Heat Health in Hong Kong Learning from the 1St Global Forum on Heat and Health
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
SUMMARY ACCREDITATION REPORT Nursing Services
SUMMARY ACCREDITATION REPORT Nursing Services Department, Hospital Authority Head Office Learning Programme Re-accreditation Higher Diploma in Nursing MARCH 2018 - 1 - 1. TERMS OF REFERENCE 1.1 Based on the Service Agreement (No.: VA790), the Hong Kong Council for Accreditation of Academic and Vocational Qualifications (HKCAAVQ), in the capacity of the Accreditation Authority as provided for under the Accreditation of Academic and Vocational Qualifications Ordinance (Cap 592) (hereafter Ordinance), was commissioned by the Nursing Services Department, Hospital Authority Head Office (Operator) to conduct a Learning Programme Re-accreditation Exercise with the following Terms of Reference: (a) To conduct an accreditation test as provided for in the Ordinance to determine whether the programme of the Nursing Services Department, Hospital Authority Head Office (the Operator) meets the stated objectives and QF standard and can continue to be offered as an accredited programme (i) Higher Diploma in Nursing (b) To issue to the Operator an accreditation report setting out the results of the determination in relation to (a) by HKCAAVQ. 1.2 The accreditation exercise was conducted according to the relevant accreditation guidelines referred to in the Service Agreement. The Education Bureau’s “Updated Revised Common Descriptors for Associate Degree and Higher Diploma Programmes under the New Academic Structure” was also a guiding document used by the Panel and the Operator in conducting this exercise for the Higher Diploma programme. 2. HKCAAVQ’S DETERMINATION Learning Programme Re-accreditation 2.1 HKCAAVQ has determined that the Higher Diploma in Nursing meets the stated objectives and QF standard at Level 4, and can be offered as an accredited programme with a validity period from 01 September 2018 to 30 September 2020. -
Experimental Use of a Weather Buoy in Wind
Reprint 893 Wind Data Collected by a Fixed-wing Aircraft in the Vicinity of a Typhoon over the South China Coastal Waters P.W. Chan & K.K. Hon The 29 th Conference on Hurricanes and Tropical Meteorology, 10-14 May 2010, Tucson, Arizona, USA Wind data collected by a fixed-wing aircraft in the vicinity of a typhoon over the south China coastal waters P.W. Chan * and K.K. Hon Hong Kong Observatory, Hong Kong, China Abstract: east of Hong Kong, GFS conducted a SAR operation near the typhoon. The J41 aircraft equipped with The fixed-wing aircraft of Government Flying Service AIMMS-20 flied within 100 km from the centre of of the Hong Kong Government has recently equipped Molave. At that time, the horizontal wind and with an upgraded meteorological measuring system. pressure measurements from AIMMS20 were Besides search and rescue (SAR) missions, this checked to be normal. This SAR operation provided aircraft is also used for windshear and turbulence valuable observations about the typhoon that could investigation flights at the Hong Kong International not be achieved with the conventional meteorological Airport. In a SAR operation in July 2009, the aircraft measurements (including both in situ and remote flew close to the eye of Typhoon Molave, when it was sensing measurements) available in the region. In located at about 200 km to the east of Hong Kong particular, the 20-Hz wind data could be used to over the south China coastal waters. The aircraft calculate the wind spectrum and turbulence intensity provided valuable information about the winds in such as eddy dissipation rate (EDR) at various association with Molave. -
New HKETO Director to Promote Hong Kong in ASEAN Countries
HONG KONG ECONOMIC & TRADE OFFICE • SINGAPORE FilesFiles FEBRUARY 2002 ISSUE • MITA (P) 297/09/2001 New HKETO Director to promote Hong Kong in ASEAN countries THE Hong Kong Economic and Trade rule of law, a clean and accountable Office (HKETO) would strive to its administration, the free flow of captial, uttermost to maintain and foster the close information and ideas, a level playing tie between Hong Kong and ASEAN field would continue to provide the countries in trade, business and culture, basis of Hong Kong’s success in the Mr Rex Chang, Director of HKETO in future. While Hong Kong’s strategic Singapore, said at a welcoming reception location with China as its hinterland, in January. low and simple taxes, world- class Mr Chang said, “ ASEAN, taken as a transport and communication group, is Hong Kong’s third largest infrastructure, concentration of top market for domestic exports, re-exports flight financial and business service and source of imports. It is also the Mr Rex Chang, Director of Hong Kong Economic providers had all worked out to make fourth largest trading partner of Hong and Trade Office, addressing at the reception. Hong Kong the Asia’s World City. Kong. Five of the ASEAN countries, Over 200 guests including diplomats, namely Singapore, Malaysia, Thailand, enhance the understanding of Hong government officials, senior business the Philippines and Indonesia, are Kong in the region. Mr Chang added that executives and representatives from the among the top 20 trading partners of Hong Kong welcomed more investment media and community organisations Hong Kong.” from the region. -
