Sections 3.5.7 to 3.5.8

Total Page:16

File Type:pdf, Size:1020Kb

Sections 3.5.7 to 3.5.8 Toronto Transit Commission/City of Toronto EGLINTON CROSSTOWN LIGHT RAIL TRANSIT TRANSIT PROJECT ASSESSMENT Environmental Project Report 3.5.7.2 Keele Station Keele Station will be located at the intersection of Eglinton Avenue and Trethewey Drive/Keele Street. It will be the western-most station in the main LRT underground section. Keele Station is shown on Sheet No. 37A. Currently, the land on all sides of the intersection is developed with a mix of institutional, commercial, emergency services and residential buildings uses. At the intersection, the land use is as follows: Northwest corner – York Memorial Collegiate Institute; 3.5.7 Black Creek to Don Mills Northeast corner – City of Toronto Emergency Medical Service (EMS) Station 19; The segment from Black Creek Drive to Don Mills Road includes the underground portion of the project. Southeast corner –1-storey restaurant and parking lot; and This segment is almost entirely underground, with the exception of one surface section from east of Southwest corner –1-storey financial institution Brentcliffe Road to west of Don Mills Road. This segment includes portals at both ends of the main tunnel Special Track Work and at the ends of a shorter underground section from west of Don Mills Road to east of Don Mills Road. Storage (pocket) tracks approximately 200 metres long will be located to the west of the Keele Station 3.5.7.1 Portal platform within the underground tunnel. Storage (pocket) tracks are a third set of tracks longer than the The west portal location is location east of Black Creek Drive, near Keelesdale Park. In this section the length of a typical LRT located between the two normal tracks. LRT can enter the storage (pocket) tracks LRT transitions from the surface to underground. The typical cross section for the portal section is shown in from either direction to allow other LRT to pass them by, reverse direction or bypass construction or Exhibit 120. breakdowns. Crossover tracks approximately 90m long will be located directly to the east of the Keele Station platform, to allow trains to change direction by crossing from one track to the other track. Interface with Existing Transit While most of the existing 32 Eglinton West bus service will be replaced by the LRT, several surface transit routes will continue to operate in this area as shown in Exhibit 121. Existing Route 32C travels along Eglinton Avenue from the Yonge Subway station to the Trethewey Drive area; Route 32C will originate at Keele and service the Trethewey Drive road segment under future conditions. Similarly the 32D service will be cut back to terminate here. 41 Keele service will continue to opeate north-south through the intersection. Existing routings of these buses are shown on Exhibit 122. MARCH 2010 Page 88 Toronto Transit Commission/City of Toronto EGLINTON CROSSTOWN LIGHT RAIL TRANSIT TRANSIT PROJECT ASSESSMENT Environmental Project Report The proposed bus terminal will operate with both clockwise and counter-clockwise bus operation. The Transit Description Bus Movements entrance/exits accesses of the terminal will be located on Trethewey Drive between Eglinton Avenue and Route Yore Road, and on Yore Road. The proposed routing is shown in Exhibit 123. 32 C Trethewey Terminating here 32 D Eglinton West – Emmett Terminating here 41 N Keele northbound Through 41 S Keele southbound Through Road Layout and Traffic Operations Based on traffic analysis, a new traffic signal is proposed at the bus terminal access on Yore Road to allow transit vehicles to safely merge onto Yore Road. For safety reasons the northbound right turn on red at Trethewey Drive and Yore Road will be prohibited to limit the number of vehicles stopped on Yore Road when the Yore Road terminal access signal is activated. In addition, a westbound left turn transit only lane is proposed for the Trethewey Drive and Yore Road intersection. Lastly, an exclusive southbound right turn lane is proposed for the Eglinton Avenue and Trethewey Drive/ Keele Street intersection to serve southbound right turning vehicles and to act as a transit queue jump lane. Exhibit 124 illustrates the recommended Keele Station layout. A new 4-bay bus terminal is proposed adjacent to Keele Station to provide a direct connection between the Eglinton Crosstown LRT with bus routes along Trethewey Drive and Eglinton Avenue. The proposed bus terminal is located off-street in the southeast quadrant of the intersection of Trethewey Drive and Yore Road, north of the existing EMS Station 19. MARCH 2010 Page 89 Toronto Transit Commission/City of Toronto EGLINTON CROSSTOWN LIGHT RAIL TRANSIT TRANSIT PROJECT ASSESSMENT Environmental Project Report northwest corner of Eglinton Avenue and Croham Road. Interface with Existing Transit A bus loop is proposed adjacent to Caledonia Station to provide a direct connection between the Eglinton Crosstown LRT with the existing Route 47B and Route 47C (Lansdowne) buses which currently travel in a north-south direction on