The United Republic of Tanzania Ministry of Works, Transport and Communication

Total Page:16

File Type:pdf, Size:1020Kb

The United Republic of Tanzania Ministry of Works, Transport and Communication THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION Program DAR ES SALAAM BUS RAPID TRANSIT (BRT) SYSTEM PROJECT – PHASE 2 Project name: Constuction of Dar es salaam Bus Rapid Transit (BRT) Infrasructure – Phase 2, Lot 1: Roads Works ( 20.3KM ) including two Flyover and 29 Bus stations Along Kilwa Road ( From CBD- Kariakoo to Mbagala ) Country TANZANIA Tender No. AE/001/2017-2018/HQ/W/98 Construction of 20.3 km of roads and non motorized Scope of Contract lanes on the periphery of the motor lanes, together with associated storm water sewer system: 1 Kilwa road from Mbagala to Bandari roundabout – 11.3km; 2 Bandari – Gerezani road from Bandari roundabout to Kamata junction – 1.3km; 3 Sokoine Drive from Gerezani roundabout to Zanzibar ferry terminal – 1.4km; 4 Changombe / Kawawa roads from a roundabout along Kilwa road to Magomeni junction along Morogoro road – 6.3km; 5 Construction of 29 bus stations along the roads; 6 Construction of 2 flyovers of width 24m and length 150m each; 7 Costruction of Pedestrian Bridge (pedestrian flyover) 8 Solar street lighting; 9 Solar traffic signals at intersections; and 10 Widening of existing cross drainage structures. Evaluation Currency Tanzania Shillings (TZS) Duration of Contract 36 months Awarded Bidder Bidder Name M/s Sinohydro Corporation Limited No.11 Address No.22, Chegongzhuang West Road, Haidian District, Beijing 100048, CHINA. Bid Price at bid opening Option A: TZS 223,892,774,123.34; Option B: TZS 226,918,845,797.52 Evaluated Bid Price (in evaluation Option A: TZS 160,307,417,887.30; Option B: Currency) TZS 159,703,017,745.86 Contract Price (in evaluation Currency) Option B: TZS 223,531,865,717.61 1 Evaluated Bidders Bidder No.1 Name M/s China Gezhouba Group Co.Ltd Address Tower F,Ocean International Center,208 Ciyunsi Beili,Chaoyang, District,Beijing (100025), CHINA Bid Price at bid opening Option A: TZS 480,996,285,480.00; Option B: TZS 490,937,604,107.00 Evaluated Bid Price (in evaluation Option A TZS 348,567,690,462.00; Option B Currency) TZS 355,860,922,381.00 Bidder No.2 Name M/s China Wu Yi Co.Ltd Address P.O. Box 1940. Dar Es Salaam, TANZANIA Bid Price at bid opening Option A: TZS 314,757,123,143.57; Option B: TZS 315,446,748,580.21 Evaluated Bid Price (in evaluation Option A: TZS 219,786,481,844.89; Option B: Currency) TZS 220,277,035,009.63 Bidder No.3 Name M/s Larsen and Toubro Ltd Landmark ‘B’ Ground Floor, 3rd,5th & 6th Floors Address Suren Road off.Andheri Kurla Road Andheri (E), Mumbai – 400 093, INDIA Bid Price at bid opening Option A: TZS 447,230,499,617.88; Option B: TZS 459,430,080,291.33 Evaluated Bid Price (in evaluation Option A: TZS 299,545,519,990.42; Option B: Currency) TZS 307,825,378,921.57 Bidder No.4 Name M/s China State Construction Engineering Corporation Address Hou Baozhu, CHINA Bid Price at bid opening Option A: TZS 270,957,459,053.00; Option B: TZS 268,764,866,856.00 Evaluated Bid Price (in evaluation Option A: TZS 299,383,690,968.28; Option B: Currency) TZS 195,218,198,104.00 Bidder No.5 Name M/S China Geo -Engineering Corporation Address P. O. Box 76459, Dar es