Cardiff to Swansea Journey Time Improvement GRIP1 Intervention Study

Total Page:16

File Type:pdf, Size:1020Kb

Cardiff to Swansea Journey Time Improvement GRIP1 Intervention Study Cardiff to Swansea Journey Time Improvement GRIP1 Intervention Study Cardiff to Swansea Journey Time Project Name: Improvement Document Ref: 161034‐NRD‐G1‐CDSW‐REP‐EMF‐100000 Issue: P01 GRIP Stage: 1 Contents 1. Document Control ......................................................................................................... 5 2. Executive Summary ...................................................................................................... 6 3. Introduction ................................................................................................................... 7 3.1 Scope of Works .................................................................................................................................. 7 3.2 Methodology of this study .................................................................................................................. 7 4. Signalling Review ....................................................................................................... 10 4.1 Background ...................................................................................................................................... 10 4.2 Signalling Scope of alteration ........................................................................................................... 10 4.2.1 Signal positioning and sighting .......................................................................................... 11 4.2.2 Train Protection ................................................................................................................. 11 4.2.3 Loops and Junctions ......................................................................................................... 11 4.2.4 Level Crossings ................................................................................................................. 12 4.2.5 Stations with permissive movements ................................................................................ 13 4.2.6 Point Operating Equipment ............................................................................................... 13 4.2.7 Train Detection Equipment ................................................................................................ 13 4.2.8 Interlocking - Lineside equipment compatibility ................................................................ 13 4.2.9 Interlocking – Alterability ................................................................................................... 13 4.2.10 Power supplies .............................................................................................................. 14 4.3 Proposed Optimised Speed Profile .................................................................................................. 14 5. Track Review ............................................................................................................... 15 5.1 Assumptions and Exclusions ........................................................................................................... 15 5.2 Third (3rd) Way Analysis ................................................................................................................... 16 5.3 Track interventions ........................................................................................................................... 17 5.3.1 Intervention Methodology .................................................................................................. 17 File Ref: 161034-NRD-G1-CDSW-REP-EMF-100000 Issue No: P.01 Page 2 of 59 5.3.2 Summary of interventions ................................................................................................. 17 5.4 Track component review .................................................................................................................. 19 5.5 Gauging review ................................................................................................................................ 20 6. Civils Review ............................................................................................................... 21 6.1 Assumptions and Exclusions ........................................................................................................... 22 6.1.1 Assumptions ...................................................................................................................... 22 6.1.2 Exclusions ......................................................................................................................... 22 6.2 Civils Methodology ........................................................................................................................... 23 6.2.1 Culverts ............................................................................................................................. 25 6.2.2 Underbridges ..................................................................................................................... 26 6.3 Civils Interventions ........................................................................................................................... 26 6.3.1 Speed Increase Interventions ........................................................................................... 26 6.3.2 Impact of Track Interventions ............................................................................................ 29 6.4 Headline Results .............................................................................................................................. 30 6.5 Lonlas Tunnel ................................................................................................................................... 