Caledonia Road. The proposed bus loop is located at the northwest corner of Eglinton Avenue and Croham Road. Buses will travel counterclockwise through the loop, which will have one bus bay for passenger pickup/drop-off. To facilitate the proposed LRT/bus interface, the through bus services on Caledonia Road (47 Lansdowne) will be rerouted via Eglinton Avenue to a bus loop located east of the GO Rail line next to the main entrance. Northbound and southbound buses on Caledonia Road will turn west onto Eglinton Avenue, followed by a right turn north onto Croham Road then a left turn into the east end of the bus loop. After passing counterclockwise through the loop, buses will exit the bus loop by making an eastbound left turn onto Eglinton Avenue, and from there rejoin its regular route on Caledonia Road. In addition to the bus interface, there is potential for a future connection with GO Rail at Caledonia Station, which operates its Barrie service in the north-south rail corridor between Caledonia Station and the proposed bus loop. The potential future connection is shown in Exhibit 125 although exact connectivity will be subject to GO Rail alignment and platform configurations. 3.5.7.3 Caledonia Station Caledonia Station will be located 300 metres west of the intersection of Eglinton Avenue and Caledonia Road, immediately to the west of the north-south GO Rail – Barrie rail corridor. Caledonia Station is shown on Sheet No. 39. Currently, land on all sides of the intersection of Eglinton Avenue and the GO Rail – Barrie rail corridor is developed with a mix of commercial and residential buildings. At the immediate intersection, the land use is as follows: Northwest corner – Westside Mall with Canadian Tire and a food store as its main tenants and surface parking towards Eglinton Avenue; Additionally, immediately west of Westside Mall is a small cluster of high density development; Northeast corner (west of Croham Road) – public land with billboards and low rise commercial buildings (barbershop, fabric store); Southeast corner – Parkette and low-rise residential buildings; and Road Layout and Traffic Operations Southwest corner – low-rise commercial/light industrial buildings (bodyshop, plumbing A new traffic signal is proposed at the intersection between the south end of the bus loop (i.e. the exit) and supplies). Eglinton Avenue to facilitate buses making the eastbound left turn onto Eglinton Avenue. Entrances Exhibit 126 illustrates the recommended Caledonia Station layout. There will be a main entrance on the north side of Eglinton Avenue just east of the GO Rail-Barrie rail corridor. The main entrance will be co-located with the new Caledonia bus loop, which is proposed for the MARCH 2010 Page 90 Toronto Transit Commission/City of Toronto EGLINTON CROSSTOWN LIGHT RAIL TRANSIT TRANSIT PROJECT ASSESSMENT Environmental Project Report 3.5.7.5 Oakwood Station 3.5.7.4 Dufferin Station Oakwood Station will be located at the intersection of Eglinton Avenue and Oakwood Avenue. Oakwood Dufferin Station will be located at the intersection of Eglinton Avenue and Dufferin Street. Dufferin Station is Station is shown on Sheet No. 45. Currently the land on all sides of the intersection is developed with a mix shown on Sheet No. 43. Currently the land on all sides of the intersection is developed with a mix of of commercial and residential buildings. At the immediate intersection (which is a T-intersection), the land commercial, residential, religious and recreational buildings. At the immediate intersection, the land use is use is as follows: as follows: North side of Eglinton Avenue at Oakwood Avenue – Mixed use two-to-three-storey Northwest corner – Commercial building; commercial/residential buildings. Northeast corner – St. James United Church; Southeast corner – Mixed use two-storey commercial/residential buildings; and Southeast corner – St. Hilda’s Park and immediately south is St. Hilda’s Retirement Southwest corner – Single storey commercial building with parking lot further west of the Community with 3 high rise towers; and building. This site is currently subject to a development proposal for a mid-rise residential Southwest corner – Mixed use two-storey commercial/residential buildings. building with retail at ground level facing Eglinton Avenue. Road Layout and Traffic Operations Exhibit 128 illustrates the recommended Oakwood Station layout. On the northwest and southeast quadrants of the intersection, the existing traffic islands separated by channelized right turn lanes will be removed to provide a larger base for sidewalk area and space for locating the entrances. Northbound and southbound right turn movements will continue to be permitted. Exhibit 127 illustrates the recommended Dufferin Station layout. MARCH 2010 Page 91 Toronto Transit Commission/City of Toronto EGLINTON CROSSTOWN LIGHT RAIL TRANSIT TRANSIT PROJECT ASSESSMENT Environmental Project Report The main entrance to Eglinton West (Allen) Station will be shared with the existing Eglinton West subway entrance on the north side of Eglinton Avenue.
