PRE FEASIBILITY REPORT

for

PROPOSED , & INTERMEDIATES MANUFACTURING UNIT

of

M/s. SHREE PARSHWNATH COLOURANTS LLP Plot No. D-2/CH/50, Dahej Industrial Estate-2, Taluka: Vagra, Dist: Bharuch – 392 130 (Guj.)

Prepared By:

NABL Accredited Testing Laboratory ISO 9001:2008 Certified Company Aqua-Air Environmental Engineers P. Ltd. 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat - 395002

0

CONTENTS

Sr. No. Description Page No. 1. Executive Summary 2 2. Introduction of the Project/Background information 9 3. Project Description 11 4. Site Analysis 16 5. Planning Brief 20 6. Proposed Infrastructure 22 7. Rehabilitation and resettlement (R & R) Plan 23 8. Project Schedule & Cost Estimates 24 9. Analysis of Proposal (Final Recommendations) 24

1

1.0 EXECUTIVE SUMMARY 1.1 Company Profile M/s. Shree Parshwnath Colourants L.L.P proposes pigments, dyes and intermediates products manufacturing unit to be located at Plot. No. D-2/CH/50, Dahej Industrial Estate-2, Taluka Vagra, Dist: Bharuch, Gujarat.

1.2 Project Details Proposed Products along with Production Capacity Sr. Products * CAS No. Proposed No. Capacity (MT/Month) A PIGMENTS 1200 1 GREEN 7 1325-53-6 2 PIGMENT GREEN 36 40302-13-7 3 PIGMENT BLUE 15.0 147-14-8 4 PIGMENT BLUE 15.1 147-14-8 5 PIGMENT BLUE 15.3 147-14-8 6 PIGMENT BLUE 15.4 147-14-8 7 PIGMENT BLUE 15.6 147-14-8 8 PIGMENT BLUE 60 81-77-6 9 PIGMENT ORANGE 5 3468-63-1 10 PIGMENT ORANGE 13 3520-72-7 11 PIGMENT ORANGE 16 6505-28-8 12 PIGMENT ORANGE 34 15793-73-4 13 PIGMENT ORANGE 36 12236-62-3 14 PIGMENT ORANGE 38 12236-64-5 15 PIGMENT ORANGE 43 442-06-0 16 PIGMENT ORANGE 62 52846-56-7 17 PIGMENT ORNAGE 64 72102-84-2 18 PIGMENT ORANGE 70 15793-72-4 19 PIGMENT RED 1 6410-10-2 20 PIGMENT RED 2 6041-94-7 21 PIGMENT RED 3 2425-85-6 22 PIGMENT RED 8 6410-30-6 23 PIGMENT RED 38 6358-87-8 24 PIGMENT RED 48 3564-21-4 25 PIGMENT RED 48.1 7585-41-3 26 PIGMENT RED 48.2 7023-61-2 27 PIGMENT RED 48.3 15782-05-5

2 28 PIGMENT RED 48.4 5280-66-0 29 PIGMENT RED 49.1 1103-38-43 30 PIGMENT RED 49.2 1103-39-5 31 PIGMENT RED 53 2092-56-0 32 PIGMENT RED 53.1 5160-02-1 33 PIGMENT RED 57 5858-81-1 34 PIGMENT RED 57.1 5281-04-9 35 PIGMENT RED 63.1 6417-83-0 36 PIGMENT RED 112 6535-46-2 37 PIGMENT RED 122 980-26-7 38 PIGMENT RED 144 5280-78-4 39 PIGMENT RED 146 5280-68-2 40 PIGMENT RED 149 4948-15-6 41 PIGMENT RED 166 3905-19-9 42 PIGMENT RED 168 4378-61-4 43 PIGMENT RED 170 2786-76-7 44 PIGMENT RED 176 12225-06-8 45 PIGMENT RED 177 4051-63-2 46 PIGMENT RED 178 3049-71-6 47 5221-31-3 48 PIGMENT RED 185 51920-12-8 49 PIGMENT RED 187 59487-23-9 50 PIGMENT RED 188 61847-48-1 51 PIGMENT RED 207 71819-77-7 52 PIGMENT RED 208 31778-10-6 53 PIGMENT RED 210 61932-63-6 54 PIGMENT RED 242 52238-92-3 55 PIGMENT RED 254 84632-65-5 56 PIGMENT RED 264 88949-33-1 57 PIGMENT VIOLET 19 1047-16-1 58 PIGMENT VIOLET 23 6358-30-1 59 PIGMENT VIOLET 32 12225-08-0 60 PIGMENT YELLOW 1 2512-29-0 61 PIGMENT YELLOW 3 6486-23-3 62 PIGMENT YELLOW 12 6358-85-6 63 PIGMENT YELLOW 13 5102-83-0 64 PIGMENT YELLOW 14 5468-75-7 65 PIGMENT YELLOW 16 5979-28-2 66 PIGMENT YELLOW 17 4531-49-1 67 PIGMENT YELLOW 24 475-71-8 68 PIGMENT YELLOW 62 12286-66-7 69 PIGMENT YELLOW 65 6528-34-3