Information of the Mobile Apps of B/Ds Available for Download by the Public (As of End-April 2019)
Annex A Information of the mobile apps of B/Ds available for download by the public (as of end-April 2019) B/D Name Annual Recurrent Cost Total Number (Approximate) of Downloads as at 30 April 2019 1. Agriculture, Fisheries Country Parks Tree $54,000 50 000 and Conservation Walks Department 2. Agriculture, Fisheries Enjoy Hiking $54,000 394 000 and Conservation Department 3. Agriculture, Fisheries Reef Check Hong $39,000 10 700 and Conservation Kong Department 4. Buildings Department Quick Guide for $65,000 12 700 MBIS/MWIS 5. Buildings Department Quick Guide for $120,000 33 000 Minor Works 6. Civil Engineering and HK Geology Maintained by deploying 22 900 Development internal resources. No Department additional expenditure is involved. 7. Civil Service Bureau Government Included in maintenance cost 600 000 Vacancies of other systems. As it is not a stand-alone project, no separate cost breakdown is available. 8. Companies Registry CR eFiling Included in the maintenance 13 900 cost of the Core System of the Companies Registry. As it is not a stand-alone project, no separate cost breakdown is available. 9. Constitutional and A Basic Law Quiz A $77,000 65 000 Mainland Affairs Bureau Day 10. Correctional Services Hong Kong Maintained by deploying 19 300 Department Correctional Services internal resources. Department Mobile No additional expenditure is App involved. 11. Customs and Excise HK Car First $45,000 19 400 Department Registration Tax 12. Department of Health CookSmart: $35,000 49 000 (Central Health EatSmart Recipes Education Unit) 13. Department of Health EatSmart Restaurant $16,000 41 000 (Central Health Education Unit) 14. -
Report of the Steering Committee on Review of Hospital Authority
Report of the Steering Committee on Review of Hospital Authority July 2015 CONTENTS Glossary .................................................................................................................. iii Executive Summary ................................................................................................ v Chapter 1 Introduction ...................................................................................... 1 Chapter 2 Work of the Steering Committee ...................................................... 6 Chapter 3 Major Challenges Facing the Hospital Authority ............................ 9 Chapter 4 Management and Organisation Structure ....................................... 13 Chapter 5 Resource Management ................................................................... 26 Chapter 6 Staff Management .......................................................................... 42 Chapter 7 Cost Effectiveness and Service Management ................................ 59 Chapter 8 Overall Management and Control .................................................. 87 Chapter 9 Conclusion ...................................................................................... 96 Annex 1 Membership of the Steering Committee on Review of Hospital Authority ....................................................................................... 102 Annex 2 Report of the Public Engagement Programme ............................. 103 Annex 3 Clustering of Hospitals and Institutions ...................................... -
Astronomy Education in China, Hong Kong Or on This Document Please Contact the Office of Astronomy for Education ([email protected])
Astronomy Education in China, Hong Kong This overview is part of the project "Astronomy Education Worldwide" of the International Astronomical Union's Office of Astronomy for Education. More information: https://astro4edu.org/worldwide Structure of education: Usually, children start their learning in kindergartens from 3 to 6 years old. It is followed by 6-year formal education in mainstream primary education (taught in Chinese, English and Mandarin). Secondary school is compulsory for 6 years, studying all subjects for the first 3 years and registering their interested subjects (from Liberal Arts, Science and Business) as electives for the remaining 3 years. There would be Territory-wide System Assessments for P.3, P.6 and F.3 students every year for evaluating the overall learning standard of students. All twelve years of education at public schools are free of charge if studying at government and aided schools. In the final year of secondary studies, Form 6 Students need to prepare for the Hong Kong Diploma of Secondary Education (HKDSE) Examination to fulfill requirements for higher-level studies. As for Post-secondary Education, there are multiple study pathways, such as 4-year bachelor’s degree programs and 2-year sub-degree programs. For non-Chinese speaking students and foreign nationals, there are also some international schools and private schools in primary and secondary education. They will continue their further studies to overseas universities or high-level educational colleges after another public examination, such as GCE A-Level and IB Diploma (different curriculum comparing to the mainstream education). Education facilities: Hong Kong schools have typical class sizes of around 25 to 30 students, students usually would have the same timetables from primary to secondary (P.1-P.6 and F.1-F.3). -
