Proposed Project to Connect CN Railway Corridor with CP Railway Corridor Between Oshawa and Bowmanville, Which Will Allow GO

Total Page:16

File Type:pdf, Size:1020Kb

Proposed Project to Connect CN Railway Corridor with CP Railway Corridor Between Oshawa and Bowmanville, Which Will Allow GO Subiect: Proposed project to connect CN Railway corridor with CP Railway corridor ,,-c"-"z . between Oshawa and Bowmanville, which will allow GO Transit to ext train service to Bowmanville. If the above is approved: 1) Home owner's will have property taxes reduced on Mitchell Avenue, Drew Str George Street 2) Compensation ~iiiibe paid when homes are sold due: -1 a) Property depreciation b) Increased vibrations and noise from increased traffic on railway c) lncreased traffic in the area I? 3) Sound barriefs to be installed on north side of rail tracks to reduce train noise Signatures of residents of the above noted streets. Subiect: Proposed project to connect CN Railway corridor with CP Railway corridor between Oshawa and Bowmanville, which will allow GO Transit to extend their train service to Bowmanville. If the above is approved: 1) Home owner's will have property taxes reduced on Mitchell Avenue, Drew Street and George Street 23 CornpensatIan will be paid when homes are sold due: a) Property depreciation b) lncreased vibrations and noise from increased traffic on railway c) lncreased traffic in the area 3) Sound barriers to be installed on north side of rail tracks to reduce train noise Signatures of residents of the above noted streets. /.-- /4/? .!??A 4- '2926-)q/-fXC><-J mi 20 Bay Street, Suite 600 m 20 rue Bay, bureau 600 Toronto, ON M5J 2W3 Toronto, ON M5J 2W3 APPENDIX A OSHAWA TO BOWMANVILLE GO TRAIN SERVICE EXPANSION AND MAINTENANCE FACILITY PROJECT OVERVIEW 1.0 Project Name Oshawa to Bowmanville GO Train Service Expansion and Maintenance Facility Transit Project Assessment Process (TPAP) Environmental Assessm~nt(EA) and Preliminary Design Study. ,---0' 2.0 Project Purpose and Justification GO Transit currently offers two-way all-day service on the Lakeshore East line between Oshawa and Union Station in Toronto. To provide more choices for travel across the Greater Toronto and Hamilton Area, meet increasing customer demand, and attract more transit users in the future, a need has been identified to expand rail service beyond Oshawa to Bowmanville. Further, the rail fleet has outgrown its existing storage and maintenance facilities at Willowbrook, GO'S largest and primary rail maintenance facility located in Etobicoke. The purpose of this TPAP EA will be to investigate the future service requirements between Oshawa and Bowmanville and the potential impacts of building a new rail maintenance and storage facility in Whitby. 3.0 Proposed Work GO Transit completed a feasibility study to expand train service from Oshawa to Bowmanville, which investigated both the CN and CP railway connections, recommended a preferred expansion route, and potential station, layover, and maintenance facility locations. The study recommended connecting the existing CN railway corridor, just west of the existing Oshawa GO Station, north across Hwy. 40i to the CP conidor. The TPAP EA will review in more detail potential sites for new stations, layover, and maintenance facilities, the CN/CP connection, and potential improvements to the existing rail line. 4.0 TPAP EA Process Work under this project is associated with the expansion of GO Transit's rail service to meet the anticipated transit demands and maintenance facility requirements. The environmental impact of this project will be assessed according to the Transit Project Assessment Process as prescribed in Ontario Regulation 231/08, Transit Projects and Greater Toronto Transportation Undertakings. ' Appendix A Oshawa To Bowrnanville GO Train Service Expansion And Maintenance Facility Project Overview 5.0 Study Area 6.0 Planncd Schedale Environmental Assessment and Preliminary Design Report.....................Winter 2010/11 .
