Pradhan Mantri Gram Sadak Yojana

Road List for attachment with Sanction Letter - District Wise Abstract

State : Sanction Year : 2016-2017 Batch : 2 Collaboration : Regular PMGSY

Sr.No. District No of Road Length MoRD Cost State Cost (Rs Total Cost Maint. Cost Habs (1000+, 500+, 250+, <250, Total) Works (Kms) / Bridge (Rs Lacs) Lacs) (Rs Lacs) (Rs Lacs) Length (Mtrs) 1 2 3 4 5 6 7 8 9

Road Proposals

1 Angul 28 98.050 3,122.81 2,189.90 5,312.71 413.65 (0 , 28 , 3 , 2 , 33)

2 Balasore 3 4.250 154.13 107.99 262.12 25.01 (0 , 3 , 0 , 0 , 3)

3 Bargarh 45 93.910 2,226.50 1,561.57 3,788.07 289.34 (0 , 46 , 0 , 0 , 46)

4 Bhadrak 13 39.100 1,276.53 894.77 2,171.30 175.78 (0 , 13 , 6 , 4 , 23)

5 Bolangir 97 254.315 6,872.60 4,818.24 11,690.84 995.45 (1 , 4 , 93 , 2 , 100)

6 Boudh 8 31.390 910.68 638.46 1,549.14 123.11 (0 , 8 , 0 , 0 , 8)

7 Cuttack 1 3.050 107.45 75.28 182.73 14.25 (0 , 1 , 0 , 0 , 1)

8 Deogarh 6 21.500 610.36 428.28 1,038.64 71.11 (0 , 1 , 6 , 0 , 7)

9 Dhenkanal 1 3.410 106.49 74.61 181.10 14.85 (0 , 2 , 0 , 1 , 3)

10 Gajapati 9 49.450 1,626.24 1,140.32 2,766.56 234.36 (0 , 0 , 11 , 5 , 16)

11 Ganjam 4 24.520 802.32 562.51 1,364.83 119.71 (0 , 0 , 4 , 0 , 4)

12 Jajpur 28 88.000 2,727.42 1,911.28 4,638.70 359.91 (3 , 8 , 21 , 0 , 32)

13 Jharsuguda 8 19.290 533.29 373.89 907.18 70.05 (0 , 8 , 1 , 0 , 9)

14 Kalahandi 67 287.850 8,671.45 6,079.74 14,751.19 940.17 (1 , 6 , 75 , 30 , 112)

15 Kendrapara 4 17.580 678.70 475.47 1,154.17 101.48 (5 , 1 , 0 , 1 , 7)

16 Keonjhar 32 100.700 3,054.66 2,141.28 5,195.94 451.92 (2 , 6 , 33 , 5 , 46)

17 Koraput 97 384.810 12,565.53 8,819.87 21,385.40 1,880.83 (0 , 1 , 104 , 68 , 173)

18 Malkangiri 26 136.630 3,933.42 2,757.03 6,690.45 656.37 (0 , 2 , 26 , 13 , 41)

19 Mayurbhanj 15 63.199 1,982.57 1,390.59 3,373.16 273.90 (0 , 3 , 12 , 0 , 15)

20 Nawarangpur 8 41.320 1,000.66 701.54 1,702.20 135.02 (0 , 2 , 6 , 6 , 14)

21 Nayagarh 64 177.740 6,094.33 4,272.16 10,366.49 841.49 (0 , 3 , 71 , 11 , 85)

22 Nuapara 8 42.350 1,148.53 804.93 1,953.46 159.46 (0 , 4 , 4 , 1 , 9)

23 Phulbani(Kandhamal) 34 141.330 3,712.60 2,601.52 6,314.12 513.00 (0 , 0 , 42 , 18 , 60)

24 Puri 1 2.830 93.23 65.32 158.55 17.60 (0 , 1 , 0 , 0 , 1)

25 Rayagada 38 230.360 6,953.21 4,872.09 11,825.30 1,136.07 (0 , 5 , 35 , 19 , 59)

26 Sambalpur 41 116.575 3,044.73 2,135.60 5,180.33 384.64 (0 , 0 , 49 , 11 , 60)

27 Sonepur 3 7.550 196.58 137.84 334.42 28.07 (0 , 0 , 3 , 0 , 3)

28 Sundargarh 193 649.024 18,066.19 12,670.65 30,736.84 2,574.92 (0 , 17 , 215 , 30 , 262)

Roads Total 882 3,130.083 92,273.21 64,702.73 1,56,975.94 13,001.51 (12 , 173 , 820 , 227 , 1232)

Long Span Bridge Proposals

1 Angul 2 522.270 239.53 1,729.95 1,969.48 0.00 -

2 Bargarh 1 36.800 26.34 42.73 69.07 0.00 -

3 Bolangir 1 43.080 73.88 110.91 184.79 0.00 -

4 Kalahandi 2 64.000 83.01 76.64 159.65 0.00 -

5 Keonjhar 2 130.500 147.82 287.11 434.93 0.00 -

6 Koraput 1 18.000 36.32 33.53 69.85 0.00 -

7 Mayurbhanj 3 253.150 453.05 914.00 1,367.05 0.00 -

Bridges Total 12 1,067.800 1,059.95 3,194.87 4,254.82 0.00 -

Grand Total 894 Total Road 93,333.16 67,897.60 1,61,230.76 13,001.51 (12 , 173 , 820 , 227 , 1232) Length:3130.083 Kms Total LSB Length:1067.800 Mtrs

Page 1 of 1 Generated On : 17/08/2016 11:42 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

State : Odisha Sanction Year : 2016-2017 Batch : 2 Collaboration : Regular PMGSY Note : All Costs are in Lakhs and Lengths are in Kms.

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Road Proposals

District- Angul

Block- Angul

1 L049 L049-Tainsi Kantabeda Road New -- 2.800 3.750 Complete 9 89.30 62.62 151.92 11.87 (0 , 1 , 0 , 0 , 1)

2 L049 L049-Tainsi Kantabeda Road New -- 4.200 3.750 Complete 15 135.02 94.64 229.66 17.83 (0 , 1 , 0 , 1 , 2)

3 L067 L067-PWD Road Saharagudia New -- 1.510 3.750 Complete 5 46.76 32.81 79.57 6.24 (0 , 1 , 0 , 0 , 1) Road 4 L061 L061-Matiasahi Chhampatir New Cold Mix 5.500 3.750 Complete 17 195.47 137.16 332.63 24.90 (0 , 1 , 0 , 0 , 1) Road Technology Block Angul Total 14.010 46 466.55 327.23 793.78 60.84 (0 , 4 , 0 , 1 , 5)

Block- Athamallik

5 L071 L071-PWD Road Titirkata New -- 2.000 3.750 Complete 9 66.87 46.92 113.79 9.43 (0 , 1 , 1 , 0 , 2)

Block Athamallik Total 2.000 9 66.87 46.92 113.79 9.43 (0 , 1 , 1 , 0 , 2)

Block- Banarpal

6 L033 L033-Talmul Rankasinga New -- 3.500 3.750 Complete 7 109.49 76.70 186.19 14.98 (0 , 1 , 0 , 0 , 1) Road 7 L061 L061-Balaramprasad New -- 3.000 3.750 Complete 4 94.95 66.55 161.50 12.56 (0 , 1 , 0 , 0 , 1) Kuspangi Road 8 L057 L057-PWD Road Rajanipal New -- 4.000 3.750 Complete 12 129.92 91.08 221.00 16.97 (0 , 1 , 0 , 0 , 1)

9 L056 L056-PWD Road Ghuchapal New -- 2.000 3.750 Complete 7 65.37 45.84 111.21 8.64 (0 , 1 , 0 , 0 , 1)

10 L025 L025-Santri Narendrapur via New Cold Mix 4.100 3.750 Complete 14 139.27 97.73 237.00 17.85 (0 , 1 , 0 , 0 , 1) Bhagabatpur Road Technology

Page 1 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

11 L063 L063-Balaramprasad New -- 3.000 3.750 Complete 4 98.47 68.98 167.45 12.42 (0 , 1 , 0 , 0 , 1) Amantapur Road Block Banarpal Total 19.600 48 637.47 446.88 1,084.35 83.42 (0 , 6 , 0 , 0 , 6)

Block- Chendipada

12 L031 L031-RD Road Bahagilakata New -- 1.500 3.750 Complete 2 47.35 33.21 80.56 6.26 (0 , 1 , 0 , 0 , 1)

13 L021 L021-Kampasala New -- 2.550 3.750 Complete 10 81.10 56.82 137.92 11.05 (0 , 1 , 0 , 0 , 1) Kainchapada Road Block Chendipada Total 4.050 12 128.45 90.03 218.48 17.31 (0 , 2 , 0 , 0 , 2)

Block- Kaniha

14 L059 L059-Barapada nakatideul New -- 4.200 3.750 Complete 8 135.63 95.09 230.72 15.27 (0 , 1 , 1 , 0 , 2) Road 15 L032 L032-NH 200 Rutubhuin to New -- 6.000 3.750 Complete 12 171.43 120.14 291.57 23.02 (0 , 1 , 0 , 0 , 1) Dhobapal 16 L049 L049-Derenga Bole Road New Soil Stablizer 5.200 3.750 Complete 11 157.71 110.76 268.47 24.40 (0 , 1 , 0 , 0 , 1) JGRS Block Kaniha Total 15.400 31 464.77 325.99 790.76 62.69 (0 , 3 , 1 , 0 , 4)

Block- Kishorenagar

17 L027 L027-Badahula to Dhundi New -- 1.500 3.750 Complete 6 48.88 34.29 83.17 7.14 (0 , 1 , 0 , 0 , 1) Road 18 L069 L069-Gatikrushnapur New -- 5.000 3.750 Complete 17 149.31 104.69 254.00 20.83 (0 , 1 , 0 , 0 , 1) Bagartipali Road 19 L044 L044-RD Road Phuljhari New Soil Stablizer 7.000 3.750 Complete 20 227.99 159.88 387.87 32.25 (0 , 1 , 1 , 0 , 2) JGRS Block Kishorenagar Total 13.500 43 426.18 298.86 725.04 60.22 (0 , 3 , 1 , 0 , 4)

Page 2 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Pallahara

20 L027 L027-Jokapani Duipani Road New Soil Stablizer 5.000 3.750 Complete 15 156.82 109.92 266.74 21.51 (0 , 1 , 0 , 0 , 1) JGRS 21 L108 L108-Sahargurujang to New -- 3.000 3.750 Complete 5 87.25 61.21 148.46 11.60 (0 , 1 , 0 , 0 , 1) Gurusulei Road 22 L066 L066-PWD Road to New -- 3.500 3.750 Complete 9 112.48 78.90 191.38 14.70 (0 , 1 , 0 , 0 , 1) Chhanchunia 23 L122 L122-RD Road to Udaypur New -- 1.890 3.750 Complete 5 67.38 47.45 114.83 9.67 (0 , 1 , 0 , 0 , 1)

24 L127 L127-NH 6 to Kolipal Road New -- 3.000 3.750 Complete 11 96.94 67.97 164.91 12.72 (0 , 1 , 0 , 0 , 1)

25 L068 L068-PWD Road Injidi to New -- 3.000 3.750 Complete 6 94.93 66.58 161.51 12.79 (0 , 1 , 0 , 1 , 2) Bhujapur 26 L049 L049-Kerjanga Chhak to New -- 2.000 3.750 Complete 5 59.64 41.78 101.42 7.69 (0 , 1 , 0 , 0 , 1) Kerjenga Road 27 L087 L087-RD Road to Besalia New -- 3.000 3.750 Complete 5 97.01 67.99 165.00 12.36 (0 , 1 , 0 , 0 , 1)

Block Pallahara Total 24.390 61 772.45 541.80 1,314.25 103.04 (0 , 8 , 0 , 1 , 9)

Block- Talcher

28 L033 L033-Dera Raghunathapur New -- 5.100 3.750 Complete 13 160.07 112.19 272.26 16.70 (0 , 1 , 0 , 0 , 1) Road Block Talcher Total 5.100 13 160.07 112.19 272.26 16.70 (0 , 1 , 0 , 0 , 1)

District Angul Total 98.050 263 3,122.81 2,189.90 5,312.71 413.65 (0 , 28 , 3 , 2 , 33) District- Balasore

Block- Bahanaga

29 L024 L024-PWD Road 4500 KM to New -- 2.400 3.000 Complete 8 81.26 56.93 138.19 12.05 (0 , 1 , 0 , 0 , 1) Nachinta Block Bahanaga Total 2.400 8 81.26 56.93 138.19 12.05 (0 , 1 , 0 , 0 , 1)

Page 3 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Balasore

30 L041 L041-R D Road to Nalkuli New -- 1.100 3.000 Complete 6 44.30 31.04 75.34 10.69 (0 , 1 , 0 , 0 , 1) Road Block Balasore Total 1.100 6 44.30 31.04 75.34 10.69 (0 , 1 , 0 , 0 , 1)

Block- Baliapal

31 L022 L022-Parulia to New -- 0.750 3.000 Complete 3 28.57 20.02 48.59 2.27 (0 , 1 , 0 , 0 , 1) Chhotakanpur Road Block Baliapal Total 0.750 3 28.57 20.02 48.59 2.27 (0 , 1 , 0 , 0 , 1)

District Balasore Total 4.250 17 154.13 107.99 262.12 25.01 (0 , 3 , 0 , 0 , 3)

District- Bargarh

Block- Ambabhona

32 L042 L042-RD Road to Beleigarh New -- 3.320 3.000 Complete 7 79.25 55.56 134.81 10.66 (0 , 1 , 0 , 0 , 1)

33 L043 L043-RD Road to Narangpur New -- 1.700 3.000 Complete 4 41.69 29.24 70.93 5.57 (0 , 1 , 0 , 0 , 1)

34 T01 T01-Ambabhona to Behera New -- 4.400 3.750 Complete 10 118.29 82.94 201.23 16.03 (0 , 1 , 0 , 0 , 1)

Block Ambabhona Total 9.420 21 239.23 167.74 406.97 32.26 (0 , 3 , 0 , 0 , 3)

Block- Attabira

35 L056 L056-NH6 to T Khaliapali New -- 2.630 3.000 Complete 12 64.33 45.10 109.43 6.15 (0 , 1 , 0 , 0 , 1)

36 L034 L034-Gambharipali firm to New -- 2.990 3.000 Complete 9 66.65 46.74 113.39 6.30 (0 , 1 , 0 , 0 , 1) Andharipali Block Attabira Total 5.620 21 130.98 91.84 222.82 12.45 (0 , 2 , 0 , 0 , 2)

Block- Bargarh

37 L058 L058-NH 6 at Haldipali New -- 0.800 3.000 Complete 2 15.76 11.08 26.84 2.24 (0 , 1 , 0 , 0 , 1) Chhak to Haldipali

Page 4 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

38 L040 L040-PWD Road to Bagdia New -- 1.000 3.000 Complete 3 23.62 16.60 40.22 3.22 (0 , 1 , 0 , 0 , 1)

39 L031 L031-RD Road at Jitatikira New -- 1.800 3.000 Complete 4 42.11 29.57 71.68 5.76 (0 , 1 , 0 , 0 , 1) to Malipali 40 L024 L024-R D Road to Bausen New -- 2.200 3.000 Complete 5 50.32 35.30 85.62 6.82 (0 , 1 , 0 , 0 , 1) Pali 41 L041 L041-P W D Road to New -- 1.450 3.000 Complete 3 31.83 22.34 54.17 4.35 (0 , 1 , 0 , 0 , 1) Bandanbahal Block Bargarh Total 7.250 17 163.64 114.89 278.53 22.39 (0 , 5 , 0 , 0 , 5)

Block- Barpali

42 L033 L033-NH Road to Munupali New -- 3.160 3.000 Complete 7 70.79 49.65 120.44 9.28 (0 , 1 , 0 , 0 , 1)

43 L032 L032-NH Road to Retamunda New -- 2.100 3.000 Complete 6 50.11 35.11 85.22 6.77 (0 , 1 , 0 , 0 , 1)

Block Barpali Total 5.260 13 120.90 84.76 205.66 16.05 (0 , 2 , 0 , 0 , 2)

Block- Bhatli

44 L031 L031-Haldipali Chhak to New -- 0.810 3.000 Complete 2 15.61 10.97 26.58 2.20 (0 , 1 , 0 , 0 , 1) Haldipali 45 L063 L063-PWD Road to New -- 1.600 3.000 Complete 5 43.81 30.73 74.54 5.86 (0 , 1 , 0 , 0 , 1) Nalichuan 46 L042 L042-R D raod to Bartunda New -- 0.800 3.000 Complete 2 17.19 12.05 29.24 2.35 (0 , 1 , 0 , 0 , 1)

47 L033 L033-PWD Road to Dabalang New -- 0.790 3.000 Complete 3 17.03 11.97 29.00 2.38 (0 , 1 , 0 , 0 , 1)

Block Bhatli Total 4.000 12 93.64 65.72 159.36 12.79 (0 , 4 , 0 , 0 , 4)

Block- Bheden

48 L036 L036-Canal Road Bhalupali New -- 1.850 3.000 Complete 7 45.29 31.77 77.06 4.28 (0 , 1 , 0 , 0 , 1)

49 L051 L051-Tenteltikira to New -- 2.190 3.000 Complete 8 49.56 34.78 84.34 6.65 (0 , 1 , 0 , 0 , 1) Dhubenpali 50 L055 L055-Bargarh Bheden R D New -- 1.250 3.000 Complete 7 27.35 19.20 46.55 3.81 (0 , 1 , 0 , 0 , 1) Road to Khagsipali

Page 5 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

51 L033 L033-Garvana to Kamgaon New -- 1.620 3.000 Complete 7 34.94 24.51 59.45 3.13 (0 , 1 , 0 , 0 , 1)

Block Bheden Total 6.910 29 157.14 110.26 267.40 17.87 (0 , 4 , 0 , 0 , 4)

Block- Bijepur

52 L084 L084-RD Road to K Nuapali New -- 4.500 3.000 Complete 8 102.51 71.86 174.37 13.88 (0 , 1 , 0 , 0 , 1)

Block Bijepur Total 4.500 8 102.51 71.86 174.37 13.88 (0 , 1 , 0 , 0 , 1)

Block- Gaisilet

53 L026 L026-PWD Road to Jimbahal New -- 1.500 3.000 Complete 4 34.01 23.87 57.88 4.65 (0 , 1 , 0 , 0 , 1)

54 L055 L055-R D road to New -- 1.470 3.000 Complete 3 31.36 22.01 53.37 4.28 (0 , 1 , 0 , 0 , 1) Kamlapadar 55 L037 L037-T3 RD Road to Lebdi New -- 1.620 3.000 Complete 2 31.06 21.76 52.82 4.15 (0 , 1 , 0 , 0 , 1)

Block Gaisilet Total 4.590 9 96.43 67.64 164.07 13.08 (0 , 3 , 0 , 0 , 3)

Block- Jharbandh

56 L055 L055-RD Road to Mahagaon New -- 2.250 3.000 Complete 10 59.31 41.59 100.90 8.04 (0 , 1 , 0 , 0 , 1)

Block Jharbandh Total 2.250 10 59.31 41.59 100.90 8.04 (0 , 1 , 0 , 0 , 1)

Block- Padampur

57 L071 L071-Lamberjuna to New -- 2.000 3.000 Complete 4 41.18 28.89 70.07 5.75 (0 , 1 , 0 , 0 , 1) Nagenmunda via Charpali 58 L077 L077-PR Road to Sarasmal New -- 2.300 3.000 Complete 7 59.89 41.98 101.87 8.03 (0 , 1 , 0 , 0 , 1) via Humabera 59 L025 L025-RD Road T03 to New -- 1.300 3.000 Complete 4 31.76 22.28 54.04 4.37 (0 , 1 , 0 , 0 , 1) Dhauramunda 60 L032 L032-RD Road T03 to New -- 3.300 3.000 Complete 12 82.28 57.70 139.98 11.11 (0 , 1 , 0 , 0 , 1) Pudherkhar

Page 6 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

61 L021 L021-SH3 at 30th Km to New -- 1.650 3.000 Complete 4 41.72 29.26 70.98 5.78 (0 , 1 , 0 , 0 , 1) Belmunda 62 L044 L044-RD Road to Sargipali New -- 1.440 3.000 Complete 3 32.32 22.67 54.99 4.56 (0 , 1 , 0 , 0 , 1)

63 L058 L058-PR Road to Tendapadar New -- 1.600 3.000 Complete 2 33.84 23.74 57.58 4.76 (0 , 1 , 0 , 0 , 1)

64 L043 L043-PR Road to New -- 3.350 3.000 Complete 6 75.73 53.10 128.83 10.63 (0 , 1 , 0 , 0 , 1) Brahmandihi 65 L062 L062-Gambharidihi to New -- 1.560 3.000 Complete 4 38.93 27.31 66.24 5.51 (0 , 1 , 0 , 0 , 1) Kadlimunda 66 L051 L051-PR Road to Bukajhula New -- 1.200 3.000 Complete 3 23.17 16.26 39.43 3.29 (0 , 1 , 0 , 0 , 1)

Block Padampur Total 19.700 49 460.82 323.19 784.01 63.78 (0 , 10 , 0 , 0 , 10) Block- Paikmal

67 L051 L051-SH3 at 80 Km to New -- 2.500 3.000 Complete 8 66.95 46.94 113.89 8.87 (0 , 1 , 0 , 0 , 1) Jharmunda 68 L081 L081-Bhubaneswarpur to New -- 1.620 3.000 Complete 3 39.65 27.82 67.47 5.49 (0 , 1 , 0 , 0 , 1) Brahmandihi 69 L024 L024-Lakhmara to Bamrit New -- 6.700 3.000 Complete 16 186.77 130.87 317.64 20.32 (0 , 2 , 0 , 0 , 2)

70 L025 L025-PR Road to Pujharipali New -- 1.080 3.000 Complete 2 27.46 19.25 46.71 3.29 (0 , 1 , 0 , 0 , 1)

71 L069 L069-Temrimal to New -- 4.850 3.000 Complete 8 118.50 83.06 201.56 16.10 (0 , 1 , 0 , 0 , 1) Ganjadadar Block Paikmal Total 16.750 37 439.33 307.94 747.27 54.07 (0 , 6 , 0 , 0 , 6)

Block- Sohella

72 L021 L021-Dasmile Chhak to New -- 2.040 3.000 Complete 9 41.80 29.33 71.13 5.76 (0 , 1 , 0 , 0 , 1) Damapali 73 L093 L093-NH6 to Pipilipali New -- 2.010 3.000 Complete 6 46.10 32.34 78.44 6.36 (0 , 1 , 0 , 0 , 1)

74 L052 L052-Balipata Road to New -- 0.810 3.000 Complete 3 17.29 12.16 29.45 2.40 (0 , 1 , 0 , 0 , 1) Brahmanipata

Page 7 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

75 L043 L043-RD road to New -- 1.500 3.000 Complete 5 31.16 21.89 53.05 4.41 (0 , 1 , 0 , 0 , 1) Tambimunda 76 L041 L041-Sadhupali Chhak to New -- 1.300 3.000 Complete 4 26.22 18.42 44.64 3.76 (0 , 1 , 0 , 0 , 1) Barupali Block Sohella Total 7.660 27 162.57 114.14 276.71 22.69 (0 , 5 , 0 , 0 , 5)

District Bargarh Total 93.910 253 2,226.50 1,561.57 3,788.07 289.34 (0 , 46 , 0 , 0 , 46) District- Bhadrak

Block- Basudevpur

77 L033 L033-PWD Road to Gadala New -- 2.000 3.000 Complete 5 68.43 47.94 116.37 9.32 (0 , 1 , 0 , 0 , 1)

78 L099 L099-RD Road to Antira New Cold Mix 4.200 3.000 Complete 7 149.20 104.69 253.89 20.04 (0 , 1 , 0 , 0 , 1) Technology 79 L072 L072-RD Road to Chiral New -- 2.200 3.000 Complete 3 68.66 48.10 116.76 9.41 (0 , 1 , 0 , 0 , 1)

80 L059 L059-RD Road to New Geotextile 2.500 3.000 Complete 3 83.76 58.78 142.54 11.29 (0 , 1 , 0 , 0 , 1) Jaganathprasad 81 L046 L046-RD Road to New Geotextile 4.200 3.000 Complete 7 135.16 94.84 230.00 18.34 (0 , 1 , 1 , 0 , 2) Krutibassasan Block Basudevpur Total 15.100 25 505.21 354.35 859.56 68.40 (0 , 5 , 1 , 0 , 6)

Block- Bhadrak

82 L096 L096-L95 to Nurupur New Cold Mix 2.600 3.000 Complete 7 84.83 59.52 144.35 11.32 (0 , 1 , 1 , 0 , 2) Technology Block Bhadrak Total 2.600 7 84.83 59.52 144.35 11.32 (0 , 1 , 1 , 0 , 2)

Block- Bonth

83 L076 L076-RD Road to Govindapur New Geotextile 5.500 3.000 Complete 11 177.10 124.07 301.17 24.16 (0 , 1 , 1 , 0 , 2)

Block Bonth Total 5.500 11 177.10 124.07 301.17 24.16 (0 , 1 , 1 , 0 , 2)

Page 8 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Chandbali

84 L057 L057-Deuligaon to New -- 3.200 3.000 Complete 5 99.22 69.51 168.73 13.66 (0 , 1 , 0 , 0 , 1) Chandkuda 85 L043 L043-Nalagohira to New -- 2.000 3.000 Complete 3 70.02 49.05 119.07 9.43 (0 , 1 , 0 , 0 , 1) Gouradeipur 86 L035 L035-L34 to Tentulidia New -- 2.000 3.000 Complete 4 63.26 44.31 107.57 8.50 (0 , 1 , 0 , 0 , 1)