Salaam, TANZANIA Bid Price bid opening Option A: TZS 303,322,587,710.00; Option B: TZS 303,734,480,076.00 Evaluated Bid Price (in evaluation Currency) Option A: TZS 218,314,375,982.80; Option B: TZS 218,612,693,649.70 Bidder No.6 Name M/s Odebrecht Engineering and Construction international S. A Address Ground Floor 369 kilwa House, Toure Drive, oyster bay kinondoni, P.O.Box 23197, Dar es salaam, TANZANIA Bid Price bid opening Option A: TZS 578,875,217,128.60; Option B: TZS 584,838,607,421.60 Evaluated Bid price (in evaluation Option A: TZS 423,622,400,742.86; Option B: TZS currency) 428,044,222,048.10 Bidder No.7 Name M/s Reynolds Construction Co.( Nig) Ltd 2 Address P.O.Box 34653, Dar es Salaam, TANZANIA Bid Price at Bid opening Option A: TZS 363,140,991,400.00; Option B: TZS 372,472,415,460.00 Evaluated Bid price (in evaluation Option A: TZS 267,644,258,409.38; Option B: currency) TZS 274,756,404,168.05 Bidder No.8 Name M/S China Henan International Cooperation Group Co. Ltd Address P. O. Box 75026, Dar es Salaam, TANZANIA Bid Price at bid opening Option A: TZS 274,406,985,360.20; Option B: TZS 239,166,666,666.00 Evaluated Bid price (in evaluation r currency) Option A: TZS 177,582,817,137.23; Option B: TZS 178,,020,513,872.00 Bidder No.9 Name M/s Sichuan Roads & Bridge Corporation Address 12#Jiuxing Avenue, Hi-Tech Development Zone, Chengdu, Post Code :610041, CHINA. Bid Price at bid opening Option A: TZS 344,254,553,097.00; Option B: TZS 346,140,392.292.00 Evaluated Bid price (in evaluation Option A: TZS 249,075,298,871.00; Option B: currency TZS 250,463,323,081.00 Bidder No.10 Name M/s China Road and Bridge Corporation Address Zhonglu Plaza,C88,Andingmenwai Dajie, Beijing, CHINA Bid Price at bid opening Option A: TZS 260,474,908,432.00; Option B: TZS 260,264,846,449.00 Evaluated Bid price (in evaluation Option A: TZS 187,928,361,212.93; Option B: currency TZS 187,773,664,017.81 Bidder No.12 Name M/s CCECC – CR15G Joint Venture Address P.O. Box 4083, Dar es salaam, TANZANIA. Bid Price at bid opening Option A: TZS 246,553,270,345.54; Option B: TZS 244,478,973,279.68 Evaluated Bid price (in evaluation Option A: TZS 177,478,177,301.00; Option B: TZS currency 175,955,950,931.00 Bidder No.13 Name M/s Zhejiang Communication Construction Group Co. Ltd Address Qianjiag Building, No.2031, Jiangling Road, Binjiang District,Hangzhou, CHINA. Bid Price at bid opening Option A: TZS 280,883,205,430.00; Option B: TZS 290,649,751,410.00 Evaluated Bid price (in evaluation Option A: TZS 201,998,878,561.58; Option B: TZS currency 209,173,725,200.46 3 Bidder No. 14 Name M/S China Railway Seventh Group Co .Ltd Address P.O. Box 23480, Dar es salaam. TANZANIA. Bid Price at bid opening Option A: TZS 226,839,135,695.06; Option B: TZS 224,720,263,438.07 Evaluated Bid price (in evaluation Option A: TZS 162,116,031,268.00; Option B: TZS currency 160,562,192,908.00 Rejected/Non –responsive Bidder Bidder No.15 Name M/s Mota Engil Engenharia E.Construction Africa Address SOUTH AFRICA Bid Price at bid opening Option A: TZS 433,174,466,420.57; Option B: TZS 451,072,626,338.02 Reason for rejection The Bid was not accompanied by Bid security - the Bidder submitted a letter indicating that the Bid Security will be submitted after bid opening. THE CHIEF EXECUTIVE TANZANIA NATIONAL ROADS AGENCY 4 .