3 70 PIGMENT YELLOW 73 13515-40-7 71 PIGMENT YELLOW 74 6358-31-2 72 PIGMENT YELLOW 81 22094-93-5 73 PIGMENT YELLOW 83 5567-15-7 74 PIGMENT YELLOW 93 5580-57-4 75 PIGMENT YELLOW 95 5580-80-8 76 PIGMENT YELLOW 97 12225-18-2 77 PIGMENT YELLOW 101 2387-03-3 78 PIGMENT YELLOW 109 5045-40-9 79 PIGMENT YELLOW 110 5590-18-1 80 PIGMENT YELLOW 120 29920-31-8 81 PIGMENT YELLOW 127 71872-67-8 82 PIGMENT YELLOW 128 79953-85-8 83 PIGMENT YELLOW 129 15680-42-9 84 PIGMENT YELLOW 138 30125-47-4 85 PIGMENT YELLOW 139 36888-99-0 86 PIGMENT YELLOW 147 4118-16-5 87 PIGMENT YELLOW 150 68511-62-6 88 PIGMENT YELLOW 151 31837-42-0 89 PIGMENT YELLOW 153 29204-84-0 90 PIGMENT YELLOW 154 68134-22-5 91 PIGMENT YELLOW 155 68516-73-4 92 PIGMENT YELLOW 158 66186-93-6 93 PIGMENT YELLOW 168 71832-85-4 94 PIGMENT YELLOW 174 78952-72-4 95 PIGMENT YELLOW 175 35636-63-6 96 PIGMENT YELLOW 183 65212-77-3 97 PIGMENT YELLOW 184 14059-33-7 98 PIGMENT YELLOW 185 76199-85-4 99 PIGMENT YELLOW 188 23792-68-9 100 PIGMENT YELLOW 191 129423-54-7 101 PIGMENT YELLOW 191.1 154946-66-7 102 PIGMENT YELLOW 194 82199-12-0 103 PIGMENT YELLOW 196 68186-90-3 104 PIGMENT YELLOW 213 220198-21-0 105 COPPER PHTHALOCYANINE BLUE CRUDE 147-14-8 B SOLVENT DYES 500 106 SOLVENT BLACK 3 4197-25-5 107 SOLVENT BLACK 27 12237-22-8 108 SOLVENT BLUE 35 17354-14-2 109 SOLVENT BLUE 36 14233-37-5 110 SOLVENT BLUE 58 61814-09-3

