TTC Operating Statistics
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Noise and Vibration Projects
Frontop Engineering Limited 101 Amber Street, Unit 1, Markham Ontario, Canada, L3R 3B2 Telephone: (905) 947-0900; Fax: (905) 305-9370 Website: www.frontop.ca; Email: [email protected] List of Our Ongoing Noise and Vibration Monitoring Projects Project 1: Name of Project: Geotechnical Instrumentation and Monitoring Plan- Segment 1- Keelesdale Station Location: Toronto, Ontario, Canada Client: Metrolinx-Eglinton Crosstown Light Rapid Transit (ECLRT) Project Main project features: Geotechnical Instrumentation and Monitoring, Noise and Vibration Monitoring Activities performed: install and monitoring following instrument Prepared and installed six (6) real-time vibration stations and five (5) real-time noise monitoring station. And weekly attendant two (2) noise and two (2) vibration stations monitoring. Project 2: Name of Project: Geotechnical Instrumentation and Monitoring Plan- Segment 1- Mt Dennis Station Location: Toronto, Ontario, Canada Client: Metrolinx-Eglinton Crosstown Light Rapid Transit (ECLRT) Project Main project features: Geotechnical Instrumentation and Monitoring, Noise and Vibration Monitoring Activities performed: install and monitoring following instrument Prepared and installed four (4) real-time vibration stations and four (4) real-time noise monitoring station. And weekly attendant two (2) noise and two (2) vibration stations monitoring Project 3: Name of Project: TTC Wilson Yard Track and Structure Building Renovation (Contract AW1-3) Location: Toronto, Ontario, Canada Client: TTC Main project features: Track and Structure Building Renovation Activities performed: Prepared and installed the one (1) real-time noise monitoring station and one (1) real- time vibration monitoring station. Project 4: Name of Project: TTC Hillcrest Complex Surface Way Facility Replacement, and Harvey Shop Loading Deck (Contract M7-2 & M1-91) Client: TTC Main project features: Surface Way Facility Replacement Activities performed: Prepared and installed the two (2) real-time noise monitoring station and two (2) real- time vibration monitoring station. -
STAFF REPORT ACTION REQUIRED Lake Shore Boulevard West
STAFF REPORT ACTION REQUIRED Lake Shore Boulevard West - Speed Limit Reduction Date: March 29, 2007 To: Etobicoke York Community Council From: Director, Transportation Services - Etobicoke York District Wards: Ward 6 – Etobicoke-Lakeshore Reference eycc070058-to - 4757 Number: SUMMARY The purpose of this report is to obtain approval to reduce the speed limit on Lake Shore Boulevard West, between Mimico Creek and Palace Pier Court, from 60 km/h to 50 km/h. Given the existence of Toronto Transit Commission’s (TTC) streetcar tracks on the majority of this section of Lake Shore Boulevard West and the curved road alignment east of the F.G. Gardiner Expressway on-ramp/Brookers Lane, a lower (50 km/h) speed limit is justified and recommended. In addition, the proposed 50 km/h speed limit on Lake Shore Boulevard West between Mimico Creek and Palace Pier Court will provide for a consistent speed limit on this road in the Etobicoke York Community. RECOMMENDATIONS Transportation Services recommends that: 1. City Council approve the reduction of the speed limit on Lake Shore Boulevard West between Mimico Creek and Palace Pier Court from 60 km/h to 50 km/h. Financial Impact Type of Funding Source of Funds Amount Available within current budget Transportation Services Operating Budget $700.00 ISSUE BACKGROUND Transportation Services, in meetings with Councillor Mark Grimes and residents of the Humber Bay Shores community, have received requests to determine the appropriateness of the 60 km/h speed limit on Lake Shore Boulevard West between Mimico Creek and Palace Pier Court. A map of the area is Attachment No. -
July 10 Board Agenda
Toronto Transit Commission Board TTC Board Members Josh Colle (Chair) Alan Heisey, Q.C. (Vice Chair) Rick Byers Glenn De Baeremaeker Joe Mihevc John Campbell Joanne De Laurentiis Denzil Minnan-Wong Vincent Crisanti Mary Fragedakis Ron Lalonde Special Assistance for Members of the Public: TTC staff can arrange for special assistance with some advance notice. If you need special assistance, please call 416-393-3698 or e-mail [email protected] Closed Meeting Requirements: If the TTC Board wants to meet in closed session (privately) a Member of the Board must make a motion to do so and give the reason why the Board has to meet privately. (Section 29 of the TTC By-law and Section 190 of the City of Toronto Act, 2006) Notice to people writing or making presentations to the TTC Board: The City of Toronto Act, 2006 and the Municipal Freedom of Information and Protection of Privacy Act, R.S.O. 1900, authorize the TTC to collect any personal information in your communication or presentation to the TTC Board. The TTC collects this information to enable it to make informed decisions on the relevant issue(s). If you are submitting letters, faxes, e-mails, presentations or other communications to the TTC, you should be aware that your name and the fact that you communicated with the TTC will become part of the public record and will appear on the TTC’s website. The TTC makes a video record of its Board meetings. If you make a presentation to the Board, the TTC will be video-recording you and the video record is available to the public. -