Recommended publications
  • The Top 225 Global Contractors
    The Top 225 International Contractors The Top 225 Global Contractors August 18, 2008 This annual issue ranks the 225 largest construction contracting firms from around the world. It also ranks the largest firms in a wide variety of market sectors and geographic markets: Building, Manufacturing, Power, Water, Industrial/Petroleum, Transportation, Hazardous Waste, Sewer/Waste and Telecommunications. In addition, readers will get insights from executives of these top firms about the markets and issues affecting the industry around the world. This and other ENR survey issues are used as reference tools throughout the industry. Companies are ranked according to construction revenue generated in 2007 in US$ millions. Main story: "Prices Soar in a Boom Market" Tables - The 2008 Top 225 International Contractors based on Contracting Revenue from Projects Outside Home Country (with description about how to use the tables) - The 2008 Top 225 Global Contractors based on Total Firm Contracting Revenue (with descriptions about how to use the tables) - The 2008 Top 225 At a Glance: Volume, Profitability, Professional Staff, Backlog, Market Analysis, International Regions - Top 10 by Market: Building, Manufacturing, Power, Water, Transportation, Hazardous Waste, Sewer/Waste, Telecommunications - Top 20 Non-US Firms in International Construction Management/Program Management Fees - Top 20 Non-US in Total CM/PM Fees - Top 10 By Region: Middle East, Asia, Africa, Latin America/Caribbean, Europe, U.S., Canada - How the Top 225 International Contractors Shared the 2007 Market - Where to Find The Top 225 International Contractors - Where to Find The Top 225 Global Contractors Web Only Supplements: "Subsidiaries By Rank"-includes in-depth listings of each firm's subsidiaries "Where the 2008 Top 225 Contractors Worked"-lists the countries in which these firms had work or offices during 2007.
    [Show full text]
  • 2016 Top 250 International Contractors – Subsidiaries by Rank Rank Company Subsidiary Rank Company Subsidiary
    Overview p. 38 // International Market Analysis p. 38 // Past Decade’s International Contracting Revenue p. 38 // International Region Analysis p. 39 // 2015 Revenue Breakdown p. 39 // 2015 New Contracts p. 39 // Domestic Staff Hiring p. 39 // International Staff Hiring p. 39 // Profit-Lossp. 40 // 2015 Backlog p. 40 // Top 10 by Region p. 40 // Top 10 by Market p. 41 // Top 20 Non-U.S. International Construction/Program Managers p. 42 // Top 20 Non-U.S. Global Construction/Program Managers p. 42 // VINCI Builds a War Memorial p. 43 // How Contractors Shared the 2015 Market p. 44 // How To Read the Tables p. 44 // Top 250 International Contractors List p. 45 // International Contractors Index p. 50 // Top 250 Global Contractors List p. 53 // Global Contractors Index p. 58 THE FALCON EMERGES Turkey’s Polimeks is building the NUMBER 40 $2.3-billion Ashgabot International Airport in Turkmenistan. The terminal shape is based on a raptor species. PHOTO COURTESY OF POLIMAEKS INSAATTAAHUT VE SAN TIC. AS TIC. VE SAN OF POLIMAEKS INSAATTAAHUT PHOTO COURTESY International Contractors Seeking Stable Markets Political and economic uncertainty in several regions have global firms looking for markets that are reliable and safe By Peter Reina and Gary J. Tulacz enr.com August 22/29, 2016 ENR 37 0829_Top250_Cover_1.indd 37 8/22/16 3:52 PM THE TOP 250 INTERNATIONAL CONTRACTORS 27.9% Transportation $139,563.9 22.9% Petroleum 21.4% Int’l Market Analysis $114,383.2 Buildings $106,839.6 (Measured $ millions) 10.8% Power $54,134.5 6.0% Other 2.2% 4.1% $29,805.5 0.8% Manufacturing Industrial Telecom $10,808.9 $20,615.7 $ 4,050.5 2.8% 0.2% 1.0% Water Hazardous Sewer/Waste $13,876.8 Waste $4,956.0 $1,210.5 SOURCE: ENR DATA.