4 111 SOLVENT BLUE 59 6994-46-3 112 SOLVENT BLUE 68 4395-65-7 113 SOLVENT BLUE 79 74499-36-8 114 SOLVENT BLUE 97 61969-44-6 115 SOLVENT BLUE 98 71819-49-3 116 SOLVENT BLUE 101 6737-68-4 117 SOLVENT BLUE 102 15403-56-2 118 SOLVENT BLUE 104 116-75-6 119 SOLVENT BLUE 107 12223-02-8 120 SOLVENT BLUE 122 67905-17-3 121 SOLVENT BLUE 128 18038-99-8 122 SOLVENT BROWN 53 64696-98-6 123 SOLVENT GREEN 3 128-80-3 124 SOLVENT GREEN 5 79869-59-3 125 SOLVENT GREEN 7 6358-69-6 126 SOLVENT GREEN 28 71839-01-5 127 SOLVENT GREEN 33 10671-57-8 128 SOLVENT ORANGE 58 71775-93-4 129 SOLVENT ORANGE 60 61969-47-9 130 SOLVENT ORANGE 63 16294-75-0 131 SOLVENT ORANGE 86 81-64-1 132 SOLVENT ORANGE 105 31482-56-1 133 SOLVENT ORANGE 112 70546-25-7 134 SOLVENT ORANGE 196 71775-93-3 135 SOLVENT RED 19E 56358-09-9 136 SOLVENT RED 23 85-86-9 137 SOLVENT RED 24 85-83-6 138 SOLVENT RED 27 1320-06-5 139 SOLVENT RED 52 82-39-0 140 SOLVENT RED 111 82-38-2 141 SOLVENT RED 127 61969-48-0 142 SOLVENT RED 135 20749-68-2 143 SOLVENT RED 149 71902-18-6 144 SOLVENT RED 151 114013-41-1 145 SOLVENT RED 161 85750-13-6 146 SOLVENT RED 164 71819-51-7 147 SOLVENT RED 168 71832-19-4 148 SOLVENT RED 169 27354-18-3 149 SOLVENT RED 172 63512-13-0 150 SOLVENT RED 179 6829-22-7 151 SOLVENT RED 195 164251-88-1 152 SOLVENT RED 196 52372-36-8

5 153 SOLVENT RED 197 52372-39-1 154 SOLVENT RED 207 10114-49-5 155 SOLVENT RED 227 2944-28-7 156 SOLVENT VIOLET 13 81-48-1 157 SOLVENT VIOLET 14 67577-84-8 158 SOLVENT VIOLET 26 2872-48-2 159 SOLVENT VIOLET 38 63512-14-1 160 SOLVENT VIOLET 49 205057-15-4 161 SOLVENT VIOLET 59 6408-72-6 162 SOLVENT YELLOW 14 842-07-9 163 SOLVENT YELLOW 16 4314-14-1 164 SOLVENT YELLOW 18 6407-80-3 165 SOLVENT YELLOW 33 8003-22-3 166 SOLVENT YELLOW 43 19125-99-6 167 SOLVENT YELLOW 44 2478-20-8 168 SOLVENT YELLOW 59 27908-75-8 169 SOLVENT YELLOW 72 61813-98-7 170 SOLVENT YELLOW 82 12227-67-7 171 SOLVENT YELLOW 85 2478-20-8 172 SOLVENT YELLOW 93 4702-90-3 173 SOLVENT YELLOW 98 12671-74-8 174 SOLVENT YELLOW 107 67990-27-6 175 SOLVENT YELLOW 114 7576-65-0 176 SOLVENT YELLOW 124 34432-92-3 177 SOLVENT YELLOW 131 71819-82-4 178 SOLVENT YELLOW 133 51202-86-9 179 SOLVENT YELLOW 145 27425-55-4 180 SOLVENT YELLOW 157 27908-75-4 181 SOLVENT YELLOW 160.1 94945-27-4 182 SOLVENT YELLOW 163 13676-91-0 183 SOLVENT YELLOW 167 38489-24-6 184 SOLVENT YELLOW 172 68427-35-0 185 SOLVENT YELLOW 185 27425-55-4 186 SOLVENT YELLOW 196 38215-36-0 187 SOLVENT YELLOW 257 -- C OTHER DYES 500 188 OPTICAL BRIGHTENER (OB) 7128-64-5 189 OPTICAL BRIGHTENER 184 (OB 184) 7128-64-5 190 OPTICAL BRIGHTENER 1 (OB 1) 1533-45-5 191 ACID RED 52 3520-42-1 192 ACID YELLOW 184 61968-07-8 193 ACID YELLOW 250 93859-32-6

