Office of the Executive Engineer Minor Irrigation

Total Page:16

File Type:pdf, Size:1020Kb

Office of the Executive Engineer Minor Irrigation OFFICE OF THE EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION, SONEPUR No:- 521 Dt:- 11.04.2016 GOVERNMENT OF ODISHA e-PROCUREMENT NOTICE BID IDENTIFICATION No: Online/SNPMI-01/2016-17 Name of work:- Construction of Instrem Storage Check Dams, MIPs & Buildings in different Blocks of Subarnapur District. No. of works:- 17 (Seventeen) Nos. Estimated cost:- Varies from Approximately Rs. 9.00 lakhs to Rs.43.00 lakhs Tender paper cost:- Mentioned in Col.5 of Tender call notice. Period of completion :- 03 (Three calendar months) for each work. Availability of bid From 20.4.2016 at 7.00 hours to 04.5.2016 up to 13.00 hours in website. documents:- (www.tendersorissa.gov.in ) Period of receipt of From 20.4.2016 at 7.00 hours to 04.05.2016 up to 13.00 hours through bid through online:- online. Period of receipt of From 25.04.2016 at 7.00 hours to 06.4.2016 upto 13.00 Hours by bid cost and bid Regd/Speed post or dropping in the box located in the Office of the security (In Superintending Engineer, K.B.K. M.I.Circle-I, Bh.Patna/ Executive original):- Engineer, M.I.Division, Sonepur. Date of opening of At 8.00 hours of 12.05.2016 in the O/O the Executive Engineer, MI bid documents:- Division, Sonepur. Digital signature The bidder must possess compatible digital signature certificate (DSC) of Class- certificate of Bidder II or Class-III. 1. Bid Documents consisting of plans, Specifications, Schedule of Quantities and the set of terms and conditions of contact and other necessary documents can be seen in the website. N.B- Contractors will be debarred if they fail to submit the Bid cost & Vat @ 5% in two separate drafts for each work, bid security and authenticity of their uploaded documents in shape of Affidavit in original before last date of receipt date i.e. by 04.05.2016 upto 13.00 Hours. 2. The Authority will not be held responsible for any technical snag or network failure during online bidding. 3. The Authority reserves right to cancel any or all bids without assigning any reason thereof. 4. The last date seeking clarification towards “e” Procurement portal using his/her DSC from 10.00 Hrs of Dt. 16.11.2015. 5. Any Corrigendum/ Addendum will be displayed in the above website only. 6. Scanned clear copies should be uploaded. In-visible copies of Documents may be liable for rejection. 7. The amendments made vide Works Dept. Memorandum No. 12366 Dtd 08.11.13, No- 10224 Dt. 01.09.2015 and Lt. No:- 20415 Dt 14.09.2015 towards general instruction to the contractor will be followed scrupulously regarding rate to be quoted etc. The detail tender call notice can also be seen in the DOWR website: http://dowrorissa.gov.in Name & Address of the OIT : Executive Engineer, M.I. Division, Sonepur, At/PO/Dist: Subarnapur PIN-767017, Ph- 06654-220516, E-Mail:- [email protected] Further details can be seen from the: http://tenderorissa.gov.in e-Procurement market place. Executive Engineer M.I.Division, Sonepur. Memo No. 522/ Dt. 11.04.2016 • InformationBoth the & hard Public Copy Relation and soft Deparment, copy (C.D) Govt. submitted of Odisha, to the Bhubaneswar Deputy Director, at I &(Adv.) P.R. Cum-DeputyBuilding, Near Secretary, State Guest OdiaHouse, Dailly Bhubaneswar News papers for information preferable inand for necessary one day facortion. wide The circulation notice may on or please before be Dt. published 19.04.2016 in two. The Loc billal of necessarypublication pass along and with payment. copy of Advertisement of published Tender Call Notice may be sent to this Office for Encl: Tender notice in CD format. Executive Engineer Memo No. 523/ Dt. 11.04.2016 Copy along with soft