87 L049 L049-BC Road to Chalunia New -- 2.500 3.000 Complete 6 82.93 58.09 141.02 11.30 (0 , 1 , 2 , 0 , 3)

88 L084 L084-L82 to Giripur New -- 1.600 3.000 Complete 3 52.58 36.83 89.41 7.25 (0 , 1 , 1 , 0 , 2)

89 L022 L022-Khamarsahi to Barol New Cold Mix 4.600 3.000 Complete 6 141.38 99.04 240.42 21.76 (0 , 1 , 0 , 4 , 5) Technology Block Chandbali Total 15.900 27 509.39 356.83 866.22 71.90 (0 , 6 , 3 , 4 , 13) District Bhadrak Total 39.100 70 1,276.53 894.77 2,171.30 175.78 (0 , 13 , 6 , 4 , 23) District- Bolangir

Block- Agalpur

90 L055 L055-Jemapali to Sansa road New -- 1.000 3.750 Complete 4 28.66 20.10 48.76 3.99 (0 , 0 , 1 , 0 , 1)

91 L052 L052-RD road to Jemapali New -- 1.290 3.750 Complete 3 37.17 26.06 63.23 5.14 (0 , 0 , 1 , 0 , 1) road 92 L048 L048-RD road to New Terrazyme 1.400 3.750 Complete 5 42.24 29.60 71.84 5.92 (0 , 0 , 1 , 0 , 1) Pathermunda road 93 T05 T05-Nagaon to Agalpur road New -- 1.420 3.750 Complete 6 40.88 28.65 69.53 3.58 (0 , 0 , 1 , 0 , 1)

94 L081 L081-RD road to Latsar road New -- 1.250 3.750 Complete 4 35.41 24.82 60.23 4.89 (0 , 0 , 1 , 0 , 1)

95 L072 L072-Uperhabahal to New Terrazyme 1.550 3.750 Complete 4 44.08 30.89 74.97 6.15 (0 , 0 , 1 , 0 , 1) Kudadera road 96 T05 T05-Nagaon to Agalpur road New Terrazyme 1.420 3.750 Complete 6 41.10 28.79 69.89 5.68 (0 , 0 , 1 , 0 , 1)

Block Agalpur Total 9.330 32 269.54 188.91 458.45 35.35 (0 , 0 , 7 , 0 , 7)

Page 9 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Bangomunda

97 L036 L036-RD road to Jamtara New -- 3.500 3.750 Complete 5 97.53 68.32 165.85 14.02 (0 , 0 , 1 , 0 , 1) road 98 L080 L080-NH 217 to Sanmula New -- 1.000 3.750 Complete 4 28.73 20.16 48.89 3.95 (1 , 0 , 0 , 0 , 1) road 99 L079 L079-Sandhisar to Asurla New -- 2.500 3.750 Complete 2 57.47 40.33 97.80 8.46 (0 , 0 , 1 , 0 , 1) Chhok road 100 L058 L058-Bhusulagarh to New -- 2.000 3.750 Complete 5 48.82 34.20 83.02 7.91 (0 , 0 , 1 , 0 , 1) Paruabhadi road 101 L039 L039-Beherabhata to New -- 2.400 3.750 Complete 6 59.17 41.44 100.61 8.99 (0 , 0 , 1 , 0 , 1) Porapali road 102 L037 L037-Phulbandha to New -- 3.400 3.750 Complete 9 91.58 64.15 155.73 13.03 (0 , 0 , 1 , 0 , 1) Malkasara road 103 L028 L028-SH 42 to Panderipani New -- 2.300 3.750 Complete 5 54.08 37.95 92.03 8.00 (0 , 0 , 1 , 0 , 1) road Block Bangomunda Total 17.100 36 437.38 306.55 743.93 64.36 (1 , 0 , 6 , 0 , 7)

Block- Belpara

104 L074 L074-Sarmuhan to New -- 1.950 3.750 Complete 5 52.46 36.88 89.34 8.34 (0 , 0 , 1 , 0 , 1) Ainlabhata 105 L054 L054-RD road to Sargiguda New Cold Mix 2.100 3.750 Complete 5 57.62 40.45 98.07 9.03 (0 , 0 , 1 , 0 , 1) road Technology 106 L068 L068-RD road to Bhatapada New Cold Mix 4.230 3.750 Complete 10 117.62 82.52 200.14 14.95 (0 , 0 , 1 , 0 , 1) road Technology 107 L048 L048-RD road to Hatkat road New Cold Mix 1.500 3.750 Complete 3 40.61 28.52 69.13 6.29 (0 , 0 , 1 , 0 , 1) Technology 108 L058 L058-RD road to New -- 2.500 3.750 Complete 6 65.32 45.87 111.19 10.15 (0 , 0 , 1 , 0 , 1) Bangamundabahal road 109 L064 L064-Suanbahal to New Terrazyme 2.900 3.750 Complete 4 78.13 54.75 132.88 12.22 (0 , 0 , 1 , 0 , 1) Muribahal road 110 L079 L079-Banmal to Malpada New -- 3.000 3.750 Complete 8 80.22 56.36 136.58 12.77 (0 , 0 , 1 , 0 , 1)

Page 10 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

111 L110 L110-RD road to Bodamunda New -- 2.700 3.750 Complete 8 73.81 51.81 125.62 11.37 (0 , 0 , 1 , 0 , 1)

112 L098 L098-Ghagara to Jamjuri New -- 8.000 3.750 Complete 17 189.31 132.60 321.91 32.66 (0 , 0 , 1 , 0 , 1)

113 L101 L101-PWD road to New Terrazyme 2.400 3.750 Complete 6 63.37 44.41 107.78 10.37 (0 , 0 , 1 , 0 , 1) Kandhenjhula 114 L099 L099-Jamjuri to Pandkimal New -- 2.590 3.750 Complete 9 77.93 54.60 132.53 11.13 (0 , 0 , 1 , 0 , 1)

115 L029 L029-Salandi to Bhutumpada New -- 3.000 3.750 Complete 6 76.85 53.99 130.84 12.82 (0 , 0 , 1 , 0 , 1) road Block Belpara Total 36.870 87 973.25 682.76 1,656.01 152.10 (0 , 0 , 12 , 0 , 12) Block- Bolangir

116 L061 L061-PWD road to janakpur New Terrazyme 1.350 3.750 Complete 3 38.28 26.83 65.11 5.32 (0 , 0 , 1 , 0 , 1) road 117 L053 L053-RD road to Luchkibahal New -- 1.150 3.750 Complete 3 32.49 22.77 55.26 4.53 (0 , 0 , 1 , 0 , 1) road 118 L064 L064-SH 42 to Barpitha road New Terrazyme 2.450 3.750 Complete 9 71.01 49.77 120.78 9.77 (0 , 1 , 1 , 0 , 2)

119 L081 L081-SH 42 to Haripali road New -- 2.500 3.750 Complete 8 75.76 53.11 128.87 10.50 (0 , 1 , 0 , 0 , 1)

120 L026 L026-NH 201 to Bijilmunda New -- 4.610 3.750 Complete 16 140.66 98.57 239.23 19.39 (0 , 1 , 0 , 1 , 2) road 121 L052 L052-PWD road to Phatkara New -- 1.390 3.750 Complete 3 39.85 27.93 67.78 5.46 (0 , 0 , 1 , 0 , 1) road 122 L055 L055-Sahajbahal Chhok to New Terrazyme 3.120 3.750 Complete 9 88.86 62.27 151.13 12.21 (0 , 0 , 1 , 0 , 1) Jhariabahal road 123 L097 L097-Khaliapali to New Terrazyme 4.000 3.750 Complete 12 110.83 77.66 188.49 15.38 (0 , 0 , 1 , 0 , 1) Dhamnasar road Block Bolangir Total 20.570 63 597.74 418.91 1,016.65 82.56 (0 , 3 , 6 , 1 , 10) Block- Deogaon

124 L040 L040-Badadunguripali to New -- 0.600 3.750 Complete 2 16.10 11.30 27.40 2.28 (0 , 0 , 1 , 0 , 1) Budelguma road

Page 11 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

125 L087 L087-Upparjhar to Rengali New Terrazyme 3.150 3.750 Complete 7 89.17 62.49 151.66 12.33 (0 , 0 , 1 , 0 , 1) road 126 L026 L026-PWD road to New -- 2.000 3.750 Complete 4 54.59 38.26 92.85 9.47 (0 , 0 , 1 , 0 , 1) Barahkana road Block Deogaon Total 5.750 13 159.86 112.05 271.91 24.08 (0 , 0 , 3 , 0 , 3)

Block- Gudvella

127 L054 L054-PWD road to New Terrazyme 1.500 3.750 Complete 3 41.89 29.37 71.26 5.81 (0 , 0 , 1 , 0 , 1) Dangapathar road 128 L062 L062-Chantipadar Sasapali New Terrazyme 2.050 3.750 Complete 4 54.64 38.30 92.94 7.60 (0 , 0 , 1 , 0 , 1) road 129 L025 L025-Ghuna to Bakbahal New Cold Mix 9.350 3.750 Complete 25 281.57 197.59 479.16 38.27 (0 , 0 , 1 , 0 , 1) road Technology 130 L033 L033-Jamut to Demahan New -- 0.800 3.750 Complete 2 23.03 16.15 39.18 2.36 (0 , 0 , 1 , 0 , 1) road 131 L021 L021-Jamut to New Terrazyme 4.100 3.750 Complete 12 122.00 85.47 207.47 17.57 (0 , 0 , 1 , 0 , 1) Gambhariguda road 132 L030 L030-PS road to New -- 1.550 3.750 Complete 2 39.76 27.87 67.63 5.50 (0 , 0 , 1 , 0 , 1) Kumbharpadar road 133 L022 L022-PS road to Lartara New -- 1.830 3.750 Complete 4 48.73 34.16 82.89 6.73 (0 , 0 , 1 , 0 , 1) road 134 L033 L033-Jamut to Demahan New -- 0.630 3.750 Complete 1 16.89 11.85 28.74 3.21 (0 , 0 , 1 , 0 , 1) road 135 L032 L032-Jogimara to Sandhisara New -- 3.200 3.750 Complete 5 95.09 66.64 161.73 13.10 (0 , 0 , 1 , 0 , 1) road 136 L040 L040-PS road to Kurebhana New -- 1.100 3.750 Complete 3 31.29 21.94 53.23 4.33 (0 , 0 , 1 , 0 , 1) road Block Gudvella Total 26.110 61 754.89 529.34 1,284.23 104.48 (0 , 0 , 10 , 0 , 10) Block- Khaprakhol

137 L072 L072-RD road to Jaliabahal New Cold Mix 2.300 3.750 Complete 7 65.56 46.01 111.57 8.58 (0 , 0 , 1 , 0 , 1) road Technology

Page 12 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

138 L036 L036-PS road to Mahurundi New -- 1.510 3.750 Complete 4 36.46 25.58 62.04 5.22 (0 , 0 , 1 , 0 , 1) road 139 L052 L052-RD road to Chormunda New Terrazyme 3.300 3.750 Complete 9 86.84 60.83 147.67 12.11 (0 , 0 , 1 , 0 , 1) road 140 L022 L022-Luhasingha to Luhuret New -- 7.000 3.750 Complete 15 165.47 116.03 281.50 24.78 (0 , 0 , 1 , 0 , 1) road 141 L058 L058-RD road to Khuripani New Terrazyme 3.500 3.750 Complete 14 100.39 70.33 170.72 14.53 (0 , 0 , 1 , 1 , 2) road Block Khaprakhol Total 17.610 49 454.72 318.78 773.50 65.22 (0 , 0 , 5 , 1 , 6)

Block- Loisinga

142 L057 L057-Banchhorpali to New -- 0.800 3.750 Complete 2 22.03 15.44 37.47 3.07 (0 , 0 , 1 , 0 , 1) Antapali road 143 L064 L064-Jamjuri to New -- 0.750 3.750 Complete 2 21.54 15.11 36.65 3.01 (0 , 0 , 1 , 0 , 1) Sanjhankarpali road 144 L079 L079-Kandajori to New Terrazyme 2.100 3.750 Complete 7 59.62 41.78 101.40 7.95 (0 , 0 , 1 , 0 , 1) Tentulikhunti road 145 L044 L044-Singhanimunda to New -- 0.750 3.750 Complete 2 20.72 14.53 35.25 2.92 (0 , 0 , 1 , 0 , 1) Babja road 146 L048 L048-Ratakhandi to New Cold Mix 6.970 3.750 Complete 20 192.02 134.74 326.76 25.77 (0 , 0 , 1 , 0 , 1) Tablabanji road Technology 147 L062 L062-Rengali to Podamund New Cold Mix 3.500 3.750 Complete 11 101.46 71.07 172.53 14.53 (0 , 0 , 1 , 0 , 1) road Technology Block Loisinga Total 14.870 44 417.39 292.67 710.06 57.25 (0 , 0 , 6 , 0 , 6)

Block- Muribahal

148 L059 L059-Rehenbhata to New -- 2.100 3.750 Complete 6 48.12 33.71 81.83 6.87 (0 , 0 , 1 , 0 , 1) Khairmal road Block Muribahal Total 2.100 6 48.12 33.71 81.83 6.87 (0 , 0 , 1 , 0 , 1)

Block- Patnagarh

149 L090 L090-RD road to New -- 1.205 3.750 Complete 3 35.50 24.86 60.36 4.79 (0 , 0 , 1 , 0 , 1) Masinachapper road

Page 13 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

150 L102 L102-PWD road to Gadiajore New -- 2.000 3.750 Complete 3 58.12 40.76 98.88 8.35 (0 , 0 , 1 , 0 , 1)

151 L104 L104-PWD road to Ghumpali New -- 2.000 3.750 Complete 6 54.26 38.06 92.32 8.10 (0 , 0 , 1 , 0 , 1)

152 L051 L051-Khursel to Debhuin New -- 4.000 3.750 Complete 16 103.16 72.35 175.51 14.06 (0 , 0 , 1 , 0 , 1) road 153 L056 L056-PWD road to Khuripani New -- 5.640 3.750 Complete 17 153.02 107.20 260.22 21.43 (0 , 0 , 1 , 0 , 1) road 154 L055 L055-PWD road to New Cold Mix 7.010 3.750 Complete 14 125.99 88.26 214.25 27.89 (0 , 0 , 1 , 0 , 1) Chandanjuri road Technology 155 L065 L065-T2 to Pandesara road New Cold Mix 6.000 3.750 Complete 3 146.99 103.14 250.13 21.65 (0 , 0 , 1 , 0 , 1) Technology 156 L066 L066-RD road to Bhatpali New Terrazyme 3.000 3.750 Complete 8 89.74 62.87 152.61 12.81 (0 , 0 , 1 , 0 , 1) road 157 L022 L022-PWD road to New Cold Mix 3.000 3.750 Complete 6 77.55 54.33 131.88 11.67 (0 , 0 , 1 , 0 , 1) Pandripani road Technology 158 L026 L026-PWD road to New -- 2.000 3.750 Complete 4 57.50 40.34 97.84 8.73 (0 , 0 , 1 , 0 , 1) Burdabahal road 159 L047 L047-L42 to Maral road New -- 1.500 3.750 Complete 3 37.37 26.23 63.60 5.55 (0 , 0 , 1 , 0 , 1)

160 L132 L132-RD road to Kusabahali New -- 5.000 3.750 Complete 12 133.62 93.70 227.32 19.46 (0 , 0 , 1 , 0 , 1)

161 L072 L072-RD road to Bagbahali New -- 4.000 3.750 Complete 9 113.90 79.87 193.77 16.78 (0 , 0 , 1 , 0 , 1) road 162 L046 L046-L42 to Goilpita road New -- 2.500 3.750 Complete 8 58.37 40.95 99.32 8.59 (0 , 0 , 1 , 0 , 1)

163 L130 L130-Pandripani to New -- 3.000 3.750 Complete 6 73.28 51.40 124.68 10.92 (0 , 0 , 1 , 0 , 1) Phulmunda 164 L037 L037-Kutmunda to New -- 2.010 3.750 Complete 7 59.74 41.85 101.59 8.46 (0 , 0 , 1 , 0 , 1) Rugdimunda road Block Patnagarh Total 53.865 125 1,378.11 966.17 2,344.28 209.24 (0 , 0 , 16 , 0 , 16) Block- Puintala

165 L112 L112-Gaintala to Pipalbahali New -- 2.500 3.750 Complete 9 70.52 49.40 119.92 9.95 (0 , 1 , 0 , 0 , 1) road

Page 14 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

166 L096 L096-T 05 to Khairmal road New -- 1.280 3.750 Complete 3 36.33 25.48 61.81 5.03 (0 , 0 , 1 , 0 , 1)

167 L093 L093-Chhatapipal RD road New Terrazyme 2.470 3.750 Complete 8 63.94 44.82 108.76 9.01 (0 , 0 , 1 , 0 , 1) to Amthimunda road 168 L057 L057-Bhaler Khaliapali to New -- 4.000 3.750 Complete 14 105.56 73.97 179.53 14.58 (0 , 0 , 1 , 0 , 1) Mahakurpali road 169 L082 L082-Kharjura chhok to New -- 0.900 3.750 Complete 3 23.75 16.64 40.39 3.31 (0 , 0 , 1 , 0 , 1) Raghabpali road 170 L079 L079-SH14 to Mangalapali New -- 1.450 3.750 Complete 5 41.14 28.84 69.98 5.70 (0 , 0 , 1 , 0 , 1) road 171 L084 L084-SH 14 to Kurlupali road New Terrazyme 2.400 3.750 Complete 6 71.33 50.01 121.34 9.78 (0 , 0 , 1 , 0 , 1)

172 L070 L070-MDR to Sirabahal road New -- 2.640 3.750 Complete 7 69.30 48.57 117.87 9.56 (0 , 0 , 1 , 0 , 1)

173 L062 L062-Kankaria chhak to New Terrazyme 1.200 3.750 Complete 5 34.06 23.88 57.94 4.71 (0 , 0 , 1 , 0 , 1) Dumerpali road 174 L073 L073-Tandamunda to New -- 1.900 3.750 Complete 4 54.83 38.43 93.26 7.56 (0 , 0 , 1 , 0 , 1) Kalijharan road 175 L042 L042-BK road to Ainlapali New Terrazyme 1.450 3.750 Complete 4 41.48 29.08 70.56 5.78 (0 , 0 , 1 , 0 , 1) road 176 L117 L117-Lukapada RD road to New -- 0.950 3.750 Complete 2 27.75 19.46 47.21 3.85 (0 , 0 , 1 , 0 , 1) Rugudipali road Block Puintala Total 23.140 70 639.99 448.58 1,088.57 88.82 (0 , 1 , 11 , 0 , 12) Block- Saintala

177 L079 L079-Deng Tikrapara PWD New Terrazyme 8.000 3.750 Complete 26 225.00 157.66 382.66 30.98 (0 , 0 , 1 , 0 , 1) road to Saledamak road 178 L071 L071-Deng Tikrapara PWD New Terrazyme 2.000 3.750 Complete 6 51.21 35.89 87.10 7.48 (0 , 0 , 1 , 0 , 1) road to Khumbhikela road 179 L041 L041-NH 201 Kutramunda RD New -- 2.300 3.750 Complete 6 66.26 46.47 112.73 9.24 (0 , 0 , 1 , 0 , 1) road to Mayamunda road 180 L039 L039-NH201 Kutramunda RD New -- 1.800 3.750 Complete 5 51.43 36.06 87.49 7.18 (0 , 0 , 1 , 0 , 1) road to Liakani road

Page 15 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

181 L065 L065-Saintala Titilagarh New -- 1.100 3.750 Complete 3 30.38 21.32 51.70 4.30 (0 , 0 , 1 , 0 , 1) road to Beniabandha road 182 L029 L029-NH201 to Bagjore road New -- 2.000 3.750 Complete 6 56.07 39.32 95.39 7.85 (0 , 0 , 1 , 0 , 1)

183 L032 L032-NH201 to Runimahul New -- 3.000 3.750 Complete 11 83.68 58.66 142.34 11.57 (0 , 0 , 1 , 0 , 1) road Block Saintala Total 20.200 63 564.03 395.38 959.41 78.60 (0 , 0 , 7 , 0 , 7)

Block- Titilagarh

184 L057 L057-Desil Luthorbandha RD New -- 1.200 3.750 Complete 1 25.54 17.93 43.47 3.81 (0 , 0 , 1 , 0 , 1) road to Pudapadar road Block Titilagarh Total 1.200 1 25.54 17.93 43.47 3.81 (0 , 0 , 1 , 0 , 1)

Block- Tureikela

185 L041 L041-Khagsa to Salepada New Terrazyme 2.000 3.750 Complete 5 58.49 40.97 99.46 8.46 (0 , 0 , 1 , 0 , 1) road 186 L060 L060-PWD road to Jamki New -- 3.600 3.750 Complete 6 93.55 65.53 159.08 14.25 (0 , 0 , 1 , 0 , 1) road Block Tureikela Total 5.600 11 152.04 106.50 258.54 22.71 (0 , 0 , 2 , 0 , 2)

District Bolangir Total 254.315 661 6,872.60 4,818.24 11,690.84 995.45 (1 , 4 , 93 , 2 , 100) District- Boudh

Block- Boudh

187 T05 T05-Baghapada Sagada RD New Cold Mix 5.500 3.750 Complete 17 164.73 115.59 280.32 22.12 (0 , 1 , 0 , 0 , 1) road to Dimirikhole road Technology 188 L197 L197-Telibandha New Cold Mix 5.090 3.750 Complete 18 149.78 105.11 254.89 20.03 (0 , 1 , 0 , 0 , 1) Barapuduga RD road to Technology Nuapada 189 L038 L038-PWD road ODR to New -- 3.100 3.750 Complete 11 90.07 63.10 153.17 12.27 (0 , 1 , 0 , 0 , 1) Iiasinga road Block Boudh Total 13.690 46 404.58 283.80 688.38 54.42 (0 , 3 , 0 , 0 , 3)

Page 16 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Harbhanga

190 L067 L067-Purunkatak to New -- 1.950 3.750 Complete 7 56.38 39.49 95.87 7.68 (0 , 1 , 0 , 0 , 1) Kamalpur 191 L084 L084-NH to Balarampur New Cold Mix 3.900 3.750 Complete 13 116.10 81.47 197.57 15.56 (0 , 1 , 0 , 0 , 1) Technology 192 L076 L076-Lunibahal Talapadar New -- 2.400 3.750 Complete 10 69.37 48.59 117.96 9.46 (0 , 1 , 0 , 0 , 1) road Block Harbhanga Total 8.250 30 241.85 169.55 411.40 32.70 (0 , 3 , 0 , 0 , 3)

Block- Kantamal

193 L137 L137-SH 41 to Fagunamal New -- 5.550 3.750 Complete 15 149.94 105.03 254.97 20.45 (0 , 1 , 0 , 0 , 1)

194 L129 L129-SH 41 to Jhinkarpali New -- 3.900 3.750 Complete 14 114.31 80.08 194.39 15.54 (0 , 1 , 0 , 0 , 1)

Block Kantamal Total 9.450 29 264.25 185.11 449.36 35.99 (0 , 2 , 0 , 0 , 2)

District Boudh Total 31.390 105 910.68 638.46 1,549.14 123.11 (0 , 8 , 0 , 0 , 8)

District- Cuttack

Block- Nischintakoili

195 L033 L033-Oriti toJagannathpur New -- 3.050 3.750 Complete 13 107.45 75.28 182.73 14.25 (0 , 1 , 0 , 0 , 1)

Block Nischintakoili Total 3.050 13 107.45 75.28 182.73 14.25 (0 , 1 , 0 , 0 , 1)

District Cuttack Total 3.050 13 107.45 75.28 182.73 14.25 (0 , 1 , 0 , 0 , 1)

District- Deogarh

Block- Barkote

196 L041 L041-NH 6 Padianali New -- 2.100 3.000 Complete 8 57.42 40.34 97.76 6.75 (0 , 0 , 1 , 0 , 1)

197 L041 L041-NH 6 Padianali New -- 1.900 3.000 Complete 4 47.37 33.35 80.72 5.95 (0 , 0 , 1 , 0 , 1)

Block Barkote Total 4.000 12 104.79 73.69 178.48 12.70 (0 , 0 , 2 , 0 , 2)

Page 17 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Reamal

198 L032 L032-NH 200 to New -- 4.300 3.750 Complete 9 119.83 84.17 204.00 16.60 (0 , 0 , 1 , 0 , 1) Dudukajharan 199 L053 L053-NH 200 to Sadhupali New -- 1.700 3.000 Complete 6 42.87 30.24 73.11 5.35 (0 , 0 , 1 , 0 , 1)

200 L053 L053-NH 200 to Sadhupali New Waste Plastics 7.000 3.750 Complete 24 204.91 143.53 348.44 22.12 (0 , 1 , 1 , 0 , 2)

Block Reamal Total 13.000 39 367.61 257.94 625.55 44.07 (0 , 1 , 3 , 0 , 4)

Block- Tileibani

201 L049 L049-Hadamunda to New -- 4.500 3.750 Complete 15 137.96 96.65 234.61 14.34 (0 , 0 , 1 , 0 , 1) Jhaliamara Block Tileibani Total 4.500 15 137.96 96.65 234.61 14.34 (0 , 0 , 1 , 0 , 1)

District Deogarh Total 21.500 66 610.36 428.28 1,038.64 71.11 (0 , 1 , 6 , 0 , 7)

District- Dhenkanal

Block- Gondia

202 L035 L035-T2 MDR Gondia to New -- 3.410 3.750 Complete 8 106.49 74.61 181.10 14.85 (0 , 2 , 0 , 1 , 3) Chhatakhamba Block Gondia Total 3.410 8 106.49 74.61 181.10 14.85 (0 , 2 , 0 , 1 , 3)

District Dhenkanal Total 3.410 8 106.49 74.61 181.10 14.85 (0 , 2 , 0 , 1 , 3)

District- Gajapati

Block- Gumma

203 L081 L081-Talajingi to New Cold Mix 2.400 3.750 Complete 7 84.67 59.41 144.08 12.18 (0 , 0 , 1 , 0 , 1) Talakhilimunda Technology Block Gumma Total 2.400 7 84.67 59.41 144.08 12.18 (0 , 0 , 1 , 0 , 1)

