Pradhan Mantri Gram Sadak Yojana

Road List for attachment with Sanction Letter - Wise Abstract

State : Sanction Year : 2016-2017 Batch : 1 Collaboration : Regular PMGSY

Sr.No. District No of Road Length MoRD Cost State Cost (Rs Total Cost Maint. Cost Habs (1000+, 500+, 250+, <250, Total) Works (Kms) / Bridge (Rs Lacs) Lacs) (Rs Lacs) (Rs Lacs) Length (Mtrs) 1 2 3 4 5 6 7 8 9

Road Proposals

1 Araria 14 53.847 2,028.42 1,352.29 3,380.71 359.41 (38 , 22 , 7 , 6 , 73)

2 Arwal 17 24.592 789.32 526.21 1,315.53 94.39 (2 , 8 , 9 , 0 , 19)

3 Aurangabad 98 247.119 7,472.00 4,981.32 12,453.32 769.17 (30 , 43 , 63 , 31 , 167)

4 Banka 51 154.415 4,878.39 3,252.27 8,130.66 901.54 (5 , 56 , 10 , 47 , 118)

5 Begusarai 6 7.749 202.83 135.22 338.05 22.97 (3 , 4 , 3 , 1 , 11)

6 Bhagalpur 9 30.252 974.39 649.59 1,623.98 190.73 (5 , 5 , 1 , 0 , 11)

7 Bhojpur 12 23.800 894.47 596.34 1,490.81 130.11 (5 , 9 , 1 , 0 , 15)

8 Buxar 5 9.990 395.39 263.61 659.00 58.31 (0 , 6 , 0 , 0 , 6)

9 Darbhanga 20 58.903 1,910.50 1,273.67 3,184.17 139.63 (30 , 23 , 22 , 24 , 99)

10 East Champaran 67 124.877 4,000.46 2,667.01 6,667.47 385.71 (32 , 50 , 22 , 32 , 136)

11 Gaya 200 311.574 8,617.98 5,745.35 14,363.33 1,149.84 (44 , 107 , 143 , 45 , 339)

12 Gopalganj 6 24.150 749.26 499.80 1,249.06 56.40 (0 , 7 , 0 , 0 , 7)

13 Jahanabad 15 19.397 556.53 371.02 927.55 73.72 (2 , 5 , 12 , 6 , 25)

14 Jamui 9 55.851 1,706.79 1,137.86 2,844.65 202.73 (0 , 1 , 14 , 58 , 73)

15 Kaimur (Bhabhua) 106 204.660 6,353.25 4,235.54 10,588.79 952.99 (7 , 45 , 93 , 41 , 186)

16 Katihar 66 157.147 5,028.23 3,352.11 8,380.34 981.48 (42 , 50 , 18 , 20 , 130)

17 Khagaria 1 2.150 58.25 38.83 97.08 5.82 (1 , 0 , 0 , 0 , 1)

18 Kishanganj 9 29.055 1,062.29 708.19 1,770.48 194.56 (3 , 16 , 18 , 26 , 63)

19 Lakhisarai 5 8.799 262.43 174.95 437.38 36.77 (2 , 5 , 7 , 10 , 24)

20 Madhepura 34 85.816 3,135.49 2,090.33 5,225.82 330.34 (19 , 45 , 21 , 13 , 98)

21 Madhubani 33 83.048 2,981.97 1,987.99 4,969.96 346.70 (26 , 33 , 6 , 6 , 71)

22 Munger 2 8.580 263.13 175.43 438.56 30.76 (0 , 2 , 7 , 1 , 10)

23 Muzaffarpur 15 23.499 797.24 531.51 1,328.75 133.21 (10 , 12 , 4 , 7 , 33)

24 Nalanda 29 36.725 1,249.99 833.31 2,083.30 126.27 (10 , 23 , 1 , 5 , 39)

25 98 133.896 3,732.32 2,488.27 6,220.59 346.99 (24 , 35 , 40 , 0 , 99)

26 8 16.026 537.96 358.65 896.61 78.24 (5 , 8 , 0 , 1 , 14)

27 Purnea 89 208.508 8,152.83 5,435.20 13,588.03 709.57 (50 , 81 , 36 , 64 , 231)

28 Rohtas 17 34.530 1,231.11 820.76 2,051.87 184.66 (6 , 8 , 8 , 0 , 22)

29 Saharsa 13 39.454 1,568.35 1,045.56 2,613.91 153.83 (5 , 21 , 21 , 18 , 65)

30 Samastipur 50 116.357 3,596.60 2,397.71 5,994.31 486.49 (42 , 51 , 22 , 18 , 133)

31 Shekhpura 11 25.653 695.74 463.80 1,159.54 100.65 (9 , 4 , 1 , 1 , 15)

32 Sheohar 18 29.190 1,083.10 722.07 1,805.17 193.39 (10 , 16 , 2 , 1 , 29)

33 Sitamarhi 6 8.987 337.54 225.02 562.56 51.37 (1 , 1 , 5 , 1 , 8)

34 Siwan 111 235.505 6,620.82 4,419.41 11,040.23 526.25 (51 , 120 , 95 , 159 , 425)

35 15 24.916 653.05 435.36 1,088.41 105.53 (5 , 14 , 4 , 3 , 26)

36 West Champaran 66 100.632 4,081.40 2,720.95 6,802.35 476.63 (9 , 38 , 44 , 19 , 110)

Roads Total 1,331 2,759.649 88,659.82 59,112.51 1,47,772.33 11,087.15 (533 , 974 , 760 , 664 , 2931)

Long Span Bridge Proposals

1 Araria 6 373.120 721.36 676.38 1,397.74 29.36 -

2 Banka 22 2,505.025 2,857.76 6,887.23 9,744.99 170.94 -

3 Bhagalpur 9 818.780 1,775.69 2,448.49 4,224.18 67.87 -

4 East Champaran 9 689.915 1,539.95 2,166.11 3,706.06 71.55 -

5 Gaya 14 596.980 1,551.61 1,035.28 2,586.89 42.52 -

6 Kishanganj 5 178.760 471.36 314.24 785.60 18.31 -

7 Madhubani 1 44.720 194.05 129.36 323.41 0.00 -

8 Patna 2 93.900 215.14 143.42 358.56 3.87 -

9 Sitamarhi 2 141.320 474.15 316.10 790.25 12.72 -

Bridges Total 70 5,442.520 9,801.05 14,116.62 23,917.67 417.14 -

Grand Total 1,401 Total Road 98,460.87 73,229.13 1,71,690.00 11,504.29 (533 , 974 , 760 , 664 , 2931) Length:2759.649 Kms Total LSB Length:5442.520 Mtrs

Page 1 of 1 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sanction Letter No :P-17024/4/2016-RC (350684) Sanction Date : 29/11/2016

State : Bihar Sanction Year : 2016-2017 Batch : 1 Collaboration : Regular PMGSY Note : All Costs are in Lakhs and Lengths are in Kms.

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Road Proposals

District- Araria

Block- Araria

1 L050 L050-T02 TO PACHU TOLA New -- 1.834 3.750 Complete 2 70.48 46.99 117.47 12.05 (1 , 1 , 1 , 0 , 3) (VR50) Block Araria Total 1.834 2 70.48 46.99 117.47 12.05 (1 , 1 , 1 , 0 , 3)

Block- Forbisganj

2 L050 L050-Parwaha to Rampur New -- 2.768 3.750 Complete 6 94.07 62.71 156.78 18.44 (7 , 0 , 0 , 0 , 7) (VR50) 3 L036 L036-Ramai More to ramai New -- 1.338 3.750 Complete 1 42.43 28.29 70.72 8.94 (1 , 3 , 0 , 0 , 4) Mandal Tola (VR36) 4 L033 L033-T06 Harpur to Mehta New -- 5.121 3.750 Complete 8 202.88 135.26 338.14 37.14 (1 , 0 , 0 , 0 , 1) Tola (VR331) Block Forbisganj Total 9.227 15 339.38 226.26 565.64 64.51 (9 , 3 , 0 , 0 , 12) Block- Joukihat

5 T02 T02-RANI TO MEHADI NAGAR New -- 2.811 3.750 Complete 1 90.21 60.14 150.35 19.29 (3 , 4 , 2 , 3 , 12) (VR2) Block Joukihat Total 2.811 1 90.21 60.14 150.35 19.29 (3 , 4 , 2 , 3 , 12) Block- Kursakanta

6 L061 L061-T01 TO HARIRAH New -- 0.919 3.750 Complete 1 39.54 26.36 65.90 6.27 (1 , 0 , 0 , 0 , 1) (VR61)

Page 1 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

7 L046 L046-T02 TO GOTHBANMALI New -- 0.952 3.750 Complete 1 35.16 23.44 58.60 3.66 (1 , 0 , 0 , 0 , 1) (VR46) Block Kursakanta Total 1.871 2 74.70 49.80 124.50 9.93 (2 , 0 , 0 , 0 , 2)

Block- Raniganj

8 T02 T02-Garha to Farkia (VR2) New -- 14.553 3.750 Complete 24 615.45 410.30 1,025.75 102.74 (6 , 6 , 1 , 1 , 14)

9 T14 T14-T04 to Majhua north New -- 3.701 3.750 Complete 2 114.23 76.16 190.39 22.28 (5 , 1 , 0 , 1 , 7) (VR32) 10 T12 T12-Bharaili to Dumra New -- 6.120 3.750 Complete 4 182.92 121.94 304.86 24.70 (3 , 3 , 0 , 1 , 7) (VR29) 11 T15 T15-Majhuwa lakunwar New -- 5.270 3.750 Complete 7 229.92 153.28 383.20 45.13 (0 , 1 , 3 , 0 , 4) (VR52) 12 L040 L040-Dhobinia to saidpur New -- 3.129 3.750 Complete 6 123.90 82.60 206.50 21.32 (1 , 0 , 0 , 0 , 1) (VR40) 13 L043 L043-Kharhat to rehua New -- 3.257 3.750 Complete 6 118.68 79.12 197.80 22.59 (1 , 0 , 0 , 0 , 1) (VR43) Block Raniganj Total 36.030 49 1,385.10 923.40 2,308.50 238.76 (16 , 11 , 4 , 3 , 34) Block- Sikti

14 L025 L025-T02 TO TERAKHARDA New -- 2.074 3.750 Complete 1 68.55 45.70 114.25 14.87 (7 , 3 , 0 , 0 , 10) (VR25) Block Sikti Total 2.074 1 68.55 45.70 114.25 14.87 (7 , 3 , 0 , 0 , 10) District Araria Total 53.847 70 2,028.42 1,352.29 3,380.71 359.41 (38 , 22 , 7 , 6 , 73) District- Arwal

Block- Arwal

15 L072 L072-Patna auranga bad to New Cold Mix 1.337 3.750 Complete 3 40.75 27.17 67.92 4.42 (0 , 0 , 1 , 0 , 1) duna chhapra (TRACK41) Technology

Page 2 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

16 L075 L075-Bhadasi Pakharpur to New -- 1.704 3.750 Complete 3 41.21 27.47 68.68 7.23 (0 , 0 , 1 , 0 , 1) Bhimpur Khapura (TRACK44) Block Arwal Total 3.041 6 81.96 54.64 136.60 11.64 (0 , 0 , 2 , 0 , 2)

Block- Banshi Surajpur

17 L072 L072-Uphara More Senari New Mechnical 3.370 3.750 Complete 6 103.41 68.94 172.35 16.06 (1 , 0 , 0 , 0 , 1) (TRACK6) stabilization Block Banshi Surajpur Total 3.370 6 103.41 68.94 172.35 16.06 (1 , 0 , 0 , 0 , 1)

Block- Kaler

18 L026 L026-Pasprsurmpur L065 To New Cold Mix 0.779 3.750 Complete 2 27.86 18.57 46.43 2.94 (0 , 0 , 1 , 0 , 1) sahay bigha (TRACK25) Technology 19 L069 L069-Mehndia Kamta Road New -- 0.731 3.750 Complete 2 20.15 13.44 33.59 2.26 (0 , 0 , 1 , 0 , 1) To Madhusarwa Chauki (TRACK38) 20 L070 L070-Kamta Bathe To Kamta New -- 2.015 3.750 Complete 5 61.02 40.68 101.70 8.81 (0 , 0 , 1 , 0 , 1) Mathiya (TRACK39) 21 L023 L023-To2 To Narayan bigha New Mechnical 1.370 3.750 Complete 4 53.21 35.47 88.68 5.18 (0 , 1 , 0 , 0 , 1) (TRACK21) stabilization Block Kaler Total 4.895 13 162.24 108.16 270.40 19.19 (0 , 1 , 3 , 0 , 4)

Block- Karpi

22 L083 L083-Arwal Jehanabad Road New Mechnical 1.050 3.750 Complete 4 36.77 24.52 61.29 2.94 (0 , 1 , 0 , 0 , 1) To Mahmadpur (TRACK53) stabilization 23 L090 L090-Imamgang Deokund New Mechnical 1.950 3.750 Complete 5 66.32 44.22 110.54 2.23 (0 , 2 , 0 , 0 , 2) Road To Asarhi (TRACK60) stabilization 24 L073 L073-Abigla Road To New -- 0.713 3.750 Complete 2 19.85 13.23 33.08 2.99 (0 , 0 , 1 , 0 , 1) Jagmohan Bigha (TRACK43) 25 L074 L074-Karpi Telpa Main Road New -- 0.592 3.750 Complete 1 15.83 10.55 26.38 3.33 (0 , 1 , 0 , 0 , 1) To Dakshi Mathya (TRACK44)

Page 3 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

26 L057 L057-Karpi Barhamile Road, New -- 1.098 3.750 Complete 3 32.65 21.76 54.41 4.68 (0 , 1 , 0 , 0 , 1) T03 To Barhiya Bagh (TRACK4) 27 L075 L075-Karpi Makhmilpur Road New Cold Mix 1.168 3.750 Complete 3 34.98 23.32 58.30 4.95 (0 , 1 , 0 , 0 , 1) To Purbwari Mathya Technology (TRACK45) 28 L099 L099-Fakharpur Canal To New Mechnical 2.475 3.750 Complete 8 87.95 58.63 146.58 10.31 (0 , 1 , 0 , 0 , 1) Ramnagar (TRACK69) stabilization Block Karpi Total 9.046 26 294.35 196.23 490.58 31.43 (0 , 7 , 1 , 0 , 8)

Block- Kurtha

29 L049 L049-kurtha kinjer to savlak New Mechnical 0.780 3.750 Complete 3 23.47 15.64 39.11 3.60 (0 , 0 , 1 , 0 , 1) sarai (TRACK36) stabilization 30 L046 L046-kurtha lari path to New Mechnical 1.660 3.750 Complete 8 63.46 42.31 105.77 6.80 (1 , 0 , 0 , 0 , 1) surhi (TRACK30) stabilization 31 L060 L060-Baid Bigha To New Mechnical 1.800 3.750 Complete 5 60.43 40.29 100.72 5.67 (0 , 0 , 2 , 0 , 2) Mahmadpur (TRACK46) stabilization Block Kurtha Total 4.240 16 147.36 98.24 245.60 16.07 (1 , 0 , 3 , 0 , 4)

District Arwal Total 24.592 67 789.32 526.21 1,315.53 94.39 (2 , 8 , 9 , 0 , 19) District- Aurangabad

Block- Aurangabad

32 L077 L077-L071 TO NEHUTA New CELL Filled 1.650 3.750 Complete 6 53.72 35.82 89.54 4.73 (1 , 0 , 0 , 0 , 1) LAPURA (TRACK77) Concrete
Mechnical stabilization 33 L027 L027-T01 TO WAZIDPUR New CELL Filled 2.150 3.750 Complete 5 63.69 42.46 106.15 11.38 (0 , 1 , 0 , 0 , 1) (TRACK27) Concrete
Mechnical stabilization

Page 4 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

34 L091 L091-L048 HARIJAN TOLLA New CELL Filled 3.700 3.750 Complete 8 124.36 82.90 207.26 9.80 (1 , 0 , 0 , 0 , 1) RAGHULLIA TO Concrete MAULANAGAR (TRACK91)
Mechnical stabilization Block Aurangabad Total 7.500 19 241.77 161.18 402.95 25.90 (2 , 1 , 0 , 0 , 3)

Block- Barun

35 L042 L042-T01 TO KOJICHAK New CELL Filled 2.580 3.750 Complete 6 83.65 55.77 139.42 15.69 (1 , 0 , 0 , 0 , 1) (TRACK42) Concrete
Mechnical stabilization 36 L072 L072-T01 TO CHANDAULI New CELL Filled 0.650 3.750 Complete 2 20.32 13.54 33.86 1.53 (0 , 1 , 0 , 0 , 1) (TRACK72) Concrete
Mechnical stabilization 37 L075 L075-T01 TO KAREYA New CELL Filled 0.800 3.750 Complete 2 25.91 17.27 43.18 2.31 (0 , 0 , 1 , 0 , 1) (TRACK75) Concrete
Mechnical stabilization 38 L040 L040-T01 TO CHETU BIGHA New CELL Filled 2.280 3.750 Complete 5 73.88 49.25 123.13 6.97 (0 , 0 , 1 , 0 , 1) (TRACK40) Concrete
Mechnical stabilization 39 L077 L077-T06 TO MANGURAHI New CELL Filled 0.750 3.750 Complete 1 24.75 16.50 41.25 1.92 (0 , 1 , 0 , 0 , 1) (TRACK77) Concrete
Mechnical stabilization Block Barun Total 7.060 16 228.51 152.33 380.84 28.43 (1 , 2 , 2 , 0 , 5)

Page 5 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Daudnagar

40 L056 L056-AURANGABAD PATNA New CELL Filled 1.150 3.750 Complete 5 37.32 24.88 62.20 2.66 (0 , 1 , 0 , 0 , 1) ROAD TO LAGAN BIGHA Concrete (TRACK11) 41 L066 L066-BELWAN JINORIYA New CELL Filled 1.250 3.750 Complete 4 38.90 25.93 64.83 1.72 (0 , 1 , 0 , 0 , 1) ROAD TO VILLAGE KHAIRA Concrete DIP DEVI STHAN HOTE HUE SCHOOL (TRACK21) Block Daudnagar Total 2.400 9 76.22 50.81 127.03 4.39 (0 , 2 , 0 , 0 , 2)

Block- Deo

42 L080 L080-T04 DEO BALUGANJ New Mechnical 5.230 3.750 Complete 11 163.12 108.74 271.86 18.22 (1 , 0 , 0 , 0 , 1) ROAD TO KARMA (TRACK80) stabilization 43 T09 T09-DEO TO BHALUAHI New CELL Filled 8.180 3.750 Complete 13 269.71 179.81 449.52 26.20 (5 , 3 , 3 , 9 , 20) (VR9) Concrete
Mechnical stabilization 44 L071 L071-T09 DEO BEDHNI New Mechnical 4.030 3.750 Complete 10 127.93 85.29 213.22 14.03 (0 , 1 , 0 , 0 , 1) BALUGANJ ROAD TO BARA stabilization (TRACK71) 45 L059 L059-T04 TO TATARIYA New CELL Filled 3.050 3.750 Complete 7 95.29 63.53 158.82 6.51 (0 , 0 , 1 , 0 , 1) (TRACK59) Concrete
Mechnical stabilization 46 L081 L081-T08 DEO AMBA ROAD New CELL Filled 4.080 3.750 Complete 5 137.02 91.35 228.37 11.21 (0 , 0 , 1 , 0 , 1) TO KUSYARI (TRACK81) Concrete
Mechnical stabilization 47 L029 L029-BHIM BIGHA , BALI New Mechnical 6.525 3.750 Complete 8 188.23 125.49 313.72 20.98 (0 , 0 , 2 , 1 , 3) BIGHA TO NEPUWA stabilization (TRACK29)

Page 6 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

48 L065 L065-T02 AURANGABAD DEO New CELL Filled 3.200 3.750 Complete 5 94.17 62.78 156.95 9.73 (0 , 0 , 1 , 0 , 1) ROAD TO HARIHARBIGHA Concrete (TRACK65)
Mechnical stabilization 49 L028 L028-T04 TO BASDIHA New CELL Filled 3.050 3.750 Complete 6 92.57 61.71 154.28 6.50 (0 , 1 , 2 , 1 , 4) (TRACK28) Concrete
Mechnical stabilization Block Deo Total 37.345 65 1,168.04 778.70 1,946.74 113.36 (6 , 5 , 10 , 11 , 32) Block- Goh

50 L110 L110-GOH HAMID NAGAR New CELL Filled 2.500 3.750 Complete 5 77.98 51.99 129.97 4.95 (1 , 0 , 0 , 0 , 1) ROAD L078 TO DUMARTHU Concrete (TRACK35)
Mechnical stabilization 51 L101 L101-MALHAD TO SUGGI New Mechnical 3.000 3.750 Complete 8 91.22 60.81 152.03 8.76 (0 , 2 , 0 , 0 , 2) (TRACK27) stabilization 52 L106 L106-DEOHARA GOH ROAD New CELL Filled 2.000 3.750 Complete 4 53.82 35.88 89.70 4.88 (0 , 1 , 0 , 0 , 1) T02 TO BHAWANIPUR Concrete (TRACK31) 53 L123 L123-MIYANPUR ROAD L027 New CELL Filled 1.200 3.750 Complete 2 39.87 26.58 66.45 1.58 (0 , 1 , 0 , 0 , 1) TO MIYANPUR VILLEGE Concrete (TRACK47) 54 L112 L112-GOH GAYA PATH RAJA New CELL Filled 2.675 3.750 Complete 2 67.49 44.99 112.48 6.23 (1 , 0 , 0 , 0 , 1) NAL L037 TO JALALPUR Concrete (VR45) 55 L111 L111-GOH UPHARA ROAD New CELL Filled 1.100 3.750 Complete 4 34.90 23.26 58.16 2.22 (1 , 0 , 0 , 0 , 1) T01 MIRPURA (TRACK36) Concrete 56 L120 L120-BAJIDPUR ROAD L035 New CELL Filled 1.050 3.750 Complete 0 21.61 14.41 36.02 0.18 (0 , 1 , 0 , 0 , 1) TO PRANPUR (TRACK44) Concrete 57 L119 L119-UPHARA BANTARA New CELL Filled 0.600 3.750 Complete 0 12.84 8.56 21.40 0.06 (1 , 0 , 0 , 0 , 1) ROAD TO1 BELA (TRACK43) Concrete

Page 7 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

58 L116 L116-DHABAHI PMGSY ROAD New CELL Filled 2.175 3.750 Complete 4 58.18 38.78 96.96 5.59 (1 , 0 , 0 , 0 , 1) L029 TO HASAMPUR Concrete (TRACK40) 59 L114 L114-JAITIYA BUXER L050 TO New CELL Filled 0.875 3.750 Complete 1 21.78 14.52 36.30 0.10 (0 , 1 , 0 , 0 , 1) SEKHPURA (TRACK38) Concrete 60 L104 L104-PEMA PHOLL TO New CELL Filled 1.305 3.750 Complete 2 36.54 24.36 60.90 2.76 (0 , 1 , 0 , 0 , 1) AKAUNI (TRACK29) Concrete 61 L043 L043-GOH RAFIGANJ ROAD New CELL Filled 3.800 3.750 Complete 10 107.17 71.45 178.62 9.86 (1 , 0 , 0 , 4 , 5) T03 TO GHONATA (TRACK9) Concrete Block Goh Total 22.280 42 623.40 415.59 1,038.99 47.17 (6 , 7 , 0 , 4 , 17) Block- Haspura

62 L079 L079-HASPURA PIRU ROAD New CELL Filled 1.500 3.750 Complete 0 38.19 25.46 63.65 3.78 (1 , 1 , 0 , 0 , 2) TO PAHARPURA VIA SHANKA Concrete PUR (TRACK59) 63 L058 L058-JAIYPUR DEOKUND New CELL Filled 1.125 3.750 Complete 4 38.30 25.53 63.83 2.37 (1 , 0 , 0 , 0 , 1) ROAD TO BAGHOI (TRACK38) Concrete 64 L072 L072-HASPURA DEOKUND New CELL Filled 1.020 3.750 Complete 1 29.22 19.48 48.70 2.18 (0 , 1 , 0 , 1 , 2) ROAD TO BAGHREWA VIA Concrete SIDPUR (TRACK61) 65 L061 L061-HHASPURA SANSA New CELL Filled 1.000 3.750 Complete 4 32.80 21.87 54.67 2.36 (0 , 0 , 1 , 0 , 1) ROAD TO BAGHA KOL Concrete (TRACK41) 66 L076 L076-HASPURA PIRU ROAD New CELL Filled 0.700 3.750 Complete 4 22.24 14.83 37.07 1.68 (0 , 0 , 1 , 0 , 1) TO GULABIYA BIGHA Concrete (TRACK56)
Mechnical stabilization 67 L023 L023-SAIDPUR T03 TO New CELL Filled 1.300 3.750 Complete 1 35.87 23.91 59.78 1.95 (1 , 0 , 0 , 2 , 3) BIRHARA (VR2) Concrete Block Haspura Total 6.645 14 196.62 131.08 327.70 14.32 (3 , 2 , 2 , 3 , 10)

Page 8 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Kutumba

68 L081 L081-T03 DEO AMBA ROAD New CELL Filled 1.700 3.750 Complete 7 58.97 39.31 98.28 4.22 (0 , 0 , 1 , 0 , 1) TO CHANDAUL (TRACK81) Concrete
Mechnical stabilization 69 L076 L076-T03 DEO AMBA ROAD New CELL Filled 1.650 3.750 Complete 4 48.66 32.44 81.10 4.39 (0 , 0 , 1 , 0 , 1) TO NAUDIHA (TRACK76) Concrete
Mechnical stabilization 70 L080 L080-T03 DEO AMBA ROAD New CELL Filled 1.900 3.750 Complete 5 56.88 37.92 94.80 4.39 (0 , 0 , 1 , 0 , 1) TO RATIKHAP (TRACK80) Concrete
Mechnical stabilization 71 L088 L088-T03 DEO AMBA ROAD New CELL Filled 3.700 3.750 Complete 18 130.65 87.10 217.75 23.65 (0 , 0 , 1 , 0 , 1) SIMRI (TRACK88) Concrete
Mechnical stabilization 72 L079 L079-T03 DEO AMBA ROAD New CELL Filled 1.780 3.750 Complete 4 51.72 34.48 86.20 4.85 (0 , 0 , 1 , 0 , 1) TO BAIJAL (TRACK79) Concrete
Mechnical stabilization 73 L065 L065-T06 TO SANGRI New CELL Filled 1.320 3.750 Complete 2 36.05 24.03 60.08 5.22 (0 , 1 , 1 , 0 , 2) (TRACK65) Concrete
Mechnical stabilization 74 L091 L091-T03 AMBA DEO ROAD New CELL Filled 2.900 3.750 Complete 10 91.16 60.77 151.93 15.10 (1 , 0 , 0 , 0 , 1) TO NAHER AMBA (TRACK91) Concrete
Mechnical stabilization

Page 9 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

75 L030 L030-T01 TO BASDIHA GOPAL New Mechnical 1.970 3.750 Complete 7 61.45 40.97 102.42 6.54 (1 , 2 , 2 , 0 , 5) (TRACK30) stabilization 76 L087 L087-T03 DEO AMBA ROAD New CELL Filled 1.350 3.750 Complete 4 39.92 26.62 66.54 2.50 (0 , 1 , 0 , 0 , 1) TO HARIYA (TRACK87) Concrete
Mechnical stabilization 77 L083 L083-NH 139 TO KISHANPUR New CELL Filled 3.300 3.750 Complete 6 94.48 62.99 157.47 5.12 (0 , 1 , 0 , 0 , 1) AND MANSARA (TRACK83) Concrete
Mechnical stabilization 78 L075 L075-Aerka Budhuwa Road New CELL Filled 3.700 3.750 Complete 7 100.67 67.11 167.78 21.46 (0 , 0 , 1 , 0 , 1) Jagai koul To Gangher Concrete (TRACK75)
Mechnical stabilization 79 L085 L085-T05 TO ERKA BUDHUWA New CELL Filled 4.250 3.750 Complete 15 132.05 88.04 220.09 12.40 (0 , 0 , 1 , 0 , 1) TO BELAI (TRACK85) Concrete
Mechnical stabilization 80 L082 L082-T02 AMBA NABINAGAR New CELL Filled 1.700 3.750 Complete 5 53.23 35.49 88.72 2.78 (0 , 0 , 1 , 0 , 1) ROAD TO MIRJAPUR Concrete (TRACK82)
Mechnical stabilization 81 L058 L058-L050 TO HAZARI New CELL Filled 2.900 3.750 Complete 4 79.94 53.29 133.23 15.25 (0 , 0 , 1 , 0 , 1) (TRACK58) Concrete
Mechnical stabilization 82 L086 L086-T01 RISIYP TO New Mechnical 2.000 3.750 Complete 4 57.21 38.14 95.35 6.45 (0 , 0 , 1 , 0 , 1) MOHANPUR (TRACK86) stabilization

Page 10 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

83 L084 L084-T05 ERKA BUDHUWA TO New CELL Filled 3.280 3.750 Complete 15 106.99 71.32 178.31 9.79 (0 , 0 , 1 , 0 , 1) NIMA DAROGA BIGHA Concrete (TRACK84)
Mechnical stabilization 84 L024 L024-T01 TO CHANDKHAP New CELL Filled 9.200 3.750 Complete 16 284.79 189.86 474.65 55.36 (0 , 0 , 1 , 1 , 2) (TRACK24) Concrete
Mechnical stabilization 85 L040 L040-T02 TO MARINDRAKHAP New CELL Filled 6.500 3.750 Complete 12 183.82 122.55 306.37 38.58 (0 , 0 , 1 , 0 , 1) (TRACK40) Concrete
Mechnical stabilization 86 L037 L037-L036 TO ARTI New CELL Filled 3.900 3.750 Complete 5 127.78 85.19 212.97 9.43 (0 , 0 , 2 , 0 , 2) (TRACK37) Concrete
Mechnical stabilization 87 L070 L070-T05 TO DEURA New CELL Filled 8.575 3.750 Complete 7 219.77 146.51 366.28 19.40 (1 , 0 , 0 , 0 , 1) (TRACK70) Concrete
Mechnical stabilization 88 L043 L043-T05 TO RAJPARSA New CELL Filled 4.800 3.750 Complete 10 138.63 92.42 231.05 14.83 (1 , 0 , 0 , 0 , 1) (TRACK43) Concrete
Mechnical stabilization 89 T05 T05-T01 ERKA TO BUDHUA New CELL Filled 3.550 3.750 Complete 3 102.76 68.50 171.26 10.10 (2 , 3 , 1 , 0 , 6) (VR5) Concrete
Mechnical stabilization

Page 11 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

90 L074 L074-T05 TO GHUGHI New CELL Filled 4.900 3.750 Complete 8 137.42 91.62 229.04 12.87 (0 , 1 , 0 , 0 , 1) (TRACK74) Concrete
Mechnical stabilization Block Kutumba Total 80.825 178 2,395.00 1,596.67 3,991.67 304.70 (6 , 9 , 19 , 1 , 35) Block- Madanpur

91 L136 L136-L040 Nima Ajan to New CELL Filled 1.000 3.750 Complete 3 35.13 23.42 58.55 2.73 (0 , 1 , 0 , 0 , 1) Kanidih (TRACK136) Concrete
Mechnical stabilization 92 L058 L058-T01 TO KUSHDIHARA New CELL Filled 1.150 3.750 Complete 1 38.25 25.50 63.75 3.03 (0 , 1 , 0 , 0 , 1) (TRACK58) Concrete
Mechnical stabilization 93 L040 L040-T05 TO SOHIYARI New CELL Filled 10.100 3.750 Complete 16 319.66 213.11 532.77 29.36 (1 , 2 , 5 , 6 , 14) (TRACK40) Concrete
Mechnical stabilization 94 L115 L115-T05 Chilami To New CELL Filled 12.050 3.750 Complete 13 360.73 240.48 601.21 36.39 (0 , 0 , 2 , 0 , 2) Pachrukhiya (TRACK115) Concrete
Mechnical stabilization 95 L104 L104-L040 To Ajad Bigha New CELL Filled 1.050 3.750 Complete 3 37.45 24.97 62.42 2.73 (0 , 0 , 1 , 0 , 1) (TRACK104) Concrete
Mechnical stabilization

Page 12 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

96 L092 L092-L035 to Bardih New CELL Filled 4.050 3.750 Complete 4 123.93 82.62 206.55 12.28 (0 , 0 , 1 , 0 , 1) (TRACK92) Concrete
Mechnical stabilization 97 L057 L057-L069 TO MIRZAPUR New CELL Filled 1.050 3.750 Complete 2 31.20 20.80 52.00 2.04 (0 , 0 , 1 , 0 , 1) (TRACK57) Concrete
Mechnical stabilization 98 L116 L116-L040 Chhalidohar to New CELL Filled 4.050 3.750 Complete 8 135.62 90.42 226.04 10.57 (0 , 0 , 1 , 0 , 1) Ambabar (TRACK116) Concrete
Mechnical stabilization 99 L118 L118-L035 to Pararawan New CELL Filled 1.060 3.750 Complete 3 33.40 22.27 55.67 2.60 (0 , 1 , 0 , 0 , 1) (TRACK118) Concrete
Mechnical stabilization Block Madanpur Total 35.560 53 1,115.37 743.59 1,858.96 101.73 (1 , 5 , 11 , 6 , 23) Block- Nabinagar

100 L114 L114-T04 NABINAGAR New CELL Filled 1.800 3.750 Complete 3 60.97 40.65 101.62 5.47 (0 , 0 , 1 , 0 , 1) BARUN ROAD TO Concrete DARAR,MAKDUMPUR
(TRACK114) Mechnical stabilization 101 L072 L072-L071 TO KAMARI New CELL Filled 2.930 3.750 Complete 6 97.71 65.14 162.85 8.75 (0 , 1 , 1 , 0 , 2) (TRACK72) Concrete
Mechnical stabilization

Page 13 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

102 L043 L043-TO2 TO BADKI PATHI New CELL Filled 1.850 3.750 Complete 3 64.21 42.81 107.02 4.99 (0 , 1 , 0 , 0 , 1) (TRACK43) Concrete
Mechnical stabilization 103 L133 L133-L065 TOL TENGO ROAD New CELL Filled 1.750 3.750 Complete 3 59.71 39.81 99.52 5.39 (0 , 1 , 0 , 0 , 1) TO BAIRIA (TRACK133) Concrete
Mechnical stabilization Block Nabinagar Total 8.330 15 282.60 188.41 471.01 24.59 (0 , 3 , 2 , 0 , 5)

Block- Obra

104 L096 L096-KARA PATH TO RAGHE New CELL Filled 1.100 3.750 Complete 3 32.17 21.45 53.62 2.90 (1 , 0 , 0 , 0 , 1) BIGHA (TRACK70) Concrete 105 L085 L085-KELAN TO KASTURIPUR New CELL Filled 2.050 3.750 Complete 5 74.04 49.36 123.40 10.63 (1 , 0 , 0 , 0 , 1) (TRACK85) Concrete 106 L087 L087-PACHRUKHIA PATH TO New CELL Filled 2.300 3.750 Complete 6 70.19 46.79 116.98 6.02 (1 , 0 , 0 , 0 , 1) BISHUNPUR (TRACK87) Concrete 107 L086 L086-PACHRUKHIA TO SABA New CELL Filled 0.830 3.750 Complete 3 32.31 21.54 53.85 4.61 (0 , 1 , 0 , 0 , 1) DIHRI (TRACK81) Concrete 108 L084 L084-NAROLA KALEN PATH New CELL Filled 1.200 3.750 Complete 3 42.59 28.39 70.98 6.43 (0 , 0 , 1 , 0 , 1) TO GHURDAUR (TRACK84) Concrete 109 L092 L092-AYODHYABIGHA TO New Mechnical 1.600 3.750 Complete 5 48.94 32.63 81.57 5.27 (0 , 0 , 1 , 0 , 1) RAMPUR (TRACK92) stabilization 110 L095 L095-BEL PAUTHU TO New CELL Filled 0.650 3.750 Complete 3 23.00 15.33 38.33 1.50 (0 , 0 , 1 , 0 , 1) MANIKPUR (TRACK68) Concrete 111 L099 L099-N.H.98 TO New CELL Filled 0.825 3.750 Complete 1 22.75 15.17 37.92 0.06 (0 , 0 , 1 , 0 , 1) NARAYANPUR (TRACK74) Concrete 112 L022 L022-T03 TO SAGAR PUR New CELL Filled 1.525 3.750 Complete 3 46.19 30.79 76.98 4.39 (0 , 0 , 1 , 0 , 1) (VR9) Concrete Block Obra Total 12.080 32 392.18 261.45 653.63 41.81 (3 , 1 , 5 , 0 , 9)

Page 14 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Rafiganj

113 L130 L130-L023 TO MOWARAK New CELL Filled 1.059 3.750 Complete 4 30.20 20.14 50.34 2.61 (0 , 1 , 0 , 0 , 1) PUR (VR130) Concrete
Mechnical stabilization 114 L120 L120-KHAIRA MORE TO New Mechnical 1.100 3.750 Complete 4 30.89 20.59 51.48 3.42 (1 , 0 , 0 , 0 , 1) KHAIRA (VR120) stabilization 115 L141 L141-KHAIRA TO DIHWA New CELL Filled 0.947 3.750 Complete 1 21.85 14.57 36.42 1.66 (0 , 1 , 0 , 0 , 1) (VR141) Concrete 116 L125 L125-RAFIGANJ OBRA PATH New CELL Filled 3.353 3.750 Complete 6 95.60 63.73 159.33 7.63 (0 , 1 , 0 , 1 , 2) TO PARRIYA (VR125) Concrete 117 L162 L162-KHAIRA MAJHAULI TO New CELL Filled 1.448 3.750 Complete 2 37.32 24.88 62.20 3.17 (0 , 1 , 0 , 0 , 1) DHAMANI (TRACK162) Concrete
Mechnical stabilization 118 L137 L137-L58 TO New CELL Filled 1.700 3.750 Complete 0 41.73 27.82 69.55 3.49 (0 , 0 , 4 , 1 , 5) SALPURA,RAMAN BIGHA Concrete (VR137)
Mechnical stabilization 119 L139 L139-BADHWA JAKHIM PATH New CELL Filled 0.750 3.750 Complete 2 23.00 15.33 38.33 1.43 (0 , 0 , 1 , 3 , 4) TO BANCHAR BAGRA (VR139) Concrete
Mechnical stabilization 120 L135 L135-SINDHI BUJURG TO New CELL Filled 0.892 3.750 Complete 3 26.85 17.90 44.75 2.00 (0 , 0 , 1 , 0 , 1) BIHTA (VR135) Concrete
Mechnical stabilization

Page 15 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

121 L147 L147-TO5, MOHANPUR New CELL Filled 1.209 3.750 Complete 5 37.88 25.25 63.13 2.70 (0 , 0 , 1 , 0 , 1) (TRACK147) Concrete
Mechnical stabilization 122 L153 L153-LATA TO DALBIGHA New CELL Filled 1.161 3.750 Complete 3 29.57 19.71 49.28 2.32 (0 , 0 , 1 , 0 , 1) (TRACK153) Concrete
Mechnical stabilization 123 L154 L154-MAKHDUMPUR NAHAR New CELL Filled 3.000 3.750 Complete 3 83.34 55.56 138.90 6.52 (0 , 0 , 1 , 0 , 1) TO NAYKI (VR154) Concrete
Mechnical stabilization 124 L169 L169-L 67 TO APKI New CELL Filled 0.750 3.750 Complete 2 24.19 16.12 40.31 0.12 (0 , 1 , 0 , 0 , 1) (TRACK169) Concrete
Mechnical stabilization 125 L168 L168-BARKI ENGLISH New CELL Filled 2.825 3.750 Complete 3 74.39 49.59 123.98 7.92 (0 , 0 , 1 , 0 , 1) FESHARA KUSHIM TO ISHAK Concrete BIGHA (TRACK168)
Mechnical stabilization 126 L161 L161-L024 TO NEEMA New CELL Filled 1.350 3.750 Complete 1 39.03 26.02 65.05 2.64 (0 , 0 , 1 , 0 , 1) MAMRAGE (TRACK161) Concrete
Mechnical stabilization 127 L136 L136-L 58 TO JAGRUP BIGHA New CELL Filled 2.175 3.750 Complete 1 68.25 45.50 113.75 5.65 (0 , 0 , 1 , 1 , 2) (VR136) Concrete
Mechnical stabilization

Page 16 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

128 L129 L129-L048 TO DASHRATH New CELL Filled 1.800 3.750 Complete 4 47.62 31.75 79.37 5.33 (0 , 1 , 0 , 0 , 1) BIGHA (VR129) Concrete
Mechnical stabilization 129 L124 L124-DEVKULI PUL TO New CELL Filled 1.575 3.750 Complete 3 40.58 27.05 67.63 4.14 (1 , 0 , 0 , 0 , 1) NAROUCH (VR124) Concrete
Mechnical stabilization Block Rafiganj Total 27.094 47 752.29 501.51 1,253.80 62.77 (2 , 6 , 12 , 6 , 26) District Aurangabad Total 247.119 490 7,472.00 4,981.32 12,453.32 769.17 (30 , 43 , 63 , 31 , 167) District- Banka

Block- Amarpur

130 L077 L077-Bishanpur Kothia to New CELL Filled 4.000 3.750 Complete 12 121.36 80.91 202.27 25.66 (0 , 1 , 0 , 0 , 1) Nanaychak Mainathchak Concrete (VR55) 131 L079 L079-Ranikitta to Kajra via New CELL Filled 4.850 3.750 Complete 17 157.64 105.09 262.73 34.20 (1 , 1 , 0 , 0 , 2) Athmaha (VR57) Concrete 132 L074 L074-Banka Amarpur Road New CELL Filled 3.030 3.750 Complete 4 84.63 56.42 141.05 17.32 (1 , 0 , 0 , 0 , 1) Bhimsen to Ratanpur (VR52) Concrete 133 L078 L078-Banka Amarpur Road New CELL Filled 0.680 3.750 Complete 1 18.65 12.44 31.09 2.72 (0 , 1 , 0 , 0 , 1) Fatehpur to Nurganj (VR56) Concrete
Cold Mix Technology Block Amarpur Total 12.560 34 382.28 254.86 637.14 79.90 (2 , 3 , 0 , 0 , 5)

Block- Banka

134 L079 L079-BANKA-DHAKA MORE New CELL Filled 1.500 3.750 Complete 4 52.87 35.24 88.11 4.56 (0 , 1 , 0 , 0 , 1) TO 1 TO DOMAKHAR (VR55) Concrete
Cold Mix Technology

Page 17 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

135 L081 L081-KATELI MORE DUNA New CELL Filled 2.428 3.750 Complete 11 91.82 61.21 153.03 11.78 (0 , 1 , 0 , 0 , 1) L066 TO GADHWA TAREE Concrete (VR57)
Cold Mix Technology 136 L080 L080-KATELI MORE DONA New CELL Filled 1.172 3.750 Complete 7 51.57 34.38 85.95 3.66 (0 , 1 , 0 , 0 , 1) LO66 TO DOSHADHI (VR56) Concrete
Cold Mix Technology Block Banka Total 5.100 22 196.26 130.83 327.09 20.00 (0 , 3 , 0 , 0 , 3)

Block- Barahat

137 L053 L053-BGP Dumka RD to New -- 1.700 3.750 Complete 6 52.49 34.99 87.48 11.95 (1 , 1 , 0 , 0 , 2) Chihar (TRACK53) Block Barahat Total 1.700 6 52.49 34.99 87.48 11.95 (1 , 1 , 0 , 0 , 2)

Block- Baunsi

138 L104 L104-RAMPUR PABRA VIA New -- 3.400 3.750 Complete 4 102.66 68.44 171.10 22.35 (0 , 1 , 0 , 0 , 1) RANGA TO SARONCHA (TRACK104) 139 L034 L034-SHYAMBAJAR TO New Waste Plastics 2.700 3.750 Complete 6 81.77 54.52 136.29 17.74 (0 , 1 , 0 , 0 , 1) RATANSAR (TRACK34) 140 L105 L105-RAJDAH TO BELTIKARI New CELL Filled 2.000 3.750 Complete 6 62.70 41.80 104.50 11.32 (0 , 1 , 0 , 1 , 2) (TRACK105) Concrete 141 L111 L111-L063 BHALJOR DAM RD New CELL Filled 2.500 3.750 Complete 5 73.83 49.22 123.05 9.50 (0 , 1 , 0 , 0 , 1) TO BAGHWA (TRACK111) Concrete 142 L116 L116-Bousi Mela Road Panda New CELL Filled 2.000 3.750 Complete 4 59.46 39.64 99.10 10.63 (0 , 1 , 0 , 0 , 1) Tola to Upernima Concrete (TRACK116) 143 L118 L118-BGP Dumaka Road T0 New CELL Filled 1.950 3.750 Complete 0 48.57 32.38 80.95 11.92 (0 , 1 , 0 , 0 , 1) Hechala (TRACK118) Concrete 144 L119 L119-Bousi Sichae Dam Road New -- 3.800 3.750 Complete 11 114.37 76.25 190.62 17.90 (0 , 1 , 0 , 0 , 1) Maniyarpur Mor to Nawadih (TRACK119)

Page 18 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

145 L102 L102-BGP-DUMKA RD TO New -- 1.050 3.750 Complete 3 31.44 20.96 52.40 7.21 (0 , 1 , 0 , 0 , 1) BEGDUMA (TRACK102) 146 L114 L114-khangarh PRIMARY New CELL Filled 2.400 3.750 Complete 5 72.19 48.13 120.32 13.54 (0 , 1 , 0 , 0 , 1) SCHOOL TO Sahasaram Concrete (TRACK114) 147 L024 L024-L022 TO DARGATHI New CELL Filled 4.700 3.750 Complete 13 138.78 92.52 231.30 28.72 (1 , 3 , 0 , 2 , 6) AMARBARAIT (TRACK24) Concrete 148 L112 L112-LABANDO RD VIA New -- 3.400 3.750 Complete 3 101.65 67.77 169.42 19.38 (0 , 1 , 2 , 0 , 3) BHALUA BADAR TO HALMATTA (TRACK112) 149 L101 L101-BAUSI IRRIGATION DAM New -- 1.850 3.750 Complete 5 59.18 39.45 98.63 12.60 (0 , 2 , 0 , 0 , 2) ROAD TO PORAI VIA BARMANIA TO PANIA (TRACK101) 150 L064 L064-BAUSI IRRIGATIONDAM New -- 2.275 3.750 Complete 6 84.33 56.22 140.55 9.87 (0 , 1 , 0 , 0 , 1) RD (TRACK64) Block Baunsi Total 34.025 71 1,030.93 687.30 1,718.23 192.68 (1 , 16 , 2 , 3 , 22) Block- Belhar