Recommended publications
  • Lakeshore East GO Rail Extension to Bowmanville
    Lakeshore East GO Rail Extension to Bowmanville For discussion with Metrolinx Chair D. Wright and President and CEO P. Verster April 8, 2019 Confirm Lakeshore East GO Rail Extension The Province’s commitment to delivering the Lakeshore East (LSE) GO rail extension to Bowmanville by 2024 is critical because: • Durham Region is poised for significant growth – almost double by 2041 • Durham is committed to developing transit to • Improve connections • Shape growth • Unlock development potential at new station areas • Is a catalyst to job creation and city building • LSE GO Rail extension is a pillar of our rapid transit network 2 Lakeshore East GO Rail Extension 20 km and 4 new stations by 2024 $550 million investment 3 It’s Durham’s Time • Majority of GO investment in new rail service has been west of Durham • Current ridership on Lakeshore East is roughly double that on Milton and Kitchener lines. • Forecast ridership for LSE stations exceeds stations in Kitchener, Niagara, Gormley 4 Extension Addresses Regional Transportation Challenges • Population growth • Disconnected transit • Congestion • Competitiveness • Demographic change • Urbanization • Clean environment 5 Population Growth Will Create Demand The population east of 2031: 2041: Durham Region 960,000 residents/ 1.2 million residents/ (Northumberland 350,000 jobs 430,000 jobs County, City of Kawartha Lakes, City of Peterborough and County of Peterborough) will account for another 408,000 by 2041. LSE GO Rail Extension – Ridership • Forecasts: • 10,700 daily customers • Growth –
    [Show full text]
  • Cultural Heritage Screen Report
    Lincolnville Go Station Improvements: Cultural Heritage Screening Report Prepared for: Metrolinx 20 Bay Street, Suite 1800 Toronto ON M5J 2W3 ~ METROLINX Prepared by: Stantec Consulting Ltd. 300W-675 Cochrane Drive Markham ON L3R 0B8 () Stantec File No. 1135200010 October 12, 2017 LINCOLNVILLE GO STATION IMPROVEMENTS: CULTURAL HERITAGE SCREENING REPORT Project Personnel EA Project Manager: Alex Blasko, B.Sc. (Hon.) Heritage Consultant: Heidy Schopf, MES, CAHP Task Manager: Meaghan Rivard, MA, CAHP Report Writer: Heidy Schopf, MES, CAHP Laura Walter, MA GIS Specialist: Sean Earles Office Assistants: Carol Naylor Quality Review: Meaghan Rivard, MA, CAHP Independent Review: Tracie Carmichael, BA, B. Ed. () Stantec Sign-off Sheet This document was prepared by Stantec Consulting Ltd. (“Stantec”) for the account of Metrolinx (the “Client”). The material in it reflects Stantec’s professional judgment in light of the scope, schedule and other limitations stated in the document and in the contract between Stantec and the Client. The opinions in the document are based on conditions and information existing at the time the document was published and do not take into account any subsequent changes. The report has been prepared based, in part, on information provided by others as cited in the Reference section. Stantec has not verified the accuracy and / or completeness of third party information. Prepared by (signature) Heidy Schopf, MES, CAHP Cultural Heritage Specialist Reviewed by (signature) Signed by Tracie Carmichael on behalf of: Meaghan Rivard,
    [Show full text]
  • Smarttrack Ridership Analysis: Project Final Report
    SMARTTRACK Research Report RIDERSHIP ANALYSIS Project Final Report Eric J. Miller, James Vaughan, Monika Nasterska June 2016 SMARTTRACK RIDERSHIP ANALYSIS PROJECT FINAL REPORT Prepared for the City Manager, City of Toronto by: Eric J. Miller, Ph.D. Professor, Department of Civil Engineering Director, Transportation Research Institute Research Director, Travel Modelling Group University of Toronto James Vaughan & Monika Nasterska Travel Modelling Group, University of Toronto Transportation Research Institute June, 2016 i Executive Summary Project Objectives On December 11, 2014, City Council directed the City Manager in consultation with the Province/Metrolinx to develop a work plan to undertake an accelerated review of the SmartTrack and RER plans. Council also directed the City Manager to retain the specialized services of the University of Toronto Transportation Research Institute (UTTRI) to support the planning analysis and required transit ridership modelling as a component of the overall review.1 On February 10, 2015, City Council considered the report EX2.2 SmartTrack Work Plan (2015- 2016), and approved the accelerated work plan for the review of SmartTrack.2 The UTTRI component of this work was to provide transit ridership estimates and other key network performance measures using the City’s new Regional Travel Demand Model (GTAModel Version 4.0) developed at the University of Toronto by UTTRI. As detailed in the final Terms of Reference for the UTTRI work, this work included: • Confirming the integrated RER and SmartTrack Service Concept to be modelled. • Completion and validation of a new travel demand model system to be used by the City of Toronto in this and similar studies of transit ridership and travel demand.
