Please submit the following documents as needed or requested. (With √ must be submitted.)

Standard Raw Deadline Index Booth Booth Service Contact List...... 03 Official Construction Company List...... 05 Important Note...... 06 Comprehensive material...... 07~14 I. Exhibitors Check-In & Move-Out Schedule...... 07 II. Exhibition Schedule...... 07 III. Technical data of exhibition hall...... 08 IV. Entry management...... 08 V. Arrangement for exhibition dismantlement...... 08 Ⅵ. Form A1 - The Exhibition Catalogue of Exhibitor's Information √ √ 2018-05-15 Login Information Sheet ...... 10 Form A2 Advertisement Application Form (Catalogue)...... 11 Optional 2018-06-10 Form A3 On-Site Advertisement Application Form...... 12 Optional 2018-06-10 Form A4 Meeting/Conference Room Application Form...... 14 Exhibition Booth Instructions...... 15~44 VII. Standard Booth Instructions...... 15 1. Configuration Instructions and Size Sketch Map of Standard Booth A...... 16 2. Electronic design draft submitted by Standard Booth A...... 17 √ × 2018-06-10 3. Configuration Instructions and Size Sketch Map of Standard Booth B...... 18 VIII. Description, precautions and application procedure for Raw Booth...... 20~26 9-1: Raw Booth Instructions...... 20 9-2: Expenses related to Raw Booth...... 22 × √ 2018-06-10 9-3: Application procedures, information and precautions for Raw Booth...... 24 9-4: Measures on the violation of construction management regulations……………...... 26 Form B2 Standard Booth Reconstruction and Location of Leased Facilities………...... ….27 Form B3 Appliances Rental Form...... 29 Optional 2018-06-10 B3 Appliance Sample 1~3...... 31~33 Form B4 Application for electrical equipment...... 34 Form B5 Application for Decoration of Raw Booth...... 36 × √ Form B5-1 × √ Booth Electricity Safety Responsibility Commitment...... …38 Form B5-2 2018-06-10 × √ Booth Construction Safety Commitment...... 39 Form B6 Application for Electricity...... 40 Optional Form B7 Application for Water...... 42 Optional

1

Form B8 Application for Air Compressor………………….44 Optional IX. Notes on exhibition equipment lease...... 46 X. Demonstration of Raw Booth Blueprints...... 47~49 XI. Form C1 Digital Printing Order Form...... 50 Optional XII. Official Hotels...... 52 Optional XIII.Transportation...... 54

2

Service Contact List

Organizer Informa Yifan Exhibition Co. Ltd. Tel: +86-20-29191500 Fax: +86-20-29191501 Address: Room 1103-1104, No.996 Xin Gang East Road, Guangzhou, 510000, China

Official On-site Construction Company (Exhibit Furniture Rental Service) Exhibition Engineering Co., Ltd Address: No. 1+001, A Floor, Area A, Canfair Complex (No 382, Yuejiang Zhong Road, ) Contactor: Mr. Han, Mr. Tan, Mr. Li Tel: +86-20-89139722, 89139785, 89139720 Email: [email protected] Subordinate enterprise of China Import and Export Fair Complex Official Domestic Shipping Company (On site Forwarder) ZhuoYi Logistic Agency Co.Ltd(Guangzhou) Contactor:Mr. Shen (Hewitt) and Mr. Ou (Vincent) Mobile: +86-13609756001 ; 13725354846 Email: [email protected]; [email protected] Tel: +86-20-82274826 Fax: +86-20-82286935 Offical Email: [email protected]

Official International Shipping Company APT SHOWFREIGHT Contact: Mr. Jim Zhou、Mr. Vincent Huang Tel: +86-20-3877 6833、38776157 Fax: +86-20-3877 6157 Mobile: +86-13510480135 Email: [email protected]; [email protected]

JoyHigh Shipping Ltd. Contactor: Ms. Mina Mo Mobile:+86-139 2410 6098 Tel:+86-20-3889 1919 ext 802 Fax:+86-20-3889 1506 Web:www.joyhigh.com Email:[email protected] Adds:10/F,CentralTower,JunHuiBuilding,No.7 TiYu Road West,Guangzhou

3

Service Contact List

Official Hotels JL BEST Meeting Contact Person: Ms. Li Tel: +86-755-8288-0055/89 Email: [email protected] QQ:1472309660

Temporary employment agency (Translation service) Guangzhou YiMei Co., Ltd Contact Person: Ms. Luo Mobile: +86-18507844488 Email: [email protected] QQ: 2164223873

Digital Printing service Gimsun Limited Contact Person: Tiffany Ho、Carrie Wong Mobile:+86-13556000060、13809249003 Email :[email protected] Tel:+86-20-86351502 Fax:+86-20-86249553

Television/ Refrigerator Rental / Wine glass & Ice Cubes Services

Guangzhou Informa Yifan Exhibition Co. Ltd. Contact Person: Yannis Chen Tel: +86-20-29191509 Mobile:+86-13535441574 Email :[email protected]

4

Official Construction Company List Guangzhou CES Exhibition Decoration Ltd. Address: 5 floor, business building No.10, changliu Industrial Park, No. 20 Chigang west road. Haizhu district ,Guangzhou Contact Person: Mr. ZOU Mobile: +86-13825025838 QQ: 2355777900 Contact Person: Mr. Shen Mobile: +86-13924100728 QQ: 2355777915 Tel: 400-8873636 +86-20-87673977 Fax: +86-20-37653379 Email: [email protected] Website: www.gzces.com Enterprise Qualification: Canton Fair Special Booth Decoration Qualification Enterprise

TRIPOD EXHIBIT Address: Room 301, No.306, CheBei Road, Tianhe District, Guangzhou Contact Person: Mr. Xie Mobile: +86-13539499439/ 13286686788 QQ: 993738315 / 2382303336 Contact Person: Mrs.Chen Mobile: +86-15019270189 QQ: 1542013805 Tel: +86-20-29835058 Fax: +86-20-29835058 ext 881 Email: [email protected] Website: www.gzdingzhan.com Enterprise Qualification: Canton Fair Special Booth Decoration Qualification Enterprise

LIMU EXHIBIT Address: Room 503, South of Big Family Garden, No.159 Garden Road, HaiZhu District, Guangzhou Contact Person: Mr. Zhu Mobile:+86-13424047958 QQ:649227352 Contact Person: Mr. Fang Mobile:+86-18028625699 QQ:50906520 Tel: 86-20-34099783 Fax: 86-20-34099395 Email: [email protected] Website: http://www.gzlimu.com Enterprise Qualification: Canton Fair Special Booth Decoration Qualification Enterprise

Live Art Address: Room 508, Building A, No. 2437, XinGang East Road, Haizhu District, Guangzhou Contact Person: Mr. Cheng Mobile: +86-18602062828 QQ: 2261219513 Tel: +86-20-89232010 /89202011 Fax: +86-20-89232012 Website: www.gzliveart.com Enterprise Qualification: Canton Fair Special Booth Decoration Qualification Enterprise

TEEYOO EXPO Address: Room 201, No.2, Xincun Street, Xinzao Town, Panyu, Guangzhou Contact Person: Mrs. Wang Mobile: +86-18922190871 /13570544849 QQ: 549492331 Email: [email protected] Website: www.teeyoo.cn Enterprise Qualification: Level Ⅱof Guangzhou Exhibit Engineering Qualification

ZHANG – XING Address: Room B326, Area C, Qixing Commercial Center, No.8, HuangcunDong Road, Tianhe District, Guangzhou Contact Person: Mr. Tang Mobile: +86-13560135764 QQ:1203786172 Contact Person: Mr. Liu Mobile: +86-13527670336 QQ: 577224767 Tel: +86-20-82575895 /29130577 Fax: +86-20-82575895 Email: [email protected] Website: www.gzzxexpo.com Enterprise Qualification: Level Ⅱqualification of National Exhibit Engineering