34 6.6 Conclusion ........................................................................................................................................ 34 6.7 Next Steps ........................................................................................................................................ 35 7. Geotechnical Review .................................................................................................. 36 7.1 Assumptions ..................................................................................................................................... 36 7.2 Assessment Approach ..................................................................................................................... 37 7.2.1 Risk Category .................................................................................................................... 45 7.3 Geotechnical Interventions ............................................................................................................... 45 7.3.1 Regrade / Batter ................................................................................................................ 45 7.3.2 Retaining Structures .......................................................................................................... 46 7.3.3 Superficial Deposits .......................................................................................................... 46 7.4 Conclusions ...................................................................................................................................... 47 7.4.1 EHC ................................................................................................................................... 47 7.4.2 Risk Category .................................................................................................................... 47 7.5 Next Steps ........................................................................................................................................ 47 File Ref: 161034-NRD-G1-CDSW-REP-EMF-100000 Issue No: P.01 Page 3 of 59 8. Appendices .................................................................................................................. 48 Appendix A1: ............................................................................................................................................... 49 Appendix B1: ............................................................................................................................................... 50 Appendix B2: ............................................................................................................................................... 51 Appendix B3: ............................................................................................................................................... 52 Appendix B4: ............................................................................................................................................... 53 Appendix C1: ............................................................................................................................................... 54 Appendix C2: ............................................................................................................................................... 55 Appendix D1: ............................................................................................................................................... 56 Appendix E1: ............................................................................................................................................... 57 Appendix E2: ............................................................................................................................................... 58 File Ref: 161034-NRD-G1-CDSW-REP-EMF-100000 Issue No: P.01 Page 4
Recommended publications
  • Wales: River Wye to the Great Orme, Including Anglesey
    A MACRO REVIEW OF THE COASTLINE OF ENGLAND AND WALES Volume 7. Wales. River Wye to the Great Orme, including Anglesey J Welsby and J M Motyka Report SR 206 April 1989 Registered Office: Hydraulics Research Limited, Wallingford, Oxfordshire OX1 0 8BA. Telephone: 0491 35381. Telex: 848552 ABSTRACT This report reviews the coastline of south, west and northwest Wales. In it is a description of natural and man made processes which affect the behaviour of this part of the United Kingdom. It includes a summary of the coastal defences, areas of significant change and a number of aspects of beach development. There is also a brief chapter on winds, waves and tidal action, with extensive references being given in the Bibliography. This is the seventh report of a series being carried out for the Ministry of Agriculture, Fisheries and Food. For further information please contact Mr J M Motyka of the Coastal Processes Section, Maritime Engineering Department, Hydraulics Research Limited. Welsby J and Motyka J M. A Macro review of the coastline of England and Wales. Volume 7. River Wye to the Great Orme, including Anglesey. Hydraulics Research Ltd, Report SR 206, April 1989. CONTENTS Page 1 INTRODUCTION 2 EXECUTIVE SUMMARY 3 COASTAL GEOLOGY AND TOPOGRAPHY 3.1 Geological background 3.2 Coastal processes 4 WINDS, WAVES AND TIDAL CURRENTS 4.1 Wind and wave climate 4.2 Tides and tidal currents 5 REVIEW OF THE COASTAL DEFENCES 5.1 The South coast 5.1.1 The Wye to Lavernock Point 5.1.2 Lavernock Point to Porthcawl 5.1.3 Swansea Bay 5.1.4 Mumbles Head to Worms Head 5.1.5 Carmarthen Bay 5.1.6 St Govan's Head to Milford Haven 5.2 The West coast 5.2.1 Milford Haven to Skomer Island 5.2.2 St Bride's Bay 5.2.3 St David's Head to Aberdyfi 5.2.4 Aberdyfi to Aberdaron 5.2.5 Aberdaron to Menai Bridge 5.3 The Isle of Anglesey and Conwy Bay 5.3.1 The Menai Bridge to Carmel Head 5.3.2 Carmel Head to Puffin Island 5.3.3 Conwy Bay 6 ACKNOWLEDGEMENTS 7 REFERENCES BIBLIOGRAPHY FIGURES 1.