6 194 BASIC VIOLET 1 8004-87-3 195 BASIC VIOLET 11 2390-63-8 196 BASIC VIOLET 11.1 39393-39-0 197 BASIC YELLOW 40 12221-32-5 198 DISPERSE ORANGE 47 12236-03-2 199 DISPERSE YELLOW 186 108173-53-1 200 DISPERSE YELLOW 201 80748-21-6 D INTERMEDIATES 250 201 8-AMINOQUINALDINE 18978-78-4 202 DINITRONAPTHALENE 602-38-0 203 4-CHLORO 1,8 NAPTHALICANHYDRIDE 4053-08-1 204 1,5 DIAMINO NAPTHALENE 2243-62-1 205 1,8 DIAMINO NAPTHALENE 479-27-6 206 1-CHLORO ANTHRAQUINONE 82-44-0 207 1,5 DICHLORO ANTHRAQUINONE 82-46-2 208 1,8 DICHLORO ANTHRAQUINONE 82-43-9 209 5 ACETOACETLY AMINO BENZIMIDAZOLONE 26576-46-5 210 5-(2’-HYDROXY-3’NAPHTHOYL)- 26848-40-8 AMINOBENZIMIDAZOLONE 211 PERYLENETETRACARBOXYLIC DIANHYDRIDE 128-69-8 212 1-PHENYL-3-METHYL-5-PYRAZOLONE (PMP) 89-25-8 213 QUINIZARINE 81-64-1 Total 2450 By-Products 1 POLY ALUMINIUM CHLORIDE 1327-41-9 800 2 SODIUM ALUMINIUM SILICATE 12003-51-9 1080 3 ALUMINIUM HYDROXIDE 21645-51-2 870 4 COPPER SULPHATE 7758-99-8 50 5 Dilute HCl 7647-01-0 300 6 Dilute H 2SO 4 7664-93-9 1000 7 SODIUM HYPOCHLORIDE 7681-52-9 100 Total 4200 * All products are water insoluble.

1.3 Raw Materials Consumption Reference: Form-I, Annexure-1

1.4 Water Requirement, Waste Water Generation and Treatment Total water requirement will be 380 KL/Day which will be met through GIDC water supply. Total wastewater generation will be 255 KL/Day. Industrial waste water (240 KL/Day) will be sent to propose ETP consists of primary, secondary & tertiary treatment and treated waste

7 water will be sent to GIDC drainage line. Domestic waste water (15 KL/Day) will be disposed through septic tank & soak pit.

1.5 Air Pollution Source and Control Management Sr. Stack/Vent Stack Stack Fuel name & Type of APCM No. attached to Height Diameter Quantity Emission (meter) (meter) 1. Boiler-I 13 1.5 Agro Waste/Coal PM

(5 TPH) /Briquettes SO 2 (1.5 MT/hr.) NOx 2 Boiler-II 13 1.5 Agro Waste/Coal PM Multicyclone

(5 TPH) /Briquettes SO 2 Separator with (1.5 MT/hr.) NOx Bag filter 3 Thermic Fluid 12 0.225 Agro Waste/Coal PM

Heater /Briquettes SO 2 (5 Lac KL/hr.) (500 Kg/Day) NOx 3. Process Vent 15 0.3 -- HCl Water scrubber followed by Caustic scrubber 5 D.G. Set* 10 0.3 Diesel PM --

(1000 KVA) 250 Liter/hr. SO 2 NOx

* To be used in emergency only.

1.6 Hazardous Waste SR. TYPE OF CATEGORY QUANTITY DISPOSAL NO. WASTE NO. 1 ETP Sludge 34.3 400 MT/Month Collection, Storage, Transportation a nd sent to common TSDF site for disposal. 2 Used Oil 5.1 60 Kg/Month Collection, Storage, Transportation and given to GPCB registered reprocessor/ refiner

8 4 Discarded 33.1 Collection, Storage, Decontamination, Drums 1000 Nos./Month Transportation & given to GPCB Bags 50MT/Month authorized Vendor 5 Distillation 20.3 4 MT/Month Collection, Storage, Transportation and Residue sent for co-processing in cement industries or to CHWIF for disposal.