5

Important Note Distinguished exhibitors: Welcome to participate in the exhibition sponsored/organized by Guangzhou Informa Yi Fan Exhibition Co., Ltd.! To effectively help you better complete the preparatory work for exhibition participation, we provide you with this manual (Exhibitors' Manual). Please do read it to learn service information therein. Please login in the online exhibitors' system before the designated expiration date (please refer to the relevant form and expiration date on Page 1), and fill in relevant forms, so that we can provide you with proper arrangement and thoughtful services. Do clearly learn all content hereof (exhibitors' registration, exhibition setup/dismantlement time, overtime work charging standard, administration cost during construction, construction margin, increased leasing of exhibition appliance, water/electricity/gas/expense, etc.); I. Intellectual property rights: To guarantee all exhibitors' rights and smooth implementation of this exhibition, please come with all the supporting patent documents (copies) related to exhibits for right protection in case of a patent dispute. II. Height limit specified: The public security and fire departments as well as the exhibition hall strictly require that the height limit for specially decorated single-decker booths is 4.5 meters; the height limit for specially decorated double-decker booths is 6 meters; any booths exceeding the height limit will be fined heavily. Please fully understand and actively cooperate. III. Fire safety regulation: No smoking in the exhibition hall. Exhibitors must set up booths with flame- resistant materials, and the electrical appliances used by exhibitors at the exhibition must accord with the safety standard. No open fire operations are allowed. IV. Power supply regulation: No standard electrical socket can be used for lighting fittings (like spotlights, fluorescent lamps, small suns, etc.) or connected with a power source of which the power exceeds the rated power (500W). In case the electrical socket isn't used as specified, the sponsor/main exhibition site contractor can stop supplying power in real time without refunding the payment. V. Audio-visual communication: The positions and sound volumes of audio-visual equipment must be adjusted to appropriate levels to avoid any influence on other exhibitors and audience. The exhibition organizer reserves the right to terminate the use of audio-visual equipment. VI. On-site order: To maintain the on-site order of the exhibition, exhibitors shall not distribute any material outside their booths. The sponsor and staff of the exhibition hall would confiscate all materials distributed by anybody randomly. Please cooperate with and support our work. VII. Security and insurance: Security personnel have been assigned for the whole exhibition site. Yet during the exhibition, exhibitors shall be responsible for and well guard their booths, exhibits and their staff's belongings, especially when exhibits are moved in and out of the exhibition; exhibitors shall buy proper insurance for their booths, exhibits and staff. For any risks in the exhibitors'/visitors' booths, exhibits and personal belongings, the sponsor/organizer bears no financial/legal responsibilities. Exhibitors shall buy proper insurance and third party insurance for their booths, exhibits, exhibition halls and other personnel. The time of buying insurance shall include the exhibition period as well as setup/dismantlement time. VIII. Booth use: Exhibitors shall not transfer or sublet their booth to or co-use them with other organizations or individuals in any form, and any violators identified by the sponsor would be required to clear the booth and then leave the site, with the qualification for exhibition participation canceled! In case any staff of an exhibitor privately transfer or sublet its booth to or co-use it with other organizations or individuals with unqualified products, and a dispute related to the exhibit has happened, the exhibitor originally registered shall bear the responsibility fully. IX. Material to be submitted: All exhibitors shall provide Form A1 on the Exhibition Catalogue: Company Profile (Page 6) before May 15 X. Exhibitors of bare (specially decorated) booths: Please carefully learn this manual, and provide relevant graphic material for booth setup before June 10.

6

Comprehensive material

I. Exhibitors Check-In & Move-Out Schedule June 26th - 27th , Check-In & Set-up 09∶00-17∶00 Raw space booth 2018 Move-Out June 30th , 2018 16∶00-19∶00

Check-In & Set-up June 27th, 2018 09∶00-17∶00 Standard booth Move-Out June 30th , 2018 16∶00-19∶00 Overtime notice: Overtime charge(after 17:00 the day) If exhibitors need overtime works, please apply to official construction company and pay before 16:00 the day. After 16:00 should charge 20% extra fee. The overtime works can’t be over 23: 00. Apply Before 16:00 RMB20.00/M2/3hrs Min 100M2,the Min charge is RMB2,000. the day Apply After 16:00 RMB22.00/M2/3hrs Min 100M2,the Min charge is RMB2,200. the day

Exhibitors Check-In Notice: 1. Required information when check-in: a. "Booth confirmation letter." issued by committee. b. Business license (exhibitors can send the e-copy to committee in advance) c. Valid proof of identity 2. Exhibitors Registration Center: near the entrance of every hall, please refer to the on-site signature. 3. Cargo entrance: the max size of the cargo entrance: 6.98m(W)×4.19M(H)

II. Exhibition Schedule Exhibitor Check-in June 28th , 2018 08∶30-17∶00 June 29th , 2018 09∶00-17∶00 Time: June 30th , 2018 09∶00-16∶00 Visitor Check-in June 28th -29th , 2018 09∶30-16∶30

Time: June 30th , 2018 09∶30-15∶30

7

III. Technical data of exhibition hall The height limit for single-decker booths is 4.5 meters, and the height limit Booth height for double-decker booths is 6 meters 5t/m2 on the 1st floor; 1.5t/m2 on the 2nd and Main Floor tolerance 7.6×5.3m 3rd floors entrance Brightness of Clear height of 9m, 7.8m in the local positions of both sides exhibition 200LX exhibition hall hall 1,440 Mode of power Electric 3-phase 5-wire system, 380V/220V/50HZ kilowatts/ha supply quantity ll Set based on ditches. 6 interface boxes set for each ditch; setting of each water supply and drainage interface box: One Dg15 for water supply, one Water supply Dg20, one DN20 for water drainage, one DN32 (floor type); in the remaining equipment exhibition halls, six water distribution boxes are respectively set across a ditch, with two DN20 water supply interfaces set in each of the water distribution boxes. In Area B, there are 10 freight elevators (5T), 40 escalators and 12 passenger elevators Elevator (1.35T). West-eastern air circulation has been adopted. Two rows of air distributors respectively Air conditioning 8.4m above the ground are set on the north-southern side of each distribution hall. IV. Entry management 1. During booth setup, exhibition and booth dismantlement, all personnel entering or staying in the exhibition hall must wear the corresponding certificates and hang them on their chests to voluntarily cooperate with checking by the security staff. 2. Categories of certificates for the exhibition 1) Exhibition participation certificate: Used by exhibitors' staff. 2) Visit card: Used by professional audience and buyers; obtained by providing name cards or work permits. 3) VIP certificate: Used by special guests of the exhibition. 4) Media certificate: Used by special media reporters of the exhibition; collected with the sponsor's invitation letter. 5) Work certificate: Used by the sponsor's staff. 6) Construction certificate: Used by the constructors of the contractors of Raw booths. 3. All certificates must be well kept. It is prohibited to lend them to others or bring anyone without certificate to the exhibition hall. Any violator shall be held accountable. V. Arrangement for exhibition dismantlement a) The exhibition is scheduled to be closed at 16:00 o'clock on June 30, 2018, and 16:00- 19:00 is the time for exhibition dismantlement. To keep the overall atmosphere of the exhibition and avoid any influence on other exhibitors and visitors, don't transport packing materials into the exhibition hall before the time or transport any sample exhibits out of the same; all exhibitors and contractors are prohibited to take away or dismantle exhibits in advance! Any exhibitors applying for overtime exhibition dismantlement shall come to the service center of the main exhibition site contractor to handle the procedure before 12:00 of the day. b) All exhibitors shall assign some personnel to well keep their items during exhibition 8

dismantlement. When some exhibits are transported out of the exhibition site, the Exhibit Release Pass shall be showed actively to the security personnel, and cooperate in the security personnel's checking whether the Exhibit Release Pass accords with the exhibits to be moved away. [Obtain the Exhibit Release Pass at the service counter of the sponsor] c) Exhibition props, samples, decorative materials, packing materials, etc. brought by exhibitors shall be completely cleared and moved out of the scope of the exhibition hall by exhibitors on time. d) The exhibitors having leased standard/luxurious booths shall keep such leased electrical items as lights, sockets, etc. at their booths, other than privately dismantling or moving away them. The exhibition hall will arrange electricians to check and recover them. e) The exhibitor having entrusted a transport company to move its exhibits must assign its staff to follow the sample exhibits being moved, to prevent them from being damaged, lost or moved by mistake. f) The exhibition hall's electricians will check and recover the power distribution boxes of every booth from 16:00, with their signatures on the "Power Distribution Box Deposit Sheet" as confirmation. The Raw booth contractor shall collect the power distribution box refund at the service center of the main exhibition site contractor against the deposit sheet with signature. g) After clearing the booth, the Raw booth contractor shall notify the main exhibition site's staff to check and issue the clearing certificate at the service center of the main exhibition site contractor, and go to the same to handle the procedure for construction margin refund with the original deposit sheet and clearing certificate. h) Exhibitors' exhibition dismantlement vehicles must obey the commanding and dispatch by the exhibition hall's security personnel. The drivers shall neither leave their vehicles, nor park them at all entries, exits, passages and non-designated truck parking areas in the exhibition hall for loading.

9

VI. Forms The Exhibition Catalogue of Exhibitor's Information Form A1 Login Information Sheet (Please make sure to fill in and send back this form prior to May 15, 2018, and overdue forms won’t be published.) Information provided in Form A1 will be published in the Exhibition Catalogue. In case the form is not received from the exhibitor within the deadline, the organizer will, according to what is written in the participation contract, publish the company’s contact information, “limited only to country, telephone, fax number, website and exhibition booth number”, in the Exhibition Catalogue. Notes: the organizer has the right to modify the information.

Company Name

Address

Postal Code Country Country Tel Fax code code Email

Website

Company Description

Product

Categories

Brand of Product Country of Origin

New Products Recommendation

Mainly Recommended

Products for This Exhibition

Product

Description

Please check more details on the Online Exhibitor Manual. To avoid duplication, the forms must be returned by ONLINE ONLY. 10

Advertisement Application Form Form A2 (To be sent back on demand. Deadline: June 10, 2018)

Company Name (Seal): Please send it back to the organizer: Guangzhou Informa Yi Fan Exhibition Hall No. & Booth No.: Exhibition Co., Ltd Contact: Tel: (020) 29191500 Fax: (020) 29191501 Mobile:

A. Catalogue Advertisement (please tick the appropriate box.) Apply Page Price Apply Page Price

□ Front Cover USD4, 600 □ Back cover USD3, 300 The second front The second back USD 2,000 USD 2,000 □ cover □ cover The third front Color page USD2, 100 USD1500 □ cover □ double spread Inside white and Inside color page USD1, 000 USD 500 □ □ black page 1. Size: 140mm (w)*210mm (H) 2. Electronic design draft should be sent to organizer before June 10, 2018. (CDR /JPG /TIF) 3. Design by organizer should be charged RMB700 B. Other Advertisement (please tick the appropriate box.) Electronic design draft should be sent to organizer within 5 days after confirmation. (CDR /JPG /TIF)

Specification Apply Item Price Note (mm) Exhibitor badge 5000USD/per W85H125 Color printing □ (single page) Visitor badge 8400USD/per W85H125 Color printing □ (single page) Visiting invitation 1650USD/10THS W105H210 Total 50THS □ letter(back cover) Visiting Ticket 850USD /10THS W90H210 Total 300THS □ (single page) Information bag 3400USD/5 THS W350H420 Total 30THS □ (single color printing)

11

On-Site Advertisement Application Form

Form A3 (To be sent back on demand. Deadline: June 10, 2018)

Please send it back to the organizer: Company Name (Seal):

Guangzhou Informa Yi Fan Exhibition Hall No. & Booth No.: Exhibition Co., Ltd Contact: Tel: (020) 29191500 Fax: (020) 29191501 Mobile:

Instructions:

1、 For advertising items listed in the form below, please refer to the appended list on the next page [the On-Site Advertising List].

