BID PACKAGE: V19200043PWBR-1 Scope Description: General Construction
Total Page:16
File Type:pdf, Size:1020Kb
Vista Magnet MS Pool Modernization BID PACKAGE: V19200043PWBR-1 Scope Description: General Construction SCOPE OF WORK SUMMARY: The scope of work includes, but is not necessarily limited to, furnishing all labor, materials, accessories, appliances, tools, equipment, facilities, transportation, applicable taxes and services necessary for, and incidental to, performing all operations in connection with the specification sections listed below, complete as indicated on the drawings and specifications or incidental to the requirements of this Bid Package Contractor and/or specified herein, unless specifically excluded. The Following are the project Contract Documents are primary to this Bid Package: Bid Package Bid Package # V19200043PWBR-1 – General Construction Plans – Vista Magnet MS Pool Modernization 10/16/18 Geotechnical Recommendations – Geotechnical Evaluation Proposed Retaining Wall Vista Magnet MS 4/16/2018 Project Manual #V19200043PWBR Vista Magnet MS Pool Mod Site Utilization Plan District Standards Hazardous Material Survey As-Builts DSA – TI 103 – Testing and Inspection Requirements 04-116786_DSA103A Construction Manager Supplemental Specifications 00 10 00 General Requirements 00 46 00 Post Bid Interview 01 21 00 Allowances 01 73 01 Final Clean 01 74 19 Construction Demolition Waste Management Technical Specifications – Pool Modernization Vista Magnet MS dated 10-16-18 DIVISION 01 – General Requirements 01 10 00 Summary 01 20 00 Price & Payment Procedures 01 30 00 Administrative Requirements 01 30 25 Submittals Vista Unified School District Vista Magnet MS Pool Modernization Project No. V19200043PWBR-1 Bid Issuance Set Page 1 of 13 Vista Magnet MS Pool Modernization 01 32 16 Construction Progress Schedule 01 40 00 Quality Requirements 01 42 19 Reference Standards 01 46 00 Testing & Inspection Requirements 01 50 00 Temporary Facilities & Controls 01 60 00 Product Requirements 01 70 00 Execution & Closeout Requirements 01 70 70 Project Closeout 01 77 00 Cleaning 01 78 00 Closeout Submittals DIVISION 02 – Existing Conditions 02 41 00 Demolition DIVISION 03 - Concrete 03 05 05 Underslab Vapor Barrier 03 10 00 Concrete Forming & Accessories 03 20 00 Concrete Reinforcing 03 30 00 Cast-In-Place Concrete DIVISION 04 – Masonry 04 05 11 Mortar and Masonry Grout 04 27 31 Reinforced Unit Masonry DIVISION 05 - Metals 05 52 13 Pipe and Tube Railings DIVISION 07 – Thermal & Moisture Protection 07 90 05 Joint Sealers DIVISION 09 - Finishes 09 90 00 Paints & Coatings – Exterior DIVISION 10 – Specialties 10 14 00 Signage 10 28 00 Toilet, Bath, and Laundry Accessories Division 13 – Special Construction 13 11 00 General Requirements 13 11 01 Excavation 13 11 02 Concrete 13 11 03 Shotcrete 13 11 04 Ceramic Tile 13 11 05 Plaster 13 11 06 Equipment 13 11 07 Mechanical 13 11 08 Electrical 13 11 09 Waterproofing Vista Unified School District Vista Magnet MS Pool Modernization Project No. V19200043PWBR-1 Page 2 of 13 Vista Magnet MS Pool Modernization Division 22 – Plumbing 22 05 00 Common Plumbing 22 05 53 Identifications 22 11 16 Water Piping 22 40 00 Plumbing Fixtures DIVISION 31 – Earthwork 31 10 00 Site Clearing 31 22 00 Grading 31 23 16 Excavation 31 23 16.13 Trenching 31 23 23 Fill DIVISION 32 – Exterior Improvements 32 13 13 Concrete Paving 32 31 13 Chain Link Fencing and Gates INCLUSIONS: SPECIFIC INCLUSIONS FOR THE SCOPE OF WORK (including, but not limited to) 1.1 The Bid Package Contractor will be responsible for completing all work included in the contract documents including, but not limited to, the following summary. DIVISION 01 – General Requirements (Includes All Specifications in Division 01) 1.2 The Bid Package Contractor is responsible for all general requirements in the Division 1 Specifications. 1.3 The Bid Package Contractor is responsible for all items included in the CM Supplemental Specifications including, but not limited to, furnishing two trailers for the IOR and CM including furniture and accessories, project sign, toilets and hand wash station, temporary power, dumpsters, construction fencing, 1 laborer per week, and all other requirements as specified in Section 00 10 00 General Requirements. 1.4 This Bid Package Contractor is responsible for making all ADA accessible path of travel upgrades as shown in the Contract Documents. 1.5 This Bid Package Contractor is responsible for patching/repairing all restroom surfaces affected by accessibility upgrades including, but not limited to tile, terrazzo, interior painting, drywall,etc. DIVISION 02 – Existing Conditions (Includes All Specifications in Division 02) 1.6 Remove surface debris, existing asphalt and concrete paving, curbs, building foundations, building material, water lines, fencing, footings, abandoned utilities, abandoned irrigation lines, trees, palm trees, shrubs and root systems. Any hazardous ballast materials shall be properly handled and disposed of. 1.7 Remove and properly dispose of all surface and subsurface debris, abandoned utilities structures, pipes, conduits and all other items found below grade (requiring removal) within the grading limits or trench lines. 