Recommended publications
  • Neighbourhood Equity Scores for Toronto Neighbourhoods and Recommended Neighbourhood Improvement Areas
    Appendix B Neighbourhood Equity Scores for Toronto Neighbourhoods and Recommended Neighbourhood Improvement Areas All Scores are out of a maximum 100 points: the lower the Score, the higher the level of total overall inequities faced by the neighbourhood. Neighbourhoods with Scores lower than the Neighbourhood Equity Benchmark of 42.89 face serious inequities that require immediate action. Neighbourhoods marked with "*" in the Rank column were designated by Council as Priority Neighbourhood Areas for Investment (PNIs) under the 2005 Strategy. For neighbourhoods marked with a "+" in the Rank column, a smaller portion of the neighbourhood was included in a larger Priority Neighbourhood Areas for Investment designated by Council under the 2005 Strategy. Neighbourhood Recommended Rank Neighbourhood Number and Name Equity Score as NIA 1* 24 Black Creek 21.38 Y 2* 25 Glenfield-Jane Heights 24.39 Y 3* 115 Mount Dennis 26.39 Y 4 112 Beechborough-Greenbrook 26.54 Y 5 121 Oakridge 28.57 Y 6* 2 Mount Olive-Silverstone-Jamestown 29.29 Y 7 5 Elms-Old Rexdale 29.54 Y 8 72 Regent Park 29.81 Y 9 55 Thorncliffe Park 33.09 Y 10 85 South Parkdale 33.10 Y 11* 61 Crescent Town 33.21 Y 12 111 Rockcliffe-Smythe 33.86 Y 13* 139 Scarborough Village 33.94 Y 14* 21 Humber Summit 34.30 Y 15 28 Rustic 35.40 Y 16 125 Ionview 35.73 Y 17* 44 Flemingdon Park 35.81 Y 18* 113 Weston 35.99 Y 19* 22 Humbermede 36.09 Y 20* 138 Eglinton East 36.28 Y 21 135 Morningside 36.89 Y Staff report for action on the Toronto Strong Neighbourhoods Strategy 2020 1 Neighbourhood Recommended
    [Show full text]
  • Transit City Etobicoke - Finch West LRT
    Delcan Corporation Toronto Transit Commission / City of Toronto Etobicoke-Finch West Light Rail Transit Transit Project Assessment Environmental Project Report - Appendices Transit City Etobicoke - Finch West LRT APPENDIX M – Consultation Record March 2010 March 2010 Appendix M Delcan Corporation Toronto Transit Commission / City of Toronto Etobicoke-Finch West Light Rail Transit Transit Project Assessment Environmental Project Report - Appendices 3.0 List of Interested Persons Participating in the Consultations 1.0 Introduction This appendix documents in detail the consultations carried out with the technical agencies, the public, Consultation was carried out to encourage technical agencies to provide input during the course of the and the First Nations communities. study. The following agencies were invited to be involved and provide comment on the TPAP study for the EFWLRT: 2.0 Description of Consultations and Follow-up Efforts The general public, government agencies and various interest groups were provided opportunities to Government Review Agencies Technical Agencies Canadian Environmental Assessment All Stream review and comment on this project during the course of the study. The City of Toronto Public Agency Consultation Team was involved in the overall public consultation process. They offered a wide range Environmental Canada MTA All Stream Inc. of communication methods to the public, including project web site, dedicated telephone number, fax, Department of Fisheries and Oceans Telus and email address for contacting the project team. Indian and Northern Affairs Canada Enwave Energy Corporation (INAC) Transportation Canada-Ontario Region Group Telecom/360 Network Technical agencies, including federal, provincial, municipal agencies, utilities, and potential interested Ministry of Aboriginal Affairs Hydro One Network Inc.
