Pradhan Mantri Gram Sadak Yojana

Road List for attachment with Sanction Letter - District Wise Abstract

State : Sanction Year : 2016-2017 Batch : 2 Collaboration : Regular PMGSY

Sr.No. District No of Road Length MoRD Cost State Cost (Rs Total Cost Maint. Cost Habs (1000+, 500+, 250+, <250, Total) Works (Kms) / Bridge (Rs Lacs) Lacs) (Rs Lacs) (Rs Lacs) Length (Mtrs) 1 2 3 4 5 6 7 8 9

Road Proposals

1 Araria 8 25.080 829.67 553.12 1,382.79 177.80 (11 , 4 , 5 , 3 , 23)

2 Banka 6 10.200 299.13 199.42 498.55 68.79 (0 , 7 , 4 , 19 , 30)

3 Begusarai 8 10.212 262.45 174.97 437.42 38.48 (5 , 5 , 6 , 22 , 38)

4 Bhagalpur 8 11.735 230.95 153.97 384.92 37.37 (6 , 9 , 7 , 6 , 28)

5 Bhojpur 2 8.200 279.59 186.39 465.98 39.79 (0 , 4 , 0 , 1 , 5)

6 Chapra(Saran) 21 34.274 1,008.66 672.44 1,681.10 147.17 (12 , 19 , 10 , 21 , 62)

7 Darbhanga 14 32.720 1,006.66 671.12 1,677.78 122.24 (11 , 9 , 5 , 4 , 29)

8 East Champaran 42 82.734 2,467.61 1,645.07 4,112.68 250.71 (20 , 50 , 41 , 31 , 142)

9 Gaya 90 160.670 4,450.51 2,967.04 7,417.55 595.92 (18 , 43 , 70 , 15 , 146)

10 Gopalganj 21 45.521 1,390.88 927.27 2,318.15 175.24 (5 , 24 , 26 , 43 , 98)

11 Jahanabad 11 11.014 341.20 227.46 568.66 41.33 (4 , 1 , 7 , 0 , 12)

12 Jamui 40 92.969 2,886.81 1,924.54 4,811.35 339.93 (7 , 9 , 48 , 48 , 112)

13 Kaimur (Bhabhua) 15 23.585 786.26 524.17 1,310.43 113.22 (2 , 4 , 10 , 1 , 17)

14 Katihar 42 79.375 2,633.70 1,755.77 4,389.47 433.39 (33 , 30 , 18 , 6 , 87)

15 Khagaria 16 51.271 1,633.78 1,089.17 2,722.95 194.60 (10 , 19 , 4 , 10 , 43)

16 Kishanganj 49 104.902 3,640.89 2,427.25 6,068.14 594.09 (17 , 49 , 52 , 55 , 173)

17 Lakhisarai 9 14.260 412.16 274.74 686.90 54.93 (0 , 12 , 5 , 10 , 27)

18 Munger 1 1.533 59.44 39.63 99.07 5.51 (0 , 0 , 1 , 1 , 2)

19 Nalanda 19 25.962 891.36 594.23 1,485.59 84.86 (10 , 16 , 5 , 4 , 35)

20 Nawada 26 57.980 1,463.94 975.95 2,439.89 209.37 (5 , 12 , 9 , 5 , 31)

21 Patna 2 5.052 169.33 112.89 282.22 14.81 (1 , 2 , 2 , 0 , 5)

22 Purnea 22 55.755 2,069.36 1,379.56 3,448.92 201.04 (13 , 21 , 15 , 22 , 71)

23 Saharsa 26 72.545 2,562.59 1,708.38 4,270.97 225.35 (13 , 24 , 11 , 22 , 70)

24 3 4.734 146.90 97.93 244.83 22.73 (0 , 1 , 2 , 0 , 3)

25 Siwan 9 15.625 452.24 301.93 754.17 32.68 (6 , 7 , 12 , 8 , 33)

26 16 25.158 710.43 473.61 1,184.04 82.99 (5 , 27 , 17 , 7 , 56)

Roads Total 526 1,063.066 33,086.50 22,058.02 55,144.52 4,304.34 (214 , 408 , 392 , 364 , 1378)

Long Span Bridge Proposals

1 Araria 39 2,089.310 3,894.45 3,861.18 7,755.63 161.64 -

2 Arwal 3 105.040 265.13 176.76 441.89 9.04 -

3 Bhagalpur 16 848.700 2,582.09 2,056.75 4,638.83 131.36 -

4 Khagaria 6 466.160 1,038.49 1,360.45 2,398.94 18.94 -

5 Kishanganj 11 596.430 1,329.43 1,026.13 2,355.56 45.14 -

6 Nalanda 3 117.040 265.39 176.93 442.32 7.21 -

7 Patna 8 433.920 780.54 785.18 1,565.72 22.41 -

8 Purnea 1 90.200 235.67 236.72 472.39 16.35 -

9 Saharsa 6 547.120 1,298.80 1,416.01 2,714.81 38.46 -

10 Sitamarhi 27 1,049.260 3,735.25 2,945.22 6,680.46 49.38 -

11 Supaul 5 365.580 854.88 947.90 1,802.78 25.87 -

12 Vaishali 4 182.350 557.84 419.33 977.17 25.74 -

Bridges Total 129 6,891.110 16,837.97 15,408.55 32,246.51 551.55 -

Grand Total 655 Total Road 49,924.47 37,466.57 87,391.03 4,855.89 (214 , 408 , 392 , 364 , 1378) Length:1063.066 Kms Total LSB Length:6891.110 Mtrs

Page 1 of 1 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

State : Bihar Sanction Year : 2016-2017 Batch : 2 Collaboration : Regular PMGSY Note : All Costs are in Lakhs and Lengths are in Kms.

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Road Proposals

District- Araria

Block- Araria

1 L036 L036-BELWA TO KOCHAGAWA New -- 2.850 3.750 Complete 4 92.09 61.40 153.49 20.54 (3 , 0 , 3 , 0 , 6) (VR36) 2 L035 L035-BELWAPOOL T04 TO New -- 0.820 3.750 Complete 2 28.46 18.97 47.43 4.76 (1 , 0 , 0 , 0 , 1) BARSKAMAT (VR35) Block Araria Total 3.670 6 120.55 80.37 200.92 25.30 (4 , 0 , 3 , 0 , 7)

Block- Forbisganj

3 L033 L033-T05 to Besgara (VR33) New -- 5.700 3.750 Complete 8 189.27 126.18 315.45 41.75 (1 , 1 , 0 , 0 , 2)

4 L029 L029-batnaha to belahi New -- 2.000 3.000 Complete 1 67.69 45.13 112.82 13.10 (0 , 3 , 1 , 0 , 4) dhata (VR74) 5 L056 L056-Arraha to Kurwa New -- 3.600 3.750 Complete 5 115.59 77.06 192.65 26.71 (2 , 0 , 1 , 0 , 3) (VR56) 6 L066 L066-T04 To Sahabjpur New -- 3.700 3.750 Complete 5 123.51 82.34 205.85 26.77 (2 , 0 , 0 , 3 , 5) (VR66) Block Forbisganj Total 15.000 19 496.06 330.71 826.77 108.32 (5 , 4 , 2 , 3 , 14) Block- Raniganj

7 L046 L046-T02 bebhara to East New -- 2.410 3.750 Complete 2 78.67 52.45 131.12 16.48 (1 , 0 , 0 , 0 , 1) Durgapur (VR46) 8 T13 T13-Dhobinia to Karankia New -- 4.000 3.750 Complete 2 134.39 89.59 223.98 27.70 (1 , 0 , 0 , 0 , 1) (VR30) Block Raniganj Total 6.410 4 213.06 142.04 355.10 44.18 (2 , 0 , 0 , 0 , 2)

Page 1 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District Araria Total 25.080 29 829.67 553.12 1,382.79 177.80 (11 , 4 , 5 , 3 , 23) District- Banka

Block- Baunsi

9 L109 L109-L063 BHALJOR DAM RD New CELL Filled 1.200 3.750 Complete 3 40.56 27.04 67.60 7.35 (0 , 1 , 1 , 0 , 2) VIA BASLETA TO KANIMAU Concrete (TRACK109) 10 L061 L061-L064 TO LOBANDO New CELL Filled 1.400 3.750 Complete 2 43.95 29.30 73.25 8.58 (0 , 1 , 0 , 0 , 1) (TRACK61) Concrete Block Baunsi Total 2.600 5 84.51 56.34 140.85 15.93 (0 , 2 , 1 , 0 , 3)

Block- Katoria

11 L091 L091-T05 Dholadanr To New CELL Filled 0.900 3.750 Complete 2 25.01 16.67 41.68 4.56 (0 , 1 , 2 , 7 , 10) Tiliya (VR91) Concrete 12 L040 L040-Katoriya Banka PWd New CELL Filled 2.200 3.750 Complete 3 66.36 44.24 110.60 13.04 (0 , 1 , 1 , 10 , Rd. to Mochnhawaran Concrete 12) (VR40) 13 L086 L086-Burhighat To Damodara New CELL Filled 3.000 3.750 Complete 4 84.64 56.43 141.07 19.25 (0 , 2 , 0 , 2 , 4) (VR86) Concrete Block Katoria Total 6.100 9 176.01 117.34 293.35 36.85 (0 , 4 , 3 , 19 , 26) Block- Rajaun

14 L023 L023-L0 21 TO New CELL Filled 1.500 3.750 Complete 3 38.61 25.74 64.35 16.01 (0 , 1 , 0 , 0 , 1) NUNUWACHAK (TRACK2) Concrete Block Rajaun Total 1.500 3 38.61 25.74 64.35 16.01 (0 , 1 , 0 , 0 , 1)

District Banka Total 10.200 17 299.13 199.42 498.55 68.79 (0 , 7 , 4 , 19 , 30) District- Begusarai

Page 2 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Bacchwara

15 L058 L058-L034 To Bharaul (VR58) New -- 1.000 3.750 Complete 2 28.41 18.94 47.35 5.31 (1 , 0 , 0 , 8 , 9)

Block Bacchwara Total 1.000 2 28.41 18.94 47.35 5.31 (1 , 0 , 0 , 8 , 9)

Block- Bhagwanpur

16 L039 L039-T02 To Tajpur (VR39) New -- 0.517 3.750 Complete 2 14.68 9.79 24.47 2.79 (0 , 1 , 0 , 6 , 7)

Block Bhagwanpur Total 0.517 2 14.68 9.79 24.47 2.79 (0 , 1 , 0 , 6 , 7)

Block- Cheriabariarpur

17 L021 L021-T02 TO JAY MANGAL New Cold Mix 0.750 3.750 Complete 1 17.05 11.36 28.41 5.03 (0 , 3 , 2 , 0 , 5) PUR (ODR7) Technology Block Cheriabariarpur Total 0.750 1 17.05 11.36 28.41 5.03 (0 , 3 , 2 , 0 , 5)

Block- Khodwantpur

18 L033 L033-BARIARPUR MASURAJ New CELL Filled 1.750 3.750 Complete 1 41.35 27.57 68.92 6.08 (1 , 0 , 0 , 0 , 1) ROAD TO PUBARI TOL (VR15) Concrete
Cold Mix Technology Block Khodwantpur Total 1.750 1 41.35 27.57 68.92 6.08 (1 , 0 , 0 , 0 , 1)

Block- Mansurchak

19 L043 L043-L042 To Ahiapur Takia New -- 1.750 3.750 Complete 2 41.90 27.93 69.83 4.74 (1 , 0 , 0 , 0 , 1) (VR43) 20 L027 L027-Agapur T01 to Navtol New -- 1.720 3.750 Complete 3 44.72 29.81 74.53 5.48 (1 , 0 , 0 , 6 , 7) (VR27) Block Mansurchak Total 3.470 5 86.62 57.74 144.36 10.23 (2 , 0 , 0 , 6 , 8)

Page 3 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Nawkothi

21 L022 L022-T02 TO KARAITAR New CELL Filled 0.975 3.750 Complete 3 26.54 17.70 44.24 3.38 (0 , 1 , 1 , 0 , 2) (VR5) Concrete
Cold Mix Technology Block Nawkothi Total 0.975 3 26.54 17.70 44.24 3.38 (0 , 1 , 1 , 0 , 2)

Block- Sahebpur Kamal

22 L037 L037-T02 TO SANDALPUR New -- 1.750 3.750 Complete 2 47.80 31.87 79.67 5.66 (1 , 0 , 3 , 2 , 6) (VR20) Block Sahebpur Kamal Total 1.750 2 47.80 31.87 79.67 5.66 (1 , 0 , 3 , 2 , 6)

District Begusarai Total 10.212 16 262.45 174.97 437.42 38.48 (5 , 5 , 6 , 22 , 38) District- Bhagalpur

Block- Kahalgaon

23 L030 L030-REO Road to New -- 3.300 3.750 Complete 2 56.20 37.47 93.67 14.47 (1 , 1 , 1 , 2 , 5) Sadanadpur (VR14) 24 L034 L034-Ganjal Gopali to New -- 1.100 3.750 Complete 1 21.86 14.57 36.43 3.02 (0 , 1 , 0 , 0 , 1) Simariya (VR18) Block Kahalgaon Total 4.400 3 78.06 52.04 130.10 17.49 (1 , 2 , 1 , 2 , 6)

Block- Pirpaiti

25 L086 L086-Pakriya Road to jogiya New -- 1.000 3.750 Complete 1 21.58 14.39 35.97 3.04 (1 , 0 , 0 , 0 , 1) Talab (VR62) 26 L058 L058-Danapur to Manikpur New -- 0.610 3.750 Complete 0 9.55 6.37 15.92 0.01 (1 , 2 , 4 , 0 , 7) (VR32) 27 L034 L034-Upper Bhalua to Jadu New -- 1.875 3.750 Complete 1 32.12 21.41 53.53 3.06 (0 , 1 , 1 , 0 , 2) Bhalua (VR14)

Page 4 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

28 L021 L021-Madhopur T01 to New Fly Ash 1.530 3.750 Complete 3 37.39 24.93 62.32 4.12 (1 , 1 , 0 , 4 , 6) Parsurampur (VR4) Subgrade 29 L065 L065-Bilaiya to Sarkanda New Fly Ash 1.320 3.750 Complete 4 31.13 20.75 51.88 5.44 (1 , 1 , 0 , 0 , 2) (VR38) Subgrade Block Pirpaiti Total 6.335 9 131.77 87.85 219.62 15.67 (4 , 5 , 5 , 4 , 18) Block- Sanhaula

30 L048 L048-Telondha to Pakaria New -- 1.000 3.750 Complete 3 21.12 14.08 35.20 4.21 (1 , 2 , 1 , 0 , 4) (VR32) Block Sanhaula Total 1.000 3 21.12 14.08 35.20 4.21 (1 , 2 , 1 , 0 , 4)

District Bhagalpur Total 11.735 15 230.95 153.97 384.92 37.37 (6 , 9 , 7 , 6 , 28) District- Bhojpur

Block- Charpokhari

31 L047 L047-L030 to Balihari (VR47) New -- 1.200 3.750 Complete 4 46.83 31.22 78.05 5.43 (0 , 1 , 0 , 0 , 1)

Block Charpokhari Total 1.200 4 46.83 31.22 78.05 5.43 (0 , 1 , 0 , 0 , 1)

Block- Tarari

32 L047 L047-L046 to Hararua (L47) New CELL Filled 7.000 3.750 Complete 22 232.76 155.17 387.93 34.36 (0 , 3 , 0 , 1 , 4) Concrete Block Tarari Total 7.000 22 232.76 155.17 387.93 34.36 (0 , 3 , 0 , 1 , 4)

District Bhojpur Total 8.200 26 279.59 186.39 465.98 39.79 (0 , 4 , 0 , 1 , 5)

District- Chapra(Saran)

Block- Dighwara

33 L041 L041-NH 30 to Harijan Tola New CELL Filled 1.014 3.750 Complete 2 31.31 20.88 52.19 3.98 (0 , 1 , 0 , 0 , 1) Basti Jalal Road (VR17) Concrete Block Dighwara Total 1.014 2 31.31 20.88 52.19 3.98 (0 , 1 , 0 , 0 , 1)

Page 5 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Ekma

34 L056 L056-T02 to Parasa Jarh New CELL Filled 1.439 3.750 Complete 2 43.45 28.97 72.42 6.76 (2 , 3 , 0 , 3 , 8) (VR43) Concrete Block Ekma Total 1.439 2 43.45 28.97 72.42 6.76 (2 , 3 , 0 , 3 , 8)

Block- Garkha

35 L050 L050-Aloni to Majlispur New CELL Filled 2.986 3.750 Complete 5 90.02 60.01 150.03 15.11 (1 , 2 , 0 , 1 , 4) (VR33) Concrete 36 L049 L049-Nh 102 Mithepur to New CELL Filled 2.719 3.750 Complete 5 85.36 56.91 142.27 13.11 (0 , 1 , 1 , 1 , 3) Rasulpur (TRACK40) Concrete Block Garkha Total 5.705 10 175.38 116.92 292.30 28.22 (1 , 3 , 1 , 2 , 7)

Block- Isuapur

37 L058 L058-T03 to Datra Parsauli New CELL Filled 1.948 3.750 Complete 2 50.35 33.56 83.91 9.47 (0 , 1 , 0 , 0 , 1) (VR23) Concrete 38 L059 L059-T03 to Shampur Israuli New CELL Filled 1.650 3.750 Complete 2 44.27 29.51 73.78 5.57 (0 , 1 , 0 , 0 , 1) (VR24) Concrete Block Isuapur Total 3.598 4 94.62 63.07 157.69 15.04 (0 , 2 , 0 , 0 , 2)

Block- Manjhi

39 L030 L030-Patkhoulia T0 6 to New CELL Filled 1.673 3.750 Complete 0 52.14 34.76 86.90 7.95 (0 , 1 , 0 , 0 , 1) Natwar-Birbal (VR19) Concrete 40 L043 L043-Babhauli to Gorhat New CELL Filled 1.472 3.750 Complete 4 50.64 33.76 84.40 6.35 (1 , 0 , 0 , 1 , 2) (VR44) Concrete Block Manjhi Total 3.145 4 102.78 68.52 171.30 14.30 (1 , 1 , 0 , 1 , 3)

Block- Marhaura

41 L093 L093-T02 Mirjapur PCC Path New CELL Filled 1.040 3.750 Complete 2 25.60 17.07 42.67 5.15 (0 , 1 , 1 , 0 , 2) to Talpur Puraniya East Tola Concrete

Page 6 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

42 L090 L090-Chapra-Marhaura Path New CELL Filled 0.721 3.750 Complete 0 19.58 13.05 32.63 2.64 (0 , 1 , 0 , 0 , 1) via Tejpurva to Talpur Concrete Purania via Pachim Tola (VR95) Block Marhaura Total 1.761 2 45.18 30.12 75.30 7.79 (0 , 2 , 1 , 0 , 3)

Block- Parsa

43 L057 L057-T06 To Pachrukhi New CELL Filled 1.439 3.750 Complete 2 51.07 34.05 85.12 5.98 (1 , 0 , 0 , 0 , 1) (VR25) Concrete 44 L064 L064-Harpur Parsa Hote New -- 0.738 3.750 Complete 2 25.62 17.08 42.70 4.05 (0 , 1 , 0 , 0 , 1) Huye Baghaut Baba Tak (VR30) Block Parsa Total 2.177 4 76.69 51.13 127.82 10.04 (1 , 1 , 0 , 0 , 2)

Block- Sadar Chapra

45 L043 L043-T04 NH to Amarchapra New -- 1.091 3.750 Complete 4 31.75 21.16 52.91 5.98 (0 , 1 , 0 , 0 , 1) (VR26) 46 L065 L065-Syam Chowk NH 101 to New CELL Filled 2.104 3.750 Complete 2 62.81 41.87 104.68 9.78 (0 , 1 , 0 , 0 , 1) Bin Tolia (VR57) Concrete Block Sadar Chapra Total 3.195 6 94.56 63.03 157.59 15.76 (0 , 2 , 0 , 0 , 2)

Block- Sonpur

47 L038 L038-P.W.D Road To New CELL Filled 1.000 3.750 Complete 2 28.74 19.16 47.90 2.11 (2 , 0 , 1 , 5 , 8) Kalenpur (VR16) Concrete 48 L023 L023-NH 19 To New CELL Filled 1.300 3.750 Complete 0 32.57 21.71 54.28 3.92 (0 , 1 , 0 , 3 , 4) Babhamgawan (VR4) Concrete 49 L022 L022-Approach RD To New CELL Filled 1.000 3.750 Complete 0 28.48 18.99 47.47 2.07 (0 , 0 , 3 , 1 , 4) Sobhepur & MAlah Tola Concrete (VR3) Block Sonpur Total 3.300 2 89.79 59.86 149.65 8.10 (2 , 1 , 4 , 9 , 16)

Page 7 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Taraiya

50 L024 L024-NARYANPUR TO1 TO New CELL Filled 2.325 3.750 Complete 4 68.22 45.48 113.70 10.87 (1 , 0 , 1 , 0 , 2) RAMPUR KESHAW (VR13) Concrete 51 L023 L023-MANJHOPUR TO1 TO New CELL Filled 2.072 3.750 Complete 1 53.24 35.49 88.73 7.54 (2 , 2 , 0 , 2 , 6) MOLANAPUR (VR12) Concrete 52 L021 L021-TARAIYA MADHAURA New CELL Filled 2.195 3.750 Complete 3 63.53 42.36 105.89 10.80 (1 , 0 , 0 , 0 , 1) MAIN ROAD TO GIGNA Concrete MIDDLE SCHOOL (VR20) 53 L021 L021-Tarraiya T01 to New CELL Filled 2.348 3.750 Complete 1 69.91 46.61 116.52 7.97 (1 , 1 , 3 , 4 , 9) Chanchalia (VR6) Concrete Block Taraiya Total 8.940 9 254.90 169.94 424.84 37.18 (5 , 3 , 4 , 6 , 18) District Chapra(Saran) Total 34.274 45 1,008.66 672.44 1,681.10 147.17 (12 , 19 , 10 , 21 , 62) District- Darbhanga

Block- Alinagar

54 L025 L025-L024 to Jayantipur New -- 1.100 3.750 Complete 2 29.07 19.38 48.45 3.86 (1 , 0 , 1 , 0 , 2) (VR25) 55 L033 L033-T02 to Daath (VR33) New -- 2.950 3.750 Complete 3 98.02 65.35 163.37 10.78 (1 , 0 , 0 , 0 , 1)

Block Alinagar Total 4.050 5 127.09 84.73 211.82 14.64 (2 , 0 , 1 , 0 , 3)

Block- Benipur

56 L052 L052-Sardar house to New -- 0.510 3.750 Complete 1 18.39 12.26 30.65 0.08 (1 , 0 , 0 , 0 , 1) Purwari tol Mahinam (VR52) Block Benipur Total 0.510 1 18.39 12.26 30.65 0.08 (1 , 0 , 0 , 0 , 1)

Block- Darbhanga

57 L034 L034-T03, SONKI TO New -- 1.995 3.750 Complete 4 57.59 38.40 95.99 8.47 (0 , 1 , 0 , 0 , 1) KHOJKIPUR (VR34)

Page 8 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

58 L041 L041-N.H., T02 TO GAUSA New -- 1.000 3.750 Complete 1 22.11 14.74 36.85 3.58 (0 , 1 , 0 , 1 , 2) (VR41) Block Darbhanga Total 2.995 5 79.70 53.14 132.84 12.05 (0 , 2 , 0 , 1 , 3)

