INVESTMENT POTENTIAL OF THE REPUBLIC OF LOCATION

Area TERRITORY of the region Krasnodar 7800 km2

Maykop Population 453 000 people Including Krasnodar The Black Sea THE REPUBLIC Territory almost OF ADYGEA 6000000 people

Potential consumers within a radius of 500 km 26 million people NATURAL RESOURCES

sand and construction gravel mix 191. 5 73. 5 limestone mln m3 mln m3 141 148. 8 limestone construction sand mln m3 mln m3 for sugar industry

34. 4 forest fund 6. 347 thous. clay 3 3 mineral waters mln m 337.1 thous. ha m/day

gas dolomites 38. 3 3 6. 25 3 18 470 mln m thermal waters for glass mln m thous. m3/day

51. 7 40 mln granitoids 3 building gypsum mln m tons 5. 4 3 147. 6 mln mln m tons phosphorites gypsum for cement HUMAN RESOURCES 202000 workforce size, pers. 151000 Management and economy including workers employed in the economy, pers. Agriculture and processing

IT industry

Every year nearly 5000 specialists are graduated: Legal and humanitarian sector

Public health 3700 specialists with higher education Industry and construction

workers with secondary 1300 vocational education Transport

Education and culture

Sport and tourism TRANSPORT INFRASTRUCTURE

5 federal highways R-217 А-146

М-4 М-4 “Don”

R-217 “Kavkaz”

А-160 R-217 А-146 “Krasnodar - Verkhnebakansky”

Maykop А-159 “Maykop – Guzeripl” - Caucasian А-159 state Biosphere Reserve”

А-160 “Maykop – Adygeysk - Bzedughabl - Ust-

А-159 - "

Sections of North Caucasus Railway А-159

Krasnodar “Pashkovsky” Airport INVESTMENTS

63,3% buildings (except Investments in the xed capital residential ones) $ 502 mln. and structures 34,4% machinery, equipment, vehicles 502

0,4% housing 396,85 315,48 211,18 1,9% other 2015 2016 2017 2018

Investments in the xed capital by type of economic activity, million U.S. dollars

Transportation and storage

71,92 Сonstruction

55,29 Manufacturing Real estate transactions 35,50 Trade Other economic activities 22,30 Information and Education Health and social servicesAgriculture, forestryPublic administration 17,34 communications 7,97 7,34 7,20 5,89 5,71 12,06 COMPETITIVE ADVANTAGES

The fame of a number of regional brands outside the Republic 1 (“Adygea cheese”, “Adygea salt”).

Favorable agroclimatic conditions for agriculture 2 and soil composition.

Mild climate, unique natural objects, wide variety 3 of flora and fauna.

4 Availability of recreation in Adygea (low cost of rest).

5 Provision of relatively inexpensive trained manpower.

Favorable geostrategic location of the Republic (proximity 6 of economically developed regions, in particular Krasnodar Territory, Rostov Region, Stavropol Territory).

Provision of a number of industries with own raw materials 7 (chemical, forest industry, building materials industry).

8 Unique objects of cultural heritage. TYPES OF GOVERNMENT SUPPORT AND INCENTIVES

Exemption of property tax and transport tax: Leasing a land plot without holding a tender:

Organizations implementing investment projects included in the list of major construction projects and facilities. Organizations realizing investment projects with cost over 100 Benefits are granted for up to three years. million rubles and (or) creating 30 workplaces. Leasing a land plot without holding a tender for the construction of an investment site by assigning the investment project a «large- scale» status. Organizations whose main activity is processing industry, with the exception of the food industry, implementing investment projects in excess of 100 million rubles in the presence of a special investment contract. Benefits are granted for up to five years. Support of the investment project on the principle of «one window»:

Managing companies and residents of park areas. Benefits are granted for up to seven years. Organizations implementing investment projects with cost at least 20 million rubles and creating at least 5 workplaces. Unification of the procedure for interaction of investors with executive bodies of the governmental authority of the Republic of Reduced Corporate Income Tax rate: Adygea, shortening of the time for conducting preparatory, permitting procedures for the implementation of the investment project.