    [Show full text]
  • Routing Changes - Junction Area Study Update
    For Action Routing Changes - Junction Area Study Update Date: July 10, 2018 To: TTC Board From: Chief Customer Officer Summary The TTC bus network is very mature. In order to ensure that the network continues to reflect the way our customers travel across the city, staff has developed a program to review different segments of the city over time. This report provides an update on the status of the Junction Area Study. The objective of the study is to improve transit travel for customers by restructuring the bus route network in the Junction Area. In spring 2017, the TTC began the study with a customer survey to better understand customer travel patterns in the Junction Area. Feedback was also collected on existing services to identify key concerns for customers. Three key issues were identified: • No continuous transit service along Dundas Street West between Dundas West Station and Kipling Station; • No continuous transit service along St Clair Avenue West between Gunn's Loop (Weston Road) and Scarlett Road; and, • Need to extend the 80 Queensway from its current eastern terminus at Humber Loop to Keele Station via Parkside Drive in the late evening and on Sundays and holidays. Based on this feedback, staff prepared and proposed a preliminary transit network to reflect the data collected and address concerns raised by customers. The new transit network includes a number of service proposals that include restructuring and rationalizing existing services and improving periods of service on routes. In May 2018, the TTC held public information sessions at Runnymede, High Park, and Dundas West stations, and Gunn’s Loop to share the proposed transit network with customers and to collect feedback on the proposals.
    [Show full text]
  • Systems & Track: What to Expect
    IT’S HAPPENING, TODAY Forum Eglinton Crosstown LRT Metrolinx’s Core Business – Providing Better, Faster, Easier Service We have a strong connection with our Adding More Service Today Making It Easier for Our customers, and a Customers to Access Our great understanding Service of who they are and Building More to Improve Service where they are going. Planning for New Connections Investing in Our Future MISSION: VISION: WE CONNECT GETTING YOU THERE COMMUNITIES BETTER, FASTER, EASIER 3 SIMC OE L A K E SIMC OE L A K E SIMC OE Allandale Waterfront Newmarket Hwy 404 Yonge-Davis Lincolnville Bloomington Y ORK Unionville Vaughan University of Ontario Metropolitan Institute of Technology Helen Centre Richmond Hill Centre (Langstaff GO) Hwy 407 Finch West Conestoga Downsview Park DURHAM Don Sheppard Leslie Mills W A TERL OO Humber -Yonge McCowan College Oriole Bramalea Kitchener Yorkdale Scarborough Centre Weston TORONT O Pickering Oshawa Bowmanville Science Gateway Terminal Toronto Region of Waterloo Caledonia Cedarvale Eglinton Centre International Airport Pearson International Kennedy Airport Mount Renforth Dennis Fairway Dundas West Lansdowne St. George Bloor-Yonge Pape Main Kipling Bloor Spadina Square WELLING T ON One Danforth Cooksville Gerrard- Osgoode Queen Carlaw Milton PEEL Winston LEGEND Churchill East Harbour Port Credit UNION Subway Ontario Place /Exhibition Billy Bishop Toronto Light Rail Transit (LRT) City Airport HA LT ON Bus Rapid Transit (BRT)/ LAKE ONTARIO Regional Express Bus Aldershot GO Rail - 15-min Two-Way All-Day GORail - Two-Way All-Day HAMI LT ON West Harbour Niagara Falls GO Rail - Peak Only McMaster Hamilton GO Centre UP Express John C.