Block- Gaura Bauram

59 L032 L032-T01 ROUTA TO NADAI New -- 5.735 3.750 Complete 7 180.39 120.26 300.65 21.65 (1 , 1 , 0 , 0 , 2) (VR15) 60 L029 L029-T01 BOURAM TO New -- 5.680 3.750 Complete 0 152.53 101.68 254.21 23.07 (1 , 0 , 0 , 0 , 1) MANSARA (VR12) 61 L039 L039-AKHATVARA TO New -- 1.360 3.750 Complete 2 43.03 28.69 71.72 4.97 (0 , 2 , 0 , 0 , 2) USARAHI (VR21) Block Gaura Bauram Total 12.775 9 375.95 250.63 626.58 49.69 (2 , 3 , 0 , 0 , 5)

Block- Hayaghat

62 L043 L043-HAYAGHAT TO GHARARI New Fly Ash 3.250 3.750 Complete 6 98.11 65.41 163.52 13.17 (0 , 1 , 0 , 0 , 1) (VR43) Subgrade Block Hayaghat Total 3.250 6 98.11 65.41 163.52 13.17 (0 , 1 , 0 , 0 , 1)

Block- Kiratpur

63 L047 L047-T01 TO KHAISA (VR31) New Fly Ash 1.200 3.750 Complete 2 38.27 25.51 63.78 4.38 (3 , 1 , 4 , 3 , 11) Subgrade 64 L039 L039-L025 TO BABNAHA New -- 1.100 3.750 Complete 2 37.98 25.32 63.30 3.37 (1 , 0 , 0 , 0 , 1)

Block Kiratpur Total 2.300 4 76.25 50.83 127.08 7.74 (4 , 1 , 4 , 3 , 12) Block- Ksheshwar Sthan

65 L059 L059-L058 TO SANHAULI New -- 3.350 3.750 Complete 4 124.33 82.89 207.22 11.64 (1 , 0 , 0 , 0 , 1) (VR13) Block Ksheshwar Sthan Total 3.350 4 124.33 82.89 207.22 11.64 (1 , 0 , 0 , 0 , 1)

Page 9 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Manigachhi

66 L028 L028-Baghant to New -- 1.995 3.750 Complete 3 59.57 39.71 99.28 8.47 (1 , 1 , 0 , 0 , 2) Chakbasaban (TRACK28) Block Manigachhi Total 1.995 3 59.57 39.71 99.28 8.47 (1 , 1 , 0 , 0 , 2)

Block- Tard Dih

67 L028 L028-T03 to Goth south tol New -- 1.495 3.750 Complete 3 47.27 31.52 78.79 4.76 (0 , 1 , 0 , 0 , 1) (VR28) Block Tard Dih Total 1.495 3 47.27 31.52 78.79 4.76 (0 , 1 , 0 , 0 , 1)

District Darbhanga Total 32.720 40 1,006.66 671.12 1,677.78 122.24 (11 , 9 , 5 , 4 , 29) District- East Champaran

Block-

68 L052 L052-Rampurwa chhpakhiya New Panelled 1.711 3.750 Complete 4 51.94 34.63 86.57 5.24 (0 , 1 , 0 , 1 , 2) to Kumhar tola Damodarpur Cement (VR19) Concrete Block Areraj Total 1.711 4 51.94 34.63 86.57 5.24 (0 , 1 , 0 , 1 , 2)

Block- Banjaria

69 L042 L042-L038 to Khairaghat New Panelled 0.710 3.750 Complete 1 23.14 15.43 38.57 1.85 (0 , 1 , 0 , 0 , 1) (VR13) Cement Concrete 70 L038 L038-L0 26 to Kairy Tola New Panelled 4.474 3.750 Complete 5 146.42 97.61 244.03 13.94 (1 , 0 , 0 , 0 , 1) (VR9) Cement Concrete
Waste Plastics 71 L026 L026-T 07 to Siswa Bankat New Panelled 2.001 3.750 Complete 4 72.84 48.56 121.40 6.14 (0 , 2 , 8 , 5 , 15) (VR6) Cement Concrete

Page 10 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

72 L076 L076-Singhia Hiban to New Panelled 2.366 3.750 Complete 3 64.83 43.22 108.05 7.24 (1 , 0 , 0 , 0 , 1) Ajagarhi (VR37) Cement Concrete Block Banjaria Total 9.551 13 307.23 204.82 512.05 29.16 (2 , 3 , 8 , 5 , 18) Block- Chakia or Pipra

73 L050 L050-PIPREO ROAD TO New Panelled 3.645 3.750 Complete 4 93.80 62.53 156.33 11.51 (0 , 1 , 1 , 7 , 9) PARSAUNI KISHUN (VR37) Cement Concrete
Waste Plastics 74 L048 L048-NH28 CHAKIA TO NAYA New Panelled 0.882 3.750 Complete 2 26.54 17.70 44.24 2.62 (0 , 1 , 2 , 0 , 3) TOLA TARANIA (VR35) Cement Concrete Block Chakia or Pipra Total 4.527 6 120.34 80.23 200.57 14.13 (0 , 2 , 3 , 7 , 12) Block- Harsidhhi

75 T01 T01-Ramnagar to Gosai Tola New Panelled 4.866 3.750 Complete 2 129.96 86.64 216.60 15.46 (1 , 2 , 2 , 2 , 7) Cement Concrete
Waste Plastics 76 T01 T01-Saraiya barai tola to New Panelled 2.149 3.750 Complete 3 60.51 40.34 100.85 6.55 (0 , 1 , 2 , 0 , 3) harijan tola Kishori Cement Concrete 77 T01 T01-Manikpur Harijan tola New Panelled 1.288 3.750 Complete 0 30.96 20.64 51.60 3.85 (0 , 1 , 1 , 0 , 2) to Koiri tola Dom toli Cement Harijan Tola Concrete

Page 11 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

78 L060 L060-L022 to Ghegh tola New Panelled 1.266 3.750 Complete 1 29.96 19.97 49.93 3.82 (0 , 1 , 0 , 0 , 1) (VR11) Cement Concrete Block Harsidhhi Total 9.569 6 251.39 167.59 418.98 29.68 (1 , 5 , 5 , 2 , 13) Block- Kalyanpur

79 L075 L075-T04 To Parariya (VR21) New Panelled 1.658 3.750 Complete 1 41.06 27.37 68.43 4.99 (0 , 1 , 0 , 0 , 1) Cement Concrete 80 L032 L032-Rajpur P.W.D Road To New Panelled 1.797 3.750 Complete 3 45.07 30.04 75.11 5.34 (2 , 11 , 5 , 0 , Harijan Tola (VR39) Cement 18) Concrete Block Kalyanpur Total 3.455 4 86.13 57.41 143.54 10.33 (2 , 12 , 5 , 0 , 19) Block- Kotwa

81 L052 L052-T 06 to Hasanpur New Panelled 1.360 3.750 Complete 2 47.07 31.38 78.45 4.15 (0 , 2 , 1 , 0 , 3) (VR23) Cement Concrete 82 L067 L067-PWD Road Nangol New Panelled 1.994 3.750 Complete 4 58.49 38.99 97.48 5.98 (0 , 3 , 0 , 0 , 3) Chowk (VR30) Cement Concrete Block Kotwa Total 3.354 6 105.56 70.37 175.93 10.14 (0 , 5 , 1 , 0 , 6)

Block-

83 L053 L053-L0 23 to Sekah Toli New Panelled 1.466 3.750 Complete 3 48.72 32.48 81.20 4.59 (1 , 1 , 0 , 0 , 2) (VR37) Cement Concrete 84 L075 L075-T 06 to Chamar Toli New Panelled 0.606 3.750 Complete 1 17.26 11.51 28.77 1.58 (1 , 0 , 0 , 0 , 1) Via Jhitkahiya New (VR69) Cement Concrete

Page 12 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

85 T07 T07-NH 28 at Bariya to NH New Panelled 0.624 3.750 Complete 1 18.60 12.40 31.00 1.63 (0 , 1 , 0 , 1 , 2) 28 at Mathbanwari (VR62) Cement Concrete 86 L034 L034-Motihari Chauradano New Panelled 0.945 3.750 Complete 1 29.29 19.53 48.82 2.69 (0 , 2 , 0 , 1 , 3) PWD Road to Ramgharwa Cement (VR26) Concrete 87 L055 L055-L0 24 to Dusadh Toli New Panelled 1.226 3.750 Complete 4 46.23 30.82 77.05 3.84 (1 , 0 , 0 , 0 , 1) (VR38) Cement Concrete Block Motihari Total 4.867 10 160.10 106.74 266.84 14.32 (3 , 4 , 0 , 2 , 9)

Block- Narkatia or Chhauradano

88 L045 L045-Parsa to Hanuman New Panelled 1.383 3.750 Complete 1 44.13 29.42 73.55 4.02 (0 , 1 , 1 , 0 , 2) Nagar (VR45) Cement Concrete Block Narkatia or Chhauradano Total 1.383 1 44.13 29.42 73.55 4.02 (0 , 1 , 1 , 0 , 2)

Block- Paharpur

89 L023 L023-Bhaya Chapra to New Panelled 2.859 3.750 Complete 3 92.68 61.79 154.47 8.80 (0 , 0 , 2 , 1 , 3) Bharwaliya (VR3) Cement Concrete
Waste Plastics 90 L042 L042-Barkurwa Patrwa to New Panelled 1.482 3.750 Complete 2 45.51 30.34 75.85 4.34 (0 , 1 , 2 , 0 , 3) Ramsarangi (VR9) Cement Concrete Block Paharpur Total 4.341 5 138.19 92.13 230.32 13.14 (0 , 1 , 4 , 1 , 6)

Block- Pipra Kothi

91 L062 L062-Piprakothi NH 28 to New Panelled 2.646 3.750 Complete 3 86.27 57.51 143.78 8.37 (2 , 0 , 2 , 0 , 4) Bela Tola (VR18) Cement Concrete Block Pipra Kothi Total 2.646 3 86.27 57.51 143.78 8.37 (2 , 0 , 2 , 0 , 4)

Page 13 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Ramgarhwa

92 L041 L041-Purushottampur to New Panelled 3.000 3.750 Complete 4 99.85 66.57 166.42 9.50 (0 , 2 , 0 , 0 , 2) Balua Cement Concrete
Waste Plastics 93 L035 L035-Belwa Piparpati to New Panelled 3.219 3.750 Complete 2 95.98 63.98 159.96 9.59 (2 , 0 , 1 , 0 , 3) Phulwariya (VR35) Cement Concrete
Waste Plastics Block Ramgarhwa Total 6.219 6 195.83 130.55 326.38 19.09 (2 , 2 , 1 , 0 , 5)

Block-

94 L043 L043-Semri to Ahirwa Tola New -- 1.650 3.750 Complete 2 56.82 37.88 94.70 5.20 (0 , 1 , 0 , 0 , 1)

95 L056 L056-L028 Lachhmanwa to New Panelled 1.125 3.750 Complete 1 29.94 19.96 49.90 3.32 (0 , 1 , 0 , 0 , 1) Pokhara Tola Cement Concrete 96 L038 L038-T04 to Baumna tola New Panelled 1.319 3.750 Complete 2 36.45 24.30 60.75 3.91 (0 , 2 , 0 , 1 , 3) Cement Concrete Block Raxaul Total 4.094 5 123.21 82.14 205.35 12.43 (0 , 4 , 0 , 1 , 5)

Block- Sangrampur

97 L026 L026-T0 9 Madhubani to New Panelled 2.346 3.750 Complete 4 58.72 39.15 97.87 7.17 (1 , 0 , 0 , 0 , 1) bhatwaliya Cement Concrete 98 T04 T04-Barwa P.M.G.S.Y to New Panelled 1.943 3.750 Complete 3 45.34 30.23 75.57 5.52 (0 , 1 , 1 , 0 , 2) Dalit basti chamar tola Cement Concrete

Page 14 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

99 T08 T08-S.H. to Mathiya Upadya New Panelled 1.365 3.750 Complete 2 32.61 21.74 54.35 4.04 (0 , 0 , 1 , 1 , 2) tola Cement Concrete Block Sangrampur Total 5.654 9 136.67 91.12 227.79 16.72 (1 , 1 , 2 , 1 , 5)

Block-

100 L042 L042-Parsuna to Pachbhirwa New Panelled 1.559 3.750 Complete 3 55.82 37.21 93.03 4.71 (1 , 0 , 1 , 3 , 5) (VR12) Cement Concrete 101 L049 L049-Kathwaliya to Malah New Panelled 0.787 3.750 Complete 0 24.24 16.16 40.40 2.24 (0 , 0 , 1 , 2 , 3) toli (VR16) Cement Concrete 102 L041 L041-Bhatha to Bhatha New Panelled 1.266 3.750 Complete 2 37.51 25.01 62.52 3.52 (0 , 0 , 1 , 3 , 4) Laxmitola (VR11) Cement Concrete 103 L066 L066-PWD Areraj to Kobiya New Panelled 2.136 3.750 Complete 0 71.89 47.93 119.82 6.36 (1 , 0 , 0 , 0 , 1) (VR36) Cement Concrete Block Sugauli Total 5.748 5 189.46 126.31 315.77 16.84 (2 , 0 , 3 , 8 , 13) Block- Turkaulia

104 T04 T04-Trkauliya to Kotwa New Panelled 2.704 3.750 Complete 3 85.21 56.80 142.01 8.25 (1 , 1 , 0 , 0 , 2) (VR4) Cement Concrete 105 L067 L067-L029 to Karmaula New Panelled 2.250 3.750 Complete 3 73.40 48.93 122.33 6.68 (0 , 1 , 0 , 0 , 1) (VR42) Cement Concrete 106 T05 T05-Nankar to Turakuilya via New Panelled 3.795 3.750 Complete 4 120.89 80.59 201.48 12.06 (1 , 3 , 3 , 3 , 10) Madhumalti (VR5) Cement Concrete
Waste Plastics

Page 15 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

107 L033 L033-Sankar Saria Tikaita New Panelled 2.569 3.750 Complete 3 74.53 49.69 124.22 7.67 (0 , 2 , 1 , 0 , 3) Madhu Chapra Road to Cement VillGovindpur Siwan (VR28) Concrete 108 L053 L053-T 05 to Nath Tola New Panelled 1.734 3.750 Complete 1 45.57 30.38 75.95 5.09 (1 , 2 , 1 , 0 , 4) (VR23) Cement Concrete 109 L086 L086-T02 to Majuraha New Panelled 2.563 3.750 Complete 1 71.56 47.71 119.27 7.36 (2 , 0 , 1 , 0 , 3) Nimuiya Tola (VR56) Cement Concrete Block Turkaulia Total 15.615 15 471.16 314.10 785.26 47.11 (5 , 9 , 6 , 3 , 23) District East Champaran Total 82.734 98 2,467.61 1,645.07 4,112.68 250.71 (20 , 50 , 41 , 31 , 142) District- Gaya

Block- Atri

110 L022 L022-Atri-Bathani road New Cold Mix 1.339 3.750 Complete 3 29.26 19.50 48.76 5.54 (0 , 0 , 1 , 0 , 1) ToBholibigha (VR33) Technology Block Atri Total 1.339 3 29.26 19.50 48.76 5.54 (0 , 0 , 1 , 0 , 1)

Block- Banke Bazar

111 L034 L034-L037 to Barhmoria New CELL Filled 4.375 3.750 Complete 6 122.31 81.54 203.85 17.43 (0 , 0 , 1 , 0 , 1) (VR34) Concrete
Cold Mix Technology 112 L066 L066-Pananiya to New CELL Filled 3.052 3.750 Complete 24 110.30 73.53 183.83 9.66 (1 , 1 , 2 , 0 , 4) Kodwariya (VR6) Concrete
Cold Mix Technology 113 L061 L061-T01 to Singhpur (VR61) New CELL Filled 0.942 3.750 Complete 2 25.72 17.15 42.87 3.07 (1 , 1 , 4 , 0 , 6) Concrete
Cold Mix Technology

Page 16 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

114 L067 L067-L 032 to Dukhatpur New CELL Filled 0.671 3.750 Complete 2 22.76 15.17 37.93 1.79 (0 , 1 , 0 , 0 , 1) (VR7) Concrete
Cold Mix Technology 115 L062 L062-Majuri Khurd to New Cold Mix 0.791 3.750 Complete 1 19.00 12.67 31.67 3.21 (0 , 0 , 1 , 0 , 1) Pachim Tola (VR10) Technology 116 L044 L044-L048 to Lutua (VR44) New CELL Filled 7.932 3.750 Complete 17 250.38 166.92 417.30 26.54 (2 , 0 , 1 , 0 , 3) Concrete
Waste Plastics Block Banke Bazar Total 17.763 52 550.47 366.98 917.45 61.70 (4 , 3 , 9 , 0 , 16) Block- Barachatti

117 L027 L027-P SCHOOL GANGAWAR New CELL Filled 1.371 3.750 Complete 3 35.20 23.47 58.67 5.25 (0 , 0 , 1 , 0 , 1) TOP SCHOOL TIKAIT (VR53) Concrete
Cold Mix Technology 118 L036 L036-SEWAI TO BHAGALPUR New CELL Filled 1.493 3.750 Complete 3 41.13 27.42 68.55 5.96 (0 , 0 , 1 , 0 , 1) (VR63) Concrete
Cold Mix Technology 119 L038 L038-TILAYA KHURD L040 TO New Cold Mix 2.312 3.750 Complete 6 75.51 50.34 125.85 9.61 (0 , 1 , 0 , 0 , 1) DEOURI DUMAR (VR19) Technology 120 L035 L035-BUMER TO SEWAI New CELL Filled 3.559 3.750 Complete 9 118.69 79.13 197.82 12.19 (0 , 1 , 0 , 0 , 1) (VR62) Concrete
Cold Mix Technology 121 L052 L052-TILAYA KHURD ROAD New Cold Mix 0.766 3.750 Complete 2 31.23 20.82 52.05 3.13 (0 , 0 , 1 , 0 , 1) TOMANKUMHARI (VR80) Technology 122 L038 L038-BUMER TO KENDUA New Cold Mix 0.508 3.750 Complete 2 15.11 10.08 25.19 2.29 (0 , 1 , 0 , 0 , 1) (VR65) Technology

Page 17 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

123 L025 L025-SELARI BINDA ROAD TO New CELL Filled 0.968 3.750 Complete 3 28.48 18.99 47.47 3.76 (0 , 1 , 0 , 0 , 1) PIPRADIH (VR51) Concrete
Cold Mix Technology Block Barachatti Total 10.977 28 345.35 230.25 575.60 42.18 (0 , 4 , 3 , 0 , 7)

Block- Bathani

124 L043 L043-Gaya-Islampur Road New CELL Filled 4.350 3.750 Complete 11 119.99 79.99 199.98 16.55 (0 , 0 , 2 , 0 , 2) T03 To Deay (ODR43) Concrete
Cold Mix Technology Block Bathani Total 4.350 11 119.99 79.99 199.98 16.55 (0 , 0 , 2 , 0 , 2)

Block- Belaganj

125 L101 L101-Suraundha to New CELL Filled 1.170 3.750 Complete 2 28.54 19.03 47.57 4.00 (0 , 1 , 0 , 0 , 1) Norangpur (TRACK101) Concrete
Cold Mix Technology Block Belaganj Total 1.170 2 28.54 19.03 47.57 4.00 (0 , 1 , 0 , 0 , 1)

Block- Bodh Gaya

126 L109 L109-Itra to Manjhhi Bigha New CELL Filled 1.172 3.750 Complete 4 32.73 21.82 54.55 4.68 (0 , 1 , 1 , 0 , 2) Via pachhnawa (VR109) Concrete
Cold Mix Technology 127 L119 L119-Gaya Sherghati Road New CELL Filled 0.995 3.750 Complete 2 23.45 15.64 39.09 3.67 (0 , 0 , 1 , 1 , 2) to Lakshmipur via Kajraili Concrete (VR119)
Cold Mix Technology 128 L027 L027-Gafa Kalan Road to New CELL Filled 1.214 3.750 Complete 2 26.85 17.90 44.75 4.66 (1 , 0 , 3 , 3 , 7) Rajondha (VR27) Concrete
Cold Mix Technology

Page 18 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

129 L114 L114-L114Harli kala more to New CELL Filled 0.923 3.750 Complete 2 22.37 14.91 37.28 3.69 (0 , 1 , 0 , 0 , 1) harli kurd (VR114) Concrete
Cold Mix Technology Block Bodh Gaya Total 4.304 10 105.40 70.27 175.67 16.71 (1 , 2 , 5 , 4 , 12) Block- Dobhi

130 L071 L071-L042 TO MAHUARI New CELL Filled 7.541 3.750 Complete 14 218.88 145.92 364.80 28.01 (1 , 0 , 0 , 0 , 1) (VR46) Concrete
Waste Plastics Block Dobhi Total 7.541 14 218.88 145.92 364.80 28.01 (1 , 0 , 0 , 0 , 1)

Block- Fatehpur

131 L144 L144-Trawan Road to New CELL Filled 0.504 3.750 Complete 1 14.54 9.69 24.23 1.53 (0 , 1 , 0 , 0 , 1) Haridatta (TRACK144) Concrete
Cold Mix Technology 132 L100 L100-Patwansh Road Gurpa New Cold Mix 3.874 3.750 Complete 7 96.88 64.58 161.46 15.89 (0 , 1 , 0 , 0 , 1) Bazar to Telani (TRACK100) Technology 133 L065 L065-Fatehpur Wazirganj New CELL Filled 0.965 3.750 Complete 4 27.01 18.01 45.02 4.00 (0 , 1 , 0 , 0 , 1) Road to Badganw Concrete (TRACK65)
Cold Mix Technology 134 L103 L103-Fatehpur Rajauli New CELL Filled 0.865 3.750 Complete 3 24.46 16.31 40.77 3.00 (1 , 1 , 0 , 0 , 2) Road,Kenduya to Ketra Concrete (TRACK103)
Cold Mix Technology 135 L142 L142-PMGSY Amin Road to New CELL Filled 1.002 3.750 Complete 2 26.79 17.86 44.65 3.81 (0 , 1 , 0 , 0 , 1) Jehalibigha (TRACK142) Concrete
Cold Mix Technology

Page 19 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

136 L121 L121-PMGSY Ganeshidih New Cold Mix 1.127 3.750 Complete 5 38.41 25.61 64.02 5.03 (0 , 0 , 1 , 0 , 1) Road to Marahitand Technology (TRACK121) 137 L150 L150-Fatehpur Rajauli Road New CELL Filled 1.448 3.750 Complete 1 40.22 26.82 67.04 5.03 (0 , 1 , 0 , 0 , 1) to Baraghat (TRACK150) Concrete
Cold Mix Technology 138 L059 L059-Tetariya Road to New Cold Mix 3.692 3.750 Complete 8 95.53 63.69 159.22 15.39 (0 , 1 , 0 , 0 , 1) Ganipipra (VR59) Technology 139 L098 L098-Bherwan to Bherwan New Cold Mix 1.523 3.750 Complete 3 43.30 28.86 72.16 6.43 (0 , 0 , 1 , 0 , 1) Beldari (TRACK98) Technology 140 L105 L105-Halumatta Road to New CELL Filled 2.513 3.750 Complete 3 63.32 42.21 105.53 9.72 (0 , 0 , 1 , 2 , 3) Sidariya via Fulganj & Concrete Mistiriyadih (TRACK105)
Cold Mix Technology 141 L154 L154-Dumarichati Jaipur New Cold Mix 1.067 3.750 Complete 2 30.91 20.61 51.52 4.49 (0 , 0 , 1 , 0 , 1) Gurpa Rd To Tinanma Technology (TRACK154) 142 L123 L123-Guri -Isarway Road to New CELL Filled 1.561 3.750 Complete 4 43.09 28.72 71.81 6.31 (0 , 0 , 1 , 0 , 1) Raghunathpur (TRACK123) Concrete
Cold Mix Technology 143 L145 L145-PMGSY L029 Gummn New CELL Filled 1.175 3.750 Complete 2 38.44 25.63 64.07 3.57 (0 , 0 , 1 , 0 , 1) TO Lalu Nagar (TRACK145) Concrete
Cold Mix Technology 144 L106 L106-Gurpa Dummarichatti New CELL Filled 3.194 3.750 Complete 6 91.55 61.03 152.58 12.64 (0 , 1 , 0 , 1 , 2) Road to Bhuttubigha via Concrete Barsauna (TRACK106)
Cold Mix Technology 145 L141 L141-Tarawan Kothar Road New Cold Mix 2.219 3.750 Complete 3 58.39 38.92 97.31 8.96 (0 , 0 , 1 , 0 , 1) to Tengra (TRACK141) Technology 146 L054 L054-Kariyadpur Road to New CELL Filled 3.433 3.750 Complete 7 96.34 64.23 160.57 11.25 (0 , 0 , 2 , 1 , 3) Barua (TRACK54) Concrete
Waste Plastics