Page 18 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Kasinagar

204 L036 L036-PWD road to New -- 2.000 3.750 Complete 6 65.52 45.98 111.50 9.69 (0 , 0 , 1 , 0 , 1) Bhenkatapur 205 L027 L027-PWD road to New -- 2.500 3.750 Complete 9 79.59 55.75 135.34 11.03 (0 , 0 , 1 , 0 , 1) Sauraguda Block Kasinagar Total 4.500 15 145.11 101.73 246.84 20.72 (0 , 0 , 2 , 0 , 2)

Block- Mohana

206 L102 L102-RD road to Labru New -- 10.000 3.750 Complete 29 342.35 239.83 582.18 51.98 (0 , 0 , 1 , 2 , 3)

207 L062 L062-RD road toBorn New -- 11.200 3.750 Complete 23 401.29 281.29 682.58 52.96 (0 , 0 , 1 , 2 , 3)

208 L121 L121-Rechaguda to Palada New -- 1.500 3.750 Complete 4 48.96 34.33 83.29 7.11 (0 , 0 , 2 , 0 , 2)

Block Mohana Total 22.700 56 792.60 555.45 1,348.05 112.05 (0 , 0 , 4 , 4 , 8)

Block- Paralakhemundi

209 L051 L051-PWD road to New -- 0.850 3.750 Complete 4 26.17 18.36 44.53 4.13 (0 , 0 , 1 , 0 , 1) Chandankhola Block Paralakhemundi Total 0.850 4 26.17 18.36 44.53 4.13 (0 , 0 , 1 , 0 , 1)

Block- R Udayagiri

210 T01 T01-Mahendragada Sialilati New Cold Mix 16.000 3.750 Complete 27 477.15 334.83 811.98 71.02 (0 , 0 , 2 , 0 , 2) Technology 211 L048 L048-PWD road to Bhaliasahi New Cold Mix 3.000 3.750 Complete 6 100.54 70.54 171.08 14.26 (0 , 0 , 1 , 1 , 2) Technology Block R Udayagiri Total 19.000 33 577.69 405.37 983.06 85.28 (0 , 0 , 3 , 1 , 4)

District Gajapati Total 49.450 115 1,626.24 1,140.32 2,766.56 234.36 (0 , 0 , 11 , 5 , 16) District- Ganjam

Page 19 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Bhanjanagar

212 L036 L036-RD road to Sunapalli New -- 1.500 3.750 Complete 4 48.86 34.25 83.11 6.52 (0 , 0 , 1 , 0 , 1)

Block Bhanjanagar Total 1.500 4 48.86 34.25 83.11 6.52 (0 , 0 , 1 , 0 , 1)

Block- Jaganathprasad

213 L081 L081-RD road to Arakhapalli New -- 2.200 3.750 Complete 9 73.01 51.20 124.21 10.12 (0 , 0 , 1 , 0 , 1) Road 214 L091 L091-PWD road to Siuli Via New -- 10.320 3.750 Complete 24 348.87 244.38 593.25 58.43 (0 , 0 , 1 , 0 , 1) Kadaliguda Road Block Jaganathprasad Total 12.520 33 421.88 295.58 717.46 68.55 (0 , 0 , 2 , 0 , 2)

Block- Sorada

215 L056 L056-RD road to New Cold Mix 10.500 3.750 Complete 25 331.58 232.68 564.26 44.64 (0 , 0 , 1 , 0 , 1) Baruapradhani Road Technology
Roller Compacted Concrete Pavement Block Sorada Total 10.500 25 331.58 232.68 564.26 44.64 (0 , 0 , 1 , 0 , 1)

District Ganjam Total 24.520 62 802.32 562.51 1,364.83 119.71 (0 , 0 , 4 , 0 , 4)

District- Jajpur

Block- Badachana

216 L067 L067-Pattamundai canal New -- 1.500 3.750 Complete 4 47.31 33.14 80.45 6.89 (0 , 1 , 0 , 0 , 1) embankment to Ambasouri (VR66)

Page 20 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

217 L067 L067-Pattamundai Canal New Cold Mix 2.000 3.750 Complete 6 64.66 45.30 109.96 8.86 (1 , 0 , 0 , 0 , 1) embakment to Dekudi Technology (VR67) Block Badachana Total 3.500 10 111.97 78.44 190.41 15.75 (1 , 1 , 0 , 0 , 2)

Block- Bari

218 L051 L051-MDR 14 to New Roller 7.000 3.000 Complete 7 215.98 151.29 367.27 27.25 (1 , 1 , 1 , 0 , 3) Sarangadeipur Compacted Concrete Pavement 219 L055 L055-MDR-14 to Nuagaon New Roller 1.300 3.000 Complete 3 37.52 26.29 63.81 5.10 (0 , 0 , 1 , 0 , 1) (VR55) Compacted Concrete Pavement 220 L023 L023-MDR 14 to Ratalanga New Roller 2.830 3.000 Complete 5 89.51 62.70 152.21 11.15 (1 , 1 , 1 , 0 , 3) Compacted Concrete Pavement Block Bari Total 11.130 15 343.01 240.28 583.29 43.50 (2 , 2 , 3 , 0 , 7)

Block- Binjharpur

221 L065 L065-R&B road to New Roller 4.900 3.000 Complete 10 160.45 112.40 272.85 19.08 (0 , 0 , 1 , 0 , 1) Mangarajpur (VR65) Compacted Concrete Pavement 222 L066 L066-RD road to Baitangi New Roller 4.410 3.000 Complete 13 149.19 104.51 253.70 18.67 (0 , 0 , 1 , 0 , 1) (VR66) Compacted Concrete Pavement

Page 21 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

223 L062 L062-R&B road to New Roller 3.110 3.000 Complete 5 96.22 67.41 163.63 12.55 (0 , 0 , 1 , 0 , 1) Harasingha (VR62) Compacted Concrete Pavement Block Binjharpur Total 12.420 28 405.86 284.32 690.18 50.30 (0 , 0 , 3 , 0 , 3)

Block- Dasrathpur

224 L074 L074-RD road to Bijulipada New Roller 3.000 3.000 Complete 5 101.97 71.43 173.40 12.87 (0 , 1 , 0 , 0 , 1) (VR74) Compacted Concrete Pavement Block Dasrathpur Total 3.000 5 101.97 71.43 173.40 12.87 (0 , 1 , 0 , 0 , 1)

Block- Dharmasala

225 L110 L110-Bichhakhandi to Kateni New -- 2.000 3.750 Complete 5 60.65 42.49 103.14 8.31 (0 , 0 , 1 , 0 , 1) (VR110) 226 L105 L105-R&D road to New -- 3.500 3.750 Complete 4 105.35 73.81 179.16 14.45 (0 , 0 , 1 , 0 , 1) Bramhanada (VR105) 227 L103 L103-RD road to Kanpur New Cold Mix 2.500 3.750 Complete 6 76.88 53.94 130.82 9.43 (0 , 0 , 1 , 0 , 1) (VR103) Technology 228 L102 L102-Santibazar chhaka to New Cold Mix 5.000 3.750 Complete 4 159.40 111.85 271.25 21.55 (0 , 0 , 1 , 0 , 1) Abdan (VR102) Technology 229 L104 L104-PMGSY road to New -- 2.700 3.750 Complete 3 74.57 52.23 126.80 10.46 (0 , 0 , 1 , 0 , 1) Jalsukha (VR104) 230 L099 L099-R&D road to Nalakul New -- 2.000 3.750 Complete 3 63.01 44.14 107.15 8.48 (0 , 0 , 1 , 0 , 1) (VR99) 231 L100 L100-Areikana to New -- 2.700 3.750 Complete 6 81.53 57.13 138.66 10.92 (0 , 0 , 1 , 0 , 1) Sanachandanpur (VR100) 232 L107 L107-NH-200 to Balangia New Cold Mix 3.200 3.750 Complete 6 97.16 68.19 165.35 12.64 (0 , 0 , 1 , 0 , 1) (VR107) Technology 233 L098 L098-Bhagabanpur R&D rod New -- 2.250 3.750 Complete 5 67.18 47.06 114.24 8.57 (0 , 0 , 1 , 0 , 1) to Budhalinga (VR98)

Page 22 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

234 L108 L108-Mahulakholi to Nuasahi New -- 3.600 3.750 Complete 6 102.53 71.83 174.36 13.66 (0 , 0 , 1 , 0 , 1) (VR108) 235 L109 L109-Muraripur RD road to New -- 3.500 3.750 Complete 5 86.02 60.26 146.28 11.94 (0 , 0 , 1 , 0 , 1) Gambhari (VR109) 236 L101 L101-Badakaema to Serapur New -- 2.500 3.750 Complete 4 81.44 57.05 138.49 10.91 (0 , 1 , 0 , 0 , 1) (VR101) 237 L106 L106-Raipada to Kothadiha New -- 3.000 3.750 Complete 4 98.29 68.85 167.14 14.42 (0 , 1 , 0 , 0 , 1) (VR106) Block Dharmasala Total 38.450 61 1,154.01 808.83 1,962.84 155.74 (0 , 2 , 11 , 0 , 13) Block- Rasulpur

238 L021 L021-Barabati to Sabarasahi New -- 1.800 3.750 Complete 4 48.83 34.21 83.04 6.78 (0 , 0 , 1 , 0 , 1) (VR58) 239 L058 L058-Kharasuan River New -- 1.500 3.750 Complete 5 50.36 35.28 85.64 6.88 (0 , 0 , 1 , 0 , 1) Embankment to Khanabadi (VR59) 240 L057 L057-Nathuabara to New Cold Mix 5.000 3.750 Complete 14 155.59 109.18 264.77 18.91 (0 , 1 , 0 , 0 , 1) Mangalashi (VR104) Technology 241 L021 L021-Tikarapada to New -- 2.200 3.750 Complete 6 68.83 48.21 117.04 10.71 (0 , 0 , 1 , 0 , 1) Podajagulia (VR62) 242 L060 L060-Madhuban Palasahi New -- 8.000 3.750 Complete 14 252.92 177.24 430.16 33.83 (0 , 1 , 0 , 0 , 1) Chhaka to Kainchisasana (VR61) 243 L085 L085-RandB road to New -- 1.000 3.750 Complete 3 34.07 23.86 57.93 4.64 (0 , 0 , 1 , 0 , 1) Gaudasahi (VR60) Block Rasulpur Total 19.500 46 610.60 427.98 1,038.58 81.75 (0 , 2 , 4 , 0 , 6)

District Jajpur Total 88.000 165 2,727.42 1,911.28 4,638.70 359.91 (3 , 8 , 21 , 0 , 32) District- Jharsuguda

Page 23 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Kolabira

244 L059 L059-Singhbahal to New -- 0.800 3.750 Complete 4 21.61 15.17 36.78 3.05 (0 , 1 , 0 , 0 , 1) Rengalpali 245 L053 L053-Parmanpur to New -- 1.900 3.750 Complete 5 41.73 29.28 71.01 4.75 (0 , 1 , 0 , 0 , 1) Chandradihi road 246 L052 L052-NH200 to Kaputikira New -- 2.400 3.750 Complete 5 59.59 41.79 101.38 7.12 (0 , 1 , 0 , 0 , 1) road 247 L036 L036-Samasingha to New -- 1.300 3.000 Complete 4 30.98 21.74 52.72 4.56 (0 , 1 , 1 , 0 , 2) Bhogipali Block Kolabira Total 6.400 18 153.91 107.98 261.89 19.48 (0 , 4 , 1 , 0 , 5)

Block- Laikera

248 L021 L021-RD Road to Kankumar New Cold Mix 7.290 3.750 Complete 19 212.15 148.62 360.77 29.29 (0 , 1 , 0 , 0 , 1) Road Technology 249 L070 L070-Dumerdihi to New Cold Mix 2.400 3.750 Complete 6 72.05 50.57 122.62 9.59 (0 , 1 , 0 , 0 , 1) Naikbandhpali Technology Block Laikera Total 9.690 25 284.20 199.19 483.39 38.88 (0 , 2 , 0 , 0 , 2)

Block- Lakhanpur

250 L053 L053-Remenda to Bhutia New Cold Mix 1.100 3.750 Complete 4 34.13 23.94 58.07 3.80 (0 , 1 , 0 , 0 , 1) Road Technology 251 L083 L083-RD Road to Gudum New Cold Mix 2.100 3.750 Complete 6 61.05 42.78 103.83 7.89 (0 , 1 , 0 , 0 , 1) Technology Block Lakhanpur Total 3.200 10 95.18 66.72 161.90 11.69 (0 , 2 , 0 , 0 , 2)

District Jharsuguda Total 19.290 53 533.29 373.89 907.18 70.05 (0 , 8 , 1 , 0 , 9)

District- Kalahandi

Page 24 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Bhawanipatna

252 L127 L127-Artal to Masigaon New Cold Mix 9.360 3.000 Complete 28 254.36 178.49 432.85 29.74 (0 , 1 , 2 , 0 , 3) Technology
Terrazyme 253 L164 L164-NH201 to Kantabanji New -- 1.650 3.000 Complete 4 38.81 27.22 66.03 5.06 (0 , 0 , 1 , 0 , 1)

254 L147 L147-PWD Road to New Cold Mix 5.550 3.000 Complete 15 142.28 99.84 242.12 16.40 (0 , 0 , 1 , 1 , 2) Palsijharan Technology 255 L134 L134-Seinpur Chhak to New -- 3.630 3.000 Complete 11 104.29 73.08 177.37 11.17 (0 , 1 , 0 , 0 , 1) Chikili 256 L114 L114-RD Road to Kholandi New Cold Mix 7.500 3.750 Complete 25 238.61 167.15 405.76 29.24 (0 , 0 , 1 , 0 , 1) Technology
Terrazyme 257 L035 L035-Gudialipadar to New Cold Mix 3.200 3.000 Complete 9 73.69 51.61 125.30 9.39 (0 , 0 , 1 , 0 , 1) Borguda Technology 258 L169 L169-Jhikimiki to Katyanpur New -- 1.500 3.000 Complete 5 34.51 24.19 58.70 4.75 (0 , 0 , 1 , 0 , 1)

259 L148 L148-PWD Road to Kubudi New -- 1.650 3.000 Complete 4 34.39 24.12 58.51 5.34 (0 , 0 , 1 , 0 , 1)

260 L149 L149-PWD Road to New Cold Mix 2.400 3.000 Complete 5 75.41 52.92 128.33 7.19 (0 , 0 , 1 , 0 , 1) Pandigaon Technology 261 L075 L075-PWD Road to New Cold Mix 11.000 3.000 Complete 26 334.27 234.56 568.83 31.27 (0 , 0 , 2 , 1 , 3) Bengasipadar Technology
Terrazyme 262 L038 L038-PWD Road to Gudang New -- 2.500 3.000 Complete 8 69.02 48.38 117.40 7.50 (0 , 0 , 2 , 1 , 3)

263 L025 L025-PWD road to New -- 1.600 3.000 Complete 5 56.42 39.61 96.03 4.78 (0 , 0 , 1 , 0 , 1) Dongriguda 264 L036 L036-PWD Road to Janakpur New -- 0.900 3.000 Complete 2 26.49 18.57 45.06 2.08 (0 , 0 , 3 , 0 , 3)

265 L087 L087-PWD Road to Surli New Cold Mix 7.100 3.000 Complete 21 181.36 127.26 308.62 23.03 (0 , 0 , 1 , 2 , 3) Technology

Page 25 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

266 L044 L044-RD road to Gotabhata New Cold Mix 3.000 3.000 Complete 11 78.15 54.84 132.99 9.28 (0 , 0 , 1 , 0 , 1) Technology
Terrazyme 267 L034 L034-Gudialipadar to New Cold Mix 3.120 3.000 Complete 8 88.51 62.11 150.62 10.35 (0 , 0 , 1 , 0 , 1) Kurlabhata Technology
Terrazyme Block Bhawanipatna Total 65.660 187 1,830.57 1,283.95 3,114.52 206.57 (0 , 2 , 20 , 5 , 27) Block- Junagarh

268 L093 L093-Dasigaon to Padampur New Cold Mix 2.000 3.000 Complete 7 60.65 42.54 103.19 7.16 (0 , 0 , 1 , 1 , 2) Technology 269 L035 L035-Junagarh to Eknaguda New -- 4.300 3.000 Complete 11 110.12 77.17 187.29 12.26 (0 , 3 , 0 , 0 , 3)

270 L130 L130-PWD Road to New -- 3.300 3.000 Complete 8 116.94 81.99 198.93 7.73 (0 , 0 , 1 , 0 , 1) Sunamukhipada 271 L097 L097-PWD Road to New Cold Mix 2.300 3.000 Complete 8 61.34 43.00 104.34 7.05 (1 , 0 , 0 , 0 , 1) Purunasar Technology 272 L022 L022-RD road to khairmal New -- 1.500 3.000 Complete 5 52.46 36.76 89.22 4.40 (0 , 0 , 1 , 0 , 1)

Block Junagarh Total 13.400 39 401.51 281.46 682.97 38.60 (1 , 3 , 3 , 1 , 8)

Block- Karlamunda

273 L045 L045-Regeda to Bhairmunda New Cold Mix 2.040 3.000 Complete 7 73.64 51.67 125.31 6.58 (0 , 0 , 1 , 0 , 1) Technology 274 L038 L038-Harijanpada to New Terrazyme 2.630 3.000 Complete 8 74.80 52.42 127.22 7.71 (0 , 0 , 1 , 0 , 1) Jamunapur Block Karlamunda Total 4.670 15 148.44 104.09 252.53 14.29 (0 , 0 , 2 , 0 , 2)

Block- Kesinga

275 L056 L056-NH 201 to Kerkuda New Terrazyme 6.350 3.000 Complete 17 171.55 120.21 291.76 27.73 (0 , 1 , 0 , 0 , 1)

Page 26 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

276 L058 L058-Pastikudi to New Cold Mix 3.850 3.000 Complete 10 104.24 73.14 177.38 11.10 (0 , 0 , 1 , 0 , 1) Papalbhadi Technology 277 L027 L027-Bandhapala to New -- 2.310 3.000 Complete 7 59.92 41.99 101.91 6.68 (0 , 0 , 1 , 0 , 1) Babejore 278 L028 L028-Tundla to Khajurpada New -- 1.500 3.000 Complete 4 40.87 28.65 69.52 7.13 (0 , 0 , 1 , 0 , 1)

279 L030 L030-NH 201 Rengali New -- 1.140 3.000 Complete 3 32.74 22.96 55.70 3.13 (0 , 0 , 1 , 0 , 1)

Block Kesinga Total 15.150 41 409.32 286.95 696.27 55.77 (0 , 1 , 4 , 0 , 5)

Block- Koksara

280 T02 T02-Ladugaon to Ampani New -- 4.700 3.000 Complete 14 126.56 88.68 215.24 17.58 (0 , 0 , 2 , 0 , 2)

281 L080 L080-Sargigudaii to New -- 2.500 3.000 Complete 6 67.27 47.13 114.40 7.18 (0 , 0 , 1 , 0 , 1) Tarapurchhak 282 L059 L059-Darlipada to New -- 4.000 3.000 Complete 9 90.91 63.80 154.71 12.52 (0 , 0 , 1 , 0 , 1) Dobenchancha 283 L030 L030-Ladugaon to New Cold Mix 2.700 3.000 Complete 6 68.89 48.34 117.23 8.09 (0 , 0 , 2 , 0 , 2) Pitabaspur Technology
Terrazyme Block Koksara Total 13.900 35 353.63 247.95 601.58 45.37 (0 , 0 , 6 , 0 , 6)

Block- Lanjigarh

284 T10 T10-Bengaon to Lanjigarh New Cold Mix 16.000 3.000 Complete 47 481.55 337.92 819.47 54.80 (0 , 0 , 1 , 2 , 3) Technology 285 L040 L040-Golangbandh PWD New Terrazyme 4.320 3.000 Complete 12 146.05 102.35 248.40 12.46 (0 , 0 , 1 , 2 , 3) road to Chandanpur 286 L073 L073-Kandhajubang to New -- 8.400 3.000 Complete 22 272.93 191.19 464.12 28.18 (0 , 0 , 1 , 1 , 2) Panjam 287 L059 L059-PWD road to New -- 3.800 3.000 Complete 10 106.61 74.71 181.32 11.55 (0 , 0 , 1 , 2 , 3) Badakhamheju 288 L055 L055-PWD road to Bairkupuli New -- 2.500 3.000 Complete 6 44.02 30.84 74.86 7.85 (0 , 0 , 1 , 2 , 3)

Page 27 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

289 L081 L081-RD road to Netra New -- 7.500 3.000 Complete 17 188.24 131.93 320.17 25.31 (0 , 0 , 1 , 1 , 2)

290 L090 L090-RD road to Panchakudi New -- 6.600 3.000 Complete 18 159.19 111.52 270.71 20.95 (0 , 0 , 1 , 1 , 2)

291 L092 L092-RD road to New -- 4.000 3.000 Complete 10 107.74 75.50 183.24 12.30 (0 , 0 , 1 , 1 , 2) Rajendrapur Block Lanjigarh Total 53.120 142 1,506.33 1,055.96 2,562.29 173.40 (0 , 0 , 8 , 12 , 20) Block- M.Rampur

292 L090 L090-Sikelkupa to New Cold Mix 5.000 3.000 Complete 14 176.89 124.13 301.02 15.36 (0 , 0 , 1 , 1 , 2) Kandasarabahali Technology 293 L068 L068-Salepali to Karnimal New Cold Mix 4.350 3.000 Complete 11 105.76 74.21 179.97 12.90 (0 , 0 , 1 , 2 , 3) Technology 294 L042 L042-Manikera to Taprang New Cold Mix 4.250 3.000 Complete 11 154.54 108.45 262.99 13.49 (0 , 0 , 2 , 0 , 2) Technology
Terrazyme 295 L063 L063-Belgaon to Chaitra New Cold Mix 19.700 3.000 Complete 55 692.70 486.08 1,178.78 72.12 (0 , 0 , 1 , 1 , 2) Technology
Terrazyme 296 L071 L071-NH 217 to Kutigundam New -- 3.000 3.000 Complete 6 62.56 43.82 106.38 10.08 (0 , 0 , 1 , 1 , 2)

297 L043 L043-Pajibahal to New -- 2.700 3.000 Complete 8 87.85 61.56 149.41 8.09 (0 , 0 , 1 , 0 , 1) Kandegaon 298 L091 L091-Sikelkupa to Pirolmal New -- 1.750 3.000 Complete 6 62.23 43.62 105.85 5.70 (0 , 0 , 1 , 0 , 1)

299 L085 L085-PWD Road to New -- 2.750 3.000 Complete 8 99.86 69.96 169.82 8.87 (0 , 0 , 2 , 0 , 2) Podelkona 300 L087 L087-Madanpur to Gopalpur New -- 2.730 3.000 Complete 8 82.87 58.07 140.94 7.49 (0 , 0 , 1 , 0 , 1)

301 L084 L084-PWD Road to New -- 1.500 3.000 Complete 4 40.95 28.71 69.66 4.91 (0 , 0 , 1 , 1 , 2) Jambahali Block M.Rampur Total 47.730 131 1,566.21 1,098.61 2,664.82 159.01 (0 , 0 , 12 , 6 , 18)

Page 28 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Narla

302 L079 L079-PWD Road to New -- 4.500 3.000 Complete 14 163.06 114.25 277.31 14.33 (0 , 0 , 1 , 0 , 1) Kendujharan 303 L082 L082-Palam to Salebhata New -- 1.700 3.000 Complete 5 42.22 29.59 71.81 5.22 (0 , 0 , 1 , 0 , 1)

304 L069 L069-PWD Road to New -- 1.650 3.000 Complete 4 41.71 29.26 70.97 4.73 (0 , 0 , 1 , 0 , 1) Dendrabahali 305 L046 L046-Ratul to Nagihari New -- 3.000 3.000 Complete 10 95.63 67.02 162.65 9.59 (0 , 0 , 1 , 0 , 1)

306 L060 L060-Budhipadar to New Terrazyme 5.800 3.000 Complete 19 179.58 125.83 305.41 18.42 (0 , 0 , 1 , 0 , 1) Khaichuan Block Narla Total 16.650 52 522.20 365.95 888.15 52.29 (0 , 0 , 5 , 0 , 5)

Block- Th.Rampur

307 L106 L106-RD Road to New -- 3.100 3.000 Complete 10 100.45 70.39 170.84 8.75 (0 , 0 , 1 , 1 , 2) BrChanchara via Gopinathpur 308 L120 L120-Project road to New -- 2.820 3.000 Complete 6 75.05 52.61 127.66 7.74 (0 , 0 , 1 , 0 , 1) Uperchabri 309 L095 L095-PWD Road to Pokhara New -- 3.500 3.000 Complete 11 119.02 83.40 202.42 11.23 (0 , 0 , 1 , 0 , 1)

310 L058 L058-RD Road to Jubang New Cold Mix 10.800 3.000 Complete 29 372.73 261.55 634.28 35.60 (0 , 0 , 2 , 1 , 3) Technology
Terrazyme 311 L110 L110-RD Road to Pengdhusi New -- 2.040 3.000 Complete 7 54.24 38.02 92.26 6.42 (0 , 0 , 1 , 1 , 2)

312 L102 L102-RD Road to Suryagarh New Cold Mix 3.510 3.000 Complete 10 122.23 85.62 207.85 11.06 (0 , 0 , 3 , 0 , 3) Technology 313 L053 L053-Uper Ampadar to New -- 5.700 3.000 Complete 17 203.05 142.23 345.28 18.75 (0 , 0 , 1 , 0 , 1) Chulbadi 314 L063 L063-RD Road to Ranidumer New -- 1.100 3.000 Complete 3 33.78 23.69 57.47 3.48 (0 , 0 , 1 , 0 , 1)