    [Show full text]
  • Great Western Signal Box Diagrams 22/06/2020 Page 1 of 40
    Great Western Signal Box Diagrams Signal Box Diagrams Signal Box Diagram Numbers Section A: London Division Section B: Bristol Division Section E: Exeter Division Section F: Plymouth Division Section G: Gloucester Division Section H: South Wales Main Line Section J: Newport Area Section K: Taff Vale Railway Section L: Llynvi & Ogmore Section Section M: Swansea District Section N: Vale of Neath Section P: Constituent Companies Section Q: Port Talbot & RSB Railways Section R: Birmingham Division Section S: Worcester Division Section T: North & West Line Section U: Cambrian Railways Section W: Shrewsbury Division Section X: Joint Lines Diagrams should be ordered from the Drawing Sales Officer: Ray Caston 22, Pentrepoeth Road, Bassaleg, NEWPORT, Gwent, NP10 8LL. Latest prices and lists are shown on the SRS web site http://www.s-r-s.org.uk This 'pdf' version of the list may be downloaded from the SRS web site. This list was updated on: 10th April 2017 - shown thus 29th November 2017 - shown thus 23rd October 2018 - shown thus 1st October 2019 - shown thus 20th June 2020 (most recent) - shown thus Drawing numbers shown with an asterisk are not yet available. Note: where the same drawing number appears against more than one signal box, it indcates that the diagrams both appear on the same sheet and it is not necessary to order the same sheet twice. Page 1 of 40 22/06/2020 Great Western Signal Box Diagrams Section A: London Division Section A: London Division A1: Main Line Paddington Arrival to Milton (cont'd) Drawing no. Signal box A1: Main Line Paddington Arrival to Milton Burnham Beeches P177 Drawing no.
    [Show full text]
  • Route Utilisation Strategy November 2008  Foreword
    Wales Route Utilisation Strategy November 2008 2 Foreword I am delighted to present Network Rail’s Route Principally this is in south Wales, where capacity Utilisation Strategy (RUS) for Wales. This use is at its highest. This is a result of a growth covers the entire rail network in Wales, as well in the number of trains serving Cardiff and the as some parts of the network in the English building of a number of new stations. On this border counties. part of the network, in the most populous part of the country, the RUS builds on the successful This network is extensive and diverse. past introduction of more services and the There are main line links from Wales into selective growth of the network. England, a long-distance line along the border connecting north and south Wales, a busy A major programme to renew signalling urban passenger network serving Cardiff, and equipment in the Newport and Cardiff areas branches traversing sparsely populated rural will take place in the next five to seven years, areas. Some parts of the network are subject and much of the work described in this to fluctuating demand according to the time of strategy to enhance the network is planned year, most notably on the Cambrian Coast and in conjunction with this signalling work to in the Conwy Valley. increase cost-effectiveness. The High Level Output Specification (HLOS), published in The context in which this RUS has been July 2007, contained a specific requirement to produced, as has often been the case with increase seating capacity into Cardiff during other RUSs, is one of growing demand for the morning peak.
    [Show full text]
  • Swansea Region
    ASoloeErlcrv lElrtsnpul rol uollElcossv splou^au lned soq6nH uaqdels D -ir s t_ ?a ii I,. II I 1' a : a rii rBL n -. i ! i I ET .t) ? -+ I t ) I I I (, J*i I 0r0EuuEsrr eqt lo NOOTOHFti'c T$'rr!'I.snGME oqt ol ap!n9 v This booklel is published by the Associalion lor trial archaeology ol south-wesl and mid-Wales. lndustrial Archaeology in association with lhe lnlormation on lhese can be oblained lrom the Royal Commission on Ancient and Hislorical address given below. Detailed surveys, notes Monuments in Wales and the South Wesl Wales and illustrations ol these ieatures are either lndustrial Archaeology Sociely. lt was prepared housed in the Commission s pre-publication lor the annual conference of the AIA, held in records or in lhe National Monuments Record Swansea in 1988. lor Wales. The laller is a major archive lhat can be consulted, lree ol charge, during normal The AIA was established in 1973 lo promote working hours at the headquaners of the Royal lhe study ol industrial archaeology and encour- Commission on Ancaenl and Historical Monu- age improved slandards ol recording, re- ments in Wales. Edleston House, Oueen's search. conservalion and publication. lt aims lo Road, Aberyslwyth SY23 2HP; (a 0970- suppon individuals and groups involved in the 624381. study and recording ol past induslrial aclivily and the preservation ol industrial monuments; The SWWIAS was lormed an 1972 to sludy and to represent the interests of industrial archaeo' record lhe industraal hastory ol the western parl logy at a national leveli lo hold conlerences and ol lhe south Wales coaltield.