    [Show full text]
  • BOWMANVILLE Municipality of Clarington TWO COMMERCIAL LOTS on 401 EAST for SALE
    BOWMANVILLE Municipality of Clarington TWO COMMERCIAL LOTS ON 401 EAST FOR SALE OFFICE BUILDING-1 ( proposed) 45 Spicer Sq., Bowmanville Municipality of Clarington, Regional Municipality of Durham., Ontario. FOR SALE TWO COMMERCIAL LOTS ON 401 BOWMANVILLE. Municipality of Clarington. LOCATION: 45 Spicer Square & 5 Spicer Square - South of Baseline Road and West of Waverly Road / HWY 401 Interchange LEGAL Block 2 & Block 9 - Plan 40M2171 Town of Clarington, Region of DESCRIPTION: Durham. LOT SIZE & Block 2 - 0.95 Acres ; ( West Lot) OFFER PRICE: OFFER PRICE: $ 700.000 Block 9 - 1.139Acres. ( East Lot) - OFFER PRICE: $ 750.000 DIMENTIONS: Block 2 - 182 .61 Ft. x 229.29 Ft. Block 9 - 166.20 Ft x 270.30 Ft. ZONING: C 5-16 Clarington By-Law 2009-19. Permitting wide range of commercial uses, including office building, retail sales& service, motor vehicle sales, restaurants, building supply outlet. SERVICES: Full Municipal services available. COMMENTS: Full set of Architectural drawings (preliminary) for 2 storey* office building of 20,000 Sq. Ft, (with U/G parking) available to Purchaser. * City has agreed, in principle, for a 3 storey office Building and a Restaurant, with surface Parking. Direct access to Highway 401, Great office building or retail site. Just 50 Min. drive, from GTA - 401 East. SITE FEATURES & Proximity to Ontario Power Generation (OPG) / Darlington OPPORTUNITIES Nuclear Plant ( 2500 + Employees) in Clarington**: Nuclear Plant Refurbishment: 4 year project, in progress. (2013- 2017) OPG Darlington- B Nuclear New Build (2013-2020) OPG Darlington- A Refurbishment Nuclear Reactors -(2015-2022) Nuclear Supply Chain - over 10 Companies expressed interest in establishing operations in Bowmansville (2013-2020) 67% - Interested in Commercial / Office space.
    [Show full text]
  • September 5, 2019 Overview of Public Meeting #1
    Welcome to Public Meeting #1 Alternative Low Carbon Fuel Use at St Marys Cement Bowmanville Plant September 5, 2019 Overview of Public Meeting #1 . St Marys Cement (SMC) a company of Votorantim Cimentos North America (VCNA) is undertaking efforts to use Alternative Low Carbon Fuels (ALCFs) as an energy source for their Bowmanville Cement Plant . Today our Project Team is here to answer the following questions and hear your feedback: . Overview of the St Marys Cement Bowmanville Plant (SMCB) . What are the important characteristics / facts of SMCB operation? . How is cement made? . What are Alternative Low Carbon Fuels (ALCF)? . Overview of the Demonstration Project and results . What is the Demonstration Project and why was it conducted? . What are the results of the Demonstration Project? . Overview of the current project and proposed application under Ontario Regulation (O. Reg) 79/15 . What SMCB is proposing and why? . How is SMCB considering the environment in this project? . How is this study being conducted? . What is the timeline for this project? . How can you participate in this project? St Marys Cement Bowmanville Plant Site Overview . St Marys Cement Bowmanville Plant (SMCB) is located at 410 Bowmanville Avenue, in Bowmanville, Ontario, within the Municipality of Clarington . SMCB extracts limestone at the site, produces clinker and cement for the Ontario market and also exports to the US . The cement produced at the plant contributes to building infrastructure (e.g. roads, bridges, buildings) across Ontario and North America: . Examples of projects include the CN Tower, Darlington Nuclear Station and Toronto-York Spadina Subway Extension Site Facts . Started operations over 50 years ago in 1968 .