1.7 Green Belt Total 19,950 m2 land area is available at site; out of this area about 3,990 sq. meter (20 %) area will be covered as greenbelt and other forms of greenery.

1.8 Power & Fuel Requirements • Power Requirement: 1 MW • Sources: - DGVCL - D.G. Set (Proposed): 1000 KVA (to be used in emergency only)

• Fuel Requirement: - Agro waste/Coal/Briquettes: 3.02 MT/hr - Diesel: 250 Liter/day

2 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION 2.1 Identification of the project and project proponent. In case of mining project, a copy of mining lease/letter of intent should be given. Identification of the project Proposed pigments, dyes & dye intermediates manufacturing unit.

Identification of the project proponent • Mr. Amal Jobaliya • Mr. Hitesh D. Jobaliya • Mr. Dhaval Jobaliya

9 2.2 Brief description of nature of the Project Proposed pigments, dyes & dye intermediates manufacturing unit.

2.3 Need for the project and its importance to the country and or region The demand for products intended to be manufactured is increasing in domestic as well as in international market. To meet this demand, they propose the project. By setting up this unit will be able to meet the demand of various products locally. The project will save forex as certain products import will be reduced. This will also generate direct and indirect employment opportunity for various levels of people.

2.4 Demands-Supply Gap Based on our informal survey of the market with our current customers and various traders, we have found that there is a big potential for the range of the products we are planning.

2.5 Imports vs. Indigenous production Based on the current cost of indigenous raw materials and the non availability of some materials, we will have to import some of the key raw materials as they are not available indigenously. This will make us very competitive against imported finished products and we will export our finished products in the international market.

2.6 Export possibility We shall explore the possibility of export the products. 2.7 Domestic/Export Markets Our products have good demand in domestic & international markets. We shall explore the possibility of export the products.

2.8 Employment Generation (Direct and Indirect) due to project.

Company will give direct employment to local skilled and unskilled people based on qualification and requirement as per prevailing norms of state government In addition to direct employment, indirect employment shall generate ancillary business to some extent for the local population.

10

3 Project Description 3.3 Type of Project including interlinked and interdependent projects, if any.

No interlinked project has been submitted . 3.4 Location (map showing general location, specific location and project boundary & project site layout) with coordinates. • Map showing general location

(Courtesy: Environmental Information Center, New Delhi)

11 • Specific location and project boundary

12 Plot Layout

13 3.3 Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted. Major factors involved in the selection of site are listed below: • Site is very well connected by road and rail • Proximity to Raw Material suppliers • Proximity to common effluent treatment and hazardous/solid waste disposal facilities • Availability of sufficient land free from cultivation • Availability of water for industrial use • Availability of power evacuation facilities • Efficient transport facilities within the industrial estate and to & fro the city area. • Environment-friendly zone. • Availability of port facility • Uninterrupted power supply.

3.4 Size or Magnitude of Operation Reference: Section-1.0, Sub-section 1.2, Page No. 2 of this report.

3.5 Project Description with process details (a schematic diagram/flow chart showing the project layout, components of the project, etc. should be given) Reference: Form-1, Annexure-1, 2 & 3.

3.6 Raw Material required along with estimated quantity, likely source, marketing area of final product/s, mode of transport of raw material and Finished product. • For raw materials along with consumption quantities - Reference: Form-I, Annexure-1 • We will procure raw materials (as and when require) as much as possible from the domestic market. • We shall explore the possibility of export of the finished products.

3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be briefly outlined. Resource optimization/recycling and reuse shall be explored.

14 3.8 Availability of water its source, energy/power requirement and source should be given. Water Source Total water requirement shall be met through GIDC water supply. Power & Fuel Requirement Reference: Section-1.0, Sub-section 1.8, Page No. 9 of this report.

3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management/disposal. Reference: Form-I, Annexure-4, 5 and 6.