2、 Please provide the advertising design draft (in CDR, JPG or TIF formatting) within seven days after the confirmation of the advertisement.

3、 The advertising display time is from June 28 to 30 when the exhibition will be convened, namely, from the opening till the dismantlement of the exhibition.

No. Items of Advertising Location and Quantity Net size Price

1

2

3

4

5

6

7

8

9

Application Form for Site Advertising in the Exhibition Hall

Items of Advertising Quantity Amount

12

The On-Site Advertising List

13

Meeting/Conference Room Application Form Form A4 (To be sent back on demand. Deadline: June 10, 2018)

Company Name (Seal): Please send it back to the organizer: Guangzhou Informa Yi Fan Exhibition Hall No. & Booth No.: Exhibition Co., Ltd Contact: Tel: (020) 29191500 Fax: (020) 29191501 Mobile:

1. During the exhibition, exhibitors can bid to host Conference of new products or technical seminars. Each conference will be charged management fee USD1600/45 minutes(The fees include venue rental, sound amplification equipment, projection equipment, bottled water and conference promotion service). 2. Conference room can accommodate 100-150 people (Open & Theatre Style). 3. Meeting holding period for each day:10:00-10:30,11:00-11:30,13:00-13:30,14:00-14:30, 15:00-15:30,16:00-16:30(Can make appropriate adjustments) 4. Please apply to the organizer before June 10, 2018, and to pay related fees within 3 days after confirmation. After receiving payment, organizer will make promotion for your conference. All exhibitors are welcome to organize audiences. 5. If requesting the private meeting/conference room, please contact with the organizer for more information.

Time 28th June 29th June 30th June 10:00-10:30 A G M 11:00-11:30 B H N 13:00-13:30 C I 14:00-14:30 D J 15:00-15:30 E K 16:00-16:30 F L Please select your time period according to the above-mentioned table: (Please indicate the letter) The First choice: The Second choice: The Third choice: Organizer will make arrangement subject to your selection and using status of convention area, and inform your company immediately.

Name of speaker □Sir / □Madam Position of Language speaker Lecture topic

14

Exhibition Booth Instructions VII. Standard booth instructions Notes (1) No nail, drilling or spreading is allowed on the display boards inside the booth, only single-sided adhesive and no other glue is allowed to stick pictures, and the exhibitor has to remove the single-sided adhesive before the dismantlement of the booth. (2) If the exhibitor rents two or more consecutively-arranged standard booths, the main exhibition site contractor will remove the display boards between the two booths unless as required by the exhibitor in written form. (3) For booth with two open sides, there will be display boards where it is connected with other booths and no display boards will be provided in other places (but with lintel). If there is a need to alter the booth, please notify the sponsor in written form 15 days prior to the opening of the exhibition and the alteration is free of charge. If there is a need to alter on site or add display boards, expenses will be charged according to the posted prices in the exhibition hall. (4) The exhibitor and the contractor must not alter the structure of standard booths on their own. (5) No nail or installation of any other devices is allowed on the display boards, aluminum alloy posts, the floor, the ceiling, the wall, columns and fire sprinklers. In case of any violations, compensation is required according to the cost. (6) The main exhibition site contractor has the right to locate the electric switch and the overload protection switch box in the standard booth. (7) If the exhibitor needs to rent other facilities, exhibition equipment and appliances, etc., extra fees will be charged. Please fill in the application form and submit to the main exhibition site contractor on time. Please pay the fee as required before the stipulated time. (8) For the sake of electrical safety, electrical sockets equipped in standard booths must not be used for lighting fittings (such as spotlights, fluorescent lamps, imitated solar lamps, etc.) or connected with a power source of which the power exceeds the rated power (500W). In case the electrical socket isn't used as specified, the sponsor/main exhibition site contractor has the right to cancel the usage of the electrical socket of this booth without refunding the payment. (9) If the exhibitor needs to use lighting fittings, three-phase electricity or single-phase electricity of above 500W, the rental of additional electricity boxes is required.

15

1. Configuration Instructions and Size Sketch Map of Standard Booth A

Standard Booth A (3m×3m=9m2)/each, and each booth is equipped with the following facilities: One lintel plate (two for two-open-sided booths), one consultation desk, one negotiation square table, one display cabinet, four black leather chairs, four reflector lamps (six for two-open-sided booths), display boards with three sides having light boxes (two sides having light boxes for two-open-sided booths), one dustbin, 9m2 of carpet, one 220V power socket (limited to non-illumination usage lower than 500W).

Tips from the organizer: Exhibitors who want to present their won corporate images must design pictures according to the ۞ lintel and light box size as specified in the picture below and in the next page, and deliver them to the organizer 20 days prior to the exhibition setup. No waiting after the set time. Exhibitors without the above requirements don’t have to provide pictures, and the sponsor will set ۞ up booths based on unified booth image.

16

2. Electronic design draft must be submitted by Standard Booth A Please find the following dimension and submit the electronic design draft (CDR /JPG /TIF) to organizer 20 days prior to the exhibition setup.

17

3. Configuration Instructions and Size Sketch Map of Standard Booth B

Standard Booth B (3m×6m×4.5m (H)) 18m²/each, and each booth is equipped with the following facilities: A 4.5m-high square aluminum frame, a set of lintel plate, two/four LED lamps (door head), four spotlights (rear board), two aluminum alloy consultation desks, two negotiation square tables, eight chairs, one power socket (limited to non-illumination usage lower than 500W), one/two partitions, one dustbin, and wall-to-wall carpet

Tips from the organizer: Exhibitors who want to present their won corporate images must design pictures according to the ۞ lintel and light box size as specified in the picture below and in the next page, and deliver them to the organizer 20 days prior to the exhibition setup. No waiting after the set time. Exhibitors without the above requirements don’t have to provide pictures, and the sponsor will set ۞ up booths based on unified booth image.

18

19

VIII. Description, precautions and application procedure for Raw Booth

9-1: Raw Booth instructions For exhibitors who decorate the rented Raw Booth by their own or hire other contractors to conduct special decorations, please read the following precautions in detail, fill in Form B5- B6 and submit the form to the contractor of the exhibition prior to the scheduled date. 1.The exhibitors must comply with related matters in Instructions for Booth Decoration. 2.The structures must be built within the limits set by the exhibition and their vertical projections shall not exceed beyond the limits. 3.Requirements for decoration and fire safety of booths (including double-decker booths): 1) In terms of installing a single piece of glass exceeding 3m2 at a height less than two meters, or glass of whatever area at a height above two meters, tempered glass must be used. 2) The height limit for single-decker booths is 4.5 meters, and the height limit for double- decker booths is 6 meters (If the height of the booths exceeds the limit, the exhibitors shall bear responsibilities by themselves after the investigation of on-site fire department). 3) If wood materials are used for decoration, fire retardant treatment shall be carried out using 0.5 kg fire-proof paints per square meter; if cloth materials are used for decoration and capping, there shall be an internal of 20 cm between each piece of cloth and fire retardant shall be used at 5m2/kg (8m2/kg for nylon fabric or hole fabric). 4) All building and decorative materials shall be non-flammable or flame-retardant materials. Grass rattan, paper, bark, foam, reed, bamboo, flammable plastic board (corrugated board, kt board, sunlight), combustible carpet, cloth and wood without fire retardant treatment shall not be used as building or decorative materials in the exhibition hall. 5) Heat emission holes shall be left in billboards, light boxes and lamp posts; fluorescent lamp ballasts shall be qualified products checked by fire safety and research institute. 6) Lamps in each booth such as down lights, spotlights and quartz lamps shall maintain a distance of more than 30cm from exhibits and decorations; junction boxes shall be used to prevent the exposure of wires. 7) Flammable and dangerous chemical products are forbidden in the whole exhibition hall, including volatile flammable solutions such as thinner, turpentine, alcohol and flammable gases such as lighter gas, hydrogen, oxygen. 4.Booth rear boards must be decorated to maintain the beautiful appearance of the exhibition hall. 5.Exhibits, promotional materials or other signs shall not be placed, hung up or nailed up near the pedestrian passages of the exhibition hall, stairs junctions, elevator doors, fire facilities or return air inlets of air conditioners. 6.Fire hydrants shall not be blocked and fire exits shall not be occupied. 7.The electricians and welders of exhibitors must have valid certificates or they will not be allowed to enter the hall for construction. 8.Flammable or combustible materials shall not be used for construction or decoration; materials used to build booths shall be non-combustible materials with the combustion diffusivity no 20