Managing companies and residents of park areas. The rate of the Corporate Income Tax allocated to the local budget is reduced to 13,5 %. TERRITORY FOR YOUR DEVELOPMENT

Possible directions of development: 67 investment sites (1 463, 8 ha)

8 sites for construction of residential complexes (8.7 hectares) Education Public Health

35 industrial sites (416.2 hectares)

8 tourist and recreational Trade and sites (726.8 hectares) Tourist and Agro-industrial recreational branch sector logistics

17 agricultural sites (312.1 ha)

Industry (timber processing, 2 business incubators agricultural machinery, equipment for tourism “Green” energy (73, 2 ha) and resorts) CREATION OF CHEMICAL COMPLEX FOR NATURAL GAS PROCESSING

S Total area: 46, 9 ha Site Category: land of industry,energy, transport, communications and other Chekhrak special purpose, republic property. Electric power: PTL (35 kV), consumed by 2 MW, at the distance of 7 km. It is possible to provide electricity due to its own cogeneration. Gas supply: high pressure gas pipeline at the distance of 3.2 km. 5 km away there is a natural gas preparation factory of LLC "Yuzhgazenerdzhy" (residents of the gas supply park will be provided with 18% discount) design and estimate for gas pipeline to the site is developed. Water supply: water supply is planned at the expense of water intake of surface waters from Chekhrak River and groundwaters.

Chekhrak 1,5 km from the highway “Maykop-” 10 km from the highway “Krasnodar - Labinsk” 7 km from the railway station “Koshekhabl” 8 km from the railway station “Dondukovskaya” 14 km from the railway station “Kurganinsk” Krasnodar “Pashkovsky” Airport is 200 km away

The port of is 293 km away INDUSTRIAL PARK “TEUCHEZHSKY”

Total area: 45, 6 ha. S Adygeisk Electric power: Site Category: land of industry 10 mW, Category II (connection point М-4 K on the territory of the site. o energy, transport, communications munisticheskaya Street and other special purposes, private property. Gas supply: 1.5 million m 3per year (available within the boundaries of the site). Heating: 5, 4 MW (central heating М-4 from its own gas boiler).

Water supply: Karusel 75 m3 / day (own well within the boundaries of the site. There are purification facilities on the territory of the site). Pyatyorochka М-4 Federal highway M-4 “Don” Perekrestok (Moscow - Voronezh - Rostov-on-Don - Krasnodar - Novorossiysk) Highway R-251 ( - Krasnodar - Kropotkin - Armavir) 15 km to Krasnodar. М-4 6 km to the railway station “Psekups”. Krasnodar “Pashkovsky” Airport is 10 km away. INDUSTRIAL PARK “MAYKOPSKY”

S Total area: 18, 1 ha. Site Category: lands of settlements (land of locality). To accommodate industrial park, municipal property.

Electric power: possible due to the capacity of the substation “North” 110/35/10-6 kV at a distance of 0.8 km. Gas supply: high pressure gas pipeline at a distance of 0.3 km.

Water supply: 10 m3 per day in 300 meters.

Shovgenova Street Water disposal: 10 m3 per day in 300 meters. 1 km from the federal highway A-160 “Maykop - Adygeisk - Bzhedughabl - Ust-Labinsk - Korenovsk” 2 km from the federal highway R-217 “Kavkaz” 2 km from the railway station “Maykop” Stroitelej Street

Reducer plant Krasnodar “Pashkovsky” Airport is 120 km away. «ZAREM» The port of Novorossiysk is 263 km away.

Shovgenova Street TOURIST AND RECREATIONAL PARK “DZHENET”

Electric power: 2 substations - 1 MW each. Gas supply: high pressure gas pipeline at a distance of 5 km, Water supply: water supply is planned at the expense of water intake of surface waters А-159 from Belaya River and groundwates. In immediate proximity

Belaya to the regional road: “Maykop - Hajokh - Guzeripl”.