copy of the notice submitted to the Head State Portal Group, I.T. centre, Deptt. of Information & Technology, Bhubaneswar for exhibiting the advertisement in the Website of Government. “orissagov.nic.in” Encl: Tender notice in CD format. Executive Engineer Memo No. 524/ Dt. 11.04.2016 Copy to Director, Printing, Stationary and Publication, Orissa, Madhupatna, Cuttack-10 with a request to get the notice published in next issue of Orissa Gazettee. Executive Engineer Memo No. 525/ Dt. 11.04.2016 Copy submitted to the Director, Monitoring, O/O the Engineering-in-Chief., Deptt. of Water Resources, Bhubaneswar for favour of kind information and exhibiting the advertisement in the Web site of the Government. Encl: Tender notice in CD format. Executive Engineer Memo No. 526/ Dt. 11.04.2016 Copy submitted to the Engineer-in-Chief-cum-Secretary to Govt of Odisha, Works Department Bhubaneswar for favour of kind information and necessary action. Executive Engineer Memo No. 527/ Dt. 11.04.2016 Copy submitted to the Additional Secretary to Govt of Odisha, Department of Water Resources, Bhubaneswar for favour of kind information and necessary action. Executive Engineer Memo No. 528/ Dt. 11.04.2016 Copy submitted to the Chief Engineer, M.I. Orissa, Bhubaneswar for favour of kind information and necessary action. Executive Engineer Memo No. 529/ Dt. 11.04.2016 Copy submitted to the Superintending Engineer KBK, M.I.Circle-I, Bh.Patna for favour of kind information and necessary action. Executive Engineer Memo No. 530/ Dt. 11.04.2016 Copy submitted to the District Informatic Officer, NIC Collectorate, Subarnapur for favour of kind information and necessary action. He is requested to display the tender notice in the Dist. website. Encl: Tender notice in CD format. Executive Engineer Memo No. 531/ Dt. 11.04.2016 Copy submitted to the Collector, Subarnapur/ Supdt. Of Police, Subarnapur/ All Dist. Level Officers of Subarnapur for favour of kind information and necessary action. Executive Engineer Memo No. 532/ Dt. 11.04.2016 Copy to the Officer-in-charge, Town Police Station, Subarnapur for information and necessary action. Executive Engineer Memo No. 533/ Dt. 11.04.2016 Copy to all S.D.Os under M.I.Divn, Sonepur/ Estimator/ H.C./ DAO/ Cashier/ Tender file/ Office Notice Board for information and wide publication. Executive Engineer GOVERNMENT OF ORISSA “e”-PROCUREMENT NOTICE BID IDENTIFICATION No: Online/SNPMI-01/2016-17 The Executive Engineer, M.I. Division, Sonepur on behalf of Governor of Orissa invites percentage rate basis bid for the Improvement of following Minor Irrigation Projects through e- procurement. The bid should be submitted online in the website ( www.tendersorissa.gov.in ) by eligible contractors. The bid documents will be available in above website from 07.00 hours of 20.04.2015 to 04.05.2016 up to 13.00 hours for “On-line bidding” . The bidder must possess compatible digital signature certificate (DSC) of Class-II or Class-III. Bid VAT @ Time App. E Cost of Class of Sl. security 5% over required Name of the project & location cost (in tender contracto No. @ 1% in cost of for lakhs) paper r Rs. Tender completion. paper as 1 2 3 4 5 6 7 8 Improvement to Jharbandha MIP 03 (Three) “D” & 1. in Birmaharajpur Block of 14.99 15000/- 6000/- 300/- calendar “C” Subarnapur District under Critical months Grant. Improvement to Magarkata MIP 03 (Three) “D” & 2. in Birmaharajpur Block of 10.00 10000/- 4000/- 200/- calendar “C” Subarnapur District under Critical months Grant. Improvement to Dabapali MIP in “D” & 03 (Three) 3. 14.99 15000/- 6000/- 300/- calendar Sonepur Block of Subarnapur “C” District under Critical Grant. months Completion of 1 st floot of office 03 (Three) Building of M.I Sub-Division, “D” & 4. 