151 L081 L081-Banka Belhar PWD New CELL Filled 3.600 3.750 Complete 7 111.24 74.16 185.40 21.24 (0 , 1 , 0 , 0 , 1) Road To Srinagar Ranga Concrete (VR81) 152 L089 L089-Boka to Matangiya New CELL Filled 2.402 3.750 Complete 5 90.16 60.10 150.26 10.42 (0 , 1 , 0 , 0 , 1) (TRACK79) Concrete
Cold Mix Technology Block Belhar Total 6.002 12 201.40 134.26 335.66 31.66 (0 , 2 , 0 , 0 , 2)

Block- Chanan

153 L054 L054-Chandan Deoghar-PWD New -- 6.500 3.750 Complete 14 195.74 130.49 326.23 47.03 (0 , 2 , 0 , 0 , 2) Rd .Via-Garbhudih to Dumarkala (TRACK54)

Page 19 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

154 L094 L094-Turki More Kurumtan New CELL Filled 2.000 3.750 Complete 7 60.83 40.55 101.38 12.85 (0 , 1 , 0 , 0 , 1) to Jugari (TRACK94) Concrete
Waste Plastics 155 L083 L083-Kolhaydih -Jhagra RD New -- 7.484 3.750 Complete 18 317.47 211.65 529.12 41.42 (0 , 1 , 0 , 0 , 1) To Kanaudih (TRACK83) Block Chanan Total 15.984 39 574.04 382.69 956.73 101.30 (0 , 4 , 0 , 0 , 4)

Block- Dhoraiya

156 L107 L107-T01 Bindi Chitka To New -- 3.906 3.750 Complete 10 139.74 93.16 232.90 14.89 (0 , 1 , 0 , 0 , 1) Dharhara , Dumarjor (VR107) 157 L097 L097-LO37 to Jogdiha New CELL Filled 2.220 3.750 Complete 7 62.59 41.73 104.32 12.56 (0 , 1 , 0 , 0 , 1) (VR97) Concrete 158 L109 L109-Bhelai Pahari To New CELL Filled 1.860 3.750 Complete 6 53.01 35.34 88.35 10.55 (0 , 1 , 0 , 0 , 1) Pathalkuria (VR109) Concrete 159 L106 L106-Rangaon To Gadian New -- 0.906 3.750 Complete 3 32.51 21.67 54.18 3.93 (0 , 1 , 0 , 0 , 1) (VR106) Block Dhoraiya Total 8.892 26 287.85 191.90 479.75 41.93 (0 , 4 , 0 , 0 , 4)

Block- Fulli Dumar

160 L047 L047-Salaiya - Bharkutia to New CELL Filled 3.700 3.750 Complete 7 111.66 74.44 186.10 18.55 (0 , 1 , 1 , 3 , 5) Chaudaran (VR16) Concrete Block Fulli Dumar Total 3.700 7 111.66 74.44 186.10 18.55 (0 , 1 , 1 , 3 , 5)

Block- Katoria

161 L083 L083-Kajhar To Kachnath New CELL Filled 6.630 3.750 Complete 15 192.96 128.64 321.60 43.14 (0 , 1 , 0 , 5 , 6) (VR83) Concrete
Waste Plastics 162 L047 L047-Jamdaha To New -- 2.000 3.750 Complete 6 63.27 42.18 105.45 13.85 (0 , 1 , 1 , 0 , 2) Rangapathar (VR47)

Page 20 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

163 L090 L090-T05 Karda To Bhalua New CELL Filled 2.000 3.750 Complete 5 61.81 41.21 103.02 13.04 (0 , 1 , 1 , 6 , 8) (VR90) Concrete
Waste Plastics 164 L081 L081-Kulharia To Katahara New CELL Filled 4.000 3.750 Complete 10 119.07 79.38 198.45 23.54 (0 , 2 , 2 , 7 , 11) (VR81) Concrete
Waste Plastics 165 L101 L101-Jamdaha To Ghutia New CELL Filled 2.000 3.750 Complete 5 58.96 39.31 98.27 9.98 (0 , 1 , 0 , 0 , 1) (VR101) Concrete 166 L104 L104-Katoriya Simultala To New CELL Filled 1.560 3.750 Complete 5 48.75 32.50 81.25 7.83 (0 , 1 , 0 , 0 , 1) Harijan Tola (VR104) Concrete 167 L098 L098-Darda To Asnatari New CELL Filled 5.500 3.750 Complete 7 161.11 107.41 268.52 33.96 (0 , 3 , 2 , 7 , 12) (VR98) Concrete 168 L099 L099-Hirna to Kajisar (VR99) New CELL Filled 6.000 3.750 Complete 16 184.96 123.30 308.26 36.37 (0 , 1 , 0 , 0 , 1) Concrete 169 L082 L082-Makbathan to Balukura New CELL Filled 2.300 3.750 Complete 7 70.13 46.75 116.88 14.45 (0 , 1 , 0 , 0 , 1) (VR82) Concrete
Waste Plastics 170 L037 L037-T02 Majhliyadih To New -- 1.900 3.750 Complete 5 58.56 39.04 97.60 10.82 (0 , 1 , 1 , 9 , 11) Kalothar (VR37) 171 L097 L097-Chiraiyamore To New CELL Filled 2.700 3.750 Complete 10 83.28 55.52 138.80 17.60 (0 , 1 , 0 , 0 , 1) Digghibandh (VR97) Concrete 172 L105 L105-Darda to Chananthara New -- 3.630 3.750 Complete 9 105.38 70.25 175.63 24.39 (0 , 1 , 0 , 0 , 1) (VR105) 173 L023 L023-Katoria Simultala Rd. New CELL Filled 4.110 3.750 Complete 7 123.50 82.34 205.84 27.47 (0 , 1 , 0 , 6 , 7) to Dewasi (VR23) Concrete 174 L039 L039-Katoria Banka PWD Rd. New -- 2.194 3.750 Complete 4 88.08 58.72 146.80 11.40 (0 , 1 , 0 , 0 , 1) to Peprewakala (VR39) 175 L062 L062-T03 Charkhapathar To New -- 3.868 3.750 Complete 8 147.19 98.13 245.32 18.74 (0 , 1 , 0 , 0 , 1) Makanda (VR62)

Page 21 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

176 L070 L070-Malwarichak to New CELL Filled 5.000 3.750 Complete 15 149.91 99.94 249.85 31.50 (0 , 1 , 0 , 0 , 1) Hethmathiya (VR70) Concrete
Waste Plastics Block Katoria Total 55.392 134 1,716.92 1,144.62 2,861.54 338.08 (0 , 19 , 7 , 40 , 66) Block- Rajaun

177 L110 L110-BGP. Dumka Rd., New CELL Filled 3.320 3.750 Complete 8 100.56 67.04 167.60 21.96 (1 , 0 , 0 , 0 , 1) Shyampur To Sujalkorama Concrete Via Mohanpur (TRACK58)
Waste Plastics 178 L095 L095-L096 TO DAYALPUR New CELL Filled 2.900 3.750 Complete 8 79.64 53.10 132.74 15.75 (0 , 1 , 0 , 1 , 2) (TRACK48) Concrete 179 L098 L098-T02 TO New CELL Filled 1.600 3.750 Complete 5 47.58 31.72 79.30 7.31 (0 , 1 , 0 , 0 , 1) CHHOTIMURADPUR Concrete (TRACK51) Block Rajaun Total 7.820 21 227.78 151.86 379.64 45.02 (1 , 2 , 0 , 1 , 4)

Block- Shambhuganj

180 L053 L053-Mirjapur kiranpur road New CELL Filled 3.240 3.750 Complete 7 96.78 64.52 161.30 20.47 (0 , 1 , 0 , 0 , 1) to Mahisautha (TRACK53) Concrete Block Shambhuganj Total 3.240 7 96.78 64.52 161.30 20.47 (0 , 1 , 0 , 0 , 1)

District Banka Total 154.415 379 4,878.39 3,252.27 8,130.66 901.54 (5 , 56 , 10 , 47 , 118) District- Begusarai

Block- Begusarai

181 L058 L058-L026 Parna Masjid To New CELL Filled 0.591 3.750 Complete 0 14.41 9.61 24.02 1.67 (1 , 0 , 0 , 0 , 1) Harizen Tola (TRACK20) Concrete

Page 22 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

182 L059 L059-T09 To Sankh Yadav New CELL Filled 0.594 3.750 Complete 0 14.85 9.90 24.75 1.64 (0 , 1 , 0 , 0 , 1) Tola (TRACK21) Concrete Block Begusarai Total 1.185 0 29.26 19.51 48.77 3.31 (1 , 1 , 0 , 0 , 2)

Block- Cheriabariarpur

183 L043 L043-SAKARBASA SRIPUR New CELL Filled 1.222 3.750 Complete 0 32.21 21.47 53.68 3.57 (0 , 1 , 0 , 0 , 1) ROAD TO BHITIARAHI (VR) Concrete 184 L045 L045-SHAHPUR PWD ROAD New CELL Filled 2.445 3.750 Complete 1 62.20 41.47 103.67 7.43 (0 , 1 , 3 , 1 , 5) TO BEECHTOLA (VR2) Concrete Block Cheriabariarpur Total 3.667 1 94.41 62.94 157.35 11.00 (0 , 2 , 3 , 1 , 6)

Block- Matihani

185 L038 L038-Jagatpura To Minapur New CELL Filled 1.223 3.750 Complete 2 33.90 22.60 56.50 3.62 (2 , 0 , 0 , 0 , 2) Ramdiri-1 (TRACK18) Concrete 186 L040 L040-Jagatpura To Purana New CELL Filled 1.674 3.750 Complete 2 45.26 30.17 75.43 5.05 (0 , 1 , 0 , 0 , 1) Tola Rachiyahi (TRACK20) Concrete Block Matihani Total 2.897 4 79.16 52.77 131.93 8.67 (2 , 1 , 0 , 0 , 3)

District Begusarai Total 7.749 5 202.83 135.22 338.05 22.97 (3 , 4 , 3 , 1 , 11) District- Bhagalpur

Block- Ismilepur

187 L028 L028-MMGSY Chhatu Singh New CELL Filled 3.500 3.750 Complete 8 77.78 51.85 129.63 23.94 (1 , 0 , 0 , 0 , 1) Tola To Idmadpur (VR9) Concrete
Cement Stabilization
Waste Plastics 188 L030 L030-Laxmipur Dhar To New -- 4.244 3.750 Complete 2 158.41 105.61 264.02 34.24 (1 , 1 , 0 , 0 , 2) Ismailpur (VR11) Block Ismilepur Total 7.744 10 236.19 157.46 393.65 58.18 (2 , 1 , 0 , 0 , 3)

Page 23 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Narayanpur

189 L021 L021-PMGSY Road Shahabad New CELL Filled 10.000 3.750 Complete 27 375.82 250.55 626.37 59.09 (0 , 1 , 1 , 0 , 2) to Athgama (TRACK3) Concrete
Waste Plastics 190 L024 L024-Narayanpur to New -- 2.778 3.750 Complete 4 84.48 56.32 140.80 16.31 (1 , 0 , 0 , 0 , 1) Paharpur (VR1) Block Narayanpur Total 12.778 31 460.30 306.87 767.17 75.40 (1 , 1 , 1 , 0 , 3)

Block- Naugachhia

191 L059 L059-NH 31 to Mahadat New -- 1.365 3.750 Complete 1 40.44 26.96 67.40 5.47 (0 , 1 , 0 , 0 , 1) Gauri Tola (VR35) 192 L052 L052-RCD Road no. 14 To New CELL Filled 1.500 3.750 Complete 2 30.19 20.12 50.31 11.06 (0 , 1 , 0 , 0 , 1) Ganarchak Diara (VR43) Concrete
Cement Stabilization
Waste Plastics Block Naugachhia Total 2.865 3 70.63 47.08 117.71 16.53 (0 , 2 , 0 , 0 , 2)

Block- Rengra Chowk

193 L023 L023-RCD Road T02 To New CELL Filled 3.100 3.750 Complete 5 85.95 57.30 143.25 17.10 (0 , 1 , 0 , 0 , 1) Tintanga Simaria Tola (VR6) Concrete
Cement Stabilization
Waste Plastics 194 L041 L041-NH 31 to Sadhua New -- 1.497 3.750 Complete 2 47.78 31.85 79.63 9.85 (1 , 0 , 0 , 0 , 1) Chapar Village (VR24) 195 L036 L036-PMGSY to Rajpur Tola New -- 2.268 3.750 Complete 3 73.54 49.03 122.57 13.67 (1 , 0 , 0 , 0 , 1) Shivmandir Madrauni (VR18) Block Rengra Chowk Total 6.865 10 207.27 138.18 345.45 40.62 (2 , 1 , 0 , 0 , 3)

Page 24 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District Bhagalpur Total 30.252 54 974.39 649.59 1,623.98 190.73 (5 , 5 , 1 , 0 , 11) District- Bhojpur

Block- Agion

196 L049 L049-T04 to Bisambharpur New -- 1.500 3.750 Complete 2 58.82 39.21 98.03 8.31 (0 , 1 , 0 , 0 , 1) (VR49) 197 L033 L033-To4 to Bhikhampur New -- 1.800 3.750 Complete 3 65.62 43.75 109.37 9.60 (1 , 0 , 0 , 0 , 1) (VR71) Block Agion Total 3.300 5 124.44 82.96 207.40 17.92 (1 , 1 , 0 , 0 , 2)

Block- Barhara

198 L056 L056-L022 Road to New -- 2.500 3.750 Complete 3 91.88 61.26 153.14 13.05 (1 , 0 , 0 , 0 , 1) Bhabhangaon (VR56) 199 L038 L038-L021 to Kuiya (VR38) New -- 1.000 3.750 Complete 2 38.84 25.89 64.73 3.87 (1 , 0 , 0 , 0 , 1)

200 L033 L033-T03 Sinha to Mohali New -- 2.900 3.750 Complete 4 107.84 71.90 179.74 15.52 (1 , 2 , 0 , 0 , 3) (L33) Block Barhara Total 6.400 9 238.56 159.05 397.61 32.44 (3 , 2 , 0 , 0 , 5)

Block- Bihia

201 L041 L041-NH- 84 Itwa T01 to New -- 2.000 3.750 Complete 3 73.76 49.17 122.93 11.78 (1 , 0 , 0 , 0 , 1) Birpur (VR41) 202 L036 L036-Bihiya Tiar Road T03 to New -- 1.300 3.750 Complete 2 48.87 32.58 81.45 6.89 (0 , 1 , 0 , 0 , 1) Shiobala Tola (VR36) 203 L025 L025-NH- 84 T01 to New -- 1.250 3.750 Complete 4 49.53 33.02 82.55 7.22 (0 , 1 , 0 , 0 , 1) Motirampur (VR25) Block Bihia Total 4.550 9 172.16 114.77 286.93 25.89 (1 , 2 , 0 , 0 , 3)

Block- Charpokhari

204 L034 L034-T01 to Inglis Pur (L34) New -- 2.600 3.750 Complete 5 96.90 64.60 161.50 14.30 (0 , 1 , 1 , 0 , 2)

Page 25 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

205 L023 L023-T02 to Pitambarpur New -- 1.100 3.750 Complete 2 44.27 29.52 73.79 6.86 (0 , 1 , 0 , 0 , 1) (L23) Block Charpokhari Total 3.700 7 141.17 94.12 235.29 21.15 (0 , 2 , 1 , 0 , 3)

Block- Piro

206 L086 L086-L046 to KHAIRAHI New -- 2.000 3.750 Complete 6 72.56 48.38 120.94 10.06 (0 , 1 , 0 , 0 , 1) (VR86) Block Piro Total 2.000 6 72.56 48.38 120.94 10.06 (0 , 1 , 0 , 0 , 1)

Block- Tarari

207 L023 L023-PWD Road to Bihompur New -- 3.850 3.750 Complete 11 145.58 97.06 242.64 22.64 (0 , 1 , 0 , 0 , 1) Bharpur (L23) Block Tarari Total 3.850 11 145.58 97.06 242.64 22.64 (0 , 1 , 0 , 0 , 1)

District Bhojpur Total 23.800 47 894.47 596.34 1,490.81 130.11 (5 , 9 , 1 , 0 , 15) District- Buxar

Block- Chausa

208 L084 L084-CHAUSA STATION TO New -- 1.200 3.750 Complete 2 49.19 32.80 81.99 6.87 (0 , 1 , 0 , 0 , 1) NAYAYPUR HARIJAN TOLA (VR84) Block Chausa Total 1.200 2 49.19 32.80 81.99 6.87 (0 , 1 , 0 , 0 , 1)

Block- Itarhi

209 L055 L055-BUXAR DHANSOI to New -- 1.190 3.750 Complete 2 47.51 31.68 79.19 6.22 (0 , 1 , 0 , 0 , 1) Kashimpur (L55) Block Itarhi Total 1.190 2 47.51 31.68 79.19 6.22 (0 , 1 , 0 , 0 , 1)

Page 26 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Rajpur

210 L087 L087-MAHAVEER STHAN New -- 2.100 3.750 Complete 4 81.77 54.52 136.29 11.82 (0 , 1 , 0 , 0 , 1) JAMAULI TO UTARI (VR87) 211 L029 L029-CHAUSA MAIN NAHAR New -- 3.000 3.750 Complete 6 117.64 78.42 196.06 18.54 (0 , 1 , 0 , 0 , 1) MANIYA PUL TO KHIRI LINE NAHAR TAK (VR29) 212 L086 L086-TIYRA DHANSOI New -- 2.500 3.750 Complete 4 99.28 66.19 165.47 14.85 (0 , 2 , 0 , 0 , 2) MOTIKIPUR TO MANIA (VR86) Block Rajpur Total 7.600 14 298.69 199.13 497.82 45.21 (0 , 4 , 0 , 0 , 4)

District Buxar Total 9.990 18 395.39 263.61 659.00 58.31 (0 , 6 , 0 , 0 , 6)

District- Darbhanga

Block- Bahadurpur

213 L044 L044-T06 ODR TO DHANAILA New -- 1.247 3.750 Complete 3 28.26 18.84 47.10 3.27 (2 , 0 , 0 , 0 , 2) (VR44) Block Bahadurpur Total 1.247 3 28.26 18.84 47.10 3.27 (2 , 0 , 0 , 0 , 2)

Block- Biraul

214 L071 L071-UCHATI TO BALRA New CELL Filled 1.049 3.750 Complete 2 29.59 19.73 49.32 2.65 (1 , 1 , 0 , 0 , 2) (VR50) Concrete Block Biraul Total 1.049 2 29.59 19.73 49.32 2.65 (1 , 1 , 0 , 0 , 2)

Block- Gaura Bauram

215 L024 L024-T02 ASI TO BISHANPUR New CELL Filled 4.888 3.750 Complete 6 127.95 85.30 213.25 11.05 (3 , 0 , 0 , 0 , 3) (VR7) Concrete 216 L040 L040-L026 SAHJATHVIMOAD New CELL Filled 1.118 3.750 Complete 1 28.49 18.99 47.48 2.61 (0 , 1 , 0 , 0 , 1) TO HASANPUR (VR22) Concrete 217 L042 L042-T01 KHATWARA EAST New CELL Filled 1.531 3.750 Complete 1 49.69 33.12 82.81 2.89 (0 , 1 , 0 , 0 , 1) END TO CHATRA Concrete HARIJANPUR (VR24) Block Gaura Bauram Total 7.537 8 206.13 137.41 343.54 16.55 (3 , 2 , 0 , 0 , 5)

Page 27 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Nagar

218 L044 L044-L033 TO BISHAUL New -- 1.772 3.750 Complete 2 42.71 28.48 71.19 3.44 (1 , 0 , 1 , 0 , 2) (VR44) 219 L046 L046-T01 NARDARYA TO New -- 2.880 3.750 Complete 5 66.89 44.60 111.49 6.09 (1 , 0 , 0 , 0 , 1) BAHPATTI (VR46) 220 L045 L045-T04 TO RAMPUR (VR45) New CELL Filled 1.155 3.750 Complete 3 32.37 21.58 53.95 2.37 (0 , 1 , 0 , 0 , 1) Concrete 221 L026 L040-T03 TO NAKTI TOL New CELL Filled 1.765 3.750 Complete 4 51.26 34.17 85.43 4.28 (3 , 1 , 1 , 1 , 6) (VR40) Concrete Block Hanuman Nagar Total 7.572 14 193.23 128.83 322.06 16.17 (5 , 2 , 2 , 1 , 10) Block- Kiratpur

222 L035 L035-T01 TO BHUBHAUL New CELL Filled 2.836 3.750 Complete 3 105.26 70.18 175.44 6.47 (0 , 1 , 0 , 0 , 1) (VR16) Concrete 223 L025 L025-T01 TO KIRATHPUR New CELL Filled 1.759 3.750 Complete 1 44.28 29.52 73.80 4.17 (1 , 0 , 0 , 0 , 1) (VR6) Concrete 224 L029 L029-L028 TO PAKARIA New -- 2.667 3.750 Complete 1 105.06 70.04 175.10 6.88 (1 , 0 , 0 , 1 , 2) (VR10) 225 L040 L040-TETARI TO KUBAUL New CELL Filled 2.766 3.750 Complete 0 101.66 67.77 169.43 7.09 (1 , 0 , 0 , 0 , 1) (VR24) Concrete 226 L034 L034-L032 TO BHANDARIA New CELL Filled 3.765 3.750 Complete 2 143.23 95.48 238.71 9.42 (0 , 1 , 0 , 0 , 1) (VR15) Concrete Block Kiratpur Total 13.793 7 499.49 332.99 832.48 34.02 (3 , 2 , 0 , 1 , 6)

Block- Ksheshwar Sthan

227 L046 L046-L047 TO HATHAURI New CELL Filled 3.966 3.750 Complete 6 149.13 99.42 248.55 10.18 (0 , 1 , 0 , 0 , 1) (VR16) Concrete 228 T03 T03-T01 KALNADIH TO New CELL Filled 7.638 3.750 Complete 5 246.02 164.01 410.03 16.34 (5 , 7 , 11 , 10 , KHESRAHA,LATHDHARTOLA Concrete 33) (ODR2) Block Ksheshwar Sthan Total 11.604 11 395.15 263.43 658.58 26.52 (5 , 8 , 11 , 10 , 34)

Page 28 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Kusheshwar Sthan East

229 L030 L030-T03 TO SISAUNA New CELL Filled 3.784 3.750 Complete 6 143.13 95.42 238.55 9.72 (1 , 0 , 0 , 0 , 1) (VR12) Concrete 230 L026 L026-T02 UJUA TO New CELL Filled 3.622 3.750 Complete 6 135.85 90.57 226.42 9.06 (1 , 0 , 1 , 0 , 2) SIMARTOKA (VR8) Concrete 231 L021 L021-KUSHESHWAR A New CELL Filled 4.568 3.750 Complete 9 124.21 82.81 207.02 11.13 (9 , 7 , 8 , 12 , STHAN TO BHINDWA Concrete 36) (VR4) 232 L028 L028-T02 HARNAHI TO New CELL Filled 4.127 3.750 Complete 5 155.46 103.64 259.10 10.55 (0 , 1 , 0 , 0 , 1) KAUNIYA (VR10) Concrete Block Kusheshwar Sthan East Total 16.101 26 558.65 372.44 931.09 40.45 (11 , 8 , 9 , 12 , 40) District Darbhanga Total 58.903 71 1,910.50 1,273.67 3,184.17 139.63 (30 , 23 , 22 , 24 , 99) District- East Champaran

Block- Banjaria

233 L043 L043-T01 to Brahmanpuri New -- 0.860 3.750 Complete 1 29.58 19.72 49.30 2.57 (0 , 1 , 1 , 0 , 2) (VR14) 234 L063 L063-Jatwa Chichurahiya to New -- 2.683 3.750 Complete 4 89.97 59.98 149.95 8.33 (0 , 1 , 0 , 0 , 1) Mushar Toli (VR23) Block Banjaria Total 3.543 5 119.55 79.70 199.25 10.90 (0 , 2 , 1 , 0 , 3)

Block- Chakia or Pipra

235 L042 L042-T06 KUANWA TO New CELL Filled 1.420 3.750 Complete 4 38.87 25.91 64.78 8.34 (1 , 1 , 0 , 0 , 2) SEKHICHAKIA (VR29) Concrete Block Chakia or Pipra Total 1.420 4 38.87 25.91 64.78 8.34 (1 , 1 , 0 , 0 , 2)

Block- Harsidhhi

236 T01 T01-Ramnagar to bahrampur New -- 1.471 3.750 Complete 3 52.46 34.97 87.43 4.53 (1 , 1 , 0 , 0 , 2) pandit Tola

Page 29 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

237 T01 T01-Ghiwadhar to New -- 1.522 3.750 Complete 2 51.64 34.43 86.07 4.49 (0 , 1 , 1 , 0 , 2) govindapur frijan tola Block Harsidhhi Total 2.993 5 104.10 69.40 173.50 9.02 (1 , 2 , 1 , 0 , 4)

Block- Motihari

238 L073 L073-T 03 To Hanumangarhi New -- 1.940 3.750 Complete 2 64.41 42.94 107.35 5.87 (2 , 2 , 0 , 1 , 5) Via Naya Tola (VR66) 239 L070 L070-T 06 to Laxuman Kajan New -- 2.210 3.750 Complete 1 68.60 45.74 114.34 6.44 (2 , 0 , 0 , 0 , 2) Tola (VR61) 240 L076 L076-L 025 to Sihuliya New -- 3.517 3.750 Complete 4 114.77 76.51 191.28 11.11 (1 , 0 , 5 , 0 , 6) (VR76) 241 L040 L040-Baraulia to Harajpur New -- 2.231 3.750 Complete 4 75.77 50.51 126.28 6.85 (1 , 1 , 1 , 1 , 4) Laxmipur (VR6) 242 L079 L079-T 06 Motihari PWD to New -- 2.089 3.750 Complete 3 74.05 49.37 123.42 6.51 (1 , 0 , 0 , 1 , 2) Bhatha Malah Tolia (VR70) 243 L068 L068-T 02 to Santpur Via New -- 0.928 3.750 Complete 1 30.08 20.05 50.13 2.72 (0 , 1 , 1 , 1 , 3) Harijan Tola (VR57) 244 L047 L047-L 032 to Targhatwa New CELL Filled 0.720 3.750 Complete 1 24.49 16.33 40.82 2.16 (0 , 1 , 0 , 0 , 1) (VR25) Concrete 245 L046 L046-L 028 to Hasua (VR24) New CELL Filled 3.000 3.750 Complete 4 72.65 48.44 121.09 9.19 (0 , 1 , 0 , 0 , 1) Concrete 246 L060 L060-L026 to Sanichara Tola New CELL Filled 1.320 3.750 Complete 2 43.46 28.98 72.44 3.98 (0 , 1 , 0 , 0 , 1) (VR47) Concrete 247 L065 L065-T 04 to Sahani Tola New CELL Filled 1.710 3.750 Complete 2 55.59 37.06 92.65 5.19 (0 , 1 , 0 , 0 , 1) (VR52) Concrete 248 L059 L059-L0 42 to Bhatahan New CELL Filled 3.139 3.750 Complete 3 98.86 65.90 164.76 9.78 (0 , 1 , 0 , 0 , 1) (VR45) Concrete 249 L054 L054-L023 to Kathariya New CELL Filled 0.861 3.750 Complete 0 27.59 18.39 45.98 2.52 (0 , 1 , 0 , 0 , 1) (VR34) Concrete 250 L069 L069-L 032 to East Tikuliya New CELL Filled 0.971 3.750 Complete 2 33.59 22.40 55.99 2.93 (0 , 1 , 0 , 0 , 1) Via Dhobi Tola (VR59) Concrete

Page 30 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

251 L038 L038-T 04 to Ahir Tola via New CELL Filled 2.818 3.750 Complete 3 66.00 44.00 110.00 8.75 (0 , 1 , 0 , 0 , 1) Bariyar pur (VR49) Concrete Block Motihari Total 27.454 32 849.91 566.62 1,416.53 83.97 (7 , 12 , 7 , 4 , 30) Block- Narkatia or Chhauradano

252 L054 L054-L029 Tinkoni to New -- 0.699 3.750 Complete 1 25.53 17.02 42.55 2.10 (0 , 1 , 0 , 0 , 1) Sukhlahiya (VR54) 253 L041 L041-T01 PWD Road to New -- 1.347 3.750 Complete 2 47.25 31.50 78.75 3.81 (0 , 1 , 0 , 0 , 1) North Tola (VR41) 254 L050 L050-Panditpur to Hardiya New -- 2.019 3.750 Complete 1 68.54 45.70 114.24 6.04 (0 , 1 , 1 , 0 , 2)

255 L056 L056-T01 PWD Road New -- 1.062 3.750 Complete 2 38.62 25.75 64.37 3.26 (0 , 1 , 0 , 0 , 1) Dhapahar Patti Saraiya to Dhapahar Patti Hardiya Block Narkatia or Chhauradano Total 5.127 6 179.94 119.97 299.91 15.22 (0 , 4 , 1 , 0 , 5)

Block- Pipra Kothi

256 L058 L058-Surujpur PMGSY Road New -- 1.077 3.750 Complete 2 36.36 24.24 60.60 3.23 (1 , 1 , 1 , 0 , 3) to Murdachak (VR14) Block Pipra Kothi Total 1.077 2 36.36 24.24 60.60 3.23 (1 , 1 , 1 , 0 , 3)

Block- Ramgarhwa

257 L034 L034-L027 Triveni to New -- 4.732 3.750 Complete 4 146.68 97.79 244.47 15.03 (1 , 0 , 0 , 0 , 1) Bherihari (VR34) 258 L047 L047-L033 Teenphoriya New -- 2.686 3.750 Complete 4 91.67 61.11 152.78 8.22 (1 , 0 , 0 , 0 , 1) Chowk to Kharkatwa (ODR6) 259 L040 L040-Laxyabada PMGSY New -- 1.626 3.750 Complete 3 58.90 39.26 98.16 4.93 (1 , 0 , 0 , 0 , 1) Road to Laxmanwa 260 L025 L025-L023Parsauna Madan New -- 1.254 3.750 Complete 3 34.64 23.10 57.74 3.80 (1 , 1 , 0 , 0 , 2) to Laxmipur (VR25)

Page 31 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

261 L043 L043-T04 to Gurhanwa New -- 2.088 3.750 Complete 3 73.26 48.84 122.10 6.50 (0 , 1 , 0 , 0 , 1) (VR43) 262 L042 L042-NH-28 to Bhaisra New -- 1.855 3.750 Complete 3 48.48 32.32 80.80 5.58 (1 , 0 , 0 , 0 , 1) (VR42) Block Ramgarhwa Total 14.241 20 453.63 302.42 756.05 44.07 (5 , 2 , 0 , 0 , 7)

Block- Raxaul

263 L042 L042-L023 to Jagadhar New -- 1.927 3.750 Complete 1 63.83 42.55 106.38 5.74 (1 , 0 , 0 , 0 , 1) Dhab 264 L052 L052-L027 Sirisiya Brit New -- 0.892 3.750 Complete 1 28.37 18.91 47.28 2.68 (1 , 0 , 0 , 0 , 1) Hospital to Sirisiya Nizamat 265 L025 L025-T10 to Khirichiya New -- 2.419 3.750 Complete 0 78.72 52.48 131.20 7.51 (1 , 0 , 0 , 0 , 1) (VR23) 266 L037 L037-T04 to Gadiyani (VR37) New -- 2.182 3.750 Complete 1 75.51 50.34 125.85 6.80 (0 , 1 , 1 , 0 , 2)

267 L051 L051-L031 Purandra to New -- 1.628 3.750 Complete 2 52.50 35.00 87.50 4.91 (0 , 2 , 0 , 0 , 2) Kachorwa via Paraswa 268 L024 L024-T09 to Lachhmipur New -- 0.833 3.750 Complete 1 23.20 15.47 38.67 2.43 (0 , 1 , 1 , 2 , 4) (VR24) 269 L069 L069-L044 Gaunaha to New -- 0.610 3.750 Complete 2 23.75 15.84 39.59 1.93 (0 , 1 , 0 , 0 , 1) Harnahi Barka (VR69) 270 L066 L066-L028 Lachhmipur to New -- 1.288 3.750 Complete 1 33.06 22.04 55.10 3.85 (0 , 1 , 0 , 0 , 1) Bhaluahiya 271 L055 L055-T08 to Lachhnauta New -- 0.899 3.750 Complete 1 23.13 15.42 38.55 2.67 (0 , 1 , 0 , 0 , 1) (VR55) 272 L039 L039-T08 to Narwa Tola New -- 1.386 3.750 Complete 1 48.18 32.12 80.30 4.14 (0 , 1 , 0 , 0 , 1)

273 L045 L045-Gamhariya to Barka New -- 1.264 3.750 Complete 2 32.48 21.66 54.14 3.82 (0 , 1 , 0 , 0 , 1) Tola (VR45) 274 L053 L053-T09 Bahuarwa to New -- 0.710 3.750 Complete 1 22.72 15.15 37.87 2.11 (0 , 1 , 0 , 0 , 1) Bahuarwa North Tola (VR53) Block Raxaul Total 16.038 14 505.45 336.98 842.43 48.59 (3 , 10 , 2 , 2 , 17)

Page 32 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Sugauli

275 L050 L050-N.H. 28 to Lalparsa New -- 1.474 3.750 Complete 0 47.13 31.42 78.55 4.23 (1 , 0 , 2 , 9 , 12) (VR17) 276 L051 L051-Mansingha to New -- 2.083 3.750 Complete 1 71.73 47.82 119.55 6.35 (1 , 0 , 0 , 0 , 1) Laxmipur (VR18) 277 L068 L068-Phulwariya Naya Tola New -- 2.883 3.750 Complete 3 96.45 64.30 160.75 8.83 (1 , 0 , 0 , 0 , 1) to Khapartata (VR38) 278 L047 L047-T 01 Bahuari (VR15) New -- 1.500 3.750 Complete 2 53.27 35.51 88.78 4.53 (1 , 0 , 0 , 0 , 1)

279 L046 L046-Kenal Road to New -- 1.049 3.750 Complete 0 33.60 22.40 56.00 3.01 (0 , 1 , 0 , 4 , 5) Dawditwa (VR14) 280 L043 L043-Panchavirwa to New -- 1.326 3.750 Complete 1 46.23 30.82 77.05 3.86 (0 , 1 , 0 , 1 , 2) Sayampur barwa (VR69) Block Sugauli Total 10.315 7 348.41 232.27 580.68 30.80 (4 , 2 , 2 , 14 , 22) Block- Turkaulia

281 T08 T08-PWD Road turkauliya to New CELL Filled 2.406 3.750 Complete 4 80.35 53.57 133.92 7.48 (1 , 0 , 1 , 5 , 7) Parshurampur (VR8) Concrete 282 L066 L066-L029 to Takia (VR41) New -- 1.500 3.750 Complete 3 52.97 35.32 88.29 4.70 (1 , 0 , 0 , 0 , 1)

283 L068 L068-L051 to Bandraha New CELL Filled 2.250 3.750 Complete 2 72.54 48.36 120.90 6.62 (1 , 0 , 0 , 0 , 1) (VR43) Concrete 284 L063 L063-T 02 to Harijan Dusadh New -- 0.869 3.750 Complete 1 29.33 19.55 48.88 2.64 (1 , 0 , 0 , 0 , 1) Tola (VR29) 285 L085 L085-T04 to Ahir Tola via New CELL Filled 0.799 3.750 Complete 1 26.01 17.34 43.35 2.32 (1 , 0 , 1 , 0 , 2) Fudi Babu Tola (VR55) Concrete 286 L059 L059-T02 to Bhalua Tola New CELL Filled 2.318 3.750 Complete 1 71.98 47.99 119.97 7.02 (1 , 0 , 0 , 0 , 1) (VR27) Concrete 287 L052 L052-T 05 to Nimuiya (VR22) New CELL Filled 2.850 3.750 Complete 3 75.15 50.10 125.25 8.67 (1 , 2 , 2 , 2 , 7) Concrete 288 L050 L050-L 029 to Chhaka Tola New CELL Filled 2.456 3.750 Complete 4 85.21 56.81 142.02 7.65 (1 , 1 , 0 , 0 , 2) (VR20) Concrete

Page 33 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

289 L044 L044-L 033 to Dil Tola New CELL Filled 2.841 3.750 Complete 5 77.49 51.66 129.15 8.85 (0 , 2 , 0 , 1 , 3) (VR16) Concrete 290 L060 L060-T 03 to Barwa (VR30) New CELL Filled 1.624 3.750 Complete 1 51.99 34.66 86.65 4.83 (0 , 1 , 0 , 0 , 1) Concrete 291 L054 L054-L 027 to Shekha Wazim New -- 0.571 3.750 Complete 1 19.96 13.30 33.26 1.74 (0 , 1 , 0 , 0 , 1) (VR24) 292 L031 L031-T 02 to Belahi (VR11) New CELL Filled 2.341 3.750 Complete 5 78.77 52.51 131.28 7.14 (0 , 1 , 0 , 0 , 1) Concrete 293 L065 L065-L027 to Barkurwa New CELL Filled 4.269 3.750 Complete 4 136.03 90.69 226.72 13.53 (0 , 1 , 0 , 0 , 1) (VR35) Concrete 294 L049 L049-T 03 to Bankahi (VR19) New CELL Filled 5.102 3.750 Complete 3 160.67 107.11 267.78 16.24 (0 , 1 , 0 , 0 , 1) Concrete 295 L055 L055-L031 to Majhar (VR25) New CELL Filled 0.757 3.750 Complete 2 27.08 18.06 45.14 2.28 (0 , 1 , 0 , 0 , 1) Concrete 296 L072 L072-L051 to Chhattu Rai New CELL Filled 3.750 3.750 Complete 6 124.28 82.85 207.13 11.78 (0 , 1 , 0 , 0 , 1) Tola (VR58) Concrete 297 L048 L048-T 03 to Bhaghi (VR18) New CELL Filled 1.878 3.750 Complete 2 60.87 40.58 101.45 5.59 (0 , 1 , 0 , 0 , 1) Concrete 298 L075 L075-T04 to Murgiya Tola New CELL Filled 1.120 3.750 Complete 2 38.21 25.47 63.68 3.36 (1 , 1 , 3 , 4 , 9) (VR45) Concrete 299 L064 L064-SCP Sapahi to New CELL Filled 2.968 3.750 Complete 2 95.35 63.57 158.92 9.13 (1 , 0 , 0 , 0 , 1) Rahmatia (VR34) Concrete Block Turkaulia Total 42.669 52 1,364.24 909.50 2,273.74 131.58 (10 , 14 , 7 , 12 , 43) District East Champaran Total 124.877 147 4,000.46 2,667.01 6,667.47 385.71 (32 , 50 , 22 , 32 , 136) District- Gaya

Block- Amas

300 L035 L035-T01 TO SHMSHER KHAP New -- 2.212 3.750 Complete 3 60.18 40.12 100.30 8.30 (0 , 0 , 2 , 3 , 5) (VR14) Block Amas Total 2.212 3 60.18 40.12 100.30 8.30 (0 , 0 , 2 , 3 , 5)

Page 34 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Atri

301 L056 L056-Punar road To New Cold Mix 1.497 3.750 Complete 3 43.86 29.24 73.10 6.36 (0 , 0 , 2 , 0 , 2) Chiraiyan tanr (VR20) Technology 302 L065 L065-Koiribigha To Bhadin New -- 1.110 3.750 Complete 1 22.39 14.93 37.32 3.63 (0 , 0 , 1 , 0 , 1) Bhuintoli (VR38) 303 L067 L067-Teunsa-atri road To New -- 0.509 3.750 Complete 2 13.30 8.87 22.17 1.77 (0 , 0 , 1 , 0 , 1) Jharibigha (VR41) 304 L041 L041-Punar Kariyat road To New -- 1.349 3.750 Complete 3 41.84 27.89 69.73 4.70 (0 , 0 , 1 , 0 , 1) Nawada tanr-H.Toli (VR19) 305 L068 L068-Teunsa-Atri road To New -- 1.140 3.750 Complete 2 27.19 18.13 45.32 3.96 (0 , 1 , 0 , 0 , 1) Gohchak (VR42) 306 L063 L063-Gangti To Chamar Toli- New -- 1.843 3.750 Complete 3 38.53 25.69 64.22 6.50 (1 , 0 , 1 , 0 , 2) narawat (VR34) Block Atri Total 7.448 14 187.11 124.75 311.86 26.93 (1 , 1 , 6 , 0 , 8)

Block- Banke Bazar

307 L024 L024-L023 to Madarpur New -- 0.569 3.750 Complete 2 17.45 11.63 29.08 2.06 (0 , 1 , 0 , 1 , 2) (VR24) 308 L069 L069-Sondaha to New Cold Mix 1.425 3.750 Complete 4 46.05 30.70 76.75 6.51 (0 , 0 , 1 , 0 , 1) Chaperwar (VR14) Technology 309 L054 L054-T01 to Baida Saida New -- 2.100 3.750 Complete 6 81.48 54.32 135.80 7.44 (0 , 1 , 0 , 0 , 1) (VR54) Block Banke Bazar Total 4.094 12 144.98 96.65 241.63 16.01 (0 , 2 , 1 , 1 , 4)

Block- Barachatti

310 L029 L029-SHOBH DHANGAI ROAD New -- 1.857 3.750 Complete 4 58.83 39.22 98.05 6.04 (1 , 0 , 0 , 0 , 1) TOBHAKTAURI (VR56) 311 L031 L031-T01 TO GULARBED New -- 2.583 3.750 Complete 5 64.99 43.32 108.31 9.62 (0 , 1 , 2 , 6 , 9) (VR14) 312 L037 L037-L039 TO MEHUGAIN New -- 3.268 3.750 Complete 6 98.05 65.37 163.42 11.91 (1 , 0 , 0 , 0 , 1) (VR24)

Page 35 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

313 L043 L043-T01 TO PATIAUNA New -- 3.286 3.750 Complete 4 81.24 54.16 135.40 11.61 (0 , 1 , 0 , 0 , 1) (VR32) 314 L045 L045-L039 TO BANKI (VR31) New -- 2.151 3.750 Complete 4 53.99 35.99 89.98 7.92 (0 , 0 , 1 , 0 , 1)

315 L049 L049-PADRIYA TO REWADA New Cold Mix 1.797 3.750 Complete 1 55.94 37.29 93.23 6.74 (2 , 0 , 1 , 3 , 6) (VR77) Technology 316 L050 L050-DHARMA L037 TO New -- 0.741 3.750 Complete 1 18.18 12.12 30.30 2.78 (0 , 0 , 1 , 0 , 1) MURHI (VR25) 317 L051 L051-L039 TO TALUCHAK New Cold Mix 2.175 3.750 Complete 4 67.29 44.86 112.15 9.87 (0 , 1 , 0 , 0 , 1) (VR23) Technology 318 L055 L055-L043 TO MANJHAULIA New -- 1.358 3.750 Complete 2 38.02 25.35 63.37 4.78 (0 , 2 , 0 , 0 , 2) (VR88) 319 L021 L021-T02 BELAHARIA TO New Cold Mix 0.706 3.750 Complete 2 26.11 17.41 43.52 2.70 (0 , 0 , 1 , 0 , 1) MANICHAK (VR1) Technology 320 L025 L025-T01 GT ROAD TO New -- 4.125 3.750 Complete 8 110.82 73.88 184.70 15.47 (1 , 0 , 0 , 0 , 1) BARANDI (VR5) Block Barachatti Total 24.047 41 673.46 448.97 1,122.43 89.43 (5 , 5 , 6 , 9 , 25) Block- Bathani

321 L050 L050-Atri Bathani Road T02 New Cold Mix 0.801 3.750 Complete 2 24.03 16.02 40.05 3.32 (1 , 1 , 1 , 0 , 3) To Maniara (ODR50) Technology 322 L051 L051-Gaya Islampur Road New -- 1.067 3.750 Complete 2 34.37 22.92 57.29 3.52 (1 , 0 , 1 , 0 , 2) T03 To Khukhari (ODR51) 323 L057 L057-Gaya Islampur Road New -- 0.772 3.750 Complete 2 23.11 15.40 38.51 2.62 (0 , 1 , 0 , 0 , 1) T03 To Kabirpur (ODR57) 324 L059 L059-Patharkatti T03 To New -- 3.845 3.750 Complete 7 92.76 61.84 154.60 14.63 (0 , 1 , 0 , 0 , 1) Simaper (ODR59) Block Bathani Total 6.485 13 174.27 116.18 290.45 24.08 (2 , 3 , 2 , 0 , 7)

Block- Belaganj

325 L031 L031-Mubarakpur Road to New -- 1.074 3.750 Complete 2 24.85 16.57 41.42 3.77 (0 , 0 , 1 , 0 , 1) Chakan Bigha (VR31)

Page 36 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

326 L055 L055-Bela Nimchak Road to New -- 1.173 3.750 Complete 2 28.74 19.16 47.90 4.12 (1 , 3 , 0 , 0 , 4) Dalelchak Bhalua-2 (VR55) 327 L062 L062-Nanku Bigha to Simra New -- 0.982 3.750 Complete 3 29.51 19.67 49.18 3.63 (1 , 0 , 0 , 0 , 1) (VR62) 328 L070 L070-Bela Barabar Rd. New -- 2.210 3.750 Complete 3 67.71 45.14 112.85 6.97 (0 , 1 , 0 , 0 , 1) Shekhpura (VR70) 329 L100 L100-Pai Bigha Road to New -- 0.595 3.750 Complete 2 17.67 11.78 29.45 2.10 (0 , 1 , 0 , 0 , 1) Suraundha (TRACK100) 330 L102 L102-Bela Barabar Road to New -- 0.590 3.750 Complete 3 18.40 12.27 30.67 2.26 (0 , 1 , 0 , 0 , 1) Kabirpur (TRACK102) 331 L023 L023-Bhalua to Sakir Bigha New -- 3.556 3.750 Complete 8 101.75 67.83 169.58 12.34 (2 , 4 , 1 , 0 , 7) (VR23) 332 L024 L024-Jafara to Sukarn Bigha New Cold Mix 0.740 3.750 Complete 2 24.33 16.22 40.55 3.10 (0 , 0 , 2 , 0 , 2) (VR24) Technology 333 L040 L040-Nimchak to Agandha New -- 1.576 3.750 Complete 1 36.60 24.40 61.00 5.34 (1 , 0 , 0 , 0 , 1) (VR40) 334 L050 L050-B.T. Road NH 83 to New Cold Mix 2.562 3.750 Complete 5 78.03 52.02 130.05 10.89 (3 , 0 , 1 , 0 , 4) Akthu Kachanpur (VR50) Technology 335 L052 L052-T03 Gaya Patna Road New -- 1.013 3.750 Complete 2 27.95 18.63 46.58 3.57 (0 , 0 , 2 , 0 , 2) to Parwal Bigha (VR52) 336 L059 L059-Ore to Erki (VR59) New -- 0.702 3.750 Complete 2 18.44 12.29 30.73 2.80 (1 , 2 , 1 , 0 , 4)