Page 20 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

147 L068 L068-Fatehpur Wazirganj New CELL Filled 2.094 3.750 Complete 6 64.35 42.90 107.25 6.10 (1 , 2 , 1 , 1 , 5) Road to Darha (TRACK68) Concrete
Cold Mix Technology 148 L143 L143-Tengara Road to New CELL Filled 1.876 3.750 Complete 3 58.79 39.19 97.98 7.39 (0 , 1 , 0 , 0 , 1) Manikbigha (TRACK143) Concrete
Cold Mix Technology 149 L133 L133-Paharpur Guri-Isarway New CELL Filled 1.945 3.750 Complete 5 53.46 35.64 89.10 7.52 (0 , 1 , 0 , 0 , 1) Road to Khiderpur Concrete (TRACK133)
Cold Mix Technology 150 L097 L097-Fatehpur Rajauli New Cold Mix 1.618 3.750 Complete 4 50.99 33.99 84.98 6.73 (0 , 0 , 2 , 0 , 2) Rakshi Road to Lodichak Technology (TRACK97) 151 L116 L116-Dummarichatti-Dundu New CELL Filled 3.838 3.750 Complete 7 99.97 66.65 166.62 12.76 (0 , 0 , 1 , 0 , 1) Road to Manjhiyawan Concrete (TRACK116)
Cold Mix Technology 152 L152 L152-Dummarichati-Dundu New Cold Mix 1.908 3.750 Complete 4 58.73 39.16 97.89 8.08 (0 , 0 , 1 , 0 , 1) Road to Keshodih Technology (TRACK152) 153 L101 L101-Gurpa Bazar Road to New CELL Filled 3.562 3.750 Complete 4 88.81 59.21 148.02 13.50 (0 , 1 , 1 , 0 , 2) Jhagrahi Kauriya Concrete (TRACK101)
Cold Mix Technology Block Fatehpur Total 47.003 94 1,304.28 869.52 2,173.80 179.10 (2 , 13 , 15 , 5 , 35) Block- Guraru

154 L100 L100-Gaya Rafiganj Main New CELL Filled 0.759 3.750 Complete 1 18.63 12.42 31.05 2.54 (0 , 1 , 0 , 1 , 2) Road to Amwan (VR100) Concrete
Cold Mix Technology

Page 21 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

155 L027 L027-Jungaldiha to Tanti New CELL Filled 5.802 3.750 Complete 14 148.05 98.70 246.75 23.93 (0 , 1 , 2 , 3 , 6) (VR27) Concrete
Cold Mix Technology Block Guraru Total 6.561 15 166.68 111.12 277.80 26.47 (0 , 2 , 2 , 4 , 8)

Block- Gurua

156 L099 L099-T01 TO TETARIYA New CELL Filled 1.840 3.750 Complete 5 45.33 30.22 75.55 6.70 (0 , 0 , 1 , 0 , 1) (VR68) Concrete
Cold Mix Technology 157 L098 L098-T03 TO NARIAHI (VR67) New CELL Filled 0.820 3.750 Complete 2 22.25 14.84 37.09 2.52 (0 , 0 , 1 , 0 , 1) Concrete
Cold Mix Technology 158 L092 L092-L036 TO RUPANCHAK New CELL Filled 0.771 3.750 Complete 3 23.23 15.49 38.72 1.66 (1 , 0 , 0 , 0 , 1) SERARI (VR61) Concrete
Cold Mix Technology 159 L100 L100-L071 TO KAJH (VR69) New CELL Filled 1.040 3.750 Complete 3 28.17 18.78 46.95 3.78 (0 , 1 , 0 , 0 , 1) Concrete
Cold Mix Technology 160 L095 L095-L029 TO SHERPUR New CELL Filled 1.078 3.750 Complete 3 27.93 18.62 46.55 4.07 (0 , 1 , 0 , 0 , 1) (VR64) Concrete
Cold Mix Technology 161 L121 L121-T03 TO SIDHARATHPUR New CELL Filled 0.913 3.750 Complete 3 26.41 17.61 44.02 2.90 (0 , 1 , 0 , 0 , 1) (VR90) Concrete
Cold Mix Technology Block Gurua Total 6.462 19 173.32 115.56 288.88 21.64 (1 , 3 , 2 , 0 , 6)

Page 22 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Imamganj

162 L032 L032-T03 to Phulwaria New CELL Filled 1.938 3.750 Complete 4 60.46 40.31 100.77 6.87 (0 , 1 , 0 , 0 , 1) (ODR32) Concrete
Cold Mix Technology Block Imamganj Total 1.938 4 60.46 40.31 100.77 6.87 (0 , 1 , 0 , 0 , 1)

Block- Konch

163 L117 L117-T02 Mohan Bigha New Cold Mix 0.786 3.750 Complete 2 22.83 15.22 38.05 3.22 (0 , 0 , 1 , 0 , 1) (VR117) Technology 164 L118 L118-Ekariya to Laliya Bigha New CELL Filled 0.794 3.750 Complete 2 27.63 18.42 46.05 1.90 (0 , 0 , 1 , 0 , 1) (VR118) Concrete
Cold Mix Technology 165 L114 L114-L029 to Gango Bigha New Cold Mix 1.587 3.750 Complete 3 39.60 26.40 66.00 6.51 (0 , 0 , 1 , 0 , 1) (VR114) Technology Block Konch Total 3.167 7 90.06 60.04 150.10 11.63 (0 , 0 , 3 , 0 , 3)

Block- Mohanpur

166 L067 L067-L040 TO MOTICHAK New CELL Filled 1.761 3.750 Complete 4 54.70 36.47 91.17 6.03 (0 , 0 , 1 , 0 , 1) (VR48) Concrete
Cold Mix Technology 167 L069 L069-T02 TO GHORDAUR New CELL Filled 2.544 3.750 Complete 4 67.70 45.13 112.83 10.10 (0 , 0 , 1 , 0 , 1) (VR50) Concrete
Cold Mix Technology Block Mohanpur Total 4.305 8 122.40 81.60 204.00 16.14 (0 , 0 , 2 , 0 , 2)

Page 23 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Nagar

168 L072 L072-SHADIPUR TO KASHMA New CELL Filled 0.802 3.750 Complete 3 21.72 14.48 36.20 3.38 (0 , 1 , 1 , 0 , 2) (TRACK72) Concrete
Cold Mix Technology 169 L062 L062-Kharati Bodh Gaya To New CELL Filled 0.797 3.750 Complete 2 19.71 13.14 32.85 2.94 (0 , 1 , 0 , 0 , 1) Charour (VR62) Concrete
Cold Mix Technology 170 L025 L025-Gaya Patna Road TO1 New CELL Filled 0.750 3.750 Complete 1 16.75 11.17 27.92 2.07 (1 , 0 , 0 , 0 , 1) To Panchu Bigha (VR25) Concrete
Cold Mix Technology 171 L079 L079-Chakand Pretsila Road New CELL Filled 2.577 3.750 Complete 9 67.18 44.79 111.97 8.42 (0 , 2 , 0 , 0 , 2) to Nabinagar (TRACK79) Concrete
Cold Mix Technology 172 L046 L046-Habipur Chakand New Cold Mix 1.018 3.750 Complete 2 22.25 14.83 37.08 4.15 (1 , 1 , 1 , 0 , 3) Tekari to Neazipur (VR46) Technology 173 L067 L067-Mira Bigha TO New CELL Filled 1.651 3.750 Complete 3 38.02 25.34 63.36 5.78 (0 , 1 , 1 , 0 , 2) Hargawon (VR67) Concrete
Cold Mix Technology 174 L027 L027-Gaya Dobhi rd TO3 To New Cold Mix 1.373 3.750 Complete 3 29.64 19.76 49.40 5.63 (0 , 0 , 1 , 0 , 1) Bajeetpur (VR27) Technology Block Nagar Total 8.968 23 215.27 143.51 358.78 32.36 (2 , 6 , 4 , 0 , 12) Block- Paraiya

175 L053 L053-Gaya Rafiganj Road to New Cold Mix 2.546 3.750 Complete 3 55.24 36.83 92.07 10.13 (0 , 0 , 1 , 0 , 1) Jhakharabigha (VR53) Technology 176 L094 L094-L055 to manjhiawan New CELL Filled 0.506 3.750 Complete 0 12.16 8.11 20.27 1.71 (0 , 1 , 0 , 0 , 1) (VR94) Concrete
Cold Mix Technology

Page 24 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

177 L075 L075-Dhansira to Gajanpur New Cold Mix 0.833 3.750 Complete 0 18.50 12.33 30.83 2.13 (0 , 0 , 1 , 0 , 1) (VR75) Technology
Panelled Cement Concrete 178 L092 L092-T03 English Gumti to New CELL Filled 2.536 3.750 Complete 5 63.97 42.65 106.62 8.87 (0 , 1 , 0 , 0 , 1) Mubarakpur (VR92) Concrete
Cold Mix Technology Block Paraiya Total 6.421 8 149.87 99.92 249.79 22.84 (0 , 2 , 2 , 0 , 4)

Block- Sherghati

179 L062 L062-L055 TO ALIGANJ New Cold Mix 0.509 3.750 Complete 2 18.64 12.43 31.07 1.54 (0 , 0 , 1 , 0 , 1) (VR41) Technology
Panelled Cement Concrete Block Sherghati Total 0.509 2 18.64 12.43 31.07 1.54 (0 , 0 , 1 , 0 , 1)

Block- Tankuppa

180 L068 L068-Parwaldih Road to New CELL Filled 3.174 3.750 Complete 7 80.20 53.47 133.67 10.74 (1 , 0 , 0 , 0 , 1) Dariyaura (TRACK68) Concrete
Cold Mix Technology 181 L055 L055-Tetaria Road to New Cold Mix 1.172 3.750 Complete 4 27.30 18.20 45.50 5.07 (0 , 3 , 0 , 0 , 3) Bhagwanpur (VR55) Technology Block Tankuppa Total 4.346 11 107.50 71.67 179.17 15.81 (1 , 3 , 0 , 0 , 4)

Block- Tekari

182 L034 L034-Panchanpur Kurtha New CELL Filled 4.261 3.750 Complete 10 156.22 104.15 260.37 15.67 (4 , 0 , 1 , 2 , 7) Road, T05 to Mahmanna Concrete
Cold Mix Technology

Page 25 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

183 L040 L040-Dighoura, L039 to New CELL Filled 0.579 3.750 Complete 1 15.51 10.34 25.85 1.60 (0 , 0 , 3 , 0 , 3) Bhirpar (VR40) Concrete
Cold Mix Technology 184 L080 L080-Sahawara, L077 to New Cold Mix 1.172 3.750 Complete 3 32.94 21.96 54.90 4.99 (0 , 1 , 0 , 0 , 1) Idinpur (VR80) Technology 185 L143 L143-Ure Amarpur Path New CELL Filled 0.778 3.750 Complete 1 19.80 13.20 33.00 2.12 (0 , 1 , 0 , 0 , 1) Nahar to Saidpur Concrete (TRACK143)
Cold Mix Technology 186 L162 L162-Tekari Sadipur Road to New CELL Filled 0.517 3.750 Complete 1 15.38 10.25 25.63 1.19 (0 , 0 , 1 , 0 , 1) Dariyapur (TRACK162) Concrete
Cold Mix Technology 187 L149 L149-Khanetu to Muslim New CELL Filled 2.471 3.750 Complete 7 64.24 42.82 107.06 9.48 (0 , 0 , 1 , 0 , 1) Parariya (TRACK149) Concrete
Cold Mix Technology 188 L052 L052-Tikari Jagir Kathak New Cold Mix 2.987 3.750 Complete 6 84.43 56.29 140.72 12.12 (1 , 0 , 0 , 0 , 1) Road, L034 to Kusap (VR52) Technology Block Tekari Total 12.765 29 388.52 259.01 647.53 47.17 (5 , 2 , 6 , 2 , 15) Block- Wazirganj

189 L119 L119-Aamethi Road to New Cold Mix 0.961 3.750 Complete 2 24.07 16.05 40.12 3.85 (0 , 0 , 1 , 0 , 1) kailash nagar (VR119) Technology 190 L117 L117-Budh dharya Road to New CELL Filled 1.374 3.750 Complete 2 31.66 21.10 52.76 5.15 (0 , 1 , 1 , 0 , 2) Sarsa (TRACK117) Concrete
Cold Mix Technology 191 L146 L146-Kushmhar to Kushmhar New CELL Filled 0.868 3.750 Complete 2 20.14 13.43 33.57 3.25 (0 , 0 , 1 , 0 , 1) H.Toli (TRACK146) Concrete
Cold Mix Technology

Page 26 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

192 L115 L115-L063 Singhora Road to New CELL Filled 0.989 3.750 Complete 2 24.20 16.13 40.33 3.71 (0 , 0 , 1 , 0 , 1) Utampur (TRACK115) Concrete
Cold Mix Technology 193 L138 L138-L021 Ardhawa Road to New CELL Filled 0.567 3.750 Complete 0 12.48 8.32 20.80 1.75 (0 , 0 , 1 , 0 , 1) Villond (TRACK138) Concrete
Cold Mix Technology 194 L127 L127-L38Duramaya Road New CELL Filled 0.723 3.750 Complete 2 17.77 11.85 29.62 2.71 (0 , 0 , 1 , 0 , 1) toBarhi bhiga (TRACK127) Concrete
Cold Mix Technology 195 L080 L080-Mahuet Road to New CELL Filled 0.680 3.750 Complete 2 18.60 12.40 31.00 1.63 (1 , 0 , 0 , 0 , 1) Behiain (VR80) Concrete
Cold Mix Technology 196 L126 L126-Fatehpur Road to New CELL Filled 1.020 3.750 Complete 2 26.10 17.40 43.50 3.92 (0 , 0 , 1 , 0 , 1) Banabihga (TRACK126) Concrete
Cold Mix Technology 197 L082 L082-Dumarawa to New CELL Filled 1.120 3.750 Complete 3 30.43 20.28 50.71 4.28 (0 , 0 , 4 , 0 , 4) Mahugain (VR82) Concrete
Cold Mix Technology 198 L145 L145-Dumrawan road to New Cold Mix 1.013 3.750 Complete 2 22.97 15.31 38.28 4.14 (0 , 0 , 1 , 0 , 1) Harli tarli (TRACK145) Technology 199 L104 L104-Mangrawan to New CELL Filled 1.466 3.750 Complete 0 27.20 18.14 45.34 5.28 (0 , 0 , 1 , 0 , 1) mangrawan N tola (VR104) Concrete
Cold Mix Technology Block Wazirganj Total 10.781 19 255.62 170.41 426.03 39.66 (1 , 1 , 13 , 0 , 15) District Gaya Total 160.670 359 4,450.51 2,967.04 7,417.55 595.92 (18 , 43 , 70 , 15 , 146) District- Gopalganj

Page 27 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Baikunthpur

200 L027 L027-Dighwa Dubali PHD se New CELL Filled 1.548 3.750 Complete 3 55.03 36.69 91.72 2.80 (1 , 0 , 1 , 4 , 6) Kahuatti daya giri ke tola Concrete (VR52) 201 T01 T01-KHAIRA AZAM TO KOIRI New CELL Filled 1.428 3.750 Complete 0 47.55 31.70 79.25 2.30 (0 , 0 , 2 , 0 , 2) TOLA TAK (VR31) Concrete Block Baikunthpur Total 2.976 3 102.58 68.39 170.97 5.10 (1 , 0 , 3 , 4 , 8)

Block- Barauli

202 L038 L038-RATANSARAI TO New CELL Filled 7.367 3.750 Complete 8 231.11 154.08 385.19 27.81 (0 , 2 , 0 , 0 , 2) MADHOPUR (TRACK4) Concrete Block Barauli Total 7.367 8 231.11 154.08 385.19 27.81 (0 , 2 , 0 , 0 , 2)

Block- Gopalganj

203 L027 L027-Semra to Gamharia New CELL Filled 1.500 3.750 Complete 2 39.07 26.05 65.12 7.59 (0 , 1 , 3 , 13 , (ODR12) Concrete 17) 204 L037 L037-L031 Harpur to New CELL Filled 0.501 3.750 Complete 2 15.64 10.42 26.06 1.51 (0 , 1 , 0 , 0 , 1) Noniyatola (ODR6) Concrete 205 L043 L043-Bhitbherwa Mehadiya New CELL Filled 0.878 3.750 Complete 2 24.40 16.27 40.67 4.64 (0 , 1 , 1 , 1 , 3) PMGSY Road Panchayat Concrete Bhawan Tirbhirwa to Rajokhar Bhaya Ahir Tola (ODR23) 206 L042 L042-Yadopur Khargauli New CELL Filled 2.050 3.750 Complete 6 62.24 41.49 103.73 7.77 (1 , 1 , 2 , 0 , 4) PMGSY Raod Madarsa to Concrete Singhorwa (ODR22) Block Gopalganj Total 4.929 12 141.35 94.23 235.58 21.50 (1 , 4 , 6 , 14 , 25) Block- Manjha

207 L055 L055-BHAINSAHI L025 TO New CELL Filled 4.779 3.750 Complete 6 145.92 97.28 243.20 15.85 (0 , 3 , 1 , 4 , 8) NIMUIYAN (VR7) Concrete 208 L037 L037-T04 TO PAITHANPATTI New CELL Filled 2.128 3.750 Complete 3 66.14 44.09 110.23 6.09 (0 , 1 , 1 , 7 , 9) (VR18) Concrete

Page 28 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

209 L024 L024-DANAPUR T01 TO New CELL Filled 1.471 3.750 Complete 4 48.23 32.15 80.38 2.66 (3 , 1 , 7 , 0 , 11) MADHUSARAIA (VR3) Concrete 210 L047 L047-DULDULIA TO1 TO New CELL Filled 2.538 3.750 Complete 3 71.98 47.98 119.96 11.27 (0 , 3 , 2 , 1 , 6) GOVINDPUR (VR6) Concrete 211 L048 L048-T04 TO GONIYAR New CELL Filled 1.814 3.750 Complete 2 48.55 32.37 80.92 9.49 (0 , 1 , 0 , 1 , 2) (VR21) Concrete 212 L029 L029-ALAPUR TO SANTPUR New CELL Filled 1.525 3.750 Complete 1 45.27 30.18 75.45 5.31 (0 , 1 , 0 , 2 , 3) (VR9) Concrete 213 L030 L030-SHEIKHPARSA TO New CELL Filled 2.479 3.750 Complete 3 68.93 45.95 114.88 10.01 (0 , 1 , 2 , 3 , 6) PATHRA (VR10) Concrete Block Manjha Total 16.734 22 495.02 330.00 825.02 60.68 (3 , 11 , 13 , 18 , 45) Block- Panchdewari

214 L050 L050-PMGSY PATH BANKATIA New CELL Filled 1.125 3.750 Complete 3 36.92 24.62 61.54 3.57 (0 , 1 , 0 , 0 , 1) PACHAYAT BHAWAN TO Concrete BICHALA TOLA (VR9) 215 L054 L054-KUBRAHI TO MAFI New CELL Filled 2.063 3.750 Complete 5 66.21 44.14 110.35 11.08 (0 , 1 , 0 , 0 , 1) GUROAN (VR13) Concrete 216 L052 L052-JAMUNHA HIGH New CELL Filled 1.258 3.750 Complete 5 38.85 25.90 64.75 6.14 (0 , 1 , 0 , 0 , 1) SCHOOL TO POIA RUP Concrete 217 L041 L041-Mahuawa T04 to Bari New CELL Filled 1.768 3.750 Complete 3 49.46 32.98 82.44 9.23 (0 , 1 , 1 , 1 , 3) Concrete Block Panchdewari Total 6.214 16 191.44 127.64 319.08 30.01 (0 , 4 , 1 , 1 , 6)

Block- Sidhwalia

218 L041 L041-L039 TO BAKHRAUR New CELL Filled 4.307 3.750 Complete 3 123.71 82.48 206.19 16.53 (0 , 1 , 2 , 2 , 5) KURMI (TRACK3) Concrete 219 T01 T01-REO PITCH SADAK TO New CELL Filled 1.644 3.750 Complete 2 67.51 45.01 112.52 8.44 (0 , 1 , 1 , 2 , 4) DAUMARIY KKUWAR TOLA TA Concrete (VR12) Block Sidhwalia Total 5.951 5 191.22 127.49 318.71 24.97 (0 , 2 , 3 , 4 , 9)

Page 29 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Thawe

220 L053 L053-Ekdarwa L041 to New CELL Filled 1.350 3.750 Complete 3 38.16 25.44 63.60 5.17 (0 , 1 , 0 , 2 , 3) Hardia (ODR2) Concrete Block Thawe Total 1.350 3 38.16 25.44 63.60 5.17 (0 , 1 , 0 , 2 , 3)

District Gopalganj Total 45.521 69 1,390.88 927.27 2,318.15 175.24 (5 , 24 , 26 , 43 , 98) District- Jahanabad

Block- Ghosi

221 L046 L046-T04 TO NAGWAN New Panelled 0.866 3.750 Complete 4 27.25 18.17 45.42 3.36 (1 , 0 , 0 , 0 , 1) (TRACK27) Cement Concrete Block Ghosi Total 0.866 4 27.25 18.17 45.42 3.36 (1 , 0 , 0 , 0 , 1)

Block- Jahanabad

222 L028 L028-Amain to Mohanpur New Panelled 0.501 3.750 Complete 2 16.06 10.71 26.77 2.05 (1 , 0 , 0 , 0 , 1) (TRACK71) Cement Concrete 223 L071 L071-mandil Beldari Bigha New Panelled 0.659 3.750 Complete 2 20.51 13.68 34.19 1.83 (0 , 0 , 2 , 0 , 2) path to mahedev Bigha Cement (TRACK67) Concrete Block Jahanabad Total 1.160 4 36.57 24.39 60.96 3.88 (1 , 0 , 2 , 0 , 3)

Block- Makhdumpur

224 L050 L050-T02 ALUA BIGHA TO New Panelled 3.578 3.750 Complete 10 101.68 67.78 169.46 14.26 (0 , 0 , 1 , 0 , 1) AMAPUR (TRACK5) Cement Concrete 225 L130 L130-MALAHBIGHA ROAD TO New Panelled 0.603 3.750 Complete 2 17.08 11.39 28.47 2.01 (1 , 0 , 0 , 0 , 1) HARIZANTOLI KUMARDIH Cement Concrete