    [Show full text]
  • Paving the Road to Recovery As Global Construction Rebounds, Contractors Eye Infrastructure Spending As a Chance to Grow Revenue
    Overview p. 48 // International Market Analysis p. 48 // International Region Analysis p. 49 // 2020 Revenue Breakdown p. 49 2020 New Contracts p. 49 // Domestic Staff Hiring p. 49 // International Staff Hiring p. 49 // Top 10 by Region p. 50 Top 10 by Market p. 51 // Top 20 Non-U.S. International Construction/Program Managers p. 52 // Top 20 Non-U.S. Global Construction/Program Managers p. 52 // Profit-Lossp. 53 // Total Backlog p. 53 // Past Decade’s International Contractor Revenue p. 53 // How Contractors Shared the 2020 Market p. 54 // How To Read the Tables p. 55 // Hochtief's Highway Expansion p. 55 // Top 250 International Contractors List p. 57 // International Contractors Index p. 62 // Top 250 Global Contractors List p. 63 // Global Contractors Index p. 68 NUMBER 170 NUMBER TUNNEL VISION ICM SpA is contractor for the A26 Linzer Autobahn project in Austria, which includes construction of junction tunnels and a cable-stayed bridge. PHOTO COURTESY OF ICM SPA PHOTO COURTESY International Contractors Paving the Road to Recovery As global construction rebounds, contractors eye infrastructure spending as a chance to grow revenue. By Emell Adolphus, Peter Reina and Jonathan Keller enr.com August 16/23, 2021 ENR 47 0823_Top250_Intro.indd 47 8/17/21 6:34 PM nternational contractors on the long road to rebounding from the COVID-19 pandemic might find a shortcut to recovery in infrastructure projects, as countries ramp up spending to help build economies back to normal. While the global construction market is red hot for some firms, it is Istone cold for others as contractors deal with unpredictable project risks while readying for new growth opportunities.
    [Show full text]
  • Download the ENR Ranking
    Overview p. 34 // International Market Analysis p. 34 // Past Decade’s International Contracting Revenue p. 34 // International Region Analysis p. 35 // 2019 Revenue Breakdown p. 35 // 2019 New Contracts p. 35 // Domestic Staff Hiring p. 35 International Staff Hiring p. 35 // Profit-Loss p. 36 // 2019 Backlog p. 36 // Top 10 by Region p. 36 // Top 10 by Market p. 37 Top 20 Non-U.S. International Construction/Program Managers p. 38 // Top 20 Non-U.S. Global Construction/Program Managers p. 38 // Larsen & Toubro Ltd. Installs Massive Fusion Equipment p. 39 // How Contractors Shared the 2019 Market p. 40 // How To Read the Tables p. 40 // Top 250 International Contractors List p. 41 // International Contractors Index p. 46 // Top 250 Global Contractors List p. 47 // Global Contractors Index p. 52 CONNECTIONS China Communications 4 NUMBER Construction Group Ltd. is building the $500-million, 7,887-ft cable-stayed bridge connecting the Pelješac Peninsula with Croatia’s mainland. PHOTO COURTESY OF CHINA COMMUNICATIONS CONSTRUCTION GROUP LTD. GROUP CONSTRUCTION COMMUNICATIONS CHINA OF COURTESY PHOTO International Contractors Struggling With COVID-19 Rocked by the worldwide pandemic and plunging oil prices, the global construction market attempts to cope. By Gary J. Tulacz & Peter Reina enr.com August 17/24, 2020 ENR 33 0824_Top250_Intro_3.indd 33 8/18/20 5:44 PM 31.0% Transportation THE TOP 250 INTERNATIONAL CONTRACTORS $146,582.3 26.1% Buildings $123,456.9 Int’l Market Analysis 15.0% Petroleum $70,934.4 (2019 revenue measured in millions) 10.3% Power $48,556.6 5.6% Other 2.3% 3.4% $26,447.9 1.7% Manufacturing Industrial Telecom $10,822.1 $16,048.1 $7,842.1 % 0.1% 1.7% 2.9 Hazardous Sewer/Waste Water Waste $7,948.7 $13,904.0 $525.0 SOURCE: ENR Comparing the Past Decade’s International $383.7 $453.0 $511.1 $544.0 $521.6 $501.1 $468.1 $482.4 $487.3 $473.1 Contractor Revenue 2010* 2011* 2012 2013 2014 2015 2016 2017 2018 2019 (in $ billions) * Figures for 2010-2011 represent the Top 225 International Contractors before ENR expanded the list to 250.