16.45 16500/- 6000/- 300/- calendar Sonepur in Sonepur Block of “C” months Subarnapur District under Critical Grant Improvement to Mendulimunda 03 (Three) MIP in Ullunda Block of “D” & 5. 10.00 10000/- 4000/- 200/- calendar Subarnapur District under Critical “C” months Grant. Improvement to Sibasagarkata 03 (Three) MIP in Ullunda Block of “D” & 6. 10.00 10000/- 4000/- 200/- calendar Subarnapur District under Critical “C” months Grant. Improvement to Katabandha MIP “D” & 03 (Three) 7. 14.99 15000/- 6000/- 300/- in Ullunda Block of Subarnapur “C” calendar District under Critical Grant. months Construction of Gariamunda-I in 03 (Three) stream storage C Dam ( L.H.C.D) “C” & calendar 8. over Kandadhua Nalla near 30.71 30800/- 6000/- 300/- months “B” village Gariamunda in Biramaharajpur Block of Subarnapur District. Construction of Gariamunda-II in 03 (Three) stream storage C Dam ( L.H.C.D) “C” & calendar 9. over Kandadhua Nalla near 32.83 32900/- 6000/- 300/- months “B” village Gariamunda in Biramaharajpur Block of Subarnapur District. Construction of Khetisahi in stream storage C Dam (L.H.C.D) 03 (Three) “C” & 10. over Dahani Nalla near village 35.75 35800/- 6000/- 300/- calendar “B” Rathapur in Biramaharajpur Block months of Subarnapur District. Construction of Dablong-I in stream storage C Dam (L.H.C.D) 03 (Three) “B” & 11. over Ostali Nalla near village 41.88 41900/- 6000/- 300/- calendar “A” Dablong in Sonepur Block of months Subarnapur District. Construction of Dablong-II in 03 (Three) stream storage C Dam (L.H.C.D) “B” & 12. 42.43 42500/- 6000/- 300/- calendar over Ostali Nalla near village “A” Dablong in Sonepur Block of months Subarnapur District. Construction of Dablong-III in 03 (Three) stream storage C Dam (L.H.C.D) “B” & calendar 13. 42.12 42200/- 6000/- 300/- months over Ostali Nalla near village “A” Dablong in Sonepur Block of Subarnapur District. Construction of Matiapali in 03 (Three) stream storage C Dam (L.H.C.D) “D” & 14. 15.53 15600/- 6000/- 300/- calendar “C” over Khajuria Nalla near village months Matiapali in Sonepur Block of Subarnapur District.
Recommended publications
  • Citizen Forum of WODC
    DATA WODC SINCE INCEPTION TILL 05.08.2016 Project Released Sl No ID DISTRICT Executing Agency Name of the Project Amount Year Completion of Bauribandha Check Dam & Retaining Wall B.D.O., at Angapada, Angapada G.P. of 1 20350 ANGUL KISHORENAGAR. Kishorenagar Block 500000 2014-2015 Constn. of Bridge Between Budiabahal to Majurkachheni, B.D.O., Kadalimunda G.P. of 2 20238 ANGUL KISHORENAGAR. Kishorenagar Block 500000 2014-2015 Constn. of Main Building Ambapal Homeopathy B.D.O., Dispensary, Ambapal G. P. of 3 20345 ANGUL KISHORENAGAR. Kishorenagar Block 500000 2014-2015 Completion of Addl. Class Room of Lunahandi High School Building, Lunahandi 4 19664 ANGUL B.D.O., ATHMALLIK. G.P. of Athmallik Block 300000 2014-2015 Constn. of Gudighara Bhagabat Tungi at Tentheipali, Kudagaon G.P. of 5 19264 ANGUL B.D.O., ATHMALLIK. Athmallik Block 300000 2014-2015 Constn. of Kothaghara at Tentheipali, Kudagaon G.P. of 6 19265 ANGUL B.D.O., ATHMALLIK. Athmallik Block 300000 2014-2015 Completion of Building and Water Supply to Radhakrishna High School, B.D.O., Pursmala, Urukula G.P. of 7 19020 ANGUL KISHORENAGAR. Kishorenagar Block 700000 2014-2015 Completion of Pitabaligorada B.D.O., Bridge, Urukula G.P. of 8 19019 ANGUL KISHORENAGAR. Kishorenagar Block 900000 2014-2015 Constn. of Bridge at Ghaginallah in between Ghanpur Serenda Road, B.D.O., Urukula G.P. of Kishorenagar 9 19018 ANGUL KISHORENAGAR. Block 1000000 2014-2015 Completion of Kalyan Mandap at Routpada, Kandhapada G.P. 10 19656 ANGUL B.D.O., ATHMALLIK. of Athmallik Block 200000 2014-2015 Constn. of Bhoga Mandap inside Maheswari Temple of 11 19659 ANGUL B.D.O., ATHMALLIK.