Page 30 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

226 L078 L078-CHARH TO New CELL Filled 0.631 3.500 Complete 2 20.86 13.90 34.76 2.30 (0 , 0 , 1 , 0 , 1) SAHORACHAK (TRACK69) Concrete 227 L100 L100-PRABHAT NAGAR New Panelled 0.720 3.750 Complete 3 22.46 14.97 37.43 2.73 (0 , 0 , 1 , 0 , 1) ALLAHGANJ ROAD TO Cement PACHVAI Concrete Block Makhdumpur Total 5.532 17 162.08 108.04 270.12 21.30 (1 , 0 , 3 , 0 , 4)

Block- Ratni Faridpur

228 L110 L110-SAMMAT BIGHA TO KAJI New Panelled 0.645 3.750 Complete 2 21.31 14.20 35.51 1.27 (0 , 0 , 1 , 0 , 1) CHAK (TRACK92) Cement Concrete 229 L028 L028-SAKURABAD GHEJAN New Panelled 1.581 3.750 Complete 4 53.47 35.65 89.12 6.53 (0 , 0 , 1 , 0 , 1) ROAD T04 TO MANPUR Cement BALWA (TRACK17) Concrete 230 L072 L072-SHAKURABAD KURTHA New Panelled 0.719 3.750 Complete 2 23.21 15.47 38.68 2.78 (0 , 1 , 0 , 0 , 1) HANUMAN MANDIR TO Cement NARAYANPUR SCHOOL Concrete (TRACK55) 231 T05 T05-T0 2 TO UTTRAPATTI New Panelled 0.511 3.750 Complete 3 17.31 11.54 28.85 2.20 (1 , 0 , 0 , 0 , 1) (VR4) Cement Concrete Block Ratni Faridpur Total 3.456 11 115.30 76.86 192.16 12.78 (1 , 1 , 2 , 0 , 4)

District Jahanabad Total 11.014 36 341.20 227.46 568.66 41.33 (4 , 1 , 7 , 0 , 12) District- Jamui

Block- Barhat

232 L107 L107-Jamui Kharagpur PWD New CELL Filled 0.592 3.750 Complete 1 17.56 11.71 29.27 4.93 (0 , 0 , 1 , 0 , 1) road to Balwadih Concrete (TRACK107)
Cold Mix Technology

Page 31 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

233 L061 L061-Malaypur Barhat road New CELL Filled 18.000 3.750 Complete 25 504.62 336.41 841.03 57.86 (0 , 0 , 2 , 4 , 6) to Karmegh (TRACK61) Concrete
Waste Plastics Block Barhat Total 18.592 26 522.18 348.12 870.30 62.80 (0 , 0 , 3 , 4 , 7)

Block- Chakai

234 L176 L176-Thakursarkarbala Road New CELL Filled 1.600 3.750 Complete 3 48.29 32.20 80.49 6.60 (0 , 0 , 1 , 1 , 2) to Bhitiya (TRACK176) Concrete
Cold Mix Technology 235 L152 L152-L0128 To Chhotithali New CELL Filled 1.100 3.750 Complete 3 36.30 24.20 60.50 5.44 (0 , 0 , 1 , 0 , 1) (TRACK121) Concrete
Cold Mix Technology 236 L029 L029-Mohanpur To New CELL Filled 1.200 3.750 Complete 3 33.40 22.27 55.67 4.84 (0 , 0 , 1 , 0 , 1) Khonadahar (TRACK18) Concrete
Cold Mix Technology 237 L172 L172-Chakai Kiajori Road to New CELL Filled 2.000 3.750 Complete 5 62.69 41.80 104.49 7.06 (0 , 0 , 1 , 7 , 8) Peter Pahari Harizantola Concrete (TRACK172)
Cold Mix Technology 238 L184 L184-Chakai Saron Road to New CELL Filled 0.633 3.750 Complete 2 21.67 14.45 36.12 4.55 (0 , 0 , 1 , 5 , 6) Dirangi (TRACK184) Concrete
Cold Mix Technology 239 L173 L173-Pandedih to Kapsa New CELL Filled 2.044 3.750 Complete 6 64.13 42.75 106.88 7.63 (0 , 1 , 0 , 0 , 1) (TRACK173) Concrete
Cold Mix Technology

Page 32 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

240 L187 L187-Chakai Giridih Road to New CELL Filled 1.389 3.750 Complete 3 45.82 30.55 76.37 6.28 (1 , 0 , 3 , 10 , Gopidih (TRACK187) Concrete 14)
Cold Mix Technology 241 L164 L164-Sahana Road to Nagari New CELL Filled 1.250 3.750 Complete 2 42.77 28.51 71.28 4.73 (0 , 0 , 5 , 0 , 5) (TRACK164) Concrete
Cold Mix Technology 242 L188 L188-Bone Road Baratarn to New CELL Filled 2.350 3.750 Complete 5 78.11 52.07 130.18 8.15 (0 , 0 , 1 , 5 , 6) Babudih (TRACK188) Concrete
Cold Mix Technology 243 L180 L180-Karngarh Durga Mandir New CELL Filled 1.900 3.750 Complete 2 54.66 36.44 91.10 7.98 (0 , 0 , 1 , 1 , 2) to Dhodsa (TRACK180) Concrete
Cold Mix Technology 244 L166 L166-Kiajori to Maharajdih New CELL Filled 1.750 3.750 Complete 4 50.29 33.52 83.81 7.47 (0 , 0 , 1 , 3 , 4) (TRACK166) Concrete
Cold Mix Technology 245 L185 L185-Giridih Road to Marwa New CELL Filled 2.100 3.750 Complete 5 64.80 43.20 108.00 7.76 (0 , 0 , 1 , 1 , 2) (TRACK185) Concrete
Cold Mix Technology 246 L118 L118-T02 To Andhadih New CELL Filled 0.661 3.750 Complete 2 23.55 15.70 39.25 4.61 (0 , 0 , 2 , 0 , 2) (TRACK92) Concrete
Cold Mix Technology Block Chakai Total 19.977 45 626.48 417.66 1,044.14 83.09 (1 , 1 , 19 , 33 , 54) Block- Gidhaur

247 L100 L100-Simariaya PMGSY To New CELL Filled 0.533 3.750 Complete 1 16.26 10.84 27.10 4.35 (2 , 0 , 2 , 0 , 4) Geruadih (TRACK22) Concrete
Cold Mix Technology

Page 33 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

248 L033 L033-Choura To Naya Gaown New CELL Filled 5.182 3.750 Complete 8 151.77 101.18 252.95 15.90 (1 , 2 , 0 , 0 , 3) Kenuhat Road through Concrete kundhur Paharpur (TRACK5)
Cold Mix Technology Block Gidhaur Total 5.715 9 168.03 112.02 280.05 20.25 (3 , 2 , 2 , 0 , 7)

Block- Jhajha

249 L138 L138-Dhamna Dighra New CELL Filled 2.715 3.750 Complete 8 82.94 55.29 138.23 8.68 (0 , 1 , 0 , 0 , 1) Govindpur PMGSY Road via Concrete korwadih to jogadighra
Cold Mix (TRACK92) Technology 250 L139 L139-Tarakura More via New CELL Filled 1.888 3.750 Complete 4 60.39 40.26 100.65 7.59 (0 , 0 , 1 , 0 , 1) Tarakura village To Raja Concrete bathan (TRACK93)
Cold Mix Technology 251 L140 L140-Dhamna Dighra New CELL Filled 1.626 3.750 Complete 5 57.24 38.16 95.40 6.53 (0 , 1 , 0 , 0 , 1) Govindpur To Kasaia Kolwa Concrete PMGSY Road (TRACK94)
Cold Mix Technology 252 L136 L136-nichli Patao To New CELL Filled 2.736 3.750 Complete 1 77.89 51.92 129.81 9.32 (0 , 0 , 1 , 0 , 1) Keshopur Bihari Manjhi Tola Concrete Keshopur (TRACK90)
Cold Mix Technology 253 L137 L137- More to New CELL Filled 2.818 3.750 Complete 7 82.92 55.28 138.20 9.05 (0 , 0 , 1 , 0 , 1) Genshadih Rabidas Tola Concrete (TRACK91)
Cold Mix Technology 254 L161 L161-jhajha parasi reo road New CELL Filled 3.332 3.750 Complete 7 112.51 75.01 187.52 6.90 (0 , 1 , 1 , 1 , 3) to dom toli via tatawadih Concrete (VR104)
Cold Mix Technology

Page 34 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

255 L149 L149-PMGSY Khairan Rd. To New CELL Filled 1.090 3.750 Complete 2 31.58 21.06 52.64 5.56 (0 , 0 , 1 , 0 , 1) Bongyara (TRACK102) Concrete
Cold Mix Technology 256 L150 L150-Sahia-Mahua PWD Rd. New CELL Filled 0.945 3.750 Complete 3 30.94 20.63 51.57 5.35 (0 , 0 , 1 , 0 , 1) To Guriara (TRACK103) Concrete
Cold Mix Technology 257 L143 L143-PMGSY kusauna Road New CELL Filled 1.198 3.750 Complete 4 36.56 24.37 60.93 5.83 (0 , 0 , 1 , 0 , 1) To Thakurwatari (TRACK96) Concrete
Cold Mix Technology 258 L144 L144-From Dadpur Borwa New CELL Filled 1.386 3.750 Complete 4 47.75 31.84 79.59 5.96 (0 , 0 , 1 , 0 , 1) Bholadih More To Bholadih Concrete Village (TRACK97)
Cold Mix Technology Block Jhajha Total 19.734 45 620.72 413.82 1,034.54 70.76 (0 , 3 , 8 , 1 , 12) Block- Laxmipur

259 L062 L062-Kharagpur Jamui PWD New CELL Filled 3.500 3.750 Complete 7 97.35 64.90 162.25 10.43 (0 , 1 , 0 , 0 , 1) road to Latehara Musahari Concrete tola (TRACK62)
Cold Mix Technology 260 L117 L117-Kohbarba Jhajha road New CELL Filled 0.600 3.750 Complete 1 17.54 11.69 29.23 4.58 (0 , 0 , 1 , 0 , 1) Paswan tola to Musahari Concrete (TRACK117)
Cold Mix Technology 261 L118 L118-Sondipi Kakanchaur New CELL Filled 3.731 3.750 Complete 6 124.15 82.77 206.92 12.31 (1 , 0 , 0 , 0 , 1) PMGSY road to Navkhila Concrete (TRACK118)
Cold Mix Technology

Page 35 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

262 L050 L050-Jamui Kharagpur PWD New CELL Filled 2.121 3.750 Complete 7 64.53 43.02 107.55 8.08 (0 , 0 , 3 , 2 , 5) road to Sakal (TRACK50) Concrete
Cold Mix Technology Block Laxmipur Total 9.952 21 303.57 202.38 505.95 35.39 (1 , 1 , 4 , 2 , 8)

Block- Sono

263 L127 L127-piprabank akhreya New CELL Filled 0.755 3.750 Complete 2 29.03 19.36 48.39 4.64 (0 , 0 , 1 , 0 , 1) PMGSY Road to khosidih Concrete mandal tola (TRACK100) 264 L123 L123-Charkapthar chreya New CELL Filled 3.222 3.750 Complete 8 109.37 72.91 182.28 9.56 (0 , 0 , 1 , 1 , 2) PMGSY road to wabathan Concrete aadiwasi tola gatond harijan
Cold Mix tola (TRACK96) Technology 265 L118 L118-charkapthar cherya New CELL Filled 1.793 3.750 Complete 5 63.67 42.45 106.12 6.92 (1 , 2 , 1 , 0 , 4) PMGSY road to tahkar yadav Concrete tola (TRACK91)
Cold Mix Technology 266 L132 L132-BOTHA bojhayat to New CELL Filled 2.160 3.750 Complete 4 77.39 51.59 128.98 7.77 (0 , 0 , 2 , 2 , 4) chandra (TRACK105) Concrete
Cold Mix Technology 267 L140 L140-Maheswari mundmala New CELL Filled 1.215 3.750 Complete 3 40.88 27.25 68.13 5.72 (0 , 0 , 1 , 0 , 1) R.E.O road to khoswatanr Concrete (TRACK103)
Cold Mix Technology 268 L134 L134-dokli kewali PMGSY New CELL Filled 0.847 3.750 Complete 2 25.73 17.15 42.88 5.27 (0 , 0 , 2 , 0 , 2) ROAD TO MANGRUDIH Concrete (TRACK107)
Cold Mix Technology 269 L054 L054-Bisunpur To Nawai New CELL Filled 1.450 3.750 Complete 5 54.70 36.46 91.16 6.22 (1 , 0 , 2 , 3 , 6) Ahar (TRACK40) Concrete
Cold Mix Technology

Page 36 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

270 L133 L133-sonocharkaptharPWD New CELL Filled 1.218 3.750 Complete 3 38.81 25.87 64.68 5.74 (0 , 0 , 1 , 0 , 1) road hiratanr (TRACK106) Concrete
Cold Mix Technology 271 L120 L120-sleya aadiwasi tola to New CELL Filled 6.339 3.750 Complete 13 206.25 137.50 343.75 15.80 (0 , 0 , 1 , 2 , 3) ragtrohinya asnalebar Concrete (TRACK93)
Cold Mix Technology Block Sono Total 18.999 45 645.83 430.54 1,076.37 67.63 (2 , 2 , 12 , 8 , 24) District Jamui Total 92.969 191 2,886.81 1,924.54 4,811.35 339.93 (7 , 9 , 48 , 48 , 112) District- Kaimur (Bhabhua)

Block- Chainpur

272 L100 L100-T02 CHOUCK TO ARAIL New Panelled 1.000 3.750 Complete 2 32.61 21.74 54.35 4.89 (0 , 1 , 0 , 0 , 1) GAWN (VR74) Cement Concrete
Waste Plastics Block Chainpur Total 1.000 2 32.61 21.74 54.35 4.89 (0 , 1 , 0 , 0 , 1)

Block- Chand

273 L024 L024-Hatta Durgawati Road New Waste Plastics 1.900 3.750 Complete 2 60.29 40.20 100.49 9.58 (0 , 0 , 1 , 0 , 1) T01 to sonaw Bind Tola (VR12) 274 L077 L077-L050 To Bhaluhari New Waste Plastics 1.400 3.750 Complete 4 50.81 33.87 84.68 7.62 (0 , 0 , 1 , 0 , 1) Harijan Tola (VR56) 275 L074 L074-T08 To Brarhi (VR53) New Panelled 1.500 3.750 Complete 3 50.23 33.49 83.72 7.80 (0 , 0 , 2 , 1 , 3) Cement Concrete
Waste Plastics Block Chand Total 4.800 9 161.33 107.56 268.89 25.00 (0 , 0 , 4 , 1 , 5)

Page 37 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Durgawati

276 L107 L107-Durgawati kakrait road New Waste Plastics 0.800 3.750 Complete 2 27.22 18.15 45.37 4.08 (0 , 1 , 0 , 0 , 1) T 02 TO BAHERA (VR84) 277 L054 L054-T11 to Gajadhera New Panelled 0.820 3.750 Complete 0 24.71 16.47 41.18 3.89 (0 , 0 , 1 , 0 , 1) (ODR43) Cement Concrete
Waste Plastics 278 L100 L100-Durgawati kukrait road New Panelled 1.100 3.750 Complete 2 39.77 26.51 66.28 5.97 (0 , 0 , 1 , 0 , 1) to Garhawa (VR96) Cement Concrete
Waste Plastics 279 L086 L086-T010 to Dhanechha R S New Panelled 1.065 3.750 Complete 1 33.38 22.25 55.63 5.64 (0 , 1 , 0 , 0 , 1) Road to Kotsa muslim tola Cement (VR82) Concrete Block Durgawati Total 3.785 5 125.08 83.38 208.46 19.58 (0 , 2 , 2 , 0 , 4)

Block- Kudra

280 L099 L099-Gay ghat to New Panelled 3.000 3.750 Complete 4 97.09 64.72 161.81 14.82 (0 , 0 , 1 , 0 , 1) Bhagwanpur Mohania via Cement Sarodih (VR116) Concrete
Waste Plastics 281 L112 L112-Siswar to Budhahar New Panelled 4.500 3.750 Complete 7 143.23 95.49 238.72 13.36 (0 , 0 , 1 , 0 , 1) (VR129) Cement Concrete
Waste Plastics Block Kudra Total 7.500 11 240.32 160.21 400.53 28.18 (0 , 0 , 2 , 0 , 2)

Page 38 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Nuawan

282 L125 L125-Kamhari to Rajput tola New Panelled 1.700 3.750 Complete 3 64.01 42.67 106.68 9.60 (0 , 1 , 0 , 0 , 1) via Bramhan tola Kamhari Cement (VR83) Concrete
Waste Plastics 283 L077 L077-L024 to Durgapur New Panelled 1.800 3.750 Complete 2 60.72 40.48 101.20 9.56 (0 , 0 , 1 , 0 , 1) (VR61) Cement Concrete
Waste Plastics 284 L118 L118-Chaprang to Awati New Panelled 1.200 3.750 Complete 2 39.28 26.19 65.47 6.70 (1 , 0 , 0 , 0 , 1) Rajput tola (ODR45) Cement Concrete
Waste Plastics 285 L089 L089-Chhapran from T 04 to New Panelled 0.900 3.750 Complete 1 32.31 21.54 53.85 4.85 (1 , 0 , 0 , 0 , 1) gorsara (VR47) Cement Concrete
Waste Plastics 286 L129 L129-Chhata Bararhi to Kanu New Panelled 0.900 3.750 Complete 1 30.60 20.40 51.00 4.86 (0 , 0 , 1 , 0 , 1) tola (VR87) Cement Concrete
Waste Plastics Block Nuawan Total 6.500 9 226.92 151.28 378.20 35.57 (2 , 1 , 2 , 0 , 5)

District Kaimur (Bhabhua) Total 23.585 36 786.26 524.17 1,310.43 113.22 (2 , 4 , 10 , 1 , 17) District- Katihar

Block- Ajamnagar

287 T04 T04-T01 TO JOKAR New Cold Mix 2.150 3.750 Complete 4 74.80 49.87 124.67 12.60 (3 , 4 , 1 , 3 , 11) (TRACK32) Technology

Page 39 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

288 L077 L077-TO01 TO PINDHAL New Cold Mix 1.400 3.750 Complete 3 51.29 34.19 85.48 8.65 (1 , 0 , 0 , 0 , 1) (VR77) Technology 289 L066 L066-T01 TO MURBATPUR New Cold Mix 2.040 3.750 Complete 4 67.30 44.87 112.17 11.66 (1 , 0 , 0 , 0 , 1) (TRACK16) Technology 290 L078 L078-T05 GOSAIPUR TO New Cold Mix 1.520 3.750 Complete 3 64.11 42.74 106.85 8.49 (1 , 0 , 0 , 0 , 1) HALIMPUR BELRAHI (VR78) Technology 291 L060 L060-T05 TO KHAURA New Cold Mix 1.100 3.750 Complete 1 37.26 24.84 62.10 4.81 (0 , 3 , 0 , 0 , 3) (TRACK40) Technology 292 L037 L037-T05 SITALPUR TO New Cold Mix 1.080 3.750 Complete 3 40.95 27.30 68.25 6.28 (0 , 1 , 0 , 0 , 1) BISHUNPUR (TRACK43) Technology 293 L079 L079-T02 TO DHAPRA (VR79) New Cold Mix 2.250 3.750 Complete 6 81.26 54.17 135.43 14.80 (0 , 1 , 0 , 0 , 1) Technology 294 L033 L033-T02 TO NANAMIYA New Cold Mix 1.080 3.750 Complete 2 37.78 25.18 62.96 15.79 (1 , 1 , 1 , 0 , 3) (TRACK25) Technology Block Ajamnagar Total 12.620 26 454.75 303.16 757.91 83.08 (7 , 10 , 2 , 3 , 22) Block- Amdabad

295 L036 L036-L023 TO KISUNPUR New Cold Mix 0.950 3.750 Complete 2 39.06 26.04 65.10 6.33 (0 , 2 , 0 , 0 , 2) (TRACK10) Technology 296 L043 L043-T02 CHOTA New Cold Mix 3.280 3.750 Complete 3 130.61 87.07 217.68 11.12 (1 , 0 , 0 , 0 , 1) RAGHUNATHPUR TO Technology KARIMULLAHPUR DAKSHIN (VR43) 297 L026 L026-L026 TO KARIMULLAHA New Cold Mix 0.840 3.750 Complete 1 31.20 20.80 52.00 4.03 (2 , 0 , 0 , 0 , 2) PUR (TRACK12) Technology 298 L032 L032-T03 TO BAIDA New Cold Mix 2.925 3.750 Complete 2 102.52 68.34 170.86 12.72 (1 , 0 , 0 , 0 , 1) (TRACK4) Technology 299 L044 L044-TALHARI BLOCK New Cold Mix 5.425 3.750 Complete 11 151.40 100.93 252.33 29.88 (2 , 0 , 0 , 0 , 2) SAHEBGANJ TO Technology MAHARAJPUR RAILWAY STATION ROAD TO GADAIMAHARAJPUR (VR44) Block Amdabad Total 13.420 19 454.79 303.18 757.97 64.08 (6 , 2 , 0 , 0 , 8)

Page 40 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Balrampur

300 L047 L047-TO5 TO MADHOPUR New Cold Mix 1.900 3.750 Complete 1 62.98 41.99 104.97 11.12 (1 , 0 , 0 , 0 , 1) (VR47) Technology 301 L040 L040-TO4 TO KISHMATBARI New Cold Mix 1.800 3.750 Complete 3 64.39 42.92 107.31 11.10 (0 , 1 , 0 , 0 , 1) (VR40) Technology 302 L042 L042-TO6 TO CHILHAPARA New Cold Mix 2.550 3.750 Complete 3 87.76 58.51 146.27 15.87 (0 , 0 , 2 , 0 , 2) BALIABAG (VR42) Technology 303 L049 L049-TO6 SIHAGAON TO New Cold Mix 1.500 3.750 Complete 2 50.67 33.78 84.45 9.84 (1 , 0 , 0 , 0 , 1) PALSA (VR49) Technology 304 L025 L025-LO22 DULLAPUR New Cold Mix 1.725 3.750 Complete 5 57.59 38.39 95.98 10.25 (1 , 0 , 1 , 0 , 2) (VR25) Technology Block Balrampur Total 9.475 14 323.39 215.59 538.98 58.18 (3 , 1 , 3 , 0 , 7)

Block- Barari

305 L073 L073-T07 TO PACHAGACHI New Cold Mix 1.500 3.750 Complete 3 48.71 32.47 81.18 8.85 (0 , 1 , 0 , 0 , 1) (TRACK73) Technology 306 L117 L117-T07 TO KUSHWAHA New Cold Mix 0.900 3.750 Complete 1 24.57 16.38 40.95 2.85 (0 , 1 , 0 , 0 , 1) TOLA (VR117) Technology 307 L089 L089-SISIA TO PARA (VR89) New Cold Mix 1.310 3.750 Complete 1 38.91 25.94 64.85 5.19 (0 , 1 , 0 , 0 , 1) Technology 308 L082 L082-T01 to Sardarnagar New Cold Mix 2.100 3.750 Complete 3 71.85 47.90 119.75 9.26 (0 , 3 , 0 , 0 , 3) (TRACK82) Technology 309 L135 L135-L089 TO TARIYANI New Cold Mix 0.750 3.750 Complete 2 23.85 15.90 39.75 4.84 (1 , 0 , 0 , 0 , 1) (VR135) Technology 310 L034 L034-T07 to Barinagar New Cold Mix 1.400 3.750 Complete 1 38.25 25.50 63.75 7.95 (2 , 0 , 0 , 0 , 2) (VR34) Technology 311 L058 L058-L057 TO BAGHWA KOLE New Cold Mix 2.250 3.750 Complete 1 62.54 41.69 104.23 8.68 (0 , 1 , 0 , 1 , 2) (TRACK57) Technology Block Barari Total 10.210 12 308.68 205.78 514.46 47.62 (3 , 7 , 0 , 1 , 11)