337 L096 L096-Belhari Kormathu Road New -- 1.008 3.750 Complete 2 25.28 16.86 42.14 3.54 (0 , 1 , 0 , 0 , 1) to Fatehpur (TRACK96) 338 L103 L103-Agandha to Tali New -- 0.597 3.750 Complete 2 17.50 11.67 29.17 2.12 (0 , 1 , 1 , 0 , 2) (TRACK103) 339 L108 L108-Belhari Kormathu Road New -- 0.650 3.750 Complete 2 19.24 12.83 32.07 2.28 (0 , 0 , 1 , 0 , 1) to Maksudpur (TRACK108) 340 L028 L028-Khedarpura to New -- 0.900 3.750 Complete 2 26.68 17.78 44.46 3.63 (0 , 0 , 1 , 0 , 1) Kamalpur (VR28) 341 L094 L094-Bela Chanduti Road to New Cold Mix 0.900 3.750 Complete 3 29.55 19.70 49.25 4.13 (0 , 1 , 0 , 0 , 1) Banshi Bigha (TRACK94) Technology Block Belaganj Total 20.828 46 592.23 394.82 987.05 76.58 (9 , 15 , 11 , 0 , 35)

Page 37 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Bodh Gaya

342 L113 L113-L113 Domuhan Ilra New -- 0.669 3.750 Complete 2 16.47 10.98 27.45 2.32 (0 , 1 , 0 , 0 , 1) Cherki path to Bhalua (VR113) 343 L120 L120-Kajichak Shobha Khap New -- 1.065 3.750 Complete 3 23.98 15.99 39.97 4.16 (0 , 0 , 1 , 0 , 1) path Gram pachhan to Kashipur (VR120) 344 L121 L121-L121 Khap Dhanawan New -- 0.756 3.750 Complete 2 20.89 13.92 34.81 2.44 (0 , 0 , 1 , 0 , 1) path to Mahadevpur (VR121) 345 L112 L112-Prathmik Vidyalay New Cold Mix 1.622 3.750 Complete 4 44.51 29.68 74.19 7.06 (0 , 1 , 0 , 0 , 1) Niskha to Babu Bigha Technology (VR112) 346 L107 L107-Cherki IIra Dumuhan New -- 0.525 3.750 Complete 2 14.83 9.89 24.72 1.83 (0 , 1 , 0 , 0 , 1) Road To Rohi Bigha (VR107) 347 L117 L117-Amra Dumri to Jarhari New -- 2.421 3.750 Complete 5 58.75 39.17 97.92 8.99 (0 , 0 , 1 , 0 , 1) Kishunpur (VR117) 348 L115 L115-l115 Amra dumri path New -- 1.200 3.750 Complete 2 27.61 18.40 46.01 4.91 (0 , 1 , 0 , 1 , 2) to Lohra chapri (VR115) Block Bodh Gaya Total 8.258 20 207.04 138.03 345.07 31.71 (0 , 4 , 3 , 1 , 8)

Block- Dobhi

349 L035 L035-L022 TO BONDABIGHA New -- 0.751 3.750 Complete 0 18.89 12.59 31.48 2.35 (0 , 1 , 0 , 0 , 1) (VR15) 350 L064 L064-T03 TO RANI CHAK New -- 0.674 3.750 Complete 2 18.51 12.34 30.85 2.43 (0 , 1 , 0 , 0 , 1) (VR39) 351 L048 L048-TO1 TO KURUMDIH New Cold Mix 0.864 3.750 Complete 2 34.11 22.74 56.85 3.64 (0 , 1 , 0 , 0 , 1) (VR24) Technology 352 L036 L036-L021 TO DHAB (VR16) New -- 0.709 3.750 Complete 2 21.32 14.22 35.54 2.56 (0 , 1 , 0 , 0 , 1)

353 L042 L042-L057 TO NAKATIA New -- 3.552 3.750 Complete 7 107.05 71.37 178.42 13.10 (0 , 2 , 1 , 0 , 3) (VR20) 354 L052 L052-T01 TO GHATERIYA New -- 0.789 3.750 Complete 2 19.43 12.95 32.38 3.18 (0 , 0 , 1 , 0 , 1) (VR27)

Page 38 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

355 L054 L054-L047 TO SUGASOT New -- 3.567 3.750 Complete 7 101.59 67.73 169.32 13.51 (1 , 0 , 2 , 0 , 3) (VR32) 356 L065 L065-L037 TO MURIAL New -- 5.178 3.750 Complete 6 136.69 91.13 227.82 18.90 (0 , 1 , 0 , 0 , 1) MAHADALIT TOLA (VR40) 357 L030 L030-T01 TO BAJOURA New -- 1.002 3.750 Complete 2 32.01 21.34 53.35 3.78 (1 , 0 , 0 , 0 , 1) (VR10) 358 L075 L075-LO26 TO BAHERA DIH New -- 2.250 3.750 Complete 3 70.32 46.88 117.20 7.62 (0 , 0 , 1 , 0 , 1) (VR50) Block Dobhi Total 19.336 33 559.92 373.29 933.21 71.08 (2 , 7 , 5 , 0 , 14) Block- Fatehpur

359 L155 L155-Rajabigha Mocharakh New -- 1.339 3.750 Complete 2 33.96 22.64 56.60 5.18 (0 , 0 , 1 , 0 , 1) Road To Pipra (TRACK155) 360 L110 L110-Patwansh Road to New -- 1.140 3.750 Complete 2 27.28 18.19 45.47 4.01 (0 , 1 , 0 , 1 , 2) Kewal (TRACK110) 361 L102 L102-Fatehpur Wazirganj New -- 1.014 3.750 Complete 2 21.97 14.65 36.62 3.54 (0 , 1 , 1 , 0 , 2) Road to Tirma (TRACK102) 362 L136 L136-Gaya Fatehpur Road to New -- 1.158 3.750 Complete 2 24.14 16.09 40.23 4.05 (0 , 1 , 0 , 0 , 1) Maha Dalit Tola Khaira (TRACK136) 363 L115 L115-Dummarichatti Dundu New -- 1.494 3.750 Complete 3 35.66 23.77 59.43 5.37 (0 , 0 , 2 , 1 , 3) Road to Kabilpur via Gamhari (TRACK115) 364 L109 L109-Patwansh Road to New -- 1.038 3.750 Complete 2 28.38 18.92 47.30 3.91 (0 , 0 , 1 , 0 , 1) Ramgarh Sindhiya (TRACK109) 365 L108 L108-Dundu Road to New -- 1.408 3.750 Complete 3 46.63 31.09 77.72 5.15 (0 , 0 , 1 , 0 , 1) Hematpur (TRACK108) 366 L158 L158-Paharpur to Gopalkera New -- 3.348 3.750 Complete 6 81.83 54.55 136.38 12.38 (0 , 2 , 1 , 0 , 3) (TRACK158) 367 L134 L134-Gurpa Dummarichatti New -- 1.028 3.750 Complete 1 27.11 18.07 45.18 3.20 (0 , 1 , 0 , 0 , 1) Road to Itamma via Raghunathpur (TRACK134)

Page 39 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

368 T07 T07-Rajabigha to Mochrakh New -- 15.180 3.750 Complete 34 401.21 267.47 668.68 55.07 (1 , 6 , 5 , 4 , 16) (TRACK7) 369 L044 L044-BhawariKalan Road to New -- 2.250 3.750 Complete 5 58.90 39.27 98.17 8.98 (1 , 0 , 0 , 0 , 1) BhawariKhurd (VR44) Block Fatehpur Total 30.397 62 787.07 524.71 1,311.78 110.83 (2 , 12 , 12 , 6 , 32) Block- Guraru

370 L025 L025-Guraru Gurua Road to New -- 1.617 3.750 Complete 4 41.71 27.81 69.52 6.25 (0 , 2 , 0 , 1 , 3) Ranapur (VR25) 371 L043 L043-Rafiganj Gaya Road to New -- 2.189 3.750 Complete 4 58.96 39.31 98.27 8.01 (2 , 0 , 1 , 3 , 6) Rauda (VR43) 372 L049 L049-Guraru Asani Road to New -- 1.316 3.750 Complete 3 43.21 28.80 72.01 4.88 (0 , 0 , 1 , 0 , 1) Budhpur (VR49) 373 L071 L071-Guraru H.S. New Cold Mix 1.627 3.750 Complete 5 61.81 41.20 103.01 7.61 (0 , 0 , 1 , 0 , 1) Surdarshan Bigha to Technology Shekhpura (VR71) 374 L085 L085-Barorah to Sudarshan New Cold Mix 0.885 3.750 Complete 3 31.48 20.99 52.47 3.73 (0 , 1 , 0 , 1 , 2) Bigha (VR85) Technology 375 L091 L091-Girdhara to Beldari New -- 1.126 3.750 Complete 2 29.72 19.81 49.53 4.00 (0 , 1 , 0 , 0 , 1) Bigha (VR91) 376 L092 L092-Girdhara to Bainkatpur New -- 1.133 3.750 Complete 2 30.52 20.35 50.87 4.02 (0 , 0 , 1 , 0 , 1) (VR92) 377 L093 L093-Girdhara to Thakur New Cold Mix 0.988 3.750 Complete 2 31.35 20.90 52.25 4.31 (0 , 0 , 1 , 0 , 1) Bigha (VR93) Technology 378 L099 L099-Ghater Nahar to New -- 0.997 3.750 Complete 2 38.19 25.46 63.65 3.45 (0 , 1 , 0 , 0 , 1) Dadnapur (VR99) 379 L110 L110-Rauda Math to New -- 1.445 3.750 Complete 4 48.57 32.38 80.95 5.18 (0 , 1 , 0 , 0 , 1) Jamlapur (VR110) 380 L052 L052-Rafiganj Gaya Road to New Cold Mix 1.200 3.750 Complete 2 38.66 25.77 64.43 5.71 (0 , 1 , 1 , 0 , 2) Daulatpur Bariyawan (VR52) Technology Block Guraru Total 14.523 33 454.18 302.78 756.96 57.14 (2 , 7 , 6 , 5 , 20)

Page 40 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Gurua

381 L072 L072-T03 TO MAKHDUMPUR New -- 1.586 3.750 Complete 3 41.85 27.90 69.75 5.89 (0 , 1 , 0 , 0 , 1) (VR45) 382 L104 L104-T01 TO DHAMAUL New -- 1.093 3.750 Complete 2 26.10 17.40 43.50 4.26 (0 , 1 , 0 , 0 , 1) (VR73) 383 L023 L023-T03 TO KETURI (VR3) New -- 2.033 3.750 Complete 2 48.47 32.31 80.78 7.53 (0 , 1 , 0 , 0 , 1)

384 L107 L107-L039 TO SONBARSA New Cold Mix 0.782 3.750 Complete 2 26.25 17.50 43.75 3.36 (0 , 1 , 0 , 0 , 1) (VR76) Technology 385 L041 L041-L045 TO PESARA (VR21) New -- 1.553 3.750 Complete 3 42.55 28.37 70.92 5.84 (0 , 0 , 1 , 0 , 1)

386 L111 L111-T05 TO CHANDOKHARA New Cold Mix 1.236 3.750 Complete 3 40.41 26.94 67.35 5.70 (0 , 1 , 0 , 0 , 1) (VR80) Technology 387 L119 L119-T02 TO SAGAHI SATAND New -- 1.009 3.750 Complete 2 29.77 19.85 49.62 3.39 (0 , 0 , 1 , 0 , 1) (VR88) 388 L094 L094-BILAUTI TO LAKRAHI New -- 1.001 3.750 Complete 2 27.66 18.44 46.10 3.60 (0 , 0 , 1 , 0 , 1) (VR63) 389 L022 L022-TO1 TO PWARA (VR91) New -- 2.586 3.750 Complete 4 64.25 42.83 107.08 9.62 (0 , 0 , 1 , 0 , 1)

390 L046 L046-L039 TO BHARTIPUR New -- 1.542 3.750 Complete 4 42.78 28.52 71.30 6.15 (0 , 0 , 1 , 0 , 1) (VR26) 391 L101 L101-L071 TO GONDA (VR70) New -- 1.012 3.750 Complete 2 29.26 19.51 48.77 3.60 (0 , 0 , 1 , 0 , 1)

392 L096 L096-T03 TO NADIYAN New -- 0.927 3.750 Complete 3 30.34 20.23 50.57 3.42 (0 , 0 , 1 , 0 , 1) (VR65) 393 L117 L117-L037 TO DAULATPUR New Cold Mix 1.375 3.750 Complete 2 54.05 36.03 90.08 5.53 (0 , 0 , 1 , 0 , 1) (VR86) Technology 394 L109 L109-L057 TO MAHADEV New -- 2.595 3.750 Complete 4 75.91 50.61 126.52 9.54 (0 , 0 , 1 , 0 , 1) ASTHAN (VR78) 395 L112 L112-T07 TO TIKRI (VR81) New -- 0.917 3.750 Complete 3 27.89 18.60 46.49 3.47 (0 , 0 , 1 , 0 , 1)

396 L040 L040-L034 TO LAKHRAHI New -- 1.873 3.750 Complete 6 49.40 32.93 82.33 7.33 (0 , 0 , 1 , 0 , 1) (VR20) 397 L110 L110-T07 TO AZAD BIGHA New -- 2.194 3.750 Complete 5 61.38 40.92 102.30 7.74 (1 , 0 , 0 , 0 , 1) (VR79)

Page 41 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

398 L120 L120-L022 TO KAMALDHARA New -- 1.124 3.750 Complete 2 28.32 18.88 47.20 4.38 (0 , 0 , 1 , 0 , 1) (VR89) 399 L106 L106-L081 TO DHOKRA New -- 1.192 3.750 Complete 2 29.28 19.52 48.80 4.63 (0 , 1 , 0 , 0 , 1) (VR75) 400 L103 L103-L081 TO AKHORIKHAP New -- 1.078 3.750 Complete 2 27.31 18.21 45.52 4.05 (0 , 0 , 1 , 0 , 1) (VR72) 401 L102 L102-T01 TO BELA (VR71) New -- 2.197 3.750 Complete 4 55.46 36.97 92.43 8.25 (0 , 0 , 1 , 0 , 1)

402 L061 L061-L060 TO CHEIN (VR39) New Cold Mix 1.182 3.750 Complete 1 35.20 23.46 58.66 4.93 (1 , 0 , 0 , 0 , 1) Technology 403 L113 L113-L059 TO LALGANJ New -- 1.500 3.750 Complete 5 49.71 33.14 82.85 5.82 (0 , 0 , 1 , 0 , 1) (VR82) Block Gurua Total 33.587 68 943.60 629.07 1,572.67 128.00 (2 , 6 , 15 , 0 , 23) Block- Imamganj

404 L070 L070-Bikopur to Dharhara New -- 0.885 3.750 Complete 3 28.00 18.67 46.67 3.03 (0 , 0 , 1 , 1 , 2) (VR70) Block Imamganj Total 0.885 3 28.00 18.67 46.67 3.03 (0 , 0 , 1 , 1 , 2)

Block- Khijasarai

405 L056 L056-Tajpur-Kewari Road To New Cold Mix 0.917 3.750 Complete 2 25.33 16.89 42.22 3.75 (0 , 1 , 0 , 0 , 1) Sukranbigha (ODR4) Technology 406 L085 L085-Telbigha To Terka New -- 0.701 3.750 Complete 2 26.29 17.53 43.82 2.33 (0 , 1 , 0 , 0 , 1) (VR61) 407 L061 L061-Saindih To Gonardih New -- 1.115 3.750 Complete 2 24.86 16.57 41.43 4.16 (0 , 0 , 3 , 0 , 3) (VR42) 408 L084 L084-Kudai-Sarbahda Road New -- 0.755 3.750 Complete 2 17.80 11.87 29.67 2.68 (0 , 0 , 2 , 0 , 2) To Baijnathpur (VR56) 409 L048 L048-Sarbahda-Khudaganj New -- 0.965 3.750 Complete 2 23.82 15.88 39.70 3.33 (0 , 1 , 2 , 1 , 4) Road To Laliari Via Simrauka (VR31)

Page 42 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

410 L080 L080-Dullah Bigha T o Sonas New -- 1.500 3.750 Complete 3 41.97 27.98 69.95 5.64 (0 , 1 , 0 , 0 , 1) (VR49) Block Khijasarai Total 5.953 13 160.07 106.72 266.79 21.88 (0 , 4 , 7 , 1 , 12) Block- Konch

411 L022 L022-Nisurpur Road, T01 to New -- 3.302 3.750 Complete 6 87.47 58.32 145.79 12.68 (1 , 0 , 0 , 0 , 1) Ker (VR22) 412 L033 L033-T06 to Nimri (VR33) New -- 2.467 3.750 Complete 5 63.59 42.39 105.98 9.44 (0 , 2 , 0 , 0 , 2)

413 L034 L034-T03 to Kanchanpur New -- 1.614 3.750 Complete 3 42.90 28.60 71.50 6.19 (1 , 0 , 5 , 1 , 7) (VR34) 414 L050 L050-L075 to Mahamadpur New Cold Mix 1.479 3.750 Complete 3 51.26 34.17 85.43 6.50 (0 , 0 , 1 , 1 , 2) (VR50) Technology 415 L103 L103-Bhikhanpur to Maniya New -- 2.141 3.750 Complete 3 51.07 34.05 85.12 7.72 (0 , 1 , 0 , 0 , 1) Bigha (VR103) 416 L107 L107-L022 to Bargawan New -- 1.119 3.750 Complete 2 31.51 21.00 52.51 4.00 (0 , 0 , 1 , 0 , 1) Mathia (VR107) 417 L110 L110-T05 to Bedauli (VR110) New -- 1.095 3.750 Complete 3 32.85 21.90 54.75 4.06 (0 , 0 , 1 , 0 , 1)

Block Konch Total 13.217 25 360.65 240.43 601.08 50.58 (2 , 3 , 8 , 2 , 15) Block- Manpur

418 L053 L053-Manpur Teusa Road New -- 0.670 3.750 Complete 1 16.67 11.11 27.78 1.83 (0 , 0 , 1 , 0 , 1) T01 To Dudhaila (ODR53) 419 L051 L051-Manpur Teusa Road New -- 0.894 3.750 Complete 3 20.98 13.98 34.96 3.24 (1 , 1 , 0 , 0 , 2) T01 To Usri (ODR51) 420 L063 L063-Bhdegya L048 To New -- 0.919 3.750 Complete 4 31.96 21.31 53.27 3.15 (0 , 1 , 0 , 0 , 1) Bicchi (ODR63) 421 L056 L056-Manpur Khizersarai New Cold Mix 1.155 3.750 Complete 3 31.08 20.72 51.80 4.77 (0 , 1 , 0 , 1 , 2) Road T06 To Pathal Shata Technology (ODR56)

Page 43 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

422 L061 L061-Manpur Bhouro New -- 0.576 3.750 Complete 1 14.19 9.46 23.65 1.57 (0 , 0 , 1 , 0 , 1) Sanagato Road T02 To Nanhak Chak (ODR61) 423 L065 L065-Manpur Gaya By Pass New Cold Mix 1.174 3.750 Complete 4 39.92 26.61 66.53 5.02 (0 , 1 , 0 , 0 , 1) Road To Inguna (ODR65) Technology Block Manpur Total 5.388 16 154.80 103.19 257.99 19.58 (1 , 4 , 2 , 1 , 8)

Block- Mohanpur

424 L057 L057-L035 HAMZAPUR TO New -- 3.246 3.750 Complete 5 77.33 51.55 128.88 12.43 (1 , 2 , 3 , 0 , 6) DHARAHARA (VR36) 425 L053 L053-L035 TO KHARDI New -- 3.856 3.750 Complete 7 96.45 64.30 160.75 14.28 (0 , 1 , 1 , 1 , 3) (VR32) Block Mohanpur Total 7.102 12 173.78 115.85 289.63 26.71 (1 , 3 , 4 , 1 , 9)

Block- Mohra

426 L046 L046-Jethiyan Ghati New Cold Mix 0.984 3.750 Complete 2 35.12 23.41 58.53 4.03 (0 , 0 , 1 , 1 , 2) Jamuawan Road T01 To Technology Kehar Bigha (ODR46) 427 L052 L052-Tapowan Wazirganj New -- 2.170 3.750 Complete 4 66.60 44.40 111.00 7.81 (0 , 2 , 0 , 0 , 2) Road T02 To Mal Bigha (ODR52) 428 L059 L059-Tapowan Wazirganj New -- 1.502 3.750 Complete 2 34.03 22.68 56.71 5.23 (0 , 0 , 1 , 0 , 1) Road T02 To Kachahra (ODR59) 429 L060 L060-Tapowan Wazirganj New Cold Mix 0.830 3.750 Complete 3 25.60 17.07 42.67 3.65 (0 , 1 , 0 , 0 , 1) Road T02 To Lohsighani Technology (ODR60) 430 L066 L066-Khizarsrai Road New Cold Mix 0.958 3.750 Complete 1 25.83 17.22 43.05 3.77 (1 , 0 , 0 , 0 , 1) T03 To Bela (ODR66) Technology 431 L084 L084-Chandpura L026 To New -- 1.855 3.750 Complete 4 53.08 35.39 88.47 6.80 (0 , 0 , 2 , 0 , 2) Nawada Bigha (ODR84) 432 L028 L028-Jethiyan Ghati New -- 0.665 3.750 Complete 1 9.19 6.13 15.32 1.53 (0 , 0 , 2 , 2 , 4) Jamuawan Rd.-T01 To Hanuman Bigha (ODR28)

Page 44 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

433 L080 L080-Kajoor Road L051 To New -- 1.830 3.750 Complete 3 51.52 34.34 85.86 6.44 (0 , 1 , 0 , 0 , 1) Gehuni (ODR80) 434 L082 L082-Jethiyan Ghati New Cold Mix 0.757 3.750 Complete 2 22.73 15.16 37.89 3.58 (0 , 1 , 0 , 0 , 1) Jamuawan Rd. - T01 To Technology Dharam Bigha (ODR82) 435 L078 L078-Tapowan Wazirganj New -- 1.317 3.750 Complete 2 32.91 21.94 54.85 4.77 (0 , 2 , 1 , 0 , 3) Road T02 To Tikra Chak (ODR78) 436 L088 L088-Bhindus Charandih T04 New -- 5.806 3.750 Complete 12 148.17 98.78 246.95 21.18 (1 , 1 , 1 , 0 , 3) To Koriyachak More (VR88) 437 L090 L090-Bhindas-charandi road New -- 1.045 3.750 Complete 2 25.85 17.23 43.08 3.67 (0 , 1 , 0 , 0 , 1) To Nima (VR90) 438 L053 L053-Tapowan Wazirganj New -- 1.026 3.750 Complete 1 25.25 16.83 42.08 3.41 (0 , 0 , 1 , 0 , 1) Road T02 To Padmaul (ODR53) 439 L091 L091-Cheya-pakri Road L0- New -- 1.188 3.750 Complete 3 51.38 34.25 85.63 4.31 (0 , 0 , 1 , 0 , 1) 27ToNabail (VR91) Block Mohra Total 21.933 42 607.26 404.83 1,012.09 80.18 (2 , 9 , 10 , 3 , 24) Block- Nagar

440 L063 L063-Kathotiya More to New -- 1.706 3.750 Complete 2 33.31 22.21 55.52 5.76 (0 , 1 , 2 , 0 , 3) Kathihari Ghal (VR63) 441 L051 L051-Gaya Tekari Road T08 New -- 1.848 3.750 Complete 4 36.60 24.40 61.00 6.92 (0 , 1 , 3 , 0 , 4) To Deguna (VR51) 442 L068 L068-chakand mandol road New -- 2.872 3.750 Complete 5 60.67 40.45 101.12 10.16 (0 , 0 , 1 , 0 , 1) to simariya (VR68) 443 L044 L044-Gaya Tekari ROAD To New Cold Mix 1.066 3.750 Complete 2 29.21 19.47 48.68 4.33 (1 , 0 , 0 , 0 , 1) Jagannarthpur (VR44) Technology 444 L071 L071-Gaya Pretsela to New Cold Mix 0.910 3.750 Complete 2 25.18 16.79 41.97 3.69 (1 , 0 , 0 , 0 , 1) Korman (VR71) Technology 445 L061 L061-Gaya Sherghati Road New -- 1.352 3.750 Complete 4 29.62 19.74 49.36 4.94 (0 , 0 , 1 , 0 , 1) to Rehua (VR61)

Page 45 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

446 L032 L032-Gaya Sherghati Road New -- 0.891 3.750 Complete 2 19.94 13.30 33.24 3.05 (1 , 0 , 0 , 0 , 1) TO5 To Gulni (VR32) 447 L069 L069-Bazarahi to karma New -- 1.559 3.750 Complete 3 33.43 22.29 55.72 5.47 (0 , 0 , 1 , 0 , 1) tikar (VR69) 448 L064 L064-Gaya Dobhi Road To New -- 1.595 3.750 Complete 3 40.95 27.30 68.25 4.98 (0 , 0 , 1 , 0 , 1) Belahi (VR64) 449 L065 L065-Gaya Tekari Road to New -- 0.757 3.750 Complete 2 18.73 12.49 31.22 2.59 (0 , 0 , 1 , 0 , 1) Gewal Bigha (VR65) 450 L066 L066-Chatraghat Madarsh to New -- 0.971 3.750 Complete 3 25.38 16.92 42.30 3.55 (1 , 1 , 0 , 0 , 2) S.C. Tola Chattarghat (VR66) 451 L080 L080-Shohan Bigha Gutiya New -- 1.943 3.750 Complete 4 45.08 30.05 75.13 6.63 (0 , 0 , 2 , 0 , 2) Road To Paharpur (TRACK80) Block Nagar Total 17.470 36 398.10 265.41 663.51 62.08 (4 , 3 , 12 , 0 , 19) Block- Paraiya

452 L031 L031-Gaya Rafiganj Road to New -- 3.734 3.750 Complete 7 98.25 65.50 163.75 12.97 (2 , 0 , 0 , 0 , 2) Boknari (VR31) 453 L082 L082-L064 to Kurmain New -- 1.044 3.750 Complete 1 26.86 17.91 44.77 3.49 (0 , 1 , 0 , 0 , 1) (VR82) 454 L052 L052-Gaya Rafiganj New -- 1.190 3.750 Complete 2 29.39 19.59 48.98 4.33 (0 , 1 , 0 , 0 , 1) Maharajganj Road to Biso (VR52) 455 L100 L100-L064 to Utarwari Tola New -- 3.171 3.750 Complete 7 83.86 55.91 139.77 11.50 (0 , 0 , 1 , 0 , 1) to Khiri Lakshan Bigha (VR100) 456 L102 L102-L065 to Neuriya New -- 0.900 3.750 Complete 2 23.49 15.66 39.15 3.16 (0 , 0 , 1 , 0 , 1) (VR102) 457 L103 L103-L066 to Bagahi (VR103) New Cold Mix 2.302 3.750 Complete 4 73.37 48.91 122.28 10.06 (1 , 0 , 0 , 0 , 1) Technology 458 L073 L073-Kasthua to Phurhariya New -- 0.750 3.750 Complete 3 24.43 16.29 40.72 2.78 (0 , 1 , 0 , 0 , 1) (VR73) Block Paraiya Total 13.091 26 359.65 239.77 599.42 48.29 (3 , 3 , 2 , 0 , 8)

Page 46 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Tankuppa

459 L046 L046-Ginjoe Road to New -- 2.021 3.750 Complete 6 51.67 34.45 86.12 7.13 (0 , 1 , 0 , 1 , 2) Deochand Pipra (VR46) 460 L025 L025-Ginjoe Road to New Cold Mix 1.346 3.750 Complete 4 38.83 25.89 64.72 6.01 (1 , 0 , 0 , 0 , 1) Kathadih (VR25) Technology 461 L050 L050-Gaya Fatehpur Road to New -- 0.883 3.750 Complete 2 22.42 14.95 37.37 2.80 (0 , 0 , 1 , 1 , 2) Bankichak (VR50) 462 L056 L056-Gaya Fatehpur Road to New -- 1.384 3.750 Complete 2 28.33 18.89 47.22 4.78 (0 , 1 , 0 , 0 , 1) Bahera (VR56) 463 L062 L062-Chowar Road To New -- 1.193 3.750 Complete 2 30.63 20.42 51.05 4.19 (0 , 1 , 0 , 0 , 1) Sarkanda (VR62) 464 L085 L085-Gaya- Fatehpur Roa to New -- 1.114 3.750 Complete 2 23.84 15.89 39.73 3.92 (0 , 1 , 0 , 1 , 2) Mahabigha (TRACK85) Block Tankuppa Total 7.941 18 195.72 130.49 326.21 28.83 (1 , 4 , 1 , 3 , 9)

Block- Tekari

465 L036 L036-Rakasiya Noni Road, New -- 0.968 3.750 Complete 2 34.99 23.33 58.32 3.34 (1 , 0 , 0 , 0 , 1) L023 to Sikaria (VR36) 466 L096 L096-BARSIMHA BAZAR TO New -- 2.603 3.750 Complete 6 86.18 57.45 143.63 9.28 (0 , 0 , 1 , 0 , 1) BALO PUR (TRACK96) 467 L028 L028-Rakasiya Noni Road, New -- 1.164 3.750 Complete 3 33.69 22.46 56.15 4.15 (0 , 1 , 0 , 0 , 1) L023 to Chhora Bazipur (VR28) 468 L043 L043-Tikari Bhawanpur Road New -- 1.393 3.750 Complete 2 40.79 27.19 67.98 4.94 (0 , 1 , 1 , 0 , 2) to Panchmahala (VR43) 469 L050 L050-Tikari Koach Road, T07 New -- 1.205 3.750 Complete 2 29.08 19.39 48.47 4.27 (0 , 1 , 0 , 0 , 1) to Iguna (VR50) 470 L057 L057-Paluhar, L057 to New -- 1.152 3.750 Complete 2 31.82 21.21 53.03 4.17 (0 , 0 , 1 , 1 , 2) Bhirpar (VR57) 471 L071 L071-Tetarpur Khanetu New Cold Mix 1.503 3.750 Complete 3 64.21 42.81 107.02 5.39 (1 , 1 , 1 , 0 , 3) Road, L070 to Pararia (VR71) Technology 472 L089 L089-TIKARI COACH PATH TO New -- 1.354 3.750 Complete 2 37.16 24.77 61.93 4.00 (0 , 0 , 1 , 0 , 1) PANDEY BIGHA (TRACK89)

Page 47 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

473 L090 L090-PANCHANPUR COACH New -- 1.396 3.750 Complete 4 38.70 25.80 64.50 5.30 (0 , 0 , 1 , 0 , 1) PATH TO HARARAHI (TRACK90) 474 L091 L091-TEKARI BELAPATH TO New -- 1.168 3.750 Complete 2 38.83 25.89 64.72 2.85 (0 , 0 , 1 , 0 , 1) HARIZAN TOLA (TRACK91) 475 L092 L092-TEKARI BELAPATH TO New -- 2.319 3.750 Complete 4 69.57 46.38 115.95 8.08 (0 , 0 , 1 , 0 , 1) BADLU BIGHA (TRACK92) 476 L100 L100-RAKASIYA NONI PATH New -- 1.142 3.750 Complete 3 43.91 29.27 73.18 3.07 (0 , 0 , 1 , 0 , 1) TO NAUA BIGHA (TRACK100) 477 L136 L136-Tekari Bhawanpur Path New -- 2.250 3.750 Complete 5 59.43 39.62 99.05 8.16 (0 , 0 , 1 , 0 , 1) Sowal to Laxmipur Bishunpur (TRACK136) 478 L154 L154-Harna to Harna New -- 0.836 3.750 Complete 2 21.64 14.43 36.07 2.98 (0 , 0 , 1 , 0 , 1) Mathiya (TRACK154) 479 L155 L155-Tekari Mahmanna to New -- 0.913 3.750 Complete 2 28.17 18.78 46.95 3.16 (0 , 0 , 1 , 0 , 1) Usri (TRACK155) 480 L025 L025-Tekari Rupaspur Road, New Cold Mix 2.310 3.750 Complete 5 98.70 65.80 164.50 9.80 (2 , 1 , 0 , 0 , 3) L082 to Thanapur (VR25) Technology 481 L033 L033-Bhori, L035 to New -- 1.062 3.750 Complete 2 27.08 18.05 45.13 3.67 (0 , 1 , 0 , 0 , 1) Bholimath (VR33) 482 L044 L044-T05 to Lodipur (VR44) New -- 2.191 3.750 Complete 4 57.67 38.45 96.12 7.63 (0 , 0 , 1 , 1 , 2)

483 L045 L045-Tekari Coach Road to New Cold Mix 2.364 3.750 Complete 4 75.52 50.35 125.87 9.88 (0 , 0 , 1 , 0 , 1) Murarbigha (VR45) Technology 484 L053 L053-Tekari Sadipur Road New -- 1.477 3.750 Complete 3 38.13 25.42 63.55 5.41 (0 , 1 , 1 , 2 , 4) L084 to Kapya (VR53) 485 L063 L063-Tikari Kurtha Road, New -- 2.389 3.750 Complete 4 57.19 38.13 95.32 7.65 (0 , 0 , 1 , 1 , 2) T05 to Barhtarwan 486 L093 L093-TEKARI BELAPATH TO New -- 2.896 3.750 Complete 6 82.01 54.67 136.68 10.61 (0 , 0 , 1 , 0 , 1) BINOWA NAGAR, HARIJAN TOLA (TRACK93) 487 L146 L146-Chaita Middle School New Cold Mix 0.725 3.750 Complete 1 22.87 15.24 38.11 2.87 (0 , 0 , 1 , 0 , 1) to Lachhman Bigha Bhui Toli Technology (TRACK146)

Page 48 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

488 L072 L072-Tikari Bhawanpur New -- 1.050 3.750 Complete 2 30.97 20.65 51.62 3.71 (0 , 1 , 0 , 0 , 1) Road, T02 to Alarpur Bishunpur (VR72) Block Tekari Total 37.830 75 1,148.31 765.54 1,913.85 134.33 (4 , 8 , 18 , 5 , 35) Block- Wazirganj

489 L095 L095-L021 Amethi road to New -- 0.531 3.750 Complete 1 11.65 7.77 19.42 1.67 (0 , 0 , 2 , 0 , 2) uman bigha (VR95) 490 L090 L090-T03Gaya Nawada Road New -- 0.601 3.750 Complete 2 17.39 11.59 28.98 1.62 (1 , 0 , 0 , 0 , 1) To Jamuyanwa M Tola (VR90) 491 L141 L141-Tilora road to New -- 1.263 3.750 Complete 3 29.40 19.60 49.00 4.38 (0 , 2 , 0 , 0 , 2) Makhdumpur (TRACK141) 492 L118 L118-L027 Mannani Road to New -- 1.130 3.750 Complete 4 33.61 22.41 56.02 4.18 (0 , 0 , 1 , 2 , 3) Bakhra (VR118) 493 L124 L124-Birne Road to Bajaul New -- 0.949 3.750 Complete 4 23.57 15.72 39.29 3.63 (0 , 0 , 2 , 0 , 2) (VR124) 494 L140 L140-T02 Fatehpur Road to New -- 0.649 3.750 Complete 2 15.23 10.15 25.38 2.26 (0 , 1 , 0 , 0 , 1) Tipau Bighapar (TRACK140) 495 L109 L109-T02 Fatehpur Road To New -- 0.653 3.750 Complete 2 20.31 13.54 33.85 2.17 (0 , 0 , 1 , 1 , 2) Ushari (VR109) 496 L083 L083-Budhaul to Chanda New Cold Mix 1.245 3.750 Complete 3 34.23 22.82 57.05 5.24 (0 , 0 , 1 , 0 , 1) Buzurg (VR83) Technology 497 L081 L081-Bhindus-Charandih New -- 0.978 3.750 Complete 2 22.36 14.91 37.27 3.39 (0 , 0 , 1 , 0 , 1) Road to Paharpur (VR81) 498 L121 L121-Malathiya Road to New -- 0.650 3.750 Complete 2 15.57 10.38 25.95 2.25 (0 , 0 , 1 , 0 , 1) Dewachak (VR121) 499 L142 L142-Gaya Nawada Road To New -- 0.900 3.750 Complete 2 24.28 16.19 40.47 3.47 (0 , 1 , 0 , 0 , 1) Kewala Dharma (TRACK142) Block Wazirganj Total 9.549 27 247.60 165.08 412.68 34.27 (1 , 4 , 9 , 3 , 17)

Page 49 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District Gaya Total 311.574 638 8,617.98 5,745.35 14,363.33 1,149.84 (44 , 107 , 143 , 45 , 339) District- Gopalganj

Block- Bhore

500 L041 L041-Kalyanpur to Nadwan New CELL Filled 5.720 3.750 Complete 9 170.55 113.75 284.30 12.50 (0 , 1 , 0 , 0 , 1) (VR21) Concrete
Waste Plastics 501 L049 L049-Husepur Jagtauli Road New CELL Filled 4.970 3.750 Complete 8 145.90 97.31 243.21 11.27 (0 , 1 , 0 , 0 , 1) to Bhagwanpur (VR29) Concrete
Waste Plastics Block Bhore Total 10.690 17 316.45 211.06 527.51 23.77 (0 , 2 , 0 , 0 , 2)

Block- Hathwa

502 L054 L054-ManiChhapar New Waste Plastics 1.250 3.750 Complete 4 34.70 23.18 57.88 3.53 (0 , 1 , 0 , 0 , 1) Panchayat Bhawan To Ahirauli (VR47) Block Hathwa Total 1.250 4 34.70 23.18 57.88 3.53 (0 , 1 , 0 , 0 , 1)

Block-

503 L040 L040-T05 Banshi Batraha to New CELL Filled 2.000 3.750 Complete 5 59.18 39.51 98.69 4.43 (0 , 1 , 0 , 0 , 1) Sahochak (VR27) Concrete
Waste Plastics 504 L067 L067-Bich Tola to Sahu Chak New Waste Plastics 2.010 3.750 Complete 3 57.64 38.47 96.11 5.49 (0 , 1 , 0 , 0 , 1) (VR70) Block Phulwaria Total 4.010 8 116.82 77.98 194.80 9.92 (0 , 2 , 0 , 0 , 2)

Page 50 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Vijaypur

505 L024 L024-Kutha T03 to Itwa New CELL Filled 8.200 3.750 Complete 25 281.29 187.58 468.87 19.18 (0 , 2 , 0 , 0 , 2) (VR8) Concrete
Waste Plastics Block Vijaypur Total 8.200 25 281.29 187.58 468.87 19.18 (0 , 2 , 0 , 0 , 2)

District Gopalganj Total 24.150 54 749.26 499.80 1,249.06 56.40 (0 , 7 , 0 , 0 , 7)

District- Jahanabad

Block- Hulashganj

506 L082 L082-NANDANA TO DUMARI New -- 0.593 3.750 Complete 1 17.74 11.83 29.57 2.37 (0 , 1 , 0 , 0 , 1) (TRACK49) 507 L091 L091-NAHAR TO LAT New Cold Mix 1.065 3.750 Complete 1 30.64 20.42 51.06 4.34 (0 , 1 , 0 , 0 , 1) (TRACK58) Technology 508 L100 L100-ALAMCHAK TO SAIDPUR New -- 0.512 3.750 Complete 3 17.80 11.87 29.67 2.70 (0 , 0 , 1 , 0 , 1) (TRACK67) Block Hulashganj Total 2.170 5 66.18 44.12 110.30 9.40 (0 , 2 , 1 , 0 , 3)

Block- Jahanabad

509 L044 L044-TO 5 TO IMADPUR New -- 0.925 3.750 Complete 2 23.52 15.68 39.20 3.09 (0 , 0 , 1 , 0 , 1) (TRACK38) 510 L076 L076-Babhana Shakurabad New -- 0.925 3.750 Complete 3 24.72 16.48 41.20 3.72 (0 , 0 , 1 , 0 , 1) Path to Beldari Bigha (TRACK83) 511 T02 T02-T0 5 TO BAJITPUR New -- 2.123 3.750 Complete 1 53.65 35.77 89.42 7.43 (1 , 0 , 3 , 3 , 7) (TRACK36) Block Jahanabad Total 3.973 6 101.89 67.93 169.82 14.24 (1 , 0 , 5 , 3 , 9)

Page 51 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Kako

512 L023 L023-DAMUHA ROAD TO New -- 0.644 3.750 Complete 3 20.87 13.91 34.78 2.43 (0 , 1 , 0 , 0 , 1) BHATTAN BIGHA (TRACK17) 513 L031 L031-BARAWAN ROAD TO New -- 2.140 3.750 Complete 5 60.49 40.33 100.82 9.14 (0 , 1 , 1 , 0 , 2) NARAWAN (TRACK6) 514 L045 L045-MURASA TO GUHIBIGHA New Cold Mix 1.424 3.750 Complete 5 42.89 28.59 71.48 5.69 (0 , 0 , 1 , 0 , 1) (TRACK15) Technology 515 L098 L098-Lodipur to New -- 1.860 3.750 Complete 4 43.94 29.30 73.24 5.78 (0 , 0 , 1 , 0 , 1) Makhdumpur-ahra (TRACK80) 516 L028 L028-BARAWAN ROAD TO New Cold Mix 1.303 3.750 Complete 3 38.21 25.47 63.68 4.59 (0 , 0 , 1 , 0 , 1) PARKOTHIYA (TRACK3) Technology Block Kako Total 7.371 20 206.40 137.60 344.00 27.62 (0 , 2 , 4 , 0 , 6)

Block- Makhdumpur

517 L062 L062-DANUBIGHA TO New Cold Mix 0.704 3.750 Complete 2 19.04 12.69 31.73 2.49 (0 , 0 , 1 , 0 , 1) CHAMOBIGHA (TRACK53) Technology 518 L119 L119-HADAIL MOD TO New -- 1.080 3.750 Complete 2 34.90 23.27 58.17 3.41 (1 , 0 , 0 , 0 , 1) HADAIL (TRACK110) 519 L069 L069-MATOR KANAULIROAD New -- 1.844 3.750 Complete 4 54.53 36.35 90.88 7.42 (0 , 1 , 0 , 1 , 2) TO PARADHI Block Makhdumpur Total 3.628 8 108.47 72.31 180.78 13.32 (1 , 1 , 1 , 1 , 4)

Block- Modanganj

520 L021 L021-T01 TO JAGDARI New -- 2.255 3.750 Complete 4 73.59 49.06 122.65 9.14 (0 , 0 , 1 , 2 , 3) (TRACK3) Block Modanganj Total 2.255 4 73.59 49.06 122.65 9.14 (0 , 0 , 1 , 2 , 3)

District Jahanabad Total 19.397 43 556.53 371.02 927.55 73.72 (2 , 5 , 12 , 6 , 25) District- Jamui

Page 52 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Chakai

521 L094 L094-Near Garai To Hendla New CELL Filled 3.700 3.750 Complete 4 94.51 63.01 157.52 13.51 (0 , 0 , 1 , 2 , 3) (TRACK72) Concrete 522 L093 L093-Near Garai To New CELL Filled 4.400 3.750 Complete 3 147.96 98.64 246.60 15.76 (0 , 0 , 1 , 4 , 5) Simradhab (TRACK71) Concrete 523 L171 L171-Madhopur Lahaban New CELL Filled 1.200 3.750 Complete 2 34.14 22.76 56.90 5.15 (0 , 0 , 2 , 0 , 2) Road to Ghutyani Concrete Temple (TRACK171) 524 L181 L181-Saron baxila Road to New CELL Filled 1.237 3.750 Complete 3 36.35 24.23 60.58 5.30 (0 , 0 , 2 , 1 , 3) Pipra (TRACK181) Concrete
Nano Technology 525 L178 L178-Bone Road Satsala to New CELL Filled 2.759 3.750 Complete 4 83.83 55.88 139.71 10.83 (0 , 0 , 2 , 5 , 7) Nagri (TRACK178) Concrete
Nano Technology 526 L186 L186-Domohan to New CELL Filled 2.670 3.750 Complete 4 80.88 53.92 134.80 10.22 (0 , 0 , 1 , 8 , 9) Majhalakola (TRACK186) Concrete
Nano Technology 527 L179 L179-Ropai to Nodhia New CELL Filled 2.670 3.750 Complete 2 66.62 44.42 111.04 12.82 (0 , 0 , 1 , 0 , 1) (TRACK179) Concrete 528 T05 T05-Pojha To Patharia New CELL Filled 35.715 3.750 Complete 106 1,119.95 746.63 1,866.58 123.88 (0 , 1 , 3 , 38 , (TRACK6) Concrete 42) Block Chakai Total 54.351 128 1,664.24 1,109.49 2,773.73 197.47 (0 , 1 , 13 , 58 , 72) Block- Laxmipur

529 L092 L092-Jamui Kharagpur PWD New CELL Filled 1.500 3.750 Complete 3 42.55 28.37 70.92 5.26 (0 , 0 , 1 , 0 , 1) road L062 to Gobardaha Concrete (TRACK92) Block Laxmipur Total 1.500 3 42.55 28.37 70.92 5.26 (0 , 0 , 1 , 0 , 1)

District Jamui Total 55.851 131 1,706.79 1,137.86 2,844.65 202.73 (0 , 1 , 14 , 58 , 73)

Page 53 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District- Kaimur (Bhabhua)