    [Show full text]
  • Town and Village Directory, Bolangir, Part-A, Series-16, Orissa
    CENSUS OF INDIA, 1971 SERIES 16 ORISSA PART X DISTRICT CENSUS HANDBOO~ PART A-TOWN AND VILLAGE DIRECTORY BOLANGIR B. TRIPATHI of- the Indian Administrative Service Director Df Census Operations, Orissa CENSUS OF INDIA, 1971 DISTRICT CENSUS HA-NDBOOK PART A-TOWN AND VILLAGE DIRECTORY BOLA_NGIR PREFACE The District Census Handbook first introduced.as an ancillary to 1951 Census appeared as a State. Government publication in a more elaborate and ambitious form in 1961 Census. It was divided into 3 parts: Part] gave a narrative account of each District; Part 1I contained various Census Tables and a ~eries of Primary Census data relating to each village and town ; and Part III presented certain administrative statistics obtained from Government Departments. These parts further enriched by inclusion of maps of the district and of police stations within the district were together -brought out in ODe volume. The Handbook, for each one of the 13 Districts of the State was acknowledged to be highly useful. 2. But the purpose and utility of this valuable compilation somewhat suffered on account of the time lag that intervened between the conclusion of Census and the publication of the Handbook. The delay was unavoidable in the sense that the Handbook-complete with all the constituent parts brought together in one volume had necessarily<to wait till after completion of the processing and tabulation of Gensus data and collection and compilation of a large array of administrative and other statistics. 3. With the object of cutting out the delay, and also_ to making each volume handy and not-too-bulky it has been decided to bring out the 1971 District Census Handbook in three parts separately with the data becoming available from stage to stage as briefly indicated below : Part A-This part will incorporate the Town Directory and the Village Directory for each district.
    [Show full text]
  • Action Plan Format (Micro Planning) for Mobail Health Team Under Rbsk
    ACTION PLAN FORMAT (MICRO PLANNING) FOR MOBAIL HEALTH TEAM UNDER RBSK ACTION PLAN OF YEAR 2019-2020 District -SUBARNAPUR Block-BIRMAHARAJPUR MHT UID -MHT 2 S&ME Department Women & Child Dev. Depy. Staff Details Name Mob. Name of S.K.KUMBHAKAR Name of Smt. SANJURANI MISHRA AYUSH Doctor(M) DR.DEEPANKAR KARMEE 9437419539 the B.E.O the C.D.P.O Mob. No. 9437761304 Mob. No. 9437430860 AYUSH Doctor(F) DR.MADHUSMITA MEHER 7894059972 Office No. Office Pharmacist SMT.SASMITA OUROHIT 8895229392 No. ST & SC Dev. Dept Labour ESI Dept. ANM SMT.SWAGATIKA SWAIN 9937342344 Name of Mr.JAGATJIBAN BAGARTY Name of VACANT Driver ALOK 8018491587 the W.E.O the Officer Mob. No. 9438088641 Mob. No. Office No. Office No. Apr-19 Date Name of the Name of the Enrolment Status Contract No. Distance Village Inst. 6th M 3y- I II III IV V VI VII VIII IX X M F Total Covered -3y. 6y 02-04-2019 Deulmunda PS 13 7 2 12 5 15 24 39 9937311255 8 Deuli PS 9 4 6 7 3 16 13 29 9937865922 9 03-04-2019 REFERRAL 04-04-2019 Bhaliapadar PS 8 8 6 6 7 14 21 35 9777576865 14 Lumurjena PS 11 9 9 13 8 24 26 50 9937929160 10 05-04-2019 Phulchara PS 3 7 3 7 12 13 19 32 8280277202 10 Kumursingha PS 10 3 5 9 8 15 20 35 9777576865 14 06-04-2019 Gopapali PS 11 14 13 15 12 35 30 65 9778002443 12 Sitapur PS 3 7 6 8 2 13 13 26 9938361302 13 08-04-2019 Chandli PS 14 6 10 10 6 24 22 46 9937218254 12 Narayanpur PS 6 5 4 2 4 11 11 22 13 09-04-2019 Mundidamak PS 2 8 6 8 5 13 16 29 9556852022 13 Chhandasahi PPS 3 3 3 3 5 9 8 17 9937769255 14 Duhulpali PS 9 9 6 5 6 21 14 35 9437039884 10 10-04-2019 REFERRAL
    [Show full text]
  • EXTRAORDINARY PUBLISHED by AUTHORITY No. 2370, CUTTACK, SATURDAY, DECEMBER 30, 2017/PAUSA 9, 1939
    EXTRAORDINARY PUBLISHED BY AUTHORITY No. 2370, CUTTACK, SATURDAY, DECEMBER 30, 2017/PAUSA 9, 1939 REVENUE & DISASTER MANAGEMENT DEPARTMENT (DISASTER MANAGEMENT) NOTIFICATION The 30th December, 2017 No.7903–RDM-RLF-DROT-0031/2017/R&DM(DM)— Having taken into account the conditions as arising from rainfall deficiency, decline in the availability of the ground and surface water, poor crop conditions, ascertained the distress situation that is likely to develop in the area affected by these conditions through crop field verification and on the basis of reports available from the Collector, Subarnapur, the State Government in continuation of earlier Notification No.6416/R&DM(DM), dated the 25th October, 2017 do hereby declare drought of moderate/severe nature in an additional area of 1645.49 hectares in 87 villages under 21 Gram Panchayats of 3 Blocks of Subarnapur district as per the details given below.(Village list annexed) (Area in hectares) Sl. District No. of No. of No. of No. of No. of Sown Sown Total No. affected affected affected affected affected area with area with Sown Blocks GPs Villages ULBs wards damage damage area between above with 33% and 50% to damage 50% to crops >33% crops 1 2 3 4 5 6 7 8 9 10 1 Subarnapur 03 21 87 0 0 1585.49 60.00 1645.49 The declaration of drought would come into effect immediately and would continue to be in effect for six months from this date unless revoked earlier by an order of the State Government. The State Government hereby authorizes the Collector, Subarnapur to undertake relief measures in the notified area.