Page 41 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Barsoi

312 L033 L033-TO2 SORAKHAL TO New Cold Mix 0.880 3.750 Complete 1 33.28 22.19 55.47 5.91 (2 , 0 , 2 , 0 , 4) BHAWANIPUR (VR33) Technology 313 L052 L052-TO1 TO GOWAGAON New Cold Mix 0.800 3.750 Complete 2 26.52 17.68 44.20 3.44 (0 , 1 , 0 , 0 , 1) (VR52) Technology 314 T07 T07-Pamra to Balrampur New Cold Mix 4.000 3.750 Complete 7 130.71 87.14 217.85 22.81 (2 , 2 , 2 , 1 , 7) Siman (VR8) Technology 315 T01 T01-Bangal Bajuria Siman to New Cold Mix 6.100 3.750 Complete 3 193.29 128.86 322.15 23.65 (1 , 0 , 1 , 0 , 2) Javadpur (VR1) Technology 316 L053 L053-TO6 TO PHUNGAON New Cold Mix 1.000 3.750 Complete 2 36.31 24.21 60.52 6.60 (1 , 0 , 0 , 0 , 1) (VR53) Technology 317 L044 L044-TO6 TO HARIPUR New Cold Mix 1.700 3.750 Complete 3 52.19 34.79 86.98 7.59 (0 , 1 , 0 , 0 , 1) (VR44) Technology Block Barsoi Total 14.480 18 472.30 314.87 787.17 70.00 (6 , 4 , 5 , 1 , 16) Block- Dandkhora

318 L058 L058-L028 TO BELTIKARI New Cold Mix 1.800 3.750 Complete 3 50.67 33.78 84.45 10.15 (0 , 1 , 1 , 0 , 2) (VR55) Technology 319 T03 T03-T04 TO BELRAHI (VR54) New Cold Mix 0.750 3.750 Complete 1 20.27 13.51 33.78 4.49 (0 , 0 , 2 , 0 , 2) Technology Block Dandkhora Total 2.550 4 70.94 47.29 118.23 14.64 (0 , 1 , 3 , 0 , 4)

Block- Kadwa

320 L035 L035-KUMBHRI TO New Cold Mix 4.010 3.750 Complete 5 128.09 85.39 213.48 20.35 (3 , 0 , 1 , 1 , 5) BSANTPUR (VR35) Technology 321 L047 L047-TO4 A TO BENTHI New Cold Mix 1.000 3.750 Complete 2 35.72 23.82 59.54 5.21 (0 , 1 , 2 , 0 , 3) (VR47) Technology Block Kadwa Total 5.010 7 163.81 109.21 273.02 25.56 (3 , 1 , 3 , 1 , 8)

Page 42 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Manihari

322 L032 L032-T04 TO DILARPUR SEEJ New Cold Mix 2.950 3.750 Complete 5 103.58 69.05 172.63 18.34 (0 , 1 , 0 , 0 , 1) (TRACK32) Technology Block Manihari Total 2.950 5 103.58 69.05 172.63 18.34 (0 , 1 , 0 , 0 , 1)

Block- Mansahi

323 L074 L074-KATIHAR-MANIHARI New Cold Mix 0.650 3.750 Complete 1 22.94 15.29 38.23 4.01 (0 , 1 , 0 , 0 , 1) PART-II TO NARAYANPUR Technology (TRACK74) 324 L073 L073-MANSAHI KEWALA New Cold Mix 2.300 3.750 Complete 3 68.96 45.97 114.93 13.61 (1 , 0 , 0 , 0 , 1) STUATED ON MANSAHI HAT Technology TO KURSEL TO SHEBNAGAR (TRACK73) Block Mansahi Total 2.950 4 91.90 61.26 153.16 17.62 (1 , 1 , 0 , 0 , 2)

Block- Pranpur

325 L058 L058-L038 to Emli Tola New Cold Mix 1.030 3.750 Complete 1 31.12 20.75 51.87 6.33 (1 , 0 , 0 , 0 , 1) (VR27) Technology 326 L032 L032-T02 TO AMDAUL New Cold Mix 2.250 3.750 Complete 4 85.13 56.75 141.88 9.83 (2 , 1 , 0 , 0 , 3) (TRACK12) Technology 327 L023 L023-L022 TO PATHARWAR New Cold Mix 1.470 3.750 Complete 3 45.89 30.60 76.49 11.16 (1 , 0 , 0 , 0 , 1) (TRACK5) Technology Block Pranpur Total 4.750 8 162.14 108.10 270.24 27.32 (4 , 1 , 0 , 0 , 5)

Block- Sameli

328 L058 L058-Malhoria to Chakla New Cold Mix 0.960 3.750 Complete 3 27.42 18.28 45.70 6.95 (0 , 1 , 2 , 0 , 3) tola (TRACK19) Technology Block Sameli Total 0.960 3 27.42 18.28 45.70 6.95 (0 , 1 , 2 , 0 , 3)

District Katihar Total 79.375 120 2,633.70 1,755.77 4,389.47 433.39 (33 , 30 , 18 , 6 , 87)

Page 43 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District- Khagaria

Block- Alauli

329 L027 L027-T02 HARIPUR TO New -- 0.659 3.750 Complete 1 21.22 14.15 35.37 2.40 (0 , 1 , 0 , 0 , 1) BAIRWA MUSHHARI BARWADIH (VR27) 330 L044 L044-AJB ROAD TO New Panelled 1.165 3.750 Complete 3 40.44 26.96 67.40 3.73 (0 , 3 , 0 , 0 , 3) UKHRAURA (TRACK33) Cement Concrete 331 L065 L065-BAHADURPUR JAKHRA New Panelled 1.400 3.750 Complete 3 47.84 31.89 79.73 4.47 (0 , 1 , 0 , 0 , 1) PMGSY ROAD TO URDAHA Cement (TRACK32) Concrete 332 L085 L085-MURLI TO RATNAHA New Panelled 1.716 3.750 Complete 3 60.58 40.38 100.96 3.15 (1 , 0 , 0 , 0 , 1) (VR85) Cement Concrete 333 L061 L061-T05 LARHI TO New Panelled 2.774 3.750 Complete 5 93.88 62.59 156.47 9.80 (1 , 1 , 0 , 0 , 2) GORIYAMI (TRACK18) Cement Concrete Block Alauli Total 7.714 15 263.96 175.97 439.93 23.55 (2 , 6 , 0 , 0 , 8)

Block- Beldaur

334 L031 L031-NH-107 TO KANJRI New -- 4.662 3.750 Complete 2 153.23 102.15 255.38 22.76 (0 , 0 , 3 , 1 , 4) (OT107) 335 T05 T05-NH-107 MALI TO New -- 10.985 3.750 Complete 9 344.23 229.49 573.72 45.05 (1 , 1 , 0 , 3 , 5) FULBARIA (VR107) Block Beldaur Total 15.647 11 497.46 331.64 829.10 67.81 (1 , 1 , 3 , 4 , 9)

Block- Chautham

336 T06 T06-FANGO HALT TO New -- 1.800 3.750 Complete 3 73.04 48.69 121.73 11.82 (0 , 1 , 0 , 0 , 1) SINGHARSWA (VR21) Block Chautham Total 1.800 3 73.04 48.69 121.73 11.82 (0 , 1 , 0 , 0 , 1)

Page 44 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Gogari

337 L049 L049-MAHESHKHUT NH-107 New Cold Mix 3.110 3.750 Complete 4 88.30 58.86 147.16 11.57 (1 , 0 , 0 , 1 , 2) TO PATTILEWA (ODR49) Technology 338 L046 L046-KHAROA L028 TO New -- 3.250 3.750 Complete 3 100.51 67.01 167.52 12.42 (2 , 0 , 1 , 0 , 3) KOYLA BASUA (ODR46) 339 L040 L040-BHURIA TO BHARRAI New -- 4.000 3.750 Complete 3 103.48 68.98 172.46 16.01 (1 , 1 , 0 , 0 , 2) (ODR40) Block Gogari Total 10.360 10 292.29 194.85 487.14 40.00 (4 , 1 , 1 , 1 , 7)

Block- Khagaria

340 L027 L027-RAHIMPUR NH 31 TO New Panelled 7.630 3.750 Complete 14 259.59 173.06 432.65 23.25 (1 , 8 , 0 , 5 , 14) AKNIYA (TRACK6) Cement Concrete 341 L048 L048-BELA KONIYA ROAD TO New Panelled 1.180 3.750 Complete 2 37.35 24.90 62.25 2.99 (0 , 1 , 0 , 0 , 1) DAHRAI (TRACK18) Cement Concrete Block Khagaria Total 8.810 16 296.94 197.96 494.90 26.24 (1 , 9 , 0 , 5 , 15) Block- Mansi

342 L035 L035-NH 31 TO New Panelled 1.555 3.750 Complete 2 47.78 31.85 79.63 4.92 (1 , 0 , 0 , 0 , 1) BAKHATIYARPUR (VR4) Cement Concrete 343 T04 T04-GHARARI TO NH31 (VR2) New Panelled 3.585 3.750 Complete 8 116.62 77.75 194.37 12.44 (0 , 1 , 0 , 0 , 1) Cement Concrete 344 L034 L034-THATHA NIRPUR ROAD New -- 1.800 3.750 Complete 2 45.69 30.46 76.15 7.82 (1 , 0 , 0 , 0 , 1) TO SAHARKUNDI (VR) Block Mansi Total 6.940 12 210.09 140.06 350.15 25.18 (2 , 1 , 0 , 0 , 3)

District Khagaria Total 51.271 67 1,633.78 1,089.17 2,722.95 194.60 (10 , 19 , 4 , 10 , 43) District- Kishanganj

Page 45 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Bahadurganj

345 L031 L031-T02 to Dala New -- 1.440 3.750 Complete 2 52.20 34.80 87.00 6.55 (0 , 0 , 1 , 3 , 4) Mohiuddinpur (VR31) 346 L078 L078-T05 to Mukhia Allaudin New -- 2.448 3.750 Complete 4 80.34 53.56 133.90 12.42 (0 , 1 , 1 , 0 , 2) Tola (VR78) 347 T08 T08-Nisandhara to Durgapur New -- 4.750 3.750 Complete 9 213.52 142.34 355.86 20.36 (1 , 5 , 2 , 4 , 12) Bangama (VR8) 348 L061 L061-L062 to Gargaon New -- 1.037 3.750 Complete 2 35.45 23.63 59.08 5.01 (0 , 1 , 0 , 1 , 2) (VR61) 349 L042 L042-T02 to Dahgaon (VR42) New -- 2.000 3.750 Complete 2 73.25 48.83 122.08 9.93 (0 , 2 , 1 , 0 , 3)

Block Bahadurganj Total 11.675 19 454.76 303.16 757.92 54.28 (1 , 9 , 5 , 8 , 23) Block- Dighalbank

350 L027 L027-L066 to Barahmalasa New -- 1.000 3.750 Complete 2 32.71 21.80 54.51 5.24 (1 , 1 , 0 , 0 , 2) Talwari (TRACK27) 351 L033 L033-Pathharghatti T03 to New -- 1.748 3.750 Complete 6 68.55 45.70 114.25 9.04 (1 , 1 , 2 , 1 , 5) Kalpir Phatharghatti (TRACK33) 352 L042 L042-Kanchanbari to Palsa New -- 1.992 3.750 Complete 3 67.46 44.98 112.44 14.21 (0 , 1 , 3 , 4 , 8) (TRACK42) 353 L046 L046-T01 to Maltoli (VR46) New -- 3.454 3.750 Complete 4 130.79 87.19 217.98 17.71 (1 , 1 , 0 , 6 , 8)

354 L049 L049-T01 to Kamat New -- 1.296 3.750 Complete 3 57.68 38.45 96.13 6.28 (0 , 2 , 0 , 0 , 2) (TRACK49) 355 T01 T01-Athgachhia to Fulgachhi New -- 1.110 3.750 Complete 2 41.80 27.87 69.67 5.52 (2 , 3 , 2 , 0 , 7) West (TRACK2) 356 L023 L023-L021 to Tangan Tappu New -- 0.677 3.750 Complete 1 23.22 15.48 38.70 3.54 (0 , 1 , 0 , 0 , 1) (TRACK23) 357 L065 L065-T04 to Aamdangi New -- 2.779 3.750 Complete 1 87.79 58.53 146.32 14.03 (2 , 0 , 1 , 0 , 3) (TRACK65) 358 T01 T01-Atgachhia to Mohamari New -- 5.200 3.750 Complete 5 154.56 103.04 257.60 98.64 (0 , 1 , 0 , 0 , 1) (VR2)

Page 46 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

359 T03 T03-Tulsia to Patharghatti New -- 2.736 3.750 Complete 3 98.69 65.80 164.49 13.89 (1 , 0 , 0 , 0 , 1) (VR3) 360 L050 L050-T01 to Gorumara New -- 1.125 3.750 Complete 1 20.41 13.61 34.02 5.85 (0 , 1 , 0 , 2 , 3) (TRACK50) 361 L048 L048-T01 to Pachgachhi New -- 2.006 3.750 Complete 3 69.16 46.11 115.27 10.20 (0 , 1 , 1 , 0 , 2) (TRACK48) 362 L035 L035-T03 to Dhibhat Khurd New -- 1.293 3.750 Complete 2 43.45 28.96 72.41 6.47 (0 , 1 , 0 , 0 , 1) (TRACK35) 363 L021 L021-T01 to Ziapokhar New -- 2.268 3.750 Complete 3 77.67 51.78 129.45 11.39 (0 , 1 , 0 , 0 , 1) (TRACK21) Block Dighalbank Total 28.684 39 973.94 649.30 1,623.24 222.00 (8 , 15 , 9 , 13 , 45) Block- Kishanganj

364 L059 L059-L058 to Basantpur New -- 1.500 3.750 Complete 3 56.71 37.81 94.52 7.57 (0 , 2 , 2 , 4 , 8) Marua Toli (VR59) Block Kishanganj Total 1.500 3 56.71 37.81 94.52 7.57 (0 , 2 , 2 , 4 , 8)

Block- Koch Dhaman

365 L062 L062-Sahnagra to Chunamari New -- 2.100 3.750 Complete 2 50.44 33.63 84.07 5.63 (0 , 1 , 0 , 1 , 2) (VR62) 366 L049 L049-Nauranga L048 to Dolia New -- 1.500 3.750 Complete 2 39.93 26.62 66.55 6.91 (0 , 1 , 0 , 0 , 1) (VR49) 367 L063 L063-L062 to Hasan Dumaria New -- 2.700 3.750 Complete 3 84.46 56.30 140.76 8.07 (0 , 1 , 0 , 0 , 1) (VR63) Block Koch Dhaman Total 6.300 7 174.83 116.55 291.38 20.60 (0 , 3 , 0 , 1 , 4)

Block- Pothia

368 L023 L023-End Point of T02 to New -- 1.560 3.750 Complete 3 41.39 27.59 68.98 8.18 (0 , 1 , 0 , 0 , 1) Jagirgachh (TRACK23) 369 L031 L031-L030 to Pansal New -- 1.615 3.750 Complete 3 53.57 35.72 89.29 8.47 (0 , 1 , 1 , 0 , 2) (TRACK31)

Page 47 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

370 L042 L042-PMGSY Road to Batula New -- 0.626 3.750 Complete 4 26.03 17.36 43.39 3.31 (0 , 1 , 0 , 0 , 1) Tola (TRACK10) 371 L061 L061-Taiyabpur Dalua to New -- 1.587 3.750 Complete 2 56.63 37.75 94.38 7.84 (0 , 1 , 0 , 0 , 1) Ladho Hat (TRACK9) 372 L064 L064-L061 to Pakamolna New -- 1.275 3.750 Complete 4 57.62 38.41 96.03 6.38 (0 , 0 , 3 , 4 , 7) (TRACK64) 373 L071 L071-T02 to Babangaon New -- 5.250 3.750 Complete 11 197.49 131.66 329.15 26.89 (0 , 1 , 1 , 0 , 2) (TRACK71) 374 L072 L072-T05 to Galgaliya New -- 1.454 3.750 Complete 3 52.35 34.90 87.25 7.36 (0 , 0 , 3 , 3 , 6) (TRACK72) 375 L074 L074-T01 to Panbara New -- 2.652 3.750 Complete 2 95.68 63.79 159.47 13.12 (0 , 0 , 2 , 0 , 2) (TRACK74) 376 L076 L076-L066 to Mirchni Tola New -- 0.562 3.750 Complete 2 20.43 13.62 34.05 3.00 (0 , 1 , 0 , 0 , 1) (TRACK76) 377 L091 L091-T05 to Koabari New -- 1.234 3.750 Complete 2 43.25 28.83 72.08 6.18 (0 , 1 , 0 , 0 , 1) (TRACK91) 378 T04 T04-Maheshmara to New -- 1.272 3.750 Complete 1 41.05 27.37 68.42 6.59 (0 , 1 , 0 , 0 , 1) Bhapuabasti (TRACK1) 379 L055 L055-T03 to Piyakuri New -- 1.262 3.750 Complete 3 47.56 31.71 79.27 6.66 (1 , 0 , 1 , 5 , 7) (TRACK55) 380 L086 L086-L051 to Khaka New -- 1.000 3.750 Complete 2 44.73 29.82 74.55 4.50 (1 , 0 , 0 , 0 , 1) (TRACK86) 381 L045 L045-Pharkatta to Ratua New -- 3.000 3.750 Complete 6 107.06 71.38 178.44 15.19 (0 , 3 , 0 , 0 , 3) (TRACK5) 382 T04 T04-REO Road to New -- 2.097 3.750 Complete 4 71.36 47.57 118.93 10.71 (1 , 0 , 0 , 0 , 1) Kadamgachhi (TRACK8) 383 T04 T04-Belwa Ramganj Road to New -- 1.768 3.750 Complete 3 61.20 40.80 102.00 8.83 (0 , 1 , 0 , 0 , 1) Jagdubba (TRACK6) Block Pothia Total 28.214 55 1,017.40 678.28 1,695.68 143.21 (3 , 12 , 11 , 12 , 38) Block- Terhagachhi

384 L033 L033-T02 to Ghaniphulsaray New -- 5.998 3.750 Complete 2 197.43 131.62 329.05 31.30 (0 , 0 , 3 , 0 , 3) (VR33)

Page 48 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

385 L036 L036-T01 to Hawakol (VR36) New -- 1.925 3.750 Complete 1 64.68 43.12 107.80 9.89 (0 , 1 , 0 , 0 , 1)

386 L025 L025-T01 to Kalpir (VR25) New -- 4.300 3.750 Complete 8 168.44 112.29 280.73 23.77 (0 , 3 , 10 , 12 , 25) Block Terhagachhi Total 12.223 11 430.55 287.03 717.58 64.95 (0 , 4 , 13 , 12 , 29) Block- Thakurganj

387 L025 L025-L024 to Nazagachh New -- 1.335 3.750 Complete 3 49.38 32.92 82.30 6.68 (2 , 0 , 0 , 0 , 2) (TRACK25) 388 L021 L021-T01 to Sahibganj New -- 5.200 3.750 Complete 6 161.02 107.34 268.36 26.46 (3 , 1 , 8 , 5 , 17) (TRACK21) 389 L022 L022-L021 to Besarbati New -- 3.351 3.750 Complete 8 101.19 67.46 168.65 16.56 (0 , 1 , 0 , 0 , 1) (TRACK22) 390 L030 L030-T04 to Jhantibari New -- 1.527 3.750 Complete 3 52.19 34.79 86.98 7.69 (0 , 1 , 0 , 0 , 1) (TRACK30) 391 L051 L051-L050 to Deramari New -- 2.100 3.750 Complete 3 70.05 46.70 116.75 10.22 (0 , 0 , 2 , 0 , 2) (TRACK51) 392 L057 L057-L056 to Aambari New -- 1.793 3.750 Complete 3 65.39 43.59 108.98 8.83 (0 , 0 , 2 , 0 , 2) (TRACK57) 393 T04 T04-Tatpowa to Muslim Tola New -- 1.000 3.750 Complete 2 33.48 22.32 55.80 5.03 (0 , 1 , 0 , 0 , 1) (TRACK17) Block Thakurganj Total 16.306 28 532.70 355.12 887.82 81.48 (5 , 4 , 12 , 5 , 26) District Kishanganj Total 104.902 162 3,640.89 2,427.25 6,068.14 594.09 (17 , 49 , 52 , 55 , 173) District- Lakhisarai

Block- Halsi

394 L105 L105-T03 TO HALSI MANJHI New CELL Filled 0.704 3.750 Complete 2 20.11 13.40 33.51 3.43 (0 , 1 , 0 , 0 , 1) TOLA (TRACK105) Concrete
Cold Mix Technology Block Halsi Total 0.704 2 20.11 13.40 33.51 3.43 (0 , 1 , 0 , 0 , 1)

Page 49 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Lakhisarai

395 L025 L025-T02 TO BARARE New CELL Filled 0.660 3.750 Complete 2 18.65 12.43 31.08 3.31 (0 , 2 , 0 , 3 , 5) MUSHARI (TRACK25) Concrete
Cold Mix Technology 396 L106 L106-T02 TO REWTA New CELL Filled 1.964 3.750 Complete 4 53.02 35.34 88.36 6.80 (0 , 1 , 2 , 3 , 6) (TRACK106) Concrete
Cold Mix Technology 397 L073 L073-T10 TO BELOAURI New CELL Filled 1.851 3.750 Complete 9 54.76 36.50 91.26 6.55 (0 , 1 , 0 , 0 , 1) (TRACK73) Concrete
Cold Mix Technology Block Lakhisarai Total 4.475 15 126.43 84.27 210.70 16.65 (0 , 4 , 2 , 6 , 12) Block- Ramgarh Chowk

398 L101 L101-T01 TO GOSHGANJ New CELL Filled 0.820 3.750 Complete 4 24.04 16.03 40.07 5.26 (0 , 1 , 0 , 0 , 1) (TRACK101) Concrete
Cold Mix Technology Block Ramgarh Chowk Total 0.820 4 24.04 16.03 40.07 5.26 (0 , 1 , 0 , 0 , 1)

Block- Suryagarha

399 L026 L026-L025 TO BRIYARPUR New CELL Filled 0.700 3.750 Complete 2 20.26 13.50 33.76 4.23 (0 , 1 , 1 , 0 , 2) MUSHARI (VR26) Concrete
Cold Mix Technology 400 L050 L050-T05 TO TOLARPUR New CELL Filled 1.138 3.750 Complete 3 30.99 20.66 51.65 5.47 (0 , 1 , 1 , 1 , 3) (TRACK50) Concrete
Cold Mix Technology

Page 50 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

401 L031 L031-T02 TO CHHOTKI New CELL Filled 3.886 3.750 Complete 12 116.20 77.46 193.66 11.78 (0 , 2 , 1 , 0 , 3) KORASI (TRACK31) Concrete
Cold Mix Technology 402 L025 L025-T02 GHOGHI KORASI New CELL Filled 2.537 3.750 Complete 4 74.13 49.42 123.55 8.11 (0 , 2 , 0 , 3 , 5) MORE TO GHOGHI KORASI Concrete (TRACK25)
Cold Mix Technology Block Suryagarha Total 8.261 21 241.58 161.04 402.62 29.59 (0 , 6 , 3 , 4 , 13) District Lakhisarai Total 14.260 42 412.16 274.74 686.90 54.93 (0 , 12 , 5 , 10 , 27) District- Munger