3.10 Schematic representations of the feasibility drawing which give information of EIA purpose.

ACTIVITIES OVERVIEW OF SOURCE OF INFORMATION E. I. A. STUDIES

ANNUAL REPORT RECONNAISSANCE SURVEY OF EXISTING PLANT INTRODUCTION MARKET ASSESSMENT FINANCIAL REPORT PROJECT REPORT BASELINE

ENVIRONMENTAL ENVIRONMENTAL INFORMATION CENTRE MONITORING OF AIR, WATER & SOIL QUALITY & NOISE CENTRAL GROUND WATER BOARD STATUS LEVELS. DATA ON METEOROLOGY SOCIO-ECONOMIC STATUS GUJARAT POLLUTION CONTROL BOARD (GPCB) & BASIC AMENITIES. SITE VISITS BY AND INTERVIEWS WITH PUBLIC HEALTH ENGINEERING DEPT. LOCALS AGRICULTURE DEPARTMENT SOCIOECONOMIC FOREST DEPARTMENT STATUS & IRRIGATION DEPARTMENT INFRASTRUCTURE EMPLOYMENT EXCHANGE HEALTH CENTER CENSUS DEPT. PROPOSED INDIAN METEOROLOGICA L DEPT. PLANT FACILITY DESCRIPTION IDENTIFICATION & ASSESSMENT OF IMPACTS IMPACTS EVALUATION OF IMPACTS BY MATRIX METHOD METHODOLOGY OF IMPACT ASSESSMENT

DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR POLLUTION CONTROL, HAZARDOUS WASTE MANAGEMENT, ENVIRONMENTAL GREEN BELT DEVELOPMENT MONITORING PROGRAM MANAGEMENT PLAN

RISK ANALYSIS SAFETY, HEALTH & ENVIRONMENTAL POLICY, GUIDELINES BY CONSEQUENCE ANALYSIS STUDIES & DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF LABOR. PREPARATION4.0 OF Site DISASTER Analysis MANAGEMENT PLAN DISASTER MANAGEMENT PLAN

15 4.1 Connectivity • Site is very well connected by road • Availability of water, power, fuel, etc.

4.2 Land Form, Land Use and Land Ownership

(Courtesy: Environmental Information Center, New Delhi)

4.3 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ)), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from HFL of the river), CRZ. In case of the notified industrial area, a copy of the Gazette notification should be given.

16

(Courtesy: Environmental Information Center, New Delhi)

AREAS UNDER DIFFERENT LANDUSE Area Statistics of Landuse / Landcover Map Sr. Area (In Class Names Area (In Sq.Km.) Area % No. Hectares) 1 Water Body 1363.73 13.64 4.34 2 Open/Barren Land 5076.01 50.76 16.17 3 Agriculture Land 1159.56 11.60 3.69 4 Fallow Land 6291.40 62.91 20.04 5 Open/Degraded Vegetation 412.59 4.13 1.31 6 Vegetation Medium Density 397.40 3.97 1.27 7 River & Canal 23.25 0.23 0.07 8 Marshy Land 919.33 9.19 2.93 9 Salt Affected Land 128.45 1.28 0.41 10 Settlement & Habitation 324.50 3.25 1.03 11 Mud Flat 863.17 8.63 2.75 12 Jetty 32.91 0.33 0.10 13 Salt Pans 2083.03 20.83 6.63 14 Mangrove(Sparse) 117.30 1.17 0.37 15 Mangrove(Dense) 223.00 2.23 0.71 16 Marshy Vegetation 46.55 0.47 0.15 17 Industrial Area 290.32 2.90 0.92 18 Sea 11589.46 115.89 36.91

17 19 Seasonal Water Body 59.04 0.59 0.19 Total 31400.99 314.01 100.00 (Courtesy: Environmental Information Center, New Delhi)