Technical Note No
HONG KONG OBSERVATORY Technical Note No. 109 Evolution of the Tropical Cyclone Warning Systems in Hong Kong since 1884 by W.H. Lui, T.C. Lee and C.M. Shun © Hong Kong Special Administrative Region Government Published January 2018 Prepared by Hong Kong Observatory 134A Nathan Road Kowloon Hong Kong This publication is prepared and disseminated in the interest of promoting information exchange. The finding, conclusions and views contained herein are those of the authors and not necessarily those of the Hong Kong Observatory or the Government of the Hong Kong Special Administrative Region. The Government of the Hong Kong Special Administrative Region (including its servants and agents) makes no warranty, statement or representation, express or implied, with respect to the accuracy, completeness, or usefulness of the information contained herein, and in so far as permitted by law, shall not have any legal liability or responsibility (including liability for negligence) for any loss, damage, or injury (including death) which may result, whether directly or indirectly, from the supply or use of such information. Mention of product of manufacturer does not necessarily constitute or imply endorsement or recommendation. Permission to reproduce any part of this publication should be obtained through the Hong Kong Observatory. 551.515.2 i ii Abstract Soon after the establishment of the Hong Kong Observatory* in 1883, a tropical cyclone warning system was implemented as one of the main tasks of the Observatory. The signal system consisted of the non-local storm signals and the local storm signals. The non-local storm signals provided the mariners and shipmasters with the position of tropical cyclone and its direction and speed of movement. -
Windshear and Turbulence in Hong Kong
WWiinnddsshheeaarr aanndd TTuurrbbuulleennccee iinn HHoonngg KKoonngg - information for pilots Published by the Hong Kong Observatory, Hong Kong Special Administrative Region Government. 1st edition ©2002 2nd edition ©2005 3rd edition ©2010 Copyright reserved 2010. No part of this publication may be reproduced without the permission of the Director of the Hong Kong Observatory. Disclaimer The Government of the Hong Kong Special Administrative Region (including its servants and agents), the International Federation of Air Line Pilots’ Associations and The Guild of Air Pilots and Air Navigators make no warranty, statement or representation, express or implied, with respect to the accuracy, availability, completeness or usefulness of the information, contained herein, and in so far as permitted by law, shall not have any legal liability or responsibility (including liability for negligence) for any loss or damage, which may result, whether directly or indirectly, from the supply or use of such information or in reliance thereon. Foreword The Hong Kong Observatory (HKO) provides windshear and turbulence alerting service for aircraft using the Hong Kong International Airport (HKIA). This booklet aims at providing pilots and air navigators with the basic information on windshear and turbulence, their causes, and the windshear and turbulence alerting service in Hong Kong. Compared with the last edition, the present edition has incorporated in particular the latest knowledge and experience with Published by the Hong Kong Observatory, Hong Kong Special the operation of LIDAR (Light Detection And Ranging), a powerful Administrative Region Government. tool in warning windshear and turbulence under clear-air conditions. Other updated items include: aircraft flight data and 1st edition ©2002 some analyses in connection with “gentle windshear”. -
Ambulance Services in Hong Kong
Ambulance Services in Hong Kong In general, there are two types of ambulance service in Hong Kong, namely Emergency Ambulance Service (EAS) and Non-Emergency Ambulance Transfer Service (NEATS). EAS is provided for persons whose conditions require immediate pre-hospital treatment and transfer to a hospital for prompt medical attention, whereas the NEATS is provided for patients who require transport service to / from medical institution. The ambulance services are provided by the following government and non-government organizations: (1) Hong Kong Fire Services Department; (2) Auxiliary Medical Services; (3) Hospital Authority; and (4) St. John Ambulance Association. The scope of service and how to make a call Hong Kong Fire Services Department The Fire Services Department provides EAS to residents within the territory, including outlying islands. In case a person, having an emergency or injury, is unable to seek medical attention on his own, he can call the 999 Hotline or the Fire Services Communication Centre (the Centre) at 2735 3355 for EAS. If circumstances permit and his condition is not too serious, such as having rash or itching skin caused by sunburn, he should go to a hospital by other means. To enable the staff at the Centre to deploy ambulances more efficiently, a caller should provide the following information after the line has been connected: 1. What has happened (e.g. someone faints, sustains injuries or is ill); 2. Detailed location of the incident; 3. Brief description of the patient's condition (e.g. age, sex, history, symptoms, signs, seriousness of injury, number of people involved, etc); 4. -