Toronto Transit Commission Relief Line South Toronto Transit Commission
Toronto Transit Commission Relief Line South Toronto Transit Commission The engineering support services provided by GZ included Location: Toronto, Canada preliminary design of the temporary and permanent support measures for the SEM caverns in the swelling conditions as well Date: 2017 - 2019 design of the waterproofing system. In addition, GZ provided constructability reviews and value engineering studies for the stations, as well as for the alignment. Structure: 2 large diameter underground Station caverns Length: 4.66 mi (7.5 km) Geology: Georgian Bay Shale, glacial tills Cost: - Client: HDR Owner: Toronto Transit Commission Preliminary SEM Station Design: n 2017, the Toronto Transit Commission approved the I Preliminary Engineering Design of the Relief Line South Project, which was a planned new 7.5 km long subway line that was intended to run through the center of downtown Toronto. The project was to connect the Yonge-University-Spadina Subway (Line 1) to the Bloor-Danforth Subway (Line 2) in the downtown area. The goal of the Relief Line South was to help relieve Figure 1. Proposed Relief Line South arrangement with stations. crowding on Line 1 south of Bloor, at the Bloor-Yonge Station, and on the surface transit routes coming in and out of downtown. Construction planning of the Relief Line South included construction of twin running tunnels by means of tunnel boring machines, five new stations, and modifications to three existing stations, which will be converted to interchange stations. Design of the Relief Line South progressed to the preliminary engineering stage, and was consequently re-envisioned as the southern section of the Ontario Line Project. -
Framework Planning
PORT LANDS PLANNING FRAMEWORK Purpose / Elements of the Planning Framework The Purpose of the Port Lands Planning Framework is to: Elements of the Planning Framework: • Integrate the other planning initiatives currently underway • An overall vision for the Port Lands and development objectives • A connections plan which will identify: • Update and refresh the vision for the Port Lands o Major and intermediate streets o Major pedestrian and cycling facilities • Provide a comprehensive picture of how the area should redevelop over the long-term and o A transit plan that also addresses City Council direction reconcile competing interests • Generalized land use direction • Provide a flexible/adaptable planning regime • Identification of character areas • A parks and open space plan which will define: • Ensure sustainable community building o Green corridors o District / Regional parks • Ensure that public and private investments contribute to the long-term vision and have o Water’s Edge Promenades lasting value • A heritage inventory and direction for listing/designating heritage resources • Provide the basis for Official Plan amendments • Urban design principles and structure plan: o Built form and building typologies • Resolve Ontario Municipal Board appeals of the Central Waterfront Secondary Plan o Special sites (catalyst uses) o Relationship of development to major public spaces o Urban design context for heritage features o Identification of major views • A high -level community services and facilities strategy • Implementation and phasing direction PROCESS WE ARE HERE PHASE 2: PHASE 1: PHASE 3: Vision / Background Recommendations Alternatives CONSULTATION Public Meeting | November 28, 2013 PORT LANDS PLANNING FRAMEWORK Port Lands Acceleration Initiative Plan (PLAI) EASTER N AV.E DON VALLEY PARKWAY EASTERN AVENUE Don River DON RIVER NOD RI REV STREET LESLIE KRAP LAKE SHORE BOULEVARD EAST Port Lands Acceleration Initiative (PLAI) TRLYA DRS The PLAI was initiated in October 2011 to: New River Crossing DON ROADWAY CARLAW AVE. -
Relief Line and Yonge Subway Extension
