE: This offering provides the ability to acquire MIXED-USE REDEVELOPMENT LAND IN AN OPPORTUNITY ZONE in Salt • Registered Opportunity Zone Property Lake City, Utah consisting of 15.36 acres. The site represents one of the few remaining development opportunities near downtown • TSA-UN-T Zoning (Urban Neighborhood Station) supports and is centrally located to the city’s key demand generators. mixed-use development including multi-family, office, retail, and hotel, and encourages density up to 60 feet in height PROPERTY INFORMATION • Severe lack of remaining land development opportunities surrounding downtown Parcel Sizes: #15-02-103-001: 12.27 acres #15-02-103-002: 0.16 acres • Centrally located between the CBD (8 minute drive), Salt #15-02-103-003: 0.16 acres Lake City International Airport (10 minute drive), and #15-02-104-001: 2.45 acres significant-sized employers in the immediate area #15-03-233-017: 0.32 acres Total: 15.36 acres • Highly visible from the I-80 Freeway; unparalleled access to the I-80, I-15 and I-215 Freeways, along with North Temple, Zoning: TSA-UN-T (Transit Station Area Redwood Road, and 200 South major corridors District - Urban Neighborhood Station, Transition) • Part of an upcoming Transit-Oriented Development Asking Price: $20,000,000 ($29.89 psf) • Intermodal Hub 1 mile to the East offers public transportation via TRAX Light Rail and FrontRunner high-speed commuter train The opportunity to acquire land near Salt Lake City’s Downtown is an exceptionally rare occurrence. This MIXED- • Adjacent, newly-constructed Pedestrian Bridge connects USE REDEVELOPMENT LAND IN AN OPPORTUNITY ZONE directly to TRAX Light Rail stop 0.6 miles to the North will expand the city’s urban core, as the area’s access via public transportation pioneers new boundaries. • Situated along the Jordan River Parkway Trail, a 40+ mile heavily-trafficked path suitable for year-round activity Exclusively Kip Paul Rhett Bue Jorgi Paul Marketed by Vice Chairman - Investment Sales Director - Investment Sales Associate - Investment Sales 801-303-5555 801-303-5416 801-303-5570 [email protected] [email protected] [email protected] MIXED-USE REDEVELOPMENT LAND IN AN OPPORTUNITY ZONE TRAX Red Line State Capitol TRAX Main Line CBD and 400 South Periphery UTA FrontRunner High-Speed Commuter Train TRAX Green Line TRAX Blue Line 154,000 ADT Intermodal Hub 15 TRAX Green Line 80 14,000 ADT 15 193,000 ADT Poplar Grove Blvd. Future& Folsom City Creek Trail 8 Minutes to Downtown Salt Lake City North Temple Street Path to TRAX Fairpark Station Jordan River Historic Fisher Mansion & Parkway Bridge Carriage House Event Space Jord an Riv er 200 South Jordan River il ra Jordan R T iver Parkway 80 76,000 ADT 4,600 ADT 10 Minutes to Salt Lake City International Airport Imagery: Google Earth/ Landsat/Copernicus Exclusively Marketed by 170 South Main Street, Suite 1600 Kip Paul Rhett Bue Jorgi Paul Salt Lake City, Utah 84101 Vice Chairman - Investment Sales Director - Investment Sales Associate - Investment Sales Tel 801-322-2000 Fax 801-322-2040 801-303-5555 801-303-5416 801-303-5570 cushmanwakefield.com [email protected] [email protected] [email protected] ©2019 Cushman & Wakefield. All rights reserved. The information contained in this communication is strictly confidential. This information has been obtained from sources believed to be reliable but has not been verified. NO WARRANTY OR REPRESENTATION, EXPRESS OR IMPLIED, IS MADE AS TO THE CONDITION OF THE PROPERTY (OR PROPERTIES) REFERENCED HEREIN OR AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION CONTAINED HEREIN, AND SAME IS SUBMITTED SUBJECT TO ERRORS, OMISSIONS, CHANGE OF PRICE, RENTAL OR OTHER CONDITIONS, WITHDRAWAL WITHOUT NOTICE, AND TO ANY SPECIAL LISTING CONDITIONS IMPOSED BY THE PROPERTY OWNER(S). ANY PROJECTIONS, OPINIONS OR ESTIMATES ARE SUBJECT TO UNCERTAINTY AND DO NOT SIGNIFY CURRENT OR FUTURE PROPERTY PERFORMANCE. path: 1- Projects/Paul, K/1 - Flyers/1230w200s.