315 L123 L123-Talnagi to Bahadaghat New Cold Mix 7.200 3.000 Complete 28 252.73 177.04 429.77 25.41 (0 , 0 , 1 , 2 , 3) Technology

Page 29 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

316 L071 L071-RD road to Tevakalam New Cold Mix 5.800 3.000 Complete 20 196.00 137.29 333.29 19.23 (0 , 0 , 1 , 0 , 1) Technology 317 L051 L051-Uperampadar to New -- 4.000 3.000 Complete 13 123.56 86.56 210.12 13.95 (0 , 0 , 1 , 0 , 1) Talampadar 318 L075 L075-RD Road to Taragaon New -- 8.000 3.000 Complete 30 280.40 196.42 476.82 33.25 (0 , 0 , 1 , 1 , 2)

Block Th.Rampur Total 57.570 184 1,933.24 1,354.82 3,288.06 194.87 (0 , 0 , 15 , 6 , 21) District Kalahandi Total 287.850 826 8,671.45 6,079.74 14,751.19 940.17 (1 , 6 , 75 , 30 , 112) District- Kendrapara

Block- Aul (Ali)

319 L034 L034-Keradagada to New -- 3.750 3.000 Complete 8 132.10 92.53 224.63 25.69 (1 , 0 , 0 , 0 , 1) Ekamania Block Aul (Ali) Total 3.750 8 132.10 92.53 224.63 25.69 (1 , 0 , 0 , 0 , 1)

Block- Mahakalapara

320 L024 L024-RD road to East Suniti New Cement 4.100 3.000 Complete 7 171.07 119.83 290.90 28.71 (2 , 0 , 0 , 0 , 2) Stabilization 321 L023 L023-Kantilo to Suniti New Roller 4.530 3.000 Complete 15 176.71 123.78 300.49 23.43 (1 , 0 , 0 , 1 , 2) Compacted Concrete Pavement Block Mahakalapara Total 8.630 22 347.78 243.61 591.39 52.14 (3 , 0 , 0 , 1 , 4)

Block- Rajkanika

322 L042 L042-PWD road to New -- 5.200 3.000 Complete 11 198.82 139.33 338.15 23.65 (1 , 1 , 0 , 0 , 2) Ahamadpur Block Rajkanika Total 5.200 11 198.82 139.33 338.15 23.65 (1 , 1 , 0 , 0 , 2)

District Kendrapara Total 17.580 41 678.70 475.47 1,154.17 101.48 (5 , 1 , 0 , 1 , 7)

District- Keonjhar

Page 30 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Anandapur

323 L061 L061-Mochinda to New Cold Mix 3.530 3.750 Complete 6 115.35 80.81 196.16 15.29 (0 , 0 , 1 , 0 , 1) Saradhapur Technology 324 L062 L062-SH-53 to Balunkeswar New -- 3.100 3.750 Complete 8 93.93 65.83 159.76 12.51 (0 , 3 , 1 , 0 , 4) sahi 325 L063 L063-NH-215 to Beu New -- 2.300 3.750 Complete 6 72.49 50.81 123.30 9.46 (0 , 1 , 0 , 0 , 1)

326 L067 L067-Khadibil to Talasahi New -- 2.000 3.750 Complete 5 59.83 41.93 101.76 8.16 (0 , 0 , 1 , 0 , 1) (VR67) 327 L069 L069-Banika to Talasahi New -- 1.990 3.750 Complete 3 59.93 42.00 101.93 8.08 (0 , 0 , 1 , 0 , 1)

328 L064 L064-Sadangi to Tarinisahi New -- 1.050 3.000 Complete 3 30.86 21.65 52.51 4.64 (0 , 0 , 1 , 0 , 1)

329 L066 L066-Kantipal to Mathasahi New -- 2.800 3.000 Complete 8 77.18 54.09 131.27 13.31 (0 , 0 , 2 , 0 , 2) (VR66) 330 L068 L068-Baunsagarh to Nuasahi New -- 3.600 3.000 Complete 11 115.33 80.79 196.12 19.49 (0 , 0 , 2 , 0 , 2) (VR68) Block Anandapur Total 20.370 50 624.90 437.91 1,062.81 90.94 (0 , 4 , 9 , 0 , 13) Block- Bansapal

331 T03 T03-KunarPWD Road to New -- 2.010 3.750 Complete 4 68.48 47.99 116.47 9.62 (0 , 0 , 1 , 0 , 1) Banspal 332 L058 L058-Taramakanta to New -- 3.300 3.750 Complete 10 101.51 71.11 172.62 16.35 (0 , 0 , 1 , 1 , 2) Dalkinuagaon 333 L088 L088-Talakadakala to New -- 5.730 3.750 Complete 15 163.55 114.58 278.13 28.69 (0 , 0 , 1 , 0 , 1) Upperkdakala (L69) Block Bansapal Total 11.040 29 333.54 233.68 567.22 54.66 (0 , 0 , 3 , 1 , 4)

Page 31 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Champua

334 L026 L026-Silipunji to Durukulia New Cold Mix 6.200 3.750 Complete 21 172.69 121.18 293.87 26.71 (0 , 0 , 1 , 1 , 2) Road Technology
Roller Compacted Concrete Pavement Block Champua Total 6.200 21 172.69 121.18 293.87 26.71 (0 , 0 , 1 , 1 , 2)

Block- Harichandanpur

335 L078 L078-PWD road to Golagadia New -- 2.610 3.750 Complete 6 79.09 55.39 134.48 11.79 (0 , 0 , 1 , 0 , 1) (VR78) 336 L079 L079-R.D. Road to Sirishpal New -- 2.500 3.750 Complete 5 75.80 53.11 128.91 11.46 (0 , 0 , 1 , 0 , 1) (VR79) 337 L080 L080-R.D. Road to New -- 2.490 3.750 Complete 8 79.21 55.49 134.70 11.55 (0 , 0 , 1 , 0 , 1) Rangamatia (VR80) 338 L043 L043-R D Road to New Cold Mix 4.080 3.750 Complete 10 121.76 85.30 207.06 18.64 (0 , 0 , 1 , 1 , 2) Dangadhara road Technology 339 L081 L081-Sagadapata to New -- 2.130 3.750 Complete 4 68.21 47.79 116.00 9.75 (0 , 0 , 1 , 0 , 1) Khadibahali Block Harichandanpur Total 13.810 33 424.07 297.08 721.15 63.19 (0 , 0 , 5 , 1 , 6)

Block- Hatadihi

340 L075 L075-RD road to Mundakati New -- 3.240 3.000 Complete 8 104.21 73.05 177.26 14.91 (0 , 1 , 1 , 0 , 2) (VR75) 341 L076 L076-PWD road to Binapatia New -- 1.200 3.000 Complete 3 34.97 24.52 59.49 5.46 (0 , 0 , 1 , 0 , 1) (VR76) 342 L077 L077-Sangam to Dengachua New -- 1.620 3.000 Complete 4 43.12 30.24 73.36 7.37 (0 , 0 , 1 , 0 , 1) (VR77) 343 L074 L074-Bangore to New -- 1.830 3.000 Complete 1 44.83 31.44 76.27 8.50 (0 , 0 , 2 , 0 , 2) Chanchalapada (VR74)

Page 32 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

344 L034 L034-Sadha to Podarukha New Cold Mix 5.500 3.000 Complete 8 156.98 110.15 267.13 24.92 (0 , 0 , 1 , 0 , 1) road Technology Block Hatadihi Total 13.390 24 384.11 269.40 653.51 61.16 (0 , 1 , 6 , 0 , 7)

Block- Jhumpura

345 L100 L100-Panposi to New -- 3.100 3.750 Complete 14 91.10 63.86 154.96 11.74 (0 , 0 , 1 , 0 , 1) Jodakendusahi (VR) Block Jhumpura Total 3.100 14 91.10 63.86 154.96 11.74 (0 , 0 , 1 , 0 , 1)

Block- Joda

346 L046 L046-Topadihi T01 to New -- 4.600 3.750 Complete 11 152.33 106.76 259.09 19.92 (0 , 0 , 1 , 0 , 1) Chormalda road 347 L045 L045-T02 to Tilaburu road New -- 5.250 3.750 Complete 15 170.32 119.38 289.70 23.04 (1 , 1 , 0 , 1 , 3)

348 L040 L040-T02 to Silijoda road New -- 4.500 3.750 Complete 8 139.19 97.56 236.75 18.45 (1 , 0 , 0 , 0 , 1)

Block Joda Total 14.350 34 461.84 323.70 785.54 61.41 (2 , 1 , 1 , 1 , 5)

Block- Keonjhar

349 L087 L087-Kainsi to Upper New -- 2.030 3.750 Complete 5 53.96 37.85 91.81 6.69 (0 , 0 , 1 , 0 , 1) gopalsahi (VR64) 350 L076 L076-Murusuan to New -- 1.170 3.750 Complete 7 36.25 25.41 61.66 4.54 (0 , 0 , 1 , 0 , 1) Kasirapatna road 351 L076 L076-Murusuan to New -- 1.350 3.750 Complete 8 42.65 29.88 72.53 6.50 (0 , 0 , 1 , 0 , 1) Kasirapatna road 352 L081 L081-RDRoad to Tulasipur New -- 1.490 3.750 Complete 5 44.35 31.07 75.42 5.75 (0 , 0 , 1 , 0 , 1) road Block Keonjhar Total 6.040 25 177.21 124.21 301.42 23.48 (0 , 0 , 4 , 0 , 4)

Page 33 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Telkoi

353 L026 L026-Podanga to Godinanda New Cold Mix 10.200 3.750 Complete 20 315.68 221.53 537.21 48.04 (0 , 0 , 2 , 1 , 3) road Technology
Roller Compacted Concrete Pavement 354 L055 L055-L53 to Jenadar road New -- 2.200 3.750 Complete 9 69.52 48.73 118.25 10.59 (0 , 0 , 1 , 0 , 1)

Block Telkoi Total 12.400 29 385.20 270.26 655.46 58.63 (0 , 0 , 3 , 1 , 4)

District Keonjhar Total 100.700 259 3,054.66 2,141.28 5,195.94 451.92 (2 , 6 , 33 , 5 , 46) District- Koraput

Block- Bandhugaon

355 L045 L045-P Silabadi to Jalla New Terrazyme 5.000 3.750 Complete 14 170.80 119.93 290.73 21.55 (0 , 0 , 1 , 2 , 3)

356 L030 L030-Jaguguda to Nakiti New Terrazyme 10.000 3.750 Complete 26 353.82 249.23 603.05 36.58 (0 , 1 , 1 , 1 , 3)

357 L056 L056-PS Road to New -- 1.500 3.750 Complete 7 53.15 37.48 90.63 6.62 (0 , 0 , 1 , 1 , 2) Ghumaraput 358 L053 L053-PS Road to New -- 5.000 3.750 Complete 9 152.08 106.53 258.61 21.85 (0 , 0 , 1 , 0 , 1) Mamudivalsa Block Bandhugaon Total 21.500 56 729.85 513.17 1,243.02 86.60 (0 , 1 , 4 , 4 , 9)

Block- Boipariguda

359 L085 L085-Rampur Road to New -- 6.100 3.750 Complete 19 217.04 153.02 370.06 20.54 (0 , 0 , 1 , 0 , 1) Rendiguda 360 L026 L026-PWD Road to Murja New -- 2.400 3.750 Complete 5 85.38 60.21 145.59 7.99 (0 , 0 , 1 , 0 , 1)

361 L032 L032-PWD Road to New -- 1.200 3.750 Complete 2 42.34 29.74 72.08 3.82 (0 , 0 , 1 , 0 , 1) Nandanamala 362 L093 L093-PWD Road to New -- 8.700 3.750 Complete 25 303.40 213.70 517.10 32.18 (0 , 0 , 1 , 1 , 2) Baghakhadra

Page 34 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

363 L156 L156-PWD Road to New -- 3.550 3.750 Complete 10 121.17 85.08 206.25 12.39 (0 , 0 , 1 , 1 , 2) Purunaguda 364 L064 L064-RD Road to Dabguda New -- 5.000 3.750 Complete 16 176.47 124.48 300.95 18.92 (0 , 0 , 1 , 1 , 2)

365 L069 L069-Bodaput Tentulipada New -- 2.600 3.750 Complete 9 93.00 65.24 158.24 11.35 (0 , 0 , 1 , 1 , 2)

366 L023 L023-Disariguda to New -- 2.400 3.750 Complete 6 86.27 60.43 146.70 11.79 (0 , 0 , 1 , 0 , 1) Majhiguda3 367 L136 L136-Haladikund Road to New -- 2.400 3.750 Complete 7 81.83 57.32 139.15 11.47 (0 , 0 , 1 , 0 , 1) Katnikund 368 L076 L076-Khemabeda Road to New Cold Mix 5.250 3.750 Complete 15 177.97 124.67 302.64 26.54 (0 , 0 , 1 , 0 , 1) Tikarpada1 Technology
Roller Compacted Concrete Pavement 369 L027 L027-PWD Road to Badaguda New -- 1.000 3.750 Complete 4 34.01 23.84 57.85 4.64 (0 , 0 , 1 , 0 , 1)

370 L147 L147-PWD Road to Chilikund New Cold Mix 6.000 3.750 Complete 9 211.06 148.10 359.16 30.24 (0 , 0 , 1 , 4 , 5) Technology
Roller Compacted Concrete Pavement 371 L033 L033-PWD Road to New -- 1.320 3.750 Complete 5 45.79 32.07 77.86 6.28 (0 , 0 , 1 , 0 , 1) Kharaguda1 Block Boipariguda Total 47.920 132 1,675.73 1,177.90 2,853.63 198.15 (0 , 0 , 13 , 8 , 21) Block- Boriguma

372 L073 L073-Kunduragada to New -- 4.680 3.000 Complete 18 166.25 116.83 283.08 25.59 (0 , 0 , 1 , 2 , 3) Birahandi 373 L037 L037-Kumuli to New -- 3.000 3.000 Complete 8 83.87 58.77 142.64 16.59 (0 , 0 , 1 , 0 , 1) Khangaraguda 374 L025 L025-NH 201 to Solaguda New -- 9.200 3.750 Complete 23 279.19 195.63 474.82 56.17 (0 , 0 , 2 , 2 , 4)

Page 35 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

375 L065 L065-NH 43 Kenduguda to New -- 4.000 3.750 Complete 8 128.95 90.32 219.27 18.22 (0 , 0 , 1 , 0 , 1) Dengaguda 376 L084 L084-RD Road to Sana Targia New -- 1.800 3.750 Complete 4 61.67 43.21 104.88 8.68 (0 , 0 , 1 , 0 , 1)

377 L044 L044-Chandabeda to New -- 5.000 3.750 Complete 12 158.93 111.34 270.27 22.01 (0 , 0 , 1 , 0 , 1) Pataranginiguda 378 L029 L029-Haradali to New -- 1.800 3.750 Complete 4 61.21 42.89 104.10 8.56 (0 , 0 , 1 , 0 , 1) Badamajhiguda 379 L071 L071-SAsahandi to New -- 2.000 3.750 Complete 9 58.76 41.17 99.93 8.16 (0 , 0 , 1 , 0 , 1) Bairagipadar 380 L047 L047-Ranaspur to Ramaguda New -- 3.000 3.750 Complete 4 101.03 70.80 171.83 12.87 (0 , 0 , 1 , 0 , 1) Via Maliguda 381 L061 L061-PWD road Dulaguda to New Cold Mix 7.990 3.750 Complete 18 263.83 185.14 448.97 36.67 (0 , 0 , 1 , 0 , 1) Gujuniguda Technology
Roller Compacted Concrete Pavement Block Boriguma Total 42.470 108 1,363.69 956.10 2,319.79 213.52 (0 , 0 , 11 , 4 , 15) Block- Dasmanthpur

382 L054 L054-PWD Road to Tandiput New -- 7.900 3.750 Complete 20 231.95 162.52 394.47 55.86 (0 , 0 , 2 , 6 , 8)

383 L063 L063-PS Road to Malitola Via New -- 5.000 3.000 Complete 18 179.36 126.41 305.77 33.34 (0 , 0 , 2 , 1 , 3) Keshabguda 384 L076 L076-RD Road to New -- 2.000 3.000 Complete 9 59.88 41.96 101.84 13.03 (0 , 0 , 1 , 0 , 1) Malimundaguda 385 L108 L108-PS Road to Naragam New -- 6.000 3.000 Complete 18 142.99 100.18 243.17 33.28 (0 , 0 , 1 , 8 , 9)

386 T06 T06-Adamunda to Lula New -- 2.600 3.750 Complete 7 93.25 65.52 158.77 13.56 (0 , 0 , 1 , 0 , 1)

387 L049 L049-PWD Road to Kaltiguda New -- 1.810 3.750 Complete 6 65.85 46.13 111.98 9.29 (0 , 0 , 1 , 0 , 1)

388 L030 L030-RD Road to Barijhola New -- 5.000 3.750 Complete 9 169.93 119.05 288.98 24.25 (0 , 0 , 1 , 0 , 1)

Page 36 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

389 L045 L045-RD Road to P Barikanta New -- 0.700 3.750 Complete 2 23.64 16.57 40.21 3.37 (0 , 0 , 1 , 0 , 1)

390 L046 L046-RD Road to Pojar New -- 5.500 3.750 Complete 16 194.86 136.53 331.39 30.43 (0 , 0 , 1 , 0 , 1)

391 L050 L050-PWD Road PDG to New -- 1.600 3.750 Complete 5 56.23 39.40 95.63 7.89 (0 , 0 , 1 , 0 , 1) Sembi Via Mangraguda Block Dasmanthpur Total 38.110 110 1,217.94 854.27 2,072.21 224.30 (0 , 0 , 12 , 15 , 27) Block- Jeypore

392 L033 L033-Dangarkarchi to New -- 1.540 3.000 Complete 2 49.66 34.79 84.45 9.69 (0 , 0 , 1 , 0 , 1) Bhaliaguda 393 L089 L089-PWD Road to New -- 2.000 3.750 Complete 3 55.34 38.79 94.13 16.03 (0 , 0 , 1 , 0 , 1) Gandaguda 394 L072 L072-PWD Road to T New -- 2.000 3.750 Complete 4 57.65 40.42 98.07 14.69 (0 , 0 , 1 , 0 , 1) Garudaguda 395 L071 L071-Kaliagam to Podaikra New -- 5.000 3.750 Complete 13 130.63 91.75 222.38 20.67 (0 , 0 , 1 , 3 , 4)

396 L031 L031-PWD Road to Banabati New -- 1.000 3.750 Complete 3 28.95 20.34 49.29 4.29 (0 , 0 , 1 , 0 , 1)

Block Jeypore Total 11.540 25 322.23 226.09 548.32 65.37 (0 , 0 , 5 , 3 , 8)

Block- Koraput

397 L037 L037-Hinjeiput to Kechela New -- 10.000 3.000 Complete 28 350.06 246.70 596.76 53.40 (0 , 0 , 1 , 3 , 4)

398 L070 L070-NH 43 to Duruguda New -- 0.608 3.000 Complete 4 21.80 15.35 37.15 3.94 (0 , 0 , 1 , 1 , 2)

399 L023 L023-PS Road to Kardiguda New -- 1.385 3.000 Complete 6 46.25 32.46 78.71 8.29 (0 , 0 , 1 , 0 , 1)

400 L060 L060-RD Road to Karniguda New -- 5.520 3.000 Complete 20 191.12 134.56 325.68 36.55 (0 , 0 , 1 , 5 , 6)

401 L052 L052-PWD Road to New -- 2.500 3.750 Complete 6 87.28 61.16 148.44 13.30 (0 , 0 , 1 , 0 , 1) Nariaguda 402 T01 T01-Semaguda MDR to New -- 1.170 3.750 Complete 3 39.47 27.65 67.12 5.53 (0 , 0 , 1 , 0 , 1) Kakirigumma Block Koraput Total 21.183 67 735.98 517.88 1,253.86 121.01 (0 , 0 , 6 , 9 , 15)

Page 37 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Kotpad

403 L048 L048-Suruli to Pipalahandi New Cold Mix 8.750 3.750 Complete 14 266.12 186.46 452.58 38.47 (0 , 0 , 3 , 1 , 4) Technology
Roller Compacted Concrete Pavement 404 L034 L034-RD road to Baghchuan New -- 4.920 3.750 Complete 12 160.35 112.44 272.79 21.11 (0 , 0 , 1 , 0 , 1)

405 L042 L042-PWD Road to Muraoda New -- 3.820 3.750 Complete 10 118.87 83.38 202.25 16.76 (0 , 0 , 1 , 0 , 1)

406 L049 L049-RD Road to Potanor New -- 2.460 3.750 Complete 5 78.28 54.88 133.16 10.75 (0 , 0 , 1 , 0 , 1)

407 L021 L021-Kotpad to Girla New -- 3.010 3.750 Complete 7 108.64 76.15 184.79 13.06 (0 , 0 , 1 , 0 , 1)

408 L030 L030-Bobiya to Pathanguda New -- 4.310 3.750 Complete 11 146.86 102.98 249.84 18.86 (0 , 0 , 1 , 1 , 2)

409 L027 L027-NH 43 to Andaramunda New -- 3.360 3.750 Complete 8 112.33 78.77 191.10 14.32 (0 , 0 , 1 , 0 , 1)

410 L037 L037-RD Road to Michhia New -- 2.300 3.750 Complete 8 82.17 57.66 139.83 9.89 (0 , 0 , 1 , 0 , 1)

Block Kotpad Total 32.930 75 1,073.62 752.72 1,826.34 143.22 (0 , 0 , 10 , 2 , 12) Block- Kundra

411 L078 L078-Bagderi to Raxakonadi New -- 3.810 3.000 Complete 9 133.90 93.95 227.85 23.86 (0 , 0 , 1 , 2 , 3)

412 L054 L054-Gundel to New -- 1.271 3.000 Complete 3 44.86 31.58 76.44 7.77 (0 , 0 , 1 , 1 , 2) BadaAtaliguda 413 L056 L056-PS Road to Khutuguda New -- 3.396 3.000 Complete 9 114.52 80.40 194.92 21.24 (0 , 0 , 1 , 1 , 2)

414 L036 L036-Naragam to Pipalguda New -- 3.600 3.000 Complete 13 123.25 86.34 209.59 22.72 (0 , 0 , 1 , 0 , 1)

415 L067 L067-Ghadangaguda to New -- 2.500 3.000 Complete 13 90.65 63.92 154.57 15.27 (0 , 0 , 1 , 0 , 1) Saralaguda 416 L069 L069-Pakhanaguda to New -- 6.400 3.750 Complete 17 211.41 148.13 359.54 56.72 (0 , 0 , 1 , 0 , 1) Kaliajholli

Page 38 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

417 L063 L063-Udalaguda to New -- 4.000 3.750 Complete 8 128.99 90.41 219.40 34.99 (0 , 0 , 1 , 1 , 2) Kenduguda 418 L077 L077-Bagderi to Kanuguda New -- 3.200 3.750 Complete 10 104.38 73.62 178.00 17.49 (0 , 0 , 1 , 0 , 1)

Block Kundra Total 28.177 82 951.96 668.35 1,620.31 200.06 (0 , 0 , 8 , 5 , 13) Block- Lamtaput

419 L081 L081-Kumargandhana to New -- 3.800 3.750 Complete 8 134.96 95.01 229.97 14.19 (0 , 0 , 1 , 2 , 3) Bhitarchenda Via Padachenda 420 L069 L069-PWD Road to New -- 3.200 3.750 Complete 16 112.54 79.36 191.90 12.65 (0 , 0 , 1 , 0 , 1) Mardingapada 421 L030 L030-RD Road to Panjel New Terrazyme 1.500 3.750 Complete 5 53.13 37.48 90.61 4.36 (0 , 0 , 1 , 0 , 1)

422 L062 L062-PWD Road to Pipalput New Cold Mix 5.400 3.750 Complete 14 183.85 129.00 312.85 24.86 (0 , 0 , 1 , 0 , 1) Via Jalahanjar Tukum Technology 423 L039 L039-PS Road to Totaput Via New -- 3.750 3.750 Complete 9 131.93 92.43 224.36 18.35 (0 , 0 , 1 , 0 , 1) Chiliba Thama 424 L043 L043-Bangurupada to Upper New -- 1.500 3.750 Complete 4 46.14 32.33 78.47 6.46 (0 , 0 , 1 , 0 , 1) Mahada 425 L071 L071-PWD Road to New Cold Mix 4.500 3.750 Complete 10 152.51 106.84 259.35 21.32 (0 , 0 , 1 , 0 , 1) Nakulpadar Technology 426 L049 L049-Anakadelli to Hanumel New -- 6.000 3.750 Complete 13 186.47 130.66 317.13 26.83 (0 , 0 , 1 , 1 , 2)

427 L028 L028-RD Road to Maliput New -- 1.500 3.750 Complete 5 52.84 37.03 89.87 7.26 (0 , 0 , 1 , 0 , 1)

428 L026 L026-Hingeiput to New -- 0.500 3.750 Complete 3 17.51 12.27 29.78 2.40 (0 , 0 , 1 , 0 , 1) Khataguda via Bonkeiput 429 L081 L081-Kumargandhana to New -- 6.200 3.750 Complete 19 177.71 124.53 302.24 29.32 (0 , 0 , 2 , 0 , 2) Bhitarchenda Via Padachenda Block Lamtaput Total 37.850 106 1,249.59 876.94 2,126.53 168.00 (0 , 0 , 12 , 3 , 15)

Page 39 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Laxmipur

430 L042 L042-PWD Road to Bhitar New -- 5.800 3.750 Complete 17 190.63 133.57 324.20 24.79 (0 , 0 , 1 , 1 , 2) Marichamal 431 L063 L063-PWD Road to New -- 4.700 3.750 Complete 15 163.21 114.76 277.97 18.27 (0 , 0 , 1 , 1 , 2) Kaliajhola 432 L036 L036-PWD Road to New -- 4.400 3.750 Complete 12 131.92 92.52 224.44 18.54 (0 , 0 , 1 , 0 , 1) Upermattingi Block Laxmipur Total 14.900 44 485.76 340.85 826.61 61.60 (0 , 0 , 3 , 2 , 5)