    [Show full text]
  • Ground Water Year Book 2016-2017
    Government of India CENTRAL GROUND WATER BOARD Ministry of Water Resources & Ganga Rejuvenation GROUND WATER YEAR BOOK 2016-2017 South Eastern Region Bhubaneswar September 2017 F O R E W O R D Groundwater is a major natural replenishable resource to meet the water requirement for irrigation, domestic and industrial needs. It plays a key role in the agrarian economy of the state. Though richly endowed with various natural resources, the state of Orissa has a long way to go before it can call itself developed. Being heavily dependent on rain fed agriculture; the state is very often exposed to vagaries of monsoon like flood and drought. The importance of groundwater in mitigating the intermittent drought condition of a rain-fed economy cannot be overemphasized. To monitor the effect caused by indiscriminate use of this precious resource on groundwater regime, Central Ground Water Board, South Eastern Region, Bhubaneswar has established about 1606 National Hydrograph Network Stations (NHNS) (open / dug wells) and 89 purpose built piezometres under Hydrology Project in the state of Orissa. The water levels are being monitored four times a year. Besides, to study the change in chemical quality of groundwater in time and space, the water samples from these NHNS are being collected once a year (Pre-monsoon) and analysed in the Water Quality Laboratory of the Region. The data of both water level and chemical analysis are being stored in computers using industry standard Relational Database Management System (RDBMS) like Oracle and MS SQL Server. This is very essential for easy retrieval and long-term sustainability of data.
    [Show full text]
  • New Applied Routes
    Route and Timing Deatils of Vehicle Number OR04A0281 Sl Up Arv Up Dep Dn Arv Dn Dep Station Name Distance No Time Time Time Time 1 - 6.40 CHANDANPUR - 050627 0 4.10 - 2 7.25 7.35 KANDIA - 050288 24 3.25 3.35 3 8.05 8.15 SINGHPUR - 050165 10 2.30 2.45 4 9.45 9.50 JAJPUR TOWN - 050077 36 12.50 1.00 5 10.35 10.40 PANIKOILI - 050138 20 12.05 12.10 6 11.05 - JAJPUR ROAD - 050078 12 - 11.45 7 - 4.20 CHANDANPUR - 050627 104 7.05 - 8 5.05 5.10 KANDIA - 050288 24 6.20 6.25 9 5.40 - SINGHPUR - 050165 10 - 5.50 10 - - - 0 - - Route and Timing Deatils of Vehicle Number OR15G3172 Sl Up Arv Up Dep Dn Arv Dn Dep Station Name Distance No Time Time Time Time 1 00.00 06.00 KUSANGA - 120038 0 19.15 NH 2 06.10 06.15 KUMARI - 120153 5 18.45 19.00 3 06.30 06.35 CHHATRANGA - 120441 12 18.30 18.35 4 07.00 07.15 CHARICHHAK - 130031 18 17.45 18.00 5 07.20 07.30 PURUNA CTC - 050707 5 17.30 17.35 6 08.15 09.05 BOUDA - 050323 30 15.45 16.15 7 09.30 09.35 JANHAPANK 13 15.15 15.20 8 10.15 10.20 BAUNSUNI - 120467 17 14.30 14.35 9 10.50 10.55 MANAMUNDA 18 14.00 14.05 10 11.00 00 SONEPUR - 030107 2 00 13.45 Route and Timing Deatils of Vehicle Number OR133937 Sl Up Arv Up Dep Dn Arv Dn Dep Station Name Distance No Time Time Time Time 1 0 5.30 RANPUR - 130108 80 18.30 0 2 5.38 5.41 GOPALPUR - 130900 5 18.19 18.22 3 5.53 5.56 MAYURJHALIA - 130085 3 18.04 18.07 4 6.08 6.13 HAJA - 130782 5 17.47 17.52 5 6.19 6.22 RAMESWAR - 130242 5 17.38 17.41 6 6.30 7.00 NIRAKARPUR - 130093 7 17.20 17.30 7 7.12 7.13 LENDU - 130820 3 17.07 17.08 8 7.27 7.28 BAKU - 130179 2 16.52 16.53 9 7.38
    [Show full text]
  • September 2020