Recommended publications
  • Final Document Powerpoint
    ACTIVE & PUBLIC TRANSPORTATION CONNECTIVITY TEMPLE BETWEEN JORTH RDAN RIVER PARKWAY TRAIL N 1 Department of CITY & METROPOLITAN PLANNING U• THE U NIVERSITY OF UTAH Students Jordan Baker, Aaron Barlow, Tyler Cain, Kevin Cisney, John Close, Jeni Crookston, Christy Dahlberg, Annaka Egan, Brian Hoole, Christianna Johnson, Shabnam Sifat ara Khan, Isobel Lingenfelter, Steven Lizzarago, Lynn Lyons, Sharif Mahmud, Amber Mortensen, Xiaoyang Niu, Corinne Piazza, Sydney Rich, Jenna Simkins, Kathrine Skollingsberg, Instructors Ivis Garcia, Christina Oostema Brown TA’s Ian Kilpatrick, Megan Townsend Acknowledgments Access North Temple Fairpark Community Council Green Bike Jordan River Commission National Park Service NeighborWorks Poplar Grove Community Council Seven Canyon Trust SLC Bike Collective SLC Gov University Neighborhood Partners CONTENTS Executive Summary 2 Introduction 4 Methods 5 Getting to Know the West Side 6 History of the West Side 6 Socioeconomics 7 Destinations 10 Biking 16 Walking 18 Transit 26 Learning from Community Members 30 Focus Groups 30 Community Survey 33 Recommendations 35 Implementation 38 Conclusion 40 Works Cited 41 Works Referenced 42 Executive Summary This report explores active transportation connections between the Jordan River Parkway Trail and the North Temple corridor. The end goal of this project is to identify positive examples of existing connections in the area, and to identify ways to improve in places that present opportunities for good transportation infrastructure, such as signage, trails, crosswalks, and transit. In order to accomplish those goals, the class collected surveys from west side residents about their thoughts on topics such as neighborhood uses and possible changes to North Temple and the Jordan River Parkway Trail. Those survey results were combined with information collected from six focus groups comprised of approximately 18 residents of west side communities.
    [Show full text]
  • Board of Trustees of the Utah Transit Authority
    Regular Meeting of the Board of Trustees of the Utah Transit Authority Wednesday, July 22, 2020, 9:00 a.m. Remote Electronic Meeting – No Anchor Location – Live-Stream at https://www.youtube.com/results?search_query=utaride NOTICE OF SPECIAL MEETING CIRCUMSTANCES DUE TO COVID-19 PANDEMIC: In keeping with recommendations of Federal, State, and Local authorities to limit public gatherings in order to control the continuing spread of COVID-19, and in accordance with Utah Governor Gary Herbert’s Executive Order on March 18, 2020 suspending some requirements of the Utah Open and Public Meetings Act, the UTA Board of Trustees will make the following adjustments to our normal meeting procedures. • All members of the Board of Trustees and meeting presenters will participate electronically via phone or video conference. • Public Comment will not be taken during the meeting but may be submitted through the means listed below. Comments submitted before 4:00 p.m. on Tuesday, July 21st will be distributed to board members prior to the meeting: o online at https://www.rideuta.com/Board-of-Trustees o via email at [email protected] o by telephone at 801-743-3882 option 5 (801-RideUTA option 5) – specify that your comment is for the board meeting. • Meeting proceedings may be viewed remotely through YouTube live-streaming. https://www.youtube.com/results?search_query=utaride 1. Call to Order & Opening Remarks Chair Carlton Christensen 2. Safety First Minute Sheldon Shaw 3. Consent Chair Carlton Christensen a. Approval of July 15, 2020 Board Meeting Minutes 4. Agency Report Carolyn Gonot 5. August 2020 Change Day Service Plan Approval Mary DeLoretto, Laura Hanson 6.