Relief Line and Yonge Subway Extension Leslie Woo Chief Planning Officer JUNE-26-17 RELIEF LINE AND YONGE SUBWAY EXTENSION OVERVIEWS • Both the Relief Line and the Yonge Subway Extension are priority projects included in The Big Move and will be included in the next Regional Transportation Plan • Each project makes a significant contribution to the regional transit network by: • Enhancing our ability to connect people to where they need to be • Adding capacity so that transit trips are more comfortable • Enabling more residents to choose transit for their trips • Spurring on local transit oriented development 2 A REGIONAL SYSTEM • The Relief Line and the Yonge Subway Extension are part of the regional transportation network needed to meet the GTHA’s growth to 2031 and beyond • The 7.4 km northern extension of the Yonge Subway (Line 1) from Finch Avenue into Richmond Hill will connect two provincial urban growth centres, North York Centre and Richmond Hill Centre, and significantly reduce the 2,500 daily bus trips along the busy Yonge corridor • The Relief Line is a critical infrastructure investment required to create capacity for new riders on the Yonge subway and provide a new connection into Toronto’s downtown • The Yonge Subway Extension would generate more access • The Relief Line would create more capacity • Both projects need to advance in an integrated way 3 PARTNERSHIPS Much progress is being made in bringing the parties together to work as a team to advance both projects Yonge Subway Extension • Metrolinx, City of Toronto, Toronto -
Recent Achievements - (June 2013 to September 2013)
To: Metrolinx Board of Directors From: Robert Hollis Managing Director & Executive Vice President PRESTO Date: September 10th, 2013 Re: PRESTO Quarterly Report Recent Achievements - (June 2013 to September 2013) • Through the summer months, transit riders continued to embrace PRESTO and, as of August 26th, 2013, the system had reached more than 750,000 activated cards in circulation. On average, we’re welcoming 35,000 new PRESTO customers each month in the GTHA. o 75% of GO Transit riders are using PRESTO, making up the largest portion of the PRESTO customer base. • Ottawa’s OC Transpo continues its public deployment of PRESTO, with an average of more than 1,000 cards being distributed daily and over 167,000 total customers currently tapping on to an easier commute. The roll out program will run through October 2013, as 200,000 total cards will have been distributed to customers and the OC Transpo rollout will officially be complete. st o OC Transpo began offering a reduced rate fare on PRESTO as of July 1 . This reduced price is an incentive for customers to convert to PRESTO. th o As of Aug 15 , OC Transpo began charging the full $6 issuance fee for PRESTO cards. • PRESTO has also completed and launched The PRESTO Panel, a versatile and dynamic online market research tool. PRESTO began recruitment in August 2013, with a test group of registered customers who completed the 2012 Customer Satisfaction Survey. 130 Adelaide Street West, Suite 1500 130, rue Adelaide ouest, bureau 1500 Toronto, Ontario, Canada M5H 3P5 Toronto, Ontario, Canada M5H 3P5 o The PRESTO Panel provides customer feedback that can be used to generate a wealth of insights into the system, and drive improvements in a variety of areas. -
Attachment 4 – Assessment of Ontario Line
EX9.1 Attachment 4 – Assessment of Ontario Line As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed Ontario Line. The details of this assessment are provided in this attachment. 1. Project Summary 1.1. Project Description The Ontario Line was included as part of the 2019 Ontario Budget1 as a transit project that will cover similar study areas as the Relief Line South and North, as well as a western extension. The proposed project is a 15.5-kilometre higher-order transit line with 15 stations, connecting from Exhibition GO station to Line 5 at Don Mills Road and Eglinton Avenue East, near the Science Centre station, as shown in Figure 1. Figure 1. Ontario Line Proposal (source: Metrolinx IBC) Since April 2019, technical working groups comprising staff from the City, TTC, Metrolinx, Infrastructure Ontario and the Ministry of Transportation met regularly to understand alignment and station location options being considered for the Ontario 1 http://budget.ontario.ca/2019/contents.html Attachment 4 - Assessment of Ontario Line Page 1 of 20 Line. Discussions also considered fleet requirements, infrastructure design criteria, and travel demand modelling. Metrolinx prepared an Initial Business Case (IBC) that was publicly posted on July 25, 2019.2 The IBC compared the Ontario Line and Relief Line South projects against a Business As Usual scenario. The general findings by Metrolinx were that "both Relief Line South and Ontario Line offer significant improvements compared to a Business As Usual scenario, generating $3.4 billion and $7.4 billion worth of economic benefits, respectively. -
Transit Notice April 18, 2018