    [Show full text]
  • Dev-Plan.Chp:Corel VENTURA
    On Track for the 21st Century A Development Plan for the Railways of Wales and the Borders Tua’r Unfed Ganrif ar Ugain Cynllun Datblygu Rheilffyrdd Cymru a’r Gororau Railfuture Wales 2nd Edition ©September 2004 2 On Track for the 21st Century Section CONTENTS Page 1 Executive summary/ Crynodeb weithredol ......5 2 Preface to the Second Edition .............9 2.1 Some positive developments . 9 2.2 Some developments ‘in the pipeline’ . 10 2.3 Some negative developments . 10 2.4 Future needs . 10 3 Introduction ..................... 11 4 Passenger services .................. 13 4.1 Service levels . 13 4.1.1 General principles .............................13 4.1.2 Service levels for individual routes . ................13 4.2 Links between services: “The seamless journey” . 26 4.2.1 Introduction .................................26 4.2.2 Connectional policies ............................27 4.2.3 Through ticketing ..............................28 4.2.4 Interchanges .................................29 4.3 Station facilities . 30 4.4 On-train standards . 31 4.4.1 General principles .............................31 4.4.2 Better trains for Wales and the Borders . ...............32 4.5 Information for passengers . 35 4.5.1 Introduction .................................35 4.5.2 Ways in which information could be further improved ..........35 4.6 Marketing . 36 4.6.1 Introduction .................................36 4.6.2 General principles .............................36 5 Freight services .................... 38 5.1 Introduction . 38 5.2 Strategies for development . 38 6 Infrastructure ..................... 40 6.1 Introduction . 40 6.2 Resignalling . 40 6.3 New lines and additional tracks / connections . 40 6.3.1 Protection of land for rail use ........................40 6.3.2 Route by route requirements ........................41 6.3.3 New and reopened stations and mini-freight terminals ..........44 On Track for the 21st Century 3 Section CONTENTS Page 7 Political control / planning / funding of rail services 47 7.1 Problems arising from the rail industry structure .
    [Show full text]
  • Welsh Route Study March 2016 Contents March 2016 Network Rail – Welsh Route Study 02
    Long Term Planning Process Welsh Route Study March 2016 Contents March 2016 Network Rail – Welsh Route Study 02 Foreword 03 Executive summary 04 Chapter 1 – Strategic Planning Process 06 Chapter 2 – The starting point for the Welsh Route Study 10 Chapter 3 - Consultation responses 17 Chapter 4 – Future demand for rail services - capacity and connectivity 22 Chapter 5 – Conditional Outputs - future capacity and connectivity 29 Chapter 6 – Choices for funders to 2024 49 Chapter 7 – Longer term strategy to 2043 69 Appendix A – Appraisal Results 109 Appendix B – Mapping of choices for funders to Conditional Outputs 124 Appendix C – Stakeholder aspirations 127 Appendix D – Rolling Stock characteristics 140 Appendix E – Interoperability requirements 141 Glossary 145 Foreword March 2016 Network Rail – Welsh Route Study 03 We are delighted to present this Route Study which sets out the The opportunity for the Digital Railway to address capacity strategic vision for the railway in Wales between 2019 and 2043. constraints and to improve customer experience is central to the planning approach we have adopted. It is an evidence based study that considers demand entirely within the Wales Route and also between Wales and other parts of Great This Route Study has been developed collaboratively with the Britain. railway industry, with funders and with stakeholders. We would like to thank all those involved in the exercise, which has been extensive, The railway in Wales has seen a decade of unprecedented growth, and which reflects the high level of interest in the railway in Wales. with almost 50 per cent more passenger journeys made to, from We are also grateful to the people and the organisations who took and within Wales since 2006, and our forecasts suggest that the time to respond to the Draft for Consultation published in passenger growth levels will continue to be strong during the next March 2015.