List of Abbreviations
LIST OF ABBREVIATIONS AAHK Airport Authority Hong Kong AAIA Air Accident Investigation Authority AFCD Agriculture, Fisheries and Conservation Department AMS Auxiliary Medical Service ASC Aviation Security Committee ASD Architectural Services Department BD Buildings Department CAD Civil Aviation Department CAS Civil Aid Service CCCs Command and Control Centres CEDD Civil Engineering and Development Department CEO Chief Executive’s Office / Civil Engineering Office CESC Chief Executive Security Committee CEU Casualty Enquiry Unit CIC Combined Information Centre CS Chief Secretary for Administration DECC District Emergency Co-ordination Centre DEVB Development Bureau DH Department of Health DO District Officer DSD Drainage Services Department EDB Education Bureau EMSC Emergency Monitoring and Support Centre EMSD Electrical and Mechanical Services Department EPD Environmental Protection Department EROOHK Emergency Response Operations Outside the HKSAR ESU Emergency Support Unit ETCC Emergency Transport Coordination Centre FCC Food Control Committee FCP Forward Control Point FEHD Food and Environmental Hygiene Department FSCC Fire Services Communication Centre FSD Fire Services Department GEO Geotechnical Engineering Office GFS Government Flying Service GL Government Laboratory GLD Government Logistics Department HA Hospital Authority HAD Home Affairs Department HD Housing Department HyD Highways Department HKO Hong Kong Observatory HKPF Hong Kong Police Force HKSAR Hong Kong Special Administrative Region HQCCC Police Headquarters Command -
Harrow Hong Kong's Severe Weather Policy
Harrow International School Hong Kong: Severe Weather Procedures The rainy season in Hong Kong usually runs from April to September and in severe weather conditions, the School adheres to official public announcements from the Hong Kong Observatory and the Education Bureau. Broadcasts are usually announced on both radio and television by 6.15am and are repeated at regular and frequent intervals throughout the day. Parents are advised to take note of the following arrangements, which apply in all cases except when pupils are taking external examinations (see External Examinations below). Procedures when a signal is raised before School starts: Typhoon 1 All Early Years to Y13 classes will operate as usual. Typhoon 3 Early Years will close. Y1 to Y13 classes operate as usual unless otherwise instructed Pre-Typhoon 8 Lessons will be stopped for the entire day for all pupils and boarders will be /Typhoon 8 or supervised by onsite staff. above # Amber Rainstorm All Early Years to Y13 classes will operate as usual. Red Rainstorm # Lessons will be stopped for the entire day for all pupils and boarders will be supervised by onsite staff Black Rainstorm # Lessons will be stopped for the entire day for all pupils and boarders will be supervised by onsite staff # If a signal is raised while pupils are travelling to School, the School will be responsible for their supervision until it is safe for them to return home or until a parent or carer collects them from School. Pupils who have not left for School should stay at home. Please note that formal lessons will not be conducted, even if some pupils do come to School. -
Briefing on 10-Year Hospital Development Plan Date: 15 September 2016 Time: 2:30Pm – 4:00Pm
Briefing on 10-Year Hospital Development Plan Date: 15 September 2016 Time: 2:30pm – 4:00pm Q&A Session Preamble: Below is a record of the questions and answers given at the 10-year Hospital Development Plan briefing. However, it should be noted that final tender Terms and Conditions may vary at the time of actual tender exercise. Q1: Regarding the Conditions of Contract used by HA for the coming projects, will it be the traditional Government contract form or the New Engineering Contract (NEC) form? A1. HA first adopted NEC on their Tin Shui Wai Hospital. HA will take stock and review the lessons learnt from the usage of the NEC with the works agent Architectural Services Department (ArchSD) before deciding whether to adopt it in future. In the meantime, HA will use the Government standard contract form for the upcoming projects. Q2: With regards to the use of BIM and its nature as a collaborative tool, I am assuming that you will need to do some adaptations of the Government contract form. Will there be some adaptations of the current form to take account of BIM? A2. Yes. HA plans to amend contract clauses to reflect HA’s BIM requirements, which will be of similar form to those adopted by ArchSD where they have specified BIM usage. Interestingly, Buildings Department (BD) has recently issued a practice note* to encourage authorised persons to submit building plans in BIM form. HA requirements will go towards the same direction. Q3. Regarding the marking scheme for Route 2 (architectural lead), is there any “smaller” [specific, detailed] marking scheme? A3.