    [Show full text]
  • Greater Toronto Area
    Fourth Quarter Quarter 2019 2018 / Industrial / Industrial Market ReportMarket Report Greater Toronto Area Quick Stats Strong fundamentals underpinned the bringing the full-year tally to 33 buildings Greater Toronto Area (GTA) industrial market and 8.1 msf – compared with 36 buildings through 2019, continuing the success of (6 msf) completed in 2018. Meanwhile, 1.4% 2018. Steadily declining availability, rapidly almost 15 msf remained under construction Availability rate in the Greater increasing rental rates and a growing GTA-wide and, barring any delays, could Toronto Area number of new building completions were push the full-year 2020 total to more than all prominent factors throughout the year. 10 msf – a decade high. However, limited developable land impacts Average rent for industrial product ended $9.00 psf the speed and cost of construction activity, the fourth quarter and 2019 having reached Average asking net rent in the hindering delivery of much-needed new the $9-per-square-foot (psf) mark for the Greater Toronto Area supply. To protect against the increasingly first time. This represents an increase of landlord-favouring conditions, tenants 23% year-over-year – rates have jumped are seeking creative lease solutions and 34% from three years ago, and 51% in the 10 ownership positions. past five years. Speculative construction Properties in the Greater Toronto Lease renewals and sale-leasebacks were continues to moderate the pace of Area with more than 250,000 sf popular during the quarter – notably DSV declining availability in the face of strong available – down from 11 one year Logistics’ distribution centre (DC) (1.1 million tenant demand, notably for logistics space.
    [Show full text]
  • Accessible GO Transit Services Richard C
    Feature Barrier-Free Access to Transport Accessible GO Transit Services Richard C. Ducharme GO Transit is an integrated network of and we are adding more as we build new ride GO Train services independently. train and bus services reaching 100 km stations or expand existing ones. Barrier-free facilities at accessible stations (60 miles) from downtown Toronto. We Moreover, we are now poised to introduce and one accessible car in every train en- carry 36 million passengers annually in barrier-free bus services on our network able disabled passengers to buy their own the Greater Toronto Area covering 8000 later this year. ticket or pass, board the train themselves, km2 and a population of 4.9 million. On and travel at their own convenience. No a typical weekday, GO transports some reservations are needed and mobility- 133,000 passengers in our distinctive Major Retrofits impaired customers pay the same fare as green-and-white trains and buses— other passengers. If a disabled passen- 103,000 by train and 30,000 by bus. Achieving these successes required ger requires an attendant, that person Our company has been offering barrier- major retrofits to stations and carriages. travels free-of-charge on the same ticket free access to our train services since June Forty-two of our fleet of 318 split-level as long as they are in attendance for the 1995. In this first stage, 10 stations in cars were modified to accommodate entire journey. our network became fully accessible to mobility aids and selected stations were passengers using mobility aids such as substantially improved by installing Consultation on Barrier-Free motorized and ordinary wheelchairs — elevators where there were pedestrian Access Design as well as to anyone else preferring not tunnels, constructing boarding ramps on to have to climb steps to get on and off train platforms, making station buildings Our service was developed with the input our trains.