    [Show full text]
  • Ommatoiulus Moreleti (Lucas) and Cylindroiulus
    Bulletin of the British Myriapod & Isopod Group Volume 30 (2018) OMMATOIULUS MORELETI (LUCAS) AND CYLINDROIULUS PYRENAICUS (BRÖLEMANN) NEW TO THE UK (DIPLOPODA, JULIDA: JULIDAE) AND A NEW HOST FOR RICKIA LABOULBENIOIDES (LABOULBENIALES) Steve J. Gregory1, Christian Owen2, Greg Jones and Emma Williams 1 4 Mount Pleasant Cottages, Church Street, East Hendred, Oxfordshire, OX12 8LA, UK. E-mail: [email protected] 2 75 Lewis Street, Aberbargoed. CF8 19DZ, UK. E-mail: [email protected] ABSTRACT The schizophylline millipede Ommatoiulus moreleti (Lucas) and the cylindroiuline millipede Cylindroiulus pyrenaicus (Brölemann) (Julida: Julidae) are recorded new for the UK from a site near Bridgend, Glamorganshire, in April 2017. An unidentified millipede first collected in April 2004 from Kenfig Burrows, Glamorganshire, is also confirmed as being C. pyrenaicus. Both species are described and illustrated, enabling identification. C. pyrenaicus is reported as a new host for the Laboulbeniales fungus Rickia laboulbenioides. Summary information is provided on habitat preferences of both species in South Wales and on their foreign distribution and habitats. It is considered likely that both species have been unintentionally introduced into the UK as a consequence of industrial activity in the Valleys of south Wales. INTRODUCTION The genera Ommatoiulus Latzel, 1884 and Cylindroiulus Verhoeff, 1894 (Julida: Julidae) both display high species diversity (Kime & Enghoff, 2017). Of the 47 described species of Ommatoiulus the majority are found in North Africa and the Iberian Peninsula (ibid). Currently, just one species, Ommatoiulus sabulosus (Linnaeus, 1758), is known from Britain and Ireland, a species that occurs widely across northern Europe (Kime, 1999) and in Britain reaches the northern Scottish coastline (Lee, 2006).
    [Show full text]
  • Elr Data File - Swm2 South Wales Main Line (Gloucester Yd Jn - Neyland)
    ELR DATA FILE - SWM2 SOUTH WALES MAIN LINE (GLOUCESTER YD JN - NEYLAND) www.railwaydata.co.uk M. Ch. Type Name Details ID 113m 11ch Bridge Millstream Subway Underline Bridge | Steel 113 11 113m 13ch Bridge River Twyver - Also Under Chl At 92 78. Over Stream Underline Bridge | Steel 113 13 113m 44ch Bridge Windmill - Eastern Radial Road Over. Glos C.c. Own & Maintain - Agmt.rt510 Overline Bridge | Steel 113 44 114m 04ch Station Gloucester GCR 114m 07ch Bridge Gloucester Stn Fb - Footbridge | Steel 114 07 114m 12ch Bridge Station Subway Underline Bridge | Steel 114 12 114m 22ch Bridge London Road Underbridge Underline Bridge | Steel 114 21.25 114m 32ch Bridge Worcester Street Underbridge - Single Span. A38 Under Underline Bridge | Steel 114 32 114m 35ch Bridge Hare Lane Underbridge - Single Span Underline Bridge | Brick 114 35 114m 36ch Bridge Park Street Underbridge - Single Span Underline Bridge | Brick 114 36 114m 47ch Bridge Deans Walk - Closed To Vehicular Traffic Underline Bridge | Brick (Arch) 114 47 114m 54ch Bridge Over Road On Up Side. (fb Not On Nr Land - No Exams) Side of Line Bridge | Steel 114 54 B/S 114m 54ch Bridge "st.oswalds Road - Headroom 16'0""" Underline Bridge | Steel 114 54 115m 02ch Bridge St Catherines Viaduct 7 Spans Viaduct | Pre-cast Concrete 115 02 115m 07ch Bridge Pump House - River Severn (eastern Arm) Underline Bridge | Pre-tensioned Concrete 115 07 115m 16ch Bridge Ham Viaduct - 12 Spans (pre Cast Segmental Concrete Arches Over Land) Viaduct | Pre-cast Concrete 115 16 115m 31ch Bridge Townham Single Span
    [Show full text]