    Govt. of India Ministry of Jal Shakti Department of Water Resources, River Development & Ganga Rejuvenation CENTRAL GROUND WATER BOARD GROUND WATER YEAR BOOK 2019-2020 South Eastern Region Bhubaneswar September 2020 F O R E W O R D Groundwater is a major natural replenishable resource to meet the water requirement for irrigation, domestic and industrial needs. It plays a key role in the agrarian economy of the state. Though richly endowed with various natural resources, the state of Odisha has a long way to go before it can call itself developed. Being heavily dependent on rain fed agriculture; the state is very often exposed to vagaries of monsoon like flood and drought. The importance of groundwater in mitigating the intermittent drought condition of a rain-fed economy cannot be overemphasized. To monitor the effect caused by indiscriminate use of this precious resource on groundwater regime, Central Ground Water Board, South Eastern Region, Bhubaneswar has established about 1600 National Hydrograph Network Stations (NHNS) (open / dug wells) and piezometres in the state of Odisha. The water levels are being monitored four times a year. Besides, to study the change in chemical quality of groundwater in time and space, the water samples from these NHNS are being collected once a year (Pre-monsoon) and analysed in the Water Quality Laboratory of the Region. The data of both water level and chemical analysis are being stored in computers using industry standard Relational Database Management System (RDBMS) like Oracle and MS SQL Server. This is very essential for easy retrieval and long-term sustainability of data.
    [Show full text]
  • Clod16816.Pdf
    Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter - District Wise Abstract State : Odisha Sanction Year : 2016-2017 Batch : 2 Collaboration : Regular PMGSY Sr.No. District No of Road Length MoRD Cost State Cost (Rs Total Cost Maint. Cost Habs (1000+, 500+, 250+, <250, Total) Works (Kms) / Bridge (Rs Lacs) Lacs) (Rs Lacs) (Rs Lacs) Length (Mtrs) 1 2 3 4 5 6 7 8 9 Road Proposals 1 Angul 28 98.050 3,122.81 2,189.90 5,312.71 413.65 (0 , 28 , 3 , 2 , 33) 2 Balasore 3 4.250 154.13 107.99 262.12 25.01 (0 , 3 , 0 , 0 , 3) 3 Bargarh 45 93.910 2,226.50 1,561.57 3,788.07 289.34 (0 , 46 , 0 , 0 , 46) 4 Bhadrak 13 39.100 1,276.53 894.77 2,171.30 175.78 (0 , 13 , 6 , 4 , 23) 5 Bolangir 97 254.315 6,872.60 4,818.24 11,690.84 995.45 (1 , 4 , 93 , 2 , 100) 6 Boudh 8 31.390 910.68 638.46 1,549.14 123.11 (0 , 8 , 0 , 0 , 8) 7 Cuttack 1 3.050 107.45 75.28 182.73 14.25 (0 , 1 , 0 , 0 , 1) 8 Deogarh 6 21.500 610.36 428.28 1,038.64 71.11 (0 , 1 , 6 , 0 , 7) 9 Dhenkanal 1 3.410 106.49 74.61 181.10 14.85 (0 , 2 , 0 , 1 , 3) 10 Gajapati 9 49.450 1,626.24 1,140.32 2,766.56 234.36 (0 , 0 , 11 , 5 , 16) 11 Ganjam 4 24.520 802.32 562.51 1,364.83 119.71 (0 , 0 , 4 , 0 , 4) 12 Jajpur 28 88.000 2,727.42 1,911.28 4,638.70 359.91 (3 , 8 , 21 , 0 , 32) 13 Jharsuguda 8 19.290 533.29 373.89 907.18 70.05 (0 , 8 , 1 , 0 , 9) 14 Kalahandi 67 287.850 8,671.45 6,079.74 14,751.19 940.17 (1 , 6 , 75 , 30 , 112) 15 Kendrapara 4 17.580 678.70 475.47 1,154.17 101.48 (5 , 1 , 0 , 1 , 7) 16 Keonjhar 32 100.700 3,054.66 2,141.28 5,195.94 451.92 (2 , 6 , 33
    [Show full text]
  • EXTRAORDINARY PUBLISHED by AUTHORITY No. 467, CUTTACK, TUESDAY, MARCH 21, 2017/FALGUNA 30, 1938