    [Show full text]
  • The China Analyst 战略 采购 投资 中国分析家 Strategy • Sourcing • Investment a Knowledge Tool by the BEIJING AXIS for Executives with a China Agenda January 2010
    The China Analyst 战略 采购 投资 中国分析家 Strategy • Sourcing • Investment A knowledge tool by THE BEIJING AXIS for executives with a China agenda January 2010 China Marches on... FeaturesF FightingFighting forfor Trade:Trade: ChinaChina andand thethe ThreatThreat ofof ProtectionismProt 6 Rare Earths: China’s Contribution to Modern Technology 9 FOCAC: A Win-Win Formula for Sino-African Relations? 12 Regulars Macroeconomic Monitor 16 China Sourcing Strategy 26 China Capital: Inbound and Outbound M&A, Markets and Finance 32 Regional Focus: China-Africa 43 Regional Focus: China-Australia 48 Regional Focus: China-Latin America 52 Regional Focus: China-Russia 56 flickr / mt33 Sixty years ago today, the Chinese people finally won the great victory in the Chinese revolution… Today, a socialist China that is oriented to modernisation, to the world, and to the future is standing toweringly in the eastern world. Looking forward to the future, the prospect of China’s development is infinitely bright. Chinese President Hu Jintao addressing the Chinese people on the 60th anniversary of the People’s Republic of China, 1 October 2009 At the Highest Level China has recovered from the financial crisis-induced slowdown in better shape than ever, with solid pros- pects for 2010. With the stimulus of government investment, China’s economy left the financial crisis in its wake to march on past 8% GDP growth in 2009. Now, poised to become the world’s second-biggest econ- omy, China is readying itself for the challenges of 2010 and the next stage of its relentless rise. t the start of the second decade of nomic recovery in the last year is only half of the story.
    [Show full text]
  • Working in a Tough Market the International Construction Market Has Been Sluggish, and Often Unforgiving, but Many Firms Still Are Finding Surprising Success
    General Building p. 66 // Transportation p. 68 // Manufacturing, Industrial Process and Telecommunications p. 70 // Power p. 72 Petrochemical p. 74 // Water, Sewer and Hazardous Waste p. 76 // Global Firms Market Overview p. 78 // International Contractor Market Analysis p. 78 // How the Top 250 International Contractors Shared the Market p. 78 // The Top 10 International Contractors by Region p. 79 // Top 250 Reporting Profit-Loss p. 79 // Top 250 Total Backlog p. 79 // International Design Firms Market Analysis p. 80 // How the Top 225 International Design Firms Shared the Market p. 80 // The Top 10 International Design Firms by Region p. 81 // Petroleum Market Begins to Rebound p. 81 // Number of Firms Reporting Total Backlog in the Top 225 p. 81 How To Read the Tables p. 82 // The Top 225 International Design Firms List p. 83 // The Top 150 Global Design Firms List p. 88 The Top 250 International Contractors List p. 91 // The Top 250 Global Contractors List p. 96 HEALTH CARE U.S.-based HKS and SSH of Bahrain designed the planned 792-bed, 6.3-million-sq-ft Kuwait Children’s Hospital, which will be the largest children’s hospital of its kind in the world. NUMBER 81 & 121 81 NUMBER PHOTO COURTESY OF SSH PHOTO COURTESY Working in a Tough Market The international construction market has been sluggish, and often unforgiving, but many firms still are finding surprising success. enr.com December 16, 2019 ENR SOURCEBOOK 65 1216_GSB_Intro_3.indd 65 12/10/19 5:42 PM SOURCEBOOK GENERAL BUILDING Australia Major Hospital Expansion CPB Contractors, part of Hochtief’s CIMIC Group, recently began con- struction of the $431-million Camp- belltown Hospital Redevelopment Stage 2 project near Sydney.