  • HOWLTA NL128.Pmd
    Cymdeithas Teithwyr Heart of Wales Line Rheilffordd Canol Travellers’ Cymru HoWLTA Association NEWSLETTERNEWSLETTER Spring 2014 Number 128 PRICE £1.50 Free to Members Ascending the Sugar Loaf (see page 2 for details) [Photo © Peter Joyce] HoWL Walk from Llanwrtyd 10 In This Issue... News Along the Line ... ... 12 Improved Services Announced Steaming Along the HoWL ... 14 by Welsh Government ... ... 3 Chronicles of Llangadog Charter Train News Updated 5 Station volume 10 ... ... 16 Memories of Garth Station ... 6 Great News From HoWL Forum 20 HoWL on Social Media ... 7 A Word from the Chairman... 24 From the Editor’s Desktop “We need more in north and central Wales) will continue trains, faster for the next year, and this will in future be trains, comfort- open to all bus pass holders (not just those able trains...to living locally - see opposite page for details). serve the lo- In neither case though has there been any cal com- undertaking to provide faster or more com- munity” fortable trains - indeed there has not even These are the words I’ve used to introduce been any commitment to provide more car- the last few issues. Well, following recent riages (and hence more seats!) to cope with announcements from the Welsh Govern- the extra (but nonetheless very welcome!) ment, it could be said that we’ve now been passengers that can be expected from all promised more trains (albeit not until next those additional bus pass holders. Does that summer) - actually it’ll be the same number mean more crowding with more passengers of train units, but by re-jigging the timeta- left standing? If so, the trains certainly will ble, these will be used to provide an extra not be more comfortable! service in both directions (see opposite page However, fair dos, these announcements, for more details).
    [Show full text]
  • Bridgend Sites of Importance for Nature Conservation Review December 2011
    Bridgend Sites of Importance for Nature Conservation Review December 2011 Quality Management Job No GC/001170 Doc No. Title Sites of Importance for Nature Conservation Review Location Bridgend Document Ref File reference Date December 2011 Sarah Simons Prepared by Principal Ecologist 19-12-11 BSc (Hons), MSc, MIEEM Lucy Fay Checked by Senior Ecologist 19-12-11 BSc (Hons), AIEEM Ian Walsh Authorised by Technical Director 19-12-11 BSc, CEng, MICE, MCIHT Contents 1. INTRODUCTION 1 1.1 Background 1 1.2 Review objectives 1 2. METHODOLOGY 2 2.1 Introduction 2 2.2 Desktop Study 2 2.3 Field Survey 3 2.4 Constraints 4 3. OVERVIEW OF RESULTS 5 3.1 Sites that no longer qualify as SINCS 5 3.2 Sites that require re-survey to confirm status 6 3.3 Sites that should be upgraded from cSINC to SINC 6 4. RECOMMENDATIONS 7 4.1 Identifying new SINCs 7 4.2 SINC administration 7 4.3 SINC habitat management 8 5. REFERENCES 10 APPENDICES 11 i 1. INTRODUCTION 1.1 BACKGROUND Bridgend County Borough Council commissioned Capita Symonds to carry out a review of its Sites of Importance for Nature Conservation (SINCs). The review included both desk-based studies and field work. This report will provide a record of the methodologies used and a summary of the findings of the review along with recommendations for further work. 1.2 REVIEW OBJECTIVES • To confirm or otherwise that the Council’s suite of SINCs meet a robust set of criteria (Wildlife Sites Guidance Wales – A Guide to Develop Local Wildlife Systems in Wales (Wales Biodiversity Partnership, 2008)) • To provide SINC data sufficient to inform the emerging Local Development Plan (LDP) and the planning process.