4.4 Existing Infrastructure This is proposed project activity so now there is only open land.

4.5 Soil Classification Soil Characteristics under Project Area are as below Table; AREA_SQ TAXONOMY CATEGORY DESCRIPTION TAXONOMY1 CLASS SUB_CLASS KM 2 Very deep, Fine, moderately well Fine, Soils of montmorillo drained, calcareous, montmorilloniti west nitic Soils of fine soils on very c (calcareous), coast (calcareous) alluvial A 88.93 gently sloping hyperthermic (soils of hyperthermi plains alluvial plain with Typic Gujarat c Udic slight erosion and Chromusterts plain) Chromusters moderate salinity;

associated with very

18 deep moderately well drained, calcareous, fine soils with moderate erosion. Very deep, poorly drained, calcareous fine-loamy soils on very gently sloping Fine-loamy, Soils of Fine, mixed coastal plain with mixed west (calcareous), Soils of moderate erosion (calcareous), coast hyperthermi coastal C 108.64 and strong salinity; hyperthermic (soils of c Typic plains associated with very Aeric Gujarat Halaquepts deep , imperfectly Haplaquepts plain)

drained, calcareous, fine soils with severe erosion and strong salinity. - 116.43 Sea - - - - (Courtesy: Environmental Information Centre, New Delhi)

SOIL CHARACTERISTICS MAP

(Courtesy: Environmental Information Centre, New Delhi)

19 4.6 Climatic data from secondary sources. Climatic data from primary & secondary sources will be incorporated in EIA Study.

4.7 Social infrastructure available. Various Programs/ Projects related to Social & Economic development of surrounded area has been planned, which are as follows. Depending on the growth of the company the required social infrastructure will be provided.

5.0 Planning Brief 5.1 Planning Concept (type of industries, facilities, transportation etc) Town and Country planning/Development authority classification. Type of Industry: Proposed pigments, dyes & dye intermediates manufacturing unit.

5.2 Population Projection Population data will be incorporated in EIA Study.

5.3 Land use planning (breakup along with green belt etc.) Industrial Area (Processing Area) Processing Area (Plant facilities, R&D, ETP Area and Engineering / Utility Services) = 11,970 m2

Residential Area (Non Processing Area) Non Processing Area (Green belt, Raw material storage area, finished storage area, Administration Building, Parking, road and open area) = 7,980 m2

5.4 Assessment of Infrastructure Demand (Physical & Social) • Employment would be as per prevailing norms of state government for skilled and unskilled people for the proposed project activity. • Social Welfare • Cordial relation with the industry shall be established and representation shall be made to villagers for help for creation of facilities related to health, education, etc.

20 5.5 Amenities/Facilities Details of amenities available in study area

Taluka Village Educational Medical Drinking Post & Communication Approach Nearest Power Water Telegraph to Village Town Supply Vagra Galenda P(2),Ac,O RP,CHW T,W,TK PO BS PR,KR Bharuch EA Samatpor P(2),Ac RP,CHW W,TK -(-5 Kms) BS PR,KR Bharuch EA Vav P(2),Ac RP,CHW T,W,TK,HP -(-5 Kms) BS,RS PR,KR Bharuch EA Jolva P(2),Ac,O PHS,FPC,RP,CHW W,TK -(-5 Kms) BS,NW PR,KR Bharuch EA Vadadla P(2),Ac CHW W,TK PO BS PR,KR Bharuch EA P(4),H,Ac(4),O PHC,D,FPC,RP, T,W,TK PTO, BS,RS,NW PR,KR Bharuch EA Dahej CHW Phone Lakhigam P(2) PHS,RP,CHW W,TK po BS,NW PR,KR Bharuch EA Luvara P(2),Ac RP,CHW W,TK -(-5 Kms) BS,NW PR,KR,NR Bharuch EA Jageshwar P(2),Ac,H RP,CHW W,TK PO BS,NW PR,KR,NR Bharuch EA Ambheta P(2),Ac CHW T,W,TK PO BS,NW KR,NR Bharuch EA Suva P(2),Ac -(5-10 Kms) W,TK,R -(-5 Kms) BS,NW PR,KR,NR Bharuch EA Rahiad P(2),Ac(2),O RP,CHW W,TK PO BS,NW PR,KR.NR Bharuch EA Un Harinagar inhabited Padariya P(2),Ac RP,CHW W,TK PO BS PR,KR Amod EA P(2),Ac(2),H PHS,FPC, W,TK PO BS PR,KR Bharuch EA Kadodara RP,CHW Sambheti P(2),Ac -(10+Kms) W,TK PO BS,RS PR,KR Bharuch EA (Courtesy: Census Dept., GOI)