lower than level-2; fire equipment shall not be used for other purposes. 9.Capping of Raw booths is not advocated by the exhibition. If capping is required, suspended automatic fire extinguisher (6 kg) must be installed according to fire safety regulations; one fire extinguisher shall be installed for every 20 square meters; two shall be installed for every 20-30 square meters and so on. 10. Open fires are forbidden in the exhibition hall. If fire operations (open fires, electro welding and gas welding) are required, licenses to use fire shall be applied for to Guangzhou Municipal Fire Protection Bureau through the main exhibition site contractor of the exhibition before operation. 11. Electrical installation in the exhibition hall shall be applied for to the contractor and the implementation is only allowed under the supervision of the electricians of the exhibition after examination; the installation of power sources and electric wires without authorization is strictly forbidden. 12. Drawing of the booth shall include front view, lateral view and profile; sizes and materials shall be indicated; text description, electricity load and circuit diagrams are required. All the drawings shall be submitted to the main exhibition site contractor designated by the exhibition before the scheduled date in this manual. The main exhibition site contractor of the exhibition has the right to refuse the design drawings or require the exhibitors (Raw booth contractors) to modify the drawings. 13. Raw booths shall not block or cover the lighting boxes, power boxes or telephone boxes in the exhibition hall. 14. All construction materials and exhibits must be removed from the exhibition hall and duly handled by the exhibitors (Raw booths contractors) after the exhibition closes; extra charges are required if the materials are handled by the exhibition. 15. Without permission, construction, building or assembling are forbidden in the exhibition hall. The structure of the floors, walls, windows and doors or other parts of the building shall not be changed. Nails, screws or drilled holes are not allowed in any part of the building. Any damage caused by violation shall be borne by the responsible party. 16. Please do not use the main equipment in the exhibition hall to hold up or pull the display shelf of the booth. Objects are not allowed to hang on the fire sprinkler facilities, lamps or lanterns. The construction company shall not hang heavy objects on the grid. Once discovered, the heavy objects shall be removed immediately and the construction company will be fined. 17. Only non-residual single-sided or double-sided fabric tapes are allowed to fix carpets and other floor coverings to the concrete floor. Sticky objects are not allowed to be used on stony grounds or walls. Patterns or promotional materials with sticky backs (pasteable) are not allowed to be pasted on any part of the building. In case of any violation, the cleaning fee shall be paid by the exhibitor. 18. Please do not bring exhibition equipment and aluminum materials that are the same with or similar to those in the exhibition hall into the construction site; if above objects are required in the construction, the objects shall be examined and filed by the personnel in the property department of the exhibition hall before entry, or the exhibition hall has the right to refuse above materials during dismantlement.

21

9-2: Expenses related to Raw Booth: To strengthen the security, fire control management and construction drawings review of Raw Booths, contractors of Raw Booths, shall pay construction management fees and construction security margin according to regulations. To ensure the safety and success of the exhibition, if the exhibitors choose the Raw Booth contractors that are not designated by the exhibition, they shall be approved by the main exhibition site contractor of the exhibition before conduct constructions in the exhibition hall. Raw Booth contractors that are not designated by the exhibition shall pay the construction security margin through corporate-to-corporate telegraphic transfer ten days before arranging the exhibition and shall not transfer the deposit trough personal account; cash delivery or POS machine delivery is not accepted. (1) Construction management fee: RMB25/square meter/per exhibition period. (Only collected from Raw Booth contractors) (2) Construction security margin: (only collected from Raw Booth contractors) Below 36m2 (included) construction security margin: RMB30,000; 36m2-72m2 (included) construction security margin: RMB60,000; Above 72m2 construction security margin: RMB80,000; After the exhibition is closed and the dismantlement and cleaning are completed, Raw Booth contractors can process settlement with the original deposit sheet and the site-clearing certificate at the main exhibition site contractor's service center. If there is no illegal construction, potential safety risks, excessive height of booths, brutal dismantlement or remnants of wastes, the main exhibition site contractor of the exhibition will return the construction security margin to the Raw Booth contractors all at once (no interests) within 45 working days after the exhibition closes, otherwise fees will be deducted according to the instructions in this manual. (3) Electricity, water, gas fees: for the charging standards of electricity, water and gas fees of Raw Booths, please refer to this manual. (4) ID fee for construction personnel: RMB10/person/per exhibition period (only collected from Raw Booth contractors) (5) Parking fee a. Contractors shall apply to the exhibition hall for the "special car certificate" for their trucks and the charging standards is: RMB20/per certificate. b. Cars of participants of the exhibition will be charged by times: for cars parking for no more than 12 hours each time, the charging standards are: RMB10/time/per medium and small car; RMB20/time/per large car; RMB30/time/per ultra-large car. (6) Overtime pay If exhibitors (or Raw Booth contractors) need to extend the time of preparation or dismantlement, please go to the Contractor service center of the main exhibition site contractor to process the overtime procedure before 16:00 on the same day. If the overtime application exceeds the schedule time, the exhibition hall will not accept. For charging standards, please refer to this manual. (7) Insurance and responsibility: exhibitors must purchase public liability insurance and be responsible for people's property and personal injury in their booths. Meanwhile, exhibitors shall purchase exhibit insurance during the transportation and exhibition of exhibits and commodities. 22

The sponsor reminds all exhibitors that they have the same legal responsibility for their own employee representatives, booth contractors, sub-contractors and employees participating in the exhibition. Exhibitors are suggested to clarify the security construction responsibility of the construction site when signing the booth construction contract, examine whether the construction site has purchased public liability insurance and construction personnel insurance so as to protect their own interests. Exhibitors shall urge contractors to return the policy of insurance to the main exhibition site contractor of the exhibition before the deadline; for contractors who cannot comply with the regulations, the sponsor and the main exhibition site contractor of the exhibition have the right to refuse their entry to the exhibition hall and forbid their construction. The sum insured for any single compensation shall be no less than RMB300,000, and the total sum insured for accumulative compensation shall be no less than RMB4 million. In addition, contractors shall have effective and adequate insurance against ordinary risks such as theft, fire, property damage, accidents, natural disasters and force majeure related to contractors' personnel or property (including all equipment, fixtures, furniture, materials and other facilities provided or used in services). During the whole exhibition period (including preparation, exhibition and dismantlement), contractors must bring the insurance contract or its copy and ensure that the insurance is valid for the period. Above fees can only be paid through telegraphic transfer. Raw Booth contractors shall transfer the money to the main exhibition site contractor designated by the exhibition: Canton Fair Exhibition Design and Construction Co., Ltd. ten days before arranging the exhibition. Contractors who fail to complete the payment within the stipulated time are not allowed to enter the site to conduct constructions.

Payee: Canton Fair Exhibition Design and Construction Co., Ltd.

Bank: Bank of China Guangzhou Canton Fair Sub-branch Bank address: Guangzhou, Account: 680857744434

Main exhibition site contractor designated by the exhibition: Canton Fair Exhibition Design and Construction Co., Ltd. Address: Room 1+002, Floor A, Exhibition Area A, Canton Fair Complex, 382 Yuejiang Middle Road, Haizhu District, Guangzhou, China Contact: Mr. Han, Mr. Tan, Mr. Li Tel: 020-89139722, 89139785, 89139720 Fax: 020-89139701, 89139702 Email: [email protected]

23

9-3: Application procedures, information and precautions for Raw Booth Raw Booth contractors must design and arrange the exhibition according to regulations and submit relevant materials to the main exhibition site contractor of the exhibition as required. The main exhibition site contractor shall submit them to the fire department for approval. Please read the following items carefully: (1) Contractors shall submit the complete set of materials as required to the main exhibition site contractor of the exhibition before the deadline of June 10, 2018 (inclusive). For details, please refer to the Declaration Information List of Raw Booth. (2) All materials shall be printed or copied in A4 paper in duplicate and stamped with official seal, and then bound in a volume based on the order of Declaration Information List of Raw Booth. (3) All materials shall be originals stamped with official seal. Any unsealed copies or fax or E-mail materials will not be accepted. (4) Please submit the declaration materials before the deadline through express (paid) or in person to the main exhibition site contractor. (5) Main exhibition site contractor will send a Notice of Payment to the booth contractors who submit the complete declaration materials of Raw Booth by E-mail, and the contractors of Raw Booth shall pay the relevant fees within the stipulated time. Declaration information list of Raw Booth: (1) Booth Electricity and Deposit Declaration Form (2) Booth Construction Safety Commitment (3) Commitment of Safety Utilization of Electricity at Booth (4) Copies of Effective Operation Certificate of Electricians at Construction Company. (5) Name list of electrician on duty, operating permit number of electricians, contact telephone and other information. (6) Design renderings, floor plans, elevation plans, circuit diagrams and decoration materials. (7) Contractors of Raw Booth shall provide copies of business license and legal person identity card. (8) Copies of exhibition liability insurance and third party liability insurance policy. (Original for future reference) Requirements on drawing: (1) The proportion of drawing of the booth provided shall not be less than 1: 100. (2) No less than 2 views in color drawings. (3) At the bottom right of the drawing, the following items shall be marked: Booth number, name of exhibiting companies, booth space, total electricity consumption, maximum height, and height of back wall. Notes: (1) According to the safety regulations of the exhibition hall, the height of a single-decker Raw

24

Booth at the Area B of Canton Fair Complex shall not exceed 4.5 meters and the height of double-decker shall not exceed 6 meters. (2) Electricity application form shall be submitted before June 10, 2016, and additional charges will be collected for on-site declaration after June 10. (3) Contractors of Raw Booth shall pay the relevant fees before June 10, 2018; after the main exhibition site contractor receives the full payment, the declaration takes effect, otherwise it will be handled according to the regulations of overdue declaration. (4) Exhibitors or contractors shall install electrical equipment in accordance with the safety codes and the regulations of the exhibition hall. After entering the site, if the practical electricity consumptions of exhibitors are greater than the declared electricity consumptions, and exhibitors need to increase electricity consumption, they shall pay the additional price based on the price set at on site. (5) The collected price of electricity consumptions is the total costs during the entire exhibition; electricity consumption application shall be submitted together with the drawings of Raw Booth and filing material, otherwise it shall be deemed as invalid. If overdue, it shall be handled in accordance with overdue declaration. (6) Main exhibition site contractor have the right to refuse to accept overdue applications. (7) If the electricity consumption is not listed in the form of this manual, please contact the main exhibition site contractor.