    [Show full text]
  • THE TOP 225 INTERNATIONAL CONTRACTORS the Top 225 International Contractors Webhead to Come
    THE TOP 225 INTERNATIONAL CONTRACTORS The Top 225 International Contractors Webhead to come STRABAG SE broke through on its tunnel boring on May 13, 2011, on the 6.3-mile #08 water tunnel under Niagara Falls, Ontario, for Ontario Power Generation. With Traditionally Strong Markets in Decline, Firms Look to Break Through in New Regions By Peter Reina and Gar y Tulacz The international contracting community has been enduring diffi cult economic headwinds during the past three years. However, even as the U.S. continues to fi ght off the prospect of a double-dip recession and European nations pull back from stimulus programs to stabilize the troubled euro, opportunities are bubbling for international contractors in developing countries, particularly those rich in resources. T H E TOP 225 INTERNATIONAL CONTRACTORS 4 6 Overview 4 8 Top 10 by region 51 How to read the tables 4 6 Market analysis 48 Backlog analysis 53 The Top 225 International 4 6 Hiring 4 9 Top 10 by market Contractors 5 8 4 7 International regions 5 0 Top Global CM/PM fi rms Index of International Contractors 61 4 7 Analysis of past decade 5 1 How the Top 225 International The Top 225 Global Contractors 6 6 47 Profi t/loss analysis Contractors shared the 2010 market Index of Global Contractors PHOTO COURTESY OF STRABAG OF COURTESY PHOTO enr.com August 29, 2011 ENR 45 ENR08292011TL_Top225Opener.indd 45 8/22/11 7:15:48 PM THE TOP 225 INTERNATIONAL CONTRACTORS General Building Transportation Market Analysis 83,026.4 (21.6%) 109,007.2 (28.4%) Petroleum 89,320.8 (23.3%) Industrial Power Other 20,948.0 (5.5%) 38,598.1 (10.1%) 15,749.3 (4.1%) Sewer Waste 6,389.3 (1.7%) Manufacturing 4652.6 (1.2%) Water 12,380.8 (3.2%) Hazardous Waste 630.2 (0.2%) Telecom 2,959.6 (0.8%) (Measured $ millions) Source: McGraw-Hill Construction Reasearch & Analytics/ENR.
    [Show full text]
  • The Belt and Road Initiative in East Africa Davids Etyang
    The Belt and Road Initiative in East Africa Davids Etyang Mapping Trade Union Context and Possibilities to Organize BWI Building and Wood Workers’ International www.bwint.org BWI is the Global Union Federation grouping free and democratic unions with members in the Building, Building Materials, Wood, Forestry and Allied sectors. BWI brings together around 334 trade unions representing around 12 million members in 130 countries. The Headquarters is in Geneva, Switzerland while the Regional Offices are in Panama, Malaysia, and South Africa. Our mission is to defend and advance workers’ rights, and to improve working and living conditions in our sectors. The BWI, above all, has a rights-based approach. We believe that trade union rights are human rights and are based on equality, solidarity and democracy, and that trade unions are indispensable to good governance. BWI goals include 1) to promote and defend human and trade union rights; 2) to increase trade union strength; 3) to promote a stable and high level of employment in our sectors; and 4) to influence policy and strengthen the capacity of institutions and tripartite structures in our sectors. ©2019 Building and Wood Workers’ International (BWI). Parts of this publication may be excerpted or cited as long as the source is acknowledged. All photos used herein are from BWI photo collection. About the author Davids Etyang has more than 12 years of experience as a social economist and researcher in the trade union (labour) movement; His focus areas include Governance, Accountability and Human and Trade union rights campaigner; Social Security and protection; Gender and Women empowerment; International Labour Affairs; Environment Management and Green Jobs advocate; and Conflict Resolution and Peace Building.