    [Show full text]
  • North Temple Boulevard Plan
    Viaduct Transfer Station 800 West Station Fairpark Station Cornell Station 1950 West / 2200 West Station Adopted August 10, 2010 Prepared by the Salt Lake City Planning Division Department of Community & Economic Development NORTH TEMPLE BOULEVARD PLAN Table of Contents Introduction 2 Viaduct Transfer Station Area 22 800 West Station Area 45 Fairpark Station Area 70 Cornell Station Area 88 1950 West / 2200 West Station Areas 108 Anonymous comment from one of the North Temple Boulevard public workshops North Temple Boulevard Plan . Introduction 1 Introduction The Street: Historic Context Over time, the commercial uses extended further west to form a North Temple originally developed as a residential street served continuous commercial street between the Airport and by a trolley line with City Creek running down the middle of the Downtown. For decades, North Temple was the primary street road. This pattern continued to about 1000 West through the to and from the Airport and points west. Once Interstate 80 was first half of the 1900s. Once the Salt Lake International Airport complete, motorists could bypass North Temple and the street was built and automobile use became more widespread, North carried less traffic. With the construction of the Airport Light Temple transformed into an auto‐oriented street, lined with Rail line, North Temple will be transformed again, this time into a commercial uses that were designed to appeal to motorists. mixed use, multi‐modal boulevard that unites neighborhoods and becomes the main street for the community. Today: The street is dominated by the automobile. What is the next stage in the life of North Temple? 1900s: North Temple as a residential street , with City Creek running down the middle.
    [Show full text]
  • TRAX GREEN LINE Light Rail Time Schedule & Line Route
    TRAX GREEN LINE light rail time schedule & line map TRAX GREEN LINE To Airport View In Website Mode The TRAX GREEN LINE light rail line (To Airport) has 2 routes. For regular weekdays, their operation hours are: (1) To Airport: 5:02 AM - 10:17 PM (2) To West Valley: 4:52 AM - 11:14 PM Use the Moovit App to ƒnd the closest TRAX GREEN LINE light rail station near you and ƒnd out when is the next TRAX GREEN LINE light rail arriving. Direction: To Airport TRAX GREEN LINE light rail Time Schedule 19 stops To Airport Route Timetable: VIEW LINE SCHEDULE Sunday 5:53 AM - 7:08 PM Monday 4:50 AM - 10:20 PM West Valley Central Station Tuesday 4:50 AM - 10:20 PM Decker Lake Station 3100 South, West Valley City Wednesday 5:02 AM - 10:17 PM Redwood Junction Station Thursday 5:02 AM - 10:17 PM 2698 S Redwood Rd, West Valley City Friday 5:02 AM - 10:17 PM River Trail Station Saturday 5:53 AM - 10:38 PM 1070 West, West Valley City Jordan River Service Center Relief UT 201 East, South Salt Lake TRAX GREEN LINE light rail Info Central Pointe Station Direction: To Airport Stops: 19 Ballpark Station Trip Duration: 47 min 208 W Lucy Ave, Salt Lake City Line Summary: West Valley Central Station, Decker Lake Station, Redwood Junction Station, River Trail 900 South Station Station, Jordan River Service Center Relief, Central 833 S 200 W, Salt Lake City Pointe Station, Ballpark Station, 900 South Station, Courthouse Station, Gallivan Plaza Station, City Courthouse Station Center Station, Temple Square Station, Arena Main Street, Salt Lake City Station, North Temple Bridge/Guadalupe, Jackson/Euclid Station, Fairpark Station, Power Gallivan Plaza Station Station, 1940 W.
    [Show full text]
  • Plan Proposal – South Side of North Temple /Sara Lindh
    Plan Proposal – South side of North Temple /Sara Lindh 101 General Principals Floor Space Index (FSI) is the ratio of the total floor area of buildings on a The first chapter of the south side proposal starts with general certain location divided by the total size of the land of that location. FSI recommendations for the area with motivations. The motivations are has been calculated for the proposal. The calculation has been based on a based on the research and analysis presented in the previous parts of the convenient walking distance of 400 meters/ 1300SF from the stations. thesis. The second chapter has deeper focus on different segments of the The FS index has been calculated to reach approximately 1 for the three Boulevard. stations closest to downtown. The FS index for the two stations closest to the airport is calculated to 0.2, the number is low due to the bulky Density character of airport-related businesses. Cars and the abundance of unexploited land in the West US have resulted in a very scattered development in Salt Lake City, but the spread out Walkability pattern have and high economical, social and environmental costs. Salt The placement of buildings can enhance the sense of place. The Lake is an expanding region, in order to preserve virgin land and prevent neighborhood city contains closed/semi closed blocks, which generates a further urban sprawl; future land use needs to be compact. The increased private side to the center and a public side to the street. Distinction land value is another factor that argues for denser development; it is not between private, semi private and public spaces avoids conflicts and optimal to build low intense developments on valuable land.