Block- Bhabhua

530 L116 L116-T03 to kawai mahto New CELL Filled 0.700 3.750 Complete 2 24.19 16.13 40.32 3.63 (0 , 0 , 2 , 0 , 2) tola (VR110) Concrete
Waste Plastics 531 L093 L093-Betri Manihari to New CELL Filled 1.000 3.750 Complete 1 29.96 19.97 49.93 4.49 (0 , 1 , 0 , 1 , 2) Damodarpur (VR87) Concrete
Waste Plastics 532 L097 L097-Bhabhua mohania Rd New CELL Filled 3.500 3.750 Complete 6 107.33 71.55 178.88 16.10 (0 , 0 , 2 , 0 , 2) T01 to Ujari sikti dhobi tola Concrete (VR91)
Waste Plastics 533 L110 L110-T07 to mahua bari New CELL Filled 1.200 3.750 Complete 1 36.13 24.09 60.22 5.42 (0 , 0 , 1 , 0 , 1) bind tola (VR104) Concrete
Waste Plastics 534 L102 L102-T08 to mahesua New CELL Filled 1.700 3.750 Complete 3 54.26 36.17 90.43 8.14 (0 , 0 , 1 , 0 , 1) harijan tola (VR96) Concrete
Waste Plastics 535 L124 L124-L069 to khanaw Uttar New Waste Plastics 1.700 3.750 Complete 3 54.68 36.45 91.13 8.20 (0 , 1 , 0 , 0 , 1) Tola (VR118) 536 L104 L104-L092 to sarewa miya New CELL Filled 0.800 3.750 Complete 1 26.48 17.66 44.14 3.97 (0 , 1 , 0 , 0 , 1) tola (VR98) Concrete
Waste Plastics 537 L095 L095-Bhabhua mohania Rd New CELL Filled 1.500 3.750 Complete 3 49.56 33.04 82.60 7.43 (0 , 1 , 0 , 0 , 1) to Akhalashpur Marac tola Concrete (VR89)
Waste Plastics

Page 54 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

538 L134 L134-Betri Kohari to Kurasan New CELL Filled 1.500 3.750 Complete 2 45.63 30.42 76.05 6.84 (0 , 1 , 0 , 0 , 1) Harijan tola (VR128) Concrete
Waste Plastics 539 L115 L115-T03 to akorhi (VR109) New CELL Filled 0.700 3.750 Complete 1 22.55 15.03 37.58 3.38 (0 , 1 , 0 , 0 , 1) Concrete
Waste Plastics 540 L117 L117-T02 to sonhan miya New CELL Filled 0.950 3.750 Complete 2 30.47 20.32 50.79 4.57 (0 , 1 , 0 , 0 , 1) tola (VR111) Concrete
Waste Plastics 541 L106 L106-L050 to shivpur harijan New CELL Filled 5.850 3.750 Complete 7 172.33 114.88 287.21 25.85 (0 , 1 , 0 , 0 , 1) tola (VR100) Concrete
Waste Plastics 542 L108 L108-L058 to asrarhi Harijan New CELL Filled 2.400 3.750 Complete 3 73.62 49.08 122.70 11.04 (1 , 0 , 0 , 0 , 1) Tola (VR102) Concrete
Waste Plastics 543 L123 L123-T09 to Manihari New CELL Filled 1.200 3.750 Complete 2 43.68 29.12 72.80 6.55 (0 , 0 , 1 , 0 , 1) Harijan Tola (VR117) Concrete
Waste Plastics 544 L101 L101-L048 toHarla harijan New CELL Filled 0.700 3.750 Complete 2 24.34 16.22 40.56 3.65 (0 , 0 , 1 , 0 , 1) tola (VR95) Concrete
Waste Plastics 545 L100 L100-Bhabhua bhagwanpur New CELL Filled 3.400 3.750 Complete 6 113.85 75.90 189.75 17.08 (0 , 0 , 1 , 0 , 1) RdT05 to dumdum harijan Concrete tola (VR94)
Waste Plastics 546 L114 L114-T01 t0 sikati harijan New CELL Filled 3.000 3.750 Complete 6 100.76 67.17 167.93 15.11 (0 , 0 , 1 , 0 , 1) tola (VR108) Concrete
Waste Plastics

Page 55 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

547 L125 L125-Bhabhua T070 New CELL Filled 0.800 3.750 Complete 2 28.00 18.67 46.67 4.20 (0 , 0 , 1 , 0 , 1) to kung Miya tola (VR119) Concrete
Waste Plastics 548 L098 L098-Betri manihari RdT08 New CELL Filled 0.700 3.750 Complete 1 24.27 16.18 40.45 3.64 (0 , 0 , 1 , 0 , 1) to betri bind tola (VR92) Concrete
Waste Plastics 549 L107 L107-L048 to mahuat New CELL Filled 1.200 3.750 Complete 2 39.52 26.35 65.87 5.93 (0 , 0 , 1 , 0 , 1) harijan tola (VR101) Concrete
Waste Plastics 550 L126 L126-T07 TO Goraipur Uttar New CELL Filled 0.800 3.750 Complete 1 26.92 17.95 44.87 4.04 (0 , 0 , 1 , 0 , 1) tola (VR120) Concrete
Waste Plastics 551 L119 L119-L023 to Machiawn New CELL Filled 0.850 3.750 Complete 1 27.71 18.48 46.19 4.16 (0 , 0 , 1 , 0 , 1) Mushar tola (VR113) Concrete
Waste Plastics 552 L096 L096-Bhabhua Betri RdT06 New CELL Filled 0.700 3.750 Complete 1 23.01 15.34 38.35 3.45 (0 , 0 , 1 , 0 , 1) to Akhlashpur new basti - Concrete Koeri Tola (VR90)
Waste Plastics 553 L120 L120-T06 to Dharhania New CELL Filled 1.000 3.750 Complete 1 31.54 21.03 52.57 4.73 (0 , 0 , 1 , 0 , 1) Harijan Tola (VR114) Concrete
Waste Plastics 554 L129 L129-Ratwar Jigni to Ruppur New CELL Filled 0.900 3.750 Complete 1 29.48 19.66 49.14 4.42 (0 , 0 , 1 , 0 , 1) harijan Tola (VR123) Concrete
Waste Plastics 555 L105 L105-T08 to upharwalia New CELL Filled 0.750 3.750 Complete 2 25.84 17.23 43.07 3.88 (0 , 0 , 1 , 0 , 1) (VR99) Concrete
Waste Plastics

Page 56 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

556 L113 L113-T06 to bhekash harijan New CELL Filled 3.000 3.750 Complete 3 88.41 58.94 147.35 13.26 (0 , 0 , 1 , 0 , 1) tola (VR107) Concrete
Waste Plastics 557 L099 L099-L023 to machiawan New CELL Filled 1.400 3.750 Complete 2 45.38 30.26 75.64 6.81 (0 , 0 , 1 , 0 , 1) miya tola (VR93) Concrete
Waste Plastics 558 L111 L111-T07 to Ruiya harijan New CELL Filled 1.200 3.750 Complete 1 38.68 25.79 64.47 5.80 (0 , 0 , 1 , 0 , 1) tola (VR105) Concrete 559 L109 L109-L0r24 to dalipur New CELL Filled 2.250 3.750 Complete 3 72.95 48.64 121.59 10.94 (0 , 0 , 1 , 0 , 1) (VR103) Concrete
Waste Plastics 560 L022 L022-bhabhua Mohania Road New CELL Filled 1.500 3.750 Complete 3 47.37 31.58 78.95 7.11 (0 , 0 , 1 , 2 , 3) T01 to Kishunpura (VR12) Concrete
Waste Plastics 561 L083 L083-Rudrawar Bhabhua New CELL Filled 1.600 3.750 Complete 2 51.78 34.52 86.30 7.77 (0 , 1 , 0 , 1 , 2) Road T04 toAwarahi (VR73) Concrete
Waste Plastics Block Bhabhua Total 50.450 77 1,610.68 1,073.82 2,684.50 241.59 (1 , 9 , 24 , 4 , 38) Block- Bhagwanpur

562 L041 L041-T04 Basatpur to New CELL Filled 2.200 3.750 Complete 1 67.76 45.17 112.93 10.16 (0 , 1 , 1 , 0 , 2) Urgawn (VR5) Concrete
Waste Plastics 563 L046 L046-L037 to Chuan (VR23) New Waste Plastics 1.150 3.750 Complete 2 37.10 24.74 61.84 5.57 (0 , 1 , 0 , 0 , 1)

564 L047 L047-T03 to Ghosa (VR26) New CELL Filled 1.300 3.750 Complete 2 41.19 27.46 68.65 6.18 (0 , 1 , 0 , 0 , 1) Concrete
Waste Plastics

Page 57 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

565 L049 L049-L023 Pihra to Katkara New CELL Filled 2.750 3.750 Complete 4 86.76 57.84 144.60 13.01 (0 , 1 , 0 , 0 , 1) (VR27) Concrete
Waste Plastics 566 L048 L048-L037 to Makarikoh New CELL Filled 2.800 3.750 Complete 3 85.94 57.29 143.23 12.89 (0 , 0 , 2 , 1 , 3) Parloia (VR22) Concrete
Waste Plastics 567 L044 L044-T03 to Padmadehri New CELL Filled 1.000 3.750 Complete 1 31.26 20.84 52.10 4.69 (0 , 0 , 1 , 0 , 1) (VR20) Concrete
Waste Plastics 568 L043 L043-T03 to Kaser Mahto New CELL Filled 1.200 3.750 Complete 1 37.90 25.27 63.17 5.69 (0 , 0 , 1 , 0 , 1) tola (VR11) Concrete
Waste Plastics 569 L042 L042-T05 to Babhani (VR7) New CELL Filled 5.400 3.750 Complete 7 164.08 109.38 273.46 24.61 (0 , 0 , 1 , 0 , 1) Concrete
Waste Plastics 570 L045 L045-L032 to Nadula (VR21) New CELL Filled 1.250 3.750 Complete 2 41.23 27.48 68.71 6.18 (0 , 0 , 2 , 0 , 2) Concrete
Waste Plastics Block Bhagwanpur Total 19.050 23 593.22 395.47 988.69 88.98 (0 , 4 , 8 , 1 , 13) Block- Chainpur

571 L055 L055-T04 to Bari Takiya New CELL Filled 0.700 3.750 Complete 1 22.46 14.98 37.44 3.37 (0 , 1 , 0 , 0 , 1) (TRACK50) Concrete
Waste Plastics 572 L086 L086-KARJAWN TO New CELL Filled 2.750 3.750 Complete 2 89.64 59.76 149.40 13.45 (1 , 0 , 0 , 0 , 1) PHAKARABAD (VR86) Concrete
Waste Plastics

Page 58 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

573 T02 T02-Hazara to Nauratta New Waste Plastics 12.100 3.750 Complete 6 356.93 237.95 594.88 53.54 (0 , 1 , 2 , 1 , 4) (VR2) 574 L091 L091-JIGNA RAJNAGAR New Waste Plastics 7.000 3.750 Complete 0 193.72 129.14 322.86 29.06 (0 , 1 , 0 , 1 , 2) BANDH TO Satwana (VR91) 575 L099 L099-T02 Chouck TO DARWA New CELL Filled 1.200 3.750 Complete 1 37.88 25.25 63.13 5.68 (0 , 1 , 1 , 1 , 3) 1 (VR71) Concrete
Waste Plastics 576 L070 L070-Naudih T07 To New CELL Filled 3.800 3.750 Complete 5 123.43 82.28 205.71 18.51 (0 , 1 , 2 , 1 , 4) Mohammadpur (VR98) Concrete
Waste Plastics 577 L097 L097-L031 Chouck TO New CELL Filled 0.700 3.750 Complete 1 23.06 15.38 38.44 3.46 (1 , 0 , 2 , 1 , 4) NARSINGHPUR-2 (VR75) Concrete
Waste Plastics 578 L090 L090-HAJRAPUL TO SIRSI New CELL Filled 4.030 3.750 Complete 4 121.19 80.79 201.98 18.18 (0 , 0 , 3 , 2 , 5) RAJNAGAR CENAL (VR90) Concrete
Waste Plastics 579 L102 L102-T02 Chouck TO MADRA New CELL Filled 1.200 3.750 Complete 2 35.31 23.54 58.85 5.30 (0 , 0 , 1 , 0 , 1) (VR78) Concrete
Waste Plastics 580 L092 L092-T07 Chouck to New CELL Filled 1.200 3.750 Complete 1 36.82 24.55 61.37 5.52 (0 , 0 , 1 , 0 , 1) Village (VR66) Concrete
Waste Plastics 581 L080 L080-T02 Chouck TO DEUWA New CELL Filled 1.000 3.750 Complete 1 31.67 21.11 52.78 4.75 (0 , 0 , 1 , 0 , 1) (VR80) Concrete
Waste Plastics 582 L101 L101-T02 Chouck TO New Waste Plastics 1.350 3.750 Complete 1 38.07 25.38 63.45 5.71 (0 , 0 , 1 , 0 , 1) KHARGIPUR (VR87)

Page 59 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

583 L069 L069-Karji T01 to Babhanion New CELL Filled 1.800 3.750 Complete 1 56.86 37.90 94.76 8.53 (0 , 1 , 0 , 0 , 1) (VR99) Concrete
Waste Plastics 584 L021 L021-Bhabhua Chand PWD New CELL Filled 1.100 3.750 Complete 1 33.25 22.16 55.41 4.99 (0 , 0 , 1 , 0 , 1) road T04 to Damodarpur Concrete (VR21)
Waste Plastics 585 L030 L030-T04 to Biran (VR20) New CELL Filled 1.900 3.750 Complete 2 61.72 41.14 102.86 9.26 (0 , 2 , 3 , 2 , 7) Concrete
Waste Plastics 586 L076 L076-T02 MoreTO New CELL Filled 1.100 3.750 Complete 0 34.66 23.11 57.77 5.20 (0 , 1 , 0 , 0 , 1) GANGAPUR (VR76) Concrete
Waste Plastics Block Chainpur Total 42.930 29 1,296.67 864.42 2,161.09 194.51 (2 , 9 , 18 , 9 , 38) Block- Chand

587 L063 L063-T04 to Paraicha New CELL Filled 1.300 3.750 Complete 1 42.29 28.20 70.49 6.34 (0 , 1 , 2 , 1 , 4) (VR42) Concrete
Waste Plastics 588 L030 L030-L029 to Birbhanpur New CELL Filled 1.800 3.750 Complete 2 54.71 36.48 91.19 8.21 (0 , 1 , 0 , 4 , 5) Yadaw Tola (VR18) Concrete
Waste Plastics 589 L067 L067-L055 To karwadiya New CELL Filled 5.700 3.750 Complete 7 170.75 113.83 284.58 25.61 (1 , 2 , 1 , 3 , 7) Muslim Tola (VR46) Concrete
Waste Plastics 590 L072 L072-Paura To Keshri (VR51) New CELL Filled 3.000 3.750 Complete 2 89.38 59.58 148.96 13.41 (0 , 0 , 1 , 1 , 2) Concrete
Waste Plastics

Page 60 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

591 L076 L076-T04 to Digdi (VR55) New CELL Filled 2.100 3.750 Complete 2 63.96 42.64 106.60 9.59 (0 , 0 , 1 , 1 , 2) Concrete
Waste Plastics 592 T09 T09-Hatta mahdaich Road New Waste Plastics 7.650 3.750 Complete 0 203.14 135.42 338.56 30.47 (0 , 0 , 1 , 1 , 2) chand T02 (VR76) 593 L039 L039-Hatta Mahdaich Road New CELL Filled 6.020 3.750 Complete 4 179.35 119.56 298.91 26.90 (0 , 2 , 4 , 1 , 7) T04 to Sirhira (VR23) Concrete
Waste Plastics 594 L064 L064-T04 to Lohdan gram New CELL Filled 2.050 3.750 Complete 2 65.16 43.44 108.60 9.77 (0 , 0 , 1 , 0 , 1) (VR44) Concrete
Waste Plastics 595 L060 L060-T08 to Piparia (VR39) New CELL Filled 1.100 3.750 Complete 1 37.22 24.81 62.03 5.58 (0 , 0 , 1 , 1 , 2) Concrete
Waste Plastics Block Chand Total 30.720 21 905.96 603.96 1,509.92 135.88 (1 , 6 , 12 , 13 , 32) Block- Durgawati

596 L071 L071-NH-2 to Sarangpur New CELL Filled 1.150 3.750 Complete 2 38.03 25.35 63.38 5.70 (0 , 1 , 0 , 0 , 1) (VR67) Concrete
Waste Plastics 597 L083 L083-T011 TO Khrsara New CELL Filled 0.600 3.750 Complete 1 20.61 13.74 34.35 3.09 (0 , 1 , 0 , 0 , 1) harijan tola (VR79) Concrete
Waste Plastics 598 L119 L119-Chhata Ramgarh road New CELL Filled 0.700 3.750 Complete 1 23.02 15.35 38.37 3.45 (0 , 1 , 0 , 0 , 1) link road to Kulharia Concrete (VR104)
Waste Plastics

Page 61 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

599 L065 L065-Hatta Durgawati road New CELL Filled 0.550 3.750 Complete 0 18.91 12.60 31.51 2.84 (0 , 1 , 0 , 0 , 1) to Sariyaon Bind tola (VR61) Concrete
Waste Plastics 600 L118 L118-Larma Main canal to New CELL Filled 0.800 3.750 Complete 1 27.50 18.34 45.84 4.13 (0 , 0 , 1 , 0 , 1) Madanpura (VR117) Concrete
Waste Plastics 601 L092 L092-Jewari main road to New Waste Plastics 0.750 3.750 Complete 1 22.92 15.28 38.20 3.44 (0 , 0 , 1 , 0 , 1) Gopinathpur (VR88) 602 T03 L093-Ghinhupattii Didkhili New CELL Filled 1.500 3.750 Complete 1 48.45 32.30 80.75 7.27 (1 , 2 , 3 , 2 , 8) road to Dumari muslim tola Concrete (VR89)
Waste Plastics Block Durgawati Total 6.050 7 199.44 132.96 332.40 29.92 (1 , 6 , 5 , 2 , 14) Block- Mohania

603 L119 L119-Barka Sagra to New CELL Filled 0.750 3.750 Complete 0 24.65 16.43 41.08 3.70 (0 , 0 , 2 , 0 , 2) Chhotka Sagra (VR83) Concrete
Waste Plastics 604 L127 L127-T03 Primary school to New CELL Filled 0.900 3.750 Complete 1 29.00 19.34 48.34 4.35 (0 , 1 , 0 , 0 , 1) Rampur (VR91) Concrete
Waste Plastics 605 L030 L030-T01 to Amarpura New CELL Filled 2.020 3.000 Complete 0 58.41 38.94 97.35 8.76 (1 , 0 , 0 , 0 , 1) (VR11) Concrete
Waste Plastics 606 L142 L142-SIAPOKHAR PUL CANAL New CELL Filled 2.700 3.750 Complete 2 85.33 56.89 142.22 12.80 (0 , 0 , 1 , 0 , 1) ROAD TO PASPIRA VIA Concrete DAMPOKHAR (VR106)
Waste Plastics Block Mohania Total 6.370 3 197.39 131.60 328.99 29.61 (1 , 1 , 3 , 0 , 5)

Page 62 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Nuawan

607 L114 L114-Maharo nahar pull to New CELL Filled 0.900 3.750 Complete 1 31.10 20.73 51.83 4.66 (0 , 0 , 1 , 0 , 1) MAahro vill (VR72) Concrete
Waste Plastics 608 L121 L121-Akhani to Akhani New CELL Filled 0.800 3.750 Complete 1 27.59 18.39 45.98 4.14 (0 , 0 , 1 , 0 , 1) koyari tola (VR79) Concrete
Waste Plastics 609 L102 L102-Gara chhaubey nahar New CELL Filled 1.400 3.750 Complete 1 48.09 32.06 80.15 7.21 (0 , 0 , 1 , 0 , 1) to Maharatha Brahman tola Concrete (VR60)
Waste Plastics 610 L030 L030-T08 to Muslim tola New CELL Filled 3.400 3.750 Complete 2 81.19 54.13 135.32 12.18 (0 , 1 , 2 , 0 , 3) Akhini (VR17) Concrete
Waste Plastics Block Nuawan Total 6.500 5 187.97 125.31 313.28 28.19 (0 , 1 , 5 , 0 , 6)

Block- Ramgarh

611 L114 L114-Kisunpura to Tenua New CELL Filled 1.450 3.750 Complete 2 49.28 32.86 82.14 7.39 (0 , 1 , 0 , 0 , 1) (VR80) Concrete
Waste Plastics 612 L134 L134-Bandipur Buxar road to New Waste Plastics 1.250 3.750 Complete 2 40.39 26.93 67.32 6.06 (0 , 1 , 0 , 0 , 1) Akorhi Rajput tola Baramhan tola (VR100) 613 L123 L123-Baraura to Baraura New CELL Filled 1.350 3.750 Complete 1 43.85 29.23 73.08 6.58 (0 , 1 , 0 , 0 , 1) yadav tola (VR89) Concrete
Waste Plastics 614 L107 L107-Mera to Mera village New CELL Filled 1.000 3.750 Complete 1 33.91 22.61 56.52 5.09 (0 , 0 , 1 , 0 , 1) (VR73) Concrete
Waste Plastics

Page 63 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

615 L104 L104-Kanhpur to Chitha New CELL Filled 3.150 3.750 Complete 4 104.15 69.44 173.59 15.62 (0 , 0 , 1 , 0 , 1) (VR70) Concrete
Waste Plastics 616 L120 L120-Anantpura to New CELL Filled 1.950 3.750 Complete 1 62.98 41.99 104.97 9.45 (0 , 0 , 1 , 0 , 1) Rupananpur (VR86) Concrete
Waste Plastics 617 L112 L112-Jamurna to Jamurna New Waste Plastics 1.600 3.750 Complete 2 54.43 36.29 90.72 8.17 (0 , 0 , 1 , 0 , 1) Mallah tola (VR78) Block Ramgarh Total 11.750 13 388.99 259.35 648.34 58.36 (0 , 3 , 4 , 0 , 7)

Block- Rampur

618 L044 L044-T03 to marakha (VR41) New CELL Filled 4.980 3.750 Complete 6 165.48 110.32 275.80 24.82 (0 , 0 , 2 , 3 , 5) Concrete
Waste Plastics 619 L051 L051-T02 to akorhi (VR50) New CELL Filled 1.400 3.750 Complete 2 48.19 32.13 80.32 7.23 (1 , 0 , 0 , 0 , 1) Concrete
Waste Plastics 620 L021 L021-T01 to Patna (VR1) New CELL Filled 6.000 3.750 Complete 8 154.09 102.73 256.82 23.11 (0 , 2 , 1 , 2 , 5) Concrete
Waste Plastics 621 L050 L050-L025 to karigain New CELL Filled 0.900 3.750 Complete 2 30.64 20.43 51.07 4.60 (0 , 1 , 0 , 0 , 1) (VR49) Concrete
Waste Plastics 622 L045 L045-T 02 to majhiaw New Waste Plastics 2.350 3.750 Complete 2 70.19 46.80 116.99 10.53 (0 , 1 , 0 , 1 , 2) (VR42) 623 L042 L042-T03 toamawan dhobi New CELL Filled 0.600 3.750 Complete 1 21.51 14.34 35.85 3.23 (0 , 1 , 0 , 0 , 1) tola (VR70) Concrete
Waste Plastics

Page 64 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

624 L053 L053-T 01 t0 panapur (VR52) New CELL Filled 0.900 3.750 Complete 2 32.11 21.41 53.52 4.82 (0 , 1 , 0 , 0 , 1) Concrete
Waste Plastics 625 L047 L047-L044 to barli bichla New CELL Filled 1.710 3.750 Complete 2 56.67 37.78 94.45 8.50 (0 , 0 , 1 , 2 , 3) tola (VR44) Concrete
Waste Plastics 626 L054 L054-T 01 to Sonara (VR54) New CELL Filled 1.700 3.750 Complete 2 56.08 37.39 93.47 8.41 (0 , 0 , 1 , 1 , 2) Concrete
Waste Plastics 627 L056 L056-L035 to Uchninar New CELL Filled 1.250 3.750 Complete 2 39.08 26.05 65.13 5.86 (0 , 0 , 1 , 1 , 2) (VR56) Concrete
Waste Plastics 628 L058 L058-T01 to chanki (VR77) New CELL Filled 1.200 3.750 Complete 3 41.86 27.91 69.77 6.28 (0 , 0 , 1 , 1 , 2) Concrete
Waste Plastics 629 L043 L043-T02 to lohandi (VR72) New CELL Filled 1.100 3.750 Complete 2 37.03 24.69 61.72 5.56 (0 , 0 , 1 , 0 , 1) Concrete
Waste Plastics 630 L052 L052-T02 to karaunda New CELL Filled 0.750 3.750 Complete 1 25.27 16.85 42.12 3.79 (0 , 0 , 1 , 1 , 2) (VR51) Concrete
Waste Plastics 631 L049 L049-T03 to chero tola New CELL Filled 1.500 3.750 Complete 2 48.40 32.27 80.67 7.26 (0 , 0 , 1 , 0 , 1) (VR48) Concrete
Waste Plastics 632 L048 L048-T02 to jhalkhora New CELL Filled 1.050 3.750 Complete 2 33.84 22.56 56.40 5.08 (0 , 0 , 1 , 0 , 1) (VR47) Concrete
Waste Plastics

Page 65 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

633 L055 L055-L037 to Kharanda New CELL Filled 1.050 3.750 Complete 2 35.73 23.82 59.55 5.36 (0 , 0 , 1 , 0 , 1) Harijan tola (VR55) Concrete
Waste Plastics 634 L057 L057-L024 to Itawa (VR73) New CELL Filled 0.850 3.750 Complete 0 25.87 17.25 43.12 3.88 (0 , 0 , 1 , 0 , 1) Concrete
Waste Plastics 635 L059 L059-T02 to Uphrauli New Waste Plastics 1.550 3.750 Complete 3 50.89 33.92 84.81 7.63 (0 , 0 , 1 , 0 , 1) (VR79) Block Rampur Total 30.840 44 972.93 648.65 1,621.58 145.95 (1 , 6 , 14 , 12 , 33) District Kaimur (Bhabhua) Total 204.660 222 6,353.25 4,235.54 10,588.79 952.99 (7 , 45 , 93 , 41 , 186) District- Katihar

Block- Ajamnagar

636 L067 L067-T01 TO BARIA New Cold Mix 1.130 3.750 Complete 3 35.59 23.73 59.32 8.14 (1 , 0 , 0 , 0 , 1) (TRACK17) Technology Block Ajamnagar Total 1.130 3 35.59 23.73 59.32 8.14 (1 , 0 , 0 , 0 , 1)

Block- Amdabad

637 L030 L030-T03 TO OYA HAZI TOLA New CELL Filled 4.445 3.750 Complete 3 144.15 96.10 240.25 27.74 (2 , 0 , 0 , 0 , 2) (TRACK6) Concrete
Cold Mix Technology 638 L035 L035-L025 TO CHARRAMARI New Cold Mix 2.690 3.750 Complete 2 94.56 63.04 157.60 19.63 (2 , 0 , 0 , 0 , 2) (TRACK35) Technology 639 L034 L034-T01 GAURIPUR TO New Cold Mix 2.160 3.750 Complete 2 64.21 42.81 107.02 15.75 (1 , 0 , 1 , 0 , 2) JAMRA (TRACK7) Technology 640 L038 L038-T01 NEAR PANI KAMLA New CELL Filled 1.600 3.750 Complete 2 49.86 33.24 83.10 10.80 (1 , 0 , 0 , 0 , 1) TO MAYAMARI (TRACK1) Concrete
Cold Mix Technology

Page 66 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

641 L037 L037-T02 TO MUNINRAM New CELL Filled 0.890 3.750 Complete 2 29.23 19.49 48.72 5.80 (1 , 0 , 0 , 0 , 1) TOLA (TRACK2) Concrete
Cold Mix Technology Block Amdabad Total 11.785 11 382.01 254.68 636.69 79.72 (7 , 0 , 1 , 0 , 8)

Block- Balrampur

642 L050 L050-MILLIKPURHAT TO New CELL Filled 2.320 3.750 Complete 5 73.12 48.74 121.86 14.88 (0 , 1 , 0 , 1 , 2) RAUTARA (VR50) Concrete
Cold Mix Technology 643 L037 L037-TO5 TO SIRPATOL New CELL Filled 3.290 3.750 Complete 9 106.35 70.90 177.25 21.36 (0 , 1 , 0 , 0 , 1) (VR37) Concrete
Cold Mix Technology 644 L039 L039-TO4 TO JOKY (VR39) New CELL Filled 1.520 3.750 Complete 2 48.24 32.16 80.40 9.88 (0 , 1 , 0 , 0 , 1) Concrete
Cold Mix Technology 645 L065 L065-MIDDLE SCHOOL New CELL Filled 2.670 3.750 Complete 7 84.24 56.16 140.40 16.81 (0 , 1 , 0 , 0 , 1) DATIAN TO TIKORI GOA VIA Concrete TITI KOLA KOTABADOR
Cold Mix (VR65) Technology 646 L021 L021-LO46 JAIPURA TO New CELL Filled 4.700 3.750 Complete 9 148.12 98.75 246.87 29.82 (0 , 1 , 1 , 0 , 2) BALDIA GACHHI (VR21) Concrete
Cold Mix Technology 647 L067 L067-KALHANABARI CHOWK New CELL Filled 2.460 3.750 Complete 5 78.61 52.40 131.01 15.63 (1 , 1 , 1 , 0 , 3) TO BISWANPUR VIA JAIJAN Concrete (VR67)
Cold Mix Technology Block Balrampur Total 16.960 37 538.68 359.11 897.79 108.38 (1 , 6 , 2 , 1 , 10)

Page 67 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Barari

648 L118 L118-T07 TO TATMA TOLA New CELL Filled 0.753 3.750 Complete 2 23.63 15.75 39.38 4.45 (1 , 0 , 0 , 0 , 1) (VR118) Concrete
Cold Mix Technology 649 L021 L021-T01 KABER TO BALU New CELL Filled 5.790 3.750 Complete 14 177.18 118.12 295.30 35.38 (1 , 1 , 2 , 0 , 4) (TRACK21) Concrete
Cold Mix Technology 650 L086 L086-T06 to SANTHAL TOLA New Cold Mix 1.900 3.750 Complete 4 61.95 41.30 103.25 12.26 (0 , 1 , 0 , 0 , 1) (VR31) Technology 651 L028 L028-L109 Balughat to New CELL Filled 1.360 3.750 Complete 4 41.99 27.99 69.98 8.55 (0 , 1 , 0 , 0 , 1) Azampurshankar (TRACK28) Concrete
Cold Mix Technology 652 L100 L100-L091 TO MURAHARI New CELL Filled 1.002 3.750 Complete 3 34.48 22.98 57.46 5.83 (0 , 0 , 1 , 1 , 2) TOLA (VR100) Concrete
Cold Mix Technology 653 L039 L039-T06 TO CHHAMAN New -- 5.110 3.750 Complete 10 154.63 103.09 257.72 28.91 (0 , 3 , 1 , 1 , 5) MILIK (VR39) 654 L090 L090-L023 ATHANIA New CELL Filled 4.934 3.750 Complete 14 160.00 106.66 266.66 32.00 (1 , 2 , 0 , 2 , 5) KHUSHHAL PUR TO MIYA Concrete TOLA (TRACK90)
Cold Mix Technology 655 L116 L116-T07 TO JORAIYA New CELL Filled 2.516 3.750 Complete 4 75.08 50.05 125.13 14.59 (2 , 0 , 0 , 0 , 2) (VR116) Concrete
Cold Mix Technology 656 L098 L098-L021 TURRITOLA TO New CELL Filled 1.538 3.750 Complete 5 45.35 30.23 75.58 9.14 (0 , 1 , 1 , 0 , 2) NIMTALLA (VR98) Concrete
Cold Mix Technology

Page 68 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

657 L076 L076-T04 TO GORIARI New CELL Filled 1.531 3.750 Complete 4 45.70 30.46 76.16 9.10 (0 , 1 , 0 , 0 , 1) (TRACK76) Concrete
Cold Mix Technology Block Barari Total 26.434 64 819.99 546.63 1,366.62 160.21 (5 , 10 , 5 , 4 , 24) Block- Barsoi

658 L031 L031-JATAHAR TO Sarifnagar New CELL Filled 0.830 3.750 Complete 2 26.45 17.64 44.09 5.78 (1 , 0 , 0 , 0 , 1) Abadpur (VR31) Concrete
Cold Mix Technology 659 L047 L047-ALIPUR TO BAZIDPUR New CELL Filled 0.560 3.750 Complete 1 17.03 11.35 28.38 3.89 (2 , 0 , 0 , 1 , 3) (VR47) Concrete
Cold Mix Technology 660 L045 L045-TO7 TO EMADPUR New CELL Filled 1.959 3.750 Complete 4 62.26 41.50 103.76 11.09 (1 , 0 , 0 , 0 , 1) (VR45) Concrete
Cold Mix Technology 661 L043 L043-T01 TO GERUA (VR43) New CELL Filled 1.080 3.750 Complete 2 33.57 22.38 55.95 6.97 (1 , 0 , 0 , 0 , 1) Concrete
Cold Mix Technology 662 L023 L023-ABADPUR TO JAHIRPUR New CELL Filled 2.960 3.750 Complete 6 95.66 63.77 159.43 19.32 (0 , 2 , 0 , 0 , 2) (VR23) Concrete
Cold Mix Technology 663 L025 L025-TO4 MAHESHPUR TO New Cold Mix 1.920 3.750 Complete 2 62.51 41.67 104.18 14.59 (0 , 1 , 0 , 0 , 1) KUSIYARMORA (VR25) Technology 664 L050 L050-TO8 to Kolha (VR50) New CELL Filled 2.165 3.750 Complete 2 67.44 44.96 112.40 14.45 (0 , 1 , 0 , 0 , 1) Concrete
Cold Mix Technology

Page 69 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

665 L039 L039-T01 TO LODHNA (VR39) New CELL Filled 3.210 3.750 Complete 5 106.24 70.82 177.06 22.13 (0 , 1 , 0 , 0 , 1) Concrete
Cold Mix Technology 666 L030 L030-TO2 TO NALSAR (VR30) New CELL Filled 1.095 3.750 Complete 2 35.65 23.77 59.42 7.11 (1 , 0 , 0 , 0 , 1) Concrete
Cold Mix Technology 667 L156 L156-Jatahar to Basantpur New CELL Filled 0.653 3.750 Complete 2 21.02 14.02 35.04 1.50 (1 , 0 , 0 , 0 , 1) Milikpur (VR56) Concrete
Cold Mix Technology 668 L037 L037-Jafarpur to New CELL Filled 1.793 3.750 Complete 5 61.54 41.02 102.56 12.66 (0 , 1 , 0 , 0 , 1) Chaugachhi (VR037) Concrete
Cold Mix Technology Block Barsoi Total 18.225 33 589.37 392.90 982.27 119.49 (7 , 6 , 0 , 1 , 14) Block- Dandkhora

669 L053 L053-T05 TO TIKAILI (VR53) New CELL Filled 1.053 3.750 Complete 2 35.20 23.47 58.67 5.73 (1 , 0 , 0 , 0 , 1) Concrete
Cold Mix Technology Block Dandkhora Total 1.053 2 35.20 23.47 58.67 5.73 (1 , 0 , 0 , 0 , 1)

Block- Falka

670 L055 L055-KURSELA SARSI ROAD New CELL Filled 2.699 3.750 Complete 3 85.62 57.08 142.70 17.15 (1 , 0 , 0 , 0 , 1) TO BELGACHHI (TRACK55) Concrete
Cold Mix Technology 671 L051 L051-KORHA FALKA ROAD TO New CELL Filled 4.585 3.750 Complete 8 152.46 101.64 254.10 27.07 (2 , 1 , 0 , 1 , 4) RADHA NAGAR (TRACK81) Concrete
Cold Mix Technology

Page 70 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

672 L050 L050-KURSELA SARSI ROAD New CELL Filled 1.500 3.750 Complete 5 47.40 31.60 79.00 8.02 (0 , 1 , 0 , 0 , 1) TO KABLASIYA (TRACK50) Concrete
Cold Mix Technology 673 L045 L045-KURSELA SARSI ROAD New CELL Filled 1.552 3.750 Complete 3 43.65 29.10 72.75 9.02 (0 , 3 , 0 , 0 , 3) TO SOHATA GHAT (TRACK45) Concrete
Cold Mix Technology Block Falka Total 10.336 19 329.13 219.42 548.55 61.26 (3 , 5 , 0 , 1 , 9)

Block- Hasanganj

674 L111 L111-SHIVMANDIR TO New Cold Mix 0.826 3.750 Complete 1 22.94 15.29 38.23 5.28 (0 , 1 , 0 , 0 , 1) CHANDAILI (TRACK111) Technology 675 L037 L037-T01 TO BHAWANIPUR New CELL Filled 1.780 3.750 Complete 5 54.94 36.63 91.57 11.31 (0 , 1 , 1 , 0 , 2) (TRACK37) Concrete
Cold Mix Technology 676 L043 L043-T01 TO HATHIA DIARA New CELL Filled 2.047 3.750 Complete 5 60.59 40.40 100.99 12.97 (0 , 1 , 0 , 0 , 1) (TRACK43) Concrete
Cold Mix Technology Block Hasanganj Total 4.653 11 138.47 92.32 230.79 29.56 (0 , 3 , 1 , 0 , 4)

Block- Kadwa

677 L037 L037-KUMBHARI TO New CELL Filled 5.400 3.750 Complete 11 195.42 130.28 325.70 34.20 (1 , 0 , 0 , 1 , 2) GAITHORA (VR37) Concrete
Cold Mix Technology 678 L045 L045-PARLIYAHAT TO3 TO New CELL Filled 5.563 3.750 Complete 11 181.90 121.27 303.17 27.68 (3 , 0 , 1 , 0 , 4) MILLIKPUR TO VIA Concrete NANDANPUR (VR45)
Cold Mix Technology

Page 71 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

679 L038 L038-TO6 HACHALPUR TO New CELL Filled 1.304 3.750 Complete 4 41.50 27.67 69.17 7.91 (1 , 1 , 1 , 0 , 3) KAMRAILI (VR38) Concrete
Cold Mix Technology 680 L053 L053-PARLIYA TO SARLIYA New CELL Filled 1.940 3.750 Complete 3 61.56 41.04 102.60 12.41 (2 , 2 , 2 , 3 , 9) (VR53) Concrete
Cold Mix Technology 681 L063 L063-SADAPUR TO New CELL Filled 4.031 3.750 Complete 5 121.12 80.74 201.86 25.85 (1 , 0 , 0 , 1 , 2) SEKHPURA ROAD (VR63) Concrete
Cold Mix Technology 682 L042 L042-NIKHARA BERHO TO6 New CELL Filled 0.950 3.750 Complete 2 30.63 20.42 51.05 6.10 (0 , 1 , 0 , 0 , 1) TO KOLAHA (VR42) Concrete
Cold Mix Technology 683 L044 L044-TO6 HACHALPUR TO New Cold Mix 0.590 3.750 Complete 1 19.21 12.80 32.01 4.16 (0 , 1 , 0 , 0 , 1) PAIRIA (VR44) Technology 684 L050 L050-ALHANDA TO New CELL Filled 3.040 3.750 Complete 5 96.42 64.28 160.70 18.67 (1 , 1 , 0 , 2 , 4) MOLANAPUR (VR50) Concrete
Cold Mix Technology Block Kadwa Total 22.818 42 747.76 498.50 1,246.26 136.98 (9 , 6 , 4 , 7 , 26) Block- Katihar

685 L073 L073-P W D ROAD New CELL Filled 2.530 3.750 Complete 4 74.58 49.72 124.30 7.53 (1 , 0 , 0 , 0 , 1) HAFLAGANJ SHIVMANDIR TO Concrete GOPALPUR VIL. (TRACK65)
Cold Mix Technology Block Katihar Total 2.530 4 74.58 49.72 124.30 7.53 (1 , 0 , 0 , 0 , 1)

Page 72 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Korha

686 L042 L042-NH 31 at Kishorganj to New CELL Filled 4.741 3.750 Complete 15 139.95 93.30 233.25 29.41 (1 , 1 , 1 , 0 , 3) Basgarha (VR45) Concrete
Cold Mix Technology 687 L118 L118-Kursi Narayanpur New CELL Filled 1.283 3.750 Complete 4 44.79 29.86 74.65 7.38 (1 , 0 , 0 , 0 , 1) chowk to Narayanpur Concrete (TRACK106) 688 L105 L105-Katihar Purnea road at New CELL Filled 1.800 3.750 Complete 5 57.56 38.37 95.93 11.56 (0 , 1 , 0 , 0 , 1) Dewan chowk to Concrete Dharamganj (TRACK105)
Cold Mix Technology Block Korha Total 7.824 24 242.30 161.53 403.83 48.35 (2 , 2 , 1 , 0 , 5)

Block- Kursela

689 L048 L048-KURSELA STATION KALI New CELL Filled 0.540 3.750 Complete 2 17.05 11.37 28.42 2.99 (0 , 1 , 0 , 0 , 1) ASTHAN TO BALU TOLA Concrete (VR48)
Cold Mix Technology Block Kursela Total 0.540 2 17.05 11.37 28.42 2.99 (0 , 1 , 0 , 0 , 1)

Block- Manihari

690 L049 L049-DILARPUR HARI CHCWK New CELL Filled 12.840 3.750 Complete 20 446.17 297.44 743.61 85.12 (0 , 2 , 4 , 4 , 10) TO SAHPUR (VR19) Concrete
Cold Mix Technology 691 L036 L036-T01 TO SAURA DANGI New CELL Filled 3.080 3.750 Complete 9 99.81 66.54 166.35 20.83 (1 , 1 , 0 , 0 , 2) (TRACK36) Concrete
Cold Mix Technology

Page 73 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

692 L048 L048-T05 TO MAHESHPUR New CELL Filled 1.754 3.750 Complete 4 55.72 37.15 92.87 11.60 (0 , 1 , 0 , 0 , 1) DIYARA (TRACK) Concrete
Cold Mix Technology Block Manihari Total 17.674 33 601.70 401.13 1,002.83 117.55 (1 , 4 , 4 , 4 , 13) Block- Mansahi

693 L043 L043-T03 TO BHERMARA New CELL Filled 3.500 3.750 Complete 6 106.66 71.11 177.77 20.78 (1 , 0 , 0 , 0 , 1) (VR43) Concrete
Cold Mix Technology 694 L057 L057-T05 TO KAJARA (VR57) New CELL Filled 1.700 3.750 Complete 4 53.98 35.98 89.96 10.57 (0 , 1 , 0 , 0 , 1) Concrete
Cold Mix Technology Block Mansahi Total 5.200 10 160.64 107.09 267.73 31.35 (1 , 1 , 0 , 0 , 2)

Block- Pranpur

695 L061 L061-T02 to Guni tola New Cold Mix 0.760 3.750 Complete 1 23.68 15.78 39.46 5.45 (2 , 0 , 0 , 0 , 2) (VR15) Technology 696 L077 L077-L038 to Sonaila (VR77) New -- 1.550 3.750 Complete 2 48.34 32.23 80.57 10.99 (0 , 1 , 0 , 0 , 1)

697 L076 L076-T02 to Bisare (VR76) New Cold Mix 1.760 3.750 Complete 3 61.04 40.69 101.73 12.55 (0 , 1 , 0 , 0 , 1) Technology 698 L057 L057-T02 to Kajra (VR29) New CELL Filled 1.836 3.750 Complete 3 57.77 38.52 96.29 9.33 (0 , 1 , 0 , 0 , 1) Concrete
Cold Mix Technology 699 L064 L064-T02 TO KHJATE HAT New CELL Filled 1.221 3.750 Complete 2 39.83 26.56 66.39 6.74 (0 , 1 , 0 , 0 , 1) (VR9) Concrete
Cold Mix Technology

Page 74 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

700 L059 L059-T02 TO BALUA New Cold Mix 1.067 3.750 Complete 2 30.38 20.25 50.63 7.37 (0 , 1 , 0 , 1 , 2) SANTHALI (TRACK7) Technology Block Pranpur Total 8.194 13 261.04 174.03 435.07 52.43 (2 , 5 , 0 , 1 , 8)

Block- Sameli

701 L057 L057-T04 to Bakia New Cold Mix 1.791 3.750 Complete 4 54.72 36.48 91.20 11.81 (1 , 1 , 0 , 1 , 3) (TRACK31) Technology Block Sameli Total 1.791 4 54.72 36.48 91.20 11.81 (1 , 1 , 0 , 1 , 3)

District Katihar Total 157.147 312 5,028.23 3,352.11 8,380.34 981.48 (42 , 50 , 18 , 20 , 130) District- Khagaria

Block- Gogari

702 L050 L050-KANHAULI TO BALTARA New -- 2.150 3.750 Complete 3 58.25 38.83 97.08 5.82 (1 , 0 , 0 , 0 , 1) (VR50) Block Gogari Total 2.150 3 58.25 38.83 97.08 5.82 (1 , 0 , 0 , 0 , 1)

District Khagaria Total 2.150 3 58.25 38.83 97.08 5.82 (1 , 0 , 0 , 0 , 1)

District- Kishanganj

Block- Bahadurganj

703 L053 L053-L024 to Pahatgaon New -- 2.455 3.750 Complete 4 89.01 59.34 148.35 15.78 (1 , 1 , 1 , 1 , 4) (VR53) 704 L071 L071-T02 to Kharsan Basti New -- 1.870 3.750 Complete 0 66.99 44.66 111.65 12.82 (0 , 3 , 3 , 5 , 11) (VR71) Block Bahadurganj Total 4.325 4 156.00 104.00 260.00 28.61 (1 , 4 , 4 , 6 , 15)

Page 75 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Pothia

705 L049 L049-T05 to Darogaon New -- 2.821 3.750 Complete 4 108.95 72.63 181.58 18.91 (0 , 1 , 0 , 0 , 1) (TRACK49) Block Pothia Total 2.821 4 108.95 72.63 181.58 18.91 (0 , 1 , 0 , 0 , 1)

Block- Terhagachhi

706 L044 L044-T01 to Kadolata (VR44) New -- 2.812 3.750 Complete 2 91.64 61.09 152.73 20.18 (0 , 1 , 0 , 4 , 5)

707 L022 L022-L021 to Phulwari New -- 2.015 3.750 Complete 2 74.69 49.79 124.48 16.30 (0 , 1 , 0 , 5 , 6) (VR22) Block Terhagachhi Total 4.827 4 166.33 110.88 277.21 36.48 (0 , 2 , 0 , 9 , 11) Block- Thakurganj

708 L036 L036-T02 to Dudhaunti New -- 5.377 3.750 Complete 12 214.77 143.18 357.95 35.33 (2 , 3 , 3 , 4 , 12) (TRACK36) 709 L035 L035-T02 to Ruidhasa New -- 3.053 3.750 Complete 3 112.93 75.29 188.22 19.98 (0 , 2 , 3 , 0 , 5) (TRACK35) 710 L081 L081-T04 to Dhobibhita New -- 4.974 3.750 Complete 6 169.14 112.76 281.90 31.22 (0 , 1 , 5 , 7 , 13) (TRACK81) 711 L029 L029-T01 to Gorkha Patasari New -- 3.678 3.750 Complete 3 134.17 89.45 223.62 24.03 (0 , 3 , 3 , 0 , 6) (TRACK29) Block Thakurganj Total 17.082 24 631.01 420.68 1,051.69 110.56 (2 , 9 , 14 , 11 , 36) District Kishanganj Total 29.055 36 1,062.29 708.19 1,770.48 194.56 (3 , 16 , 18 , 26 , 63) District- Lakhisarai