    [Show full text]
  • 2017 Chinese Enterprises in Kenya Social Responsibility Report
    携手共创未来 2017 共圆发展梦想 肯尼亚中资企业 March towards Development, 社会责任报告 Together for a Shared Future 2017 Chinese Enterprises in Kenya Social Responsibility Report 肯尼亚中国经贸协会 Kenya China Economic and Trade Association Download the 2017 Chinese Enterprises in Kenya Social Responsibility Report 支持:中国驻肯尼亚大使馆 http://ke2.mofcom.gov.cn/17en.pdf Supported by: Embassy of the People's Republic of China in the Republic of Kenya Preface March towards Development, Together for a Shared Future China's friendship with Kenya dates back to more than 600 years ago, when Zheng He, the great navigator of the Ming Dynasty, arrived in Kenya’s Malindi during the fourth voyage of his Treasure Fleet. In 1963, China was the fourth country in the world to recognize Kenya’s independence and establish diplomatic relations with Kenya, two days after Kenya’s declaration of independence. In 2013, President Xi Jinping and President Uhuru Kenyatta jointly announced the initiation of the China-Kenya Comprehensive Cooperative Partnership, setting a clear course for the long-term development of the bilateral relationship between the two countries. As bilateral relationship develops at accelerating speed, the political trust, economic and trade cooperation, and cultural exchanges between China and Kenya have all made new progresses. The bilateral relationship between China and Kenya has entered a new phase of its history, with concrete progresses in the fields of infrastructure, energy, high-tech, youth employment and entrepreneurship, etc. In May 2017, President Xi Liu Xianfa, Jinping and President Uhuru Kenyatta jointly declared to further upgrade bilateral Chinese Ambassador to Kenya relations to the China-Kenya Comprehensive Strategic Partnership, reaching a new height of smooth bilateral relations.
    [Show full text]
  • ENR's 2015 Top 250 International Contractors
    ENR’s 2015 Top 250 International Contractors RANK 2015/2014 FIRM 1/1 ACS, Actividades de Construccion y Servicios SA, Madrid, Spain 2/2 HOCHTIEF Aktiengesellschaft, Essen, Germany 3/3 Bechtel, San Francisco, Calif., U.S.A. 4/4 VINCI, Rueil-Malmaison Cedex, France 5/9 China Communications Construction Grp. Ltd., Beijing, China 6/10 TECHNIP, Paris, France 7/7 BOUYGUES SA, Paris Cedex 08, France 8/8 Skanska AB, Stockholm, Sweden 9/6 STRABAG SE, Vienna, Austria 10/11 Saipem, San Donato Milanese, Italy 11/23 Power Construction Corp. of China, Beijing, China 12/5 Fluor Corp., Irving, Texas, U.S.A. 13/12 Construtora Norberto Odebrecht SA, Sao Paulo, SP, Brazil 14/13 Hyundai Engineering & Construction Co. Ltd., Seoul, S. Korea 15/14 Ferrovial, Madrid, Spain 16/17 Samsung C&T Corp., Seoul, S. Korea 17/20 China State Construction Eng'g Corp. Ltd., Beijing, China 18/** Ozturk Holding Co., Istanbul, Turkey 19/18 Royal BAM Group nv, Bunnik, The Netherlands 20/19 Abeinsa SA, Seville, Spain 第 1 页 共 50 页 RANK 2015/2014 FIRM 21/21 Petrofac Ltd., Jersey, Channel Islands, U.K. 22/24 Consolidated Contractors Group, Athens, Greece 23/28 China Railway Group Ltd., Beijing, China 24/26 CB&I, The Woodlands, Texas, U.S.A. 25/22 PCL Construction Enterprises Inc., Denver, Colo., U.S.A. 26/29 GS Engineering & Construction, Seoul, S. Korea 27/25 China Nat'l Machinery Industry Corp., Beijing, China 28/27 JGC Corp., Yokohama, Japan 29/33 CIMIC Group Ltd., St. Leonards, NSW, Australia 30/34 Salini Impregilo SpA, Milan, Italy 31/31 OHL, Madrid, Spain 32/38 Tecnicas Reunidas, Madrid, Spain 33/35 Lend Lease, Millers Point, NSW, Australia 34/30 Daelim Industrial Co.