    [Show full text]
  • 2019 Activities and Accomplishments Report
    Activities and Accomplishments Report FISCAL YEAR 2019 FISCAL YEAR 2019 Table of Contents 1 Executive Summary The Wasatch Front Regional Council achieved several important milestones this past year and accomplished the goals and priorities adopted by the Council. 6 Goal Number One Collaboratively develop and implement the Wasatch Choice 2050 Vision for regional transportation, land use, and economic development. 19 Goal Number Two Advance transportation, land use, and economic development policy-making and projects. 30 Goal Number Three Strive for organizational excellence. PAGETABLE 2 OF CONTENTS ACTIVITIES AND ACCOMPLISHMENTS REPORT Goals and Priorities FISCAL YEAR 2019 GOALS Collaboratively develop and implement the Wasatch Choice 2050 Vision for regional transportation, land use, and economic development. Goal Number One • Adopt the 2019-2050 Regional Transportation Plan (RTP), including the Collaboratively develop and prioritization of road, transit, and active transportation projects by phase, financial implement the Wasatch constraints, and land use and development assumptions (adopt spring/summer Choice 2050 Vision for 2019). regional transportation, • Develop the 2019-2050 Utah’s Unified Transportation Plan, in collaboration land use, and economic with transportation agency partners (adopt summer/fall 2019). development. • Develop the 2020-2025 Transportation Improvement Program (TIP), compiling prioritized road, transit, and active transportation projects (adopt summer 2019). Goal Number Two • Adopt an updated regional Comprehensive
    [Show full text]
  • Mark Steel Property
    for sale - mark steel property 15 acres zoned high density multifamily near downtown salt lake city offering memorandum table of contents A. Executive Summary B. Property Overview C. Call For Offers D. Opportunity Zone E. Location Overview F. Market Overview PROPERTY ADDRESS 1230 WEST 200 SOUTH | SALT LAKE CITY, UT 84104 Table of Contents Mark steel Property executive summary Opportunities like this one don’t come along every day, especial- ly in the booming climate of Salt Lake County. The Mark Steel THE OFFERING Property is poised to be the next large multifamily development in Salt Lake City. THE MARK STEEL PROPERTY IS A RARE REDEVELOP- MENT OPPORTUNITY CONVENIENTLY LOCATED DIRECTLY BETWEEN SALT LAKE CITY AND THE SALT LAKE INTER- NATIONAL AIRPORT. IN ADDITION, A NEW PEDESTRIAN BRIDGE CONNECTS THIS PARCEL TO A LIGHT RAIL STOP IN FRONT OF THE UTAH STATE FAIR PARK. NOT OFTEN DO YOU FIND A PARCEL OF THIS SIZE ALREADY ZONED HIGH DENSITY MULTIFAMILY DEVELOPMENT. executive summary mark steel property Property overview SHERWOOD PARK ZONING DESCRIPTION: Total acres: 15.4 URBAN NEIGHBORHOOD STATION Parcels: 15-02-104-001 (2.45 acres) URBAN NEIGHBORHOOD STATION (TSA-UN): 15-03-233-017 (0.32 acres) AN EVOLVING AND FLEXIBLE DEVELOPMENT 15-02-103-001 (12.27 acres) PATTERN DEFINES AN URBAN NEIGHBORHOOD 15-02-151-002 (0.16 acres) STATION AREA. URBAN NEIGHBORHOODS 15-02-151-003 (0.16 acres) CONSIST OF MULTILEVEL BUILDINGS THAT ARE GENERALLY LOWER SCALE THAN WHAT IS Utilities: To site FOUND IN THE URBAN CENTER STATION AREA. THE DESIRED MIX OF USES WOULD INCLUDE Zoning: TSA-UN-T Urban Neighborhood Station.