Page 76 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Barahiya

712 L025 L025-T01 TO DARIYAPUR New CELL Filled 1.000 3.750 Complete 2 30.31 20.21 50.52 4.62 (1 , 0 , 0 , 0 , 1) BABHANTOLI (VR25) Concrete Block Barahiya Total 1.000 2 30.31 20.21 50.52 4.62 (1 , 0 , 0 , 0 , 1)

Block- Halsi

713 L028 L028-T02 TO BEHRAMA Upgarde CELL Filled 2.310 3.750 Complete 5 71.73 47.82 119.55 9.98 (1 , 0 , 2 , 0 , 3) (TRACK28) Concrete 714 L073 L073-TO5 SH TO SILWAY New CELL Filled 1.600 3.750 Complete 4 43.81 29.20 73.01 6.69 (0 , 1 , 1 , 2 , 4) (TRACK73) Concrete Block Halsi Total 3.910 9 115.54 77.02 192.56 16.66 (1 , 1 , 3 , 2 , 7)

Block- Lakhisarai

715 L061 L061-T02 TO LAKHOCHAK New CELL Filled 1.672 3.750 Complete 2 48.98 32.65 81.63 6.71 (0 , 0 , 3 , 4 , 7) (TRACK61) Concrete Block Lakhisarai Total 1.672 2 48.98 32.65 81.63 6.71 (0 , 0 , 3 , 4 , 7)

Block- Ramgarh Chowk

716 L051 L051-GARSANDA PMGSY RD Upgarde CELL Filled 2.217 3.750 Complete 5 67.60 45.07 112.67 8.77 (0 , 4 , 1 , 4 , 9) TO DAKRA (TRACK51) Concrete Block Ramgarh Chowk Total 2.217 5 67.60 45.07 112.67 8.77 (0 , 4 , 1 , 4 , 9)

District Lakhisarai Total 8.799 18 262.43 174.95 437.38 36.77 (2 , 5 , 7 , 10 , 24) District- Madhepura

Block- Alamnagar

717 L022 L022-T-04 Hariharpur New -- 3.290 3.750 Complete 6 107.46 71.64 179.10 11.85 (0 , 1 , 0 , 0 , 1) Bajraha chowk to pathraha (VR9)

Page 77 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

718 L029 L029-T-07 Basanwara TO New -- 2.800 3.750 Complete 4 98.64 65.76 164.40 10.23 (0 , 1 , 0 , 0 , 1) TALIHARI (VR16) 719 L040 L040-T04 BAJRAHA TO New -- 1.080 3.750 Complete 3 40.50 27.00 67.50 3.97 (0 , 1 , 0 , 0 , 1) PASALWA (VR27) 720 L028 L028-T-06 bargawn to prail New CELL Filled 2.411 3.750 Complete 0 78.25 52.17 130.42 12.18 (1 , 0 , 0 , 0 , 1) (VR15) Concrete
Waste Plastics Block Alamnagar Total 9.581 13 324.85 216.57 541.42 38.23 (1 , 3 , 0 , 0 , 4)

Block- Chausa

721 L034 L034-L032 TO SINGHIA New -- 1.440 3.750 Complete 2 43.50 29.00 72.50 5.15 (0 , 4 , 0 , 1 , 5) (VR13) 722 L047 L047-R.W.D path to Birbal New -- 3.160 3.750 Complete 4 101.82 67.88 169.70 11.28 (0 , 1 , 4 , 2 , 7) tola (VR31) 723 L025 L025-T03 TO pHULKIYA TOLA New CELL Filled 1.995 3.750 Complete 3 72.71 48.47 121.18 9.66 (0 , 1 , 0 , 0 , 1) (VR20) Concrete
Waste Plastics Block Chausa Total 6.595 9 218.03 145.35 363.38 26.09 (0 , 6 , 4 , 3 , 13) Block- Gamharia

724 L028 L028-Belhi To Damha (VR28) New CELL Filled 1.746 3.750 Complete 0 55.59 37.06 92.65 8.11 (1 , 2 , 0 , 1 , 4) Concrete
Waste Plastics Block Gamharia Total 1.746 0 55.59 37.06 92.65 8.11 (1 , 2 , 0 , 1 , 4)

Block- Gwalpara

725 L036 L036-Gwalpara to biswari New -- 4.000 3.750 Complete 4 134.97 89.98 224.95 14.70 (0 , 3 , 3 , 3 , 9) (VR7)

Page 78 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

726 L042 L042-L035 to jhitkiya hadi New -- 0.950 3.750 Complete 2 36.27 24.18 60.45 3.50 (0 , 2 , 0 , 3 , 5) (VR13) Block Gwalpara Total 4.950 6 171.24 114.16 285.40 18.20 (0 , 5 , 3 , 6 , 14) Block- Kumarkhand

727 L045 L045-Haribola To Ranipatti New -- 0.532 3.750 Complete 0 19.50 13.00 32.50 2.06 (2 , 2 , 1 , 0 , 5) (VR45) 728 L046 L046-Belari To Haribola New -- 1.852 3.750 Complete 4 72.07 48.05 120.12 6.87 (2 , 0 , 0 , 0 , 2) (VR46) 729 L030 L030-T-02 To Pureni (VR30) New CELL Filled 2.051 3.750 Complete 3 78.62 52.42 131.04 10.33 (1 , 2 , 1 , 0 , 4) Concrete
Waste Plastics 730 L025 L025-Belari To Bishanpur New -- 4.990 3.750 Complete 7 181.66 121.11 302.77 18.63 (2 , 2 , 0 , 0 , 4) (VR25) 731 L040 L040-Madhuban To Gopipur New -- 4.175 3.750 Complete 8 171.36 114.24 285.60 15.71 (0 , 1 , 0 , 0 , 1) (VR40) 732 L027 L027-Babhan Tola To New -- 2.050 3.750 Complete 4 85.68 57.12 142.80 7.77 (1 , 3 , 4 , 0 , 8) Kuranwa (VR27) 733 L043 L043-Rahta To Sonapur New -- 3.050 3.750 Complete 4 121.13 80.75 201.88 11.40 (0 , 1 , 0 , 0 , 1) (VR43) 734 L036 L036-Dev Asthan To Tapra New -- 0.850 3.750 Complete 1 32.67 21.78 54.45 2.98 (0 , 1 , 0 , 0 , 1) (VR36) 735 L026 L026-Tengraha To Tengraha New -- 2.500 3.750 Complete 2 94.30 62.87 157.17 9.28 (0 , 1 , 0 , 0 , 1) (VR26) Block Kumarkhand Total 22.050 33 856.99 571.34 1,428.33 85.03 (8 , 13 , 6 , 0 , 27) Block- Madhepura

736 T08 T08-Madhepura To Pathraha New -- 2.430 3.750 Complete 4 91.28 60.85 152.13 9.05 (1 , 1 , 0 , 0 , 2) (VR8)

Page 79 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

737 L030 L030-NH-106 Madhuwan To New -- 2.575 3.750 Complete 6 98.20 65.47 163.67 9.29 (0 , 2 , 0 , 1 , 3) Turkahi Shamatola (VR30) 738 L026 L026-Pararia To Dharhar New -- 5.065 3.750 Complete 7 187.51 125.00 312.51 19.62 (1 , 1 , 0 , 0 , 2) (VR26) 739 L025 L025-NH-107 To Piparpatta New -- 2.250 3.750 Complete 3 86.56 57.70 144.26 8.40 (0 , 2 , 3 , 0 , 5) (VR25) Block Madhepura Total 12.320 20 463.55 309.02 772.57 46.35 (2 , 6 , 3 , 1 , 12) Block- Murliganj

740 L030 L030-Hari Singh Ka Mushari New -- 5.930 3.750 Complete 9 218.98 145.98 364.96 18.46 (1 , 1 , 3 , 0 , 5) Devan Hari Via Sautari (VR30) Block Murliganj Total 5.930 9 218.98 145.98 364.96 18.46 (1 , 1 , 3 , 0 , 5)

Block- Puraini

741 L033 L033-T06 To Ganeshpur New -- 0.981 3.750 Complete 2 30.56 20.38 50.94 3.49 (2 , 0 , 0 , 0 , 2) diara (VR20) Block Puraini Total 0.981 2 30.56 20.38 50.94 3.49 (2 , 0 , 0 , 0 , 2)

Block- Shankarpur

742 L033 L033-Lahi L021 To Barlahi New -- 1.400 3.750 Complete 3 52.85 35.23 88.08 5.59 (1 , 0 , 0 , 0 , 1) (VR33) Block Shankarpur Total 1.400 3 52.85 35.23 88.08 5.59 (1 , 0 , 0 , 0 , 1)

Block- Singheshwar

743 L033 L033-T-01 To Budhawe via New -- 4.965 3.750 Complete 7 182.14 121.43 303.57 19.07 (2 , 2 , 0 , 0 , 4) Rampatti (VR33) 744 L022 L022-T-02A To Patori (VR22) New -- 1.780 3.750 Complete 2 67.15 44.77 111.92 6.85 (0 , 1 , 0 , 0 , 1)

745 L042 L042-T 03 NH 106 Baheri New -- 1.194 3.750 Complete 4 51.62 34.41 86.03 4.72 (0 , 1 , 0 , 0 , 1) Bajrangwali Chowk To Bahanga (VR42)

Page 80 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

746 L031 L031-L-021 Lalpur To New -- 3.194 3.750 Complete 9 130.70 87.14 217.84 12.39 (0 , 1 , 0 , 0 , 1) Gultara (VR31) 747 L034 L034-L-027 To Kanua Teli New CELL Filled 1.988 3.750 Complete 2 57.52 38.34 95.86 9.05 (0 , 1 , 0 , 0 , 1) Tola (VR34) Concrete
Waste Plastics 748 L038 L038-Piprahi To Jalwara New -- 1.500 3.750 Complete 2 51.64 34.43 86.07 5.47 (0 , 0 , 2 , 1 , 3) (VR38) Block Singheshwar Total 14.621 26 540.77 360.52 901.29 57.56 (2 , 6 , 2 , 1 , 11) Block- Udakishanganj

749 L044 L044-T04NH106UDA TO New -- 2.892 3.750 Complete 4 101.40 67.60 169.00 13.05 (1 , 2 , 0 , 1 , 4) TINTANGA (VR31) 750 L041 L041-L039 TO MANGAL WASA New -- 2.750 3.750 Complete 5 100.68 67.12 167.80 10.20 (0 , 1 , 0 , 0 , 1) (VR28) Block Udakishanganj Total 5.642 9 202.08 134.72 336.80 23.25 (1 , 3 , 0 , 1 , 5)

District Madhepura Total 85.816 130 3,135.49 2,090.33 5,225.82 330.34 (19 , 45 , 21 , 13 , 98) District- Madhubani

Block- Andhrartharhi

751 L029 L029-T01 TO RAKHWARI New Waste Plastics 3.721 3.750 Complete 8 131.44 87.63 219.07 11.84 (1 , 4 , 0 , 0 , 5) (VR029) 752 L025 L025-TO3A TO JAMAILA New Waste Plastics 6.524 3.750 Complete 10 260.27 173.51 433.78 28.40 (1 , 2 , 1 , 0 , 4) (VR25) 753 L022 L022-T03 T0 GHOGHRARIA New Waste Plastics 3.087 3.750 Complete 7 106.02 70.68 176.70 13.88 (1 , 2 , 0 , 0 , 3) (VR22) 754 L039 L039-L022 TO TRAPATTI New Waste Plastics 0.527 3.750 Complete 1 17.89 11.93 29.82 1.75 (0 , 1 , 0 , 0 , 1) (VR39) 755 L049 L049-T04 TO KWAR PATTI New Waste Plastics 1.139 3.750 Complete 2 41.94 27.96 69.90 5.92 (0 , 1 , 0 , 0 , 1) (VR49)

Page 81 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

756 L050 L050-KASMA GOUR TO New Waste Plastics 1.677 3.750 Complete 3 55.21 36.81 92.02 5.91 (0 , 2 , 0 , 0 , 2) DHEDHMA (VR50) 757 L033 L033-TO1 HARI New Waste Plastics 2.366 3.750 Complete 6 92.58 61.72 154.30 9.41 (1 , 0 , 0 , 0 , 1) CHANDESWAR STHAN TO KORIAPATTI (VR033) Block Andhrartharhi Total 19.041 37 705.35 470.24 1,175.59 77.10 (4 , 12 , 1 , 0 , 17) Block- Babu Barhi

758 L069 L069-Bela To parwatiatol New Waste Plastics 6.990 3.750 Complete 5 239.26 159.51 398.77 28.24 (1 , 0 , 0 , 0 , 1) (VR069) Block Babu Barhi Total 6.990 5 239.26 159.51 398.77 28.24 (1 , 0 , 0 , 0 , 1)

Block- Ghoghardiha

759 L031 L031-T03 Devnath Patti to New Waste Plastics 5.659 3.750 Complete 0 182.36 121.57 303.93 17.56 (1 , 2 , 0 , 0 , 3) Haryahi Bhaya Amhi (VR29) 760 L056 L056-T03 Dhanpal Barhi to New Waste Plastics 2.721 3.750 Complete 4 113.48 75.65 189.13 13.33 (1 , 0 , 0 , 0 , 1) Dhabghata (VR38) 761 L030 L030-L03 Hasani to Mainahi New Waste Plastics 3.379 3.750 Complete 4 133.39 88.93 222.32 13.78 (1 , 0 , 0 , 0 , 1) (VR31) 762 L044 L044-T04 Khopa to Mahuliya New Waste Plastics 4.746 3.750 Complete 5 166.17 110.78 276.95 19.31 (2 , 2 , 0 , 0 , 4) Bhaya Belmohan (VR37) Block Ghoghardiha Total 16.505 13 595.40 396.93 992.33 63.99 (5 , 4 , 0 , 0 , 9)

Block- Jainagar

763 L024 L024-T01 T0 Betaunha New Waste Plastics 2.841 3.750 Complete 7 92.25 61.50 153.75 13.23 (1 , 0 , 0 , 0 , 1) (VR024) Block Jainagar Total 2.841 7 92.25 61.50 153.75 13.23 (1 , 0 , 0 , 0 , 1)

Block- Jhanjharpur

764 L024 L024-T02 NH57 TO TAJPUR New Waste Plastics 3.027 3.750 Complete 3 98.50 65.67 164.17 15.26 (2 , 2 , 0 , 2 , 6) (VR024)

Page 82 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

765 L023 L023-L024 TO MALICHAM New Waste Plastics 2.380 3.750 Complete 3 80.06 53.37 133.43 10.32 (1 , 1 , 0 , 0 , 2) (VR023) 766 L056 L056-TO2 NH57 TO New Waste Plastics 2.127 3.750 Complete 6 73.91 49.28 123.19 9.57 (1 , 0 , 0 , 0 , 1) MAHESHPURA (VR056) Block Jhanjharpur Total 7.534 12 252.47 168.32 420.79 35.15 (4 , 3 , 0 , 2 , 9)

Block- Kaluahi

767 L054 L054-BHALANI TO KAPARIA New Waste Plastics 1.135 3.750 Complete 3 39.94 26.63 66.57 4.76 (1 , 1 , 0 , 0 , 2) (VR54) 768 L055 L055-L034 TO ISLAMPUR New Waste Plastics 0.729 3.750 Complete 0 22.51 15.01 37.52 1.23 (0 , 1 , 0 , 0 , 1) (VR55) Block Kaluahi Total 1.864 3 62.45 41.64 104.09 5.99 (1 , 2 , 0 , 0 , 3)

Block- Khutauna

769 L060 L060-Balanpatti to chakdah New Waste Plastics 3.272 3.750 Complete 4 114.24 76.16 190.40 16.04 (1 , 0 , 1 , 0 , 2) (VR2) Block Khutauna Total 3.272 4 114.24 76.16 190.40 16.04 (1 , 0 , 1 , 0 , 2)

Block- Lakhnaur

770 L055 L055-L035 TO SOUTH TOL New Waste Plastics 0.854 3.750 Complete 3 29.12 19.41 48.53 4.08 (1 , 1 , 0 , 0 , 2) (VR055) 771 L052 L052-L021 REO ROAD TO New Waste Plastics 2.235 3.750 Complete 4 88.91 59.27 148.18 11.50 (0 , 2 , 3 , 0 , 5) PASWAN TOLA (VR052) 772 L062 L062-L021 TAMURIYA BERMA New Waste Plastics 2.251 3.750 Complete 5 83.90 55.94 139.84 10.22 (0 , 1 , 0 , 0 , 1) REO ROAD TO BHAKHRAULI (VR062) Block Lakhnaur Total 5.340 12 201.93 134.62 336.55 25.80 (1 , 4 , 3 , 0 , 8)

Block- Madhepur

773 L059 L059-SUNDAR BIRAJEET TO New Waste Plastics 3.068 3.750 Complete 6 112.10 74.74 186.84 10.89 (0 , 1 , 1 , 4 , 6) PHOKCHAHA (VR55) 774 L072 L072-PACHAHI TO MIYAN TOL New CELL Filled 0.582 3.750 Complete 0 17.99 11.99 29.98 0.10 (1 , 0 , 0 , 0 , 1) (TRACK62) Concrete

Page 83 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

775 L068 L068-CHAPRAM TO New Waste Plastics 2.325 3.750 Complete 4 95.15 63.43 158.58 10.63 (1 , 0 , 0 , 0 , 1) KALIKAPUR (VR60) 776 L073 L073-BASIPATTI ROAD TO New Waste Plastics 1.391 3.750 Complete 2 44.98 29.99 74.97 6.08 (1 , 0 , 0 , 0 , 1) MIYAN TOL Darah (TRACK63) 777 L069 L069-SANGAT CHOUK TO New CELL Filled 0.631 3.750 Complete 0 20.21 13.47 33.68 0.01 (1 , 0 , 0 , 0 , 1) NORTH BRAHMAN TOL Concrete (TRACK57) 778 L065 L065-DALDAL KALAM TO New Waste Plastics 1.582 3.750 Complete 4 64.32 42.88 107.20 6.38 (0 , 1 , 0 , 0 , 1) MUSAHARI (VR52) Block Madhepur Total 9.579 16 354.75 236.50 591.25 34.09 (4 , 2 , 1 , 4 , 11) Block- Phulparas

779 L032 L032-T04 to Goriyari (VR31) New Waste Plastics 3.384 3.750 Complete 7 118.61 79.07 197.68 16.10 (3 , 1 , 0 , 0 , 4)

780 L047 L047-T02 to Phularas Tole New Waste Plastics 1.162 3.750 Complete 2 41.75 27.83 69.58 4.92 (0 , 1 , 0 , 0 , 1) (VR22) Block Phulparas Total 4.546 9 160.36 106.90 267.26 21.02 (3 , 2 , 0 , 0 , 5)

Block- Rajnagar

781 L043 L043-T04 to KAITHAHI EAST New Waste Plastics 3.494 3.750 Complete 9 129.42 86.28 215.70 16.59 (0 , 3 , 0 , 0 , 3) (VR43) 782 L045 L045-T05 to RAGHOPUR New Waste Plastics 1.004 3.750 Complete 2 36.59 24.39 60.98 4.79 (1 , 0 , 0 , 0 , 1) (VR45) 783 L072 L072-PIPRAULIYA TO New Waste Plastics 1.038 3.750 Complete 2 37.50 25.00 62.50 4.70 (0 , 1 , 0 , 0 , 1) PILAKHBAR (VR72) Block Rajnagar Total 5.536 13 203.51 135.67 339.18 26.08 (1 , 4 , 0 , 0 , 5)

District Madhubani Total 83.048 131 2,981.97 1,987.99 4,969.96 346.70 (26 , 33 , 6 , 6 , 71) District- Munger

Page 84 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Bariarpur

784 L035 L035-L030 to Anantnagar New CELL Filled 5.400 3.750 Complete 10 160.55 107.04 267.59 19.25 (0 , 2 , 0 , 0 , 2) Binda Diyara (TRACK13) Concrete 785 L026 L026-T01 to Gosaichak New CELL Filled 3.180 3.750 Complete 4 102.58 68.39 170.97 11.51 (0 , 0 , 7 , 1 , 8) (TRACK3) Concrete Block Bariarpur Total 8.580 14 263.13 175.43 438.56 30.76 (0 , 2 , 7 , 1 , 10) District Munger Total 8.580 14 263.13 175.43 438.56 30.76 (0 , 2 , 7 , 1 , 10) District- Muzaffarpur

Block- Aurai

786 L038 L038-Ganguli L037 To New -- 1.500 3.750 Complete 3 56.54 37.70 94.24 11.20 (1 , 0 , 0 , 0 , 1) Suderkhauli (VR16) 787 T05 T05-T01 To Babhangawan New -- 0.976 3.750 Complete 1 29.84 19.89 49.73 4.33 (1 , 0 , 0 , 0 , 1) (ODR12) Block Aurai Total 2.476 4 86.38 57.59 143.97 15.53 (2 , 0 , 0 , 0 , 2)

Block- Bandra

788 L059 L059-Ratmaniya lakshu New CELL Filled 2.100 3.750 Complete 0 66.89 44.59 111.48 14.17 (0 , 1 , 0 , 0 , 1) chowk to Pirapur yadav tola Concrete (VR29)
Waste Plastics 789 L055 L055-Tepri Hanman Chowk New CELL Filled 2.250 3.750 Complete 2 102.74 68.49 171.23 13.71 (0 , 1 , 0 , 0 , 1) to Shankarpur Barewa tola Concrete (VR)
Waste Plastics Block Bandra Total 4.350 2 169.63 113.08 282.71 27.88 (0 , 2 , 0 , 0 , 2)

Block- Bochaha

790 L035 L035-NH57 KaharaHardas to New -- 1.743 3.750 Complete 4 55.54 37.03 92.57 9.79 (1 , 1 , 1 , 0 , 3) Rudra (VR24)

Page 85 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

791 L027 L027-T07 to SIMRAHA New -- 3.151 3.750 Complete 8 101.01 67.34 168.35 20.01 (1 , 0 , 0 , 0 , 1) BASUDEV (VR32) 792 L028 L028-T07 Jhapha to Bela New -- 1.053 3.750 Complete 4 37.77 25.18 62.95 5.83 (0 , 1 , 0 , 1 , 2) (VR33) 793 L066 L066-Garhan chamartola to New -- 1.200 3.750 Complete 1 40.83 27.22 68.05 6.70 (2 , 3 , 1 , 4 , 10) hamidpur (VR21) Block Bochaha Total 7.147 17 235.15 156.77 391.92 42.33 (4 , 5 , 2 , 5 , 16) Block- Kurhani

794 L104 L104-T02 Maniyari to New CELL Filled 1.985 3.750 Complete 5 78.04 52.02 130.06 10.21 (0 , 1 , 0 , 0 , 1) Rampur Kashi (VR18) Concrete
Waste Plastics 795 L077 L077-Gobarsahi sakri saraiya New CELL Filled 2.200 3.750 Complete 1 62.79 41.86 104.65 10.83 (1 , 0 , 0 , 0 , 1) road petrol pump to Concrete Sumera noor nagar (VR37)
Waste Plastics 796 L083 L083-Basauli Chowk to New CELL Filled 1.820 3.750 Complete 0 50.39 33.60 83.99 8.90 (1 , 0 , 0 , 0 , 1) Molama (VR43) Concrete
Waste Plastics Block Kurhani Total 6.005 6 191.22 127.48 318.70 29.94 (2 , 1 , 0 , 0 , 3)

Block- Minapur

797 L037 L037-L034 To Madhaipur New -- 0.960 3.750 Complete 2 31.01 20.68 51.69 4.32 (1 , 1 , 0 , 2 , 4) (VR28) 798 L048 L048-Maksudpur L087 To Ali New -- 0.600 3.750 Complete 1 19.91 13.27 33.18 2.83 (1 , 1 , 2 , 0 , 4) Neora (VR40) 799 L054 L054-t03 Maksudpur NH77 New -- 0.961 3.750 Complete 1 28.25 18.84 47.09 4.51 (0 , 1 , 0 , 0 , 1) To Mohanpur (VR38) Block Minapur Total 2.521 4 79.17 52.79 131.96 11.66 (2 , 3 , 2 , 2 , 9)

Page 86 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Muraul

800 L050 L050-Hasanpur L038 to New CELL Filled 1.000 3.750 Complete 2 35.69 23.80 59.49 5.87 (0 , 1 , 0 , 0 , 1) Markan (VR12) Concrete
Waste Plastics Block Muraul Total 1.000 2 35.69 23.80 59.49 5.87 (0 , 1 , 0 , 0 , 1)

District Muzaffarpur Total 23.499 35 797.24 531.51 1,328.75 133.21 (10 , 12 , 4 , 7 , 33) District- Nalanda

Block- Asthawan

801 L021 L021-T01,Kumhari River, to New Mechnical 3.000 3.750 Complete 8 88.49 59.00 147.49 9.25 (0 , 1 , 0 , 0 , 1) Gongchak (VR8) stabilization 802 L031 L031-T04,Noawan to New Mechnical 3.175 3.750 Complete 8 112.94 75.29 188.23 9.31 (1 , 1 , 0 , 1 , 3) Chakper (VR17) stabilization Block Asthawan Total 6.175 16 201.43 134.29 335.72 18.56 (1 , 2 , 0 , 1 , 4)

Block- Bihar Sharif

803 L043 L043-NH-82 to Meghi (VR29) New Mechnical 1.110 3.750 Complete 3 47.67 31.78 79.45 2.62 (1 , 0 , 0 , 0 , 1) stabilization 804 L048 L048-Mahalpar-Tetrawan Rd. New Mechnical 0.550 3.750 Complete 1 14.56 9.71 24.27 2.41 (0 , 1 , 0 , 0 , 1) to Kalyanpur (VR36) stabilization 805 L063 L063-L028A to Bilaspur New Mechnical 1.385 3.750 Complete 4 50.04 33.36 83.40 5.43 (1 , 0 , 0 , 0 , 1) (VR49) stabilization 806 L022 L022-NH-82 to Mohiudinpur New Mechnical 1.110 3.750 Complete 2 41.52 27.68 69.20 4.07 (1 , 1 , 0 , 0 , 2) (VR7) stabilization 807 L037 L037-L040 TO Nawaji Bighha New Mechnical 0.900 3.750 Complete 2 26.95 17.97 44.92 3.19 (1 , 0 , 0 , 0 , 1) (VR24) stabilization 808 L032 L032-Mahalpar-Tetrawan Rd. New Mechnical 0.850 3.750 Complete 2 22.08 14.72 36.80 2.72 (0 , 2 , 0 , 0 , 2) To Alaudia (VR18) stabilization

Page 87 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

809 L036 L036-L036 to Chhato (VR23) New Mechnical 0.870 3.750 Complete 2 24.62 16.41 41.03 3.41 (0 , 1 , 0 , 0 , 1) stabilization Block Bihar Sharif Total 6.775 16 227.44 151.63 379.07 23.85 (4 , 5 , 0 , 0 , 9)

Block- Ekangarsarai

810 L093 L093-Ekangarhilsa T 01 to New Mechnical 0.925 3.750 Complete 1 29.05 19.37 48.42 2.67 (0 , 1 , 0 , 0 , 1) Kharjama (TRACK50) stabilization 811 L027 L027-Eakangar Biharsharif New Mechnical 0.600 3.750 Complete 4 19.55 13.03 32.58 2.57 (0 , 1 , 0 , 0 , 1) road T02 to Atram Chak stabilization (TRACK13) 812 L092 L092-Ekangarsarai brahm New Mechnical 1.125 3.750 Complete 5 37.40 24.93 62.33 3.59 (1 , 0 , 0 , 0 , 1) sthan T02 to Dulari bigha stabilization (TRACK42) 813 L070 L070-T04 to Dhangaon New Mechnical 1.200 3.750 Complete 5 46.85 31.23 78.08 4.06 (1 , 0 , 0 , 1 , 2) (TRACK31) stabilization 814 L100 L100-Gomhar Aungari path New Mechnical 2.550 3.750 Complete 9 86.33 57.55 143.88 8.81 (0 , 1 , 0 , 0 , 1) to Mohammadpur middle stabilization school (VR9) 815 L096 L096-T02 to Dalorbigha New Mechnical 2.250 3.750 Complete 7 77.85 51.90 129.75 7.59 (0 , 1 , 0 , 0 , 1) (VR7) stabilization 816 L090 L090-T01 koshiawan to New Mechnical 1.500 3.750 Complete 3 39.43 26.28 65.71 2.68 (0 , 1 , 0 , 0 , 1) lodipur (TRACK40) stabilization 817 L101 L101-T01 to Dharampur New Mechnical 1.390 3.750 Complete 4 47.32 31.54 78.86 5.45 (0 , 1 , 0 , 0 , 1) (VR8) stabilization Block Ekangarsarai Total 11.540 38 383.78 255.83 639.61 37.42 (2 , 6 , 0 , 1 , 9)

Block- Giriak

818 L048 L048-NH31 Giriyak to New Mechnical 1.300 3.750 Complete 4 37.68 25.12 62.80 5.04 (0 , 1 , 0 , 0 , 1) Bishunpur (ODR12) stabilization Block Giriak Total 1.300 4 37.68 25.12 62.80 5.04 (0 , 1 , 0 , 0 , 1)

Page 88 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Islampur

819 L075 L075-L026 to Bhabhikshan New Mechnical 1.525 3.750 Complete 5 55.55 37.03 92.58 5.49 (0 , 1 , 0 , 0 , 1) Bigha (VR75) stabilization 820 L044 L044-Khudaganj Hu to New Mechnical 1.850 3.750 Complete 6 73.80 49.20 123.00 8.00 (0 , 1 , 0 , 2 , 3) Gangti (TRACK27) stabilization Block Islampur Total 3.375 11 129.35 86.23 215.58 13.49 (0 , 2 , 0 , 2 , 4)

Block- Katri Sarai

821 L063 L063-T02 to Sundarpur New Mechnical 0.600 3.750 Complete 3 24.35 16.24 40.59 2.20 (2 , 0 , 0 , 0 , 2) (ODR14) stabilization Block Katri Sarai Total 0.600 3 24.35 16.24 40.59 2.20 (2 , 0 , 0 , 0 , 2)

Block- Parwalpur

822 L032 L032-Bhasim Pur-Pilich road New Mechnical 1.900 3.750 Complete 7 69.98 46.65 116.63 8.55 (0 , 1 , 0 , 0 , 1) to Rudda (TRACK56) stabilization 823 L034 L034-PMGSY ALAWAN ROAD New Mechnical 1.015 3.750 Complete 2 42.00 28.00 70.00 3.39 (0 , 1 , 0 , 0 , 1) TO WEST KIRTIPUR (VR25) stabilization Block Parwalpur Total 2.915 9 111.98 74.65 186.63 11.94 (0 , 2 , 0 , 0 , 2)

Block- Sarmera

824 L065 L065-L049 to Chhoti Kenar New Mechnical 0.750 3.750 Complete 1 21.50 14.33 35.83 2.76 (0 , 1 , 0 , 0 , 1) (VR34) stabilization 825 L063 L063-L054 to Chhoti New Mechnical 0.550 3.750 Complete 3 28.85 19.24 48.09 1.78 (0 , 1 , 1 , 1 , 3) Malawan (VR32) stabilization 826 L064 L064-T01 to Baserhtar Road New Mechnical 0.625 3.750 Complete 2 21.40 14.27 35.67 2.29 (0 , 1 , 0 , 0 , 1) (VR33) stabilization 827 L066 L066-T05 to Sujachak New Mechnical 0.750 3.750 Complete 2 25.04 16.69 41.73 2.00 (0 , 1 , 0 , 0 , 1) (VR35) stabilization 828 L068 L068-To5 to Chuharchak New Mechnical 0.520 3.750 Complete 1 16.42 10.94 27.36 1.49 (1 , 0 , 0 , 0 , 1) Road (VR37) stabilization Block Sarmera Total 3.195 9 113.21 75.47 188.68 10.32 (1 , 4 , 1 , 1 , 7)

Page 89 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Silaw

829 L022 L022-L024 to Taju Bigha New Mechnical 0.850 3.750 Complete 1 20.77 13.85 34.62 3.44 (0 , 1 , 0 , 0 , 1) (VR22) stabilization Block Silaw Total 0.850 1 20.77 13.85 34.62 3.44 (0 , 1 , 0 , 0 , 1)

District Nalanda Total 36.725 107 1,249.99 833.31 2,083.30 126.27 (10 , 23 , 1 , 5 , 39) District- Nawada

Block- Akbarpur

830 L112 L112-NH 31 NONAI New CELL Filled 0.665 3.750 Complete 3 18.63 12.42 31.05 1.40 (0 , 0 , 1 , 0 , 1) DAKHINTOLA (TRACK112) Concrete
Mechnical stabilization 831 L054 L054-SIRKATTA RD TO KASI New CELL Filled 1.600 3.750 Complete 5 44.64 29.76 74.40 4.08 (0 , 0 , 1 , 0 , 1) CHUAN (TRACK54) Concrete
Mechnical stabilization Block Akbarpur Total 2.265 8 63.27 42.18 105.45 5.49 (0 , 0 , 2 , 0 , 2)

Block- Govindpur

832 L047 L047-SARKANDA PATH New CELL Filled 1.306 3.750 Complete 4 36.20 24.13 60.33 2.88 (0 , 1 , 0 , 0 , 1) TOMAHAWARA (TRACK47) Concrete
Mechnical stabilization Block Govindpur Total 1.306 4 36.20 24.13 60.33 2.88 (0 , 1 , 0 , 0 , 1)

Page 90 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Hisua

833 L070 L070-S H TO URSHA New CELL Filled 0.700 3.750 Complete 2 16.82 11.22 28.04 1.24 (1 , 0 , 0 , 0 , 1) (TRACK46) Concrete
Mechnical stabilization 834 L061 L061-NH 82 TO DOMN BIGHA New CELL Filled 0.600 3.750 Complete 2 15.08 10.05 25.13 1.43 (0 , 1 , 1 , 0 , 2) VIASONSA RAILWAY HALT Concrete (TRACK37)
Mechnical stabilization 835 L058 L058-CHAKPAR TO New CELL Filled 1.700 3.750 Complete 5 39.26 26.18 65.44 3.74 (0 , 1 , 0 , 0 , 1) MURGIACHAK (TRACK34) Concrete
Mechnical stabilization 836 L062 L062-SINHIN TO LAXMIPUR New CELL Filled 2.300 3.750 Complete 5 53.43 35.62 89.05 5.69 (0 , 1 , 0 , 0 , 1) (TRACK38) Concrete
Mechnical stabilization 837 L053 L053-TUNGI TO HASANPAR New CELL Filled 1.500 3.750 Complete 4 33.44 22.29 55.73 3.72 (0 , 1 , 0 , 0 , 1) (TRACK29) Concrete
Mechnical stabilization 838 L066 L066-S H 8 TOGAREN BIGHA New CELL Filled 1.000 3.750 Complete 2 22.73 15.15 37.88 2.33 (0 , 1 , 0 , 0 , 1) (TRACK42) Concrete
Mechnical stabilization 839 L054 L054-TUNGI ROAD TO TUNGI New CELL Filled 2.000 3.750 Complete 5 44.09 29.40 73.49 4.59 (0 , 1 , 0 , 0 , 1) CHAKPAR (TRACK30) Concrete
Mechnical stabilization

Page 91 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

840 L065 L065-S H 8 TO INDRA NAGAR New CELL Filled 0.550 3.750 Complete 3 16.33 10.89 27.22 1.18 (0 , 0 , 1 , 0 , 1) (TRACK41) Concrete
Mechnical stabilization Block Hisua Total 10.350 28 241.18 160.80 401.98 23.93 (1 , 6 , 2 , 0 , 9)

Block- Kashichak

841 L043 L043-SHAHPUR SEIKHPURA New CELL Filled 0.830 3.750 Complete 3 27.11 18.07 45.18 1.91 (1 , 0 , 0 , 0 , 1) ROAD TO GAJDISHPUR Concrete (TRACK23)
Mechnical stabilization 842 L046 L046-SUVANPUR ROAD TO New CELL Filled 1.200 3.750 Complete 4 37.30 24.87 62.17 3.00 (0 , 1 , 0 , 0 , 1) PALI (TRACK26) Concrete
Mechnical stabilization Block Kashichak Total 2.030 7 64.41 42.94 107.35 4.91 (1 , 1 , 0 , 0 , 2)

Block- Kauakol

843 L092 L092-KAWAKOL JAMUI ROAD New CELL Filled 0.600 3.750 Complete 1 18.37 12.25 30.62 3.72 (0 , 0 , 1 , 0 , 1) TO BANDOGHAR (TRACK65) Concrete
Mechnical stabilization 844 L102 L102-PWD KAWAKOL TO New CELL Filled 1.200 3.750 Complete 1 31.77 21.18 52.95 6.18 (1 , 0 , 0 , 0 , 1) TARAUN (TRACK75) Concrete
Mechnical stabilization

Page 92 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

845 L082 L082-KADHAR ROAD TO New CELL Filled 1.200 3.750 Complete 3 42.45 28.30 70.75 6.01 (1 , 0 , 0 , 0 , 1) BHANDARI (TRACK55) Concrete
Mechnical stabilization 846 L074 L074-PMGSY PAHARPUR New CELL Filled 3.745 3.750 Complete 17 137.31 91.54 228.85 13.01 (0 , 1 , 0 , 0 , 1) TIKODIH TO MANANIYATARI Concrete (TRACK47)
Mechnical stabilization 847 L073 L073-KAWAKOL JAMUI ROAD New Mechnical 1.500 3.750 Complete 6 55.29 36.86 92.15 6.63 (0 , 1 , 0 , 0 , 1) TO GUA DHODHARA stabilization (TRACK46) 848 L077 L077-PMGSY GANDHI DHAM New CELL Filled 0.700 3.750 Complete 1 19.02 12.68 31.70 3.69 (0 , 1 , 0 , 0 , 1) TO KAPASIYA (TRACK50) Concrete
Mechnical stabilization 849 L079 L079-GURIGHAT TO New CELL Filled 1.100 3.750 Complete 3 30.87 20.58 51.45 4.75 (0 , 1 , 0 , 0 , 1) PANSAGWA (TRACK52) Concrete
Mechnical stabilization 850 L071 L071-KAWAKOL JAMUI ROAD New Mechnical 1.000 3.750 Complete 4 30.96 20.64 51.60 3.37 (0 , 1 , 0 , 0 , 1) TO PACHIARI TOLA LALPUR stabilization (TRACK44) 851 L076 L076-PMGSY MANJHILA New CELL Filled 1.500 3.750 Complete 6 55.29 36.86 92.15 6.51 (0 , 1 , 0 , 0 , 1) ROAD TO AMARPUR Concrete (TRACK49)
Mechnical stabilization 852 L096 L096-PMGSY BUKAR ROAD New CELL Filled 1.300 3.750 Complete 9 45.31 30.20 75.51 3.60 (0 , 0 , 1 , 0 , 1) TO BRINDABAN (TRACK69) Concrete
Mechnical stabilization

Page 93 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

853 L069 L069-PMGSY BARAUN ROAD New CELL Filled 4.050 3.750 Complete 9 143.06 95.37 238.43 12.08 (0 , 0 , 1 , 0 , 1) TO RADHAWA (TRACK42) Concrete
Mechnical stabilization 854 L081 L081-KACHNA KAWAKOL PWD New CELL Filled 0.800 3.750 Complete 1 21.12 14.08 35.20 4.72 (0 , 0 , 1 , 0 , 1) ROAD TO HAHAPUR Concrete (TRACK54)
Mechnical stabilization Block Kauakol Total 18.695 61 630.82 420.54 1,051.36 74.26 (2 , 6 , 4 , 0 , 12) Block- Meskaur

855 L069 L069-PAWAI PATH TO RADHA New CELL Filled 1.620 3.750 Complete 5 39.93 26.62 66.55 3.91 (0 , 0 , 1 , 0 , 1) BIGHA (TRACK69) Concrete
Mechnical stabilization Block Meskaur Total 1.620 5 39.93 26.62 66.55 3.91 (0 , 0 , 1 , 0 , 1)

Block- Nardiganj

856 L069 L069-NH 82 TO DARIYAPUR New CELL Filled 2.000 3.750 Complete 8 52.36 34.90 87.26 4.96 (1 , 0 , 0 , 0 , 1) (TRACK48) Concrete
Mechnical stabilization 857 L068 L068-NH82 TO SADIPUR New CELL Filled 0.550 3.750 Complete 1 13.12 8.75 21.87 4.30 (1 , 0 , 0 , 0 , 1) (TRACK47) Concrete
Mechnical stabilization 858 L071 L071-NH 82 TO ABDULPUR New CELL Filled 0.900 3.750 Complete 2 22.08 14.72 36.80 1.55 (0 , 1 , 0 , 0 , 1) (TRACK50) Concrete
Mechnical stabilization

Page 94 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

859 L058 L058-NH82 TO FALDU New CELL Filled 0.700 3.750 Complete 2 17.89 11.93 29.82 1.13 (0 , 1 , 0 , 0 , 1) (TRACK60) Concrete
Mechnical stabilization 860 L060 L060-NH82 TO FATEHPUR New CELL Filled 0.700 3.750 Complete 3 18.68 12.45 31.13 1.30 (0 , 1 , 0 , 0 , 1) (TRACK59) Concrete
Mechnical stabilization 861 L064 L064-BILAYCHAK TO NAUYA New CELL Filled 1.000 3.750 Complete 3 25.41 16.94 42.35 2.39 (0 , 1 , 0 , 0 , 1) BIGHA (TRACK43) Concrete
Mechnical stabilization 862 L063 L063-T09 TO New CELL Filled 1.510 3.750 Complete 5 39.99 26.66 66.65 3.74 (0 , 0 , 1 , 0 , 1) CHANANACHATAR (TRACK42) Concrete
Mechnical stabilization 863 L072 L072-T04 TO TARAUNI New CELL Filled 1.610 3.750 Complete 5 40.94 27.29 68.23 3.73 (0 , 0 , 1 , 0 , 1) (TRACK51) Concrete
Mechnical stabilization 864 L065 L065-TO4 TO BARESARA New CELL Filled 0.900 3.750 Complete 4 24.81 16.54 41.35 2.03 (0 , 0 , 1 , 0 , 1) (TRACK44) Concrete
Mechnical stabilization 865 L062 L062-SABHRI TO New CELL Filled 1.000 3.750 Complete 4 27.79 18.52 46.31 2.07 (0 , 0 , 1 , 0 , 1) KHEDUBIGHA (TRACK41) Concrete
Mechnical stabilization

Page 95 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

866 L074 L074-NARDIGANJ TO New CELL Filled 0.700 3.750 Complete 2 17.98 11.99 29.97 3.47 (0 , 0 , 1 , 0 , 1) LODIPURJAFARA H. TOLA Concrete (TRACK55)
Mechnical stabilization Block Nardiganj Total 11.570 39 301.05 200.69 501.74 30.67 (2 , 4 , 5 , 0 , 11) Block- Narhat

867 L035 L035-DARGAHIBIGHA TO New CELL Filled 1.395 3.750 Complete 4 36.16 24.11 60.27 3.40 (0 , 1 , 0 , 0 , 1) BARA (TRACK15) Concrete
Mechnical stabilization 868 L022 L022-GANGTA TO PUNTHAR New CELL Filled 0.856 3.750 Complete 3 23.48 15.66 39.14 1.91 (0 , 0 , 1 , 0 , 1) (TRACK2) Concrete
Mechnical stabilization Block Narhat Total 2.251 7 59.64 39.77 99.41 5.31 (0 , 1 , 1 , 0 , 2)

Block- Nawada

869 L076 L076-NAWADA NARDIGANJ New CELL Filled 1.650 3.750 Complete 7 52.45 34.96 87.41 4.05 (1 , 0 , 0 , 0 , 1) ROAD TO NEYA (TRACK70) Concrete
Mechnical stabilization 870 L100 L100-NH 31 TO AKAUNA New CELL Filled 0.550 3.750 Complete 2 15.33 10.22 25.55 2.62 (1 , 0 , 0 , 0 , 1) NIJAMAT (TRACK63) Concrete
Mechnical stabilization

Page 96 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

871 L105 L105-NH 31 TO RASUL New CELL Filled 1.200 3.750 Complete 4 31.10 20.74 51.84 3.06 (1 , 0 , 0 , 0 , 1) NAGAR (TRACK68) Concrete
Mechnical stabilization 872 L092 L092-NAWADA KUNJ ROAD New CELL Filled 2.000 3.750 Complete 8 55.33 36.89 92.22 4.76 (1 , 0 , 0 , 0 , 1) TO MOHIUDDINPUR Concrete (TRACK56)
Mechnical stabilization 873 L120 L120-KENA ROAD TO New CELL Filled 1.290 3.750 Complete 4 34.43 22.96 57.39 5.37 (0 , 1 , 0 , 0 , 1) SALUGANJ (TRACK83) Concrete
Mechnical stabilization 874 L075 L075-SISWA ROAD TO New CELL Filled 1.550 3.750 Complete 6 42.67 28.45 71.12 3.48 (0 , 1 , 0 , 0 , 1) BHAGALPUR (TRACK69) Concrete
Mechnical stabilization 875 L117 L117-GONIGARH ROAD TO New CELL Filled 1.500 3.750 Complete 6 41.81 27.87 69.68 3.21 (0 , 1 , 0 , 0 , 1) SHANKARPUR (TRACK80) Concrete
Mechnical stabilization 876 L115 L115-GONI GARH TO New CELL Filled 0.500 3.750 Complete 1 12.40 8.27 20.67 3.36 (0 , 1 , 0 , 0 , 1) MAHARAJGANJ (TRACK78) Concrete
Mechnical stabilization 877 L104 L104-KADIRGANJ SAMAI New CELL Filled 0.700 3.750 Complete 2 18.45 12.30 30.75 3.59 (0 , 1 , 0 , 0 , 1) ROAD TO SADIKPUR Concrete (TRACK67)
Mechnical stabilization