25

9-4: Measures on the violation of construction management regulations If contractors of Raw Booth fail to comply with the rules and regulations during the construction process, they shall accept the following penalties: 一、If a contractor has any of the following circumstances, its total construction deposit shall be deducted. If such contractor is a recommended contractor, his recommended contractor qualification shall be terminated. 1. In the event of any collapse of booth, casualty, fire or other safety accidents caused as a result of violation of safety operation rules by the construction personnel during booth construction, exhibition process, hall dismantling and transportation process, the construction companies shall bear full responsibility. The construction deposit shall be deducted and all the economic losses caused to the sponsor, main exhibition site contractor and exhibition hall shall be borne by the construction companies; 2. Any serious security risks such as structural instability caused due to the failure to ensure the stable structure during the construction of the booth. 3. Advance dismantlement. II. In the event of any of the following circumstances, 50% of the deposit shall be deducted, and the construction shall be stopped immediately for rectification. 1. The height of the booth exceeds the prescribed height; 2. The area of the booth exceeds the prescribed area; 3. Display rack or booth is set up, or goods are stacked under the fire shutter of the exhibition hall; 4. The fire facilities, electrical equipment, emergency exit and the audience access in the exhibition hall are blocked; 5. The top grid rack, pillars, fence and a variety of special pipes and lines are used to hang or bundle stuff; 6. When arranging the exhibitions, the public channels are occupied for a long time to stack materials; 7. During dismantlement, the booths are pushed down or pulled down. III. A fine of more than RMB5,000 shall be imposed in case of any of the following circumstances. 1. Fail to configure the fire extinguisher as required; 2. When the back wall of the booth is higher than the adjacent booth, the construction company fails to do aesthetic treatment on their own back walls as required; 3. Use a variety of elastic cloth or other flammable materials for decoration; 4. Use non-tempered glass materials; 5. Use flammable or explosive materials; 6. Use open fire for operations without approval; 7. Use electricity in violation of electrical safety regulations; 8. Leave the rubbish in the exhibition hall after dismantlement. IV. A fine of more than RMB3,000 for each person shall be imposed in case of any of the following circumstances. 1. The security officer is not present during the construction process; 2. The electricians and other special technical personnel fail to operate with certificates; 3. Smoke in the exhibition hall. V. A fine of more than RMB1,000 for each violation shall be imposed in case of any of the following circumstances. 1. Fail to wear a helmet; 2. Fail to wear a helmet during climbing operations; 3. Fail to wear relevant certificates during construction. ------

26

Please make sure this form is submitted to the main exhibition site contractor designated by the exhibition before June 10, 2018.

Form B2 Standard Booth Reconstruction and Location of Leased Facilities Exhibition Hall No. Booth No.

Please mark booth reconstruction and location of leased facilities (exhibition appliance, water, and electrical installations) and rented shelves (specify height) on the following booth plan, including the basic and additional facilities of your company. If the booth booked is at a corner, please indicate in the plan below if side panels are required. Booth plan (scale: 1 cell = 1m2)

Rear

100W long-arm spotlight

40W fluorescent lamp Right Left

Shelves (specify height)

220V power socket

Front Tel. T

Please specify special requirements:

Note: 1.If an exhibitor fails to submit this plan, the main exhibition site contractor of the exhibition will install the aforementioned facilities for it at appropriate locations. Changes of the locations onsite require additional fees. 2.The plan of facility locations above must be submitted by exhibitors together with relevant forms by the deadline so as to be valid. 27

3. 20% additional charge is required for subscription exceeding the deadline. 50% additional charge is required for onsite subscription.

Please contact the exhibition designated main exhibition site contractor: Canton Fair Exhibition Design and Construction Co., Ltd. Room 1+002, Floor A, Exhibition Area A, Canton Fair Complex, 382 Yuejiang Address: Middle Road, Haizhu District, Guangzhou, China Contact: Mr. Han, Mr. Tan, Mr. Li Tel: 020-89139722, 89139785, 89139720 Fax: 020-89139701, 89139702

Email: [email protected]

RMB & USD Account: Beneficiary's Name: Canton Fair Exhibition Design And Construction Co. Ltd. Beneficiary's Bank: BANK OF CHINA, Guangzhou International Convention And Exhibition Center Sub- Branch Beneficiary's Address: 3.1th pearl. Promenade, Guangzhou International Convention And Exhibition Center, Guangzhou P.R. China A/C NO.: 680857744434 Swift code: BKCH CN BJ 400 REMITTANCE REMARKS: (Please indicate the Name of Exhibition, Hall No., Booth No. and Company name)

Exhibitor Name: Address: Postcode: Contact: Mobile: Email: Tel: Fax: Seal:

28

Please make sure this form is submitted to the main exhibition site contractor designated by the exhibition before June 10, 2018.

Form B3 Appliances Rental Form Exhibition Hall No. Booth No.

No. Item USD Qty. Showcase(with wooden shelves) 1000mm(L) x 500mm(W) x F1 2500mm(H) $41.00 Tall Display Counter(no lights inside) 1000mm(L) x 500mm(W) *F2 x 2500mm(H) $64.00 F3 Hanger Stand 1000mm(L) x 300mm(W) x 2500mm(H) $18.00 F4 Register Counter 1000mm(L) x 500mm(W) x 1000mm(H) $36.00 F5 Cabinet(with lock) 1000mm(L) x 500mm(W) x 750mm(H) $28.00 *F6 Short Display Counter 1000mm(L) x 500mm(W) x 1000mm(H) $64.00 High-low-combined Display Counter F7 1000mm(L) x 500mm(W) x 1000/750mm(H) $41.00 High-low-combined Display Counter F8 1000mm(L) x 500mm(W) x 750/300mm(H) $41.00 F9 Flat Shelf 1000mm(L) x 300mm(W) $7.00 F10 Inclined Shelf 1000mm(L) x 300mm(W) $9.00 F11 Aluminum Door with lock 1000 mm(L) x 2500mm(H) $18.00 F12 Pannel Board 1000mm(L) x 2500mm(H) $9.00 F13 Meeting Table 650mm(L) x 650mm(W) x 680mm(H) $20.00 *F14 Round Glass Table 400mm(R) x 800mm(H) $28.00 F15 Consultation Counter 950mm(L) x 450mm(W) x 750mm(H) $20.00 F17 Leather Folding Chair $6.00 *F18 Bar Chair $18.00 F19 Carpet per sqm $3.00 F20 Waste basket $2.00 F22 Sofa $27.00 F23 White Chair $17.00 F24 White Round Table $25.00

Total

29

Note: 1.Exhibitors shall present the locations of rental items on the Form B1. The Form B1 & B2 must be submitted by the deadline so as to be valid. 2.If an exhibitor fails to submit the Form B1, the main exhibition site contractor of the exhibition will install the aforementioned facilities for it at appropriate locations. Changes of the locations onsite require additional fees. 3.For appliances sample listed in the form below, please refer to the appended diagrams on the next page [Appliance Sample - 1~3]. 4. All the funds to be paid by exhibitors shall be remitted at least 5 days in advance before entering the site. Please do not remit in the name of an individual. The company name on the invoice issued by the contractor of the exhibition shall be consistent with the name of the remittance company and only arrange the delivery of items with confirmed fund remittance. 5. 20% additional charge is required for subscription exceeding the deadline. 50% additional charge is required for onsite subscription.

Please contact the exhibition designated main exhibition site contractor: Canton Fair Exhibition Design and Construction Co., Ltd. Room 1+002, Floor A, Exhibition Area A, Canton Fair Complex, 382 Yuejiang Address: Middle Road, Haizhu District, Guangzhou, China Contact: Mr. Han, Mr. Tan, Mr. Li Tel: 020-89139722, 89139785, 89139720 Fax: 020-89139701, 89139702

Email: [email protected]

RMB & USD Account: Beneficiary's Name: Canton Fair Exhibition Design And Construction Co. Ltd. Beneficiary's Bank: BANK OF CHINA, Guangzhou International Convention And Exhibition Center Sub- Branch Beneficiary's Address: 3.1th pearl. Promenade, Guangzhou International Convention And Exhibition Center, Guangzhou P.R. China A/C NO.: 680857744434 Swift code: BKCH CN BJ 400 REMITTANCE REMARKS: (Please indicate the Name of Exhibition, Hall No., Booth No. and Company name)

Exhibitor Name: Address: Postcode: Contact: Mobile: Email:

Tel: Fax: Seal:

30

B3 [Appliance Sample - 1.]

31

B3 [Appliance Sample - 2.]

32

B3 [Appliance Sample - 3.]

33

Please make sure this form is submitted to the main exhibition site contractor designated by the exhibition before June 10, 2018.

Form B4 Application for electrical equipment Exhibition Hall No. Booth No.

