Sydney Football Stadium Redevelopment Stage 2 Construction Heritage Management Plan SFS-JHG-00-PLN-PM060009 SSD-9835 This Plan is the property of John Holland and may not be copied, distributed or used without the written consent of John Holland Table of Contents Table of Contents ................................................................................................................... 2 1. Revisions and distribution ................................................................................................ 4 1.1. Revisions 4 1.1.1. Distribution list...................................................................................................... 4 2. Compliance matrix ............................................................................................................ 5 3. References, definitions and abbreviations ...................................................................... 8 3.1. Definitions and abbreviations 8 4. Introduction ....................................................................................................................... 9 4.1. Purpose and application 9 4.1.1. Purpose ............................................................................................................... 9 4.1.2. Objectives ............................................................................................................ 9 4.1.3. Targets ................................................................................................................ 9 4.1.4. Personnel ............................................................................................................. 9 5. Context of the Project ..................................................................................................... 10 5.1. Project scope 10 5.2. The site 11 5.3. Statutory context 12 5.4. Guidelines 13 6. Existing Environment ...................................................................................................... 14 6.1. Aboriginal occupation 14 6.2. European/Historical Background 14 6.2.1. Sydney Common ............................................................................................... 14 6.2.2. Busby’s Bore ...................................................................................................... 15 6.2.3. Victoria Barracks Rifle Range ............................................................................ 19 6.2.4. Moore Park ........................................................................................................ 20 6.2.5. The Engineers and Military Depot ...................................................................... 21 6.2.6. The Sydney Sports Ground ................................................................................ 23 6.2.7. The Sydney Football Stadium ............................................................................ 25 6.3. Historically documented impacts 26 6.4. Heritage listings 32 6.5. Archaeological potential as assessed in the Heritage Impact Statement 34 6.6. Revised impact assessment 34 7. Heritage management ..................................................................................................... 36 7.1. Archaeological methodology 36 7.2. Archaeological supervision 36 7.3. Archaeological recording and salvage excavation 37 7.4. Avoidance of impacts to Busby’s Bore 37 Revision No: B Document Number: SFS-JHG-00-PLN-PM060009 Page 2 of 49 When printed this document is an uncontrolled version and must be checked against the IMS electronic version for validity 7.5. Aboriginal archaeology 38 7.6. Unexpected finds 38 7.7. Skeletal remains 38 7.8. Contamination 38 7.9. Excavation reporting 38 7.10. Management of relics 38 7.11. Management measures summary 39 8. Compliance management ............................................................................................... 41 8.1. Roles and responsibilities 41 8.2. Training 41 Appendix A ........................................................................................................................... 42 Appendix B ........................................................................................................................... 46 Revision No: B Document Number: SFS-JHG-00-PLN-PM060009 Page 3 of 49 When printed this document is an uncontrolled version and must be checked against the IMS electronic version for validity 1. Revisions and distribution 1.1. Revisions Draft issues of this document are identified as Revision 1, 2, 3, etc. Upon initial issue (generally Contract Award), this will be changed to an alphabetical revision. Revisions will continue at Revision A, B, C etc. Rev Date Prepared By Reviewed By Approved By Remarks A 24/01/20 Sandra Wallace Mark Turner Final B 20/01/21 Sandra Wallace Cameron Newling Matt Chapple Incorporate Stadium Fitness Facilities (SSD 9835 Modification No.2) C D E 1.1.1. Distribution list Client’s Representative Electronic copy via Aconex Project Director Access to electronic copy in Aconex Project Manager (Construction) Access to electronic copy in Aconex Environmental/Sustainability Manager Access to electronic copy in Aconex Project Planning Representative Access to electronic copy in Aconex Project Personnel Access to electronic copy in Aconex The controlled master copy of this document is maintained on Aconex and available for distribution as required. All hard copies of this document are deemed to be uncontrolled. Revision No: B Document Number: SFS-JHG-00-PLN-PM060009 Page 4 of 49 When printed this document is an uncontrolled version and must be checked against the IMS electronic version for validity 2. Compliance matrix The following compliance matrix demonstrates the alignment of this management plan with the full understanding of requirements under the Minister’s Conditions of Consent and Final Mitigation Measures as outlined in the Environmental Impact Statement1 and Response to Submissions2. The Project was approved as a State Significant Development (SSD) pursuant to Part 4 of the Environmental Planning and Assessment Act 1979 (EP&A Act) on 6 December 2019 (SSD- 9835). In December 2020 the consent was modified to integrate the Stadium Fitness Facilities (SFF), no additional conditions were noted associated with the modification to the consent. Table 1: Compliance Matrix: Minister’s Conditions of Approval Ministers Conditions of Approval Section reference B39 Prior to the commencement of construction, a Construction Heritage This Plan Management Plan (CHMP) must be prepared by a suitably qualified heritage Section 4.1.1 consultant and address, but not be limited to, the following; a Details of the excavation director nominated to direct the historic Section 4.1.4 archaeological program for the development. The excavation director must have appropriate qualification in accordance with the ‘Criteria for Assessment of Excavation Directors’ published by the Heritage Division of the Department of Premier and cabinet (formerly Heritage Council) at a State level of monitoring and testing to identify and protect Busby’s Bore; b Details of areas of low, moderate and high archaeological potential; Table 6 c Details of management (for supervision and unexpected finds) measures Section 7.6 identified in the ‘Heritage Impact Statement’ and section 7.2 of the ‘Archaeology Research Design and Excavation Methodology’ prepared by Curio dated May 2019; d Detailed methods of protection of Busby’s Bore including (but not limited to) Section 7.4 vibration monitoring techniques in accordance with the recommendations of the ‘Methodology Statement – Working near Busby’s Bore’ prepared by Curio Projects dated 2018 as updated by condition B22; e All additional measures (supervision and monitoring) required for below Section 7.4 ground works in the near vicinity of shafts 9,10 and the Bore itself f The Unexpected Finds Protocol for heritage (including unexpected skeletal Appendix A remains) in accordance with the recommendations of Archaeological Research Design and Excavation Methodology prepared by Curio projects dated May 2019; g Details of the monitoring regime including a program of visits from Section 7.2 archaeologists; and h Details of a stop-work procedure in case archaeological relics are uncovered Section 7.6 during the work (including contacting the NSW Heritage Division and Detailed in the recommencing works once the approval from the NSW Heritage Division). Unexpected Find Protocol Appendix A B40 The CHMP must be made publicly available on the Applicant’s website prior Section 4.1.1 to the commencement of construction. B43 Prior to the commencement of construction of the stadium structure or public Methodology domain works (i.e. during the bulk earth works), historical archaeological outlined in Section 8 investigation (supervision, monitoring and salvage (where needed)) is to be undertaken for all impacted areas of the site under the supervision of the nominated excavation director, in accordance with the recommendations of the Archaeological Research Design and Excavation Methodology prepared by Curio projects dated May 2019 and the CHMP required by condition 39. 1 Environmental Impact Statement, Stage 2 Construction and Operation Sydney Football Stadium dated 12 June 2019, Ethos Urban 2 Response to Submissions and Amended Proposal dated 2 September 2019, Ethos Urban. Revision No: B Document Number: SFS-JHG-00-PLN-PM060009 Page 5 of 49 When printed this document is an uncontrolled version and must be checked against the IMS electronic version for validity Ministers Conditions of