Page 97 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

878 L077 L077-PIPAR PATI ROAD TO New CELL Filled 2.500 3.750 Complete 10 68.45 45.63 114.08 5.44 (0 , 0 , 1 , 0 , 1) SHIVCHARAN BIGHA Concrete (TRACK71)
Mechnical stabilization 879 L116 L116-STEEL NAGAR TO New CELL Filled 2.000 3.750 Complete 8 55.69 37.12 92.81 5.05 (0 , 0 , 1 , 0 , 1) DHUMRA (TRACK79) Concrete
Mechnical stabilization 880 L114 L114-GONIGARH ROAD TO New CELL Filled 0.650 3.750 Complete 2 17.40 11.60 29.00 1.27 (0 , 0 , 1 , 0 , 1) RAJAMBHA (TRACK77) Concrete
Mechnical stabilization 881 L098 L098-PATWASARI ROAD TO New CELL Filled 0.800 3.750 Complete 2 20.15 13.44 33.59 1.83 (0 , 0 , 1 , 0 , 1) BAJRANGI BIGHA (TRACK61) Concrete
Mechnical stabilization 882 L103 L103-LOHARPURA ROAD TO New CELL Filled 0.600 3.750 Complete 2 16.47 10.98 27.45 1.14 (0 , 0 , 1 , 0 , 1) CHILAUNGIYA (TRACK66) Concrete
Mechnical stabilization 883 L118 L118-AMBIKA BIGHA TO New CELL Filled 2.000 3.750 Complete 6 53.38 35.59 88.97 4.69 (0 , 0 , 1 , 0 , 1) PAKARIYA MUSHARI Concrete (TRACK81)
Mechnical stabilization 884 L095 L095-PWD ROAD TO New CELL Filled 0.600 3.750 Complete 1 14.66 9.77 24.43 0.92 (0 , 0 , 1 , 0 , 1) NEHALUCHAK (TRACK58) Concrete
Mechnical stabilization

Page 98 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

885 L101 L101-NH 31 TO BELDARIYA New CELL Filled 1.300 3.750 Complete 3 32.04 21.36 53.40 2.73 (0 , 0 , 1 , 0 , 1) (TRACK64) Concrete
Mechnical stabilization 886 L109 L109-T017 ROAD TO New CELL Filled 0.620 3.750 Complete 2 16.44 10.96 27.40 1.46 (0 , 0 , 1 , 0 , 1) MOTNAJE (TRACK72) Concrete
Mechnical stabilization 887 L112 L112-SAMAI KADIRGANJ New CELL Filled 1.750 3.750 Complete 6 47.98 31.99 79.97 4.27 (0 , 0 , 1 , 0 , 1) ROAD TO MAHDALICHAK Concrete (TRACK75)
Mechnical stabilization 888 L113 L113-SAMAI KADIRGANJ New CELL Filled 0.600 3.750 Complete 2 16.47 10.98 27.45 1.27 (0 , 0 , 1 , 0 , 1) ROAD TO KARIMCHAK Concrete (TRACK76)
Mechnical stabilization 889 L111 L111-KENA ROAD TO New CELL Filled 0.700 3.750 Complete 2 18.26 12.18 30.44 1.55 (0 , 0 , 1 , 0 , 1) POKHARPUR (TRACK74) Concrete
Mechnical stabilization 890 L121 L121-KUJHA ROAD TO New CELL Filled 1.300 3.750 Complete 4 34.61 23.07 57.68 3.11 (0 , 0 , 1 , 0 , 1) JAGANNATHPUR (TRACK84) Concrete
Mechnical stabilization 891 L119 L119-NH 31 TO JAIN MANDIR New CELL Filled 0.900 3.750 Complete 1 21.63 14.42 36.05 0.14 (1 , 0 , 0 , 0 , 1) (TRACK82) Concrete
Mechnical stabilization Block Nawada Total 27.260 91 737.60 491.75 1,229.35 68.36 (5 , 5 , 13 , 0 , 23)

Page 99 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Pakri Barwan

892 L084 L084-PAKRIBARAWAN New CELL Filled 1.500 3.750 Complete 6 43.26 28.84 72.10 2.99 (1 , 0 , 0 , 0 , 1) TO Concrete DHEWADHA (TRACK60)
Mechnical stabilization 893 L079 L079-JIYURI ROAD TO New CELL Filled 1.420 3.750 Complete 5 41.19 27.46 68.65 3.53 (1 , 0 , 0 , 0 , 1) PURANI JIYURI (TRACK55) Concrete
Mechnical stabilization 894 L091 L091-WARISALIGANJ New CELL Filled 1.950 3.750 Complete 6 52.92 35.28 88.20 5.01 (1 , 0 , 0 , 0 , 1) PAKRIBARAWAN ROAD TO Concrete CHATARWAR (TRACK67)
Mechnical stabilization 895 L068 L068-T02 TO POKSI New CELL Filled 0.883 3.750 Complete 3 25.24 16.83 42.07 2.23 (1 , 0 , 0 , 0 , 1) (TRACK44) Concrete
Mechnical stabilization 896 L100 L100-KACHNA RUPO ROAD New CELL Filled 4.500 3.750 Complete 10 117.54 78.36 195.90 10.27 (1 , 0 , 0 , 0 , 1) TO KEWLA (TRACK76) Concrete
Mechnical stabilization 897 L076 L076-MARWA DUMRI PMGSY New CELL Filled 2.793 3.750 Complete 8 77.91 51.94 129.85 7.04 (1 , 0 , 0 , 0 , 1) ROAD TO SIMARIYA Concrete (TRACK52)
Mechnical stabilization 898 L072 L072-KACHNA RUPO ROAD New CELL Filled 0.862 3.750 Complete 3 25.53 17.02 42.55 1.25 (1 , 0 , 0 , 0 , 1) TO KOIRIYA BIGHA Concrete (TRACK48)
Mechnical stabilization

Page 100 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

899 L083 L083-SH-8 TO DUDHAILA New CELL Filled 1.262 3.750 Complete 8 41.23 27.49 68.72 3.69 (1 , 0 , 0 , 0 , 1) (TRACK59) Concrete
Mechnical stabilization 900 L080 L080-TANPURA ROAD TO New CELL Filled 1.444 3.750 Complete 3 38.82 25.88 64.70 3.51 (0 , 0 , 1 , 0 , 1) BAREYA BIGHA (TRACK56) Concrete
Mechnical stabilization 901 L078 L078-KACHNA RUPO ROAD New CELL Filled 1.058 3.750 Complete 4 30.63 20.42 51.05 2.73 (0 , 1 , 0 , 0 , 1) TO BENGRAJPUR (TRACK54) Concrete
Mechnical stabilization 902 L087 L087-SH-8 TO RAMPUR New CELL Filled 1.800 3.750 Complete 5 48.81 32.54 81.35 4.09 (0 , 1 , 0 , 0 , 1) (TRACK63) Concrete
Mechnical stabilization 903 L081 L081-PAKRIBARAWAN JAMUI New CELL Filled 2.000 3.750 Complete 4 52.90 35.27 88.17 3.80 (0 , 1 , 0 , 0 , 1) ROAD TO KESOCHAK Concrete (TRACK57)
Mechnical stabilization 904 L114 L114-ANJUNAR ROAD TO New CELL Filled 1.700 3.750 Complete 4 48.94 32.62 81.56 3.82 (0 , 1 , 0 , 0 , 1) HORILKHAP (TRACK39) Concrete
Mechnical stabilization 905 L077 L077-KACHNA PWD ROAD TO New CELL Filled 1.000 3.750 Complete 3 27.63 18.42 46.05 1.80 (0 , 0 , 1 , 0 , 1) ARSANIYA (TRACK53) Concrete
Mechnical stabilization

Page 101 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

906 L082 L082-PAKRIBARAWAN JAMUI New CELL Filled 1.900 3.750 Complete 4 49.06 32.71 81.77 3.75 (0 , 0 , 1 , 0 , 1) ROAD TO BARTARAR Concrete (TRACK58)
Mechnical stabilization 907 L109 L109-BHALURI TO PAKARIYA New CELL Filled 3.100 3.750 Complete 7 80.17 53.45 133.62 6.78 (0 , 0 , 1 , 0 , 1) DIH (TRACK85) Concrete
Mechnical stabilization 908 L086 L086-THALPOS PMGSY ROAD New CELL Filled 2.500 3.750 Complete 9 77.64 51.76 129.40 6.38 (0 , 0 , 1 , 0 , 1) TO KARMANIYA (TRACK62) Concrete
Mechnical stabilization 909 L073 L073-KACHNA RUPO ROAD New CELL Filled 2.326 3.750 Complete 6 62.53 41.69 104.22 6.29 (0 , 0 , 1 , 0 , 1) TO TARA BIGHA (TRACK49) Concrete
Mechnical stabilization Block Pakri Barwan Total 33.998 98 941.95 627.98 1,569.93 78.95 (8 , 4 , 6 , 0 , 18) Block- Roh

910 L034 L034-ROH-SEOR ROAD TO New CELL Filled 1.780 3.750 Complete 7 51.96 34.64 86.60 4.50 (0 , 1 , 0 , 0 , 1) KAZICHAK (TRACK34) Concrete
Mechnical stabilization 911 L070 L070-ROH MARUI PATH TO New CELL Filled 0.726 3.750 Complete 2 19.39 12.93 32.32 1.30 (1 , 0 , 0 , 0 , 1) RATOI (TRACK70) Concrete
Mechnical stabilization

Page 102 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

912 L029 L029-KARMA RD TO SANTHE New CELL Filled 1.200 3.750 Complete 2 30.67 20.44 51.11 4.89 (0 , 1 , 0 , 0 , 1) (TRACK29) Concrete
Mechnical stabilization 913 L059 L059-KOSHI RUKHI PATH TO New CELL Filled 1.350 3.750 Complete 7 41.37 27.58 68.95 3.49 (0 , 0 , 1 , 0 , 1) PACHTARWA (TRACK59) Concrete
Mechnical stabilization Block Roh Total 5.056 18 143.39 95.59 238.98 14.17 (1 , 2 , 1 , 0 , 4)

Block- Sirdala

914 L035 L035-ABDUL TO KADWARA New CELL Filled 1.540 3.750 Complete 3 36.00 24.00 60.00 3.44 (1 , 0 , 0 , 0 , 1) (TRACK45) Concrete
Mechnical stabilization Block Sirdala Total 1.540 3 36.00 24.00 60.00 3.44 (1 , 0 , 0 , 0 , 1)

Block- Warsalliganj

915 L091 L091-BHOJWAN BARBIGHA New CELL Filled 1.380 3.750 Complete 3 37.80 25.20 63.00 2.21 (1 , 0 , 0 , 0 , 1) ROAD TO BALI (TRACK61) Concrete
Mechnical stabilization 916 L106 L106-WARISALIGANJ BELDHA New CELL Filled 1.000 3.750 Complete 3 27.91 18.61 46.52 1.65 (1 , 0 , 0 , 0 , 1) ROAD MAHARANI STHAN TO Concrete BANDHA (TRACK76)
Mechnical stabilization 917 L110 L110-CHULHAI BIGHA ROAD New CELL Filled 0.750 3.750 Complete 2 20.81 13.88 34.69 0.86 (1 , 0 , 0 , 0 , 1) TO CHAKMILKI (TRACK94) Concrete
Mechnical stabilization

Page 103 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

918 L081 L081-KUTRI TO TULAPUR New CELL Filled 2.000 3.750 Complete 6 57.13 38.09 95.22 4.78 (0 , 1 , 0 , 0 , 1) (TRACK51) Concrete
Mechnical stabilization 919 L096 L096-MAI MAHADEWA ROAD New CELL Filled 2.100 3.750 Complete 6 58.87 39.25 98.12 4.79 (0 , 1 , 0 , 0 , 1) TO DHANKAUL MUSHARI Concrete (TRACK66)
Mechnical stabilization 920 L084 L084-TARABIGHA BILARI New CELL Filled 0.800 3.750 Complete 2 22.04 14.69 36.73 1.60 (0 , 1 , 0 , 0 , 1) ROAD TO KHIRBHOJNA Concrete (TRACK54)
Mechnical stabilization 921 L101 L101-VIJAYNAGAR MASUDA New CELL Filled 1.500 3.750 Complete 3 39.75 26.50 66.25 1.66 (0 , 1 , 0 , 0 , 1) ROAD TO KOLHA BIGHA Concrete (TRACK71)
Mechnical stabilization 922 L079 L079-MURGIYACHAK TO New CELL Filled 0.550 3.750 Complete 1 13.71 9.14 22.85 0.62 (0 , 0 , 1 , 0 , 1) MANCHAK (TRACK49) Concrete
Mechnical stabilization 923 L082 L082-MASANKHAMA ROAD TO New CELL Filled 1.500 3.750 Complete 3 39.42 26.28 65.70 3.41 (0 , 0 , 1 , 0 , 1) GANESHNAGAR (TRACK52) Concrete
Mechnical stabilization 924 L109 L109-WARISALIGANJ New CELL Filled 0.600 3.750 Complete 1 15.05 10.04 25.09 1.07 (0 , 0 , 1 , 0 , 1) BAGHIBARDIHA PWD ROAD Concrete TO BELDARIYA (TRACK79)
Mechnical stabilization

Page 104 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

925 L122 L122-MOSMA ROAD TO New CELL Filled 0.900 3.750 Complete 3 25.55 17.04 42.59 1.80 (0 , 0 , 1 , 0 , 1) BHAGALPUR (TRACK92) Concrete
Mechnical stabilization 926 L099 L099-PAKRIBARAWAN New CELL Filled 1.500 3.750 Complete 3 39.24 26.16 65.40 2.83 (0 , 0 , 1 , 0 , 1) WARISALIGANJ ROAD TO Concrete MALICHAK (TRACK69)
Mechnical stabilization 927 L093 L093-GORAPAR TO New CELL Filled 1.375 3.750 Complete 4 39.60 26.40 66.00 3.43 (0 , 1 , 0 , 0 , 1) BELDARIYA (TRACK63) Concrete
Mechnical stabilization Block Warsalliganj Total 15.955 40 436.88 291.28 728.16 30.72 (3 , 5 , 5 , 0 , 13) District Nawada Total 133.896 409 3,732.32 2,488.27 6,220.59 346.99 (24 , 35 , 40 , 0 , 99) District- Patna

Block- Dhanarua

928 L113 L113-L025 to Nizamat New Mechnical 3.475 3.750 Complete 7 123.33 82.22 205.55 22.59 (0 , 2 , 0 , 0 , 2) (VR78) stabilization 929 L026 L026-T01 To Fatehpur via New Mechnical 2.550 3.750 Complete 6 102.25 68.17 170.42 11.55 (1 , 0 , 0 , 0 , 1) Ramanibigha (VR10) stabilization Block Dhanarua Total 6.025 13 225.58 150.39 375.97 34.14 (1 , 2 , 0 , 0 , 3)

Block- Masaurhi

930 L022 L022-T01 to Chananpur New Mechnical 1.600 3.750 Complete 3 50.33 33.55 83.88 6.08 (1 , 1 , 0 , 0 , 2) (VR12) stabilization Block Masaurhi Total 1.600 3 50.33 33.55 83.88 6.08 (1 , 1 , 0 , 0 , 2)

Page 105 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Paliganj

931 L061 L061-ARWAL JEHANABAD TO New -- 0.866 3.750 Complete 3 28.57 19.05 47.62 4.17 (1 , 0 , 0 , 0 , 1) JANHARU (TRACK41) 932 L028 L028-KHIRI KINJAR TO New -- 2.340 3.750 Complete 7 70.52 47.01 117.53 12.42 (1 , 0 , 0 , 1 , 2) SEHARA (TRACK14) 933 L037 L037-PALI CHANDOS TO New -- 1.983 3.750 Complete 3 64.59 43.06 107.65 8.58 (1 , 1 , 0 , 0 , 2) ARARI (TRACK23) 934 L032 L032-PALI MASAURHI TO New -- 1.392 3.750 Complete 3 40.87 27.25 68.12 6.69 (0 , 1 , 0 , 0 , 1) PASAURAHA (TRACK19) Block Paliganj Total 6.581 16 204.55 136.37 340.92 31.85 (3 , 2 , 0 , 1 , 6)

Block- Punpun

935 L031 L031-T02 to Patanpura New Mechnical 1.820 3.750 Complete 1 57.50 38.34 95.84 6.18 (0 , 3 , 0 , 0 , 3) (VR16) stabilization Block Punpun Total 1.820 1 57.50 38.34 95.84 6.18 (0 , 3 , 0 , 0 , 3)

District Patna Total 16.026 33 537.96 358.65 896.61 78.24 (5 , 8 , 0 , 1 , 14) District- Purnea

Block- Amaur

936 L025 L025-L024 to New Cold Mix 3.847 3.750 Complete 9 139.34 92.90 232.24 7.31 (1 , 1 , 0 , 0 , 2) Kapariabangawn (VR25) Technology 937 L049 L049-Asranda to Banganw New Cold Mix 1.410 3.750 Complete 4 55.13 36.75 91.88 4.56 (1 , 0 , 0 , 0 , 1) (VR49) Technology 938 L053 L053-Apprch Rd. T05 to New CELL Filled 0.990 3.750 Complete 2 37.82 25.21 63.03 2.16 (0 , 1 , 0 , 0 , 1) Manuware (VR53) Concrete
Cold Mix Technology 939 L073 L073-Madhya vidyaly habib New Cold Mix 3.650 3.750 Complete 12 147.06 98.04 245.10 13.69 (0 , 1 , 0 , 0 , 1) tola to mushalman tola Technology (VR73)

Page 106 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

940 L082 L082-Jainuddin dukan to New CELL Filled 0.822 3.750 Complete 2 33.37 22.25 55.62 2.72 (0 , 1 , 0 , 0 , 1) mushalman tolla pachim Concrete (VR82)
Cold Mix Technology 941 L077 L077-Chand tola to New Cold Mix 2.760 3.750 Complete 5 116.05 77.36 193.41 10.21 (0 , 1 , 0 , 0 , 1) simalbari Bagsahrulla (VR77) Technology 942 L062 L062-T06 to Karia (VR62) New Cold Mix 1.435 3.750 Complete 4 55.26 36.84 92.10 4.23 (0 , 1 , 0 , 0 , 1) Technology 943 L035 L035-Apprch Rd. T03 to New Cold Mix 0.739 3.750 Complete 1 26.60 17.73 44.33 2.77 (0 , 1 , 0 , 0 , 1) Bhakuri (VR35) Technology 944 L069 L069-SBI to Tejpur (VR69) New Cold Mix 1.420 3.750 Complete 4 57.82 38.55 96.37 4.11 (0 , 1 , 0 , 2 , 3) Technology 945 L067 L067-Basna chowk to Bagdar New Cold Mix 0.900 3.750 Complete 3 43.38 28.92 72.30 3.37 (1 , 0 , 0 , 0 , 1) (VR67) Technology 946 L081 L081-Nashrudiin To rahua New Cold Mix 3.600 3.750 Complete 6 141.89 94.59 236.48 12.49 (0 , 1 , 1 , 2 , 4) (VR81) Technology 947 L063 L063-L034 to kolhamohan New Cold Mix 1.500 3.750 Complete 5 61.17 40.78 101.95 5.68 (0 , 1 , 0 , 0 , 1) (VR63) Technology 948 L086 L086-Belka chowk to New Cold Mix 3.085 3.750 Complete 8 125.44 83.63 209.07 8.51 (0 , 1 , 1 , 1 , 3) Mushalman Tolla (VR86) Technology 949 L083 L083-Hatua chowk to Gerua New Cold Mix 1.768 3.750 Complete 4 68.09 45.40 113.49 5.26 (0 , 1 , 0 , 1 , 2) (VR83) Technology 950 L022 L022-Apprch Rd. T01to New Cold Mix 4.465 3.750 Complete 8 163.17 108.78 271.95 16.25 (1 , 1 , 0 , 3 , 5) Talbari (VR22) Technology 951 L042 L042-Apprch Rd. T03 to New CELL Filled 0.900 3.750 Complete 2 43.25 28.83 72.08 3.23 (0 , 2 , 1 , 1 , 4) Bengdah (VR42) Concrete
Cold Mix Technology 952 L074 L074-Sahangawn South more New Cold Mix 5.000 3.750 Complete 10 216.45 144.30 360.75 18.71 (0 , 2 , 1 , 1 , 4) to nBangali tola (VR74) Technology 953 L057 L057-Apprch Rd. T06 to New Cold Mix 1.055 3.750 Complete 2 39.38 26.25 65.63 3.37 (0 , 1 , 1 , 2 , 4) Sakma (VR57) Technology 954 L059 L059-Apprch Rd. L024 to New Cold Mix 1.400 3.750 Complete 4 55.64 37.10 92.74 4.45 (1 , 0 , 0 , 1 , 2) Bavandov (VR59) Technology

Page 107 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

955 L033 L033-Kanahariya to Raili New Cold Mix 5.760 3.750 Complete 13 255.70 170.46 426.16 20.34 (1 , 1 , 0 , 0 , 2) (VR33) Technology 956 L044 L044-Terdahi to Maheswa New Cold Mix 1.889 3.750 Complete 4 80.25 53.50 133.75 6.49 (4 , 2 , 1 , 8 , 15) (VR44) Technology 957 L031 L031-L030 to Telangana New Cold Mix 3.992 3.750 Complete 11 163.87 109.24 273.11 10.30 (2 , 0 , 2 , 2 , 6) (VR31) Technology 958 L038 L038-Ikra to Deori (VR38) New Cold Mix 2.715 3.750 Complete 6 99.81 66.54 166.35 9.68 (0 , 1 , 0 , 0 , 1) Technology Block Amaur Total 55.102 129 2,225.94 1,483.95 3,709.89 179.89 (12 , 22 , 8 , 24 , 66) Block- Baisa

959 L032 L032-Dhusmal to Mugara New Cold Mix 3.906 3.750 Complete 12 171.53 114.35 285.88 16.59 (1 , 1 , 0 , 2 , 4) Piyaji (VR32) Technology 960 L042 L042-Raiber to Jagadal New Cold Mix 2.513 3.750 Complete 5 110.15 73.43 183.58 6.93 (0 , 1 , 0 , 2 , 3) (VR42) Technology 961 L059 L059-T04 To Budhir (VR59) New Cold Mix 1.741 3.750 Complete 6 73.93 49.29 123.22 6.80 (0 , 1 , 0 , 2 , 3) Technology 962 L056 L056-T02 to Harna (VR56) New Cold Mix 1.675 3.750 Complete 4 62.79 41.86 104.65 6.16 (0 , 1 , 0 , 0 , 1) Technology 963 L057 L057-T04 to Sirsi via New Cold Mix 1.025 3.750 Complete 2 38.64 25.76 64.40 3.36 (2 , 0 , 2 , 0 , 4) Patugaon (VR57) Technology Block Baisa Total 10.860 29 457.04 304.69 761.73 39.83 (3 , 4 , 2 , 6 , 15) Block- Baisi

964 L027 L027-Mahesh Bathna to New Cold Mix 1.950 3.750 Complete 5 70.98 47.32 118.30 6.33 (0 , 1 , 0 , 0 , 1) Satiyara (VR27) Technology 965 L050 L050-T01 To Bansdol (VR50) New Cold Mix 1.570 3.750 Complete 6 56.05 37.36 93.41 5.24 (0 , 1 , 1 , 0 , 2) Technology Block Baisi Total 3.520 11 127.03 84.68 211.71 11.57 (0 , 2 , 1 , 0 , 3)

Page 108 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Banmankhi

966 L053 L053-Rahmatpur to Pipra New Cold Mix 1.573 3.750 Complete 3 61.72 41.15 102.87 5.62 (3 , 0 , 1 , 2 , 6) (VR53) Technology 967 L049 L049-Chainpur to Narheba New Cold Mix 1.500 3.750 Complete 5 60.53 40.35 100.88 6.49 (1 , 0 , 1 , 1 , 3) Narayanpur (VR49) Technology 968 L068 L068-Budhia Dhankata to New Cold Mix 3.116 3.750 Complete 9 131.01 87.34 218.35 11.55 (1 , 1 , 1 , 4 , 7) Kamat Tola (VR68) Technology 969 L084 L084-chandpur to New Cold Mix 3.000 3.750 Complete 7 133.23 88.82 222.05 11.82 (2 , 0 , 0 , 0 , 2) jagdishpur (VR84) Technology 970 L078 L078-PWD ROAD TO New Cold Mix 1.918 3.750 Complete 6 73.01 48.67 121.68 6.10 (1 , 0 , 0 , 0 , 1) KUNWARI PASWAN TOLA Technology (VR78) 971 L086 L086-JHALI GHAT TO New Cold Mix 2.185 3.750 Complete 7 84.52 56.35 140.87 8.32 (1 , 0 , 0 , 0 , 1) TETRAHI VIA M.S. TETRAHI Technology (VR86) 972 L051 L051-Beltari to Rupauli New Cold Mix 1.480 3.750 Complete 3 50.59 33.73 84.32 5.36 (1 , 0 , 0 , 0 , 1) (VR51) Technology 973 L087 L087-BAHORA FATAK TO New Cold Mix 3.030 3.750 Complete 6 129.11 86.07 215.18 10.09 (2 , 0 , 0 , 0 , 2) MASURIA (VR87) Technology 974 L079 L079-200 RD. CANAL TO New Cold Mix 1.802 3.750 Complete 4 68.80 45.87 114.67 6.03 (1 , 0 , 0 , 0 , 1) RAMJANI MANDAL TOLA VIA Technology MUSALMAN TOLA (VR79) 975 L090 L090-PAKKA ROAD TO PURAB New Cold Mix 2.250 3.750 Complete 12 96.13 64.09 160.22 7.57 (1 , 0 , 0 , 0 , 1) MUSHARI (VR90) Technology 976 L093 L093-MUSHARI PWD ROAD New Cold Mix 1.318 3.750 Complete 3 48.76 32.51 81.27 4.35 (1 , 1 , 1 , 0 , 3) TO BAHORA MASURIA ROAD Technology VIA RAJPUT TOLA (VR93) 977 L091 L091-PWD PAKKA ROAD TO New Cold Mix 1.500 3.750 Complete 3 57.84 38.56 96.40 5.40 (0 , 2 , 0 , 0 , 2) MEHTA TOLA VIA BRAHAMAN Technology TOLA (VR91) 978 L103 L103-Kajhi Musharnia Chowk New Cold Mix 1.892 3.750 Complete 12 80.29 53.53 133.82 7.71 (0 , 2 , 0 , 0 , 2) to River Side via Kadampura Technology Santhal Tola (VR103)

Page 109 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

979 L101 L101-NH-107 to Sadhupur New CELL Filled 0.700 3.750 Complete 2 26.53 17.69 44.22 2.19 (0 , 1 , 0 , 0 , 1) (VR101) Concrete
Cold Mix Technology 980 L096 L096-PAKKA ROAD TO New Cold Mix 1.882 3.750 Complete 7 82.78 55.19 137.97 7.02 (0 , 1 , 0 , 1 , 2) GORIHARI (VR96) Technology Block Banmankhi Total 29.146 89 1,184.85 789.92 1,974.77 105.60 (15 , 8 , 4 , 8 , 35) Block- Barhara Kothi

981 L059 L059-Basriyagot Dewari New Cold Mix 4.853 3.750 Complete 12 192.83 128.55 321.38 17.56 (1 , 0 , 0 , 0 , 1) Chowk to Bidnagang (VR59) Technology 982 L092 L092-L024 to Bhangaha Tola New Cold Mix 2.325 3.750 Complete 6 92.14 61.43 153.57 7.22 (1 , 0 , 0 , 0 , 1) (VR92) Technology Block Barhara Kothi Total 7.178 18 284.97 189.98 474.95 24.78 (2 , 0 , 0 , 0 , 2)

Block- Bhawanipur

983 L049 L049-Jabe main road to New Cold Mix 1.973 3.750 Complete 3 75.99 50.66 126.65 6.80 (0 , 1 , 0 , 0 , 1) Paswan tola Bela more Technology (TRACK45) 984 L056 L056-Kharkatta to New Cold Mix 1.950 3.750 Complete 3 79.22 52.81 132.03 6.65 (1 , 1 , 0 , 1 , 3) pakariadhar (OT36) Technology 985 L052 L052-SH chappan tola to New Cold Mix 3.533 3.750 Complete 7 115.41 76.94 192.35 10.39 (0 , 1 , 0 , 0 , 1) mandal tola jabe (TRACK31) Technology Block Bhawanipur Total 7.456 13 270.62 180.41 451.03 23.84 (1 , 3 , 0 , 1 , 5)

Block- Dhamdaha

986 L080 L080-L079 to Paswan tola New CELL Filled 0.524 3.750 Complete 1 19.50 13.00 32.50 1.77 (1 , 0 , 0 , 0 , 1) (VR80) Concrete
Cold Mix Technology 987 L062 L062-T03 to Khanuwa New Cold Mix 2.920 3.750 Complete 9 130.98 87.32 218.30 9.37 (1 , 0 , 0 , 0 , 1) (VR62) Technology

Page 110 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

988 L032 L032-L043 to Mali Bajraha New Cold Mix 3.010 3.750 Complete 6 119.90 79.93 199.83 10.80 (1 , 0 , 0 , 0 , 1) (VR32) Technology 989 L036 L036-T01 to Singharapatti New Cold Mix 2.090 3.750 Complete 6 85.95 57.30 143.25 7.97 (1 , 1 , 1 , 2 , 5) (VR36) Technology 990 L048 L048-Bajraha to Teliyari New Cold Mix 2.610 3.750 Complete 7 103.60 69.06 172.66 8.96 (0 , 1 , 1 , 0 , 2) (VR48) Technology 991 L042 L042-L043 to Satmi (VR42) New Cold Mix 5.835 3.750 Complete 5 203.32 135.54 338.86 20.03 (1 , 0 , 1 , 1 , 3) Technology 992 L027 L027-T02 to Adiwasi tola New Cold Mix 3.568 3.750 Complete 9 123.78 82.52 206.30 13.27 (0 , 2 , 2 , 0 , 4) (VR27) Technology 993 L031 L031-L083 to Santhal Tola New Cold Mix 1.170 3.750 Complete 2 43.99 29.32 73.31 4.15 (0 , 1 , 1 , 0 , 2) Nirpur (VR31) Technology 994 L055 L055-L054 to Baraina (VR55) New Cold Mix 4.942 3.750 Complete 13 172.84 115.22 288.06 17.68 (1 , 1 , 1 , 0 , 3) Technology 995 L079 L079-L045 to Gangottola New CELL Filled 1.093 3.750 Complete 4 39.77 26.51 66.28 3.29 (0 , 1 , 0 , 0 , 1) (VR79) Concrete
Cold Mix Technology Block Dhamdaha Total 27.762 62 1,043.63 695.72 1,739.35 97.28 (6 , 7 , 7 , 3 , 23) Block- Jalalgarh

996 L043 L043-Begampur to Harijan New CELL Filled 1.030 3.750 Complete 3 45.21 30.14 75.35 3.49 (0 , 1 , 0 , 1 , 2) tola Begampur (VR43) Concrete
Cold Mix Technology Block Jalalgarh Total 1.030 3 45.21 30.14 75.35 3.49 (0 , 1 , 0 , 1 , 2)

Block- Kritya Nand Nagar

997 L773 L773-Sabuttar to New Cold Mix 5.066 3.750 Complete 12 182.76 121.84 304.60 18.98 (0 , 2 , 1 , 0 , 3) Bajrangbali Asthan Ghushki Technology Tola (VR73)

Page 111 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

998 L064 L064-Sri Nagar Pich Road to New CELL Filled 0.704 3.750 Complete 4 31.24 20.83 52.07 2.25 (0 , 1 , 0 , 0 , 1) P.M. School Bela Yadav Tola Concrete (VR64)
Cold Mix Technology 999 L067 L067-Middil School New CELL Filled 1.266 3.750 Complete 4 47.93 31.96 79.89 3.91 (0 , 1 , 0 , 0 , 1) Ganeshpur to Paswan Tola Concrete (VR67)
Cold Mix Technology 1000 L069 L069-Bajrangbali Asthan to New Cold Mix 2.341 3.750 Complete 8 93.34 62.23 155.57 8.56 (0 , 1 , 0 , 0 , 1) P.M. School Mushalman Tola Technology (VR69) 1001 L070 L070-Sousa to Muslim Tola New CELL Filled 1.110 3.750 Complete 4 43.74 29.16 72.90 3.50 (0 , 1 , 0 , 0 , 1) (VR70) Concrete
Cold Mix Technology 1002 L071 L071-Dainni to Jay Prakash New CELL Filled 1.500 3.750 Complete 6 66.83 44.55 111.38 4.85 (0 , 1 , 0 , 0 , 1) Nagar (VR71) Concrete
Cold Mix Technology 1003 L065 L065-L-053 to Pran Patti New CELL Filled 0.708 3.750 Complete 1 27.52 18.34 45.86 2.13 (0 , 1 , 0 , 0 , 1) Mushari Nahar (VR65) Concrete
Cold Mix Technology 1004 L072 L072-Baghmara Pitch Road New Cold Mix 1.327 3.750 Complete 5 48.41 32.27 80.68 4.32 (0 , 1 , 0 , 0 , 1) to Nandlal Mochi (VR72) Technology Block Kritya Nand Nagar Total 14.022 44 541.77 361.18 902.95 48.49 (0 , 9 , 1 , 0 , 10) Block- Purnia East

1005 L054 L054-MADHUSUDAN CHOWK New Cold Mix 1.875 3.750 Complete 8 73.42 48.95 122.37 6.20 (0 , 1 , 0 , 1 , 2) TO ADIWASI TOLA (VR54) Technology 1006 L053 L053-T04 TO SHRINAGAR New CELL Filled 0.880 3.750 Complete 3 33.50 22.34 55.84 2.20 (0 , 1 , 0 , 0 , 1) MUSHARI (VR53) Concrete
Cold Mix Technology

Page 112 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1007 L062 L062-FARYANI CHOWK TO New Cold Mix 1.516 3.750 Complete 5 57.11 38.07 95.18 4.65 (0 , 1 , 1 , 4 , 6) THARA MUSHARI (VR62) Technology 1008 L052 L052-THANA CHOWK TO New Cold Mix 1.360 3.750 Complete 6 59.20 39.47 98.67 4.14 (1 , 0 , 0 , 0 , 1) PAIMA TOLA (VR52) Technology 1009 L061 L061-FUTANI CHOWK TO New Cold Mix 3.428 3.750 Complete 11 130.76 87.17 217.93 11.09 (0 , 1 , 0 , 1 , 2) RIFUJI COLONY (VR61) Technology 1010 L058 L058-NAJIR TOLA TO UTTAR New Cold Mix 1.318 3.750 Complete 5 51.94 34.63 86.57 5.65 (0 , 1 , 0 , 0 , 1) PARMANANDPUR (VR58) Technology 1011 L057 L057-KALISTHAN TO New Cold Mix 2.423 3.750 Complete 5 81.29 54.19 135.48 7.41 (0 , 2 , 0 , 1 , 3) MUSALMAN TOLA (VR57) Technology 1012 L055 L055-UCHITPUR NAHAR New Cold Mix 1.328 3.750 Complete 6 52.47 34.98 87.45 4.03 (0 , 1 , 0 , 0 , 1) CHOWK TO BIYARPUR SIMA Technology MAULVI TOLA (VR55) 1013 L034 L034-Ranipatra SH to Phasia New Cold Mix 6.930 3.750 Complete 10 230.37 153.58 383.95 22.26 (1 , 2 , 0 , 6 , 9) (VR34) Technology Block Purnia East Total 21.058 59 770.06 513.38 1,283.44 67.64 (2 , 10 , 1 , 13 , 26) Block- Rupauli

1014 L045 L045-Bijay Lalganj to New Cold Mix 3.988 3.750 Complete 9 151.33 100.88 252.21 14.08 (3 , 4 , 0 , 0 , 7) Shantinagar (VR45) Technology 1015 L037 L037-Bahadura Bhikna to New Cold Mix 5.495 3.750 Complete 5 189.04 126.03 315.07 18.28 (1 , 3 , 5 , 4 , 13) Pipra Via Laxmipur Girdhar Technology (VR37) 1016 L035 L035-Bhushitol to Nagdhari New Cold Mix 3.050 3.750 Complete 8 121.55 81.04 202.59 10.63 (0 , 2 , 3 , 0 , 5) (VR35) Technology 1017 L052 L052-Mahabla to Adivasitola New Cold Mix 2.110 3.750 Complete 4 75.23 50.15 125.38 7.17 (0 , 2 , 1 , 0 , 3) Mainma (VR52) Technology 1018 L059 L059-Simra to Nyatola New Cold Mix 2.050 3.750 Complete 8 86.43 57.62 144.05 7.12 (1 , 0 , 0 , 0 , 1) (VR59) Technology 1019 L058 L058-Lachmipur to New Cold Mix 2.250 3.750 Complete 6 94.30 62.87 157.17 6.85 (1 , 0 , 0 , 0 , 1) Nagarawasa (VR58) Technology 1020 L042 L042-Balia L031 to Topratol New Cold Mix 2.833 3.750 Complete 6 115.33 76.89 192.22 10.37 (0 , 1 , 2 , 2 , 5) (VR42) Technology

Page 113 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1021 L057 L057-Naktapar to Soren Tola New Cold Mix 3.000 3.750 Complete 3 112.91 75.27 188.18 10.72 (0 , 1 , 0 , 0 , 1) (VR57) Technology 1022 L056 L056-Nathpur to Bhaua New CELL Filled 1.010 3.750 Complete 2 38.23 25.49 63.72 3.32 (0 , 1 , 0 , 0 , 1) Deodhi (VR56) Concrete
Cold Mix Technology 1023 L032 L032-Mohanpur to Anjhari New Cold Mix 3.815 3.750 Complete 9 144.66 96.44 241.10 11.52 (2 , 1 , 1 , 2 , 6) Via Malpur (VR32) Technology Block Rupauli Total 29.601 60 1,129.01 752.68 1,881.69 100.06 (8 , 15 , 12 , 8 , 43) Block- Sri Nagar

1024 L046 L046-Jageli bichtola (VR46) New Cold Mix 1.773 3.750 Complete 7 72.70 48.47 121.17 7.09 (1 , 0 , 0 , 0 , 1) Technology Block Sri Nagar Total 1.773 7 72.70 48.47 121.17 7.09 (1 , 0 , 0 , 0 , 1)

District Purnea Total 208.508 524 8,152.83 5,435.20 13,588.03 709.57 (50 , 81 , 36 , 64 , 231) District- Rohtas

Block- Bikramganj

1025 L067 L067-Pawara to Nilkanthpur New CELL Filled 4.300 3.750 Complete 4 161.65 107.76 269.41 24.25 (1 , 1 , 0 , 0 , 2) Via dharmagat pur (ODR40) Concrete
Waste Plastics 1026 L026 L026-Ara Sasaram PWD Road New CELL Filled 1.400 3.750 Complete 3 51.08 34.06 85.14 7.66 (0 , 0 , 1 , 0 , 1) to Bilkhuriya (ODR15) Concrete
Waste Plastics 1027 L042 L042-Ara Sasaram PWD Road New CELL Filled 2.820 3.750 Complete 3 102.81 68.54 171.35 15.42 (0 , 1 , 0 , 0 , 1) to Matuli (ODR26) Concrete
Waste Plastics Block Bikramganj Total 8.520 10 315.54 210.36 525.90 47.33 (1 , 2 , 1 , 0 , 4)

Page 114 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Dinara

1028 L111 L111-L113 TO MANIHARI New CELL Filled 1.150 3.750 Complete 1 43.70 29.14 72.84 6.56 (1 , 0 , 0 , 0 , 1) (ODR80) Concrete
Waste Plastics 1029 L022 L022-POHAPI TO DEHRI New CELL Filled 2.130 3.750 Complete 3 79.25 52.84 132.09 11.89 (0 , 1 , 0 , 0 , 1) (ODR12) Concrete
Waste Plastics 1030 L075 L075-KANIARI TO New CELL Filled 1.500 3.750 Complete 3 55.21 36.81 92.02 8.28 (0 , 1 , 0 , 0 , 1) BISHRAMPUR (ODR51) Concrete
Waste Plastics 1031 L078 L078-T08 TO BASDIHA New CELL Filled 1.620 3.750 Complete 2 58.37 38.92 97.29 8.76 (1 , 0 , 0 , 0 , 1) (ODR54) Concrete
Waste Plastics 1032 L068 L068-BHUAWAL TO New CELL Filled 2.950 3.750 Complete 4 108.63 72.42 181.05 16.29 (0 , 0 , 1 , 0 , 1) MAJAKHORA (ODR43) Concrete
Waste Plastics Block Dinara Total 9.350 13 345.16 230.13 575.29 51.78 (2 , 2 , 1 , 0 , 5)

Block- Kargahar

1033 L031 L031-SASARAM CHOUSA New Waste Plastics 0.600 3.750 Complete 1 21.29 14.19 35.48 3.19 (0 , 0 , 1 , 0 , 1) ROAD GAREIYA TO BASUNDHARA (ODR23) 1034 L056 L056-BILARI ROAD TO New CELL Filled 2.000 3.750 Complete 1 77.87 51.92 129.79 11.68 (0 , 0 , 1 , 0 , 1) KHARAGPURA (ODR42) Concrete
Waste Plastics

Page 115 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1035 L105 L105-T13 TO SAHAR (ODR74) New CELL Filled 0.950 3.750 Complete 2 33.28 22.19 55.47 4.99 (1 , 0 , 0 , 0 , 1) Concrete
Waste Plastics Block Kargahar Total 3.550 4 132.44 88.30 220.74 19.86 (1 , 0 , 2 , 0 , 3)

Block- Kchas

1036 L050 L050-N H 30 TO New CELL Filled 1.230 3.750 Complete 3 43.90 29.27 73.17 6.59 (0 , 1 , 0 , 0 , 1) PITHPHORWA AKONI (VR34) Concrete
Waste Plastics 1037 L025 L025-N H 30 USARAW TO New CELL Filled 3.000 3.750 Complete 5 109.07 72.71 181.78 16.36 (1 , 1 , 0 , 0 , 2) DHANAGUWA (ODR19) Concrete
Waste Plastics Block Kchas Total 4.230 8 152.97 101.98 254.95 22.95 (1 , 2 , 0 , 0 , 3)

Block- Nasri Ganj

1038 L021 L021-Kaithi to Khriwan New CELL Filled 1.500 3.750 Complete 1 42.76 28.50 71.26 6.41 (0 , 0 , 1 , 0 , 1) (ODR6) Concrete
Waste Plastics Block Nasri Ganj Total 1.500 1 42.76 28.50 71.26 6.41 (0 , 0 , 1 , 0 , 1)

Block- Sheo Sagar

1039 L100 L100-new nad path to New CELL Filled 1.200 3.750 Complete 2 40.48 26.98 67.46 6.07 (0 , 0 , 1 , 0 , 1) morikap (VR80) Concrete
Waste Plastics

Page 116 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1040 L053 L053-G T ROAD TO New CELL Filled 4.700 3.750 Complete 11 147.95 98.63 246.58 22.19 (0 , 1 , 0 , 0 , 1) GAJAUNDHWA JIGINA Concrete PAHARPU (ODR38)
Waste Plastics Block Sheo Sagar Total 5.900 13 188.43 125.61 314.04 28.26 (0 , 1 , 1 , 0 , 2)

Block- Suryapura

1041 T01 T01-Ara Sasaram PWD New Waste Plastics 1.480 3.750 Complete 2 53.81 35.88 89.69 8.07 (1 , 1 , 2 , 0 , 4) Road Indrathkala to Kowath PWD Road Dedhgaon (ODR1) Block Suryapura Total 1.480 2 53.81 35.88 89.69 8.07 (1 , 1 , 2 , 0 , 4)

District Rohtas Total 34.530 51 1,231.11 820.76 2,051.87 184.66 (6 , 8 , 8 , 0 , 22) District- Saharsa

Block- Mahishi

1042 L032 L032-T01 to Dharampur New CELL Filled 6.490 3.750 Complete 11 266.49 177.66 444.15 23.69 (0 , 3 , 7 , 5 , 15) (VR11) Concrete Block Mahishi Total 6.490 11 266.49 177.66 444.15 23.69 (0 , 3 , 7 , 5 , 15) Block- Salkhua

1043 T04 T04-Dengrahi To Chiraiya New -- 8.622 3.750 Complete 15 339.60 226.40 566.00 33.51 (1 , 2 , 3 , 3 , 9) (ODR4) 1044 L050 L050-T04 to Kamaathan New -- 1.490 3.750 Complete 3 55.28 36.85 92.13 5.72 (0 , 1 , 0 , 0 , 1) (VR29) 1045 L045 L045-T04 to Karhara (VR24) New -- 4.770 3.750 Complete 10 205.07 136.71 341.78 19.22 (0 , 1 , 0 , 0 , 1)

1046 L060 L060-L044 to Alani (VR40) New -- 1.270 3.750 Complete 3 50.32 33.55 83.87 4.88 (1 , 0 , 1 , 3 , 5)

1047 L038 L038-T02 to Samharkala New -- 5.203 3.750 Complete 10 181.00 120.66 301.66 20.41 (1 , 0 , 1 , 2 , 4) (VR18)

Page 117 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1048 L057 L057-L052 to Siswa (VR37) New -- 0.870 3.750 Complete 3 36.77 24.52 61.29 3.52 (1 , 1 , 2 , 1 , 5)

1049 L047 L047-T04 to Sahuria (VR26) New -- 2.484 3.750 Complete 6 98.31 65.54 163.85 9.92 (0 , 1 , 1 , 0 , 2)

Block Salkhua Total 24.709 50 966.35 644.23 1,610.58 97.19 (4 , 6 , 8 , 9 , 27) Block- Saurbazar

1050 L088 L088-L027 to Nathpur New -- 0.760 3.750 Complete 2 33.37 22.25 55.62 3.13 (1 , 1 , 1 , 0 , 3) (TRACK17) Block Saurbazar Total 0.760 2 33.37 22.25 55.62 3.13 (1 , 1 , 1 , 0 , 3)

Block- Simri Bakhtiarpur

1051 L050 L050-Jamuniya to sonpura New -- 2.480 3.750 Complete 5 104.03 69.35 173.38 9.53 (0 , 3 , 4 , 1 , 8) (VR98) 1052 L044 L088-MDR-T05 to Bariyarpur New -- 1.680 3.750 Complete 4 72.18 48.12 120.30 7.11 (0 , 6 , 0 , 2 , 8) (VR20) Block Simri Bakhtiarpur Total 4.160 9 176.21 117.47 293.68 16.64 (0 , 9 , 4 , 3 , 16) Block- Sonbarsa

1053 L048 L048-Vaisa road To gajipata New -- 1.460 3.750 Complete 3 59.94 39.96 99.90 5.66 (0 , 1 , 0 , 1 , 2) (VR27) 1054 L094 L094-Shaul to Godram New -- 1.875 3.750 Complete 3 65.99 43.99 109.98 7.52 (0 , 1 , 1 , 0 , 2) (VR61) Block Sonbarsa Total 3.335 6 125.93 83.95 209.88 13.18 (0 , 2 , 1 , 1 , 4)