Block- Nandapur

433 L031 L031-RD Road to New -- 2.500 3.750 Complete 8 89.11 62.75 151.86 8.26 (0 , 0 , 1 , 0 , 1) Bariapakhana Solpa 434 L062 L062-RD Road to Khadaput New -- 0.800 3.750 Complete 3 30.22 21.24 51.46 2.60 (0 , 0 , 1 , 0 , 1) Boding 435 L042 L042-RD Road to New -- 6.100 3.750 Complete 15 205.90 144.26 350.16 24.96 (0 , 0 , 1 , 1 , 2) Phanuakona 436 L054 L054-PWD Road to Musapur New -- 3.200 3.750 Complete 10 110.89 78.15 189.04 8.79 (0 , 0 , 1 , 1 , 2)

437 L041 L041-RD Road to Padalput New -- 4.500 3.750 Complete 17 159.17 111.94 271.11 17.72 (0 , 0 , 1 , 1 , 2)

438 L066 L066-PWD Road to New -- 7.000 3.750 Complete 21 203.09 142.30 345.39 31.56 (0 , 0 , 2 , 1 , 3) Barangpalli 439 L056 L056-PWD Road to Podalput New -- 1.800 3.750 Complete 4 52.09 36.50 88.59 7.27 (0 , 0 , 1 , 1 , 2)

440 L070 L070-Badel to P Badapada New -- 6.000 3.750 Complete 14 182.48 127.92 310.40 27.35 (0 , 0 , 1 , 1 , 2) Dangbir 441 L061 L061-RD Road to Pamalput New -- 5.000 3.750 Complete 14 155.85 109.26 265.11 22.46 (0 , 0 , 1 , 1 , 2)

Block Nandapur Total 36.900 106 1,188.80 834.32 2,023.12 150.97 (0 , 0 , 10 , 7 , 17) Block- Narayanpatna

442 L047 L047-Upora Gumandi to New -- 5.000 3.750 Complete 12 175.04 123.45 298.49 18.44 (0 , 0 , 1 , 1 , 2) Bhitarpada

Page 40 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

443 T02 T02-PWD Road to Talakesla New -- 6.000 3.750 Complete 14 184.31 129.15 313.46 26.35 (0 , 0 , 1 , 2 , 3)

444 T02 T02-PWD Road to Talakesla New -- 5.800 3.750 Complete 18 157.19 110.18 267.37 28.99 (0 , 0 , 1 , 1 , 2)

445 L054 L054-Pipalapadar to New Cold Mix 6.500 3.750 Complete 12 192.17 134.65 326.82 33.50 (0 , 0 , 1 , 0 , 1) Kamalapadar Technology 446 L063 L063-Balipeta to Upar New Cold Mix 6.000 3.750 Complete 32 191.73 134.34 326.07 30.77 (0 , 0 , 1 , 0 , 1) Metingi Technology 447 L055 L055-Dangapai to Turli New Cold Mix 7.000 3.750 Complete 21 204.53 143.31 347.84 36.69 (0 , 0 , 1 , 1 , 2) Itimari Technology 448 L055 L055-Dangapai to Turli New Cold Mix 5.800 3.750 Complete 22 172.99 121.21 294.20 28.86 (0 , 0 , 1 , 1 , 2) Itimari Technology 449 L045 L045-Gumandi to New Cold Mix 1.320 3.750 Complete 4 45.25 31.76 77.01 6.27 (0 , 0 , 1 , 0 , 1) Chabukumari Technology 450 L036 L036-Killimisi to Nalapadar New Cold Mix 6.600 3.750 Complete 19 205.64 144.09 349.73 32.44 (0 , 0 , 1 , 0 , 1) Technology Block Narayanpatna Total 50.020 154 1,528.85 1,072.14 2,600.99 242.31 (0 , 0 , 9 , 6 , 15) Block- Pottangi

451 L032 L032-NH 43 to Ologam Via New Cold Mix 1.310 3.750 Complete 5 41.53 29.14 70.67 5.72 (0 , 0 , 1 , 0 , 1) Kurialpadu Tangini Technology Block Pottangi Total 1.310 5 41.53 29.14 70.67 5.72 (0 , 0 , 1 , 0 , 1)

District Koraput Total 384.810 1,070 12,565.53 8,819.87 21,385.40 1,880.83 (0 , 1 , 104 , 68 , 173) District- Malkangiri

Block- Kalimela

452 L080 L080-K P Road to keriaguda New -- 7.800 3.750 Complete 20 231.75 162.48 394.23 40.67 (0 , 0 , 1 , 0 , 1)

453 L056 L056-R D Road to Polur New Cold Mix 5.700 3.750 Complete 9 162.44 113.82 276.26 24.63 (0 , 0 , 1 , 2 , 3) Technology 454 L093 L093-R D Road to MPV 8 New Cold Mix 2.100 3.750 Complete 6 53.51 37.51 91.02 9.01 (0 , 0 , 1 , 0 , 1) Technology

Page 41 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

455 L079 L079-K P Road to Perubai New -- 8.000 3.750 Complete 12 255.08 178.81 433.89 42.04 (0 , 0 , 1 , 0 , 1)

456 L033 L033-Bhejangawada to New -- 3.000 3.750 Complete 9 96.77 67.80 164.57 26.30 (0 , 0 , 1 , 1 , 2) Beheraguda 457 L044 L044-MPV 26 to Doraguda New -- 3.300 3.000 Complete 7 88.21 61.84 150.05 16.11 (0 , 0 , 1 , 0 , 1)

458 L023 L023-Kangorukonda to New -- 1.020 3.750 Complete 3 24.61 17.27 41.88 3.56 (0 , 0 , 1 , 0 , 1) MPV22 459 T01 T01-Venkatapalam Via New Cold Mix 3.500 3.750 Complete 11 89.66 62.85 152.51 13.38 (0 , 0 , 1 , 0 , 1) Bhejangawada to Pitakonda Technology 460 L058 L058-R D Road to Nilakota New Cold Mix 7.500 3.750 Complete 22 236.35 165.63 401.98 32.67 (0 , 0 , 1 , 0 , 1) Technology 461 L046 L046-Kalimela to MV 69 New -- 2.950 3.750 Complete 7 75.62 53.00 128.62 12.74 (0 , 0 , 1 , 0 , 1)

462 L090 L090-Supalu to MV 89 New -- 1.500 3.750 Complete 5 42.05 29.49 71.54 6.84 (0 , 0 , 1 , 0 , 1)

463 L053 L053-Badapadar to New -- 11.200 3.000 Complete 10 317.84 222.83 540.67 59.51 (0 , 0 , 1 , 1 , 2) Ramchandraput Block Kalimela Total 57.570 121 1,673.89 1,173.33 2,847.22 287.46 (0 , 0 , 12 , 4 , 16) Block- Korukunda

464 L086 L086-Mandapali to New Cold Mix 1.350 3.750 Complete 3 30.58 21.46 52.04 4.95 (0 , 0 , 1 , 0 , 1) Mundiguda Technology 465 T15 T15-T 7 SH 25 to Nilaguda New -- 8.500 3.750 Complete 18 228.15 159.89 388.04 35.93 (0 , 0 , 2 , 0 , 2)

466 L082 L082-SH 25 to Urmaguda New -- 2.000 3.750 Complete 5 61.10 42.85 103.95 8.97 (0 , 0 , 1 , 0 , 1)

467 L054 L054-RD Road to Goudaguda New -- 8.600 3.750 Complete 23 234.14 164.07 398.21 32.52 (0 , 0 , 2 , 0 , 2)

468 L056 L056-RSC Colony to New -- 2.000 3.750 Complete 6 61.13 42.86 103.99 8.51 (0 , 1 , 0 , 1 , 2) Champajhila 469 T13 T13-RD Road to Kataguda New -- 4.200 3.750 Complete 13 132.82 93.06 225.88 18.23 (0 , 0 , 1 , 0 , 1)

470 L094 L094-SH 25 to Pakhanguda New -- 3.750 3.750 Complete 10 97.68 68.47 166.15 13.85 (0 , 0 , 1 , 0 , 1)

Page 42 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

471 L088 L088-T 7 SH 25 to MV 63 New -- 1.300 3.750 Complete 2 33.55 23.52 57.07 5.36 (0 , 0 , 1 , 0 , 1)

Block Korukunda Total 31.700 80 879.15 616.18 1,495.33 128.32 (0 , 1 , 9 , 1 , 11) Block- Kudumuluguma

472 L061 L061-Jabagada to Gopalpur New -- 2.100 3.750 Complete 4 55.43 38.84 94.27 8.43 (0 , 0 , 1 , 2 , 3)

Block Kudumuluguma Total 2.100 4 55.43 38.84 94.27 8.43 (0 , 0 , 1 , 2 , 3)

Block- Mathili

473 T04 T04-Naikguda to Podaguda New -- 6.200 3.750 Complete 13 163.82 114.81 278.63 24.66 (0 , 0 , 1 , 3 , 4)

474 L085 L085-RD Road to jandraguda New -- 6.300 3.000 Complete 12 186.82 130.98 317.80 33.29 (0 , 0 , 1 , 2 , 3)

Block Mathili Total 12.500 25 350.64 245.79 596.43 57.95 (0 , 0 , 2 , 5 , 7)

Block- Podia

475 L026 L026-T1 R D Road to New -- 13.700 3.750 Complete 38 404.11 283.16 687.27 73.43 (0 , 0 , 1 , 0 , 1) Silakota 476 T08 T08-MPV 55 to Kursanpalli New -- 9.400 3.750 Complete 15 276.29 193.69 469.98 51.69 (0 , 0 , 1 , 0 , 1)

477 L056 L056-Uruvalli to Peta New -- 9.660 3.750 Complete 20 293.91 206.04 499.95 49.09 (0 , 1 , 0 , 1 , 2)

Block Podia Total 32.760 73 974.31 682.89 1,657.20 174.21 (0 , 1 , 2 , 1 , 4)

District Malkangiri Total 136.630 303 3,933.42 2,757.03 6,690.45 656.37 (0 , 2 , 26 , 13 , 41) District- Mayurbhanj

Block- Badasahi

478 L062 L062-PWD Road to New -- 2.999 3.750 Complete 9 96.97 67.92 164.89 13.20 (0 , 1 , 0 , 0 , 1) Belpalsamil Purunapani Road

Page 43 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

479 L081 L081-PWD Road to New -- 3.000 3.750 Complete 8 94.88 66.47 161.35 12.91 (0 , 1 , 0 , 0 , 1) Narankhunta road Block Badasahi Total 5.999 17 191.85 134.39 326.24 26.12 (0 , 2 , 0 , 0 , 2)

Block- Baripada

480 L045 L045-NH5 at Budhikhamari New -- 5.960 3.750 Complete 21 190.38 133.41 323.79 16.76 (0 , 1 , 0 , 0 , 1) to Tasarda Road Block Baripada Total 5.960 21 190.38 133.41 323.79 16.76 (0 , 1 , 0 , 0 , 1)

Block- Bijatola

481 L047 L047-Baghiatangar to Asana New Cold Mix 3.440 3.750 Complete 15 116.12 81.72 197.84 8.21 (0 , 0 , 1 , 0 , 1) Road Technology Block Bijatola Total 3.440 15 116.12 81.72 197.84 8.21 (0 , 0 , 1 , 0 , 1)

Block- Jashipur

482 L041 L041-Thakurgoda to Kiajhari New Cold Mix 4.300 3.750 Complete 14 147.17 103.28 250.45 22.39 (0 , 0 , 1 , 0 , 1) Technology 483 L056 L056-PWD Road to Aktapal New Cold Mix 8.070 3.750 Complete 35 252.79 177.39 430.18 37.96 (0 , 0 , 1 , 0 , 1) Technology 484 L042 L042-RD Road to Sardha New Cold Mix 5.800 3.750 Complete 27 180.17 126.43 306.60 28.08 (0 , 0 , 1 , 0 , 1) Technology 485 L058 L058-PWD Road to Mandam New Cold Mix 7.280 3.750 Complete 30 226.64 159.05 385.69 34.82 (0 , 0 , 1 , 0 , 1) Technology Block Jashipur Total 25.450 106 806.77 566.15 1,372.92 123.25 (0 , 0 , 4 , 0 , 4)

Block- Karanjia

486 L022 L022-RD Road to New Cold Mix 4.600 3.750 Complete 15 133.37 93.46 226.83 22.47 (0 , 0 , 1 , 0 , 1) Khandiadhar Technology 487 L021 L021-SH 49 to Raitali Road New Cold Mix 2.450 3.750 Complete 8 75.77 53.18 128.95 11.56 (0 , 0 , 1 , 0 , 1) Technology

Page 44 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

488 L041 L041-SH 53 to Chaturisahi New Cold Mix 2.910 3.750 Complete 10 84.91 59.49 144.40 13.44 (0 , 0 , 1 , 0 , 1) Technology Block Karanjia Total 9.960 33 294.05 206.13 500.18 47.47 (0 , 0 , 3 , 0 , 3)

Block- Raruan

489 L033 L033-ODR to Tilusahi New Cold Mix 3.000 3.750 Complete 12 80.60 56.49 137.09 13.33 (0 , 0 , 1 , 0 , 1) Technology Block Raruan Total 3.000 12 80.60 56.49 137.09 13.33 (0 , 0 , 1 , 0 , 1)

Block- Saraskana

490 T02 T02-Jharpokharia to New -- 4.320 3.750 Complete 24 140.43 98.54 238.97 12.04 (0 , 0 , 1 , 0 , 1) Kulapata Road 491 T02 T02-Jharpokharia to New Cold Mix 3.840 3.750 Complete 5 128.53 90.05 218.58 21.59 (0 , 0 , 1 , 0 , 1) Kulapata Road Technology Block Saraskana Total 8.160 29 268.96 188.59 457.55 33.63 (0 , 0 , 2 , 0 , 2)

Block- Thakurmunda

492 L064 L064-S H 53 to Ranibhol New Cement 1.230 3.750 Complete 5 33.84 23.71 57.55 5.13 (0 , 0 , 1 , 0 , 1) Stabilization Block Thakurmunda Total 1.230 5 33.84 23.71 57.55 5.13 (0 , 0 , 1 , 0 , 1)

District Mayurbhanj Total 63.199 238 1,982.57 1,390.59 3,373.16 273.90 (0 , 3 , 12 , 0 , 15) District- Nawarangpur

Block- Dabugam

493 L055 L055-Ghodakhunta to New -- 3.400 3.000 Complete 5 89.29 62.55 151.84 12.01 (0 , 0 , 0 , 2 , 2) Induguda road Block Dabugam Total 3.400 5 89.29 62.55 151.84 12.01 (0 , 0 , 0 , 2 , 2)

Page 45 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Jharigam

494 T10 T10-Karmari to Nagolsil New -- 11.570 3.000 Complete 32 284.75 199.56 484.31 34.76 (0 , 0 , 3 , 0 , 3) road Block Jharigam Total 11.570 32 284.75 199.56 484.31 34.76 (0 , 0 , 3 , 0 , 3)

Block- Kosagumuda

495 L064 L064-RD road jn to New -- 3.750 3.000 Complete 6 85.10 59.66 144.76 11.47 (0 , 0 , 1 , 0 , 1) Mankhuna 496 L050 L050-Bada Amda to New -- 5.000 3.000 Complete 10 116.77 81.84 198.61 15.90 (0 , 1 , 0 , 1 , 2) Budaguda 497 L027 L027-Kodinga to New Cold Mix 7.000 3.000 Complete 14 172.12 120.77 292.89 26.70 (0 , 0 , 1 , 1 , 2) Haladipakhana Technology Block Kosagumuda Total 15.750 30 373.99 262.27 636.26 54.07 (0 , 1 , 2 , 2 , 5)

Block- Nowrangpur

498 L024 L024-Baghasiuni to New -- 4.700 3.000 Complete 11 115.39 80.86 196.25 15.30 (0 , 0 , 0 , 2 , 2) Mosaguda road Block Nowrangpur Total 4.700 11 115.39 80.86 196.25 15.30 (0 , 0 , 0 , 2 , 2)

Block- Raighar

499 T10 T10-Raighar to Hatigaon New Cold Mix 5.000 3.000 Complete 13 113.94 79.95 193.89 16.48 (0 , 1 , 0 , 0 , 1) Technology Block Raighar Total 5.000 13 113.94 79.95 193.89 16.48 (0 , 1 , 0 , 0 , 1)

Block- Umerkote

500 L076 L076-L10075 to Dongriguda New -- 0.900 3.000 Complete 2 23.30 16.35 39.65 2.40 (0 , 0 , 1 , 0 , 1)

Block Umerkote Total 0.900 2 23.30 16.35 39.65 2.40 (0 , 0 , 1 , 0 , 1)

District Nawarangpur Total 41.320 93 1,000.66 701.54 1,702.20 135.02 (0 , 2 , 6 , 6 , 14)

Page 46 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District- Nayagarh

Block- Bhapur

501 L047 L047-MDR 68 to Hanumanta New -- 3.500 3.750 Complete 13 123.46 86.49 209.95 17.00 (0 , 1 , 0 , 0 , 1) prasad 502 L044 L044-RD Road to Kaliapalli New -- 2.400 3.750 Complete 9 85.96 60.22 146.18 11.77 (0 , 0 , 1 , 0 , 1)

503 L024 L024-MDR 68 to Dubapalli New -- 1.000 3.750 Complete 2 30.93 21.68 52.61 2.30 (0 , 0 , 1 , 0 , 1)

504 L029 L029-MDR 68 to Salabani New -- 1.800 3.750 Complete 4 64.84 45.41 110.25 8.83 (0 , 0 , 2 , 0 , 2)

505 L039 L039-RD Road to New -- 4.000 3.750 Complete 8 138.98 97.36 236.34 18.96 (0 , 0 , 1 , 0 , 1) Kunjabanaprasad Block Bhapur Total 12.700 36 444.17 311.16 755.33 58.86 (0 , 1 , 5 , 0 , 6)

Block- Daspalla

506 L038 L038-MDR 18 to Dindabhuin New Cold Mix 3.000 3.750 Complete 4 109.49 76.70 186.19 13.66 (0 , 1 , 0 , 0 , 1) Technology
Roller Compacted Concrete Pavement 507 L117 L117-NH 224 to Burusahi New -- 1.500 3.750 Complete 5 55.66 38.98 94.64 7.45 (0 , 0 , 1 , 0 , 1)

508 L069 L069-Sindurakumpa to New -- 1.600 3.750 Complete 3 55.28 38.73 94.01 7.36 (0 , 0 , 1 , 1 , 2) Araniganda 509 L057 L057-Poibadi to Khalisahi New -- 4.600 3.750 Complete 8 161.05 112.85 273.90 21.51 (0 , 0 , 1 , 0 , 1)

510 L068 L068-RD Road to New -- 2.500 3.750 Complete 6 89.56 62.73 152.29 11.96 (0 , 0 , 1 , 0 , 1) Sindurakumpa 511 L056 L056-Khalamada to New -- 5.400 3.750 Complete 16 195.80 137.16 332.96 25.91 (0 , 0 , 1 , 0 , 1) Kusumagadia 512 L041 L041-MDR 18 to Baghuapasi New -- 0.800 3.750 Complete 1 22.34 15.65 37.99 3.66 (0 , 0 , 1 , 0 , 1)

513 L105 L105-NH 224 to Mahulia New -- 1.900 3.750 Complete 5 65.81 46.11 111.92 8.83 (0 , 0 , 1 , 0 , 1)

Page 47 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

514 L049 L049-NH 224 to New -- 3.200 3.750 Complete 8 108.47 76.02 184.49 14.73 (0 , 0 , 2 , 0 , 2) Paikabaghuabereni 515 L025 L025-R D Road to Kadalibari New -- 5.810 3.750 Complete 12 199.24 139.61 338.85 26.62 (0 , 0 , 1 , 2 , 3)

516 L092 L092-NH 224 to Tilabari New -- 1.650 3.750 Complete 5 55.41 38.88 94.29 7.50 (0 , 0 , 1 , 0 , 1)

517 L087 L087-NH 224 to Duda New -- 8.600 3.750 Complete 10 270.26 189.36 459.62 43.74 (0 , 0 , 1 , 0 , 1)

518 L098 L098-NH 224 to Saliagochha New -- 3.450 3.750 Complete 8 121.39 85.03 206.42 16.20 (0 , 0 , 1 , 1 , 2)

519 L089 L089-NH 224 to Janipadar New -- 2.400 3.750 Complete 6 83.47 58.48 141.95 11.36 (0 , 0 , 1 , 0 , 1)

520 L023 L023-Ghugudipada to New Cold Mix 6.710 3.750 Complete 16 239.63 167.95 407.58 29.58 (0 , 0 , 1 , 3 , 4) Raimada Technology
Roller Compacted Concrete Pavement Block Daspalla Total 53.120 113 1,832.86 1,284.24 3,117.10 250.07 (0 , 1 , 15 , 7 , 23) Block- Gania

521 L038 L038-Pandarasinga to New -- 1.000 3.750 Complete 3 35.11 24.60 59.71 4.67 (0 , 0 , 1 , 0 , 1) Khalisara 522 L033 L033-MDR 18 PWD road to New -- 0.500 3.750 Complete 3 17.58 12.32 29.90 2.35 (0 , 0 , 1 , 1 , 2) Purunachandapur 523 L023 L023-Iswarpur to New Cold Mix 7.000 3.750 Complete 16 252.19 176.75 428.94 31.60 (0 , 1 , 1 , 2 , 4) Kimbhirakhani Technology
Roller Compacted Concrete Pavement 524 L051 L051-PWD road to New -- 0.600 3.750 Complete 2 20.57 14.44 35.01 2.74 (0 , 0 , 1 , 0 , 1) Benthisahi 525 L039 L039-MDR 18 PWD road to New -- 1.800 3.750 Complete 6 59.96 42.01 101.97 7.91 (0 , 0 , 1 , 0 , 1) Erundipathar Block Gania Total 10.900 30 385.41 270.12 655.53 49.27 (0 , 1 , 5 , 3 , 9)

Page 48 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Khandapara

526 L067 L067-RD road to New -- 7.200 3.750 Complete 17 235.43 164.97 400.40 35.05 (0 , 0 , 2 , 0 , 2) Kandhamirigi 527 L065 L065-RD road to New -- 1.200 3.750 Complete 3 45.02 31.56 76.58 6.15 (0 , 0 , 1 , 0 , 1) Mainsibindha 528 L058 L058-MDR 68 to Koduanpalli New Cold Mix 9.500 3.750 Complete 24 341.32 239.10 580.42 46.30 (0 , 0 , 4 , 0 , 4) Technology
Roller Compacted Concrete Pavement 529 L057 L057-ODR to Kiajharpatna New -- 0.960 3.750 Complete 4 34.26 24.01 58.27 4.67 (0 , 0 , 1 , 0 , 1)

530 L051 L051-ODR to Bedangi New -- 1.200 3.750 Complete 3 45.22 31.68 76.90 6.21 (0 , 0 , 1 , 0 , 1)

531 L050 L050-ODR to Duttapokhari New -- 3.500 3.750 Complete 9 123.22 86.33 209.55 16.78 (0 , 0 , 1 , 0 , 1)

532 L066 L066-Dholamara to Paik New -- 2.200 3.750 Complete 4 80.95 56.72 137.67 11.05 (0 , 0 , 2 , 0 , 2) Dholamara 533 L059 L059-ODR to Saradhapur New -- 1.600 3.750 Complete 4 59.13 41.43 100.56 8.08 (0 , 0 , 1 , 0 , 1)

534 L043 L043-R D road to Gopalipada New -- 1.000 3.750 Complete 3 33.92 23.76 57.68 2.69 (0 , 0 , 1 , 0 , 1)

535 L047 L047-MDR 68 to Gandasahi New -- 2.150 3.750 Complete 5 75.07 52.60 127.67 10.25 (0 , 0 , 1 , 0 , 1)

536 L070 L070-MDR to Ghodamari New -- 2.050 3.750 Complete 4 68.95 48.30 117.25 9.41 (0 , 0 , 1 , 0 , 1) Nuagaon 537 L028 L028-MDR 68 to Baradabari New -- 2.100 3.750 Complete 4 76.85 53.85 130.70 10.46 (0 , 0 , 1 , 0 , 1)

Block Khandapara Total 34.660 84 1,219.34 854.31 2,073.65 167.10 (0 , 0 , 17 , 0 , 17) Block- Nayagarh

538 L108 L108-Sajanapada to New -- 1.500 3.750 Complete 2 50.93 35.74 86.67 7.24 (0 , 0 , 1 , 0 , 1) 539 L079 L079-Dianpada to Barapalla New Terrazyme 5.450 3.750 Complete 17 176.15 123.60 299.75 26.47 (0 , 0 , 1 , 0 , 1)

Page 49 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

540 L069 L069-PWD road to Udayapur New -- 3.100 3.750 Complete 8 106.64 74.72 181.36 17.92 (0 , 0 , 1 , 0 , 1)

541 L122 L122-RD road to New -- 1.000 3.750 Complete 1 33.91 23.82 57.73 4.86 (0 , 0 , 1 , 0 , 1) Jayamangalprasad 542 L095 L095-Block Road to New -- 1.000 3.750 Complete 2 33.97 23.89 57.86 4.97 (0 , 0 , 1 , 0 , 1) Malatipur 543 L025 L025-NH road to New -- 1.000 3.750 Complete 1 35.56 24.97 60.53 5.30 (0 , 0 , 1 , 0 , 1) Banamalipur 544 L050 L050-Gambharidihi to New -- 1.800 3.750 Complete 2 60.47 42.37 102.84 9.17 (0 , 0 , 1 , 0 , 1) Chandrasekharpura 545 L047 L047-ODR to Nandapur New -- 1.100 3.750 Complete 3 39.81 27.95 67.76 5.67 (0 , 0 , 1 , 0 , 1)