21 ABBREVIATIONS 1. Education 3. Drinking Water 5. Transportation P-Primary Elementary School T-Tap Water RS- Railway Station H-Matriculation or Secondary HP-Hand Pump BS-Bus Station O-Other Educational Institution TK-Tank Water NW-Navigable Waterway PUC-Higher Secondary/Intermediate/pre- W-Well Water University/junior Collage R-River Water AC – Adult literacy class C-Canal TR – Training center N - Nallah S – Spring 2. Medical Facilities 4. Post & Telegraph 6. Approach to Village RP-Registered Private Practitioner PO-Post Office PR-Pucca Road PHS-Primary Health Centre PTO-Post & Telegraph KR-Kuccha Road FPC-Family Planning Centre Phone-Telephone D- Dispensary Communication CHW - Community Health Worker/Health Worker H - Hospital 7. Power Supply NH - Nursing Home EA-Electricity for all MH - Maternity Home purposes PHC - Public Health Centre EAG - Electricity for CWC - Child Welfare Centre Agriculture TB - T.B Clinic ED - Electricity for O – Others domestic EO - Electricity for other purpose like Industrial, Commercial etc.

6.0 Proposed Infrastructure 6.1 Industrial Area (Processing Area) Processing Area (Plant facilities, R&D, ETP Area and Engineering / Utility Services) = 11,970 m2

6.2 Residential Area (Non Processing Area) Non Processing Area (Green belt, Raw material storage area, finished storage area, Administration Building, Parking, road and open area) = 7,980 m2

6.3 Green Belt Total 19,950 m2 land area is available at site; out of this area about 3,990 sq. meter (20 %) area will be covered as greenbelt and other forms of greenery.

6.4 Social Infrastructure • Water Supply by GIDC • Power supply by DGVCL and D.G. Set (emergency standby)

22 6.5 Connectivity (Traffic and Transportation Road/ Rail/Metro/ Water ways etc) Major factors involved in the selection of site are listed below: • Site is very well connected by road • Proximity to Raw Material suppliers • Availability of sufficient land free from cultivation • Availability of power facilities • Availability of water for industrial use • Availability of port facility • Availability of CETP & TSDF in the region

6.6 Drinking water Management (Source & Supply of water) Total water requirement shall be met through GIDC supply.

6.7 Sewerage System Sewage pipes will be laid in entire premises for the removal and disposal of mainly non- harmful liquid wastes from offices, canteen and domestic waste to be came from different sections of unit. These liquid wastes will be sent to septic tank & soak pit.

6.8 Solid Waste Management Reference: Section-1.0, sub-section 1.6, Page No. 8 of this report.

6.9 Power Requirement & Supply/Source Reference: Section-1.0, sub-section 1.8, Page No. 9 of this report.

7.0 Rehabilitation and Resettlement (R & R) Plan 7.1 Policy to be adopted (central/state) in respect of the project affected including home oustees, land oustees and landless laborers (a brief outline to be given) There is no habitation on the proposed project activity area and it is open industrial land, so R & R policy is not applicable to this project. There shall not be displacement of any

23 population in project area. The increasing industrial activity will boost the commercial and economical status of the locality up to some extent.

8. Project Schedule & Cost Estimates 8.1 Likely date of start of construction and likely date of completion (Time schedule for the project to be given).

We shall start construction after getting EC. We shall start manufacturing after applying for CCA.

8.2 Estimated Project cost along with analysis in terms of economic viability of the project. Total Project Cost for proposed project activity is Rs. 40 Crores.

9. Analysis of Proposal (Final Recommendations) 9.1 Financial and social benefits with special emphasis on the benefit to be local people including tribal population, if any, in the area. • Employment would be as per prevailing norms of state government for skilled and unskilled people for the proposed project.

• Social Welfare shall be done.

• Cordial relation with the industry shall be established and representation shall be made to villagers for help for creation of facilities related to health, education, etc.

24