District Saharsa Total 39.454 78 1,568.35 1,045.56 2,613.91 153.83 (5 , 21 , 21 , 18 , 65) District- Samastipur

Block- Bibhutipur

1055 L073 L073-TO2 todihtabhaka New Waste Plastics 2.384 3.750 Complete 8 86.48 57.65 144.13 10.84 (1 , 0 , 0 , 0 , 1) (VR73)

Page 118 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1056 L045 L045-LO43 to kerai (VR45) New Waste Plastics 3.850 3.750 Complete 10 127.11 84.74 211.85 15.17 (1 , 1 , 2 , 0 , 4)

1057 L047 L047-MDR TO3 to mishraulia New Waste Plastics 3.273 3.750 Complete 4 105.77 70.51 176.28 12.41 (5 , 0 , 0 , 2 , 7) (VR47) 1058 L050 L050-TO3 to rupauli khurd New Waste Plastics 7.254 3.750 Complete 18 250.31 166.87 417.18 31.12 (0 , 2 , 0 , 0 , 2) (VR50) 1059 L052 L052-TO1 singhiya pasdchim New Waste Plastics 3.211 3.750 Complete 10 115.30 76.87 192.17 12.72 (1 , 0 , 0 , 0 , 1) (VR52) 1060 L053 L053-TO3 to chochani New Waste Plastics 4.951 3.750 Complete 8 161.41 107.61 269.02 22.50 (0 , 1 , 0 , 0 , 1) (VR53) 1061 L056 L056-TO3 to bhiripar (VR56) New Waste Plastics 1.904 3.750 Complete 2 66.56 44.37 110.93 9.07 (1 , 1 , 1 , 0 , 3)

1062 L062 L062-TO4 to basauna (VR62) New Waste Plastics 1.989 3.750 Complete 5 73.04 48.69 121.73 8.53 (1 , 1 , 1 , 0 , 3)

1063 L068 L068-TO3 to dusad tola New Waste Plastics 1.892 3.750 Complete 6 66.40 44.27 110.67 8.53 (1 , 0 , 0 , 0 , 1) kalyanpur (VR68) 1064 L069 L069-TO3 to boriya dih New Waste Plastics 1.944 3.750 Complete 7 64.79 43.19 107.98 8.34 (1 , 3 , 0 , 1 , 5) (VR69) 1065 L070 L070-TO3 to bibhutipur New Waste Plastics 1.289 3.750 Complete 6 46.41 30.94 77.35 4.68 (3 , 0 , 2 , 1 , 6) (VR70) 1066 L071 L071-LO28 to saidpur (VR71) New Waste Plastics 1.500 3.750 Complete 4 48.01 32.00 80.01 5.73 (1 , 0 , 0 , 0 , 1)

1067 L075 L075-LO50 to sahani tola New Waste Plastics 2.105 3.750 Complete 4 73.97 49.31 123.28 9.72 (1 , 1 , 2 , 0 , 4) bazipur bamaia (VR75) 1068 L028 L028-MDR TO4 Chandsurar New Waste Plastics 1.231 3.750 Complete 3 38.80 25.87 64.67 3.48 (2 , 1 , 1 , 1 , 5) (VR28) 1069 L065 L065-LO45 to koiri tola kerai New CELL Filled 3.150 3.750 Complete 6 87.64 58.42 146.06 15.09 (0 , 1 , 0 , 0 , 1) (VR65) Concrete 1070 L032 L032-TO2 to karrakh (VR32) New CELL Filled 1.710 3.750 Complete 2 45.29 30.19 75.48 5.20 (2 , 1 , 1 , 4 , 8) Concrete 1071 T03 T03-MDR TO3 to New Waste Plastics 4.127 3.750 Complete 9 138.12 92.08 230.20 15.47 (3 , 1 , 2 , 2 , 8) mahamadpur (VR42) Block Bibhutipur Total 47.764 112 1,595.41 1,063.58 2,658.99 198.59 (24 , 14 , 12 , 11 , 61)

Page 119 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Hasanpur

1072 L080 L080-T01 teknarayan yadav New CELL Filled 0.830 3.750 Complete 1 21.51 14.34 35.85 0.13 (1 , 0 , 0 , 0 , 1) house to Bargawan purbi Concrete tola (VR80) 1073 L049 L049-Hasanpur To Deorhi New CELL Filled 0.765 3.750 Complete 1 26.93 17.95 44.88 0.32 (1 , 0 , 0 , 0 , 1) (VR49) Concrete 1074 L079 L079-L038 Panchwati Chauk New CELL Filled 1.020 3.750 Complete 1 26.73 17.82 44.55 2.13 (1 , 0 , 0 , 0 , 1) to Haripur Ram Tola (VR79) Concrete 1075 L077 L077-Rwd road Hasanpur New CELL Filled 1.890 3.750 Complete 2 49.69 33.13 82.82 6.16 (0 , 1 , 0 , 0 , 1) Hanuman mandir T03 to Concrete Gosai math (VR77) 1076 L078 L078-L072 Phulhara to New CELL Filled 1.000 3.750 Complete 1 26.63 17.75 44.38 2.47 (0 , 1 , 0 , 0 , 1) Phulhara uttar tola (VR78) Concrete Block Hasanpur Total 5.505 6 151.49 100.99 252.48 11.20 (3 , 2 , 0 , 0 , 5)

Block- Mohiuddinnagar

1077 L046 L046-Mastalipur to Sarhad New CELL Filled 1.280 3.750 Complete 3 37.96 25.31 63.27 6.49 (0 , 1 , 1 , 0 , 2) Bhairo (VR46) Concrete Block Mohiuddinnagar Total 1.280 3 37.96 25.31 63.27 6.49 (0 , 1 , 1 , 0 , 2)

Block- Morwa

1078 L059 L059-T04 to Songar New Waste Plastics 3.211 3.750 Complete 9 105.37 70.25 175.62 13.41 (1 , 3 , 0 , 0 , 4) (VRL059) 1079 L072 L072-SH to Bangar (VR72) New Waste Plastics 3.027 3.750 Complete 7 102.38 68.26 170.64 13.67 (0 , 1 , 1 , 1 , 3)

1080 L029 L029-NH to Biyaspur (VR29) New CELL Filled 1.320 3.750 Complete 2 34.08 22.72 56.80 5.26 (1 , 0 , 0 , 0 , 1) Concrete 1081 L071 L071-T04 to Koeri Tola New CELL Filled 3.660 3.750 Complete 6 115.08 76.72 191.80 16.35 (2 , 0 , 2 , 1 , 5) (VR71) Concrete Block Morwa Total 11.218 24 356.91 237.95 594.86 48.69 (4 , 4 , 3 , 2 , 13)

Page 120 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Patori

1082 L032 L032-MDR-T02 to Chaksaho New -- 0.501 3.750 Complete 1 14.83 9.89 24.72 3.48 (1 , 2 , 1 , 1 , 5) (VR32) Block Patori Total 0.501 1 14.83 9.89 24.72 3.48 (1 , 2 , 1 , 1 , 5)

Block- Rosera

1083 L058 L058-T01 Vishwakarma New Waste Plastics 2.795 3.750 Complete 8 91.29 60.86 152.15 13.14 (1 , 0 , 0 , 0 , 1) chouk T0 Dhattha purbi (VR40) 1084 T04 T04-Rosera To Mahuli Upgarde Waste Plastics 6.615 3.750 Complete 14 215.37 143.58 358.95 27.70 (0 , 4 , 0 , 0 , 4) (ODR4) 1085 L032 L032-L031 To Bataha (VR16) New Waste Plastics 2.114 3.750 Complete 6 73.33 48.89 122.22 8.23 (0 , 3 , 0 , 0 , 3)

1086 L062 L062-L026 To Yadupatti New Waste Plastics 0.869 3.750 Complete 3 30.57 20.38 50.95 2.22 (0 , 1 , 0 , 0 , 1) (VR44) Block Rosera Total 12.393 31 410.56 273.71 684.27 51.28 (1 , 8 , 0 , 0 , 9)

Block- Sarairanjan

1087 L060 L060-nh103 to khawetola New CELL Filled 2.490 3.750 Complete 4 63.75 42.50 106.25 11.45 (1 , 1 , 1 , 0 , 3) (VR60) Concrete 1088 L062 L062-to1nh toparihata New Waste Plastics 2.126 3.750 Complete 6 67.75 45.16 112.91 8.61 (0 , 1 , 0 , 0 , 1) (VR62) 1089 L056 L056-NH to Uttar Tola via New Waste Plastics 1.505 3.750 Complete 2 54.57 36.38 90.95 7.44 (1 , 1 , 0 , 1 , 3) dagarua 1090 L028 L028-MDR to Sherpur Majari New CELL Filled 3.240 3.750 Complete 5 92.54 61.69 154.23 18.85 (1 , 0 , 1 , 0 , 2) (VR28) Concrete 1091 L037 L037-X- Road to L038 New CELL Filled 1.135 3.750 Complete 0 27.70 18.47 46.17 0.09 (0 , 5 , 1 , 2 , 8) Gansarara (VR37) Concrete Block Sarairanjan Total 10.496 17 306.31 204.20 510.51 46.43 (3 , 8 , 3 , 3 , 17)

Page 121 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Shivaji Nagar

1092 L028 L028-T01 T0 Boraj (VR12) New CELL Filled 1.500 3.750 Complete 3 42.23 28.15 70.38 5.89 (0 , 1 , 0 , 0 , 1) Concrete 1093 L074 L074-L039 To Konchi (VR55) New CELL Filled 0.780 3.750 Complete 1 21.17 14.12 35.29 3.70 (0 , 1 , 0 , 0 , 1) Concrete 1094 L064 L064-L039 to Gulrahi (VR46) New CELL Filled 1.550 3.750 Complete 4 43.38 28.92 72.30 8.42 (0 , 2 , 0 , 0 , 2) Concrete 1095 L072 L072-L060 To Fulwariya New CELL Filled 0.700 3.750 Complete 1 18.39 12.26 30.65 0.11 (0 , 1 , 0 , 0 , 1) (VR53) Concrete 1096 L075 L075-l024 Jogiya asthan To New CELL Filled 2.635 3.750 Complete 2 66.80 44.53 111.33 12.22 (0 , 1 , 0 , 0 , 1) Ranna Uttar Tola (VR56) Concrete 1097 L041 L041-T01 to Situahi (VR25) New CELL Filled 5.600 3.750 Complete 1 133.24 88.83 222.07 28.69 (2 , 1 , 2 , 0 , 5) Concrete Block Shivaji Nagar Total 12.765 12 325.21 216.81 542.02 59.03 (2 , 7 , 2 , 0 , 11) Block- Singhia

1098 L073 L073-T02 to Navtolia (VR73) New CELL Filled 2.025 3.750 Complete 3 58.38 38.92 97.30 12.49 (1 , 0 , 0 , 0 , 1) Concrete 1099 L058 L058-L044 Chaupai to New CELL Filled 1.125 3.750 Complete 2 33.37 22.24 55.61 3.73 (1 , 0 , 0 , 0 , 1) Jalwara (VR58) Concrete 1100 L059 L059-L044 Harpur to Pabra New CELL Filled 1.440 3.750 Complete 1 38.06 25.37 63.43 4.21 (0 , 1 , 0 , 0 , 1) (VR59) Concrete 1101 L070 L070-T02 Bharson to New CELL Filled 1.670 3.750 Complete 2 44.02 29.35 73.37 6.91 (0 , 1 , 0 , 1 , 2) Bisaharia (VR70) Concrete 1102 L028 L028-T01 to Bashu Deva New CELL Filled 1.465 3.750 Complete 2 39.56 26.37 65.93 5.57 (1 , 0 , 0 , 0 , 1) (VR28) Concrete 1103 L021 L021-T01 to New CELL Filled 4.310 3.750 Complete 3 113.79 75.86 189.65 15.47 (1 , 2 , 0 , 0 , 3) JamuaMohuuddinpur (VR21) Concrete Block Singhia Total 12.035 13 327.18 218.11 545.29 48.36 (4 , 4 , 0 , 1 , 9)

Page 122 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Ujiarpur

1104 L076 L076-T05 to Bhola tola New CELL Filled 2.400 3.750 Complete 7 70.74 47.16 117.90 12.93 (0 , 1 , 0 , 0 , 1) Concrete Block Ujiarpur Total 2.400 7 70.74 47.16 117.90 12.93 (0 , 1 , 0 , 0 , 1)

District Samastipur Total 116.357 226 3,596.60 2,397.71 5,994.31 486.49 (42 , 51 , 22 , 18 , 133) District- Shekhpura

Block- Ariari

1105 L049 L049-L024 To Jodhan Bigha New CELL Filled 2.200 3.750 Complete 4 56.42 37.61 94.03 8.67 (1 , 0 , 0 , 0 , 1) (VR49) Concrete 1106 L045 L045-L 046 to Sanaiya New CELL Filled 1.920 3.750 Complete 4 50.77 33.84 84.61 7.66 (1 , 0 , 0 , 0 , 1) (VR45) Concrete 1107 L069 L069-T 02 to Mahuet New CELL Filled 1.956 3.750 Complete 4 48.99 32.66 81.65 6.09 (1 , 0 , 0 , 0 , 1) (TRACK69) Concrete Block Ariari Total 6.076 12 156.18 104.11 260.29 22.41 (3 , 0 , 0 , 0 , 3)

Block- Barbigha

1108 L030 L030-L029 To Dih Nizamat New CELL Filled 1.062 3.750 Complete 2 26.33 17.55 43.88 4.69 (1 , 0 , 0 , 0 , 1) (TRACK30) Concrete 1109 L048 L048-T03 To Daria Chak New CELL Filled 1.850 3.750 Complete 4 57.38 38.25 95.63 8.71 (0 , 1 , 0 , 0 , 1) (VR48) Concrete 1110 L036 L036-L033 To Kashibigha New CELL Filled 2.835 3.750 Complete 7 71.90 47.93 119.83 11.30 (0 , 1 , 0 , 0 , 1) (TRACK36) Concrete Block Barbigha Total 5.747 13 155.61 103.73 259.34 24.69 (1 , 2 , 0 , 0 , 3)

Block- Chewara

1111 L054 L054-T-02 to Lahna New CELL Filled 1.645 3.750 Complete 4 47.81 31.87 79.68 6.77 (1 , 0 , 0 , 0 , 1) (TRACK35) Concrete

Page 123 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1112 L055 L055-L 035 to Beniganj New CELL Filled 1.467 3.750 Complete 5 43.27 28.85 72.12 6.29 (0 , 1 , 0 , 0 , 1) (TRACK33) Concrete 1113 T01 T01-Rakar more to Lohan.. New CELL Filled 7.173 3.750 Complete 17 188.77 125.84 314.61 25.61 (3 , 0 , 1 , 1 , 5) part-4.. from kewali (VR2) Concrete Block Chewara Total 10.285 26 279.85 186.56 466.41 38.67 (4 , 1 , 1 , 1 , 7)

Block- Shekhpura

1114 L033 L033-T01 To Amanatpur New CELL Filled 1.140 3.750 Complete 3 35.52 23.68 59.20 5.10 (0 , 1 , 0 , 0 , 1) (VR33) Concrete 1115 L048 L048-T02 To Kare (VR48) New CELL Filled 2.405 3.750 Complete 5 68.58 45.72 114.30 9.78 (1 , 0 , 0 , 0 , 1) Concrete Block Shekhpura Total 3.545 8 104.10 69.40 173.50 14.87 (1 , 1 , 0 , 0 , 2)

District Shekhpura Total 25.653 59 695.74 463.80 1,159.54 100.65 (9 , 4 , 1 , 1 , 15) District- Sheohar

Block- Dumri Katsari

1116 L041 L041-T02 to Middle School New CELL Filled 1.950 3.750 Complete 1 69.11 46.07 115.18 11.49 (2 , 0 , 0 , 0 , 2) Naya Gaon Tola (VR23) Concrete
Waste Plastics 1117 L040 L040-Naya Gaon to Lachhu New CELL Filled 2.870 3.750 Complete 2 114.62 76.42 191.04 20.61 (0 , 2 , 0 , 0 , 2) Tola (VR22) Concrete
Waste Plastics 1118 L042 L042-T02 to Sahbazpur New CELL Filled 2.400 3.750 Complete 2 97.80 65.20 163.00 16.28 (0 , 1 , 1 , 0 , 2) Ghurghur Tola (VR24) Concrete
Waste Plastics Block Dumri Katsari Total 7.220 5 281.53 187.69 469.22 48.38 (2 , 3 , 1 , 0 , 6)

Page 124 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Purnahia

1119 L037 L037-T02 Dosti Mahamadpur New CELL Filled 2.450 3.750 Complete 3 74.54 49.70 124.24 16.08 (2 , 0 , 1 , 0 , 3) To Barahi Jagdish (VR17) Concrete
Waste Plastics 1120 L044 L044-T01 ADAURI TO New CELL Filled 0.550 3.750 Complete 1 17.51 11.68 29.19 4.49 (0 , 1 , 0 , 0 , 1) CHHAPRA JARWAN (VR24) Concrete 1121 L046 L046-HATHSAR TO HATHSAR New CELL Filled 0.610 3.750 Complete 0 21.43 14.29 35.72 3.89 (0 , 1 , 0 , 0 , 1) HARIJAN TOLA (VR26) Concrete
Waste Plastics 1122 L043 L043-T01 ADAURI TO New CELL Filled 0.700 3.750 Complete 0 25.59 17.06 42.65 5.65 (0 , 1 , 0 , 0 , 1) BASWARIYA (VR23) Concrete
Waste Plastics 1123 L045 L045-PARSAUNI GOP TO New CELL Filled 2.550 3.750 Complete 2 91.97 61.31 153.28 15.24 (0 , 1 , 0 , 0 , 1) HARIJAN TOLA (VR25) Concrete
Waste Plastics 1124 L038 L042-PURNAHIA-CHAKFATEH New CELL Filled 1.770 3.750 Complete 1 60.13 40.09 100.22 11.09 (1 , 0 , 0 , 0 , 1) ROAD TO PAKARIYA TOLA Concrete (VR22)
Waste Plastics Block Purnahia Total 8.630 7 291.17 194.13 485.30 56.44 (3 , 4 , 1 , 0 , 8)

Block- Sheohar

1125 L021 L044-Sugia Katesri Chanau New CELL Filled 2.955 3.750 Complete 3 124.39 82.93 207.32 18.62 (5 , 1 , 0 , 0 , 6) Tola Shiv Temple to Bajrang Concrete Chowk Madhopur Anant via
Waste Rajput Tola (VR28) Plastics 1126 L046 L046-Kursahar Chowk to New CELL Filled 1.100 3.750 Complete 2 41.96 27.97 69.93 6.63 (0 , 1 , 0 , 0 , 1) Kaswa Tola (VR30) Concrete
Waste Plastics

Page 125 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1127 L045 L045-The house of New CELL Filled 1.415 3.750 Complete 2 42.31 28.20 70.51 10.06 (0 , 1 , 0 , 0 , 1) R.N.Pandey in Village Concrete Fatehpur to Brahman Tola
Waste till Basahiya Ram P.M.G.S.Y. Plastics Road (VR29) 1128 L047 L047-Medical store of New CELL Filled 2.000 3.750 Complete 2 81.20 54.13 135.33 12.33 (0 , 1 , 0 , 1 , 2) Surendra Sah Madhopur Concrete chowk to Mushar & kayasth
Waste Tola (VR31) Plastics 1129 L048 L048-Mohari Maulaganj to New CELL Filled 0.900 3.750 Complete 1 36.70 24.46 61.16 5.11 (0 , 1 , 0 , 0 , 1) Rasa Tola (VR32) Concrete
Waste Plastics Block Sheohar Total 8.370 10 326.56 217.69 544.25 52.75 (5 , 5 , 0 , 1 , 11) Block- Tariyani

1130 L032 L032-Mushari to New CELL Filled 2.435 3.750 Complete 1 95.33 63.55 158.88 16.28 (0 , 1 , 0 , 0 , 1) Ajrakbe Atkoni (VR19) Concrete
Waste Plastics 1131 L056 L056-Aura PWD road Mushar New CELL Filled 1.140 3.750 Complete 1 30.41 20.28 50.69 9.21 (0 , 1 , 0 , 0 , 1) Tola Malikana via the house Concrete of Bharat Thakur (VR43)
Waste Plastics 1132 L058 L058-Salempur Kothia New CELL Filled 0.670 3.750 Complete 1 27.67 18.44 46.11 5.87 (0 , 1 , 0 , 0 , 1) PMGSY Road to Kolso Concrete Motnaje Bandh via Madh
Waste (VR44) Plastics 1133 L057 L057-Near Banshi Pachra New CELL Filled 0.725 3.750 Complete 1 30.43 20.29 50.72 4.46 (0 , 1 , 0 , 0 , 1) REO road to old place Concrete Sonbarsa East tola (VR45)
Waste Plastics Block Tariyani Total 4.970 4 183.84 122.56 306.40 35.82 (0 , 4 , 0 , 0 , 4)

District Sheohar Total 29.190 26 1,083.10 722.07 1,805.17 193.39 (10 , 16 , 2 , 1 , 29)

Page 126 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District- Sitamarhi

Block- Bajpatti

1134 L092 L092-Tatma Tola House of New CELL Filled 1.565 3.750 Complete 1 55.78 37.19 92.97 9.19 (0 , 0 , 1 , 0 , 1) Sonfi Das Pmgsy to Teli Tola Concrete Bhasepur (VR64)
Waste Plastics 1135 L111 L111-Piprahi Bazar PMGSY to New CELL Filled 1.020 3.750 Complete 1 29.81 19.87 49.68 6.54 (0 , 1 , 0 , 0 , 1) Munharwa (VR83) Concrete
Waste Plastics 1136 L085 L085-Nimahi PMGSY Primary New CELL Filled 0.522 3.750 Complete 1 21.24 14.16 35.40 2.14 (0 , 0 , 1 , 0 , 1) School Nimahi to Dhobi Tola Concrete (VR57)
Waste Plastics 1137 L086 L086-MMGSY Road House of New CELL Filled 0.510 3.750 Complete 1 18.41 12.27 30.68 2.26 (0 , 0 , 1 , 0 , 1) Chulhai Ray to Chamar Tola Concrete (VR58)
Waste Plastics Block Bajpatti Total 3.617 4 125.24 83.49 208.73 20.13 (0 , 1 , 3 , 0 , 4)

Block- Sonbarsa

1138 L059 L059-Lakhandei Pul to New CELL Filled 2.470 3.750 Complete 2 98.27 65.51 163.78 13.67 (0 , 0 , 1 , 1 , 2) Mushahari Tola (VR60) Concrete
Waste Plastics Block Sonbarsa Total 2.470 2 98.27 65.51 163.78 13.67 (0 , 0 , 1 , 1 , 2)

Block- Sursand

1139 L077 L077-Radhaur PMGSY to New CELL Filled 2.900 3.750 Complete 2 114.03 76.02 190.05 17.57 (1 , 0 , 1 , 0 , 2) Jawahi (VR39) Concrete
Waste Plastics Block Sursand Total 2.900 2 114.03 76.02 190.05 17.57 (1 , 0 , 1 , 0 , 2)

Page 127 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District Sitamarhi Total 8.987 8 337.54 225.02 562.56 51.37 (1 , 1 , 5 , 1 , 8)

District- Siwan

Block- Andar

1140 L035 L035-Belhi ,L037 to Balia New CELL Filled 1.560 3.750 Complete 6 44.94 30.01 74.95 3.28 (0 , 1 , 2 , 5 , 8) (VR8) Concrete
Waste Plastics 1141 L052 L052-Manpur Pateji New CELL Filled 3.700 3.750 Complete 10 104.69 69.85 174.54 10.04 (0 , 1 , 4 , 4 , 9) Bahadurpur to Chakari Concrete Pateji Marg (VR17)
Waste Plastics 1142 L051 L051-T02 MDR To Pareji New CELL Filled 4.300 3.750 Complete 9 128.27 85.57 213.84 11.21 (0 , 0 , 3 , 6 , 9) (VR21) Concrete
Waste Plastics 1143 L057 L057-Katwar to Pipra (VR20) New CELL Filled 2.300 3.750 Complete 3 62.92 41.99 104.91 5.68 (0 , 1 , 3 , 10 , Concrete 14)
Waste Plastics Block Andar Total 11.860 28 340.82 227.42 568.24 30.21 (0 , 3 , 12 , 25 , 40) Block-

1144 L081 L081-T o1 ODR to Mir New Waste Plastics 1.110 3.750 Complete 3 29.80 19.92 49.72 3.10 (0 , 1 , 0 , 0 , 1) Surhiya (TRACK39) 1145 L079 L065-Satyanarayan more to New CELL Filled 0.840 3.750 Complete 1 20.76 13.89 34.65 1.42 (1 , 0 , 0 , 0 , 1) Mahboob Chhapra Concrete (TRACK35)
Waste Plastics 1146 L073 L073-L 53 road to Siswa New CELL Filled 1.800 3.750 Complete 6 54.44 36.35 90.79 4.62 (1 , 0 , 0 , 0 , 1) (TRACK25) Concrete
Waste Plastics

Page 128 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1147 L048 L079-T 02 ODR to New CELL Filled 1.700 3.750 Complete 4 46.51 31.06 77.57 4.04 (0 , 1 , 1 , 0 , 2) Babhanbara Vidayalay Concrete (TRACK31)
Waste Plastics 1148 L080 L080-T o1 ODR to Barsara New Waste Plastics 0.900 3.750 Complete 3 26.83 17.93 44.76 2.56 (1 , 0 , 0 , 0 , 1) (TRACK40) 1149 L060 L060-L026 to Rajopali New CELL Filled 1.400 3.750 Complete 3 38.68 25.83 64.51 2.68 (1 , 0 , 0 , 4 , 5) (TRACK20) Concrete
Waste Plastics 1150 L056 L022-Kail to Rasulpur New CELL Filled 1.500 3.750 Complete 4 41.10 27.45 68.55 3.92 (0 , 2 , 0 , 0 , 2) (TRACK1) Concrete
Waste Plastics 1151 L034 L034-Hardia to Ranipur New CELL Filled 2.000 3.750 Complete 4 53.81 35.92 89.73 4.05 (0 , 1 , 0 , 0 , 1) (TRACK5) Concrete
Waste Plastics 1152 L037 L037-Hardia to Mathurapur New CELL Filled 4.700 3.750 Complete 9 126.34 84.27 210.61 9.33 (1 , 2 , 2 , 0 , 5) (TRACK8) Concrete
Waste Plastics 1153 L027 L026-Paltu hata to New CELL Filled 3.600 3.750 Complete 5 92.78 61.91 154.69 6.33 (0 , 1 , 1 , 1 , 3) Jagarnathpur (TRACK6) Concrete
Waste Plastics 1154 L032 L032-Bhimapur to Bangara New CELL Filled 1.700 3.750 Complete 4 44.86 29.96 74.82 3.02 (0 , 3 , 1 , 0 , 4) (TRACK4) Concrete
Waste Plastics 1155 L059 L053-Nawalpur to Mahal New Waste Plastics 1.900 3.750 Complete 4 53.13 35.47 88.60 5.21 (0 , 1 , 0 , 0 , 1) Part of Nawalpur to Bhopatpur Road (VR4)

Page 129 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1156 L069 L069-Nabihata to Mushari New CELL Filled 1.500 3.750 Complete 5 44.48 29.71 74.19 3.70 (0 , 1 , 0 , 0 , 1) Akbar Ali Khan tola Concrete (TRACK38)
Waste Plastics Block Barharia Total 24.650 55 673.52 449.67 1,123.19 53.98 (5 , 13 , 5 , 5 , 28) Block- Basantpur

1157 L050 L050-Kanhauli Basaon T02 New CELL Filled 4.900 3.750 Complete 12 136.78 91.23 228.01 11.56 (0 , 1 , 1 , 0 , 2) road to Kalam Mia Ke Tola Concrete (TRACK17)
Waste Plastics 1158 L036 L036-Basantpur Surajpura New CELL Filled 3.100 3.750 Complete 8 91.75 61.21 152.96 6.17 (3 , 1 , 4 , 3 , 11) road To Shekhpura Concrete (TRACK11)
Waste Plastics Block Basantpur Total 8.000 20 228.53 152.44 380.97 17.73 (3 , 2 , 5 , 3 , 13) Block-

1159 L035 L035-Pandit Ke Rampur B.T. New CELL Filled 5.300 3.750 Complete 12 151.24 100.88 252.12 13.07 (1 , 1 , 6 , 1 , 9) Road T03 To Sakri Concrete (TRACK11)
Waste Plastics 1160 L027 L027-Bhagwanpur Hat T02 New CELL Filled 4.600 3.750 Complete 9 127.49 85.05 212.54 11.93 (1 , 4 , 3 , 1 , 9) To Mananpatti Via Sondhani Concrete (TRACK4)
Waste Plastics 1161 L051 L051-Pandey More To New CELL Filled 1.770 3.750 Complete 5 50.07 33.43 83.50 4.36 (0 , 1 , 0 , 0 , 1) Sarsainya (TRACK27) Concrete
Waste Plastics

Page 130 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1162 L052 L052-Nathu More To Kali New CELL Filled 2.130 3.750 Complete 6 65.04 43.41 108.45 5.15 (0 , 1 , 0 , 0 , 1) tola (TRACK26) Concrete
Waste Plastics 1163 L053 L053-Gopalpur Shyamkant New CELL Filled 2.100 3.750 Complete 6 63.02 42.06 105.08 5.43 (0 , 1 , 0 , 0 , 1) Ka Ghar To Baraura Concrete (TRACK28)
Waste Plastics 1164 L034 L034-Pandit Ke Rampur B.T New Waste Plastics 2.100 3.750 Complete 5 59.03 39.41 98.44 5.81 (0 , 4 , 1 , 0 , 5) Road T03 To Badarzamin Via Dehri Rampur (TRACK10) Block Bhagwanpur Hat Total 18.000 43 515.89 344.24 860.13 45.75 (2 , 12 , 10 , 2 , 26) Block- Darauli

1165 L056 L056-T02 to Verma Tola New CELL Filled 1.200 3.750 Complete 3 34.08 22.77 56.85 2.31 (0 , 1 , 2 , 3 , 6) Pachbhania (TRACK29) Concrete
Waste Plastics 1166 L045 L045-PWD T01 to Pataua New CELL Filled 2.100 3.750 Complete 7 64.85 43.28 108.13 5.18 (0 , 1 , 2 , 18 , Buzurg (TRACK23) Concrete 21)
Waste Plastics 1167 L038 L038-Tarwan T02 to New CELL Filled 2.700 3.750 Complete 4 69.50 46.39 115.89 4.08 (0 , 1 , 2 , 4 , 7) Chandaur (TRACK17) Concrete
Waste Plastics 1168 L067 L067-Sarokha Pitch Road To New CELL Filled 1.100 3.750 Complete 3 31.51 21.05 52.56 2.56 (0 , 1 , 1 , 2 , 4) Khor Musilm Tola (TRACK34) Concrete
Waste Plastics 1169 L058 L058-T02 to Sonwarsa New CELL Filled 2.860 3.750 Complete 5 77.42 51.66 129.08 6.49 (0 , 1 , 1 , 9 , 11) (TRACK30) Concrete
Waste Plastics

Page 131 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1170 L051 L051-Lo36 to Ukreri New CELL Filled 1.905 3.750 Complete 3 53.13 35.47 88.60 3.52 (0 , 1 , 0 , 2 , 3) (TRACK27) Concrete
Waste Plastics 1171 L046 L046-L028 to Karanpura New CELL Filled 1.000 3.750 Complete 1 25.19 16.85 42.04 1.39 (0 , 1 , 1 , 3 , 5) (TRACK24) Concrete
Waste Plastics 1172 L044 L044-L043 via Piparhia to New CELL Filled 2.700 3.750 Complete 6 76.66 51.15 127.81 6.66 (0 , 1 , 2 , 7 , 10) Murera (TRACK22) Concrete
Waste Plastics 1173 L034 L034-PWD To1 to Gopalpur New CELL Filled 2.900 3.750 Complete 9 83.70 55.85 139.55 6.76 (0 , 1 , 1 , 10 , (TRACK13) Concrete 12)
Waste Plastics 1174 L031 L031-T03 to Babhnauli via New CELL Filled 3.700 3.750 Complete 3 94.84 63.28 158.12 8.52 (0 , 2 , 3 , 10 , (TRACK11) Concrete 15)
Waste Plastics Block Darauli Total 22.165 44 610.88 407.75 1,018.63 47.47 (0 , 11 , 15 , 68 , 94) Block-

1175 L035 L035-T04 To Jalalpur New CELL Filled 2.000 3.750 Complete 5 55.19 36.84 92.03 4.65 (4 , 0 , 0 , 0 , 4) (TRACK9) Concrete
Waste Plastics 1176 L023 L023-Siwan Paigamberpur New CELL Filled 1.450 3.750 Complete 3 38.77 25.89 64.66 3.23 (0 , 1 , 0 , 0 , 1) Road To Pirarthu Khurd Concrete (TRACK2)
Waste Plastics 1177 L022 L022-Siwan Paigamberpur New CELL Filled 3.350 3.750 Complete 4 98.28 65.57 163.85 6.71 (1 , 1 , 2 , 0 , 4) Road T01 To Indapur Concrete (TRACK1)
Waste Plastics

Page 132 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1178 L054 L054-L030 To Biriti Tola New CELL Filled 1.100 3.750 Complete 3 31.09 20.78 51.87 2.56 (0 , 1 , 0 , 0 , 1) (TRACK18) Concrete
Waste Plastics 1179 L060 L060-Karsaut Naharpul Purbi New CELL Filled 2.200 3.750 Complete 9 68.16 45.49 113.65 5.87 (1 , 0 , 0 , 0 , 1) Bandh To Kangali Chapra Concrete (TRACK28)
Waste Plastics 1180 L044 L044-N.H 85 To Machhauti New CELL Filled 1.140 3.750 Complete 3 32.96 22.03 54.99 2.16 (1 , 1 , 0 , 0 , 2) (TRACK14) Concrete
Waste Plastics 1181 L064 L064-Bagaura Shiv More To New CELL Filled 1.575 3.750 Complete 8 49.91 33.33 83.24 4.18 (1 , 0 , 0 , 0 , 1) Koror (TRACK31) Concrete
Waste Plastics 1182 L067 L067-Karsaut Naharpul New CELL Filled 0.750 3.750 Complete 2 20.97 14.03 35.00 1.46 (0 , 1 , 0 , 0 , 1) Purbibandh To Bhoj Chapra Concrete (TRACK29)
Waste Plastics 1183 L066 L066-Balbangra To New CELL Filled 1.540 3.750 Complete 6 47.26 31.55 78.81 3.68 (0 , 1 , 0 , 0 , 1) Ramchandarpur (TRACK27) Concrete
Waste Plastics 1184 L062 L062-Ranibari To Raini New CELL Filled 1.000 3.750 Complete 4 30.50 20.38 50.88 2.38 (0 , 1 , 0 , 0 , 1) (TRACK30) Concrete
Waste Plastics Block Daraundha Total 16.105 47 473.09 315.89 788.98 36.88 (8 , 7 , 2 , 0 , 17) Block- Goraiyakothi

1185 L033 L033-Jagdishpur to Lilaru New Waste Plastics 2.800 3.750 Complete 3 73.97 49.37 123.34 7.46 (1 , 1 , 0 , 0 , 2) Aurangabad (TRACK10)

Page 133 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1186 L081 L081-Barhoga Pursottam To New CELL Filled 2.900 3.750 Complete 6 81.86 54.63 136.49 7.17 (0 , 1 , 0 , 0 , 1) Lalahata Mauje (TRACK52) Concrete
Waste Plastics 1187 L031 L031-Mustafabad T03 to New CELL Filled 2.300 3.750 Complete 2 59.33 39.60 98.93 5.58 (0 , 1 , 0 , 0 , 1) Bardaha (TRACK9) Concrete
Waste Plastics 1188 L075 L075-T03 To Sisai Paschim New Waste Plastics 1.440 3.750 Complete 4 41.44 27.68 69.12 4.08 (1 , 0 , 0 , 0 , 1) Tola (TRACK46) 1189 L080 L080-T04 To Kalyanpur New CELL Filled 2.400 3.750 Complete 8 72.85 48.61 121.46 5.81 (0 , 1 , 0 , 0 , 1) (TRACK51) Concrete
Waste Plastics 1190 L048 L048-L035 to Bhithi Nonia New CELL Filled 1.100 3.750 Complete 2 30.24 20.21 50.45 2.50 (0 , 2 , 1 , 0 , 3) Tola (TRACK13) Concrete
Waste Plastics 1191 L077 L077-Chhitauli Bazar To New CELL Filled 2.760 3.750 Complete 8 77.29 51.57 128.86 6.95 (0 , 1 , 0 , 0 , 1) Mustafabad (TRACK42) Concrete
Waste Plastics 1192 L029 L029-Chandauli T03 to New CELL Filled 1.500 3.750 Complete 5 44.47 29.69 74.16 3.98 (1 , 1 , 1 , 1 , 4) Mahamadpur (TRACK7) Concrete
Waste Plastics 1193 L028 L028-L021 to Hetimpur New CELL Filled 2.200 3.750 Complete 2 52.65 35.15 87.80 1.72 (0 , 0 , 2 , 0 , 2) Mauje Via Babu Tola Concrete (TRACK2)
Waste Plastics 1194 L036 L036-Saidpura to Pahlejpur New CELL Filled 1.600 3.750 Complete 5 47.02 31.39 78.41 3.98 (1 , 1 , 0 , 1 , 3) (TRACK15) Concrete
Waste Plastics

Page 134 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1195 L038 L038-L039 To Satwar New CELL Filled 3.400 3.750 Complete 6 85.40 56.98 142.38 4.48 (2 , 2 , 1 , 1 , 6) (TRACK36) Concrete
Waste Plastics 1196 L078 L078-Chhitauli Dudhara New CELL Filled 0.800 3.750 Complete 2 22.10 14.78 36.88 1.96 (0 , 1 , 0 , 0 , 1) Road To Chhitauli Kala Nonia Concrete Tola (TRACK49)
Waste Plastics 1197 L082 L082-L041 To Sarea New CELL Filled 1.600 3.750 Complete 4 43.76 29.23 72.99 3.92 (0 , 1 , 0 , 0 , 1) (TRACK53) Concrete
Waste Plastics Block Goraiyakothi Total 26.800 57 732.38 488.89 1,221.27 59.59 (6 , 13 , 5 , 3 , 27) Block-

1198 L029 L029-T01 Jataur Rewasi to New CELL Filled 7.800 3.750 Complete 20 221.38 147.63 369.01 16.47 (0 , 1 , 3 , 13 , Bangra (VR9) Concrete 17)
Waste Plastics Block Guthani Total 7.800 20 221.38 147.63 369.01 16.47 (0 , 1 , 3 , 13 , 17) Block-

1199 L043 L043-Basant Nagar To New CELL Filled 1.200 3.750 Complete 2 30.65 20.49 51.14 2.99 (0 , 1 , 0 , 0 , 1) Ghrishnagar (TRACK13) Concrete
Waste Plastics 1200 L069 L069-Harpur Mauje To New CELL Filled 1.500 3.750 Complete 5 41.90 27.99 69.89 3.38 (0 , 1 , 0 , 0 , 1) Mathiya Bechan Gir Concrete (TRACK32)
Waste Plastics 1201 L065 L065-Mahpur Piaur Road To New CELL Filled 1.200 3.750 Complete 4 33.70 22.52 56.22 2.62 (1 , 0 , 0 , 0 , 1) Deipur (TRACK24) Concrete
Waste Plastics

Page 135 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1202 L023 L071-L028 Dhanauti More to New CELL Filled 1.900 3.750 Complete 6 58.78 39.24 98.02 4.64 (1 , 1 , 0 , 3 , 5) Dhanauti Mauja (TRACK33) Concrete
Waste Plastics 1203 L035 L035-Mitwar to Mahmudpur New CELL Filled 1.830 3.750 Complete 4 50.18 33.45 83.63 3.92 (0 , 1 , 0 , 0 , 1) Sai Tola (TRACK23) Concrete
Waste Plastics 1204 L030 L029-Rafipur To sahuli New CELL Filled 1.500 3.750 Complete 4 39.88 26.64 66.52 3.90 (0 , 1 , 0 , 0 , 1) (TRACK10) Concrete
Waste Plastics 1205 L025 L067-Gaighat To Ahir Tola New CELL Filled 0.850 3.750 Complete 2 21.54 14.41 35.95 0.17 (2 , 1 , 1 , 0 , 4) Sati Sthan (TRACK27) Concrete Block Hasanpura Total 9.980 27 276.63 184.74 461.37 21.62 (4 , 6 , 1 , 3 , 14) Block- Hussainganj

1206 L061 L061-Habbi Nagar L030 New Waste Plastics 1.200 3.750 Complete 2 33.24 22.21 55.45 3.28 (2 , 5 , 3 , 0 , 10) Terighat (TRACK16) 1207 L057 L057-Habibnagar south L031 New CELL Filled 1.200 3.750 Complete 2 33.24 22.21 55.45 3.00 (0 , 1 , 0 , 0 , 1) to Habibnagar (TRACK14) Concrete
Waste Plastics Block Hussainganj Total 2.400 4 66.48 44.42 110.90 6.28 (2 , 6 , 3 , 0 , 11) Block-

1208 L061 L061-Hardia Bt Road To New CELL Filled 6.300 3.750 Complete 12 198.01 132.05 330.06 16.99 (0 , 1 , 0 , 0 , 1) Imalia More-Remaining Part Concrete (TRACK31)
Waste Plastics 1209 L050 L050-Jalalpur To Bhopatpur New CELL Filled 3.300 3.750 Complete 14 102.18 68.17 170.35 8.05 (0 , 1 , 0 , 0 , 1) Bhartia (TRACK18) Concrete
Waste Plastics

Page 136 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1210 L060 L060-L025 To Munsepur New CELL Filled 2.920 3.750 Complete 11 90.96 60.69 151.65 7.31 (0 , 1 , 0 , 0 , 1) Pandey Tola (TRACK30) Concrete
Waste Plastics 1211 L051 L051-Chattisi Bazar To New CELL Filled 2.940 3.750 Complete 10 84.72 56.53 141.25 7.29 (1 , 1 , 0 , 0 , 2) Baldiha (TRACK19) Concrete
Waste Plastics 1212 L063 L063-Madarpur To Lakri New CELL Filled 4.050 3.750 Complete 12 120.63 80.47 201.10 8.70 (1 , 0 , 0 , 0 , 1) (TRACK17) Concrete
Waste Plastics 1213 L059 L059-L046 To Taya Dumri New CELL Filled 0.810 3.750 Complete 4 24.91 16.65 41.56 2.13 (0 , 1 , 0 , 0 , 1) Koery Tola (TRACK29) Concrete
Waste Plastics 1214 L056 L056-Lakri-Dhuri Ray Ka Tola New CELL Filled 1.650 3.750 Complete 7 53.51 35.73 89.24 4.15 (0 , 1 , 0 , 0 , 1) Road To Shadipatti Concrete (TRACK26)
Waste Plastics 1215 L024 L024-L023 To Ujjaina New CELL Filled 2.600 3.750 Complete 6 74.84 49.95 124.79 6.41 (3 , 0 , 0 , 2 , 5) (TRACK3) Concrete
Waste Plastics 1216 L043 L043-L042 To Jalalpur New CELL Filled 2.700 3.750 Complete 3 76.29 50.91 127.20 3.63 (1 , 2 , 0 , 0 , 3) (TRACK7) Concrete
Waste Plastics 1217 L048 L048-T01 To Rajput Tola New CELL Filled 1.200 3.750 Complete 3 33.92 22.66 56.58 2.31 (0 , 1 , 0 , 0 , 1) (TRACK15) Concrete
Waste Plastics Block Lakri Nabiganj Total 28.470 82 859.97 573.81 1,433.78 66.97 (6 , 9 , 0 , 2 , 17)

Page 137 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Maharajganj

1218 L034 L034-Chak Mahumuda T05 New CELL Filled 6.900 3.750 Complete 18 196.72 131.19 327.91 16.25 (1 , 3 , 6 , 2 , 12) To Balua (TRACK34) Concrete
Waste Plastics 1219 L036 L036-Balua To Sarea New CELL Filled 1.600 3.750 Complete 3 43.77 29.23 73.00 2.57 (1 , 0 , 1 , 1 , 3) (TRACK36) Concrete
Waste Plastics 1220 L022 L022-Gaur To Dhanpura New CELL Filled 1.700 3.750 Complete 4 45.81 30.59 76.40 3.41 (0 , 1 , 0 , 1 , 2) (TRACK8) Concrete
Waste Plastics 1221 L144 L144-L021 To Chandpur New CELL Filled 1.260 3.750 Complete 1 32.81 21.93 54.74 2.32 (0 , 2 , 1 , 1 , 4) (TRACK144) Concrete
Waste Plastics 1222 L145 L145-L029 Itahari New CELL Filled 1.000 3.750 Complete 3 27.29 18.24 45.53 2.56 (0 , 1 , 1 , 0 , 2) (TRACK145) Concrete
Waste Plastics Block Maharajganj Total 12.460 29 346.40 231.18 577.58 27.11 (2 , 7 , 9 , 5 , 23) Block-

1223 L069 L069-Nizampur to Surbalia New CELL Filled 2.040 3.750 Complete 6 52.24 34.88 87.12 4.04 (0 , 1 , 0 , 0 , 1) (VR20) Concrete
Waste Plastics 1224 L076 L076-Srikant Bangra To New Waste Plastics 1.370 3.750 Complete 4 36.31 24.26 60.57 3.81 (0 , 1 , 0 , 0 , 1) Rampur Siwan (TRACK25) 1225 L041 L041-Sarauti to Allapur New CELL Filled 3.400 3.750 Complete 8 92.14 61.48 153.62 7.44 (1 , 0 , 2 , 0 , 3) (TRACK6) Concrete
Waste Plastics