Block- Sangrampur

403 L048 L048-Middle school New CELL Filled 1.533 3.750 Complete 5 59.44 39.63 99.07 5.51 (0 , 0 , 1 , 1 , 2) Barahaunia to Mahadev Concrete Mushahari (TRACK48)
Cold Mix Technology Block Sangrampur Total 1.533 5 59.44 39.63 99.07 5.51 (0 , 0 , 1 , 1 , 2)

District Munger Total 1.533 5 59.44 39.63 99.07 5.51 (0 , 0 , 1 , 1 , 2)

District- Nalanda

Block- Asthawan

404 L024 L024-Asthawan-Andi Road to New Panelled 0.910 3.750 Complete 3 30.92 20.61 51.53 3.05 (1 , 0 , 0 , 3 , 4) Gaphur Bigha (VR11) Cement Concrete 405 L071 L071-T01 to Jharhaper New CELL Filled 1.010 3.750 Complete 3 35.68 23.78 59.46 3.08 (0 , 1 , 0 , 0 , 1) (VR43) Concrete Block Asthawan Total 1.920 6 66.60 44.39 110.99 6.13 (1 , 1 , 0 , 3 , 5)

Page 51 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Bihar Sharif

406 L027 L027-Tiuri To Ghaspur New Panelled 0.953 3.750 Complete 3 32.04 21.36 53.40 3.35 (1 , 0 , 0 , 0 , 1) (VR52) Cement Concrete 407 L035 L035-L029A TO Baijnathpur New Panelled 1.628 3.750 Complete 5 47.71 31.80 79.51 4.00 (1 , 0 , 0 , 0 , 1) (VR22) Cement Concrete Block Bihar Sharif Total 2.581 8 79.75 53.16 132.91 7.36 (2 , 0 , 0 , 0 , 2)

Block- Chandi

408 L151 L151-Chandi Harnaut Road New Panelled 0.982 3.750 Complete 2 32.51 21.68 54.19 2.09 (0 , 2 , 0 , 0 , 2) To Hanuman Garh (VR151) Cement Concrete Block Chandi Total 0.982 2 32.51 21.68 54.19 2.09 (0 , 2 , 0 , 0 , 2)

Block- Nagarnausa

409 L101 L101-T02 Road To Kaila New Panelled 1.440 3.750 Complete 4 45.52 30.35 75.87 4.67 (0 , 1 , 0 , 0 , 1) (VR101) Cement Concrete 410 L061 L061-Ramghat Lohanda To New CELL Filled 0.535 3.750 Complete 3 22.15 14.76 36.91 1.70 (0 , 1 , 0 , 0 , 1) Sakrora (VR61) Concrete 411 L096 L096-Rampur To Kewai New Panelled 1.559 3.750 Complete 5 52.31 34.87 87.18 5.63 (0 , 1 , 0 , 0 , 1) (VR96) Cement Concrete Block Nagarnausa Total 3.534 12 119.98 79.98 199.96 12.01 (0 , 3 , 0 , 0 , 3)

Block- Rahui

412 L053 L053-T01 to Sikandarpur New Panelled 2.025 3.750 Complete 4 67.43 44.96 112.39 4.92 (2 , 0 , 1 , 0 , 3) (VR22) Cement Concrete 413 L062 L062-T 03 to Bazidpur New Panelled 1.879 3.750 Complete 4 63.34 42.23 105.57 6.85 (0 , 2 , 0 , 0 , 2) (VR29) Cement Concrete

Page 52 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

414 L061 L061-T01 to Gobindpur New Panelled 1.264 3.750 Complete 2 40.88 27.25 68.13 4.54 (0 , 2 , 0 , 0 , 2) (VR28) Cement Concrete 415 L022 L022-L021 to Mathurapur New Panelled 1.504 3.750 Complete 4 54.40 36.27 90.67 5.11 (1 , 0 , 0 , 0 , 1) (VR5) Cement Concrete Block Rahui Total 6.672 14 226.05 150.71 376.76 21.42 (3 , 4 , 1 , 0 , 8)

Block- Rajgir

416 L037 L037-Rajgir - Islampur Road New CELL Filled 1.741 3.750 Complete 0 67.55 45.04 112.59 6.61 (0 , 1 , 1 , 0 , 2) to Malisanrh (VR37) Concrete Block Rajgir Total 1.741 0 67.55 45.04 112.59 6.61 (0 , 1 , 1 , 0 , 2)

Block- Sarmera

417 L021 L021-Mokama Road to New Panelled 4.386 4.000 Complete 19 151.80 101.20 253.00 17.65 (1 , 0 , 2 , 1 , 4) Husena (VR7) Cement Concrete Block Sarmera Total 4.386 19 151.80 101.20 253.00 17.65 (1 , 0 , 2 , 1 , 4)

Block- Silaw

418 L061 L061-L022 to Pakari Sarai New Panelled 0.730 3.750 Complete 3 26.06 17.37 43.43 2.04 (1 , 1 , 0 , 0 , 2) (VR61) Cement Concrete 419 L052 L052-T01 to Gor Bigha New Panelled 0.652 3.750 Complete 2 25.30 16.87 42.17 1.11 (1 , 0 , 0 , 0 , 1) (VR52) Cement Concrete 420 L063 L063-L041 to Niyamat Nagar New Panelled 0.665 3.750 Complete 1 25.94 17.29 43.23 1.03 (0 , 1 , 0 , 0 , 1) (VR63) Cement Concrete Block Silaw Total 2.047 6 77.30 51.53 128.83 4.19 (2 , 2 , 0 , 0 , 4)

Page 53 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Tharthari

421 L133 L133-Pamara L056 To New Panelled 1.053 3.750 Complete 3 33.81 22.54 56.35 3.17 (0 , 2 , 0 , 0 , 2) Santanbigha (VR133) Cement Concrete 422 L057 L057-Kachharia L057A To New Panelled 1.046 3.750 Complete 5 36.01 24.00 60.01 4.25 (1 , 1 , 1 , 0 , 3) Juri (VR57) Cement Concrete Block Tharthari Total 2.099 8 69.82 46.54 116.36 7.41 (1 , 3 , 1 , 0 , 5)

District Nalanda Total 25.962 75 891.36 594.23 1,485.59 84.86 (10 , 16 , 5 , 4 , 35) District- Nawada

Block- Akbarpur

423 L100 L100-NH 31 TO BHAGAN New Panelled 3.511 3.750 Complete 10 95.20 63.47 158.67 7.85 (0 , 1 , 0 , 0 , 1) (TRACK100) Cement Concrete 424 L101 L101-CHOTKI AMMA SONAD New Panelled 1.750 3.750 Complete 6 55.70 37.13 92.83 4.40 (0 , 0 , 1 , 0 , 1) PATH TO KUNDILPUR Cement (TRACK101) Concrete Block Akbarpur Total 5.261 16 150.90 100.60 251.50 12.24 (0 , 1 , 1 , 0 , 2)

Block- Govindpur

425 L061 L061-AKTARA PATH TO New Panelled 2.626 3.750 Complete 8 78.24 52.16 130.40 6.17 (0 , 1 , 0 , 0 , 1) HIRANAGAR (TRACK61) Cement Concrete Block Govindpur Total 2.626 8 78.24 52.16 130.40 6.17 (0 , 1 , 0 , 0 , 1)

Block- Hisua

426 L048 L048-T04 TO New Cold Mix 0.580 3.750 Complete 1 11.05 7.37 18.42 2.43 (0 , 0 , 1 , 0 , 1) CHANDRASHEKHARANA Technology (TRACK24)

Page 54 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

427 L074 L074-S H 8 TO NANDLAL New Panelled 1.000 3.750 Complete 4 27.20 18.13 45.33 2.50 (0 , 1 , 0 , 0 , 1) BIGHA (TRACK50) Cement Concrete 428 L047 L047-L042 TO MAULANAGAR New CELL Filled 1.794 3.750 Complete 4 41.33 27.55 68.88 6.08 (0 , 1 , 0 , 0 , 1) (TRACK61) Concrete
Cold Mix Technology 429 L072 L072-SHRIRAMPUR TO New CELL Filled 1.404 3.750 Complete 3 26.25 17.50 43.75 5.46 (0 , 1 , 0 , 0 , 1) AMAHARI (TRACK48) Concrete
Cold Mix Technology 430 L073 L073-DAULTPUR TO HARIJAN New Cold Mix 3.609 3.750 Complete 6 81.77 54.51 136.28 17.90 (0 , 0 , 1 , 0 , 1) TOLA NADI PAR (TRACK49) Technology Block Hisua Total 8.387 18 187.60 125.06 312.66 34.36 (0 , 3 , 2 , 0 , 5)

Block- Kashichak

431 L037 L037-REWARA TO KOSTHUA New CELL Filled 2.486 3.750 Complete 2 41.82 27.88 69.70 8.96 (0 , 1 , 0 , 0 , 1) (TRACK17) Concrete
Cold Mix Technology Block Kashichak Total 2.486 2 41.82 27.88 69.70 8.96 (0 , 1 , 0 , 0 , 1)

Block- Kauakol

432 L083 L083-PMGSY ROAD New Panelled 2.800 3.750 Complete 10 92.14 61.43 153.57 8.14 (1 , 0 , 0 , 1 , 2) KUTUBCHAK TO KHIRA Cement (TRACK56) Concrete 433 L075 L075-PMGSY ROAD LALPUR New Panelled 2.500 3.750 Complete 9 87.00 58.00 145.00 5.04 (0 , 0 , 1 , 0 , 1) TO TILHATA DHAMNI Cement (TRACK48) Concrete 434 L090 L090-PMGSY NAWADIH TO New Panelled 1.000 3.750 Complete 3 34.08 22.72 56.80 2.34 (0 , 0 , 1 , 0 , 1) GONDAR BIGHA (TRACK63) Cement Concrete 435 L086 L086-KACHNA KAWAKOL PWD New -- 1.350 3.750 Complete 5 42.45 28.30 70.75 4.38 (1 , 0 , 0 , 0 , 1) ROAD TO RUSHTAMPUR (TRACK59)

Page 55 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

436 L094 L094-SHEKHODIORA ROAD New Cold Mix 13.701 3.750 Complete 11 296.65 197.76 494.41 70.47 (0 , 0 , 1 , 3 , 4) TO RANIGARH (TRACK67) Technology 437 L087 L087-PMGSY KHARSARI ROAD New Panelled 2.050 3.750 Complete 6 62.90 41.93 104.83 6.12 (0 , 1 , 0 , 0 , 1) TO KARHARA (TRACK60) Cement Concrete Block Kauakol Total 23.401 44 615.22 410.14 1,025.36 96.48 (2 , 1 , 3 , 4 , 10) Block- Nardiganj

438 L067 L067-L030 TO SULTANPUR New Panelled 1.750 3.750 Complete 8 52.80 35.20 88.00 4.58 (0 , 1 , 0 , 0 , 1) (TRACK56) Cement Concrete 439 L070 L070-T04 TO PARARIA New Panelled 0.900 3.750 Complete 5 29.04 19.36 48.40 1.74 (0 , 1 , 0 , 0 , 1) (TRACK49) Cement Concrete 440 L061 L061-PAKARIYA TO ANARPUR New CELL Filled 1.639 3.750 Complete 3 35.04 23.36 58.40 7.40 (1 , 0 , 0 , 0 , 1) PAKARIYA (TRACK58) Concrete
Cold Mix Technology 441 L073 L073-KAHUARA TO New CELL Filled 1.120 3.750 Complete 2 23.57 15.71 39.28 4.94 (0 , 1 , 0 , 0 , 1) MAYABIGHA (TRACK53) Concrete
Cold Mix Technology 442 L028 L028-T03 TO RUSPUR New Cold Mix 1.843 3.750 Complete 3 35.95 23.97 59.92 9.64 (0 , 0 , 1 , 0 , 1) (TRACK8) Technology 443 L066 L066-T05 TO MILKI New Panelled 2.130 3.750 Complete 5 58.43 38.95 97.38 5.66 (0 , 0 , 1 , 0 , 1) (TRACK57) Cement Concrete Block Nardiganj Total 9.382 26 234.83 156.55 391.38 33.95 (1 , 3 , 2 , 0 , 6)

Page 56 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Nawada

444 L099 L099-PWD ROAD TO AASADHI New Panelled 0.800 3.750 Complete 3 22.09 14.73 36.82 2.13 (0 , 1 , 0 , 0 , 1) (TRACK62) Cement Concrete Block Nawada Total 0.800 3 22.09 14.73 36.82 2.13 (0 , 1 , 0 , 0 , 1)

Block- Sirdala

445 L095 L095-SIMRATAD TO BAIRIYA New Panelled 2.977 3.750 Complete 4 69.89 46.59 116.48 6.81 (0 , 1 , 0 , 0 , 1) (ODR95) Cement Concrete Block Sirdala Total 2.977 4 69.89 46.59 116.48 6.81 (0 , 1 , 0 , 0 , 1)

Block- Warsalliganj

446 L125 L125-WARISALIGANJ New CELL Filled 1.350 3.750 Complete 5 29.84 19.89 49.73 6.18 (1 , 0 , 0 , 0 , 1) SHEKHPURA ROAD TO Concrete CHIRAIYAN (TRACK95)
Cold Mix Technology 447 L056 L056-PWD ROAD T06 TO New CELL Filled 0.510 3.750 Complete 2 11.80 7.87 19.67 0.14 (0 , 0 , 1 , 1 , 2) GANGTA (TRACK28) Concrete 448 L102 L102-WARISALIGANJ BELDHA New Panelled 0.800 3.750 Complete 2 21.71 14.48 36.19 1.95 (1 , 0 , 0 , 0 , 1) ROAD VIJAYNAGAR TO Cement MASUDA (TRACK72) Concrete Block Warsalliganj Total 2.660 9 63.35 42.24 105.59 8.26 (2 , 0 , 1 , 1 , 4)

District Nawada Total 57.980 130 1,463.94 975.95 2,439.89 209.37 (5 , 12 , 9 , 5 , 31) District- Patna

Page 57 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Paliganj

449 L087 L087-Pali Atola Road To New Panelled 1.352 5.500 Complete 3 43.13 28.76 71.89 3.94 (0 , 1 , 0 , 0 , 1) Rukanpura (TRACK73) Cement Concrete Block Paliganj Total 1.352 3 43.13 28.76 71.89 3.94 (0 , 1 , 0 , 0 , 1)

Block- Pandarak

450 L049 L049-T02 to Shahzadpur New CELL Filled 3.700 3.750 Complete 8 126.20 84.13 210.33 10.87 (1 , 1 , 2 , 0 , 4) Bathoi (VR49) Concrete Block Pandarak Total 3.700 8 126.20 84.13 210.33 10.87 (1 , 1 , 2 , 0 , 4)

District Patna Total 5.052 11 169.33 112.89 282.22 14.81 (1 , 2 , 2 , 0 , 5)

District- Purnea

Block- Amaur

451 L056 L056-Mangalpur L058 to New CELL Filled 2.189 3.750 Complete 4 85.98 57.32 143.30 8.16 (1 , 0 , 0 , 4 , 5) Pothia (VR56) Concrete
Cold Mix Technology 452 L087 L087-Petrol pum to New CELL Filled 2.310 3.750 Complete 6 85.84 57.23 143.07 8.79 (0 , 1 , 0 , 0 , 1) bhatgama tolla (VR87) Concrete
Cold Mix Technology 453 L028 L028-Apprch Rd. T02 to New -- 1.500 3.750 Complete 1 62.15 41.44 103.59 5.31 (1 , 4 , 1 , 6 , 12) Banbhag (VR28) Block Amaur Total 5.999 11 233.97 155.99 389.96 22.27 (2 , 5 , 1 , 10 , 18)

Page 58 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Baisi

454 L034 L034-T04 to Goghria (VR34) New CELL Filled 1.271 3.750 Complete 3 45.17 30.11 75.28 4.68 (0 , 1 , 0 , 0 , 1) Concrete
Cold Mix Technology Block Baisi Total 1.271 3 45.17 30.11 75.28 4.68 (0 , 1 , 0 , 0 , 1)

Block- Banmankhi

455 L025 L025-Sarsi Raniganj SH Road New CELL Filled 5.130 3.750 Complete 10 194.65 129.76 324.41 18.14 (1 , 1 , 2 , 0 , 4) to Bahora Ghat (VR25) Concrete
Waste Plastics 456 L073 L073-Kajhi Hirdiypur to New CELL Filled 4.200 3.750 Complete 10 154.03 102.69 256.72 15.35 (1 , 1 , 2 , 0 , 4) Harmudhi (VR73) Concrete
Waste Plastics Block Banmankhi Total 9.330 20 348.68 232.45 581.13 33.49 (2 , 2 , 4 , 0 , 8)

Block- Barhara Kothi

457 L057 L057-T01 to Jhungi via New CELL Filled 2.560 3.750 Complete 7 95.71 63.81 159.52 9.43 (1 , 2 , 0 , 1 , 4) Aurahi (VR57) Concrete
Cold Mix Technology 458 L047 L047-Jaingara to Bhabesha New CELL Filled 2.710 3.750 Complete 3 102.25 68.16 170.41 9.60 (0 , 1 , 0 , 0 , 1) (VR47) Concrete
Cold Mix Technology 459 L030 L030-Bithali to Kamlapur New CELL Filled 3.870 3.750 Complete 7 144.53 96.35 240.88 13.90 (1 , 2 , 0 , 0 , 3) Jagir (VR30) Concrete
Cold Mix Technology

Page 59 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

460 L043 L043-Bhatsara L036 to New CELL Filled 2.814 3.750 Complete 3 100.50 67.00 167.50 10.02 (1 , 0 , 0 , 0 , 1) Chaitala (VR43) Concrete
Cold Mix Technology Block Barhara Kothi Total 11.954 20 442.99 295.32 738.31 42.95 (3 , 5 , 0 , 1 , 9)

Block- Bhawanipur

461 L039 L039-T o4 to Barhari (VR39) New CELL Filled 0.900 3.750 Complete 1 30.70 20.46 51.16 3.10 (2 , 0 , 2 , 0 , 4) Concrete
Cold Mix Technology 462 L060 L060-Kushaha panchayat New CELL Filled 1.215 3.750 Complete 2 42.24 28.16 70.40 4.08 (0 , 1 , 0 , 0 , 1) Bhawan to Jumman tola Concrete Bhangha (TRACK32)
Cold Mix Technology Block Bhawanipur Total 2.115 3 72.94 48.62 121.56 7.18 (2 , 1 , 2 , 0 , 5)

Block- Dhamdaha

463 L065 L065-L063 to Dhobi Tola New CELL Filled 2.175 3.750 Complete 4 73.73 49.15 122.88 7.72 (0 , 1 , 0 , 0 , 1) (VR65) Concrete
Cold Mix Technology Block Dhamdaha Total 2.175 4 73.73 49.15 122.88 7.72 (0 , 1 , 0 , 0 , 1)

Block- Kasba

464 L070 L070-T04 Gerua Chowk to New CELL Filled 2.610 3.750 Complete 6 100.56 67.04 167.60 9.79 (1 , 0 , 0 , 1 , 2) Betauna (VR70) Concrete
Cold Mix Technology 465 L036 L036-T-05 to Banaili (VR36) New CELL Filled 1.960 3.750 Complete 3 69.10 46.07 115.17 6.81 (1 , 0 , 3 , 3 , 7) Concrete
Waste Plastics

Page 60 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

466 L052 L052-PMGSY Road Ekwal New CELL Filled 4.200 3.750 Complete 5 148.19 98.79 246.98 14.99 (1 , 0 , 0 , 1 , 2) Chowk to Kadwa South Tola Concrete (VR52)
Cold Mix Technology Block Kasba Total 8.770 14 317.85 211.90 529.75 31.60 (3 , 0 , 3 , 5 , 11) Block- Kritya Nand Nagar

467 L054 L054-T-05 Gokhulpur to New CELL Filled 2.235 3.750 Complete 4 87.53 58.35 145.88 7.95 (0 , 1 , 0 , 0 , 1) Mohammadpur (VR54) Concrete
Cold Mix Technology Block Kritya Nand Nagar Total 2.235 4 87.53 58.35 145.88 7.95 (0 , 1 , 0 , 0 , 1)

Block- Sri Nagar

468 L047 L047-Dangraha To devi New CELL Filled 3.750 3.750 Complete 11 141.15 94.10 235.25 13.35 (0 , 1 , 0 , 0 , 1) nagar yadav tola (VR47) Concrete
Cold Mix Technology 469 L022 L022-Uphorail to Khokha New CELL Filled 1.791 3.750 Complete 5 68.09 45.39 113.48 6.65 (1 , 1 , 5 , 6 , 13) (VR22) Concrete
Cold Mix Technology 470 L036 L036-T-01 to Uchepur New CELL Filled 1.158 3.750 Complete 2 45.97 30.65 76.62 4.19 (0 , 1 , 0 , 0 , 1) (VR36) Concrete
Cold Mix Technology 471 L045 L045-Rani bari to oraila New CELL Filled 3.812 3.750 Complete 6 141.09 94.06 235.15 14.05 (0 , 1 , 0 , 0 , 1) ghat masjid tola (VR45) Concrete
Cold Mix Technology

Page 61 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

472 L041 L041-L-033 to Dhongila New CELL Filled 1.395 3.750 Complete 4 50.20 33.47 83.67 4.96 (0 , 1 , 0 , 0 , 1) (VR41) Concrete
Cold Mix Technology Block Sri Nagar Total 11.906 28 446.50 297.67 744.17 43.21 (1 , 5 , 5 , 6 , 17) District Purnea Total 55.755 107 2,069.36 1,379.56 3,448.92 201.04 (13 , 21 , 15 , 22 , 71) District- Saharsa

Block- Nauhatta

473 L022 L022-T01 to Yogeshwar New Panelled 2.140 3.750 Complete 2 72.86 48.57 121.43 4.12 (0 , 4 , 0 , 3 , 7) Yadav Tola Rasalpur Cement (TRACK4) Concrete Block Nauhatta Total 2.140 2 72.86 48.57 121.43 4.12 (0 , 4 , 0 , 3 , 7)

Block- Patarghat

474 L044 L044-T04 to Manikpur patti New Panelled 2.319 3.750 Complete 3 74.23 49.48 123.71 8.07 (0 , 2 , 0 , 0 , 2) (VR27) Cement Concrete 475 L021 L021-T02 Sabela (VR10) New Panelled 0.752 3.750 Complete 2 25.13 16.75 41.88 2.09 (1 , 0 , 0 , 0 , 1) Cement Concrete 476 L042 L042-T03 to Manikpur New Panelled 1.535 3.750 Complete 4 52.09 34.73 86.82 4.74 (1 , 0 , 0 , 0 , 1) (VR25) Cement Concrete Block Patarghat Total 4.606 9 151.45 100.96 252.41 14.90 (2 , 2 , 0 , 0 , 4)

Block- Salkhua

477 T02 T02-T04 to Kabirpur (VR2) New Panelled 9.540 3.750 Complete 21 370.56 247.04 617.60 32.51 (1 , 1 , 4 , 4 , 10) Cement Concrete