    [Show full text]
  • Connecting the Region
    EGLINTON CROSSTOWN CONSTRUCTION UPDATE EASTERN WORKS OPEN HOUSE | APRIL 9, 2020 WELCOME Our Eastern Works Open House will feature the following stations and stops: • Science Centre • Aga Khan Park & Museum, Wynford, Sloane, O’Connor • Pharmacy , Hakimi Lebovic, Golden Mile, Birchmount, Ionview • and Kennedy. 2 COVID-19 MANAGEMENT • Crosslinx Transit Solutions (CTS) has been exercising all safety protocols on-site including social distancing. • For more information on CTS’ COVID-19 Management, please visit their website: http://www.crosslinxtransit.ca/wp-content/uploads/CTS_COVID- 19_mobile_v2.png EGLINTON CROSSTOWN LRT PROJECT • A 19-kilometre route separated from regular traffic • 10-kilometres underground; 9-kilometres at surface in east • 15 underground stations and 10 surface stops • A maintenance and storage facility • Transit communications system • Links to 54 bus routes, 3 subway stations, GO Transit, UP Express station PROJECT PROGRESS Maintenance and Storage Facility complete 12 vehicles received 50% of track installed Mining complete at Laird and Oakwood stations Deep excavation underway or complete at all stations 2019 PROJECT HIGHLIGHTS FIRST LIGHT RAIL VEHICLE ON MAINLINE 8 9 10 SCIENCE CENTRE STATION RENDERINGS AERIAL VIEW MAIN ENTRANCE WEST PORTAL LOBBY BUS TERMINAL SCIENCE CENTRE STATION: WHAT TO EXPECT Year What to Expect • Completion of all structural concrete works 2019 Milestones • Completion of support of excavation • Completion of excavation • Interior works at Station Box • Interior and exterior finishes as Main Entrance • Track work and rail installation Remaining Work • Waterproofing and backfill for 2020 • Permanent road restoration • Substantial completion late 2020 SCIENCE CENTRE STATION PROGRESS PHOTOS WALL TILING AT THE MAIN ENTRANCE GLAZING AT THE BUS TERMINAL Aga Khan & Museum Stop to O’Connor Stop (Don Valley Parkway to Victoria Park Ave) Brentcliffe Portal AGA KHAN PARK & MUSEUM STOP RENDERINGS SIDEWALK PLATFORM AERIAL VIEW WYNFORD STOP RENDERINGS SIDEWALK PLATFORM .
    [Show full text]
  • Systems & Track: What to Expect
    IT’S HAPPENING, TODAY Forum Eglinton Crosstown LRT Metrolinx’s Core Business – Providing Better, Faster, Easier Service We have a strong connection with our Adding More Service Today Making It Easier for Our customers, and a Customers to Access Our great understanding Service of who they are and Building More to Improve Service where they are going. Planning for New Connections Investing in Our Future MISSION: VISION: WE CONNECT GETTING YOU THERE COMMUNITIES BETTER, FASTER, EASIER 3 WELCOME Our Central Open House will feature the following stations: • Forest Hill • Chaplin • Avenue (Eglinton Connects) • Eglinton • Mount Pleasant Station • Leaside PROJECT QUANTITIES 273.5 km 111 escalators 15.2 million job hours medium voltage/ 38 two-vehicle trains direct current cable 208 overhead 60 elevators 6000 tons of rail 5 new bridges catenary system poles 60 KM/H street level MODEL: Bombardier Flexity Freedom POWER SUPPLY: Overhead Catenary Read more about how Eglinton Crosstown will change Toronto’s cityscape here. Train Testing Video: Click Here Eglinton Crosstown PROJECT UPDATE • The Eglinton Crosstown project is now over 75% complete • Three stations – Mount Dennis, Keelesdale and Science Centre – are largely complete • Over 85% of track has been installed • 45 LRVs have arrived at the EMSF to date • Vehicle testing is now underway Eglinton Crosstown What to Expect: Systems & Track 2020 Progress to-date Remaining Work in 2020 Remaining Work for 2021 • Track installed between Mount Dennis Station • Track installation between Wynford Stop to
    [Show full text]
  • Orking Rough, Living Poor