1.8 Any underground structures found (within grading limits) to be hazardous materials not identified in the abatement report must be properly removed by this contractor and placed Vista Unified School District Vista Magnet MS Pool Modernization Project No. V19200043PWBR-1 Page 3 of 13 Vista Magnet MS Pool Modernization in an area designated by the Construction Manager and covered for proper abatement by this Bid Package Contractor. 1.9 Maintain site drainage for the project and utilize existing storm drain system (as it comes on line) and sheet flow. Sandbags to be in conformance with Storm Water Pollution Prevention Plan shall be provided by this bid package contractor as it relates to the performance of this Bid Package Contractor. 1.10 Protect existing utilities (that remain) from damage at all times. 1.11 Protect existing curbs, gutters and side walks adjacent to existing building and along the entire perimeter of site as required. 1.12 Provide and maintain clean up of all adjacent areas on a daily basis during the operations of this work. 1.13 Clear and grub site of plant life, vegetation, grass and surface debris as required by the contract documents. 1.14 Demolition procedures must be done in strict compliance with all CAL/OSHA Guidelines. 1.15 Backfill all open pits and holes caused as a result of demolition. If a trench/hole is required to be left open, cover with a trench plate. 1.16 The Bid Package Contractor shall be responsible for all hazardous waste removal as identified in the Haz Mat Report. In addition, this Bid Package Contractor shall provide all notices related to the removal of hazardous material including, but no limited to, the 10 Day Hazardous Notice to the Air Pollution Control Department. 1.17 The Bid Package Contractor shall provide all labor, material, and equipment required to abate and legally dispose off-site all hazardous material including, but not limited to, Asbestos Containing Materials (ACM), lead, and any other hazardous material affected by the work of the project and as indicated in all hazardous materials reports. 1.18 Conform to all applicable codes for abatement and demolition of structures, safety of adjacent structures, dust control and disposal of materials. Hazardous materials must comply with all federal, state and local regulations. 1.19 This bid package contractor shall prepare and implement, including reporting and documentation, of a Waste Management Plan for reusing, recycling, salvage or disposal of non-hazardous waste materials generate during demolition and/or new construction (Construction and Demolition (C&D) Waste), to foster material recovery and re-use and to minimize disposal in land fills in accordance with the Drawings and Specifications Section. 1.20 Provide all labor, material and equipment required to abate and legally dispose off-site all PCB Ballasts and Fluorescent Light Tubes affected by the work of the project. 1.21 The removal of underground pipes and/or remaining structures found during grading operations that are suspected to contain hazardous materials. DISTRICT’S environmental consultant will test suspect material to determine if it contains hazardous materials. If confirmed to contain hazardous materials, this Bid Package Contractor shall abate / remove and legally dispose of offsite. 1.22 Provide all coring, cutting, boring, epoxy, welding or grouting for own work as may be required for installation of work in this Package. 1.23 Any removal/demolition of existing concrete shall be joint to joint to lessen the appearance of patching and/or trenching. 1.24 Contractor responsible to provide 10 steel trench plates for the site access road and lay atop site utility or other lids/cap areas to prevent damage for the entire duration of the project. Contractor to walk and confirm locations with Construction Manager prior to placement of lids. 1.25 During the course of demolition certain items may be designated for salvage by the District. When notified by the Construction Manager that the District wishes to salvage an Vista Unified School District Vista Magnet MS Pool Modernization Project No. V19200043PWBR-1 Page 4 of 13 Vista Magnet MS Pool Modernization item, exercise due diligence in protecting the item during its removal. Any necessary disassembly of the item to facilitate its safe removal from the work area will be the responsibility of this Bid Package Contractor. 1.26 Uniformly rough grade and compact areas affected by demolition to maintain site grades and contours during the course of construction. 1.27 Provide erosion and sediment control measures by sandbagging the perimeter of the building / structure lines of demolition as required. 1.28 Provide cut, cap and relocation as required, of existing utilities, fixtures, and features within the scope assignment of this category. Coordinate with local services on removal and/or relocation of all components including (but not limited to) piping, cleanouts, valves, valve boxes and etc. Cap items and rough-ins behind plane of proposed improvements.