    [Show full text]
  • Study on Quality of Bank Financed Road Projects
    Study On Quality Of Bank Financed Road Projects Transport, Urban Development & ICT Department Rights and Permissions All rights reserved. The information in this publication may be reproduced provided the source is acknowledged. Reproduction of the publication or any part thereof for commercial purposes is forbidden. The views expressed in this paper are entirely those of the author(s) and do not necessarily represent the view of the African Development Bank, its Board of Directors, or the countries they represent. Copyright © African Development Bank 2014 Department of Transport and ICT, OITC Prepared by : Richard MALINGA Transport Engineer, OITC2 Sector Manager (OIC) : Mamady SOUARE Sector Director : Amadou OUMAROU STUDY ON QUALITY OF BANK FINANCED ROAD PROJECTS FOREWORD The African Development Bank has over the years supported the Regional Member Countries in their efforts in improving accessibility and livelihoods of people, through the execution of road transport projects. We can proudly talk of the many kilometres of road improvements through maintenance interventions, rehabilitation, new construction or upgrading that we have supported across the continent. The focus has in many instances been paved (bitumi- nous) roads, but we have also supported the improvement of unpaved roads. The Bank reflected on the outputs in the road sub-sector, taking cognisance of the fact that we have promoted and supported the improvement of over 10,000 km of road in the conti- nent since 2006, with 4,000 km of these since 2010. We considered it prudent that we take stock of what we have been doing, to establish that we have not been doing the wrong thing to the detriment of the Bank’s overarching mission of sustainable development; and what do we need to do to avoid doing the wrong thing.
    [Show full text]
  • Challenges Faced by Large Chinese Firms in Adapting Total Kenya Labor Laws
    CHALLENGES FACED BY LARGE CHINESE FIRMS IN ADAPTING TOTAL KENYA LABOR LAWS YANG HONGXIAO A RESEARCH PROJECT SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE AWARD OF THE DEGREE OF MASTER OF BUSINESS ADMINISTRATION, SCHOOL OF BUSINESS, UNIVERSITY OF NAIROBI DECLARATION This research project is my original work and has not been submitted for examination to any other university. Signature……………………………………. Date……………………………….. YANG HONGXIAO D61/81483/2015 This research project has been submitted for examination with my approval as the University Supervisor. Signature……………………………………. Date……………………………….. Dr. Florence Muindi DEPARTMENT OF BUSINESS ADMINISTRATION, UNIVERSITY OF NAIROBI. ii ACKNOWLEDGEMENTS I wish to thank the Almighty God for giving me this opportunity to complete this work. I also wish to acknowledge those who took part either directly or indirectly to ensure successful completion of this project. Thanks to my Supervisor, Dr. Florence Muindi, for providing unlimited, invaluable and active guidance throughout the study. Her immense command and knowledge of the subject matter has enabled me to develop the research project. I also wish to acknowledge my Moderator, Dr. Margret Muthoni and the entire management of the School of Business, University of Nairobi for their great support. I wish to thank the library staff for providing library services. Further I wish to thank 73 large Chinese firms’ management and more so to Human Resource manager for taking their time and providing the necessary information that this study sought. Lastly, I wish to thank my classmate for their support and motivation that they bestowed to me during this programmes. iii DEDICATION This research project is dedicated to my parents and sisters for their inspiration, support, encouragement and understanding throughout my Masters Programme.
    [Show full text]