    Working Rough, Living Poor Employment and Income Insecurities faced by Racialized Groups and their Impacts on Health Published by Access Alliance Multicultural Health and Community Services, 2011 Study funded by: To be cited as: Wilson, R.M., P. Landolt, Y.B. Shakya, G. Galabuzi, Z. Zahoorunissa, D. Pham, F. Cabrera, S. Dahy, and M-P. Joly. (2011). Working Rough, Living Poor: Employment and Income Insecurities Faced by Racialized Groups in the Black Creek Area and their Impacts on Health. Toronto: Access Alliance Multicultural Health and Community Services. The content for this report was collaboratively analyzed and written by the core team of the Income Security, Race and Health research working group. The research was designed and implemented with valuable feedback from all our Advisory Committee members and other community partners (see list in Acknowledgement section) The views expressed in this report do not necessarily represent the views of The Wellesley Institute or the Metcalf Foundation. Requests for permission and copies of this report should be addressed to: Access Alliance Multicultural Health and Community Services 500-340 College Street Toronto, ON M5S 3G3 Telephone: (416) 324-8677 Fax: (416) 324-9074 www.accessalliance.ca © 2011 Access Alliance Multicultural Health and Community Services About the Income Security, Race and Health Research Working Group The Income Security, Race and Health (ISRH) Research Working Group is a interdisciplinary research group comprising of academics, service providers, and peer researchers interested in examining racialized economic and health inequalities. The group was established in Toronto in 2006 under the leadership of Access Alliance. The key goals of the ISRH team are to investigate the systemic causes of growing racialized inequalities in employment and income, and to document the health impacts of these inequalities.
    [Show full text]
  • Traffic and Transportation Report
    Appendix A5 Ontario Line Project Exhibition Station Early Works – Final Traffic and Transportation Early Works Report Metrolinx Traffic and Transportation Early Works Report Ontario Line Exhibition Station Early Works Prepared by: AECOM Canada Ltd. 105 Commerce Valley Drive West, 7th Floor Markham, ON L3T 7W3 Canada T: 905.886.7022 F: 905.886.9494 www.aecom.com Date: February 2021 Project #: 60611173 Metrolinx Ontario Line Exhibition Station Early Works – Traffic and Transportation Early Works Report Statement of Qualifications and Limitations The attached Report (the “Report”) has been prepared by AECOM Canada Ltd. (“AECOM”) for the benefit of the Client (“Client”) in accordance with the agreement between AECOM and Client, including the scope of work detailed therein (the “Agreement”). The information, data, recommendations and conclusions contained in the Report (collectively, the “Information”): § is subject to the scope, schedule, and other constraints and limitations in the Agreement and the qualifications contained in the Report (the “Limitations”); § represents AECOM’s professional judgement in light of the Limitations and industry standards for the preparation of similar reports; § may be based on information provided to AECOM which has not been independently verified; § has not been updated since the date of issuance of the Report and its accuracy is limited to the time period and circumstances in which it was collected, processed, made or issued; § must be read as a whole and sections thereof should not be read out of such context; § was prepared for the specific purposes described in the Report and the Agreement; and § in the case of subsurface, environmental or geotechnical conditions, may be based on limited testing and on the assumption that such conditions are uniform and not variable either geographically or over time.