546 L037 L037-RD road to Nuagaon New -- 3.550 3.750 Complete 6 119.98 84.28 204.26 17.22 (0 , 0 , 1 , 0 , 1)

Block Nayagarh Total 19.500 42 657.42 461.34 1,118.76 98.82 (0 , 0 , 9 , 0 , 9)

Block- Nuagaon

547 L059 L059-PWD Road to New -- 1.500 3.750 Complete 4 50.27 35.24 85.51 6.40 (0 , 0 , 1 , 0 , 1) Kainthapalli 548 L053 L053-PWD Road to Bantala New -- 0.800 3.750 Complete 3 27.40 19.19 46.59 3.64 (0 , 0 , 1 , 0 , 1)

549 L025 L025-RD Road to Rohisahi New -- 1.110 3.750 Complete 3 32.66 22.89 55.55 4.34 (0 , 0 , 1 , 0 , 1)

550 L099 L099-RD Road to Gouda New -- 1.500 3.750 Complete 4 45.50 31.88 77.38 6.11 (0 , 0 , 1 , 0 , 1) chanchera 551 L070 L070-Beruanbari to Podasahi New -- 5.210 3.750 Complete 8 168.90 118.39 287.29 22.67 (0 , 0 , 2 , 0 , 2)

552 L071 L071-Beladwara to Kepeti New -- 3.000 3.750 Complete 2 75.34 52.78 128.12 14.29 (0 , 0 , 1 , 1 , 2)

553 L023 L023-Balabhadrapur to New Cold Mix 7.000 3.750 Complete 13 235.29 165.11 400.40 28.73 (0 , 0 , 1 , 0 , 1) Dhipamala Technology
Roller Compacted Concrete Pavement 554 L119 L119-Kriyalanji to New -- 2.500 3.750 Complete 8 81.26 56.98 138.24 10.71 (0 , 0 , 1 , 0 , 1) Gopinathpur

Page 50 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

555 L055 L055-PWD Road to Odakapa New -- 1.470 3.750 Complete 3 48.85 34.23 83.08 6.45 (0 , 0 , 1 , 0 , 1)

Block Nuagaon Total 24.090 48 765.47 536.69 1,302.16 103.34 (0 , 0 , 10 , 1 , 11) Block- Odagaon

556 L091 L091-RD Road to New Terrazyme 2.250 3.750 Complete 7 78.96 55.39 134.35 11.21 (0 , 0 , 1 , 0 , 1) Madanagadia 557 L094 L094-RD Road to New -- 3.000 3.750 Complete 6 106.01 74.42 180.43 14.83 (0 , 0 , 1 , 0 , 1) Bitalagadia 558 L085 L085-Dalaka to Jaringi New -- 1.740 3.750 Complete 6 63.68 44.72 108.40 8.88 (0 , 0 , 1 , 0 , 1)

559 L026 L026-PWD Road to New -- 1.600 3.750 Complete 3 58.28 40.91 99.19 7.95 (0 , 0 , 1 , 0 , 1) Kurudanga 560 L030 L030-RD Road to New -- 1.200 3.750 Complete 3 43.74 30.71 74.45 6.15 (0 , 0 , 1 , 0 , 1) Kunjabanapali 561 L075 L075-PWD Road to New -- 1.900 3.750 Complete 4 67.64 47.51 115.15 9.46 (0 , 0 , 2 , 0 , 2) Nabaratnapur 562 L056 L056-Dalaka to Matha New CELL Filled 1.980 3.750 Complete 8 69.66 48.90 118.56 9.83 (0 , 0 , 1 , 0 , 1) Khajuria Concrete 563 L069 L069-Madanapur to Dahangi New -- 2.800 3.750 Complete 9 101.09 70.95 172.04 14.98 (0 , 0 , 1 , 0 , 1)

Block Odagaon Total 16.470 46 589.06 413.51 1,002.57 83.29 (0 , 0 , 9 , 0 , 9)

Block- Ranpur

564 L094 L094-Binodpada to New -- 6.300 3.750 Complete 11 200.60 140.79 341.39 30.73 (0 , 0 , 1 , 0 , 1) Gambharikhola Block Ranpur Total 6.300 11 200.60 140.79 341.39 30.73 (0 , 0 , 1 , 0 , 1)

District Nayagarh Total 177.740 410 6,094.33 4,272.16 10,366.49 841.49 (0 , 3 , 71 , 11 , 85) District- Nuapara

Page 51 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Khariar

565 L047 L047-Birighat to Bikrampur New Cold Mix 5.450 3.750 Complete 13 142.88 100.27 243.15 19.44 (0 , 0 , 1 , 1 , 2) via Kodaldangri Technology
Roller Compacted Concrete Pavement Block Khariar Total 5.450 13 142.88 100.27 243.15 19.44 (0 , 0 , 1 , 1 , 2)

Block- Komna

566 L051 L051-NH217 to Jhalkisuma New -- 1.000 3.750 Complete 3 25.48 17.87 43.35 3.62 (0 , 1 , 0 , 0 , 1)

567 L105 L105-Dianmunda to New -- 17.000 3.750 Complete 40 477.23 334.34 811.57 65.20 (0 , 1 , 0 , 0 , 1) Mundapala 568 L062 L062-PWD Road to New -- 1.000 3.750 Complete 3 29.89 20.97 50.86 4.33 (0 , 0 , 1 , 0 , 1) Chhatriapara 569 L059 L059-Belgaon to Kunjapada New -- 7.700 3.750 Complete 18 205.55 144.02 349.57 29.36 (0 , 0 , 1 , 0 , 1)

570 L048 L048-NH217 to Palsipani via New -- 4.300 3.750 Complete 10 109.46 76.71 186.17 15.40 (0 , 0 , 1 , 0 , 1) Dharamsagar 571 L056 L056-PWD Road to Sanbahali New -- 1.100 3.750 Complete 4 27.49 19.28 46.77 3.92 (0 , 1 , 0 , 0 , 1)

Block Komna Total 32.100 78 875.10 613.19 1,488.29 121.82 (0 , 3 , 3 , 0 , 6)

Block- Sinpalli

572 L028 L028-Bharuamunda to New -- 4.800 3.750 Complete 8 130.55 91.47 222.02 18.19 (0 , 1 , 0 , 0 , 1) Gambhariguda Block Sinpalli Total 4.800 8 130.55 91.47 222.02 18.19 (0 , 1 , 0 , 0 , 1)

District Nuapara Total 42.350 99 1,148.53 804.93 1,953.46 159.46 (0 , 4 , 4 , 1 , 9)

District- Phulbani(Kandhamal)

Page 52 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Balliguda

573 L030 L030-Sirsipanga to Gangeri New -- 6.050 3.000 Complete 16 159.38 111.67 271.05 23.17 (0 , 0 , 1 , 1 , 2) road Block Balliguda Total 6.050 16 159.38 111.67 271.05 23.17 (0 , 0 , 1 , 1 , 2)

Block- Daringbadi

574 L056 L056-DAbedi to Badangia New -- 12.720 3.000 Complete 29 316.54 221.80 538.34 43.07 (0 , 0 , 2 , 0 , 2) road 575 L052 L052-PWD road to New -- 4.770 3.000 Complete 13 128.11 89.76 217.87 17.43 (0 , 0 , 1 , 0 , 1) Pidatamaha road 576 L043 L043-Bamunigaon to Danegsi New -- 4.050 3.000 Complete 11 105.62 74.01 179.63 14.18 (0 , 0 , 1 , 0 , 1) road 577 L025 L025-Maubadi Chhak to New -- 8.670 3.000 Complete 23 212.57 148.94 361.51 29.17 (0 , 0 , 2 , 0 , 2) Kusipanga road 578 L068 L068-Terabedi chhak to New -- 2.550 3.000 Complete 7 61.93 43.39 105.32 8.31 (0 , 0 , 2 , 0 , 2) Dalabadi road 579 L070 L070-Tillori to Tikamaha New -- 5.400 3.000 Complete 17 132.18 92.62 224.80 17.97 (0 , 0 , 1 , 3 , 4) road 580 L053 L053-PWD road to Bijati New -- 5.640 3.000 Complete 14 158.57 111.10 269.67 21.49 (0 , 0 , 1 , 1 , 2) road 581 L037 L037-RD road to Ulipadar New -- 2.100 3.000 Complete 5 50.77 35.57 86.34 6.90 (0 , 0 , 1 , 0 , 1) road 582 L073 L073-Budungan to Balligeda New -- 12.720 3.000 Complete 35 338.64 237.28 575.92 50.52 (0 , 0 , 1 , 2 , 3) road Block Daringbadi Total 58.620 154 1,504.93 1,054.47 2,559.40 209.04 (0 , 0 , 12 , 6 , 18) Block- G.Udayagiri

583 L031 L031-PWD road to New -- 2.450 3.000 Complete 6 67.69 47.43 115.12 9.47 (0 , 0 , 1 , 0 , 1) Mundakanga 584 L027 L027-PWD Road to Kilakia New -- 1.200 3.000 Complete 3 34.70 24.32 59.02 4.70 (0 , 0 , 1 , 0 , 1)

Page 53 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

585 L036 L036-PWD Road to New -- 2.550 3.000 Complete 8 72.98 51.13 124.11 9.74 (0 , 0 , 1 , 0 , 1) Katadagandha Block G.Udayagiri Total 6.200 17 175.37 122.88 298.25 23.91 (0 , 0 , 3 , 0 , 3)

Block- K.Nuagaon

586 L039 L039-NH 217 to Gunjigan New -- 1.000 3.000 Complete 4 24.33 17.05 41.38 3.32 (0 , 0 , 1 , 0 , 1) road 587 L040 L040-Sritiguda to New -- 1.650 3.000 Complete 4 44.00 30.84 74.84 5.99 (0 , 0 , 2 , 0 , 2) Budrumaha road 588 L028 L028-RD road to Panganaju New -- 0.700 3.000 Complete 2 19.06 13.35 32.41 2.57 (0 , 0 , 1 , 1 , 2) road 589 L051 L051-Balipadar to New -- 3.750 3.000 Complete 10 93.07 65.22 158.29 12.21 (0 , 0 , 1 , 0 , 1) Gochhapada road Block K.Nuagaon Total 7.100 20 180.46 126.46 306.92 24.09 (0 , 0 , 5 , 1 , 6)

Block- Khajuripada

590 L024 L024-Lambagudari Jn to New -- 3.000 3.000 Complete 8 81.19 56.88 138.07 10.97 (0 , 0 , 1 , 0 , 1) Karuna 591 L031 L031-PWD Road to Meru New -- 1.200 3.000 Complete 5 34.19 23.95 58.14 4.66 (0 , 0 , 1 , 0 , 1)

592 L043 L043-RD Road to Gedripaju New -- 4.000 3.000 Complete 11 110.03 77.10 187.13 14.97 (0 , 0 , 1 , 0 , 1)

593 L023 L023-Lambagudari to New -- 2.000 3.000 Complete 6 55.12 38.63 93.75 7.55 (0 , 0 , 1 , 0 , 1) Jhadabalaskumpa 594 L039 L039-Balaskumpa to New Cold Mix 4.950 3.000 Complete 12 137.20 96.28 233.48 18.13 (0 , 0 , 1 , 0 , 1) Chandupadar Technology 595 L027 L027-Kharuripada to New -- 2.200 3.000 Complete 6 62.20 43.58 105.78 8.44 (0 , 0 , 1 , 0 , 1) Penabali Block Khajuripada Total 17.350 48 479.93 336.42 816.35 64.72 (0 , 0 , 6 , 0 , 6)

Page 54 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Kotgarh

596 L045 L045-PWD road to New -- 2.750 3.000 Complete 7 76.96 53.93 130.89 10.40 (0 , 0 , 1 , 1 , 2) Upparmadhuguda road 597 L023 L023-RD road to Gahiguda New -- 2.000 3.000 Complete 7 56.23 39.40 95.63 7.57 (0 , 0 , 1 , 0 , 1) road 598 L033 L033-Ora to Pilleri road New -- 2.490 3.000 Complete 6 67.64 47.40 115.04 8.99 (0 , 0 , 2 , 0 , 2)

599 L044 L044-Madaguda to Budaguda New -- 5.370 3.000 Complete 12 127.25 89.16 216.41 17.21 (0 , 0 , 1 , 2 , 3) road 600 L035 L035-Dharakote RD road to New -- 4.000 3.000 Complete 12 99.62 69.81 169.43 13.62 (0 , 0 , 1 , 2 , 3) Kalisiguda road Block Kotgarh Total 16.610 44 427.70 299.70 727.40 57.79 (0 , 0 , 6 , 5 , 11) Block- Phiringia

601 L061 L061-Talapanga Jn to New -- 4.100 3.000 Complete 10 120.28 84.27 204.55 16.41 (0 , 0 , 1 , 0 , 1) Kenduguda 602 L046 L046-Musulipanga to New Cold Mix 9.000 3.750 Complete 16 242.40 169.85 412.25 36.44 (0 , 0 , 3 , 3 , 6) Sadipanga Technology 603 L066 L066-Balandapada to New -- 1.600 3.000 Complete 5 45.12 31.61 76.73 6.16 (0 , 0 , 1 , 0 , 1) Bapanga Block Phiringia Total 14.700 31 407.80 285.73 693.53 59.01 (0 , 0 , 5 , 3 , 8)

Block- Tumudibandh

604 L022 L022-RD road to Kadakurupa New -- 1.750 3.000 Complete 5 48.29 33.84 82.13 6.53 (0 , 0 , 1 , 0 , 1) road 605 L028 L028-Malangpadar to New -- 8.600 3.000 Complete 21 220.51 154.51 375.02 30.00 (0 , 0 , 2 , 1 , 3) Budakumba road 606 L043 L043-Jhiripani to Baragaon New -- 4.350 3.000 Complete 8 108.23 75.84 184.07 14.74 (0 , 0 , 1 , 1 , 2) road Block Tumudibandh Total 14.700 34 377.03 264.19 641.22 51.27 (0 , 0 , 4 , 2 , 6)

District Phulbani(Kandhamal) Total 141.330 364 3,712.60 2,601.52 6,314.12 513.00 (0 , 0 , 42 , 18 , 60)

Page 55 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District- Puri

Block- Pipili

607 L031 L031-NH203 to Gobindpur New Cold Mix 2.830 3.750 Complete 6 93.23 65.32 158.55 17.60 (0 , 1 , 0 , 0 , 1) Technology Block Pipili Total 2.830 6 93.23 65.32 158.55 17.60 (0 , 1 , 0 , 0 , 1)

District Puri Total 2.830 6 93.23 65.32 158.55 17.60 (0 , 1 , 0 , 0 , 1)

District- Rayagada

Block- Bissam Cuttack

608 L031 L031-RD Road to Bondili New -- 1.500 3.750 Complete 7 48.25 33.79 82.04 8.25 (0 , 0 , 1 , 0 , 1)

609 L080 L080-Bissamcuttack to New -- 1.400 3.750 Complete 7 44.88 31.44 76.32 7.17 (0 , 0 , 1 , 0 , 1) Pedipadar 610 L060 L060-RD road to Penta New -- 2.450 3.750 Complete 19 76.74 53.80 130.54 12.49 (0 , 0 , 1 , 0 , 1)

611 L026 L026-RD Road to Sikabandha New -- 2.000 3.750 Complete 7 65.42 45.83 111.25 11.21 (0 , 0 , 1 , 0 , 1)

612 L025 L025-RD Road to New -- 2.400 3.750 Complete 9 76.28 53.43 129.71 12.78 (0 , 0 , 1 , 0 , 1) Jhinjiripanga 613 L074 L074-Kurli to Bhatigumma New -- 4.700 3.750 Complete 19 156.49 109.63 266.12 39.88 (0 , 0 , 1 , 0 , 1)

614 L038 L038-RD road to New -- 6.650 3.750 Complete 27 207.66 145.47 353.13 57.05 (0 , 0 , 1 , 1 , 2) Ghusiripadar Block Bissam Cuttack Total 21.100 95 675.72 473.39 1,149.11 148.83 (0 , 0 , 7 , 1 , 8)

Block- Chandrapur

615 T02 T02-Chandrapur to New -- 22.000 3.750 Complete 43 692.14 484.96 1,177.10 100.60 (0 , 1 , 1 , 2 , 4) Madhukupuda 616 L056 L056-Majhiguda to Sitagudi New Cold Mix 6.500 3.750 Complete 20 185.18 129.76 314.94 28.96 (0 , 0 , 1 , 2 , 3) Technology 617 L036 L036-PS Road to Bengasi New -- 7.000 3.750 Complete 20 225.10 157.76 382.86 31.93 (0 , 0 , 1 , 3 , 4)

Page 56 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

618 L054 L054-RD Road to Jubagudi New -- 10.000 3.750 Complete 15 292.27 204.79 497.06 45.00 (0 , 0 , 1 , 1 , 2)

619 L067 L067-R.D. Road to Runguthi New -- 5.000 3.750 Complete 12 152.50 106.84 259.34 22.58 (0 , 0 , 1 , 0 , 1)

620 L064 L064-RD Road to Munurigam New Cold Mix 2.500 3.750 Complete 6 51.70 36.22 87.92 11.35 (0 , 0 , 1 , 0 , 1) Technology
Terrazyme 621 L046 L046-Dangasorada S Hiriba New -- 15.000 3.750 Complete 35 445.44 312.17 757.61 66.77 (0 , 0 , 1 , 0 , 1)

622 L058 L058-RD Road to Budubali New Cold Mix 4.500 3.750 Complete 5 97.71 68.57 166.28 19.48 (0 , 0 , 1 , 0 , 1) Technology 623 L059 L059-Hanumantpur to New Cold Mix 8.300 3.750 Complete 11 224.04 157.21 381.25 34.64 (0 , 0 , 1 , 1 , 2) Kadisur Technology 624 L055 L055-Hanumantapur to New -- 20.500 3.750 Complete 22 533.81 373.94 907.75 76.97 (0 , 0 , 2 , 1 , 3) Gorlagudi 625 L047 L047-RD Road to Gendabaju New -- 18.000 3.750 Complete 35 607.82 425.85 1,033.67 100.42 (0 , 0 , 1 , 7 , 8)

626 L042 L042-RD Road to Daberi New -- 7.500 3.750 Complete 15 231.49 162.19 393.68 54.09 (0 , 0 , 1 , 1 , 2)

Block Chandrapur Total 126.800 239 3,739.20 2,620.26 6,359.46 592.78 (0 , 1 , 13 , 18 , 32) Block- Gudari

627 L042 L042-Madhuban to Kandha New Cold Mix 2.500 3.750 Complete 6 82.66 58.01 140.67 11.35 (0 , 0 , 1 , 0 , 1) Kinjiri Technology Block Gudari Total 2.500 6 82.66 58.01 140.67 11.35 (0 , 0 , 1 , 0 , 1)

Block- Gunupur

628 L024 L024-Putasingi to New -- 5.000 3.750 Complete 15 160.51 112.44 272.95 10.50 (0 , 0 , 1 , 0 , 1) Sindhubadi Block Gunupur Total 5.000 15 160.51 112.44 272.95 10.50 (0 , 0 , 1 , 0 , 1)

Block- Kashipur

629 T02 T02-Godibali to Sankarada New -- 5.400 3.750 Complete 16 189.17 132.52 321.69 33.02 (0 , 1 , 0 , 0 , 1)

Page 57 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

630 L106 L106-PWD Road to New -- 4.800 3.750 Complete 14 142.93 100.15 243.08 30.48 (0 , 0 , 1 , 0 , 1) Roghapadar 631 L041 L041-PWD Road to New -- 3.000 3.750 Complete 9 87.16 61.09 148.25 24.53 (0 , 1 , 0 , 0 , 1) Sanamatikona 632 L110 L110-RD Road to kutinga New -- 2.950 3.750 Complete 9 96.08 67.34 163.42 18.78 (0 , 0 , 1 , 0 , 1)

Block Kashipur Total 16.150 48 515.34 361.10 876.44 106.81 (0 , 2 , 2 , 0 , 4)

Block- Kolnara

633 T02 T02-Mukundapur to New -- 7.190 3.750 Complete 23 232.21 162.71 394.92 32.91 (0 , 0 , 1 , 0 , 1) Panichatra 634 L032 L032-RD Road to New -- 5.400 3.750 Complete 18 179.65 125.89 305.54 25.82 (0 , 0 , 1 , 0 , 1) Marichakona Block Kolnara Total 12.590 41 411.86 288.60 700.46 58.73 (0 , 0 , 2 , 0 , 2)

Block- Muniguda

635 L023 L023-RD road to Badamudra New -- 5.500 3.750 Complete 16 146.89 102.89 249.78 22.76 (0 , 0 , 1 , 0 , 1)

636 L072 L072-PS road to Gudikhal New -- 2.800 3.750 Complete 12 91.89 64.37 156.26 15.84 (0 , 0 , 1 , 0 , 1)

Block Muniguda Total 8.300 28 238.78 167.26 406.04 38.60 (0 , 0 , 2 , 0 , 2)

Block- Padmapur

637 T03 T03-Padmapur to Sourapalli New -- 11.900 3.750 Complete 42 346.63 242.84 589.47 53.45 (0 , 0 , 1 , 0 , 1)

Block Padmapur Total 11.900 42 346.63 242.84 589.47 53.45 (0 , 0 , 1 , 0 , 1)

Block- Rayagada

638 L042 L042-Kereda to Bilesu New -- 3.170 3.750 Complete 13 97.94 68.61 166.55 14.18 (0 , 1 , 0 , 0 , 1)

639 L065 L065-Tadama to Kanchmuhi New Cold Mix 4.850 3.750 Complete 13 153.20 107.32 260.52 19.70 (0 , 0 , 1 , 0 , 1) Technology 640 T02 T02-Jimidipeta to New -- 0.650 3.750 Complete 3 21.63 15.18 36.81 1.92 (0 , 0 , 1 , 0 , 1) Pipalaguda

Page 58 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

641 L060 L060-PWD Road to New -- 0.600 3.750 Complete 3 19.68 13.79 33.47 1.92 (0 , 0 , 1 , 0 , 1) Bishnuguda 642 L023 L023-Karubai to Kaneli New -- 5.130 3.750 Complete 15 161.62 113.22 274.84 23.52 (0 , 0 , 1 , 0 , 1)

643 L035 L035-PWD Road to New -- 7.250 3.750 Complete 15 204.68 143.38 348.06 33.98 (0 , 1 , 0 , 0 , 1) Dangartulasi 644 L084 L084-PWD Road to Jambu New -- 2.050 3.750 Complete 6 55.50 38.88 94.38 9.42 (0 , 0 , 1 , 0 , 1)

645 L037 L037-B Halwa to Jhanjamani New -- 2.320 3.750 Complete 7 68.26 47.81 116.07 10.37 (0 , 0 , 1 , 0 , 1)

Block Rayagada Total 26.020 75 782.51 548.19 1,330.70 115.02 (0 , 2 , 6 , 0 , 8)

District Rayagada Total 230.360 589 6,953.21 4,872.09 11,825.30 1,136.07 (0 , 5 , 35 , 19 , 59) District- Sambalpur

Block- Bamra

646 L053 L053-Mahulpali to New -- 3.000 3.750 Complete 7 89.38 62.60 151.98 12.58 (0 , 0 , 1 , 1 , 2) Chhatabar Block Bamra Total 3.000 7 89.38 62.60 151.98 12.58 (0 , 0 , 1 , 1 , 2)

Block- Dhankauda

647 L028 L028-PWD Road to Goudpali New -- 2.180 3.000 Complete 5 56.77 39.82 96.59 6.99 (0 , 0 , 1 , 0 , 1)

648 L099 L099-NH6 Mahammadpur to New -- 2.070 3.000 Complete 4 45.82 32.15 77.97 5.55 (0 , 0 , 1 , 0 , 1) Dumerpada Road Block Dhankauda Total 4.250 9 102.59 71.97 174.56 12.54 (0 , 0 , 2 , 0 , 2)

Block- Jamankira

649 L119 L119-RD road to New Waste Plastics 9.300 3.750 Complete 10 251.35 176.20 427.55 30.56 (0 , 0 , 3 , 1 , 4) Jatiakholdihi 650 L084 L084-RD Road to Langabahal New -- 2.600 3.000 Complete 5 64.46 45.21 109.67 7.95 (0 , 0 , 1 , 0 , 1) Bad 651 L106 L106-PMGSY road to New -- 2.390 3.000 Complete 5 55.19 38.72 93.91 6.77 (0 , 0 , 1 , 0 , 1) Jharaniktimal

Page 59 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

652 L078 L078-Mudhenpali to New -- 2.950 3.000 Complete 8 77.41 54.30 131.71 9.67 (0 , 0 , 1 , 0 , 1) Sardhabahal Block Jamankira Total 17.240 28 448.41 314.43 762.84 54.95 (0 , 0 , 6 , 1 , 7)

Block- Jujumura

653 L091 L091-NH6 to Paidmal New -- 2.180 3.000 Complete 9 64.60 45.30 109.90 7.80 (0 , 0 , 1 , 0 , 1)

654 L073 L073-RD Road to Talbeda New -- 0.770 3.000 Complete 4 17.82 12.51 30.33 2.25 (0 , 0 , 1 , 0 , 1)

655 L097 L097-Hapriabahal to New -- 0.690 3.000 Complete 2 15.86 11.13 26.99 1.88 (0 , 0 , 1 , 0 , 1) Panduapali 656 L024 L024-RD Road to Ladladi New -- 0.810 3.000 Complete 3 20.50 14.39 34.89 2.60 (0 , 0 , 1 , 0 , 1)