    [Show full text]
  • Best Practices for Riverfront Communities a Guide for Consistent, but Flexible, Management of the Jordan River Environment
    BEST PRACTICES FOR RIVERFRONT COMMUNITIES A guide for consistent, but flexible, management of the Jordan River environment. JUNE 2013 ACKNOWLEDGMENTS JORDAN RIVER COMMISSION Mr. Ray Pickup, Workers Compensation Fund Chuck Williamson, Utah Division of Water Rights GOVERNING BOARD Mr. Michael Steele, Utah State Fairpark Doug Sakaguchi, Utah Division of Wildlife Resources Ms. Laura Ault, Division of Forestry Fire and State Lands Justin Stoker, West Jordan Mr. Richard Bay, Jordan Valley Water Conservancy District Eric McCulley, Community, Intermountain Aquatic Mayor Ralph Becker, Salt Lake City Dan Potts, Community, S alt Lake County Fish and Game Mr. John Bennett, Governor’s Office of Planning and TECHNICAL ADVISORY COMMITTEE MEMBERS Association Budget David Eckhoff, TAC Chair Karen Nichols, Community, HDR Engineering Councilwoman Rebecca Call, Saratoga Springs Lynn Larsen, TAC Vice-Chair, Salt Lake County Ty Harrison, Community, Tree Utah and GSL Audubon Rep. Rich Cunningham, Utah State Legislature Dan Boles, Draper City Tom Ward, SLC Public Utilities Councilman Bill Colbert, Draper Ken Leetham, City of North Salt Lake Adriaan Boogard, Cyommunit Commissioner Louenda Downs, Davis County Jim McNulty, City of Saratoga Springs Commissioner Larry Ellertson, Utah County Dennis Pay, City of South Salt Lake JORDAN RIVER COMMISSION STAFF Mr. Bruce Jones, Utah Transit Authority Mike Meldrum, City of Taylorsville Laura Hanson, Executive Director Councilman Irvin Jones, South Salt Lake Larry Gardner, City of Cottonwood Heights Tyler Murdock, Program and Policy Planner Mayor Ben McAdams, Salt Lake County Scott Hess, Davis County Melanie Franti, Outreach Coordinator Councilman Chris McCandless, S andy City, Phil McCraley, Salt Lake County Commission Vice Chair Marian Hubbard, Salt Lake County Produced with the assistance of a Red Butte Creek Councilman Stan Porter, North Salt Lake James Sorenson, Sandy City Mitigation Grant through the Utah Division of Water Mayor Jerry Rechtenbach, Taylorsville Steve Pastorik, West Valley City Quality.
    [Show full text]
  • 704 Light Rail Time Schedule & Line Route
    704 light rail time schedule & line map To Airport View In Website Mode The 704 light rail line (To Airport) has 2 routes. For regular weekdays, their operation hours are: (1) To Airport: 4:50 AM - 10:20 PM (2) To West Valley: 4:48 AM - 11:24 PM Use the Moovit App to ƒnd the closest 704 light rail station near you and ƒnd out when is the next 704 light rail arriving. Direction: To Airport 704 light rail Time Schedule 19 stops To Airport Route Timetable: VIEW LINE SCHEDULE Sunday 5:53 AM - 7:08 PM Monday 5:53 AM - 10:38 PM West Valley Central Station Tuesday 4:50 AM - 10:20 PM Decker Lake Station 3100 South, West Valley City Wednesday 4:50 AM - 10:20 PM Redwood Junction Station Thursday 4:50 AM - 10:20 PM 2698 S Redwood Rd, West Valley City Friday 4:50 AM - 10:20 PM River Trail Station Saturday 5:53 AM - 10:38 PM 1070 West, West Valley City Jordan River Service Center Relief UT 201 East, South Salt Lake 704 light rail Info Central Pointe Station Direction: To Airport Stops: 19 Ballpark Station Trip Duration: 47 min 208 W Lucy Ave, Salt Lake City Line Summary: West Valley Central Station, Decker Lake Station, Redwood Junction Station, River Trail 900 South Station Station, Jordan River Service Center Relief, Central 833 S 200 W, Salt Lake City Pointe Station, Ballpark Station, 900 South Station, Courthouse Station, Gallivan Plaza Station, City Courthouse Station Center Station, Temple Square Station, Arena Main Street, Salt Lake City Station, North Temple Bridge/Guadalupe, Jackson/Euclid Station, Fairpark Station, Power Gallivan Plaza Station Station, 1940 W.
    [Show full text]
  • April 2017 Introduction
    April 2017 Introduction The Regional Arts & Culture Council (RACC) established the Design Team Roster as an on-line resource that can be used by anyone seeking an artist for a project – community groups, business or property owners, schools, architecture firms, private developers or other public art programs. The Roster provides a pool of highly qualified artists, and increases the efficiency of the selection process. The intent of the roster is to provide users a range of artistic styles from which to select an artist that fits the needs of a particular project -- creating an art plan for a site; collaborating on early design along with having a budget to create artwork(s); identifying opportunities for other artists to provide design elements within the construction budget and/or complemented with public art funds; or, for creating a distinctive artwork for a site. These artist have demonstrated skills, experience and interest in commissioned projects. As you review this roster, please read the artists’ statement and view details of up to three past projects to get a feel for their work. You are strongly encouraged to visit the artists’ websites and social media outlets to further explore their practice. Please note that there are two different PDF versions you can view/download with the larger PDF containing artists’ resumes. Questions? Contact Public Art Managers: Kristin Calhoun [email protected] | 503.823.5101 Peggy Kendellen [email protected] | 503.823.4196 Cover artists clockwise from upper left: Anne Marie Karlsen, Lawndale, CA, 2008; Adam Kuby, Aberdeen, WA, 2013; Norie Sato, San Francisco, CA, 2011; Napoleon Jones-Henderson, Bruce C.