    EXTRAORDINARY PUBLISHED BY AUTHORITY No. 467, CUTTACK, TUESDAY, MARCH 21, 2017/FALGUNA 30, 1938 REVENUE & DISASTER MANAGEMENT DEPARTMENT NOTIFICATION The 11th January, 2017 S.R.O. No. 126 /2017— In exercise of powers conferred under sub-section-(1) of Section 3 of the Odisha Special Survey and Settlement Act, 2012 (Odisha Act, 5 of 2012) read with sub-rule-(1) of rule 4 of Odisha Special Survey and Settlement Rules, 2012 , the State Government do hereby notify the 669 (Six Hundred Sixty-Nine) Nos. of villages of Subarnapur District as at Annexure-A for conduct of Special Survey and Settlement operation and preparation of Record of Rights (RoR) simultaneously with respect to all land lying in the areas comprised within the limits of those villages. The settlement of rent with respect to above said areas shall be determined as per the prevailing guidelines issued by Revenue & Disaster Management Department. [No. 1086–RDM-NLRMP-HISURV-0001/2015/R&DM.] By Order of the Governor Dr. MONA SHARMA Principal Secretary to Government 2 Annexure - "A" DISTRICT: SUBARNAPUR No. Sl. Name of Name of Sub- Name of Name of Name of Villages Name of P.S. of No. District Division Tehsil Villages English Odia P.S. 1 2 3 4 5 6 7 8 1 Subarnapur Sonepur Binka Adakasa @WûKhû Dunguripali 15 2 Subarnapur Sonepur Binka Adakasa "J" @WûKhû Rwf Dunguripali 25 3 Subarnapur Sonepur Binka Akhidadar @ûLô\û\e Binka 40 4 Subarnapur Sonepur Binka Amamunda @cûcêŠû Dunguripali 113 5 Subarnapur Sonepur Binka Antarda @«Wûð Binka 49 6 Subarnapur Sonepur Binka Antarda ‘J’ @«Wûð Rwf
    [Show full text]
  • SUBARNAPUR Block-BIRMAHARAJPUR MHT UID -MHT 2 S&ME Department Women & Child Dev
    ACTION PLAN FORMAT (MICRO PLANNING) FOR MOBAIL HEALTH TEAM UNDER RBSK ACTION PLAN OF YEAR 2019-2020 District -SUBARNAPUR Block-BIRMAHARAJPUR MHT UID -MHT 2 S&ME Department Women & Child Dev. Depy. Staff Details Name Mob. Name of the B.E.O S.K.KUMBHAKAR Name of the C.D.P.O Smt. SANJURANI AYUSH Doctor(M) Dr. Amit Ku. Muduli 9178711218 MISHRA Mob. No. 9437761304 Mob. No. 9437430860 AYUSH Doctor(F) Office No. Office No. Pharmacist ST & SC Dev. Dept Labour ESI Dept. ANM Name of the W.E.O Mr.JAGATJIBAN Name of the Officer VACANT Driver BAGARTY Mob. No. 9438088641 Mob. No. Office No. Office No. 2019 April Age of Children Enrolment Status (in class-wise) Name of Distance Sl. School or Date Name of the Village the 06 mths to 03 yrs to Contact No. Covered No. AWC I II III IV V VI VII VIII IX X Total Inst. 03 yrs 06 yrs in Kms 1 1.4.19 SUNDAY Utkal Divas 2 2.4.19 Rathapur 1&2 AWC 17, 14 16, 10 33, 24 9778975311 & 9938630908 15 3 3.4.19 Referal Day 4 4.4.19 Mendamal 3 AWC 23 13 36 9938900624 11 5 5.4.19 Mendamal 1&2 AWC 49 34 83 7605910915 11 6 6.4.19 Jharkumunda AWC 36 11 47 9777757856(Asha) 5 7 7.4.19 Sunaday 8 8.4.19 Luchabandha AWC 18 13 31 8658728302 22 9 9.4.19 Puleshwar AWC 1&2 AWC 28 17 65 8658073198, 8658274807 42 10 10.4.19 Referal Day 11 11.4.19 Ranipur & Karnapali AWC 36 21 57 8456931980 & 8018233406 8 12 12.4.19 Kenjhriapali AWC 22,9 26,8 63,56 9777391427 & 9937101701 40 13 13.4.19 Amarpali AWC 50 29 69 9556360470 & 9692505684 46 14 14.4.19 S U N D A Y RaamNabamee 15 15.4.19 Mendilipali & Purusottamapali AWC 29,11 21,6 50,17 9178246776,
    [Show full text]
  • Government of Odisha Has Long Recognized the Need to Develop High Quality Road Infrastructure Through Public Private Partnership (PPP) Mode