657 L042 L042-NH42 to Orampada New -- 0.840 3.000 Complete 3 24.74 17.35 42.09 2.90 (0 , 0 , 1 , 0 , 1)

658 L082 L082-RD Road to Sargipada New -- 1.400 3.000 Complete 3 36.86 25.86 62.72 4.49 (0 , 0 , 2 , 0 , 2)

659 L087 L087-NH42 to Rasiapada New -- 1.280 3.000 Complete 4 26.89 18.86 45.75 3.41 (0 , 0 , 1 , 0 , 1)

660 L105 L105-Kabrapali to New -- 0.740 3.000 Complete 2 15.73 11.03 26.76 1.92 (0 , 0 , 1 , 0 , 1) Phatabahal Block Jujumura Total 8.710 30 223.00 156.43 379.43 27.25 (0 , 0 , 9 , 0 , 9)

Block- Maneswar

661 L061 L061-Badmal Chhak to New Cold Mix 3.640 3.750 Complete 6 88.06 61.79 149.85 10.02 (0 , 0 , 1 , 0 , 1) Birghat Technology
Roller Compacted Concrete Pavement 662 L022 L022-Rd road to Barat New -- 2.705 3.000 Complete 8 74.81 52.46 127.27 9.05 (0 , 0 , 1 , 1 , 2)

Page 60 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

663 L038 L038-NH42 to Balaranga New Cold Mix 5.500 3.000 Complete 12 152.41 106.94 259.35 19.01 (0 , 0 , 1 , 2 , 3) Technology
Roller Compacted Concrete Pavement 664 L037 L037-NH42 to Brahmanipali New -- 0.930 3.000 Complete 4 22.43 15.74 38.17 2.53 (0 , 0 , 1 , 0 , 1)

665 L046 L046-PWD Road to New Waste Plastics 2.120 3.000 Complete 5 49.95 35.04 84.99 6.13 (0 , 0 , 1 , 0 , 1) Jhankarbahali Block Maneswar Total 14.895 35 387.66 271.97 659.63 46.74 (0 , 0 , 5 , 3 , 8)

Block- Naktideul

666 L040 L040-Simlipal to Lusura New -- 4.200 3.750 Complete 8 110.24 77.31 187.55 14.30 (0 , 0 , 1 , 0 , 1)

667 L085 L085-RD road to Hinjamura New -- 0.600 3.750 Complete 2 17.36 12.19 29.55 1.99 (0 , 0 , 1 , 0 , 1)

668 L052 L052-Sado to Phulkusum New Cold Mix 4.500 3.750 Complete 9 135.40 95.01 230.41 16.85 (0 , 0 , 1 , 1 , 2) Technology 669 L054 L054-Talab to Phulkusum New Cold Mix 8.000 3.750 Complete 14 227.11 159.37 386.48 27.49 (0 , 0 , 2 , 0 , 2) Technology 670 L036 L036-Patthuria to Brahmani New -- 3.000 3.750 Complete 6 75.10 52.69 127.79 10.94 (0 , 0 , 1 , 0 , 1)

671 L026 L026-Basaloi to Kandhal New -- 2.600 3.750 Complete 8 75.24 52.78 128.02 9.53 (0 , 0 , 1 , 0 , 1)

Block Naktideul Total 22.900 47 640.45 449.35 1,089.80 81.10 (0 , 0 , 7 , 1 , 8)

Block- Rairakhole

672 L073 L073-Rengali to Tutamunda New -- 2.500 3.750 Complete 6 75.14 52.71 127.85 6.25 (0 , 0 , 2 , 0 , 2)

673 L053 L053-Tribanpur to New -- 1.700 3.750 Complete 3 52.76 37.02 89.78 5.87 (0 , 0 , 1 , 0 , 1) Chupkadadar 674 L081 L081-RD road to Bhaliakata New -- 4.700 3.750 Complete 5 108.94 76.42 185.36 17.08 (0 , 0 , 2 , 0 , 2)

675 L042 L042-RD Road to New -- 1.750 3.750 Complete 3 48.44 33.98 82.42 6.02 (0 , 0 , 1 , 0 , 1) Mahulmunda

Page 61 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

676 L050 L050-Podabalanda chhak to New -- 7.600 3.750 Complete 13 173.09 121.40 294.49 27.32 (0 , 0 , 1 , 3 , 4) Amjhari 677 L054 L054-Telsingh chhak to New Cold Mix 6.400 3.750 Complete 10 178.43 125.14 303.57 22.22 (0 , 0 , 1 , 1 , 2) Arkhakhud Technology 678 L105 L105-NH42 to Berhampura New -- 4.700 3.750 Complete 6 118.17 82.88 201.05 14.90 (0 , 0 , 2 , 0 , 2)

Block Rairakhole Total 29.350 46 754.97 529.55 1,284.52 99.66 (0 , 0 , 10 , 4 , 14) Block- Rengali

679 L079 L079-SH10 to Gurupali New -- 1.290 3.000 Complete 3 25.61 17.97 43.58 3.45 (0 , 0 , 1 , 0 , 1)

680 L042 L042-RD Road to Jharbahal New Waste Plastics 2.800 3.000 Complete 7 66.29 46.51 112.80 8.64 (0 , 0 , 1 , 0 , 1) road 681 L032 L032-PWD Road to New Waste Plastics 0.880 3.000 Complete 2 21.10 14.81 35.91 2.77 (0 , 0 , 1 , 0 , 1) Uppermunda 682 L061 L061-Rengali to Jambahal New Cold Mix 4.110 3.000 Complete 13 111.00 77.77 188.77 13.55 (0 , 0 , 2 , 0 , 2) Technology
Roller Compacted Concrete Pavement 683 L028 L028-RD Road to Rukidihi New Waste Plastics 1.000 3.000 Complete 3 22.88 16.04 38.92 3.02 (0 , 0 , 1 , 0 , 1)

684 L076 L076-PWD Road to New Waste Plastics 1.180 3.000 Complete 3 37.45 26.26 63.71 4.34 (0 , 0 , 1 , 0 , 1) Katardhua 685 L080 L080-SH10 to MahadevPali New -- 2.490 3.000 Complete 5 51.61 36.20 87.81 6.36 (0 , 0 , 1 , 1 , 2)

686 L026 L026-RD Road to Kadammal New Waste Plastics 2.480 3.000 Complete 6 62.33 43.74 106.07 7.69 (0 , 0 , 1 , 0 , 1)

Block Rengali Total 16.230 42 398.27 279.30 677.57 49.82 (0 , 0 , 9 , 1 , 10) District Sambalpur Total 116.575 244 3,044.73 2,135.60 5,180.33 384.64 (0 , 0 , 49 , 11 , 60) District- Sonepur

Page 62 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block-

687 L023 L023-Mursundi Subalaya RD New -- 1.350 3.750 Complete 4 32.41 22.75 55.16 5.58 (0 , 0 , 1 , 0 , 1) road Patrapali Block Birmaharajpur Total 1.350 4 32.41 22.75 55.16 5.58 (0 , 0 , 1 , 0 , 1)

Block- Ulunda

688 L036 L036-Kalapathar to Nuapali New -- 2.050 3.750 Complete 6 55.15 38.68 93.83 7.38 (0 , 0 , 1 , 0 , 1)

689 L057 L057-PWD road to Badali New -- 4.150 3.750 Complete 17 109.02 76.41 185.43 15.11 (0 , 0 , 1 , 0 , 1)

Block Ulunda Total 6.200 23 164.17 115.09 279.26 22.49 (0 , 0 , 2 , 0 , 2)

District Sonepur Total 7.550 27 196.58 137.84 334.42 28.07 (0 , 0 , 3 , 0 , 3)

District- Sundargarh

Block- Balisankara

690 L069 L069-PWD road to New -- 1.800 3.000 Complete 5 48.77 34.17 82.94 6.42 (0 , 0 , 1 , 0 , 1) Sandhapani 691 L072 L072-Bondega to Fillingipara New -- 1.010 3.000 Complete 2 31.38 21.98 53.36 3.87 (0 , 0 , 1 , 0 , 1)

692 L043 L043-Putudihi to Kendajore New -- 6.500 3.750 Complete 11 185.05 129.64 314.69 25.28 (0 , 1 , 2 , 0 , 3)

693 L058 L058-PWd road to Fatikpara New -- 1.500 3.000 Complete 3 43.77 30.66 74.43 5.83 (0 , 0 , 1 , 0 , 1)

Block Balisankara Total 10.810 21 308.97 216.45 525.42 41.40 (0 , 1 , 5 , 0 , 6)

Block- Bargaon

694 L025 L025-SH 10 to Charpali New -- 2.500 3.750 Complete 4 68.09 47.70 115.79 8.72 (0 , 0 , 1 , 0 , 1)

695 L071 L071-PWD road to Badulpani New -- 7.800 3.750 Complete 13 212.81 149.12 361.93 31.89 (0 , 0 , 2 , 0 , 2)

696 L074 L074-PWD road to New -- 1.180 3.750 Complete 2 33.75 23.64 57.39 4.47 (0 , 0 , 1 , 0 , 1) Getubahal

Page 63 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

697 L073 L073-PWD road to New -- 1.220 3.750 Complete 3 34.26 24.00 58.26 4.65 (0 , 0 , 1 , 0 , 1) Ghuguniberna 698 L079 L079-PS road to Sindritangar New -- 2.390 3.000 Complete 4 65.53 45.90 111.43 8.71 (0 , 0 , 1 , 0 , 1)

699 L064 L064-RD road to Chatbud New Cement 1.100 3.000 Complete 3 34.15 23.95 58.10 4.13 (0 , 0 , 1 , 0 , 1) Stabilization 700 L053 L053-RD road to Baratengra New -- 1.190 3.750 Complete 3 38.48 26.96 65.44 5.59 (0 , 0 , 1 , 0 , 1)

701 L050 L050-SH 10 to Samelbahal New -- 1.190 3.000 Complete 3 34.09 23.91 58.00 4.64 (0 , 0 , 1 , 0 , 1)

702 L088 L088-PS road to Khodanpara New Iron Slag 1.180 3.000 Complete 5 31.40 22.02 53.42 4.36 (0 , 0 , 1 , 0 , 1)

703 L048 L048-Tileimal to Ledupada New -- 1.610 3.750 Complete 4 45.78 32.07 77.85 6.04 (0 , 0 , 1 , 0 , 1)

704 L062 L062-RD road to Biringapada New -- 0.900 3.000 Complete 1 20.15 14.14 34.29 2.61 (0 , 0 , 1 , 0 , 1)

705 L057 L057-RD road to Totolpada New -- 1.180 3.000 Complete 1 27.66 19.41 47.07 4.54 (0 , 0 , 1 , 0 , 1)

706 L039 L039-SH 10 to Kusumunda New Iron Slag 5.000 3.000 Complete 14 152.09 106.59 258.68 20.82 (0 , 0 , 1 , 0 , 1)

707 L036 L036-PS road to Nakti New -- 0.610 3.000 Complete 2 14.37 10.07 24.44 2.03 (0 , 0 , 1 , 0 , 1)

708 L054 L054-RD road to New -- 2.380 3.000 Complete 7 68.83 48.29 117.12 10.22 (0 , 0 , 2 , 0 , 2) Christianpara 709 L056 L056-RD road to Harunpada New -- 1.000 3.000 Complete 3 27.29 19.12 46.41 3.69 (0 , 0 , 1 , 0 , 1)

710 L063 L063-RD road to New Cement 1.500 3.000 Complete 3 35.80 25.11 60.91 5.38 (0 , 0 , 1 , 0 , 1) Dasananapada Stabilization Block Bargaon Total 33.930 75 944.53 662.00 1,606.53 132.49 (0 , 0 , 19 , 0 , 19) Block- Bisra

711 L055 L055-MDR 32 to Tunguritoli New Steel Slag 7.210 3.000 Complete 20 203.27 142.43 345.70 25.80 (0 , 0 , 1 , 0 , 1)

712 L042 L042-RD road to Mundatola New -- 1.210 3.000 Complete 2 33.32 23.49 56.81 5.43 (0 , 0 , 1 , 0 , 1)

713 L061 L061-Bijadihi to Pahartola New -- 1.510 3.000 Complete 2 44.09 31.12 75.21 6.12 (0 , 0 , 1 , 0 , 1)

Page 64 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

714 L049 L049-MDR 32 to Kulutola New -- 4.310 3.750 Complete 11 119.04 83.53 202.57 18.34 (0 , 0 , 2 , 0 , 2) road 715 L037 L037-MDR 32 to Hrudatola New Steel Slag 3.600 3.000 Complete 10 101.95 71.54 173.49 13.64 (0 , 0 , 3 , 0 , 3)

716 L056 L056-MDR 32 to Bandhatola New Cold Mix 7.800 3.750 Complete 17 210.59 147.77 358.36 28.01 (0 , 0 , 2 , 0 , 2) Technology
Gravel with Slag
Roller Compacted Concrete Pavement 717 L029 L029-MDR 32 to Turitola New Gravel with 2.300 3.000 Complete 9 59.38 41.59 100.97 8.10 (0 , 0 , 2 , 0 , 2) Slag 718 L036 L036-Kopsingha to Patratola New Steel Slag 1.920 3.000 Complete 5 51.87 36.40 88.27 7.10 (0 , 0 , 1 , 0 , 1)

719 L041 L041-RD road to Mahantola New -- 1.560 3.000 Complete 5 33.81 23.69 57.50 8.01 (0 , 0 , 1 , 0 , 1)

720 L032 L032-RD road to Bhatiatola New Gravel with 1.500 3.000 Complete 8 44.14 30.91 75.05 6.00 (0 , 0 , 1 , 0 , 1) Slag 721 L058 L058-Rly Road to New Gravel with 1.600 3.000 Complete 4 46.96 32.90 79.86 6.41 (0 , 0 , 1 , 0 , 1) Jabapanposh Slag 722 L050 L050-MDR 32 to Kapatmunda New Cold Mix 3.200 3.000 Complete 10 86.48 60.68 147.16 11.75 (0 , 1 , 0 , 0 , 1) Technology
Gravel with Slag
Roller Compacted Concrete Pavement 723 L046 L046-Purunabisra to Dudurta New Gravel with 3.200 3.000 Complete 10 93.15 65.25 158.40 12.68 (0 , 0 , 1 , 0 , 1) road Slag 724 L060 L060-Santoshpur to New Gravel with 7.200 3.000 Complete 11 208.56 146.10 354.66 28.43 (0 , 0 , 1 , 0 , 1) Pahadtola Slag Block Bisra Total 48.120 124 1,336.61 937.40 2,274.01 185.82 (0 , 1 , 18 , 0 , 19)

Page 65 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Bonaigarh

725 L067 L067-NH 23 to Pahadtola New -- 4.100 3.750 Complete 10 126.73 88.77 215.50 17.33 (0 , 0 , 1 , 1 , 2)

726 L043 L043-NH 23 to Balitakudar New -- 1.800 3.750 Complete 5 50.84 35.61 86.45 6.95 (0 , 0 , 1 , 0 , 1)

727 L038 L038-PWD road to Sailkudar New -- 1.700 3.750 Complete 5 49.81 34.90 84.71 6.85 (0 , 0 , 1 , 0 , 1)

728 L052 L052-Kulkuta Barhachaphal New -- 3.000 3.750 Complete 7 88.15 61.74 149.89 12.10 (0 , 0 , 1 , 0 , 1) road 729 L059 L059-RD road to Ulsara New -- 2.400 3.750 Complete 6 68.08 47.77 115.85 9.97 (0 , 0 , 1 , 0 , 1)

730 L048 L048-Pithachore chhak to New -- 4.710 3.750 Complete 13 126.16 88.40 214.56 17.31 (0 , 0 , 0 , 2 , 2) Badakanta Block Bonaigarh Total 17.710 46 509.77 357.19 866.96 70.51 (0 , 0 , 5 , 3 , 8)

Block- Gurundia

731 L053 L053-RD road to Tumbei New -- 16.000 3.750 Complete 46 507.53 355.61 863.14 77.56 (0 , 0 , 2 , 0 , 2)

732 L036 L036-Banki to Badbhutta New -- 3.600 3.750 Complete 11 106.48 74.60 181.08 14.63 (0 , 0 , 1 , 1 , 2)

733 L042 L042-PWD road to New Cold Mix 19.000 3.750 Complete 35 529.72 371.16 900.88 76.17 (0 , 0 , 1 , 1 , 2) Kantabahal Technology Block Gurundia Total 38.600 92 1,143.73 801.37 1,945.10 168.36 (0 , 0 , 4 , 2 , 6)

Block- Hemgiri

734 L091 L091-Panchayat road to New -- 4.600 3.000 Complete 7 130.31 91.51 221.82 18.46 (0 , 0 , 1 , 0 , 1) Sardega 735 L030 L030-Manaharpur Sarbahal New -- 4.000 3.000 Complete 8 113.16 79.27 192.43 15.73 (0 , 0 , 1 , 0 , 1) road 736 L049 L049-PS road to Badarampia New -- 0.824 3.000 Complete 2 22.18 15.57 37.75 3.16 (0 , 0 , 1 , 0 , 1)

737 L066 L066-Nuadihi to Dhanarasi New -- 2.678 3.000 Complete 8 72.19 50.69 122.88 10.25 (0 , 0 , 2 , 0 , 2) road

Page 66 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

738 L035 L035-Hemgir to New Cold Mix 9.500 3.000 Complete 26 274.84 192.85 467.69 37.05 (0 , 0 , 1 , 1 , 2) Biswanathpur Technology
Roller Compacted Concrete Pavement 739 L053 L053-PWD road to Usthali New -- 2.000 3.750 Complete 3 58.63 41.15 99.78 8.00 (0 , 0 , 1 , 0 , 1)

740 L082 L082-Kandadhuda to New -- 5.000 3.750 Complete 10 149.35 104.61 253.96 20.43 (0 , 0 , 1 , 1 , 2) Chatakpur 741 L088 L088-PWD road to New -- 5.000 3.000 Complete 14 148.18 103.80 251.98 20.28 (0 , 0 , 1 , 1 , 2) Ghogarpali 742 L047 L047-PS road to Budelkani New -- 2.200 3.000 Complete 4 61.87 43.42 105.29 8.46 (0 , 0 , 1 , 0 , 1)

743 L034 L034-PWD road to Katarbaga New -- 2.000 3.000 Complete 4 54.52 38.19 92.71 7.45 (0 , 0 , 1 , 0 , 1)

744 L043 L043-Fatakpara to Raichuan New -- 10.000 3.000 Complete 27 283.69 198.72 482.41 38.77 (0 , 0 , 1 , 1 , 2) road 745 L093 L093-Tikilipara to Kaletpani New -- 2.300 3.000 Complete 5 65.53 45.91 111.44 8.99 (0 , 0 , 1 , 0 , 1) road 746 L031 L031-Bihajore to Khajuridihi New -- 6.300 3.000 Complete 16 181.58 127.20 308.78 24.81 (0 , 0 , 1 , 1 , 2)

Block Hemgiri Total 56.402 134 1,616.03 1,132.89 2,748.92 221.84 (0 , 0 , 14 , 5 , 19) Block- Koira

747 L024 L024-Malda Camp to Malda New -- 1.310 3.000 Complete 2 35.69 25.00 60.69 5.61 (0 , 0 , 1 , 0 , 1) Basti road 748 L022 L022-Kalmang to New -- 1.710 3.000 Complete 3 51.97 36.61 88.58 7.01 (0 , 0 , 1 , 0 , 1) Gendruguda road 749 L031 L031-Patmunda to Podadihi New -- 3.090 3.000 Complete 6 85.72 60.45 146.17 12.60 (0 , 0 , 1 , 0 , 1) road 750 L025 L025-Ganua to Rangamatia New -- 1.350 3.000 Complete 3 38.80 27.38 66.18 5.53 (0 , 0 , 1 , 0 , 1) road 751 L081 L081-K Balang to Oramsahi New -- 0.580 3.000 Complete 1 15.91 11.21 27.12 2.45 (0 , 0 , 1 , 0 , 1) road

Page 67 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

752 L094 L094-San Roxy to Gadhatola New -- 1.030 3.000 Complete 3 30.65 21.59 52.24 4.52 (0 , 0 , 1 , 0 , 1) road 753 L078 L078-Khariabahal to New -- 2.340 3.000 Complete 4 64.07 45.21 109.28 9.27 (0 , 0 , 1 , 0 , 1) Saprambeda road 754 L030 L030-Patmunda to New -- 5.350 3.000 Complete 14 140.17 98.85 239.02 22.82 (0 , 0 , 1 , 0 , 1) Kadamdihi road 755 L102 L102-Soyamba to Kadamtola New -- 3.040 3.000 Complete 6 82.92 58.53 141.45 12.74 (0 , 0 , 2 , 0 , 2) via Barbalijore road 756 L060 L060-Chordhara to New -- 3.190 3.000 Complete 6 86.17 60.83 147.00 12.82 (0 , 0 , 1 , 0 , 1) Kusumbeda road 757 L039 L039-ODR Koira to New -- 1.640 3.000 Complete 3 44.37 31.14 75.51 6.41 (0 , 0 , 1 , 0 , 1) Dhabulabeda road 758 L050 L050-ODR to Sagadhabanga New -- 0.830 3.000 Complete 2 22.38 15.80 38.18 3.28 (0 , 0 , 1 , 0 , 1) road 759 L088 L088-Jharbeda to Girjatola New Cold Mix 11.600 3.750 Complete 18 352.98 247.69 600.67 47.23 (0 , 0 , 3 , 0 , 3) road Technology 760 L086 L086-Jharbeda to New -- 3.550 3.750 Complete 11 112.31 78.67 190.98 15.37 (0 , 0 , 1 , 0 , 1) Balandakucha road 761 L032 L032-RD road to Khajuridihi New -- 2.420 3.750 Complete 5 61.12 42.83 103.95 9.72 (0 , 0 , 1 , 0 , 1)

762 L046 L046-SAIL road to New -- 2.290 3.750 Complete 5 72.76 50.99 123.75 9.98 (0 , 0 , 2 , 0 , 2) Chemundipani via Fatatangar 763 L061 L061-Chordhara to New -- 2.400 3.750 Complete 7 67.79 47.58 115.37 9.60 (0 , 0 , 1 , 0 , 1) Kaptatola road 764 L037 L037-Baldihi to Ranisal road New -- 4.250 3.750 Complete 9 135.29 94.77 230.06 18.74 (0 , 0 , 1 , 1 , 2)

Block Koira Total 51.970 108 1,501.07 1,055.13 2,556.20 215.70 (0 , 0 , 22 , 1 , 23) Block- Kuanramunda

765 L064 L064-PWD road to New -- 2.540 3.000 Complete 4 68.54 48.38 116.92 10.14 (0 , 0 , 1 , 0 , 1) Babajitola road 766 L079 L079-Jalangbira to Ghasitola New -- 3.550 3.000 Complete 9 102.32 72.23 174.55 14.50 (0 , 0 , 1 , 0 , 1) road

Page 68 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

767 L067 L067-PWD road to Rithatoli New -- 3.110 3.000 Complete 9 92.29 64.91 157.20 12.63 (0 , 0 , 1 , 0 , 1) road 768 L025 L025-PWD road to New -- 5.370 3.000 Complete 13 152.01 106.78 258.79 21.91 (0 , 0 , 1 , 0 , 1) Luchabahal 769 L024 L024-PWD road to Lakhotola New -- 7.350 3.000 Complete 17 177.72 124.52 302.24 29.93 (0 , 0 , 1 , 0 , 1)

770 L023 L023-PS road to Darangtola New -- 1.867 3.000 Complete 9 52.33 36.74 89.07 7.63 (0 , 0 , 1 , 0 , 1)

771 L052 L052-NH 23 to Girijapara New -- 2.634 3.000 Complete 4 74.62 52.42 127.04 10.76 (0 , 0 , 1 , 0 , 1) road 772 L042 L042-RD road to Bankibahal New -- 3.046 3.000 Complete 5 85.89 60.25 146.14 12.47 (0 , 0 , 1 , 0 , 1) road 773 L038 L038-RD road to Mandatola New -- 1.760 3.000 Complete 3 48.09 33.74 81.83 7.17 (0 , 0 , 1 , 0 , 1)

774 L030 L030-PS road to Kulutola New -- 4.670 3.000 Complete 9 126.92 89.08 216.00 18.07 (0 , 0 , 1 , 0 , 1)

775 L039 L039-PS road to Belapara New -- 2.490 3.000 Complete 4 66.86 46.95 113.81 10.07 (0 , 0 , 1 , 0 , 1)

776 L044 L044-NH 23 to Kisan tola New -- 1.910 3.000 Complete 3 51.59 36.23 87.82 7.68 (0 , 0 , 1 , 0 , 1) road 777 L026 L026-Patrikhaman to New Cold Mix 5.510 3.000 Complete 9 149.27 104.86 254.13 22.22 (0 , 0 , 1 , 1 , 2) Khadiapada Technology
Roller Compacted Concrete Pavement 778 L073 L073-PWD road to New -- 2.400 3.000 Complete 8 67.26 47.12 114.38 9.20 (0 , 0 , 1 , 0 , 1) Hetabahal road 779 L065 L065-PWD road to Pahadtoli New -- 1.500 3.000 Complete 4 43.01 30.13 73.14 5.90 (0 , 0 , 1 , 0 , 1) road 780 L021 L021-Kalosiria to Sagbeda New -- 7.500 3.000 Complete 26 197.68 138.55 336.23 29.21 (0 , 0 , 1 , 1 , 2)

Block Kuanramunda Total 57.207 136 1,556.40 1,092.89 2,649.29 229.49 (0 , 0 , 16 , 2 , 18)