    [Show full text]
  • Transit Planning in Toronto: Roles, Priorities and Our Decision Making Framework
    INFORMATION ONLY ____________________________________________________________________________ Subject: Transit Planning in Toronto: roles, priorities and our decision making framework Date: July 29, 2015 At the TTC Board meeting on July 29, 2015, Jennifer Keesmaat, Chief Planner, City of Toronto will deliver a presentation titled “Transit Planning in Toronto: roles, priorities and our decision making framework.” Original signed by Vincent Rodo Chief Financial & Administration Officer 1-17 Transit Planning in Toronto: Roles, Priorities and our decision making framework TTC Board Meeting July 29, 2015 Jennifer Keesmaat, Chief Planner and Executive Director City Planning Division PLANNING A GREAT CITY, TOGETHER Overview of Presentation 1. Role of the City Planning Division in Transit Planning 2. Key Transit Planning Projects • SmartTrack/RER • Relief Line Project Assessment • Scarborough Subway Extension Project Assessment • Metrolinx LRT Program • King Streetcar Enhancements • “Feeling Congested?” Transportation Official Plan Review ruill_TORDNIO 2 City Planning Division PROGRAMS • Application Review • Business Performance & Standards • Civic Design • Committee of Adjustment • Design Review • Community Policy • Environmental Planning • Graphics & Visualization • Heritage Preservation • Official Plan & Zoning By-law • Outreach and Engagement • Public Art • Research & Information • Strategic Initiatives • Transit Planning • Waterfront Renewal 3 Transit Implementation Unit Objective Transit planning in the City of Toronto requires a transparent,
    [Show full text]
  • Attachment 4 – Assessment of Ontario Line
    EX9.1 Attachment 4 – Assessment of Ontario Line As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed Ontario Line. The details of this assessment are provided in this attachment. 1. Project Summary 1.1. Project Description The Ontario Line was included as part of the 2019 Ontario Budget1 as a transit project that will cover similar study areas as the Relief Line South and North, as well as a western extension. The proposed project is a 15.5-kilometre higher-order transit line with 15 stations, connecting from Exhibition GO station to Line 5 at Don Mills Road and Eglinton Avenue East, near the Science Centre station, as shown in Figure 1. Figure 1. Ontario Line Proposal (source: Metrolinx IBC) Since April 2019, technical working groups comprising staff from the City, TTC, Metrolinx, Infrastructure Ontario and the Ministry of Transportation met regularly to understand alignment and station location options being considered for the Ontario 1 http://budget.ontario.ca/2019/contents.html Attachment 4 - Assessment of Ontario Line Page 1 of 20 Line. Discussions also considered fleet requirements, infrastructure design criteria, and travel demand modelling. Metrolinx prepared an Initial Business Case (IBC) that was publicly posted on July 25, 2019.2 The IBC compared the Ontario Line and Relief Line South projects against a Business As Usual scenario. The general findings by Metrolinx were that "both Relief Line South and Ontario Line offer significant improvements compared to a Business As Usual scenario, generating $3.4 billion and $7.4 billion worth of economic benefits, respectively.
    [Show full text]
  • Transit City Progress Update
    Toronto Transit City Light Rail Plan City – TTC Team Progress Update February, 2008 Transit City Progress Update CATEGORIES 1. Light Rail Lines and Facilities 2. Vehicles 3. System and Design Standards 4. Processes 1 Progress Update – Light Rail Lines and Facilities PRIORITIZATION OF LINES • report to Commission : November 14, 2007 • lines evaluated against 31 criteria • results: confirm top 3 priorities: – Sheppard East LRT – Etobicoke-Finch West LRT – Eglinton Crosstown LRT • endorsed by Commission, Metrolinx 2 Criteria for Evaluation of Transit City LRT Lines Line Performance: Environmental: • Ridership • Number of Car-Trips Diverted / Replaced – Existing • Reduction in Greenhouse Gases – Projected • Current Market Share / Mode Split • New Rapid Transit Coverage, Reach Constructability, Physical Challenges: – Area (hectares) – Population • Major Physical Challenges, Obstacles – Full-time Jobs • Municipal Right-of-Way Available – Part-time Jobs • Designated, Recognized in Official Plan • Major Generators • Community, Political Acceptance, Support – En Route • Access to Yard, Maintenance Facilities – Terminals – New (Annual) Passenger-Trips/Route-Kilometre – Total (Annual) Passenger-Trips/Route-Kilometre Capital Cost: • Cost/Rider • Construction, Property Costs • Vehicle Costs City- and Region-Building: • Pro-rated Maintenance Facility Costs • Supports MoveOntario 2020 Objectives • Total Cost/Kilometre • Supports Places to Grow Principles • Supports Toronto Official Plan Objectives – Serves Priority Neighbourhoods – Avenues – Re-urbanization
    [Show full text]
  • Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
    The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C.
    [Show full text]