    EXECUTIVE SUMMARY The Outcome Budget broadly indicates physical dimensions of the financial outlays indicating the expected intermediate output & outcomes and this will serve as a tool to monitor with objectively verifiable indicators. The Outcome Budget 2016-17 broadly consists of the following chapters. Chapter-I : Brief introduction of the functions, organizational setup, list of major programmes /schemes implemented by the Department, its mandate, goals and policy frame work. Chapter-II : Tabular format(s) (statement) indicating the details of financial outlays, projected physical outputs & projected outcomes for 2016-17 under Plan (State / Central) and Non-plan with list of works. Chapter-III : The details of reforms measures and policy initiatives, if any taken by the Department during the course of the year. Chapter-IV : Scheme wise /Programme wise past performance of the year 2014-15 & 2015-16 (upto Decmber, 2015) Chapter-V : Financial review in shape of actual of the year preceding the previous year, Budget Estimate and Revised Estimates of the previous year, Budget Estimate of the current financial year. Chapter-VI : Highlights the outlays provided for the schemes benefiting ST and SC groups showing flow of SCP and TASP in the budget 2016-17. As assigned by the State Government, Public Works like construction of roads, bridges, Cross Drainage work and Nallahs, buildings including public health and electrical works etc are being executed by the Works Department. As road communication is the key element for the economic development of the State, this Department gives special emphasis to this sector. This Department looks after road totaling length of km as detailed below:- Length in km National Highways 4510.712 State Highways 4175.901 Major District Roads 2696.711 Other District Roads 11997.863 23381.187 This Department has also an important role for improvement of buildings infrastructure in the State.
    [Show full text]
  • Date of Name of the Arrival to TMC Where Sl.No Name Age Gender Address G.P
    Date of Name of the Arrival to TMC where Sl.No Name Age Gender Address G.P. sonepur BOYSaddimited HIGH SCHOOL 1 Sushil Samal 20 Male Patharghat Hilung 4/2/2020 BOYSBRIMAHARAJPU HIGH SCHOOL 2 Chandan Sahu 25 Male Patharghat Hilung 4/2/2020 BRIMAHARAJPU Indira Gandhi High 3 Padmalochan Banchhor 25 Male Badbardakata Khandahata 4/8/2020 School, Khandahata Indira Gandhi High 4 Asha Banchhor 20 Male Badbardakata Khandahata 4/8/2020 School, Khandahata O.A.V. 5 Soumitri Tandia 24 Male Bhatpadar Pitamahul 3/20/2020 Birmaharajpur O.A.V. 6 Shyam Gupta 38 M Bmpur Traipathy Colony UFULA 17-03-2020 Birmaharajpur O.A.V. 7 Viki Gupta 19 M Bmpur Traipathy Colony UFULA 17-03-2020 Birmaharajpur O.A.V. 8 Ranjit Yadav 18 M Bmpur Traipathy Colony UFULA 17-03-2020 Birmaharajpur O.A.V. 9 Budharam Patel 35 M Bmpur Traipathy Colony UFULA 17-03-2020 Birmaharajpur O.A.V. 10 Hariram Sahu 30 M Bmpur Traipathy Colony UFULA 17-03-2020 Birmaharajpur O.A.V. 11 Raja Shribastav 23 M Bmpur Traipathy Colony UFULA 17-03-2020 BOYSBirmaharajpur HIGH SCHOOL 12 Mj.Sahid 20 M Tripathy Colony Bmpur UFULA 3/17/2020 BOYSBRIMAHARAJPU HIGH SCHOOL 13 Mukhtar Alam 45 M Tripathy Colony Bmpur UFULA 3/17/2020 BOYSBRIMAHARAJPU HIGH SCHOOL 14 Rahees Ahemad 20 M Tripathy Colony Bmpur UFULA 3/17/2020 BOYSBRIMAHARAJPU HIGH SCHOOL 15 Mohd Najim 42 M Tripathy Colony Bmpur UFULA 3/17/2020 BOYSBRIMAHARAJPU HIGH SCHOOL 16 Ajharurdin Alam 20 M Tripathy Colony Bmpur UFULA 3/17/2020 BOYSBRIMAHARAJPU HIGH SCHOOL 17 Shekh Mobin 47 M Tripathy Colony Bmpur UFULA 3/17/2020 BOYSBRIMAHARAJPU HIGH SCHOOL 18 Mohd.
    [Show full text]