Page 69 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Kutra

781 L034 L034-PWD road to Kuelser New -- 2.400 3.000 Complete 5 64.17 45.08 109.25 9.16 (0 , 0 , 1 , 0 , 1) road 782 L042 L042-PWD road to New -- 1.379 3.000 Complete 2 36.62 25.74 62.36 5.37 (0 , 0 , 1 , 0 , 1) Gundipada road 783 L046 L046-SH10 to Girijapada New -- 1.516 3.000 Complete 4 40.45 28.42 68.87 5.82 (0 , 0 , 3 , 0 , 3) road 784 L059 L059-SH 10 to Baisipada New -- 3.260 3.000 Complete 6 86.53 60.80 147.33 12.98 (0 , 0 , 2 , 0 , 2) road 785 L061 L061-RD road to Mudapada New -- 3.746 3.000 Complete 14 99.36 69.82 169.18 14.99 (0 , 1 , 2 , 0 , 3) road 786 L052 L052-Purkapali to Adapada New Iron Slag 1.450 3.000 Complete 3 45.19 31.67 76.86 6.23 (0 , 0 , 1 , 0 , 1) road 787 L065 L065-Tarkera to Tirkeypada New Iron Slag 8.800 3.750 Complete 19 262.12 183.67 445.79 34.72 (0 , 0 , 1 , 0 , 1)

788 L025 L025-PWD road to New -- 1.050 3.000 Complete 2 30.13 21.10 51.23 4.09 (0 , 0 , 1 , 0 , 1) Bhuktapara road 789 L037 L037-PWD road to Bounstoli New Iron Slag 1.290 3.000 Complete 2 36.89 25.87 62.76 5.02 (0 , 0 , 1 , 0 , 1) road 790 L040 L040-PWD road to Gourpada New Iron Slag 1.630 3.000 Complete 5 45.76 32.08 77.84 6.16 (0 , 0 , 1 , 0 , 1) road 791 L024 L024-Falsakani to Girijapada New Iron Slag 2.350 3.000 Complete 7 65.93 46.21 112.14 8.86 (0 , 1 , 0 , 0 , 1)

792 L028 L028-PWD road to Titelpara New -- 1.470 3.000 Complete 5 46.96 32.91 79.87 6.20 (0 , 1 , 0 , 0 , 1)

Block Kutra Total 30.341 74 860.11 603.37 1,463.48 119.60 (0 , 3 , 14 , 0 , 17) Block- Lahunipara

793 L025 L025-OMC road Zero Point New -- 3.580 3.000 Complete 9 111.81 78.52 190.33 14.28 (0 , 1 , 0 , 1 , 2) to Kensilla road 794 L082 L082-NH 23 to New -- 2.680 3.000 Complete 7 77.43 54.37 131.80 10.69 (0 , 0 , 1 , 1 , 2) Badasahajbahal road

Page 70 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

795 L080 L080-RD road to Balisuda New -- 1.500 3.750 Complete 6 46.18 32.41 78.59 6.32 (0 , 0 , 1 , 0 , 1) road 796 L034 L034-Mundagaon to New -- 4.300 3.750 Complete 12 123.70 86.66 210.36 16.90 (0 , 0 , 2 , 1 , 3) Hatibahal road 797 L079 L079-NH 23 to New -- 7.200 3.750 Complete 15 208.76 146.24 355.00 28.52 (0 , 0 , 1 , 0 , 1) Mahisichhapal road 798 L085 L085-Saleidihi to New -- 3.600 3.750 Complete 10 109.35 76.60 185.95 14.89 (0 , 0 , 2 , 0 , 2) Goutamdihi road 799 L088 L088-Ghusuriposh to New -- 2.400 3.750 Complete 3 72.48 50.77 123.25 9.89 (0 , 0 , 1 , 0 , 1) Bhaliadihi road 800 L069 L069-NH 23 Defunct to New -- 1.800 3.750 Complete 4 51.42 36.02 87.44 7.04 (0 , 0 , 1 , 0 , 1) Saradhapur road 801 L060 L060-SH 10 A to Lalei road New Cold Mix 3.000 3.750 Complete 4 88.30 61.97 150.27 11.92 (0 , 0 , 1 , 0 , 1) Technology 802 L061 L061-Brahmangaon to New -- 1.700 3.750 Complete 2 53.54 37.51 91.05 7.33 (0 , 0 , 1 , 0 , 1) Amatpali road Block Lahunipara Total 31.760 72 942.97 661.07 1,604.04 127.78 (0 , 1 , 11 , 3 , 15) Block- Lathikata

803 L033 L033-Manko to Tankotola New -- 1.820 3.000 Complete 5 54.46 38.23 92.69 7.37 (0 , 0 , 1 , 0 , 1) road 804 L084 L084-Garjan to Naditola New -- 1.310 3.000 Complete 3 34.75 24.45 59.20 3.53 (0 , 1 , 0 , 0 , 1) road 805 L068 L068-MDR 26 to Rutukpedi New -- 21.070 3.000 Complete 18 484.48 339.47 823.95 85.78 (0 , 0 , 3 , 0 , 3) road 806 L078 L078-NH 23 to Kumbhartola New -- 1.070 3.000 Complete 5 30.11 21.12 51.23 4.36 (0 , 1 , 1 , 0 , 2) road 807 L077 L077-NH 23 to Naditola road New -- 2.100 3.000 Complete 8 57.59 40.42 98.01 8.43 (0 , 0 , 2 , 0 , 2)

808 L022 L022-RD road to Tungirtola New -- 2.300 3.000 Complete 7 62.93 44.18 107.11 9.25 (0 , 1 , 1 , 0 , 2) road 809 L058 L058-MDR 26 to Jodakudar New -- 2.680 3.000 Complete 8 72.68 51.08 123.76 10.99 (0 , 1 , 0 , 1 , 2) road

Page 71 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

810 L029 L029-NH 23 to Sansunaparba New -- 3.840 3.000 Complete 12 106.23 74.61 180.84 15.56 (0 , 2 , 0 , 0 , 2) road 811 L025 L025-Dalakudar Barbeda New Steel Slag 8.640 3.000 Complete 27 201.51 141.19 342.70 37.11 (0 , 0 , 2 , 0 , 2) road 812 L073 L073-MDR 26 to New -- 0.536 3.000 Complete 2 15.24 10.68 25.92 2.19 (0 , 0 , 1 , 0 , 1) Gadeibalanda 813 L050 L050-RD road to Ganjutola New -- 2.192 3.000 Complete 4 58.46 41.07 99.53 8.53 (0 , 0 , 1 , 0 , 1) road 814 L049 L049-RD road to Turitola New -- 2.729 3.000 Complete 5 71.95 50.57 122.52 10.54 (0 , 0 , 1 , 0 , 1) road 815 L081 L081-NH 23 to Pahadtola New Gravel with 2.500 3.000 Complete 7 62.51 43.79 106.30 8.51 (0 , 1 , 0 , 0 , 1) Slag 816 L062 L062-PS road to Latatola New Steel Slag 1.920 3.000 Complete 7 48.99 34.32 83.31 6.69 (0 , 1 , 0 , 0 , 1) road 817 L046 L046-MDR 26 to Panerpathar New Steel Slag 2.000 3.000 Complete 5 54.58 38.30 92.88 7.47 (0 , 0 , 1 , 0 , 1)

818 L074 L074-MDR 26 to Bhadratola New Cold Mix 3.500 3.000 Complete 10 99.99 70.17 170.16 13.48 (0 , 0 , 1 , 0 , 1) road Technology 819 L030 L030-Suidihi to Bhuyantola New -- 1.800 3.000 Complete 6 51.23 35.95 87.18 7.02 (0 , 0 , 1 , 0 , 1) road 820 L035 L035-NH 23 to Bhatitola New -- 1.600 3.000 Complete 6 44.84 31.42 76.26 6.12 (0 , 0 , 1 , 0 , 1) road 821 L043 L043-MDR 26 to Samarjhola New Steel Slag 1.300 3.000 Complete 6 36.84 25.81 62.65 5.04 (0 , 0 , 1 , 0 , 1) road 822 L065 L065-MDR 26 to Dahitola New Gravel with 1.300 3.000 Complete 5 35.78 25.07 60.85 4.91 (0 , 0 , 1 , 0 , 1) Slag Block Lathikata Total 66.207 156 1,685.15 1,181.90 2,867.05 262.88 (0 , 8 , 19 , 1 , 28) Block- Lefripada

823 L070 L070-Alapaka to Sagjore New Cold Mix 11.750 3.000 Complete 20 293.53 205.68 499.21 48.91 (0 , 0 , 1 , 0 , 1) (VR) Technology

Page 72 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

824 L066 L066-PWD road to New Cold Mix 8.750 3.000 Complete 15 258.21 181.19 439.40 34.24 (0 , 0 , 1 , 0 , 1) Tungripada road Technology Block Lefripada Total 20.500 35 551.74 386.87 938.61 83.15 (0 , 0 , 2 , 0 , 2)

Block- Nuagaon

825 L059 L059-Baneilata to Jhirpani New -- 3.343 3.000 Complete 16 92.84 65.22 158.06 13.72 (0 , 0 , 1 , 0 , 1) road 826 L078 L078-Hatibari to Pahartola New -- 3.160 3.000 Complete 8 89.74 62.86 152.60 12.97 (0 , 0 , 1 , 0 , 1) road 827 L052 L052-RD road to Lanjiberna New -- 7.630 3.000 Complete 13 196.42 137.63 334.05 31.19 (0 , 0 , 2 , 0 , 2)

828 L022 L022-RD road to New Cold Mix 6.103 3.000 Complete 19 162.53 113.89 276.42 26.69 (0 , 0 , 2 , 0 , 2) Kudahudang road Technology 829 L049 L049-RD road to Rengalbeda New -- 4.130 3.000 Complete 7 97.07 68.02 165.09 17.27 (0 , 0 , 1 , 0 , 1)

830 L053 L053-Purnapani to New -- 2.682 3.000 Complete 8 72.64 51.01 123.65 12.17 (0 , 0 , 1 , 0 , 1) Mundatola road 831 L088 L088-Nuagaon to Sahupada New -- 2.100 3.000 Complete 6 62.47 43.79 106.26 9.49 (0 , 0 , 1 , 0 , 1) road 832 L041 L041-Nuagaon to Karimati New -- 2.200 3.000 Complete 5 65.51 45.92 111.43 9.46 (0 , 1 , 0 , 0 , 1) road 833 L050 L050-Satra to Banrai road New -- 3.750 3.000 Complete 10 91.16 63.92 155.08 12.60 (0 , 0 , 1 , 0 , 1)

834 L046 L046-Kerketa to Girijatola New -- 2.200 3.000 Complete 6 61.85 43.38 105.23 7.72 (0 , 0 , 1 , 0 , 1) road 835 L033 L033-Teterkela to New -- 4.500 3.000 Complete 13 127.51 89.38 216.89 19.36 (0 , 0 , 2 , 0 , 2) Khatangoli road 836 L086 L086-Goladaru to Ganjutola New -- 6.500 3.000 Complete 22 171.52 120.28 291.80 8.10 (0 , 0 , 1 , 0 , 1) road Block Nuagaon Total 48.298 133 1,291.26 905.30 2,196.56 180.74 (0 , 1 , 14 , 0 , 15)

Page 73 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Rajgangpur

837 L036 L036-RD road to Kunjam New Cold Mix 7.470 3.000 Complete 10 182.06 127.56 309.62 29.61 (0 , 0 , 1 , 2 , 3) Technology
Roller Compacted Concrete Pavement 838 L038 L038-PS road to Bijakhaman New Cold Mix 5.700 3.000 Complete 10 138.26 96.88 235.14 24.23 (0 , 0 , 1 , 1 , 2) Technology
Roller Compacted Concrete Pavement 839 L044 L044-Gariamunda to New -- 3.450 3.000 Complete 12 91.43 64.26 155.69 13.88 (0 , 0 , 1 , 0 , 1) Parabtkotna 840 L027 L027-PS road to Sankhapani New -- 1.300 3.000 Complete 2 34.59 24.31 58.90 5.19 (0 , 0 , 2 , 0 , 2)

841 L048 L048-Muncipal road to New -- 2.000 3.000 Complete 9 54.59 38.33 92.92 7.98 (0 , 2 , 0 , 0 , 2) Baghdega 842 L065 L065-Kukudamunda to New -- 3.390 3.000 Complete 8 91.57 64.28 155.85 13.18 (0 , 0 , 1 , 1 , 2) Patratoli 843 L076 L076-RD Road to Badapada New -- 2.030 3.000 Complete 4 54.67 38.39 93.06 7.74 (0 , 0 , 1 , 0 , 1) (VR) 844 L078 L078-Tisco road to New Iron Slag 2.200 3.000 Complete 7 63.00 44.16 107.16 9.55 (0 , 0 , 1 , 0 , 1) Chamarapada (VR62) 845 L073 L073-RD road to Babudihi New Iron Slag 1.050 3.000 Complete 4 27.30 19.14 46.44 3.88 (0 , 0 , 1 , 0 , 1)

846 L059 L059-RD road to Pandratoli New Iron Slag 1.300 3.000 Complete 2 33.85 23.74 57.59 4.65 (0 , 0 , 1 , 0 , 1)

Block Rajgangpur Total 29.890 68 771.32 541.05 1,312.37 119.88 (0 , 2 , 10 , 4 , 16) Block- Subdega

847 L022 L022-Tangargaon to New -- 1.450 3.000 Complete 3 38.69 27.19 65.88 5.78 (0 , 0 , 1 , 0 , 1) Nuapada

Page 74 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

848 L054 L054-SH 10 to Jagatgarh New -- 0.934 3.000 Complete 3 25.22 17.71 42.93 3.65 (0 , 0 , 1 , 1 , 2)

849 L067 L067-MDR road SH31 to New -- 2.140 3.000 Complete 4 56.81 39.93 96.74 8.56 (0 , 0 , 1 , 0 , 1) Malidihi 850 L082 L082-ODR road at Babudihi New -- 3.900 3.000 Complete 8 101.47 71.30 172.77 15.32 (0 , 0 , 1 , 0 , 1) to Tentulijharia 851 L034 L034-Karampada to New -- 2.010 3.750 Complete 4 54.36 38.19 92.55 8.02 (0 , 0 , 1 , 0 , 1) Malapada 852 L064 L064-Karampara to New -- 3.850 3.000 Complete 9 105.76 74.07 179.83 14.07 (0 , 0 , 1 , 1 , 2) Rebdabahal 853 L073 L073-Mayabahal to Barpali New -- 2.550 3.000 Complete 6 73.79 51.69 125.48 9.63 (0 , 0 , 1 , 0 , 1)

854 L032 L032-ODR road At Harakpara New Cold Mix 5.150 3.000 Complete 10 165.58 116.18 281.76 21.50 (0 , 0 , 3 , 0 , 3) to Kadopani Technology 855 L038 L038-MDR road to Kutrapada New -- 11.650 3.750 Complete 20 344.72 241.55 586.27 51.16 (0 , 0 , 2 , 1 , 3)

856 L068 L068-MDR Road Ranpur to New -- 2.500 3.000 Complete 6 72.38 50.71 123.09 9.66 (0 , 0 , 1 , 1 , 2) Khatmara Lakraghara 857 L037 L037-R.D road to Bijadihi New -- 1.540 3.000 Complete 7 43.70 30.62 74.32 5.61 (0 , 0 , 1 , 0 , 1)

858 L042 L042-MDR road at SH 31 to New -- 1.500 3.000 Complete 4 42.55 29.81 72.36 5.75 (0 , 0 , 1 , 0 , 1) Taldihipara 859 L055 L055-Baurimunda to New -- 2.700 3.000 Complete 7 77.43 54.27 131.70 10.72 (0 , 0 , 1 , 0 , 1) Junadihi 860 L024 L024-ODR road to New -- 1.500 3.000 Complete 2 42.97 30.15 73.12 5.58 (0 , 0 , 1 , 0 , 1) Kotharpara 861 L087 L087-RD road Hutupani to New -- 2.100 3.000 Complete 4 61.31 42.95 104.26 8.25 (0 , 0 , 1 , 0 , 1) Jermanpara 862 L041 L041-SH 10 Rasrajpur to New -- 3.100 3.000 Complete 3 88.33 61.89 150.22 12.12 (0 , 0 , 1 , 0 , 1) Gountiapara 863 L036 L036-Luhurapada to New -- 1.780 3.000 Complete 3 51.08 35.79 86.87 6.73 (0 , 0 , 1 , 1 , 2) Khajurpada 864 L047 L047-Goppur Basti to New Cement 1.750 3.750 Complete 4 44.49 31.22 75.71 6.17 (0 , 0 , 1 , 0 , 1) Luhurenberni Stabilization

Page 75 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

865 L051 L051-Bagbandha to New -- 4.200 3.000 Complete 9 120.78 84.61 205.39 16.15 (0 , 0 , 1 , 1 , 2) Dungajore 866 L040 L040-MDR road Subdega to New -- 4.050 3.000 Complete 6 114.19 79.98 194.17 15.21 (0 , 0 , 1 , 0 , 1) Khajurpara Block Subdega Total 60.354 122 1,725.61 1,209.81 2,935.42 239.64 (0 , 0 , 23 , 6 , 29) Block- Sundargarh

867 L047 L047-SH10 to Tungridihi Via New -- 3.200 3.000 Complete 5 91.97 64.42 156.39 12.76 (0 , 0 , 1 , 1 , 2) Kaintara road 868 T01 T01-PWD road at Amasranga New -- 4.000 3.750 Complete 12 113.36 79.45 192.81 14.05 (0 , 0 , 1 , 0 , 1) to Lamti 869 L021 L021-Bijadihi to Bauridihi New -- 1.350 3.750 Complete 3 43.54 30.50 74.04 5.27 (0 , 0 , 1 , 0 , 1)

870 L024 L024-Fillingibahal to New -- 3.240 3.750 Complete 9 92.60 64.90 157.50 11.21 (0 , 0 , 1 , 0 , 1) Gireldungri Via Langbahal 871 L072 L072-Daudpara to Bagnipani New -- 4.400 3.750 Complete 13 128.27 89.90 218.17 15.83 (0 , 0 , 1 , 0 , 1) Via Lahandabud Kherapara Salangabud 872 L025 L025-Telimal to Medha New -- 2.000 3.000 Complete 5 57.97 40.60 98.57 7.96 (0 , 0 , 1 , 0 , 1)

873 L054 L054-SH 10 to Patrapali Via New -- 3.000 3.000 Complete 6 85.56 59.94 145.50 11.09 (0 , 0 , 1 , 1 , 2) Podabahal 874 L039 L039-PWD road at Baragad New -- 3.250 3.750 Complete 0 95.26 66.72 161.98 11.42 (0 , 0 , 1 , 0 , 1) to Timadihi 875 L075 L075-Lahandabud to New -- 3.600 3.750 Complete 12 106.51 74.66 181.17 12.66 (0 , 0 , 1 , 0 , 1) Alangpani Block Sundargarh Total 28.040 65 815.04 571.09 1,386.13 102.25 (0 , 0 , 9 , 2 , 11) Block- Tangarpali

876 L021 L021-Patkijore to Thelkobud New -- 1.328 3.000 Complete 7 37.84 26.57 64.41 5.33 (0 , 0 , 1 , 0 , 1)

877 L060 L060-Rd road to Ergapitha New -- 3.197 3.000 Complete 9 86.51 60.73 147.24 12.79 (0 , 0 , 1 , 0 , 1) Via Remenda

Page 76 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

878 L065 L065-L65 to Renda Via New -- 1.820 3.000 Complete 4 47.96 33.72 81.68 7.17 (0 , 0 , 1 , 1 , 2) Dhauradha 879 L023 L023-Aleikera to Kendakhol New -- 4.740 3.750 Complete 14 110.44 77.39 187.83 18.88 (0 , 0 , 2 , 0 , 2)

880 L054 L054-Nialipali to New -- 2.200 3.750 Complete 6 62.82 44.01 106.83 7.57 (0 , 0 , 1 , 0 , 1) Singhanimunda 881 L052 L052-Nialipali to Duemrkud New -- 1.300 3.000 Complete 4 36.43 25.52 61.95 4.93 (0 , 0 , 1 , 0 , 1)

882 L030 L030-Kiakachhar to New Cold Mix 4.300 3.000 Complete 10 123.88 86.93 210.81 16.73 (0 , 0 , 3 , 0 , 3) Manganpara Via Dhobakhol Technology Teldihi
Roller Compacted Concrete Pavement Block Tangarpali Total 18.885 54 505.88 354.87 860.75 73.40 (0 , 0 , 10 , 1 , 11) District Sundargarh Total 649.024 1,515 18,066.19 12,670.65 30,736.84 2,574.92 (0 , 17 , 215 , 30 , 262) Road Proposals Total 3,130.083 7,935 92,273.21 64,702.73 1,56,975.94 13,001.51 (12 , 173 , 820 , 227 , 1232) Long Span Bridge Proposals

District- Angul

Block- Chendipada

883 - Costn of H.L Bridge over New -- 245.870 0.000 Complete 0 124.01 801.34 925.35 0.00 (0 , 0 , 0 , 0 , 0) Tikira Nallah on Kampasala Kainchapada road Block Chendipada Total 245.870 0 124.01 801.34 925.35 0.00 (0 , 0 , 0 , 0 , 0)

Block- Kaniha

884 - H.L Bridge over Tikira New -- 276.400 0.000 Complete 0 115.52 928.61 1,044.13 0.00 (0 , 0 , 0 , 0 , 0) Nallah at 1st km on Derenga Bole Road Block Kaniha Total 276.400 0 115.52 928.61 1,044.13 0.00 (0 , 0 , 0 , 0 , 0)

Page 77 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District Angul Total 522.270 0 239.53 1,729.95 1,969.48 0.00 (0 , 0 , 0 , 0 , 0)

District- Bargarh

Block- Padampur

885 - Construction of H.P.V.C New -- 36.800 0.000 Complete 0 26.34 42.73 69.07 0.00 (0 , 0 , 0 , 0 , 0) at0.050 km on Gambharidihi to Kadlimunda road Block Padampur Total 36.800 0 26.34 42.73 69.07 0.00 (0 , 0 , 0 , 0 , 0)

District Bargarh Total 36.800 0 26.34 42.73 69.07 0.00 (0 , 0 , 0 , 0 , 0)

District- Bolangir

Block- Puintala

886 L112 Bridge over Laxmijore New -- 43.080 0.000 Complete 0 73.88 110.91 184.79 0.00 (0 , 0 , 0 , 0 , 0) nallah at 1st Km on Gaintala to Pipalbahali road Block Puintala Total 43.080 0 73.88 110.91 184.79 0.00 (0 , 0 , 0 , 0 , 0)

District Bolangir Total 43.080 0 73.88 110.91 184.79 0.00 (0 , 0 , 0 , 0 , 0)

District- Kalahandi

Block- Koksara

887 - Const of Bridge over Behera New -- 32.000 0.000 Complete 0 41.06 37.91 78.97 0.00 (0 , 0 , 0 , 0 , 0) Nallah at 2nd Km Block Koksara Total 32.000 0 41.06 37.91 78.97 0.00 (0 , 0 , 0 , 0 , 0)

Block- M.Rampur

888 - Oali jor nalah at 1st Km New -- 32.000 0.000 Complete 0 41.95 38.73 80.68 0.00 (0 , 0 , 0 , 0 , 0)

Block M.Rampur Total 32.000 0 41.95 38.73 80.68 0.00 (0 , 0 , 0 , 0 , 0)

District Kalahandi Total 64.000 0 83.01 76.64 159.65 0.00 (0 , 0 , 0 , 0 , 0)

Page 78 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

District- Keonjhar

Block- Keonjhar

889 - Local Nallah New -- 32.940 0.000 Complete 0 49.94 71.70 121.64 0.00 (0 , 0 , 0 , 0 , 0)

890 - River Aradei New -- 97.560 0.000 Complete 0 97.88 215.41 313.29 0.00 (0 , 0 , 0 , 0 , 0)

Block Keonjhar Total 130.500 0 147.82 287.11 434.93 0.00 (0 , 0 , 0 , 0 , 0)

District Keonjhar Total 130.500 0 147.82 287.11 434.93 0.00 (0 , 0 , 0 , 0 , 0)

District- Koraput

Block- Narayanpatna

891 - PWD road to Talakesla Local New -- 18.000 0.000 Complete 0 36.32 33.53 69.85 0.00 (0 , 0 , 0 , 0 , 0) nallaha Block Narayanpatna Total 18.000 0 36.32 33.53 69.85 0.00 (0 , 0 , 0 , 0 , 0)

District Koraput Total 18.000 0 36.32 33.53 69.85 0.00 (0 , 0 , 0 , 0 , 0)

District- Mayurbhanj

Block- Karanjia

892 - Construction of bridge over New -- 65.250 0.000 Complete 0 138.53 206.08 344.61 0.00 (0 , 0 , 0 , 0 , 0) Budhi Nallah at 2.85 Km. on Saradha Khandiadhar road Block Karanjia Total 65.250 0 138.53 206.08 344.61 0.00 (0 , 0 , 0 , 0 , 0)

Block- Raruan

893 - Construction of bridge over New -- 123.250 0.000 Complete 0 163.97 482.60 646.57 0.00 (0 , 0 , 0 , 0 , 0) river Bhandan at 0.70 Km on ODR to Tilusahi road Block Raruan Total 123.250 0 163.97 482.60 646.57 0.00 (0 , 0 , 0 , 0 , 0)

Page 79 of 80 Generated On : 17/08/2016 11:41 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter

Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Rs Lacs) (Rs Lacs) (Rs Lacs) 500+, 250+, Length <250, Total) 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Block- Saraskana

894 - Bridge over Katara Nallaha New -- 64.650 0.000 Complete 0 150.55 225.32 375.87 0.00 (0 , 0 , 0 , 0 , 0) at 1st Km. Block Saraskana Total 64.650 0 150.55 225.32 375.87 0.00 (0 , 0 , 0 , 0 , 0)

District Mayurbhanj Total 253.150 0 453.05 914.00 1,367.05 0.00 (0 , 0 , 0 , 0 , 0)

Long Span Bridge Proposals Total 1,067.800 0 1,059.95 3,194.87 4,254.82 0.00 (0 , 0 , 0 , 0 , 0)

Grand Total Total Road Length:3130.083 Kms 7,935 93,333.16 67,897.60 1,61,230.76 13,001.51 (12 , 173 , 820 , Total LSB Length:1067.800 Mtrs 227 , 1232)

Page 80 of 80 Generated On : 17/08/2016 11:41 AM