Transit Notice April 18, 2018 Harbourfront streetcar tunnel General maintenance Date: April 21 to April 23, 2018 Content/timeline accurate at time of printing Work description and purpose During the April 21 weekend, TTC staff will be working inside the Harbourfront streetcar tunnel to conduct rail and overhead inspections/maintenance and cleaning debris/sand along the tracks. TTC crews will be working at the Spadina/Queens Quay Loop to upgrade cables in the substation. City crews will be working in the streetcar right of way on Queens Quay to inspect underground hydro vaults. The City is also planning maintenance work on the Gardiner Expressway. Transit service changes (from 2 a.m. April 21 to 5 a.m. April 23) Temporary changes will be made to the 510/310 Spadina and 509 Harbourfront streetcar services and replacement buses will be employed to accommodate these work activities. 509 Harbourfront Replacement buses will operate over entire 509 Harbourfront route. 510/310 Spadina Streetcar 510/310 Streetcars will operate on Spadina Avenue from Spadina Station (at Bloor) to the Charlotte Loop. Some streetcars will operate to the King / Church intersection via King Street. 510/310 Spadina Buses See map for route details or visit ttc.ca for more information. 510 Spadina bus service will operate from Charlotte Loop to Spadina Loop via Bremner Boulevard and Rees Street. 310 Spadina bus service will operate from Charlotte Loop to King/Yonge intersection via Bay Street. Work hours Work will be around-the-clock to ensure the resumption of transit service on Monday morning. Efforts will be made to keep noise level to a minimum; noise will be evident when some equipment is in full operation. -
Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C. -
Eglinton Crosstown LRT Interchange Stations – Final Designs
Report for Action Eglinton Crosstown LRT Interchange Stations – Final Designs Date: March 20, 2018 To: TTC Board From: Chief Capital Officer Summary Metrolinx is currently constructing the Eglinton Crosstown LRT between Weston Road and Kennedy subway station, scheduled to open in 2021. This new LRT line will be operated by TTC and be identified as TTC Line 5. Approximately half of the 19 km LRT line will run underground, and connect to three existing subway stations. These interchange stations are currently under construction and will connect to Line 1 at Eglinton West Station (to be renamed Cedarvale Station) and Eglinton Station, and Line 2 at Kennedy Station. As the owner and operator of the subway system in Toronto, the TTC has a responsibility to ensure that the structural integrity of the existing subway infrastructure is maintained during construction, and that safe and efficient operation of the system is maintained. This report presents the final Metrolinx/Crosslinx Transit Solutions designs of the 3 interchange stations at Eglinton West (Cedarvale), Eglinton and Kennedy. Recommendations It is recommended that the Board: 1. Approve the final designs for Cedarvale, Eglinton and Kennedy interchange stations, as presented in this report. Financial Summary The Master Agreement between Metrolinx, the City of Toronto and the TTC, states that Metrolinx, as owner and developer, is responsible for expenditures related to the delivery of the Eglinton Crosstown Light Rail Transit Project. The Chief Financial Officer has reviewed this report and agrees with the financial impact information. Eglinton Crosstown LRT Interchange Stations – Final Designs Page 1 of 5 Equity/Accessibility Matters The new interchange stations are designed to be accessible, with barrier free paths from street to platform levels. -
Turnkey Brick & Beam Office for Sublease
VIEW ONLINE collierscanada.com/26213 2,678 SQUARE FEET Contact us: PARKER PAYETTE Sales Representative +1 416 643 3451 [email protected] FOR SUBLEASE | 550 Queen Street East, Toronto | ON Colliers International Turnkey Brick & Beam Office 181 Bay Street | Suite 1400 Toronto, ON | M5J 2V1 P: +1 416 777 2200 for Sublease F: +1 416 777 2277 Hard loft space in the rising Corktown neighbourhood, right in front of the 501 Queen streetcar, and less than 1 minute to the 504. Less than 1 minute to northbound DVP and less than 5 to the westbound Gardiner Expressway. Impressive 4 storey atrium and high ceilings throughout the suite. Accelerating success. FOR SUBLEASE | 550 Queen Street East, Toronto | ON CLOCKWISE FROM TOP LEFT: Atrium, Private Office, Reception, Exterior highlighting suite 335, Wheelchair Access. TAKE A VIRTUAL TOUR collierscanada.com/26213 Available Space & Costs Net Rent Contact Listing Agent $14.00/SF Additional Rent Available Immediately Term Expiry Date December 30th, 2020 Suite 355 2,678 SF Details 8 offices (6 closed in), boardroom, kitchenette, reception, & storage. FOR SUBLEASE | 550 Queen Street East, Toronto | ON Seconds from the Don Valley Parkway, 501 Queen, and the 504 King streetcar 2,678 Parking Security 24-Hour Wheelchair Walk Score™ 3rd Floor Hwy. DVP Gardiner square feet Available Key Card Public Transit Accessible 95 of Building 1 Min. Drive 5 Min. Drive Access 501, 502, 503, 504, 505 lines THE BUILDING THE AREA THE REGION 1920s era warehouse conversion Be a part of the monumental Toronto is the economic centre of into modern office space.