    [Show full text]
  • Go Rer Initial Business Case Summary | 2015 Go Rer Initial Business Case Summary | 2015 2 Table of Contents
    GO RER INITIAL BUSINESS CASE SUMMARY | 2015 GO RER INITIAL BUSINESS CASE SUMMARY | 2015 2 TABLE OF CONTENTS 1. Ready, Set, GO 1.1 Building on success 1 1.2 Fixing the GTHA’s transportation problem 2 1.3 RER in the GTHA: What is being recommended? 4 1.4 Future improvements 10 1.5 How a recommendation was reached 11 2. The Strategic Case: Who Benefits and How 2.1 Making the regional GO system work for more GTHA residents 12 2.2 Electrification: Faster service, lower operating costs, greener environment 17 2.3 SmartTrack coordination 17 3. The Financial Case: How Much Will it Cost? 3.1 A comprehensive cost analysis 18 3.2 Forecasting ridership 18 3.3 Estimating fare revenues 20 3.4 Service levels: Technology and timing 20 3.5 Estimating capital costs 21 3.6 Estimated operating costs 21 3.7 Overall cost and revenue comparison 21 4. The Economic Case: How Much Would it Benefit the GTHA? 4.1 The benefits of mobility for over 7 million people 22 4.2 Benefits 22 4.3 Calculating net benefits 23 4.4 Benefit:cost ratio 24 5. Developing RER 5.1 Immediate tasks ahead 26 5.2 Cooperation with municipalities 26 5.3 Engaging stakeholders 27 6. Conclusion Putting the Regional System in Place 28 GO RER INITIAL BUSINESS CASE SUMMARY 1. Ready. Set. GO. 1.1 Building on success Metrolinx is bringing faster, more frequent and more convenient service to one of the most respected regional transit systems on the continent—GO Transit.
    [Show full text]
  • Structural Engineering Services by Licensed Professional Structural Engineers in Clarington, Ontario
    Structural Engineering Services by Licensed Professional Structural Engineers in Clarington, Ontario Providing structural engineering designs of structural steel framings, reinforced concrete floors and walls, masonry and wood framed structures, footings, and foundations in the Municipality of Clarington which includes Bowmanville, Courtice and Newcastle, is a core component of our practice. Our licensed Professional Structural Engineers have continued to pioneer in structural engineering analysis and structural engineering design services including seismic design for new construction projects including structural steel framings, reinforced concrete floors and walls, masonry and wood framed structure, foundation and footings including pre-engineered building foundation design and rehabilitation of existing buildings including balcony & parking garage repairs (ledger beams, deck re- design, bearing pads, drainage remediation, slabs and columns). Our licensed professional structural engineers and support staff are committed to services of the highest quality and respond inventively, regardless of whether the project is a small or a huge complex long-span structural engineering project. Regardless of the nature of the project whether the project is rehabilitation of structures, replacement of structures, or new structures, our licensed professional structural engineers are well experienced in distinctive creative designing with a variety of building materials for structures, including steel, concrete, masonry and wood. Our licensed professional structural engineers combine structural engineering analysis with experience and knowledge to create strong, durable, elegant and economical structural engineering designs that integrate the demands of building materials, building geometry, and gravity, wind, & seismic loads. Our licensed professional structural engineers also prepare structural engineering drawings indicating the location, sizes and quantities of materials, and specifications indicating the quality of materials and required performance of structural systems.
    [Show full text]
  • GO Transit's Deliverable: the 2020 Service Plan
    GO Transit’s deliverable: the 2020 Service Plan GO Transit’s 2020 Service Plan describes GO’s commitment to customers, existing and new, Success… and challenge: Union Station. to provide a dramatically expanded interregional transit option that integrates fully with the About 95% of GO Train customers travel RTP rapid transit network, and addresses the future travel needs in the Greater Golden to or from Union Station. During the peak Horseshoe. Further analysis during the planning and design of individual services will detail the hour, 45,000 customers use GO Transit’s service outline presented here, and define the appropriate technology, rail corridor improve - seven tracks and six platforms – the most ments, bus priority measures, passenger facilities, fleet growth, operational growth, and other intensive use of a train station in North activities needed to build the service. America. GO Transit has invested in more stairways, passenger waiting areas, This 2020 Service Plan summarizes the frequency and extent of service to be offered on and communications systems to handle major corridors, and is consistent with the infrastructure improvements and technologies the growing traffic through this “mobility included in the Metrolinx RTP and GO Transit’s vision and objectives described above. hub.” The adjacent Union Station GO Bus The plan reflects a significantly more proactive approach to service development than the Terminal provides convenient access to incremental, business-case driven approach that has guided GO’s growth for the past 15 express “train-bus” service between Union years. GO Transit will provide an attractive travel option that will compete successfully with Station and GO stations when trains are not automobile use for peak and off-peak trips between Urban Growth Centres identified in scheduled to run.