Bzikha 20 km. from the railway station “Hajokh”. 70 km. from the railway station “Belorechenskaya”. distance to the Black Sea S Total area: 701 ha. Bzikha А-159 coast - 160 km. Belaya Site category: lands of especially protected Krasnodar “Pashkovsky” areas and of recreational use, republic property. Airport iis 150 km away. It is located in immediate proximity to cultural and historical sights and nature monuments. Khamyshki Design and estimate А-159 documentation for the road have been developed. CREATION OF PROCESSING CROPS PRODUCTION COMPLEX

Gas supply: There is the connection to the gas pipeline network. The limit of natural gas consumption is 5.7 million cubic meters / year. Water supply: from 2 own artesian wells with the debit of 25 cubic meters / hour each. Drainage: there are own sewage treatment plants with the capacity of 1400 cubic meters / day.

Heat supply: own boiler house with the total steam capacity of 64 tons / hour. 4 boilers DE-16-14 GM are designed and installed. Fuel type: main - natural gas; backup - fuel oil.

Own motorway adjacent to the federal highway M-4 "Don" (Moscow - Voronezh - Rostov-on-Don - Krasnodar - Novorossiysk).

Total area: 49 hectares 6 km - to the railway station "Psekups"; S 25 km - to the railway station "Krasnodar-sorting". Site category: Lands for industry, energy, transport, communications, broadcasting, television - for industrial Pashkovskiy Airport in Krasnodar - 10 km away. zone, private property. Electricity: Port of - 150 km. Centralized at the site, electric substation 110/35/10 kV The port of Novorossiysk - 170 km. with approach of high voltage line 110-35 kV. CREATION OF INDUSTRIAL PARK «YABLONOVSKIY»

Electricity: total planned park power consumption is 48 mW, Category II (connection point for residents on the site).

Gas supply: total planned consumption is 98.795 thousand tons / year Krasnodar (86.4 million m3 / year) (connection point for residents is on the site). Water supply:

Yablonovskiy organization of own water intake - 44 thousand m3 / year - own well within the boundaries of the site (connection point for residents is on the site). А-146 INDUSTRIALINDUSTRIAL Water disposal: AARKRK construction on the territory of own sewage treatment P plants, separate household and storm sewers (connection point for residents is on the site).

100 m to the federal highway A-146 "Krasnodar-Verkhnebakanskiy»

1.5 km to the railway terminal unloading station "Enem 1". S Total area: 364 hectares Pashkovskiy Airport in Krasnodar - 30 km. Site category: Lands for settlements - for agricultural activities. It is planned to transfer into lands for settlements - for industrial use. The port of Novorossiysk - 148 km. CREATION OF A FAMILY LEISURE CENTER

Electricity: centralized on the site, three transformer substations Veterans str. allowed power of 2,980 kW.

Gas supply: possible from the existing input of the high-pressure gas A FAMILY LEISURE pipeline with 89 mm diameter. The gas pressure at the CENTE connection point is 0.3 MPa. There is a gas distribution station.

Water supply: centralized at the site, current volumes - 31 m3 / h, distance to the water supply system - 15 m.

Water disposal:

Gogol str. centralized on the site, distance to the sewage system is 15 m.

Zhukovskogo str. Kurgannaya str. 1 km from the federal highway A-160 “Maykop - Adygeisk - Bzhedugkhabl – Ust-Labinsk – Korenovsk”;

2 km from the federal highway R – 217 «Caucasus";

1 km from the railway station "Maykop". S Total area: 2.3 hectares

Site category: lands of settlements. Pashkovskiy Airport in Krasnodar - 120 km. OUR INVESTORS

Leroy Merlin Ikea METRO Kia Motors trade trade trade trade

Bemholding Volma Decathlon production of polypropylene production trade bags of building materials

Silgan Metal Packaging Yuzhgazenergy production of metal cans and lids extraction and processing of natural gas CONTACT INFORMATION

Ministry of Economic Development and Trade of the Republic of Adygea

385000, Republic of Adygea, https://investra.ru Maykop, Pionerskaya Street, 199 http://investinadygea.ru 8 (8772) 52-22-30 E-mail: [email protected]