Page 62 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

478 L052 L052-T04 to Basahi (VR31) New Panelled 3.140 3.750 Complete 9 115.15 76.76 191.91 11.21 (0 , 1 , 0 , 1 , 2) Cement Concrete 479 L036 L036-Haripur To Kachaut New Panelled 1.050 3.750 Complete 2 36.79 24.53 61.32 2.47 (1 , 0 , 0 , 1 , 2) (VR16) Cement Concrete 480 L063 L063-Kopariya to Koshi New -- 0.874 3.750 Complete 2 30.29 20.19 50.48 3.27 (0 , 1 , 0 , 0 , 1) Bandh (VR64) 481 L030 L030-MDR-T01 to Karijan New Panelled 0.560 3.750 Complete 1 19.21 12.81 32.02 1.35 (0 , 1 , 0 , 0 , 1) tola (VR10) Cement Concrete 482 L053 L053-Koshi Bandh To Utesara New Panelled 1.505 3.750 Complete 3 53.28 35.52 88.80 4.17 (1 , 0 , 0 , 0 , 1) near harewa (VR32) Cement Concrete Block Salkhua Total 16.669 38 625.28 416.85 1,042.13 54.98 (3 , 4 , 4 , 6 , 17) Block- Satarkateya

483 L057 L057-T06 To Barahsher (VR9) New Panelled 0.980 3.750 Complete 2 33.56 22.38 55.94 1.81 (1 , 0 , 0 , 0 , 1) Cement Concrete Block Satarkateya Total 0.980 2 33.56 22.38 55.94 1.81 (1 , 0 , 0 , 0 , 1)

Block- Saurbazar

484 L090 L090-T02 to Dubhi Mahiyam New -- 3.800 3.750 Complete 5 107.15 71.44 178.59 14.47 (0 , 1 , 0 , 0 , 1) (TRACK19) Block Saurbazar Total 3.800 5 107.15 71.44 178.59 14.47 (0 , 1 , 0 , 0 , 1)

Block- Simri Bakhtiarpur

485 L051 L051-MDR-T04 to Badia New Panelled 1.510 3.750 Complete 3 53.10 35.40 88.50 4.47 (1 , 0 , 0 , 0 , 1) (VR26) Cement Concrete 486 L069 L069-X road L067 to New Panelled 3.300 3.750 Complete 6 116.30 77.53 193.83 9.77 (0 , 1 , 0 , 0 , 1) Chamani (VR36) Cement Concrete

Page 63 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

487 L030 L030-MDR-T01 To Lagma New Panelled 1.531 3.750 Complete 2 52.06 34.71 86.77 4.08 (1 , 0 , 1 , 1 , 3) (VR13) Cement Concrete 488 L090 L090-X road L033 to New Panelled 0.994 3.500 Complete 1 34.73 23.15 57.88 2.71 (0 , 1 , 0 , 0 , 1) Larhariya (VR51) Cement Concrete 489 L071 L071-T03 to Khara Mushari New Panelled 10.485 3.750 Complete 21 374.59 249.73 624.32 32.18 (0 , 3 , 2 , 3 , 8) (VR38) Cement Concrete 490 L096 L096-X road to L071 to New Panelled 11.190 3.750 Complete 21 402.88 268.59 671.47 33.12 (1 , 4 , 2 , 2 , 9) Ramanagar (VR52) Cement Concrete 491 L087 L087-X road L070 to New -- 0.950 3.750 Complete 2 32.00 21.33 53.33 3.54 (0 , 1 , 0 , 0 , 1) Simartok (VR46) 492 L070 L070-X road L096 to New Panelled 3.305 3.750 Complete 9 131.80 87.86 219.66 10.96 (1 , 0 , 0 , 0 , 1) Kanariya (VR37) Cement Concrete Block Simri Bakhtiarpur Total 33.265 65 1,197.46 798.30 1,995.76 100.83 (4 , 10 , 5 , 6 , 25) Block- Sonbarsa

493 L061 L061-Biratpur Bhawara Road New Panelled 1.140 3.750 Complete 2 38.81 25.87 64.68 3.30 (0 , 1 , 0 , 0 , 1) To parwaha (VR7) Cement Concrete 494 L070 L070-L028 to Soni ghat New Panelled 1.136 3.750 Complete 1 38.69 25.80 64.49 1.61 (1 , 0 , 0 , 1 , 2) (VR47) Cement Concrete 495 L093 L093-Kopa to Sakhasani New Panelled 0.618 3.750 Complete 1 20.58 13.72 34.30 1.85 (0 , 1 , 0 , 1 , 2) (VR60) Cement Concrete 496 L069 L069-L063 To Chakla Tola New Panelled 1.590 3.750 Complete 3 59.52 39.68 99.20 4.52 (0 , 1 , 0 , 0 , 1) (VR46) Cement Concrete 497 L078 L078-Jalsima to Sirrahi New -- 2.691 3.750 Complete 7 93.98 62.65 156.63 10.07 (1 , 0 , 0 , 2 , 3) (VR54)

Page 64 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

498 L022 L022-Bargawn To Mokama New Panelled 3.910 3.750 Complete 2 123.25 82.16 205.41 12.89 (1 , 0 , 2 , 3 , 6) (VR8) Cement Concrete Block Sonbarsa Total 11.085 16 374.83 249.88 624.71 34.24 (3 , 3 , 2 , 7 , 15) District Saharsa Total 72.545 137 2,562.59 1,708.38 4,270.97 225.35 (13 , 24 , 11 , 22 , 70) District- Sitamarhi

Block- Nanpur

499 L101 L101-Lakhamipur to New -- 0.779 3.750 Complete 1 23.74 15.83 39.57 3.78 (0 , 0 , 1 , 0 , 1) Jagdishpur (VR88) 500 L102 L102-Janipur to Koyali Tola New -- 1.310 3.750 Complete 0 38.24 25.49 63.73 6.50 (0 , 0 , 1 , 0 , 1) (VR89) Block Nanpur Total 2.089 1 61.98 41.32 103.30 10.28 (0 , 0 , 2 , 0 , 2)

Block- Pupari

501 L041 L041-Awapur chak urf New -- 2.645 3.750 Complete 2 84.92 56.61 141.53 12.45 (0 , 1 , 0 , 0 , 1) Sherpur (VR23) Block Pupari Total 2.645 2 84.92 56.61 141.53 12.45 (0 , 1 , 0 , 0 , 1)

District Sitamarhi Total 4.734 3 146.90 97.93 244.83 22.73 (0 , 1 , 2 , 0 , 3)

District- Siwan

Block- Basantpur

502 L047 L047-L028 To SahilPatti New Waste Plastics 2.000 3.750 Complete 4 57.63 38.47 96.10 5.55 (0 , 1 , 2 , 0 , 3) (TRACK14)

Page 65 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

503 L035 L035-Kanhauli T02 SH To New CELL Filled 2.150 3.750 Complete 5 61.27 40.89 102.16 3.59 (1 , 0 , 2 , 3 , 6) Sarea Srikant Via Hussepur Concrete (TRACK10)
Waste Plastics Block Basantpur Total 4.150 9 118.90 79.36 198.26 9.14 (1 , 1 , 4 , 3 , 9)

Block-

504 L046 L046-Mora Khas B.T. Road New CELL Filled 3.375 3.750 Complete 10 94.34 62.94 157.28 5.86 (1 , 3 , 5 , 2 , 11) T03 To Bithuna (TRACK20) Concrete
Waste Plastics 505 L047 L047-T01 To Lahuri Kawaiya New CELL Filled 1.800 3.750 Complete 5 52.16 34.82 86.98 3.63 (1 , 0 , 0 , 0 , 1) (TRACK22) Concrete
Waste Plastics 506 L050 L050-Balha Alimardanpur To New CELL Filled 1.950 3.750 Complete 4 60.07 40.10 100.17 4.29 (1 , 0 , 0 , 0 , 1) Salempur (TRACK25) Concrete
Waste Plastics Block Bhagwanpur Hat Total 7.125 19 206.57 137.86 344.43 13.78 (3 , 3 , 5 , 2 , 13) Block-

507 L048 L048-T01 To Khamhaurah New Waste Plastics 1.350 3.750 Complete 3 41.78 27.91 69.69 3.81 (0 , 1 , 0 , 0 , 1) (TRACK15) Block Daraundha Total 1.350 3 41.78 27.91 69.69 3.81 (0 , 1 , 0 , 0 , 1)

Block- Maharajganj

508 L146 L146-L034 To Lerua New CELL Filled 1.150 3.750 Complete 2 31.96 21.35 53.31 1.47 (1 , 0 , 2 , 2 , 5) (TRACK18) Concrete
Waste Plastics Block Maharajganj Total 1.150 2 31.96 21.35 53.31 1.47 (1 , 0 , 2 , 2 , 5)

Page 66 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Panchrukhi

509 L061 L061-Aakopur to Hakam New CELL Filled 0.950 3.750 Complete 3 26.94 18.01 44.95 1.92 (1 , 1 , 1 , 1 , 4) (VR18) Concrete
Waste Plastics Block Panchrukhi Total 0.950 3 26.94 18.01 44.95 1.92 (1 , 1 , 1 , 1 , 4)

Block- Raghunathpur

510 L053 L053-Amwari to Amwari New Waste Plastics 0.900 3.750 Complete 3 26.09 17.44 43.53 2.56 (0 , 1 , 0 , 0 , 1) Harijan Tola (TRACK14) Block Raghunathpur Total 0.900 3 26.09 17.44 43.53 2.56 (0 , 1 , 0 , 0 , 1)

District Siwan Total 15.625 39 452.24 301.93 754.17 32.68 (6 , 7 , 12 , 8 , 33) District- Vaishali

Block- Bhagwanpur

511 L037 L037-Manikpur Pakari To New CELL Filled 1.786 3.750 Complete 3 45.58 30.38 75.96 9.57 (1 , 2 , 0 , 0 , 3) Adhinpur (VR11) Concrete
Cold Mix Technology 512 L056 L056-T04 to khirkkhowa New CELL Filled 2.067 3.750 Complete 1 54.12 36.08 90.20 6.41 (0 , 3 , 3 , 1 , 7) (VR12) Concrete
Cold Mix Technology 513 L071 L071-T04 To Asadpur Sadpur New CELL Filled 1.055 3.750 Complete 1 28.09 18.72 46.81 0.13 (0 , 1 , 2 , 0 , 3) (VR16) Concrete 514 L025 L025-Jahangir paterha to New CELL Filled 2.325 3.750 Complete 1 61.08 40.72 101.80 5.13 (0 , 2 , 0 , 2 , 4) Anjani (VR9) Concrete
Cold Mix Technology Block Bhagwanpur Total 7.233 6 188.87 125.90 314.77 21.24 (1 , 8 , 5 , 3 , 17)

Page 67 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Chehrakala

515 L035 L035-Chapra Khaje Chand to New -- 1.685 3.750 Complete 2 51.31 34.21 85.52 6.42 (2 , 5 , 2 , 0 , 9) Chakaulya Akhtiyarpur Sehan (VR35) Block Chehrakala Total 1.685 2 51.31 34.21 85.52 6.42 (2 , 5 , 2 , 0 , 9)

Block-

516 L061 L061-L039 Fatikwara to New CELL Filled 1.390 3.750 Complete 1 38.75 25.83 64.58 6.71 (0 , 0 , 2 , 1 , 3) Mohammadpur Buzurg Concrete (VR43)
Cold Mix Technology Block Desari Total 1.390 1 38.75 25.83 64.58 6.71 (0 , 0 , 2 , 1 , 3)

Block- Goroul

517 L083 L083-Belwar To Benipatti New CELL Filled 0.750 3.750 Complete 0 18.80 12.53 31.33 0.44 (0 , 0 , 2 , 0 , 2) (TRACK83) Concrete
Cold Mix Technology 518 L055 L055-Bishun-pur Ghar To New -- 0.945 3.750 Complete 0 24.01 16.01 40.02 2.01 (0 , 1 , 1 , 0 , 2) Chauwsiwan Sarangi (VR55) 519 L071 L071-Chakaiya pakari TO New CELL Filled 0.930 3.750 Complete 1 23.80 15.87 39.67 4.20 (0 , 1 , 2 , 0 , 3) Bhikhanpura (TRACK71) Concrete
Cold Mix Technology Block Goroul Total 2.625 1 66.61 44.41 111.02 6.64 (0 , 2 , 5 , 0 , 7)

Block- Mahua

520 L150 L150-East Of Akshaybat New -- 1.645 3.750 Complete 1 51.14 34.10 85.24 3.36 (0 , 2 , 0 , 0 , 2) College To House Of Kailash Rai Via Anandi rai , Devendra rai (TRACK126)

Page 68 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

521 L120 L120-Mahua- New -- 3.400 3.750 Complete 2 100.81 67.21 168.02 12.18 (2 , 3 , 0 , 1 , 6) path fular chowk chowk se pashchim bali bathna school hote hue paswan tola tak (TRACK89) Block Mahua Total 5.045 3 151.95 101.31 253.26 15.54 (2 , 5 , 0 , 1 , 8)

Block-

522 L043 L043-T02 to Harijan Tola New -- 1.700 3.750 Complete 4 56.32 37.55 93.87 5.35 (0 , 1 , 0 , 0 , 1) (VR68) 523 L050 L050-Pyarepur to Chakwa New CELL Filled 1.555 3.750 Complete 1 39.56 26.37 65.93 8.93 (0 , 3 , 2 , 0 , 5) (TRACK19) Concrete
Cold Mix Technology Block Patepur Total 3.255 5 95.88 63.92 159.80 14.28 (0 , 4 , 2 , 0 , 6)

Block- Raghopur

524 L045 L045-Terasia to Kairi Tola New CELL Filled 0.600 3.750 Complete 0 14.98 9.98 24.96 0.07 (0 , 1 , 0 , 0 , 1) (VR26) Concrete Block Raghopur Total 0.600 0 14.98 9.98 24.96 0.07 (0 , 1 , 0 , 0 , 1)

Block-

525 L038 L038-Belkund to Rampur New -- 2.025 3.750 Complete 2 62.02 41.35 103.37 8.13 (0 , 1 , 1 , 2 , 4) Khemkaran (TRACK38) 526 L046 L046-Gram laxmi pur New -- 1.300 3.750 Complete 1 40.06 26.70 66.76 3.96 (0 , 1 , 0 , 0 , 1) bhakhari durga sthan To naresh jha laxmipur bhakhari via chauraha kali sthan (TRACK46) Block Rajapakar Total 3.325 3 102.08 68.05 170.13 12.10 (0 , 2 , 1 , 2 , 5)

District Vaishali Total 25.158 21 710.43 473.61 1,184.04 82.99 (5 , 27 , 17 , 7 , 56)

Page 69 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Road Proposals Total 1,063.066 1,896 33,086.50 22,058.02 55,144.52 4,304.34 (214 , 408 , 392 , 364 , 1378) Long Span Bridge Proposals

District- Araria

Block- Araria

527 L026 Bridge at Chainage 3500m New -- 22.600 0.000 Complete 0 53.74 35.83 89.57 2.22 (0 , 0 , 0 , 0 , 0)

528 L044 Bridge at Chainage 5000m New -- 22.600 0.000 Complete 0 52.88 35.25 88.14 1.75 (0 , 0 , 0 , 0 , 0)

529 L021 Bridge at Chainage 1500 m New -- 28.750 0.000 Complete 0 67.51 45.01 112.51 2.65 (0 , 0 , 0 , 0 , 0)

530 L040 Bridge at Chainage 7000 m New -- 206.720 0.000 Complete 0 112.99 406.05 519.04 8.19 (0 , 0 , 0 , 0 , 0)

Block Araria Total 280.670 0 287.12 522.14 809.26 14.80 (0 , 0 , 0 , 0 , 0)

Block- Bhargama

531 L030 Bridge at Chainage 1510 m New -- 45.680 0.000 Complete 0 108.31 72.21 180.52 3.58 (0 , 0 , 0 , 0 , 0)

532 L042 Bridge at Chainage 5010m New -- 37.680 0.000 Complete 0 105.53 70.35 175.88 3.70 (0 , 0 , 0 , 0 , 0)

Block Bhargama Total 83.360 0 213.84 142.56 356.41 7.29 (0 , 0 , 0 , 0 , 0)

Block- Forbisganj

533 L027 Bridge at Chainage 2025 m New -- 51.680 0.000 Complete 0 136.66 91.10 227.76 4.99 (0 , 0 , 0 , 0 , 0)

534 L035 Bridge at Chainage 1005 m New -- 33.680 0.000 Complete 0 87.57 58.38 145.95 2.60 (0 , 0 , 0 , 0 , 0)

535 L041 Bridge at Chainage 100 m New -- 41.680 0.000 Complete 0 110.59 73.73 184.32 4.46 (0 , 0 , 0 , 0 , 0)

536 T02 Bridge at Chainage 5000 m New -- 20.840 0.000 Complete 0 90.12 60.08 150.19 4.37 (0 , 0 , 0 , 0 , 0)

537 T02 Bridge at Chainage 12000 m New -- 33.680 0.000 Complete 0 99.54 66.36 165.89 4.04 (0 , 0 , 0 , 0 , 0)

Block Forbisganj Total 181.560 0 524.47 349.65 874.12 20.46 (0 , 0 , 0 , 0 , 0)

Page 70 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Joukihat

538 L074 Bridge at Chainage 3500 m New -- 22.600 0.000 Complete 0 53.84 35.89 89.74 2.65 (0 , 0 , 0 , 0 , 0)

539 L080 Bridge at Chainage 2000 m New -- 22.600 0.000 Complete 0 51.48 34.32 85.80 2.65 (0 , 0 , 0 , 0 , 0)

540 L081 Bridge at Chainage 2900 m New -- 155.040 0.000 Complete 0 138.20 337.93 476.13 7.92 (0 , 0 , 0 , 0 , 0)

541 L057 Bridge at Chainage 3200 m New -- 155.040 0.000 Complete 0 132.49 323.99 456.48 7.82 (0 , 0 , 0 , 0 , 0)

542 L048 Bridge at Chainage 3000 m New -- 50.520 0.000 Complete 0 135.56 90.37 225.93 3.13 (0 , 0 , 0 , 0 , 0)

543 L048 Bridge at Chainage 4100 m New -- 33.680 0.000 Complete 0 106.76 71.17 177.93 2.55 (0 , 0 , 0 , 0 , 0)

544 L080 Bridge at Chainage 3000 m New -- 51.680 0.000 Complete 0 129.89 86.59 216.48 5.29 (0 , 0 , 0 , 0 , 0)

Block Joukihat Total 491.160 0 748.22 980.27 1,728.49 32.01 (0 , 0 , 0 , 0 , 0)

Block- Kursakanta

545 L035 Bridge at Chainage 2800 m New -- 83.360 0.000 Complete 0 156.13 133.09 289.22 5.59 (0 , 0 , 0 , 0 , 0)

546 L053 Bridge at Chainage 1500 m New -- 45.680 0.000 Complete 0 111.12 74.08 185.20 4.27 (0 , 0 , 0 , 0 , 0)

547 L041 Bridge at Chainage 1200 m New -- 83.360 0.000 Complete 0 166.67 142.07 308.74 6.10 (0 , 0 , 0 , 0 , 0)

548 L047 Bridge at Chainage 400 m New -- 19.600 0.000 Complete 0 51.91 34.61 86.52 2.17 (0 , 0 , 0 , 0 , 0)

549 L066 Bridge at Chainage 3500 m New -- 33.680 0.000 Complete 0 88.20 58.80 147.00 2.98 (0 , 0 , 0 , 0 , 0)

Block Kursakanta Total 265.680 0 574.04 442.65 1,016.69 21.12 (0 , 0 , 0 , 0 , 0)

Block- Narpatganj

550 L024 Bridge at Chainage 12500 m New -- 22.600 0.000 Complete 0 65.07 43.38 108.45 2.69 (0 , 0 , 0 , 0 , 0)

551 L056 Bridge at Chainage 8000 m New -- 22.600 0.000 Complete 0 59.19 39.46 98.64 2.80 (0 , 0 , 0 , 0 , 0)

552 L056 Bridge at Chainage 10000 m New -- 37.680 0.000 Complete 0 116.95 77.97 194.92 4.38 (0 , 0 , 0 , 0 , 0)

553 L056 Bridge at Chainage 14000 m New -- 33.680 0.000 Complete 0 109.39 72.93 182.32 4.11 (0 , 0 , 0 , 0 , 0)

Page 71 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

554 L033 Bridge at Chainage 4000 m New -- 22.600 0.000 Complete 0 58.55 39.04 97.59 2.65 (0 , 0 , 0 , 0 , 0)

555 L052 Bridge at Chainage 5000 m New -- 22.600 0.000 Complete 0 61.46 40.98 102.44 2.87 (0 , 0 , 0 , 0 , 0)

Block Narpatganj Total 161.760 0 470.61 313.74 784.35 19.49 (0 , 0 , 0 , 0 , 0)

Block- Palasi

556 L023 Bridge at Chainage 1500 m New -- 68.520 0.000 Complete 0 159.22 106.15 265.37 5.58 (0 , 0 , 0 , 0 , 0)

557 L024 Bridge at Chainage 4400 m New -- 155.040 0.000 Complete 0 129.98 317.86 447.84 7.91 (0 , 0 , 0 , 0 , 0)

558 L046 Bridge at Chainage 1350 m New -- 41.680 0.000 Complete 0 106.53 71.02 177.56 4.46 (0 , 0 , 0 , 0 , 0)

Block Palasi Total 265.240 0 395.74 495.03 890.77 17.96 (0 , 0 , 0 , 0 , 0)

Block- Raniganj

559 L039 Bridge at Chainage 1500 m New -- 77.520 0.000 Complete 0 164.28 118.72 283.00 5.33 (0 , 0 , 0 , 0 , 0)

560 L044 Bridge at Chainage 1900 m New -- 33.680 0.000 Complete 0 97.96 65.31 163.27 3.57 (0 , 0 , 0 , 0 , 0)

561 L039 Bridge at Chainage 1800 m New -- 22.600 0.000 Complete 0 53.60 35.73 89.33 2.49 (0 , 0 , 0 , 0 , 0)

562 L039 Bridge at Chainage 2000 m New -- 22.600 0.000 Complete 0 51.70 34.46 86.16 2.19 (0 , 0 , 0 , 0 , 0)

Block Raniganj Total 156.400 0 367.53 254.22 621.76 13.58 (0 , 0 , 0 , 0 , 0)

Block- Sikti

563 L027 Bridge at Chainage 4000 m New -- 129.200 0.000 Complete 0 126.49 236.66 363.15 7.08 (0 , 0 , 0 , 0 , 0)

564 L045 Bridge at Chainage 2000 m New -- 22.600 0.000 Complete 0 55.47 36.98 92.46 3.31 (0 , 0 , 0 , 0 , 0)

565 T04 Bridge at Chainage 8700 m New -- 51.680 0.000 Complete 0 130.92 87.28 218.19 4.56 (0 , 0 , 0 , 0 , 0)

Block Sikti Total 203.480 0 312.88 360.92 673.80 14.94 (0 , 0 , 0 , 0 , 0)

District Araria Total 2,089.310 0 3,894.45 3,861.18 7,755.63 161.64 (0 , 0 , 0 , 0 , 0)

District- Arwal

Page 72 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Arwal

566 L072 Patna-Aurangabad to Duna New -- 33.680 0.000 Complete 0 86.76 57.84 144.59 3.36 (0 , 0 , 0 , 0 , 0) Chapra Block Arwal Total 33.680 0 86.76 57.84 144.59 3.36 (0 , 0 , 0 , 0 , 0)