    [Show full text]
  • Adrian R. Litavski, Mcip, Rpp
    ADRIAN R. LITAVSKI, MCIP, RPP EDUCATION 1995 Honours Bachelor of Environmental Studies, Co‐op (Urban & Regional Planning), University of Waterloo ‐ Waterloo, Ontario 1991 International Exchange, Faculty of Environmental Design & Construction (Planning) Royal Melbourne Institute of Technology ‐ Melbourne, Australia PROFESSIONAL MEMBERSHIPS / ASSOCIATIONS Registered Professional Planner (Province of Ontario) Full Member – Ontario Professional Planning Institute (www.ontarioplanners.ca) Full Member – Canadian Institute of Planners (www.cip‐icu.ca) Member of Lambda Alpha International (Simcoe Chapter) – An honourary land economics society (www.lai.org) SELECTED PROJECT EXPERIENCE Development Planning / Project Management Have acted as consulting planner and project manager for various development projects requiring all forms of development approval including Official Plan and Zoning By‐law Amendments, Development Area Plans (Tertiary Plans), Plans of Subdivision, Consents and Minor Variances, and Site Plan Approvals. Have also been responsible for the assembly and management of required consulting teams including civil engineers, traffic engineers, environmental consultants, architects, landscape architects, etc. Projects include: Giles Chevrolet, Town of Whitchurch‐Stouffville – Responsible for securing site plan approval for the re‐configured dealership lands on behalf of the Region of York. Retained to facilitate the Region’s efforts to eliminate the Ninth Line “jog” at Main Street in Stouffville wherein the Region negotiated a land
    [Show full text]
  • Metrolinx Accessibility Status Report 2016
    Acknowledgements We would like to acknowledge the efforts of former Metrolinx Accessibility Advisory Committee (AAC) members Mr. Sean Henry and Mr. Brian Moore, both of whom stepped down from the AAC in 2016. They provided valuable input into our accessibility planning efforts. We would like to welcome Mr. Gordon Ryall and Ms. Heather Willis, who both joined the Metrolinx AAC in 2015. Lastly, we would like to thank all of the Metrolinx AAC members for the important work they do as volunteers to improve the accessibility of our services. Metrolinx Accessibility Status Report: 2016 1. Introduction The 2016 Metrolinx Accessibility Status Report provides an annual update of the Metrolinx Multi-Year Accessibility Plan published in December 2012, as well as the 2015 Metrolinx Accessibility Status Report. Metrolinx, a Crown agency of the Province of Ontario under the responsibility of the Ministry of Transportation, has three operating divisions: GO Transit, PRESTO and Union Pearson Express. This Status Report, in conjunction with the December 2012 Metrolinx Multi-Year Accessibility Plan, fulfills Metrolinx’s legal obligations for 2016 under the Ontarians with Disabilities Act (ODA), to publish an annual accessibility plan; and also under the Accessibility for Ontarians with Disabilities Act (AODA), to publish an annual status report on its multi-year plan. The December 2012 Metrolinx Multi-Year Accessibility Plan and other accessibility planning documents can be referenced on the Metrolinx website at the following link: www.metrolinx.com/en/aboutus/accessibility/default.aspx. In accordance with the AODA, it must be updated every five years. Metrolinx, including its operating divisions, remains committed to proceeding with plans to ensure AODA compliance.
    [Show full text]