mageba – Project information

Krka Bridge ()

Project description Delivered products Highlights & facts About 2 kilometres south of (Cro- Two LR6 modular expansion joints were atia), near the , an arch ordered from mageba for the Krka bridge. mageba-products: bridge is being built over the Krka river. The The joints have a maximum movement ca- Type: 2 TENSA®MODULAR concrete structure of the bridge, the con- pacity of 400 mm. expansion joints struction of which started in 2003, should Based on the existing topographic situati- type LR6 be ready in October 2004. The bridge is on, the joints were equipped with a special Features: max. movement 400 mm scheduled to open for traffic in June 2005, corrosion protection system. The corrosi- Installed: 2004 which is just before the beginning of the on protection meets the requirements of Bridge: vacation season. The structure is very pic- the standard EN ISO 12944 and corres- City: Skradin turesque, fitting harmoniously into the ponds to the corrosion class C4 for bridges Country: Croatia landscape. It also has impressive technical in seawater conditions. Built: 2003-2004 features: the 390m long bridge has an arch Type: Arch bridge spanning of 204m. Here, a motorway with Length: 390 m four lanes will cross the river at a height of 66m. The 23-meter-wide superstructure was build as a sandwich structure with car- riageway plates made from prefabricated parts.The bridge arch, with a cross-section of 10 x 3 m, is build in cantilevered const- ruction in 5.20 m steps.

The bridge is located near the Krka National Park The Bridge under construction The installed mageba expansion joint of type LR6

Croatia

Karte vonBosnie-Herzégovine Google Maps

© 2012 Google

Switzerland www.mageba.ch

Version 2012.10 CH-EN ©mageba mageba sa - Solistrasse 68 - 8180 Bülach - Switzerland - T +41 44 872 40 50 - [email protected]