Block- Kaler

567 L032 Sohasa Road L037 to New -- 33.680 0.000 Complete 0 86.76 57.84 144.59 3.36 (0 , 0 , 0 , 0 , 0) Masadpur Block Kaler Total 33.680 0 86.76 57.84 144.59 3.36 (0 , 0 , 0 , 0 , 0)

Block- Karpi

568 L022 T02 to Kanaichak New -- 37.680 0.000 Complete 0 91.62 61.08 152.70 2.33 (0 , 0 , 0 , 0 , 0)

Block Karpi Total 37.680 0 91.62 61.08 152.70 2.33 (0 , 0 , 0 , 0 , 0)

District Arwal Total 105.040 0 265.13 176.76 441.89 9.04 (0 , 0 , 0 , 0 , 0)

District- Bhagalpur

Block- Gauradih

569 L050 Bridge over Kadwa river New -- 58.080 0.000 Complete 0 186.08 124.06 310.14 8.62 (0 , 0 , 0 , 0 , 0) near Satjori Mor 570 L055 Bridge over kataria chandan New -- 96.800 0.000 Complete 0 218.97 252.06 471.03 12.99 (0 , 0 , 0 , 0 , 0) river near Lakkar Bageecha 571 L051 Bridge over Ladan river at New -- 58.080 0.000 Complete 0 189.51 126.34 315.86 8.62 (0 , 0 , 0 , 0 , 0) Nadiama phanri road 572 L042 Bridge over Nargaihiya river New -- 58.080 0.000 Complete 0 187.44 124.96 312.41 8.62 (0 , 0 , 0 , 0 , 0)

573 L048 Bridge over Kokura river New -- 34.220 0.000 Complete 0 130.89 87.26 218.14 6.43 (0 , 0 , 0 , 0 , 0)

Page 73 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

574 L042 Bridge over Khalkhalia river New -- 58.080 0.000 Complete 0 192.74 128.49 321.23 8.62 (0 , 0 , 0 , 0 , 0) at Srirampur to Ustu road Block Gauradih Total 363.340 0 1,105.63 843.17 1,948.80 53.91 (0 , 0 , 0 , 0 , 0)

Block- Shahkund

575 L025 Bridge over Chanan river New -- 77.440 0.000 Complete 0 233.06 168.01 401.08 10.81 (0 , 0 , 0 , 0 , 0) near kisanpur village 576 L027 Bridge over Andhri river at New -- 96.800 0.000 Complete 0 211.41 243.35 454.76 12.99 (0 , 0 , 0 , 0 , 0) kamalpur to road 577 L028 Bridge over kathotiya nala New -- 77.440 0.000 Complete 0 226.22 163.08 389.30 10.80 (0 , 0 , 0 , 0 , 0) at Ratanganj to Narayanpur road Block Shahkund Total 251.680 0 670.69 574.45 1,245.14 34.60 (0 , 0 , 0 , 0 , 0)

Block- Sultanganj

578 L050 Bridge at Asarganj to New -- 17.110 0.000 Complete 0 85.69 57.12 142.81 4.25 (0 , 0 , 0 , 0 , 0) Hatiok road 579 - Bridge over Chaandan river New -- 34.220 0.000 Complete 0 127.17 84.78 211.95 6.43 (0 , 0 , 0 , 0 , 0) near Munjat village 580 - BRIDGE AT ROAD NH-80 TO New -- 34.220 0.000 Complete 0 127.01 84.67 211.69 6.43 (0 , 0 , 0 , 0 , 0) KISANPUR PART 1 581 L043 Bridge over Badua river New -- 96.800 0.000 Complete 0 210.45 242.25 452.70 12.99 (0 , 0 , 0 , 0 , 0)

582 - Bridge at NH80 to Kishanpur New -- 17.110 0.000 Complete 0 85.45 56.97 142.42 4.25 (0 , 0 , 0 , 0 , 0) (Part-2) 583 - Bridge at NH 80 to New -- 17.110 0.000 Complete 0 85.11 56.74 141.85 4.25 (0 , 0 , 0 , 0 , 0) Kishanpur road (Part 3) 584 - Bridge near NH80 New -- 17.110 0.000 Complete 0 84.89 56.59 141.48 4.25 (0 , 0 , 0 , 0 , 0)

Block Sultanganj Total 233.680 0 805.77 639.13 1,444.90 42.86 (0 , 0 , 0 , 0 , 0)

District Bhagalpur Total 848.700 0 2,582.09 2,056.75 4,638.83 131.36 (0 , 0 , 0 , 0 , 0)

Page 74 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District- Khagaria

Block- Gogari

585 L028 L028-NH-31 TO BIRWAS New -- 66.600 0.000 Complete 0 147.16 179.54 326.70 2.71 (0 , 0 , 0 , 0 , 0) (ODR28) 586 L025 NH-31 TO POURA (CH-1.3 New -- 66.600 0.000 Complete 0 167.30 204.11 371.42 2.79 (0 , 0 , 0 , 0 , 0) KM) 587 L025 L025-NH-31 TO POURA (CH- New -- 33.320 0.000 Complete 0 122.08 81.39 203.46 1.49 (0 , 0 , 0 , 0 , 0) 2.1 KM) 588 L025 L025-NH-31 TO POURA (CH- New -- 116.520 0.000 Complete 0 226.61 360.16 586.77 4.64 (0 , 0 , 0 , 0 , 0) 6.21 KM) 589 L025 L025-NH-31 TO POURA (CH- New -- 116.520 0.000 Complete 0 209.47 332.90 542.37 4.63 (0 , 0 , 0 , 0 , 0) 7.76) 590 L025 L025-NH-31 TO POURA (CH- New -- 66.600 0.000 Complete 0 165.87 202.36 368.22 2.69 (0 , 0 , 0 , 0 , 0) 10.31 KM) Block Gogari Total 466.160 0 1,038.49 1,360.45 2,398.94 18.94 (0 , 0 , 0 , 0 , 0)

District Khagaria Total 466.160 0 1,038.49 1,360.45 2,398.94 18.94 (0 , 0 , 0 , 0 , 0)

District- Kishanganj

Block- Bahadurganj

591 L065 -- New -- 50.520 0.000 Complete 0 128.14 85.43 213.57 3.00 (0 , 0 , 0 , 0 , 0)

592 L047 -- New -- 114.200 0.000 Complete 0 160.53 246.86 407.39 7.35 (0 , 0 , 0 , 0 , 0)

593 L026 -- New -- 62.520 0.000 Complete 0 132.33 88.22 220.55 4.44 (0 , 0 , 0 , 0 , 0)

594 T08 -- New -- 28.750 0.000 Complete 0 90.14 60.09 150.23 2.64 (0 , 0 , 0 , 0 , 0)

595 L036 -- New -- 56.520 0.000 Complete 0 135.12 90.08 225.20 4.36 (0 , 0 , 0 , 0 , 0)

Block Bahadurganj Total 312.510 0 646.26 570.68 1,216.93 21.78 (0 , 0 , 0 , 0 , 0)

Page 75 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Koch Dhaman

596 L026 -- New -- 68.520 0.000 Complete 0 147.60 98.40 246.00 4.61 (0 , 0 , 0 , 0 , 0)

597 L082 -- New -- 68.520 0.000 Complete 0 143.49 95.66 239.15 4.84 (0 , 0 , 0 , 0 , 0)

598 T03 -- New -- 41.680 0.000 Complete 0 115.16 76.77 191.93 3.40 (0 , 0 , 0 , 0 , 0)

599 T07 -- New -- 33.680 0.000 Complete 0 100.12 66.75 166.87 3.25 (0 , 0 , 0 , 0 , 0)

600 T04 -- New -- 25.840 0.000 Complete 0 75.84 50.56 126.41 3.19 (0 , 0 , 0 , 0 , 0)

Block Koch Dhaman Total 238.240 0 582.22 388.14 970.36 19.29 (0 , 0 , 0 , 0 , 0)

Block- Pothia

601 L043 -- New -- 45.680 0.000 Complete 0 100.96 67.31 168.27 4.08 (0 , 0 , 0 , 0 , 0)

Block Pothia Total 45.680 0 100.96 67.31 168.27 4.08 (0 , 0 , 0 , 0 , 0)

District Kishanganj Total 596.430 0 1,329.43 1,026.13 2,355.56 45.14 (0 , 0 , 0 , 0 , 0)

District- Nalanda

Block- Chandi

602 L157 L157-Bahadurpur To Ganga New -- 33.680 0.000 Complete 0 80.85 53.90 134.75 2.94 (0 , 0 , 0 , 0 , 0) Bigha (VR157) Block Chandi Total 33.680 0 80.85 53.90 134.75 2.94 (0 , 0 , 0 , 0 , 0)

Block- Harnaut

603 L031 Missing Bridge New -- 37.680 0.000 Complete 0 89.93 59.95 149.88 2.47 (0 , 0 , 0 , 0 , 0)

Block Harnaut Total 37.680 0 89.93 59.95 149.88 2.47 (0 , 0 , 0 , 0 , 0)

Page 76 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Nagarnausa

604 L026 Mising Bridge New -- 45.680 0.000 Complete 0 94.62 63.08 157.69 1.80 (0 , 0 , 0 , 0 , 0)

Block Nagarnausa Total 45.680 0 94.62 63.08 157.69 1.80 (0 , 0 , 0 , 0 , 0)

District Nalanda Total 117.040 0 265.39 176.93 442.32 7.21 (0 , 0 , 0 , 0 , 0)

District- Patna

Block- Bakhtiarpur

605 L051 L051-Laxmanpur to Sirshi New -- 77.520 0.000 Complete 0 148.66 107.43 256.10 4.62 (0 , 0 , 0 , 0 , 0)

606 L022 PMGSY Road to Sirsi Harijan New -- 77.520 0.000 Complete 0 149.06 107.72 256.79 4.94 (0 , 0 , 0 , 0 , 0) Tola Block Bakhtiarpur Total 155.040 0 297.73 215.16 512.89 9.55 (0 , 0 , 0 , 0 , 0)

Block- Dhanarua

607 L025 L025- T01 to Nanauri New -- 66.400 0.000 Complete 0 109.64 133.03 242.67 1.44 (0 , 0 , 0 , 0 , 0)

608 L066 T04 to Atapur (VR46) New -- 25.840 0.000 Complete 0 51.99 92.42 144.41 1.72 (0 , 0 , 0 , 0 , 0)

609 L102 T01 to Alipur New -- 68.520 0.000 Complete 0 73.00 129.77 202.76 4.00 (0 , 0 , 0 , 0 , 0)

Block Dhanarua Total 160.760 0 234.62 355.22 589.85 7.15 (0 , 0 , 0 , 0 , 0)

Block- Pandarak

610 - At ch 950 New -- 35.120 0.000 Complete 0 113.38 75.58 188.96 3.59 (0 , 0 , 0 , 0 , 0)

Block Pandarak Total 35.120 0 113.38 75.58 188.96 3.59 (0 , 0 , 0 , 0 , 0)

Block- Punpun

611 L035 L035-T02 to Tetari New -- 66.400 0.000 Complete 0 90.24 109.50 199.74 1.44 (0 , 0 , 0 , 0 , 0)

Page 77 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

612 T01 GAURICHAK MUSNAPAR TO New -- 16.600 0.000 Complete 0 44.58 29.72 74.29 0.68 (0 , 0 , 0 , 0 , 0) FARIMCHAK Block Punpun Total 83.000 0 134.82 139.22 274.03 2.12 (0 , 0 , 0 , 0 , 0)

District Patna Total 433.920 0 780.54 785.18 1,565.72 22.41 (0 , 0 , 0 , 0 , 0)

District- Purnea

Block- Amaur

613 L055 Ichamoti Dhar New -- 90.200 0.000 Complete 0 235.67 236.72 472.39 16.35 (0 , 0 , 0 , 0 , 0)

Block Amaur Total 90.200 0 235.67 236.72 472.39 16.35 (0 , 0 , 0 , 0 , 0)

District Purnea Total 90.200 0 235.67 236.72 472.39 16.35 (0 , 0 , 0 , 0 , 0)

District- Saharsa

Block- Banma Itahari

614 T03 Maharas Dhar New -- 117.240 0.000 Complete 0 222.91 357.84 580.75 7.68 (0 , 0 , 0 , 0 , 0)

Block Banma Itahari Total 117.240 0 222.91 357.84 580.75 7.68 (0 , 0 , 0 , 0 , 0)

Block- Salkhua

615 L021 Construction of Rcc Bridge New -- 97.700 0.000 Complete 0 213.00 249.45 462.45 5.24 (0 , 0 , 0 , 0 , 0) over Musaharia River 616 L025 Construction of RCC Bridge New -- 97.700 0.000 Complete 0 209.48 245.32 454.80 5.17 (0 , 0 , 0 , 0 , 0) Near Sharma Tola Block Salkhua Total 195.400 0 422.48 494.77 917.25 10.41 (0 , 0 , 0 , 0 , 0)

Block- Simri Bakhtiarpur

617 L058 Construction of RCC Bridge New -- 97.700 0.000 Complete 0 222.01 259.98 481.99 7.32 (0 , 0 , 0 , 0 , 0) over Bhawdewa Nala

Page 78 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

618 L027 Babujana Ghat New -- 58.620 0.000 Complete 0 205.96 137.30 343.26 7.22 (0 , 0 , 0 , 0 , 0)

Block Simri Bakhtiarpur Total 156.320 0 427.97 397.28 825.25 14.54 (0 , 0 , 0 , 0 , 0)

Block- Sonbarsa

619 L055 Construction of RCC Bridge New -- 78.160 0.000 Complete 0 225.44 166.12 391.56 5.83 (0 , 0 , 0 , 0 , 0) at Sahpur Vilage Baltora Ghat Block Sonbarsa Total 78.160 0 225.44 166.12 391.56 5.83 (0 , 0 , 0 , 0 , 0)

District Saharsa Total 547.120 0 1,298.80 1,416.01 2,714.81 38.46 (0 , 0 , 0 , 0 , 0)

District- Sitamarhi

Block- Bajpatti

620 L060 Bachhopatti Narha Sonmani New -- 49.960 0.000 Complete 0 196.07 130.71 326.78 2.23 (0 , 0 , 0 , 0 , 0) Tola Road PMGSY to Balbhiswa via Chingi Takiya 621 L058 L058-T09 Narharpur to New -- 66.600 0.000 Complete 0 224.39 273.75 498.14 2.86 (0 , 0 , 0 , 0 , 0) Narharpur (VR30) Block Bajpatti Total 116.560 0 420.45 404.46 824.91 5.08 (0 , 0 , 0 , 0 , 0)

Block- Bokhra

622 T02 T02-Dharampur Banaul to New -- 66.600 0.000 Complete 0 191.23 233.30 424.53 2.94 (0 , 0 , 0 , 0 , 0) Kharka Basant Ch-100m 623 T02 T02-Dharampur Banaul to New -- 49.960 0.000 Complete 0 231.40 154.26 385.66 2.26 (0 , 0 , 0 , 0 , 0) Kharka Basant Ch-6000m 624 T02 T02-Dharampur Banaul to New -- 49.960 0.000 Complete 0 192.44 128.29 320.73 2.28 (0 , 0 , 0 , 0 , 0) Kharka Basant Ch-8400m Block Bokhra Total 166.520 0 615.06 515.86 1,130.92 7.47 (0 , 0 , 0 , 0 , 0)

Page 79 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Dumra

625 L021 L021-Manihyari to Ranjitpur New -- 16.660 0.000 Complete 0 75.08 50.05 125.13 0.88 (0 , 0 , 0 , 0 , 0) Gaibipur (VR21) 626 L022 L022-Ranjitpur to Fatehpur New -- 33.320 0.000 Complete 0 124.62 83.08 207.71 1.62 (0 , 0 , 0 , 0 , 0) Girmisani Girmisani (VR22) 627 L048 L048-Pumra to Berbas New -- 16.660 0.000 Complete 0 81.72 54.48 136.20 0.90 (0 , 0 , 0 , 0 , 0) (VR48) 628 L039 L039-Bishanpur to Beli Urf New -- 33.320 0.000 Complete 0 102.90 68.60 171.50 1.52 (0 , 0 , 0 , 0 , 0) Belahi (VR39) 629 L024 L024-Simra to Bhauprasad New -- 33.320 0.000 Complete 0 101.44 67.63 169.07 1.47 (0 , 0 , 0 , 0 , 0) (VR24) 630 L066 L066-L050 to Rupauli Tola New -- 33.320 0.000 Complete 0 147.84 98.56 246.41 1.59 (0 , 0 , 0 , 0 , 0) Dhanuki (VR66) CH-600 631 L066 L066-L050 to Rupauli Tola New -- 16.660 0.000 Complete 0 111.81 74.54 186.35 0.95 (0 , 0 , 0 , 0 , 0) Dhanuki (VR66) CH-1260 632 L065 L065-L038 to Gopinathpur New -- 16.660 0.000 Complete 0 154.58 103.05 257.63 0.98 (0 , 0 , 0 , 0 , 0) (VR65) 633 L085 L085-Bhola Paswan House New -- 16.660 0.000 Complete 0 128.36 85.57 213.93 1.56 (0 , 0 , 0 , 0 , 0) Chandrahati To Bhaluaha Bhelohia Tola (VR128) 634 L247 L247-N.H-77 Lagma Chowk New -- 33.320 0.000 Complete 0 117.00 78.00 194.99 1.56 (0 , 0 , 0 , 0 , 0) To Bisnathpur Biraul REO Road Gosaipur Via Madanpur Rasalpur (VR247) 635 L025 Malipur Pakri (VR25) New -- 49.960 0.000 Complete 0 149.48 99.65 249.13 2.19 (0 , 0 , 0 , 0 , 0)

Block Dumra Total 299.860 0 1,294.82 863.21 2,158.03 15.22 (0 , 0 , 0 , 0 , 0)

Block- Major Ganj

636 L031 Majorganj to Garhwa New -- 33.320 0.000 Complete 0 140.13 93.42 233.55 1.56 (0 , 0 , 0 , 0 , 0) Bishanpur Ch-3100m 637 L034 L034-Dumari Kalan to New -- 66.600 0.000 Complete 0 129.37 157.83 287.20 2.99 (0 , 0 , 0 , 0 , 0) Dhangraha (VR34)

Page 80 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

638 L031 Majorganj to Garhwa New -- 49.960 0.000 Complete 0 150.89 100.60 251.49 2.32 (0 , 0 , 0 , 0 , 0) Bishanpur Ch-1600m Block Major Ganj Total 149.880 0 420.39 351.84 772.23 6.87 (0 , 0 , 0 , 0 , 0)

Block- Riga

639 L029 L029-Kapraul to Balua New -- 33.320 0.000 Complete 0 108.91 72.61 181.52 1.47 (0 , 0 , 0 , 0 , 0) (VR14) CH- 1800 m 640 L029 L029-Kapraul to Balua New -- 33.320 0.000 Complete 0 112.29 74.86 187.14 1.48 (0 , 0 , 0 , 0 , 0) (VR14) CH- 1750 m Block Riga Total 66.640 0 221.20 147.46 368.66 2.95 (0 , 0 , 0 , 0 , 0)

Block- Sonbarsa

641 T01 T01-Mejarganj Kanhauli New -- 16.660 0.000 Complete 0 86.38 57.58 143.96 0.99 (0 , 0 , 0 , 0 , 0) Sonbarsa (VR1) 642 L062 L062-Marpa Bazar to Naya New -- 66.600 0.000 Complete 0 143.98 175.66 319.64 3.04 (0 , 0 , 0 , 0 , 0) Tola Rahmaniya Tola (VR69) 643 L037 L037-Marpa to Piparadih New -- 66.600 0.000 Complete 0 133.42 162.77 296.19 3.04 (0 , 0 , 0 , 0 , 0) (VR37) Ch-9430 m 644 L037 Marpa to Piparadih (VR37) New -- 16.660 0.000 Complete 0 76.45 50.96 127.41 0.92 (0 , 0 , 0 , 0 , 0) Ch-8930m Block Sonbarsa Total 166.520 0 440.22 446.98 887.20 7.98 (0 , 0 , 0 , 0 , 0)

Block- Sursand

645 T04 T04-Banauli Deonath Patti New -- 33.320 0.000 Complete 0 143.05 95.37 238.41 1.59 (0 , 0 , 0 , 0 , 0) (VR12) 646 L072 Meghpur to Matauna New -- 49.960 0.000 Complete 0 180.05 120.04 300.09 2.22 (0 , 0 , 0 , 0 , 0)

Block Sursand Total 83.280 0 323.10 215.40 538.50 3.81 (0 , 0 , 0 , 0 , 0)

District Sitamarhi Total 1,049.260 0 3,735.25 2,945.22 6,680.46 49.38 (0 , 0 , 0 , 0 , 0)

District- Supaul

Page 81 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Kishanpur

647 L040 Construction of RCC Bridge New -- 39.080 0.000 Complete 0 152.09 101.39 253.48 4.66 (0 , 0 , 0 , 0 , 0) in Piyarganj in 1st km 648 L040 Construction of RCC Bridge New -- 136.780 0.000 Complete 0 193.04 393.72 586.76 6.64 (0 , 0 , 0 , 0 , 0) at Maujha in 7th Km 649 L054 Construction of RCC Bridge New -- 97.700 0.000 Complete 0 223.93 262.24 486.17 5.94 (0 , 0 , 0 , 0 , 0) at Shivpuri panchyat 1st km 650 L054 Construction of RCC Bridge New -- 33.400 0.000 Complete 0 88.93 59.28 148.21 4.43 (0 , 0 , 0 , 0 , 0) Near Jarahi at 3rd km Block Kishanpur Total 306.960 0 657.99 816.63 1,474.62 21.67 (0 , 0 , 0 , 0 , 0)

Block- Marauna

651 L040 Construction of RCC Bridge New -- 58.620 0.000 Complete 0 196.90 131.27 328.16 4.20 (0 , 0 , 0 , 0 , 0) at Ghauma in 4th Km Block Marauna Total 58.620 0 196.90 131.27 328.16 4.20 (0 , 0 , 0 , 0 , 0)

District Supaul Total 365.580 0 854.88 947.90 1,802.78 25.87 (0 , 0 , 0 , 0 , 0)

District- Vaishali

Block- Raghopur

652 L030 BRIDGE AT CHAKSINGAR New -- 51.330 0.000 Complete 0 160.61 114.19 274.80 8.62 (0 , 0 , 0 , 0 , 0) SOTA 653 L043 BRIDGE AT SARFABAD SOTA New -- 34.220 0.000 Complete 0 120.71 80.47 201.19 4.25 (0 , 0 , 0 , 0 , 0)

654 L039 BRIDGE AT SRIRAMPUR SOTA New -- 38.720 0.000 Complete 0 126.81 84.54 211.36 4.25 (0 , 0 , 0 , 0 , 0)

655 L039 BRIDGE AT MADHA SOTA New -- 58.080 0.000 Complete 0 149.71 140.13 289.83 8.62 (0 , 0 , 0 , 0 , 0)

Block Raghopur Total 182.350 0 557.84 419.33 977.17 25.74 (0 , 0 , 0 , 0 , 0)

District Vaishali Total 182.350 0 557.84 419.33 977.17 25.74 (0 , 0 , 0 , 0 , 0)

Long Span Bridge Proposals Total 6,891.110 0 16,837.97 15,408.55 32,246.51 551.55 (0 , 0 , 0 , 0 , 0)

Page 82 of 83 Generated On : 31/03/2017 12:06 PM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Grand Total Total Road Length:1063.066 Kms 1,896 49,924.47 37,466.57 87,391.03 4,855.89 (214 , 408 , 392 Total LSB Length:6891.110 Mtrs , 364 , 1378)

Page 83 of 83 Generated On : 31/03/2017 12:06 PM