Page 138 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1226 L031 L025-Shamopur to narhat New CELL Filled 1.500 3.750 Complete 3 39.40 26.32 65.72 1.86 (2 , 0 , 0 , 0 , 2) (TRACK4) Concrete
Waste Plastics 1227 L036 L036-Rasulpur to Aaakopur New Waste Plastics 0.700 3.750 Complete 2 18.95 12.68 31.63 1.95 (1 , 0 , 0 , 3 , 4) (VR17) 1228 L078 L022-Kalyanpur to Siswa New CELL Filled 1.900 3.750 Complete 5 51.57 34.43 86.00 4.18 (1 , 1 , 0 , 1 , 3) (TRACK1) Concrete
Waste Plastics 1229 L064 L064-T01 to Banjariya via New CELL Filled 2.300 3.750 Complete 5 61.52 41.07 102.59 5.08 (0 , 0 , 2 , 1 , 3) Nurrundipur (TRACK13) Concrete
Waste Plastics 1230 L058 L058-Salhaur To Garib Ganj New CELL Filled 1.400 3.750 Complete 3 38.03 25.40 63.43 2.93 (0 , 1 , 0 , 0 , 1) (TRACK22) Concrete
Waste Plastics 1231 L077 L077-Tarwara Pachrukhi New CELL Filled 1.100 3.750 Complete 3 30.76 20.55 51.31 1.52 (0 , 1 , 0 , 0 , 1) Road To Gahirawa Bari Ka Concrete tola (TRACK26)
Waste Plastics Block Panchrukhi Total 15.710 39 420.92 281.07 701.99 32.81 (5 , 5 , 4 , 5 , 19) Block- Raghunathpur

1232 L064 L064-Belwar To Harijan Tola New CELL Filled 1.500 3.750 Complete 5 42.87 28.63 71.50 2.70 (1 , 1 , 0 , 1 , 3) Nikhti Kala (TRACK21) Concrete
Waste Plastics 1233 L075 L075-Surjwliya To Pahriya New Waste Plastics 1.600 3.750 Complete 4 45.26 30.23 75.49 4.43 (0 , 1 , 0 , 0 , 1) (TRACK33) 1234 L084 L084-Adamapur To Harijan New CELL Filled 2.000 3.750 Complete 4 53.99 36.04 90.03 4.19 (0 , 1 , 0 , 0 , 1) Tola Santhi (TRACK43) Concrete
Waste Plastics

Page 139 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1235 L045 L045-Mitwar To Bahelia New -- 5.100 3.750 Complete 15 149.20 99.52 248.72 12.83 (0 , 1 , 0 , 0 , 1) (VR5) 1236 L077 L077-T01 To Dilawarpur New CELL Filled 1.400 3.750 Complete 3 36.17 24.16 60.33 1.78 (0 , 1 , 1 , 0 , 2) (TRACK35) Concrete
Waste Plastics Block Raghunathpur Total 11.600 31 327.49 218.58 546.07 25.93 (1 , 5 , 1 , 1 , 8)

Block-

1237 L040 L040-Bhikhpur to Izra New CELL Filled 2.200 3.750 Complete 5 60.28 40.24 100.52 3.48 (1 , 3 , 1 , 0 , 5) (VR12) Concrete
Waste Plastics 1238 L031 L031-CM.D.G to Bishanpura New CELL Filled 0.825 3.750 Complete 2 23.13 15.47 38.60 1.90 (0 , 1 , 1 , 0 , 2) (TRACK4) Concrete
Waste Plastics Block Siswan Total 3.025 7 83.41 55.71 139.12 5.38 (1 , 4 , 2 , 0 , 7)

Block- Siwan

1239 L043 L043-L042 to Ahir tola New CELL Filled 1.600 3.750 Complete 4 43.00 28.72 71.72 3.01 (1 , 1 , 2 , 0 , 4) Mirapur (TRACK6) Concrete
Waste Plastics 1240 L024 L024-Siwan BT road New CELL Filled 2.220 3.750 Complete 7 62.81 41.92 104.73 4.30 (1 , 0 , 2 , 2 , 5) to Chhotka Chakra (TRACK1) Concrete
Waste Plastics 1241 L048 L048-shyampur dhanauti New CELL Filled 2.900 3.750 Complete 5 73.18 48.84 122.02 4.64 (1 , 0 , 0 , 0 , 1) road me gopalji bharti ke Concrete bathan to garib mod hote
Waste hue Miya tola tak Plastics (TRACK26)

Page 140 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1242 L052 L052-sarsar siyadi path me New CELL Filled 0.600 3.750 Complete 1 15.78 10.57 26.35 1.36 (0 , 1 , 0 , 0 , 1) private school to ashok Concrete bhagat ke ghar hote huye
Waste parariya ahir toli tak Plastics (TRACK34) 1243 L044 L044-L039 to Awadhiya tola New CELL Filled 0.550 3.750 Complete 1 14.74 9.88 24.62 1.10 (1 , 3 , 4 , 0 , 8) Nathuchhap via Moulnapur Concrete (VR13)
Waste Plastics 1244 L035 L035-T06 to Pashim Tola New CELL Filled 1.600 3.750 Complete 4 42.68 28.50 71.18 3.01 (0 , 1 , 0 , 0 , 1) Sarsar (TRACK13) Concrete
Waste Plastics 1245 L045 L045-L023 to Sarsa New CELL Filled 1.250 3.750 Complete 3 34.23 22.87 57.10 2.17 (0 , 1 , 2 , 0 , 3) (TRACK7) Concrete
Waste Plastics 1246 L066 L066-sarsar siyadi path me New CELL Filled 0.800 3.750 Complete 2 21.97 14.70 36.67 1.57 (0 , 1 , 0 , 0 , 1) jinbaba sthan to majhva Concrete gram (TRACK33)
Waste Plastics 1247 L028 L028-T04 to Hasanpurwa New CELL Filled 1.500 3.750 Complete 3 37.82 25.26 63.08 3.19 (0 , 1 , 0 , 4 , 5) Saristapur (VR8) Concrete
Waste Plastics 1248 L026 L026-T03 to Nauapali (VR6) New CELL Filled 1.200 3.750 Complete 2 31.08 20.77 51.85 2.87 (1 , 3 , 2 , 1 , 7) Concrete
Waste Plastics Block Siwan Total 14.220 32 377.29 252.03 629.32 27.22 (5 , 12 , 12 , 7 , 36) Block-

1249 L365 L365-T02 to Chotaka Manjha New CELL Filled 1.260 3.750 Complete 4 36.71 24.53 61.24 2.79 (1 , 3 , 6 , 14 , (VR337) Concrete 24)
Waste Plastics

Page 141 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1250 L248 L248-T03 To Mahamadpur New CELL Filled 1.000 3.750 Complete 3 29.03 19.41 48.44 2.06 (0 , 1 , 0 , 3 , 4) (VR211) Concrete
Waste Plastics Block Ziradei Total 2.260 7 65.74 43.94 109.68 4.85 (1 , 4 , 6 , 17 , 28) District Siwan Total 235.505 572 6,620.82 4,419.41 11,040.23 526.25 (51 , 120 , 95 , 159 , 425) District- Vaishali

Block- Bhagwanpur

1251 L023 L023-Ratanpura to Bihari New CELL Filled 2.035 3.750 Complete 0 49.15 32.77 81.92 6.09 (0 , 1 , 0 , 0 , 1) (VR7) Concrete Block Bhagwanpur Total 2.035 0 49.15 32.77 81.92 6.09 (0 , 1 , 0 , 0 , 1)

Block- Goroul

1252 L087 L087-Mazirabad Road To New CELL Filled 1.650 3.750 Complete 4 43.97 29.31 73.28 8.45 (0 , 1 , 0 , 0 , 1) Madhurapur kurmi Tola Concrete (TRACK87) 1253 L024 L024-Sandho Ratti to New CELL Filled 1.920 3.750 Complete 5 53.37 35.58 88.95 6.92 (3 , 1 , 1 , 0 , 5) Sondho Mubarak (VR24) Concrete Block Goroul Total 3.570 9 97.34 64.89 162.23 15.37 (3 , 2 , 1 , 0 , 6)

Block- Lalganj

1254 L095 L095-T08 TO New CELL Filled 0.845 3.750 Complete 1 23.91 15.94 39.85 4.06 (1 , 0 , 0 , 0 , 1) BHAGATTOLAJAHANABAD Concrete (VR28) 1255 L038 L038-T02 TOSATHIUTA New -- 0.905 3.750 Complete 0 23.05 15.37 38.42 6.12 (1 , 0 , 0 , 0 , 1) BHAAGWAN (VR11) 1256 L054 L054-TO1 TO RIKHAR (VR21) New CELL Filled 2.250 3.750 Complete 1 56.99 37.99 94.98 10.43 (0 , 2 , 0 , 0 , 2) Concrete

Page 142 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1257 L048 L048-LALGANJ TO TAJPUR New -- 2.240 3.750 Complete 1 54.56 36.37 90.93 15.15 (0 , 1 , 0 , 0 , 1) (VR18) 1258 L090 L090-T06 TO YUSUFPUR New CELL Filled 1.030 3.750 Complete 2 28.10 18.74 46.84 3.70 (0 , 2 , 0 , 0 , 2) (VR27) Concrete 1259 L127 L127-Amritpur to Jaitipur New CELL Filled 3.010 3.750 Complete 2 76.69 51.13 127.82 8.95 (0 , 1 , 0 , 0 , 1) (VR53) Concrete Block Lalganj Total 10.280 7 263.30 175.54 438.84 48.42 (2 , 6 , 0 , 0 , 8)

Block- Paterhi Belsar

1260 L025 L025-Sain To Bahorkhan New CELL Filled 1.620 3.750 Complete 0 43.81 29.20 73.01 7.01 (0 , 1 , 0 , 1 , 2) (VR7) Concrete 1261 L082 L082-Manora Mushari Tola To New CELL Filled 0.560 3.750 Complete 0 12.73 8.48 21.21 0.07 (0 , 1 , 0 , 1 , 2) Siman Chowk (VR21) Concrete Block Paterhi Belsar Total 2.180 0 56.54 37.68 94.22 7.08 (0 , 2 , 0 , 2 , 4)

Block- Rajapakar

1262 L053 L053-Narayanpur Buzurg to New CELL Filled 2.030 3.750 Complete 3 67.77 45.18 112.95 9.71 (0 , 2 , 0 , 0 , 2) Chak Umar SURATPUR Concrete (TRACK53) Block Rajapakar Total 2.030 3 67.77 45.18 112.95 9.71 (0 , 2 , 0 , 0 , 2)

Block- Vaishali

1263 L021 L021-HLV Prasidh Nagar To New CELL Filled 1.031 3.750 Complete 3 26.04 17.36 43.40 6.01 (0 , 1 , 0 , 0 , 1) Kamtauliya (VR56) Concrete 1264 L089 L089-Hussain to New CELL Filled 2.205 3.750 Complete 0 55.80 37.20 93.00 8.98 (0 , 0 , 2 , 0 , 2) Baidhnathpur (VR46) Concrete 1265 L054 L054-Lalgnj tovaishali rd to New CELL Filled 1.585 3.750 Complete 0 37.11 24.74 61.85 3.87 (0 , 0 , 1 , 1 , 2) koman chapra (VR26) Concrete Block Vaishali Total 4.821 3 118.95 79.30 198.25 18.86 (0 , 1 , 3 , 1 , 5)

District Vaishali Total 24.916 22 653.05 435.36 1,088.41 105.53 (5 , 14 , 4 , 3 , 26) District- West Champaran

Page 143 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Bairia

1266 L056 L056-Gulab Chouk Pitch To New CELL Filled 1.800 3.750 Complete 5 70.07 46.72 116.79 8.12 (1 , 0 , 0 , 0 , 1) Siswa (TRACK56) Concrete 1267 L071 L071-Tumkariya Pitch Road New CELL Filled 1.615 3.750 Complete 4 63.07 42.05 105.12 7.22 (0 , 1 , 0 , 0 , 1) To Mukhiya Tola (TRACK71) Concrete 1268 L085 L085-Laukariya New CELL Filled 1.427 3.750 Complete 4 58.26 38.84 97.10 6.70 (0 , 0 , 1 , 0 , 1) Macchargama Pitch Road To Concrete Fatuha Ahir Tola (TRACK85) 1269 L033 L080-Dubaulia Bairiya To New CELL Filled 1.371 3.750 Complete 3 52.28 34.85 87.13 5.98 (1 , 3 , 3 , 2 , 9) Madhurbana (TRACK80) Concrete 1270 L083 L083-Bairoya Pitch New CELL Filled 1.972 3.750 Complete 2 75.38 50.26 125.64 8.90 (0 , 0 , 1 , 0 , 1) To nimiya Tola (TRACK83) Concrete 1271 L094 L094-Bairiya Pitch To Shekh New CELL Filled 1.112 3.750 Complete 2 42.55 28.37 70.92 5.00 (0 , 0 , 1 , 0 , 1) Toli (TRACK94) Concrete 1272 L088 L088-Loukariya Pitch Road New CELL Filled 1.887 3.750 Complete 2 74.54 49.69 124.23 8.67 (0 , 0 , 1 , 0 , 1) Mugahi Tola To Murgahi Tola Concrete (TRACK88) 1273 L091 L091-Dubaulia Bairiya To New CELL Filled 1.640 3.750 Complete 5 65.83 43.89 109.72 7.68 (0 , 0 , 1 , 0 , 1) Ahir Tola (TRACK91) Concrete 1274 L097 L097-Bagamberpur To Sonar New CELL Filled 1.206 3.750 Complete 3 47.03 31.36 78.39 5.59 (0 , 0 , 1 , 0 , 1) Tola (TRACK97) Concrete Block Bairia Total 14.030 30 549.01 366.03 915.04 63.86 (2 , 4 , 9 , 2 , 17) Block- Bhitaha

1275 L021 L021-bhudharwa to New -- 0.800 3.750 Complete 0 33.73 22.48 56.21 4.11 (0 , 1 , 0 , 1 , 2) chandarapur (VR5) 1276 L047 L047-Malahi to pakri tanr New CELL Filled 1.200 3.750 Complete 1 50.17 33.45 83.62 5.71 (0 , 0 , 1 , 0 , 1) tola (VR31) Concrete 1277 L050 L050-Ultahawa to hirasotti New CELL Filled 2.800 3.750 Complete 5 135.66 90.44 226.10 14.08 (0 , 0 , 1 , 0 , 1) (VR34) Concrete 1278 L053 L053-PMGSY Rd to nawaka New -- 1.700 3.750 Complete 2 73.60 49.06 122.66 8.80 (0 , 0 , 1 , 0 , 1) tola piparahiya (VR37)

Page 144 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1279 L049 L049-Malahi to pakri badhai New CELL Filled 1.500 3.750 Complete 3 65.57 43.71 109.28 7.52 (0 , 0 , 1 , 0 , 1) tola (VR33) Concrete 1280 L036 L036-Hathuahawa chauk to New CELL Filled 1.450 3.750 Complete 1 61.85 41.24 103.09 7.21 (0 , 1 , 0 , 0 , 1) hathuahawa mauja tola Concrete (VR20) 1281 L041 L041-Gulahariya to New -- 1.750 3.750 Complete 1 74.89 49.93 124.82 8.86 (1 , 1 , 0 , 0 , 2) ghaghawa (VR25) 1282 L039 L039-Rupahi to rupahi tarnd New -- 1.225 3.750 Complete 1 53.09 35.40 88.49 6.27 (1 , 0 , 0 , 0 , 1) (VR23) 1283 L038 L038-Jamuniya to jamuniya New CELL Filled 1.305 3.750 Complete 2 56.89 37.93 94.82 6.59 (1 , 0 , 0 , 0 , 1) harijan basti (VR22) Concrete 1284 L035 L035-Rupahi chauk to rupahi New CELL Filled 1.095 3.750 Complete 1 45.87 30.58 76.45 5.31 (1 , 0 , 0 , 0 , 1) west (VR19) Concrete 1285 L044 L044-Lakshmipur to New -- 1.000 3.750 Complete 1 44.36 29.58 73.94 5.13 (0 , 1 , 1 , 1 , 3) parasauna (VR28) 1286 L045 L045-Koiritola to barariha New CELL Filled 1.600 3.750 Complete 1 69.50 46.33 115.83 7.62 (0 , 1 , 1 , 0 , 2) (VR29) Concrete 1287 L042 L042-Dhuniyapatti to New CELL Filled 0.650 3.750 Complete 0 26.75 17.83 44.58 3.11 (0 , 1 , 1 , 0 , 2) premahi (VR26) Concrete 1288 L040 L040-Baluhi to bhagawanpur New CELL Filled 2.225 3.750 Complete 1 93.88 62.59 156.47 10.85 (0 , 1 , 0 , 0 , 1) (VR24) Concrete Block Bhitaha Total 20.300 20 885.81 590.55 1,476.36 101.17 (4 , 7 , 7 , 2 , 20) Block- Gaunaha

1289 L082 L082-T03 to Padron (VR82) New CELL Filled 1.050 3.750 Complete 2 41.41 27.60 69.01 4.87 (1 , 0 , 0 , 0 , 1) Concrete 1290 L068 L068-T03 to Salempur New -- 0.750 3.750 Complete 1 31.22 20.82 52.04 3.81 (0 , 1 , 0 , 0 , 1) (VR68) 1291 L083 L083-L060 to Marjadi New CELL Filled 0.900 3.750 Complete 1 35.66 23.78 59.44 4.11 (0 , 1 , 0 , 0 , 1) Marjadpur (VR83) Concrete 1292 L072 L072-Semra Shri Rampur to New CELL Filled 1.650 3.750 Complete 4 67.69 45.12 112.81 8.01 (0 , 1 , 0 , 0 , 1) Bairathwa (VR72) Concrete

Page 145 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1293 L073 L073-L034 to Kairi (VR73) New CELL Filled 0.800 3.750 Complete 1 32.06 21.38 53.44 3.71 (0 , 1 , 0 , 0 , 1) Concrete 1294 L067 L067-TMC to Masahi (VR67) New CELL Filled 1.050 3.750 Complete 2 41.41 27.60 69.01 4.84 (0 , 1 , 0 , 0 , 1) Concrete 1295 L070 L070-L022 to Khairatia New CELL Filled 1.600 3.750 Complete 3 64.87 43.24 108.11 7.43 (0 , 0 , 1 , 1 , 2) (VR70) Concrete 1296 L069 L069-L022 to Rajpur (VR69) New CELL Filled 1.350 3.750 Complete 3 57.59 38.40 95.99 6.44 (0 , 1 , 1 , 0 , 2) Concrete Block Gaunaha Total 9.150 17 371.91 247.94 619.85 43.22 (1 , 6 , 2 , 1 , 10) Block- Madhubani

1297 L035 L035-Devi Pur to Yogi tola New CELL Filled 1.400 3.750 Complete 2 56.97 37.98 94.95 6.79 (1 , 0 , 0 , 0 , 1) (VR20) Concrete 1298 L030 L030-Kanti tola to Miyan New CELL Filled 2.250 3.750 Complete 3 94.27 62.85 157.12 11.12 (0 , 1 , 0 , 0 , 1) Tola (VR15) Concrete 1299 L036 L036-Devipur to Koiri Tola New CELL Filled 2.100 3.750 Complete 2 88.42 58.95 147.37 10.16 (0 , 1 , 0 , 0 , 1) (VR21) Concrete 1300 L038 L038-Baldeo mahato ke ghar New CELL Filled 1.150 3.750 Complete 1 47.17 31.45 78.62 5.42 (0 , 1 , 0 , 0 , 1) madhubani to Gadiyani Concrete (VR23) 1301 L042 L042-Ranglalhi to Harijan New -- 1.000 3.750 Complete 1 41.87 27.92 69.79 5.11 (0 , 1 , 0 , 0 , 1) East Tola (VR27) 1302 L050 L050-Barwa to Barwa New -- 1.450 3.750 Complete 3 61.23 40.82 102.05 7.42 (0 , 1 , 0 , 0 , 1) Kharsal 1303 L056 L056-Dihi baira bazar to Bin New -- 2.900 3.750 Complete 7 119.80 79.86 199.66 14.76 (0 , 1 , 0 , 0 , 1) Toli (VR41) 1304 L037 L037-Kathar to Harijan Tola New -- 1.300 3.750 Complete 3 54.70 36.47 91.17 6.65 (0 , 0 , 1 , 0 , 1) (VR22) Block Madhubani Total 13.550 22 564.43 376.30 940.73 67.43 (1 , 6 , 1 , 0 , 8)

Block- Mainatanr

1305 L054 L054-T03 to Biranchi (VR54) New -- 1.400 3.750 Complete 3 58.79 39.19 97.98 7.04 (0 , 2 , 1 , 1 , 4)

Page 146 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1306 L043 L043-T02 sihnaula to New CELL Filled 1.300 3.750 Complete 2 51.27 34.18 85.45 5.93 (0 , 1 , 2 , 2 , 5) Pachrukhiya (VR43) Concrete 1307 L053 L053-T03 to Bhirbhiria New CELL Filled 1.750 3.750 Complete 4 71.35 47.56 118.91 8.08 (0 , 0 , 2 , 1 , 3) (VR53) Concrete Block Mainatanr Total 4.450 9 181.41 120.93 302.34 21.05 (0 , 3 , 5 , 4 , 12) Block- Manjhaulia

1308 L154 L154-PMGSY TO Bin Toli N New CELL Filled 2.034 3.750 Complete 2 71.84 47.89 119.73 9.06 (0 , 0 , 1 , 0 , 1) Pool (TRACK154) Concrete Block Manjhaulia Total 2.034 2 71.84 47.89 119.73 9.06 (0 , 0 , 1 , 0 , 1)

Block-

1309 L087 L087-L037 To New CELL Filled 1.350 3.750 Complete 2 55.82 37.22 93.04 6.46 (0 , 0 , 1 , 0 , 1) Langra Sekh pur (VR87) Concrete 1310 L088 L088-T01 Pandai Chowk To New CELL Filled 1.600 3.750 Complete 3 69.47 46.32 115.79 7.39 (0 , 0 , 1 , 0 , 1) Maheshpur Paschim Tola Concrete (VR88) 1311 L089 L089-L023 to Fulwaria Purb New CELL Filled 1.000 3.750 Complete 1 39.00 26.00 65.00 4.50 (0 , 0 , 1 , 0 , 1) Tola (VR89) Concrete 1312 L090 L090-L034 to Imaliya (VR90) New CELL Filled 1.900 3.750 Complete 5 77.68 51.78 129.46 8.82 (0 , 0 , 1 , 1 , 2) Concrete 1313 L077 L077-To4 To Sugauli (VR77) New CELL Filled 0.700 3.750 Complete 1 27.34 18.22 45.56 3.15 (1 , 0 , 0 , 0 , 1) Concrete 1314 L076 L076-L073 to Amwa tola New CELL Filled 2.000 3.750 Complete 3 79.73 53.15 132.88 9.25 (0 , 1 , 0 , 0 , 1) (VR76) Concrete 1315 L086 L086-T02 to Senuri Naya New CELL Filled 1.000 3.750 Complete 1 40.00 26.67 66.67 4.61 (0 , 0 , 1 , 0 , 1) Tola (VR86) Concrete 1316 L085 L085-L040 To Bishunpurwa New CELL Filled 0.650 3.750 Complete 0 23.65 15.76 39.41 2.14 (0 , 0 , 1 , 0 , 1) Paschim Tola (VR85) Concrete 1317 L065 L065-L023 Shekhauniya to New CELL Filled 2.500 3.750 Complete 5 100.90 67.26 168.16 11.71 (0 , 2 , 0 , 4 , 6) Murali (VR65) Concrete

Page 147 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1318 L064 L064-L037 to Barnihar New CELL Filled 1.850 3.750 Complete 4 73.29 48.86 122.15 8.47 (0 , 1 , 2 , 4 , 7) (VR64) Concrete Block Narkatiaganj Total 14.550 25 586.88 391.24 978.12 66.50 (1 , 4 , 8 , 9 , 22) Block-

1319 L074 L074-Dawariya Pitch Road to New CELL Filled 0.527 3.750 Complete 1 19.28 12.85 32.13 2.38 (0 , 1 , 0 , 0 , 1) Mushar Tola Bard No.6 Concrete (TRACK74) 1320 L078 L078-Bardaha Jaynagar Pul New CELL Filled 2.053 3.750 Complete 0 82.69 55.12 137.81 9.39 (0 , 1 , 0 , 0 , 1) to Harijan Tola Bajnath Concrete NAGAR (TRACK78) 1321 L087 L087-Kathaiya Gahiri Road New CELL Filled 0.806 3.750 Complete 1 31.08 20.72 51.80 3.62 (0 , 1 , 0 , 0 , 1) to Chamar Toli (TRACK87) Concrete 1322 L092 L092-Shivrajpur to Karmaini New CELL Filled 1.292 3.750 Complete 3 57.91 38.60 96.51 6.26 (0 , 0 , 1 , 0 , 1) (TRACK92) Concrete 1323 L071 L071-sofwa Tola Insaf Chauk New CELL Filled 3.599 3.750 Complete 3 126.40 84.26 210.66 15.92 (0 , 0 , 1 , 0 , 1) To Purwari Tola Via Concrete Kachahari Tola (TRACK71) 1324 L098 L098-purwari Tola to New CELL Filled 0.566 3.750 Complete 0 20.45 13.64 34.09 2.35 (0 , 0 , 1 , 0 , 1) Bagicha Tola (TRACK98) Concrete 1325 L109 L109-Mangalpur Bazar to New CELL Filled 1.640 3.750 Complete 3 59.34 39.56 98.90 7.17 (0 , 0 , 1 , 0 , 1) Toli (TRACK109) Concrete Block Nautan Total 10.483 11 397.15 264.75 661.90 47.09 (0 , 3 , 4 , 0 , 7)

Block- Ramnagar

1326 L061 L061-PMGSY Bhakhari Ghora New CELL Filled 1.500 3.750 Complete 1 63.60 42.40 106.00 7.13 (0 , 0 , 2 , 0 , 2) ghat to Bairiya (VR42) Concrete Block Ramnagar Total 1.500 1 63.60 42.40 106.00 7.13 (0 , 0 , 2 , 0 , 2)

Page 148 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Sidhaw

1327 L030 L030-Barwal T03 to Belwa New CELL Filled 3.900 3.750 Complete 4 165.23 110.15 275.38 19.51 (0 , 3 , 3 , 1 , 7) Chakhani (VR10) Concrete Block Sidhaw Total 3.900 4 165.23 110.15 275.38 19.51 (0 , 3 , 3 , 1 , 7)

Block- Yogapatti

1328 L091 L091-Paltu Sah Ke Bagicha New CELL Filled 2.755 3.750 Complete 2 99.73 66.49 166.22 13.35 (0 , 1 , 0 , 0 , 1) To Lakra (TRACK91) Concrete 1329 L130 L130-Mahavirpur To Maszid New CELL Filled 0.579 3.750 Complete 0 20.19 13.46 33.65 2.40 (0 , 0 , 1 , 0 , 1) Tola (TRACK130) Concrete 1330 L148 L148-Navranj Sah To Dukhna New CELL Filled 1.354 3.750 Complete 1 49.16 32.78 81.94 6.05 (0 , 0 , 1 , 0 , 1) Tola (TRACK148) Concrete 1331 L151 L151-Semari To Koeri Tola New CELL Filled 1.997 3.750 Complete 3 75.05 50.04 125.09 8.81 (0 , 1 , 0 , 0 , 1) (TRACK151) Concrete Block Yogapatti Total 6.685 6 244.13 162.77 406.90 30.61 (0 , 2 , 2 , 0 , 4)

District West Champaran Total 100.632 147 4,081.40 2,720.95 6,802.35 476.63 (9 , 38 , 44 , 19 , 110) Road Proposals Total 2,759.649 5,377 88,659.82 59,112.51 1,47,772.33 11,087.15 (533 , 974 , 760 , 664 , 2931) Long Span Bridge Proposals

District- Araria

Block- Forbisganj

1332 L033 Bridge at ch 950 m New -- 56.520 0.000 Complete 0 126.26 84.17 210.43 4.32 (0 , 0 , 0 , 0 , 0)

1333 L033 Bridge at ch 3685 m New -- 33.680 0.000 Complete 0 100.61 67.08 167.69 3.54 (0 , 0 , 0 , 0 , 0)

Block Forbisganj Total 90.200 0 226.87 151.25 378.11 7.86 (0 , 0 , 0 , 0 , 0)

Page 149 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Raniganj

1334 T02 Bridge at chainage-3600 m New -- 62.520 0.000 Complete 0 148.22 98.81 247.04 5.18 (0 , 0 , 0 , 0 , 0)

1335 T14 Bridge at ch 2050 m New -- 137.040 0.000 Complete 0 141.79 290.00 431.79 8.00 (0 , 0 , 0 , 0 , 0)

1336 T12 Bridge at Chainage 3900 m New -- 45.680 0.000 Complete 0 105.43 70.28 175.71 3.56 (0 , 0 , 0 , 0 , 0)

1337 T12 Bridge at Chainage 6000 m New -- 37.680 0.000 Complete 0 99.06 66.04 165.10 4.76 (0 , 0 , 0 , 0 , 0)

Block Raniganj Total 282.920 0 494.49 525.14 1,019.63 21.50 (0 , 0 , 0 , 0 , 0)

District Araria Total 373.120 0 721.36 676.38 1,397.74 29.36 (0 , 0 , 0 , 0 , 0)

District- Banka

Block- Barahat

1338 L058 bridge across Cheer River New -- 330.890 0.000 Complete 0 149.35 948.84 1,098.19 8.75 (0 , 0 , 0 , 0 , 0) on PMGSY road CNCPL No L058 from Vikrampur to Govindpur Block Barahat Total 330.890 0 149.35 948.84 1,098.19 8.75 (0 , 0 , 0 , 0 , 0)

Block- Baunsi

1339 L024 Bridge across Chir River New -- 203.640 0.000 Complete 0 182.55 643.56 826.11 8.45 (0 , 0 , 0 , 0 , 0)

1340 L024 Bridge across Sukhania River New -- 127.290 0.000 Complete 0 228.73 418.27 647.00 6.96 (0 , 0 , 0 , 0 , 0)

1341 L055 Bridge across Sukhania New -- 178.190 0.000 Complete 0 184.82 547.03 731.85 8.58 (0 , 0 , 0 , 0 , 0) River 1342 L052 Partial Sumersible RCC New -- 45.405 0.000 Complete 0 95.85 63.90 159.76 2.89 (0 , 0 , 0 , 0 , 0) Bridge across Agra jor on PMGSY 1343 L035 Partial Sumersible RCC New -- 29.350 0.000 Complete 0 83.17 55.45 138.62 4.00 (0 , 0 , 0 , 0 , 0) Bridge across Padaria jor

Page 150 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1344 L049 PARTIAL SUMERSIBLE RCC New -- 29.350 0.000 Complete 0 82.27 54.84 137.11 40.38 (0 , 0 , 0 , 0 , 0) Bridge across Agra jor Block Baunsi Total 613.225 0 857.39 1,783.05 2,640.44 71.25 (0 , 0 , 0 , 0 , 0)

Block- Chanan

1345 L056 Bridge across Chandan River New -- 229.090 0.000 Complete 0 160.73 657.54 818.27 9.22 (0 , 0 , 0 , 0 , 0)

1346 L064 Partial Sumersible RCC New -- 34.060 0.000 Complete 0 84.30 56.20 140.51 3.75 (0 , 0 , 0 , 0 , 0) Brdige across River 1347 L075 Partial sumersible RCC New -- 22.715 0.000 Complete 0 60.86 40.58 101.44 2.17 (0 , 0 , 0 , 0 , 0) Bidge Across Jor 1348 L071 Partial Sumersible RCC New -- 29.350 0.000 Complete 0 79.01 52.68 131.69 3.52 (0 , 0 , 0 , 0 , 0) Bridge across jor 1349 L083 Partial Sumersible RCC New -- 56.750 0.000 Complete 0 119.15 79.43 198.58 3.66 (0 , 0 , 0 , 0 , 0) Bridge across Block Chanan Total 371.965 0 504.06 886.42 1,390.48 22.33 (0 , 0 , 0 , 0 , 0)

Block- Dhoraiya

1350 L064 Partial Sumersible RCC New -- 22.715 0.000 Complete 0 53.43 35.62 89.06 2.27 (0 , 0 , 0 , 0 , 0) Bridge across Kadwa River 1351 L037 Partial Submersible RCC New -- 22.715 0.000 Complete 0 51.56 34.37 85.93 1.77 (0 , 0 , 0 , 0 , 0) Bridge across Rakouli River 1352 L064 Partial Sumersible RCC New -- 19.575 0.000 Complete 0 46.28 30.85 77.13 2.26 (0 , 0 , 0 , 0 , 0) Bridge across Babura Canal Block Dhoraiya Total 65.005 0 151.27 100.85 252.12 6.30 (0 , 0 , 0 , 0 , 0)

Block- Katoria

1353 T03 T03-Banka Dumka To Jaipur New -- 279.990 0.000 Complete 0 162.57 848.33 1,010.90 9.94 (0 , 0 , 0 , 0 , 0)

Page 151 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1354 T03 bridge across Kurar River New -- 203.640 0.000 Complete 0 168.97 595.65 764.62 6.44 (0 , 0 , 0 , 0 , 0) near Domuhan village on PMGSY road between Biradih to Domuhan Village 1355 T03 T03 Banka Dumka to jaipur New -- 76.390 0.000 Complete 0 269.78 188.18 457.96 5.64 (0 , 0 , 0 , 0 , 0)

1356 L058 Bridge across Chandan River New -- 152.740 0.000 Complete 0 204.46 489.52 693.98 12.66 (0 , 0 , 0 , 0 , 0) on PMGSY road CNCPL No L058 from Jaipur Jamdaha to Bathnabaran 1357 L046 Bridge across Chandan River New -- 279.990 0.000 Complete 0 153.96 803.99 957.95 15.97 (0 , 0 , 0 , 0 , 0) on PMGSY road CNCPL No L046 from Jamdaha To Basmatta 1358 L037 Bridge across Chandan River New -- 101.840 0.000 Complete 0 142.70 180.24 322.94 6.87 (0 , 0 , 0 , 0 , 0) on PMGSY road CNCPL No L037 from T02 Majhaliyadih To Kalothar Block Katoria Total 1,094.590 0 1,102.44 3,105.92 4,208.36 57.51 (0 , 0 , 0 , 0 , 0)

Block- Rajaun

1359 L042 Partial Submersible RCC New -- 29.350 0.000 Complete 0 93.24 62.16 155.40 4.82 (0 , 0 , 0 , 0 , 0) Bridge across Katriya Block Rajaun Total 29.350 0 93.24 62.16 155.40 4.82 (0 , 0 , 0 , 0 , 0)

District Banka Total 2,505.025 0 2,857.76 6,887.23 9,744.99 170.94 (0 , 0 , 0 , 0 , 0)

District- Bhagalpur

Block- Bihpur

1360 L027 L027-RCD Road To Kaharpur New -- 318.520 0.000 Complete 0 225.87 1,372.92 1,598.79 17.72 (0 , 0 , 0 , 0 , 0)

Block Bihpur Total 318.520 0 225.87 1,372.92 1,598.79 17.72 (0 , 0 , 0 , 0 , 0)

Page 152 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Ismilepur

1361 L028 L028-MMGSY Chhatu Singh New -- 70.660 0.000 Complete 0 223.23 148.82 372.05 5.71 (0 , 0 , 0 , 0 , 0) Tola To Idmadpur 1362 L028 L028-MMGSY Chhatu Singh New -- 52.660 0.000 Complete 0 168.19 112.13 280.32 4.55 (0 , 0 , 0 , 0 , 0) Tola To Idmadpur Block Ismilepur Total 123.320 0 391.42 260.95 652.37 10.26 (0 , 0 , 0 , 0 , 0)

Block- Narayanpur

1363 L021 L021 - PMGSY Road New -- 79.660 0.000 Complete 0 197.29 151.96 349.25 7.85 (0 , 0 , 0 , 0 , 0) Shahabad to Athgama 1364 - Bihpur Ganaul Road to New -- 79.720 0.000 Complete 0 208.91 161.19 370.10 7.89 (0 , 0 , 0 , 0 , 0) Baikhunthpur Block Narayanpur Total 159.380 0 406.20 313.15 719.35 15.74 (0 , 0 , 0 , 0 , 0)

Block- Naugachhia

1365 L052 RCD Road nofourteen To New -- 52.660 0.000 Complete 0 164.24 109.50 273.74 5.47 (0 , 0 , 0 , 0 , 0) Ganarchak Diara Block Naugachhia Total 52.660 0 164.24 109.50 273.74 5.47 (0 , 0 , 0 , 0 , 0)

Block- Rengra Chowk

1366 L023 L023-RCD Road T02 To New -- 70.660 0.000 Complete 0 245.25 163.50 408.75 6.46 (0 , 0 , 0 , 0 , 0) Tintanga Simaria Tola 1367 L023 L023-RCD Road T02 To New -- 47.120 0.000 Complete 0 173.84 115.89 289.73 5.78 (0 , 0 , 0 , 0 , 0) Tintanga Simaria Tola 1368 L023 L023-RCD Road T02 To New -- 47.120 0.000 Complete 0 168.87 112.58 281.45 6.44 (0 , 0 , 0 , 0 , 0) Tintanga Simaria Tola Block Rengra Chowk Total 164.900 0 587.96 391.97 979.93 18.68 (0 , 0 , 0 , 0 , 0)

District Bhagalpur Total 818.780 0 1,775.69 2,448.49 4,224.18 67.87 (0 , 0 , 0 , 0 , 0)

District- East Champaran

Page 153 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Adapur

1369 L043 High level Bridge across New -- 68.840 0.000 Complete 0 308.37 205.58 513.95 7.95 (0 , 0 , 0 , 0 , 0) Bangari river Block Adapur Total 68.840 0 308.37 205.58 513.95 7.95 (0 , 0 , 0 , 0 , 0)

Block- Ramgarhwa

1370 L039 High level bridge across New -- 76.390 0.000 Complete 0 276.21 192.67 468.88 12.65 (0 , 0 , 0 , 0 , 0) Tilawe river in L045 Sheikhbena to Khugni road at Chainage 500 m Block Ramgarhwa Total 76.390 0 276.21 192.67 468.88 12.65 (0 , 0 , 0 , 0 , 0)

Block- Raxaul

1371 - High level Bridge Across New -- 68.840 0.000 Complete 0 318.23 212.15 530.38 10.02 (0 , 0 , 0 , 0 , 0) Bangri river in Bhelahi to nonea Road at Chainge 4375.00 1372 - partial Sumersible RCC New -- 31.060 0.000 Complete 0 95.28 63.52 158.80 4.02 (0 , 0 , 0 , 0 , 0) Bridge Across Gad River in Road From Bhelahi To Nonea Road 1373 - partial Submersible RCC New -- 31.060 0.000 Complete 0 98.22 65.48 163.70 3.91 (0 , 0 , 0 , 0 , 0) Bridge across Sariswa river in Road from Bhelahi to Nonea Road 1374 - Partial Sumersible RCC New -- 31.060 0.000 Complete 0 90.48 60.32 150.80 3.13 (0 , 0 , 0 , 0 , 0) Bridge across Sariswa River in Road from Bhelahi to Nonea Road 1375 T06 High level Bridge across New -- 330.890 0.000 Complete 0 198.89 1,263.55 1,462.44 24.04 (0 , 0 , 0 , 0 , 0) Tilwe river In the Road from Bhelahi To nonea Road At Chainge 0.00km

Page 154 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1376 T07 Partial sumersible RCC New -- 31.060 0.000 Complete 0 86.77 57.85 144.62 2.86 (0 , 0 , 0 , 0 , 0) Bridge across Sariswa River in Road from Bhelahi to Nonea Road 1377 T07 Partial sumersible RCC New -- 20.715 0.000 Complete 0 67.50 45.00 112.49 2.99 (0 , 0 , 0 , 0 , 0) Bridge across Barnahiya River in Road from Bhelahi to Nonea Road Block Raxaul Total 544.685 0 955.37 1,767.86 2,723.23 50.96 (0 , 0 , 0 , 0 , 0)

District East Champaran Total 689.915 0 1,539.95 2,166.11 3,706.06 71.55 (0 , 0 , 0 , 0 , 0)

District- Gaya

Block- Atri

1378 L056 Aliyani Bridge New -- 21.740 0.000 Complete 0 86.06 57.38 143.44 4.01 (0 , 0 , 0 , 0 , 0)

Block Atri Total 21.740 0 86.06 57.38 143.44 4.01 (0 , 0 , 0 , 0 , 0)

Block- Barachatti

1379 - Dhamna Bridge New -- 86.840 0.000 Complete 0 164.73 109.82 274.55 2.22 (0 , 0 , 0 , 0 , 0)

1380 - Bridge over river Dhar-Dhari New -- 33.440 0.000 Complete 0 96.03 64.02 160.04 2.61 (0 , 0 , 0 , 0 , 0)

1381 - Bridge over River Dhamna New -- 100.240 0.000 Complete 0 217.30 145.74 363.04 2.53 (0 , 0 , 0 , 0 , 0)

1382 - Bridge over River Chardi New -- 43.440 0.000 Complete 0 91.18 60.79 151.97 3.11 (0 , 0 , 0 , 0 , 0)

1383 - Bridge over Nallah Gihuni New -- 22.100 0.000 Complete 0 45.04 30.02 75.06 1.08 (0 , 0 , 0 , 0 , 0)

Block Barachatti Total 286.060 0 614.28 410.39 1,024.66 11.54 (0 , 0 , 0 , 0 , 0)

Block- Konch

1384 - Bridge over Koil Nahar Canal New -- 16.740 0.000 Complete 0 65.21 43.47 108.68 4.27 (0 , 0 , 0 , 0 , 0)

Page 155 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1385 - Bridge over Nera River New -- 50.140 0.000 Complete 0 152.50 101.67 254.16 3.68 (0 , 0 , 0 , 0 , 0)

Block Konch Total 66.880 0 217.71 145.14 362.84 7.95 (0 , 0 , 0 , 0 , 0)

Block- Mohra

1386 - Bridge over Nallah (Dhaukal New -- 16.700 0.000 Complete 0 47.83 31.88 79.71 2.66 (0 , 0 , 0 , 0 , 0) Bigha Bangiki Pain) 1387 - Bridge over River Bodhi New -- 33.440 0.000 Complete 0 96.94 64.63 161.57 3.82 (0 , 0 , 0 , 0 , 0)

1388 - Bridge over River Mangura New -- 50.140 0.000 Complete 0 147.28 98.18 245.46 3.76 (0 , 0 , 0 , 0 , 0)

1389 - Chandpura Bridge New -- 21.740 0.000 Complete 0 77.03 51.36 128.39 2.08 (0 , 0 , 0 , 0 , 0)

Block Mohra Total 122.020 0 369.08 246.05 615.13 12.32 (0 , 0 , 0 , 0 , 0)

Block- Tekari

1390 - Bridge over River Sinanhi New -- 50.140 0.000 Complete 0 134.99 89.99 224.98 3.64 (0 , 0 , 0 , 0 , 0)

1391 - Bridge over Nallah Sala Dam New -- 50.140 0.000 Complete 0 129.50 86.33 215.83 3.07 (0 , 0 , 0 , 0 , 0) Pyne Block Tekari Total 100.280 0 264.49 176.32 440.81 6.70 (0 , 0 , 0 , 0 , 0)

District Gaya Total 596.980 0 1,551.61 1,035.28 2,586.89 42.52 (0 , 0 , 0 , 0 , 0)

District- Kishanganj

Block- Bahadurganj

1392 L053 Bridge at ch 715 m New -- 34.000 0.000 Complete 0 79.75 53.17 132.92 2.83 (0 , 0 , 0 , 0 , 0)

1393 L053 Bridge at ch 1450 m New -- 51.680 0.000 Complete 0 123.60 82.40 206.00 5.27 (0 , 0 , 0 , 0 , 0)

Block Bahadurganj Total 85.680 0 203.35 135.57 338.91 8.10 (0 , 0 , 0 , 0 , 0)

Page 156 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Thakurganj

1394 L036 Bridge at ch 2070 m New -- 25.700 0.000 Complete 0 60.52 40.35 100.86 2.57 (0 , 0 , 0 , 0 , 0)

1395 L035 Bridge at ch 1865 m New -- 25.700 0.000 Complete 0 66.27 44.18 110.45 3.44 (0 , 0 , 0 , 0 , 0)

1396 L081 Bridge at ch 2320 m New -- 41.680 0.000 Complete 0 141.22 94.15 235.37 4.20 (0 , 0 , 0 , 0 , 0)

Block Thakurganj Total 93.080 0 268.01 178.67 446.68 10.21 (0 , 0 , 0 , 0 , 0)

District Kishanganj Total 178.760 0 471.36 314.24 785.60 18.31 (0 , 0 , 0 , 0 , 0)

District- Madhubani

Block- Madhepur

1397 L031 KURSON TO BASSIPATTI New -- 44.720 0.000 Complete 0 194.05 129.36 323.41 0.00 (0 , 0 , 0 , 0 , 0)

Block Madhepur Total 44.720 0 194.05 129.36 323.41 0.00 (0 , 0 , 0 , 0 , 0)

District Madhubani Total 44.720 0 194.05 129.36 323.41 0.00 (0 , 0 , 0 , 0 , 0)

District- Patna

Block- Dhanarua

1398 L026 L026- T01 To Fatehpur via New -- 50.100 0.000 Complete 0 96.63 64.42 161.05 1.29 (0 , 0 , 0 , 0 , 0) Ramanbigha 1399 L113 L113-L025 to Nizamat New -- 43.800 0.000 Complete 0 118.51 79.00 197.51 2.58 (0 , 0 , 0 , 0 , 0) (VR78) Block Dhanarua Total 93.900 0 215.14 143.42 358.56 3.87 (0 , 0 , 0 , 0 , 0)

District Patna Total 93.900 0 215.14 143.42 358.56 3.87 (0 , 0 , 0 , 0 , 0)

District- Sitamarhi

Page 157 of 158 Generated On : 29/11/2016 11:46 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Bajpatti

1400 L104 L104-PMGSY Road Babu New -- 70.660 0.000 Complete 0 226.59 151.06 377.65 5.49 (0 , 0 , 0 , 0 , 0) Narha House of Kishori Mallik to Garhiya Block Bajpatti Total 70.660 0 226.59 151.06 377.65 5.49 (0 , 0 , 0 , 0 , 0)

Block- Runnisaidpur

1401 L029 MAHISAR TO DILAWARPUR New -- 70.660 0.000 Complete 0 247.56 165.04 412.60 7.23 (0 , 0 , 0 , 0 , 0)

Block Runnisaidpur Total 70.660 0 247.56 165.04 412.60 7.23 (0 , 0 , 0 , 0 , 0)

District Sitamarhi Total 141.320 0 474.15 316.10 790.25 12.72 (0 , 0 , 0 , 0 , 0)

Long Span Bridge Proposals Total 5,442.520 0 9,801.05 14,116.62 23,917.67 417.14 (0 , 0 , 0 , 0 , 0)

Grand Total Total Road Length:2759.649 Kms 5,377 98,460.87 73,229.13 1,71,690.00 11,504.29 (533 , 974 , 760 Total LSB Length:5442.520 Mtrs , 664 , 2931)

Page 158 of 158 Generated On : 29/11/2016 11:46 AM