    [Show full text]
  • NAO CAMS2 Nancy.QXD
    www.environment-agency.gov.uk/cams The Neath, Afan and Ogmore Catchment Abstraction Management Strategy October 2005 www.environment-agency.gov.uk/cams The Environment Agency is the leading public body protecting and improving the environment in England and Wales. It’s our job to make sure that air, land and water are looked after by everyone in today’s society, so that tomorrow’s generations inherit a cleaner, healthier world. Our work includes tackling flooding and pollution incidents, reducing industry’s impacts on the environment, cleaning up rivers, coastal waters and contaminated land, and improving wildlife habitats. Published by: Environment Agency Wales Cambria House 29 Newport Road Cardiff, CF24 0TP Tel: 08708 506 506 IC code: GEWA 1005BJNM-B-P © Environment Agency Wales All rights reserved. This document may be reproduced with prior permission of the Environment Agency. This report is printed using water based inks on Revive, a recycled paper combining at least 75% de-inked post consumer waste and 25% mill broke. Front cover photograph by David Dennis, Environmental Images. Foreword Water is so often taken for granted, especially in Wales. After all, it seems to be raining rather often, so surely there has to be a plentiful supply for all our needs! And our needs are many and varied. All our houses need water; hospitals need water; industries need water; breweries need water; some recreational activities need water, this list is endless, and at the same time we need to ensure that we keep enough water in the rivers to protect the environment. It follows that this precious resource has to be carefully managed if all interests, often conflicting, can be properly served.
    [Show full text]
  • Route Specification 2016
    Delivering a better railway for a better Britain Route Specifications 2016 Wales Wales March 2016 Network Rail – Route Specifications: Wales 02 Route L: Wales SRS L.01 Border (near Pilning) – Swansea 03 SRS L.02/03 Gloucester – Severn Tunnel Junction 07 SRS L.04/05 Newport – Crewe 10 SRS L.06/07 Llanelli – Craven Arms, Heart of Wales line 14 SRS L.08/09 Shrewsbury – Aberystwyth/Pwllheli, Cambrian line (Cambrian Main Line and Cambrian Coast lines) 17 SRS L.10 – 12 Shrewsbury – Chester 21 SRS L.13/14 Chester – Holyhead 25 SRS L.15/16 Wrexham – Bidston 29 SRS L.17 Newport – Ebbw Vale 33 SRS L.18 South Wales Valleys 37 SRS L.19 Bridgend – Maesteg 42 SRS L.20 – 22 Swansea – Milford Haven/Pembroke Dock/Fishguard Harbour 46 SRS L.23 Llandudno – Blaenau Ffestiniog 51 SRS L.99 Other Freight Lines 54 Glossary 59 Interface with other routes (refer to separate Strategic Route Specifications documents) London North Western: SRS M 20 Wolverhampton and Shrewsbury SRS L.01 Border (near March 2016 Network Rail – Route Specifications: Wales 03 Pilning) – Swansea Geographic Map Route specification description Strategic Route Section The Welsh part of the Great Western Main Line includes the Severn Maesteg branch and is used on occasions when Maesteg to Cardiff L.01 Tunnel and is four tracked between Severn Tunnel Junction and through stopping trains cannot be operated between Bridgend and Cardiff reflecting the mix of higher speed passenger trains which Cardiff. use the main lines, and lower-speed freight trains which use the Immediately west of Briton Ferry station, the grade-separated relief lines, and which serve the freight complexes at Llanwern, Skewen junction at Court Sart leads on the freight line to Llandeilo Junction, Llansamlet Neath Newport, Wentloog and Cardiff Tidal.
    [Show full text]