USD/Session

Unit Price Price Item Spec. Qty. USD/ Before After Apply Session Jun. 10 Jun.10 onsite Long-arm sport 16 20 25 light (100W) Fluorescent 16 20 25 Light Rental (40W) Halogen light(150W ) Only apply in 30 35 / advance Within 8 8 hours-socket hours, not for 20 25 30 Rental lighting, Max 500W IDD (RMB 500 deposit 125 150 190 for phone set and RMB 2000 for bill) Local Phone (RMB 500 deposit 125 150 188 for phone set) Broadband (RMB 1000 deposit 109 131 164 is need) Total Price

Note: 1.The installation locations of rental items should be presented on the Form B1. The Form B1 & B3 must be submitted by the deadline so as to be valid. 2.If an exhibitor fails to submit the Form B1, the main exhibition site contractor of the exhibition will install the aforementioned facilities for it at appropriate locations. Changes of the locations onsite require additional fees. 3. For the sake of safety, socket in the booth cannot be used for lighting (such as lamp, fluorescent tube, halogen, etc.) or beyond 500W. the organizer or the official contractor preserves the right to suspend the use of socket with no refund. If exhibitors need lighting, three-phase power,

34

or single-phase power above 500W additional rental of power box is required, please submit the Form B6 to apply. 4. All the funds to be paid by exhibitors shall be remitted at least 5 days in advance before entering the site. Please do not remit in the name of an individual. The company name on the invoice issued by the contractor of the exhibition shall be consistent with the name of the remittance company and only arrange the delivery of items with confirmed fund remittance. 5. 20% additional charge is required for subscription exceeding the deadline. 50% additional charge is required for onsite subscription.

Please contact the exhibition designated main exhibition site contractor: Canton Fair Exhibition Design and Construction Co., Ltd. Room 1+002, Floor A, Exhibition Area A, Canton Fair Complex, 382 Yuejiang Address: Middle Road, Haizhu District, Guangzhou, China Contact: Mr. Han, Mr. Tan, Mr. Li Tel: 020-89139722, 89139785, 89139720 Fax: 020-89139701, 89139702

Email: [email protected]

RMB & USD Account: Beneficiary's Name: Canton Fair Exhibition Design And Construction Co. Ltd. Beneficiary's Bank: BANK OF CHINA, Guangzhou International Convention And Exhibition Center Sub- Branch Beneficiary's Address: 3.1th pearl. Promenade, Guangzhou International Convention And Exhibition Center, Guangzhou P.R. China A/C NO.: 680857744434 Swift code: BKCH CN BJ 400 REMITTANCE REMARKS: (Please indicate the Name of Exhibition, Hall No., Booth No. and Company name)

Exhibitor Name: Address: Postcode: Contact: Mobile: Email:

Tel: Fax: Seal:

35

Please make sure this form is submitted to the main exhibition site contractor designated by the exhibition before June 10, 2018.

Form B5 Application for Decoration of Raw Booth Exhibition Hall No. Booth No.

Booth No. Exhibition Hall No. Space area (m2) Exhibitor Address Exhibitor Mobile phone ID No. leader Email Construction Address company Construction Mobile phone Fax manager Electrician Electrician Mobile phone Certificate No. Email

(required) Booth size Length width height mm Construction area m2 No. of floors Area of 2/F m2 Brief description of the structure of main body, component connection methods, and use of main materials: We promise that we will urge the construction company to design and construct in line with relevant national mandatory construction technical regulations and standards and requirements of Exhibition Safety Management Regulations. We will configure fire extinguishing equipment as required and ensure booth structural and construction safety during the exhibition (including preparation and dismantlement). We will assume unshirkable responsibilities for onsite life and property losses following booth collapse, Exhibitor's falling objects, and fire due to construction safety issues of the construction area, as well commitment: as consequent and corresponding responsibilities. We promise to accept the supervision and management of the relevant departments of the exhibition, earnestly implement safety guarantee and remediation measures, eliminate hidden dangers at any time, and ensure safety. Signature of the person-in-charge: Exhibitor (seal): Date: YYYY/MM/DD

We promise that, during booth construction, we will construct in conformity with relevant national mandatory construction technical regulations and standards and requirements of Exhibition Safety Management Regulations, configure fire extinguishing equipment as required, and ensure booth structural and construction safety during the exhibition (including preparation and dismantlement). We will assume Construction unshirkable responsibilities for onsite life and property losses following booth collapse, company's falling objects, and fire due to construction safety issues of the construction area, as well commitment: as all the consequent responsibilities. We promise to accept the supervision and management of the relevant departments of the exhibition, earnestly implement safety guarantee and remediation measures, timely eliminate hidden dangers, and ensure safety. Signature of the person-in-charge: Construction company (seal): Date: YYYY/MM/DD

Exhibitors who have contractors not designated by the exhibition for special construction shall fill in this form. 36

Note: 1.Exhibitors who rent a Raw Booth must apply for electricity to the main exhibition site contractor and provide detailed drawings (booth design sketch, plan and elevation, electrical plan, and power distribution system plan) by the deadline. The drawings shall clearly state the length, width, and height of the booth, all materials, and power facilities for review. 2.These forms (B5/B5-1/B5-2) together with the electricity application form (B6), all detailed drawings, a copy of the business license of the construction company and a copy of the ID card of its legal person, shall be duplicate and stamped with official seal, and mailed/submitted to the main exhibition site contractor before the deadline so as to be valid.

Please contact the exhibition designated main exhibition site contractor: Canton Fair Exhibition Design and Construction Co., Ltd. Room 1+002, Floor A, Exhibition Area A, Canton Fair Complex, 382 Yuejiang Address: Middle Road, Haizhu District, Guangzhou, China Contact: Mr. Han, Mr. Tan, Mr. Li Tel: 020-89139722, 89139785, 89139720 Fax: 020-89139701, 89139702

Email: [email protected]

RMB & USD Account: Beneficiary's Name: Canton Fair Exhibition Design And Construction Co. Ltd. Beneficiary's Bank: BANK OF CHINA, Guangzhou International Convention And Exhibition Center Sub-Branch Beneficiary's Address: 3.1th pearl. Promenade, Guangzhou International Convention And Exhibition Center, Guangzhou P.R. China A/C NO.: 680857744434 Swift code: BKCH CN BJ 400 REMITTANCE REMARKS: (Please indicate the Name of Exhibition, Hall No., Booth No. and Company name)

Exhibitor Name: Address: Postcode: Contact: Mobile: Email: Tel: Fax: Seal:

37

Please make sure this form is submitted to the main exhibition site contractor designated by the exhibition before June 10, 2018.

Form B5-1 Exhibition Hall No. Booth No. Booth Electricity Safety Responsibility Commitment In order to cooperate with China Foreign Trade Center (Group) (hereinafter referred to as "the exhibition hall") to well manage electricity safety of booths in Canton Fair Complex, clarify responsibilities, standardize management, ensure safety, and create an exhibition environment with safe and reliable electricity, and in line with Regulations for Electricity Safety of Canton Fair Complex (hereinafter referred to as the "Regulations"), we ______, as the user of (Exhibition) (Hall No.: Booth No.: ), hereby promise to the booth construction contractor that:

A. We will strictly abide by the Regulations, assume direct responsibilities for all the consequences caused by illegal installation of equipment or illegal use of electricity during preparation, exhibition, and dismantlement, and bear the corresponding economic and legal responsibilities. B. We will assign specific personnel to take charge of electricity safety and maintain onsite duty during preparation, exhibition, and dismantlement, timely eliminate potential safety hazards, and ensure booth safety. C. We will accept the supervision and management of the relevant departments of the exhibition hall, and earnestly implement measures for electricity safety and remediation.

This commitment is in duplicate and take effect since the date of stamping and signing. This commitment is a necessary attachment to Booth Electricity Application Form.

Exhibitor Contractor

(Official seal): (Official seal):

Legal representative or Legal representative or safety responsible person (signature): safety responsible person (signature):

Site safety responsible person Site Safety Responsible Person or site electrician: or Site Electrician:

Tel: Tel:

Date: Date:

38

Please make sure this form is submitted to the main exhibition site contractor designated by the exhibition before June 10, 2018.

Form B5-2 Exhibition Hall No. Booth No. Booth Construction Safety Commitment This form shall be submitted to Fire Protection Division, Security Department during the reporting of safety and fire safety.

Exhibitor: Contractor: Responsible Responsible person: person: Mobile: Mobile: Total area of specially Note: The height of a single floor is limited to 4.5m, m2 ★ decorated while of two floors, 6m. booth: List of booth construction safety management personnel: Name of Safety Responsibility Area (Booth Mobile phone ID No. Administrator No.)

We promise that we will urge the design and construction companies to design and construct in line with relevant national mandatory decoration technical regulations and Exhibitor's standards and requirements of Exhibition Hall Fire Safety Regulations. In case of commitment violation, we will independently assume the responsibilities.

Signature of responsible person: (seal of company) Date: We promise that, we will design and construct in strict accordance with relevant national mandatory construction technical regulations and standards and requirements of Exhibition Hall Safety Management Regulations, configure fire extinguishing equipment as required, and ensure booth structural and construction safety during the exhibition (including preparation and dismantlement). We will assume unshirkable responsibilities for onsite life and property losses following booth collapse, falling objects, and fire due to construction safety issues of the construction area of the construction area, as well as Contractor's all the consequent responsibilities. commitment:

We promise to accept the supervision and management of the relevant departments of the exhibition, earnestly implement safety guarantee and remediation measures, timely eliminate hidden dangers, and ensure safety.

Signature of responsible person: (seal of company) Date:

39

Please make sure this form is submitted to the main exhibition site contractor designated by the exhibition before June 10, 2018.

Form B6 Application for Electricity Exhibition Hall No. Booth No.