    [Show full text]
  • UTA Route Key 20202.Xlsx
    Current UTA Routes July 2020 Route # Type Route Name Key Destinations Served or Notes 2 Fixed 200 South Salt Lake Central Station, Downtown SLC, University of Utah. Sponsored service with SLC 2X Fixed 200 South Express Salt Lake Central Station, University of Utah. Currently Suspended 3 Fixed 3rd Avenue North Temple Station, Downtown SLC, University of Utah, VA Hospital, Research Park, This is the Place State Park 4 Fixed 400 South/Foothill Drive Poplar Grove, Downtown SLC, University of Utah, VA Hospital, 3900 S/Wasatch Blvd Park 'n' Ride 6 Fixed 6th Avenue Salt Lake Central Station, Downtown SLC, LDS Hospital, University of Utah 9 Fixed 900 South Poplar Grove, Glendale, University of Utah. Sponsored service with SLC 11 Fixed 11th Avenue Salt Lake Central Station, Downtown SLC, LDS Hospital, University of Utah 17 Fixed 1700 South Central Pointe Station, SLCC‐South City, University of Utah 21 Fixed 2100 South‐2100 East Central Pointe Station, Sugar House, University of Utah. Sponsored service with SLC 33 Fixed 3300 South West Valley Central Station, Millcreek Station, 3900 S/Wasatch Blvd Park 'n' Ride 35 Fixed 3500 South West Valley Central Station, Magna 35M Fixed MAX‐3500 South West Valley Central Station, Magna. Currently suspended 39 Fixed 3900 South West Valley Central Station, SLCC‐Redwood, Meadowbrook Station, Granite Peaks Learning Center, 3900 S/Wasatch Blvd Park 'n' Ride 41 Fixed 4100 South West Valley Central Station, Hunter HS 45 Fixed 4500 South Murray Central Station, Holladay Town Center, 3900 S/Wasatch Blvd Park 'n' Ride
    [Show full text]
  • Extensions of Remarks E1913 EXTENSIONS of REMARKS
    July 24, 2009 CONGRESSIONAL RECORD — Extensions of Remarks E1913 EXTENSIONS OF REMARKS EARMARK DECLARATION Authority’s Schuyler Hem Bridge Replacement Cucamonga, with its non-federal partners, is and SR–47 Expressway project. The Schuyler providing 70% of the total cost of the project HON. DANA ROHRABACHER Heim Bridge Replacement and SR–47 Ex- as a local match through the following funding OF CALIFORNIA pressway project is one of the leading regional sources: $9,800,000 from the City of Rancho IN THE HOUSE OF REPRESENTATIVES transportation projects affecting goods move- Cucamonga Development Impact Fees; Thursday, July 23, 2009 ment in Southern California. The project is a $6,200,000 from the Rancho Cucamonga Re- joint partnership between the Alameda Cor- development Agency; $9,800,000 from San Mr. ROHRABACHER. Madam Speaker, pur- ridor Transportation Authority (ACTA) and the Bernardino County Measure I Sales Tax, and suant to the requirements of the Republican California Department of Transportation $4,600,000 from the City of Fontana. Conference of the House, I am submitting the (Caltrans) to replace the State’s seismically Requesting Member: Congressman DAVID following information regarding earmarks I re- deficient Commodore Heim Bridge over DREIER ceived, which were included in the reported Cerritos Channel and add a four lane elevated version of H.R. 3288, the ‘‘Transportation, roadway to by-pass intersections and railroad Bill Number: H.R. 3288, the Transportation, Housing and Urban Development and Related crossings. The project will replace one of the Housing and Urban Development Appropria- Agencies Appropriations Act of 2010.’’ seismically deficient bridges listed on the De- tions Bill for Fiscal Year 2010 Requesting Member: Congressman DANA partment of Transportation’s list of structurally Account: Buses and Bus Facilities ROHRABACHER (CA–46) deficient bridges.
    [Show full text]