USD/Session 24 hours rental Price Price Power Specifications 8 Hours Price Before After Apply Before After Apply USD/ Voltage / Current QTY QTY Jun.10 Jun. 10 onsite Jun.10 Jun. 10 onsite Session 6A / 220V <1.3KW 75 90 112 150 180 225 10A / 220V <2.2KW 90 110 135 180 220 275 16A / 220V <3.5KW 125 150 185 250 300 375 6A / 380V <3KW 120 145 180 240 290 365 10A / 380V <5KW 165 200 250 330 400 500 16A / 380V <8KW 210 255 320 420 510 640 20A / 380V <10KW 230 280 350 460 560 700 25A / 380V <13KW 280 340 425 560 680 850 32A / 380V <16KW 330 400 500 660 800 1000 40A / 380V <20KW 405 485 610 815 980 1225 50A / 380V <25KW 500 600 750 1000 1200 1500 63A / 380V <30KW 600 720 900 1200 1440 1800 100A / 380V <50KW 880 705 1325 1760 2120 2650 150A / 380V <75KW 1315 1580 1975 12630 3160 3950 Electricity Box (required) 500 RMB per Unit Below 36 ㎡(include 36 ㎡): 30000 RMB Raw Booth 36 ㎡~72 ㎡(include 72 ㎡): 60000 RMB Deposit Construction Safety Commitment (Only for Constructor) Above 72 ㎡:80000 RMB

Construction management fee: 25 RMB / ㎡ Other items of Raw Booth ID fee for construction personnel: 10 RMB / Unit (Only for Constructor) Fee of Truck /Car card for exhibition hall access: 20 RMB/ Unit Total Price: Note: 1.Exhibitors who apply for the power supply must rent the electrical box. The electrical boxes will be installed by the electrician of the office contractor, electrical switch box under the pile (inside the booth) and the electrical connection is the exhibitor's responsibility, but supervision by our electrician. 2.The above price includes the electricity fees and rental of electrical box, 30 meters of cable. The excess cable fees are as follows: 63-100A 100A-150A 150A-200A 200A-250A 4USD/Meter 7USD/Meter 9USD/Meter 12USD/Meter 3.The Forms B6 together with all detailed drawings, a copy of the business license of the construction company and a copy of the ID card of its legal person, shall be duplicate and stamped with official seal, and mailed/submitted to the main exhibition site contractor before the deadline so as to be valid.

40

4.All the funds to be paid by exhibitors shall be remitted at least 5 days in advance before entering the site. Please do not remit in the name of an individual. The company name on the invoice issued by the contractor of the exhibition shall be consistent with the name of the remittance company and only arrange the delivery of items with confirmed fund remittance. 5.20% additional charge is required for subscription exceeding the deadline. 50% additional charge is required for onsite subscription. 6.The deposit only accepts RMB. Please contact the exhibition designated main exhibition site contractor: Canton Fair Exhibition Design and Construction Co., Ltd. Room 1+002, Floor A, Exhibition Area A, Canton Fair Complex, 382 Yuejiang Address: Middle Road, Haizhu District, Guangzhou, China Contact: Mr. Han, Mr. Tan, Mr. Li Tel: 020-89139722, 89139785, 89139720 Fax: 020-89139701, 89139702

Email: [email protected]

RMB & USD Account: Beneficiary's Name: Canton Fair Exhibition Design And Construction Co. Ltd. Beneficiary's Bank: BANK OF CHINA, Guangzhou International Convention And Exhibition Center Sub-Branch Beneficiary's Address: 3.1th pearl. Promenade, Guangzhou International Convention And Exhibition Center, Guangzhou P.R. China A/C NO.: 680857744434 Swift code: BKCH CN BJ 400 REMITTANCE REMARKS: (Please indicate the Name of Exhibition, Hall No., Booth No. and Company name)

Exhibitor Name: Address: Postcode: Contact: Mobile: Email: Tel: Fax: Seal:

41

Please make sure this form is submitted to the main exhibition site contractor designated by the exhibition before June 10, 2018. Form B7 Application for Water Exhibition Hall No. Booth No.

USD/Session Unit price Item Standard Unit Before After Apply QTY Amount Remark JUN. 10 JUN. 10 Onsite Water yield Flooding Not Water fee Spot USD40 USD50 2.2m³/minu standard: N15 Available te Place 1.6cm hard Charge for tubes every water Place 2.5cm hard pipe, the tubes Water pipe price Place 3.3cm hard connection Spot USD60 including tubes fee water pipe Place 5cm hard and tubes connecting Place 6.6cm hard fee tubes Total Price: Note: 1.The installation must be installed by the office contractor. 2. The exhibition only accepts application in advance. No reservation is accepted after entering. 3. All the funds to be paid by exhibitors shall be remitted at least 5 days in advance before entering the site. Please do not remit in the name of an individual. The company name on the invoice issued by the contractor of the exhibition shall be consistent with the name of the remittance company and only arrange the delivery of items with confirmed fund remittance. 4. 20% additional charge is required for exceeding the deadline. Please contact the exhibition designated main exhibition site contractor:

42

Canton Fair Exhibition Design and Construction Co., Ltd. Room 1+002, Floor A, Exhibition Area A, Canton Fair Complex, 382 Yuejiang Address: Middle Road, Haizhu District, Guangzhou, China Contact: Mr. Han, Mr. Tan, Mr. Li Tel: 020-89139722, 89139785, 89139720 Fax: 020-89139701, 89139702 Email: [email protected]

RMB & USD Account: Beneficiary's Name: Canton Fair Exhibition Design And Construction Co. Ltd. Beneficiary's Bank: BANK OF CHINA, Guangzhou International Convention And Exhibition Center Sub- Branch Beneficiary's Address: 3.1th pearl. Promenade, Guangzhou International Convention And Exhibition Center, Guangzhou P.R. China A/C NO.: 680857744434 Swift code: BKCH CN BJ 400 REMITTANCE REMARKS: (Please indicate the Name of Exhibition, Hall No., Booth No. and Company name)

Exhibitor Name: Address: Postcode: Contact: Mobile: Email: Tel: Fax: Seal:

43

Please make sure this form is submitted to the main exhibition site contractor designated by the exhibition before June 10, 2018. Form B8 Application for Air Compressor Exhibition Hall No. Booth No. Unit: USD/exhibition period

Unit Unit Compressor Power Host Motor Voltage Displacement price price Apply specification consump speed speed Unit Qty Amount (V) / min before After onsite s tion (W) (min) (min) Jun.10 Jun.10 Not 1 hp 220V 750W 1000 1000 36L Set $184.00 $221.00 available Not 2 hp 380V 1500W 1000 2800 170L Set $330.00 $396.00 available Not 3 hp 380V 2250W 1000 2800 250L Set $397.00 $477.00 available Not 4 hp 380V 3000W 1000 2800 360L Set $464.00 $557.00 available Not 5.5 hp 380V 4200W 1000 2800 400L Set $564.00 $677.00 available Not 7.5 hp 380V 5625W 1000 2800 670L Set $684.00 $821.00 available Not 10 hp 380V 7500W 980 1440 900L Set $750.00 $900.00 available Not 15 hp 380V 11250W 900 1440 1200L Set $950.00 $1140.00 available Rented connection pipe (diameter = 8mm, length ≤ 1.5m) Set $12 Connection labor cost (including connection accessories) Set $25 Deposit for compressor and distribution box Set 3000 RMB Total Note: 1. The unit price of air compressor above has already included 1 set of air compressor, 1 set of distribution box, and electric charge. The connection of the devices shall be done by electricians of the exhibition hall. 2. The connection pipe is limited to 1.5m (inclusive). The part longer than the limit shall be additionally charged. 3. The exhibition only accepts application in advance. No reservation is accepted after entering. 4. All the funds to be paid by exhibitors shall be remitted at least 5 days in advance before entering the site. Please do not remit in the name of an individual. The company name on the invoice issued by the contractor of the exhibition shall be consistent with the name of the remittance company and only arrange the delivery of items with confirmed fund remittance. 5. 20% additional charge is required for exceeding the deadline. 6. The deposit only accepts RMB. Please contact the exhibition designated main exhibition site contractor:

44

Canton Fair Exhibition Design and Construction Co., Ltd. Room 1+002, Floor A, Exhibition Area A, Canton Fair Complex, 382 Yuejiang Address: Middle Road, Haizhu District, Guangzhou, China Contact: Mr. Han, Mr. Tan, Mr. Li Tel: 020-89139722, 89139785, 89139720 Fax: 020-89139701, 89139702

Email: [email protected]

RMB & USD Account: Beneficiary's Name: Canton Fair Exhibition Design And Construction Co. Ltd. Beneficiary's Bank: BANK OF CHINA, Guangzhou International Convention And Exhibition Center Sub- Branch Beneficiary's Address: 3.1th pearl. Promenade, Guangzhou International Convention And Exhibition Center, Guangzhou P.R. China A/C NO.: 680857744434 Swift code: BKCH CN BJ 400 REMITTANCE REMARKS: (Please indicate the Name of Exhibition, Hall No., Booth No. and Company name)

Exhibitor Name: Address: Postcode: Contact: Mobile: Email:

Tel: Fax: Seal:

45

IX. Notes on exhibition equipment lease (1) Exhibitors, who need to increase rented exhibition equipment, shall complete Application Form for Exhibition Equipment Lease and fax or email it to the main exhibition site contractor, i.e. "Canton Fair Exhibition Design and Construction Co., Ltd." by June 10, 2018 (inclusive). In order to ensure efficiency, the exhibitors must call the contractor to confirm reception after fax or email, to avoid failure to accept the application due to machine or network issue. See Application Form for Exhibition Equipment Lease for detailed fax number and email address. (2) Please pay the exhibition equipment lease fee to the account of the main exhibition site contractor, i.e. "Canton Fair Exhibition Design and Construction Co., Ltd." by June 10, 2018 (inclusive). It is subject to funds credited into the account (Please specify "exhibition equipment lease".). (3) In terms of the funds remitted via a personal account or non-company account, please make sure to indicate the name and booth number of the exhibitor, and purpose of payment; otherwise, the main exhibition site contractor, i.e. "Canton Fair Exhibition Design and Construction Co., Ltd." may not be able to confirm the situation of fund collection and delay service. (4) Application after the deadline of June 10, 2018 (exclusive) shall require additional charge. (5) The booked exhibition equipment will be delivered to the booth of the exhibitor within 90 minutes after our company receives the notice from the exhibitor. Before 11.00 a.m. June 26, 2018, exhibition equipment leased onsite will be delivered to your booth within 60min after receiving your payment. After 11.00 a.m. June 26, 2018, exhibition equipment leased onsite will be delivered to your booth within 120min after receiving your payment. (6) The reserved service is valid only after the main exhibition site contractor receives the full payment within the stipulated time; otherwise, it will be handled as overdue application. (7) After it receives Application for Exhibition Equipment Lease, the main exhibition site contractor will sign and confirm the form and return it within two working days. (8) The price on the application form is the rental fee during the entire exhibition period. (9) The main exhibition site contractor has the right to refuse to accept overdue application. (10) If the exhibition equipment your company needs is not listed, please contact us. The exhibition designated main exhibition site contractor: Canton Fair Exhibition Design and Construction Co., Ltd. Room 1+002, Floor A, Exhibition Area A, Canton Fair Complex, 382 Yuejiang Address: Middle Road, Haizhu District, Guangzhou, China Contact: Mr. Han, Mr. Tan, Mr. Li Tel: 020-89139722, 89139785, 89139720 Fax: 020-89139701, 89139702 Email: [email protected]

46

X. Demonstration of Raw Booth Blueprints

47

48

49

XI. Form C1 Digital Printing Order Form Exhibition Hall No. Booth No.

Unit Price for No. Item Specifications Unit Quantity Amount Rental(US$) M1 KT board printing ㎡ 9 M2 Lamp cloth printing ㎡ 8.5 Dark lamp cloth M3 ㎡ 9 printing M4 Stickers Printing ㎡ 9.5 M5 Roll-up Banner 80*200h set 26 M6 Roll-up Banner 90*200h set 27 M7 X-Banner 60*160h set 23 M8 X-Banner 80*180h set 26 M9 Tipping m 1.2 Total (1) The price including printing but not design; (2) If we offer the design,it will be US$4/㎡ charge.(5 ㎡ Minimum); (3) Printing order minimum is 1 ㎡;

Note: 1. All the funds to be paid by exhibitors shall be remitted at least 5 days in advance before entering the site. Please do not remit in the name of an individual. The company name on the invoice issued by the contractor of the exhibition shall be consistent with the name of the remittance company and only arrange the delivery of items with confirmed fund remittance. 2. 20% additional charge is required for subscription exceeding the deadline. 50% additional charge is required for onsite subscription.

Please contact the exhibition designated main exhibition site contractor: Canton Fair Exhibition Design and Construction Co., Ltd. Room 1+002, Floor A, Exhibition Area A, Canton Fair Complex, 382 Yuejiang Address: Middle Road, Haizhu District, Guangzhou, China Contact: Mr. Han, Mr. Tan, Mr. Li Tel: 020-89139722, 89139785, 89139720 Fax: 020-89139701, 89139702

Email: [email protected]

RMB & USD Account:

50

Beneficiary's Name: Canton Fair Exhibition Design And Construction Co. Ltd. Beneficiary's Bank: BANK OF CHINA, Guangzhou International Convention And Exhibition Center Sub- Branch Beneficiary's Address: 3.1th pearl. Promenade, Guangzhou International Convention And Exhibition Center, Guangzhou P.R. China A/C NO.: 680857744434 Swift code: BKCH CN BJ 400 REMITTANCE REMARKS: (Please indicate the Name of Exhibition, Hall No., Booth No. and Company name)

Exhibitor Name: Address: Postcode: Contact: Mobile: Email:

Tel: Fax: Seal:

51

XII. Official Hotels

JLBEST Meeting is a designated partner of the organizer for arranging hotel bookings, Visa Invitation letter, round-trip tickets, vehicle services and tourists’ trips. The official hotels of IFE & IHE China 2018 provide guests with a special price. As June is the peak season for hotel bookings in Guangzhou, please submit the reservation as soon as possible.

Contact Person: Ms. Li Tel: +86-755-8288-0055/89

Email: [email protected] QQ:1472309660

Hotel Information

Room Hotel Room Hotel Name Rate Breakfast Hotel Address Grade Type (RMB)

Deluxe Include breakfast King 900 No. 681 FengPu Middle for 1 person Room 5 The Westin Road, Haizhuqu District, Deluxe Include breakfast Guangzhou. Twin 1000 for 2person Room

Deluxe Include breakfast King 1100 for 1 person Shangri-La Hotel Room 1 East Huizhan Road 5 Guangzhou Deluxe Include breakfast (Huizhan Dong Lu) Twin 1200 for 2person Room Superior Include breakfast King 950 Intercontinental for 1 person 828 Yuejiang Middle Room 5 Guangzhou Exhibition Road,Haizhu Superior Center Include breakfast District,Guangzhou Twin 1050 for 2person Room

638 Xingang East Road Langham Place Superior Include breakfast 5 950 | 0.53km from Metro Guangzhou Room for 2person Station: Xingangdong

52

Room Hotel Room Hotel Name Rate Breakfast Hotel Address Grade Type (RMB)

Clayton Hotel Superior Include breakfast 9 Yelin Road (Yelin Lu), 5 440 Guangzhou Room for 1 or 2 persons Tianheyuan Village

Kai Rong Du Superior Include breakfast 3 Jianghai Avenue 438 4 International Hotel Room for 1 or 2 persons (Jianghai Dadao) Guangzhou No.13 Yuancun West Deluxe Include breakfast 315 Street, Tianhe District, 4 Guangzhou Boyi Hotel Room for 1 or 2 persons Guangzhou No.1020 East Xingang eStay Residence (Poly Superior Road (Xingang Dong 4 450 Not included World Trade Center) Room Lu), Haizhu District, Guangzhou.

Superior Include breakfast 288 Room NO.84 Xingang East Guangzhou Wellgold for 1 or 2 persons 3 Road (Xingang Dong Hotel(Pazhou) Business Include breakfast Lu) ,Guangzhou 368 Room for 1 or 2 persons NO.84 Xingang East Superior Include breakfast 3 Guangzhou Pazhou Hotel 320 Road (Xingang Dong Room for 1 or 2 persons Lu) ,Guangzhou Note:

a) Above rates include 15% service charge and tax and all charges will be settled in RMB currency.

Any adjustment to the above mentioned price will not be informed.

b) Prepaid price is that paid to JLBEST Meeting company in advance, and need to prepay 100% price

as the guarantee fee of the room, the room will not be reserved if unpaid.

c) Booking amount up to 10 or more a day can enjoy the team price, please contact the designated

travel consultant about the specific price.

53

XIII. Transportation How to get to Guangzhou By plane: Guangzhou Baiyun International Airport is approximately 45kilometers away from Canton Fair Complex. Every day thousands of flights bound for places all over the world. The airport is convenient with shuttle buses running back and forth in urban areas. Metro and expressways are easily connected with Canton Fair Complex. Airport Service Hotline: 86-20-86122933

By train: Guangzhou East Railway Station is in Central Linhe Road in Tianhe District, mainly undertaking the inbound and outbound passenger trains in Guangzhou on Guangzhou-Shenzhen Railway, Guangzhou-Kowloon Railway and Beijing- Kowloon Railway. Guangzhou East Railway Station is approximately 10 kilometers away from Canton Fair Complex.

Guangzhou South Railway Station is located in Shibi Street, Panyu District, Guangzhou City, adjacent to Wuhan-Guangzhou Express Railway, Gui-Guang Express Railway, Nan-Guang High- Speed Railway on the north; bordering on Guangzhou-Zhuhai Intercity MRT and Guangzhou- Shenzhen-Hong Kong Intercity MRT, mainly responsible for the passenger transport for inbound and outbound trains and high-speed trains of Wuhan-Guangzhou Express Railway, Guangzhou- Zhuhai Intercity MRT and Guangzhou-Shenzhen Intercity MRT. Guangzhou South Railway Station is approximately 23 kilometers away from Canton Fair Complex with metro directly connecting Canton Fair Complex.

How to get to Canton Fair Complex, Area B By taxi: Address: No. 380, Yuejiang Zhong Road, Guangzhou, China From Guangzhou Baiyun International Airport, it costs about 40 minutes. From Guangzhou East Railway Station, it costs about 15 minutes.

By metro: From Guangzhou Baiyun International Airport,please take Metro to Kecun Station. Then transfer Metro to Pazhou Station Exit A for Area B. Duration: about 45 minutes;

From Guangzhou East Railway Station, please take Metro Line 3 to Kecun Station. Then transfer Metro Line 8 to Pazhou Station Exit A for Area B. Duration: about 25 minutes;

From Guangzhou South Railway Station Take Metro to Changgang Station, change to Line 8 and exit at Pazhou Station Exit A for Area B. Duration: about 50 minutes;

Free Shuttle Bus: Some of the official hotels provide guests with free shuttle bus services from hotel to exhibition hall. Please ask the receptionists of hotel to obtain more information.

54