World Bank and PPP Node

Total Page:16

File Type:pdf, Size:1020Kb

World Bank and PPP Node Client – World Bank and PPP Node Implementing Agency - Ilala Municipal Council Project - PPP pre-feasibility study for 8 municipal Projects in Dar-es-Salaam Deliverable - Buguruni Market Final Pre-feasibility Report October, 2018 Abbreviations Abbreviation Full-form AfDB African Development Bank BOQ Bill of Quantities BRELA Business Registration and Licensing Agency CA Contracting authority CAPEX Capital expenditure CBD Central business district CCTV Closed circuit television CRB Contractors Registration Board DBMO Design, build, maintain and operate DBFOMT Design, build, finance, operate, maintain, and transfer DPR Detailed project report DSCR Debt-service coverage ratio EOI Expression of interest EIRR Economic internal rate of return ELR Employment and labor relations EPC Engineering, procurement and construction EMA Environmental Management Act ENPV Economic net present value ERB Engineers Registration Board ESIA Environmental and social impact assessment ESMP Environmental and social management plan ESMS Environmental and social management system FRF Fire and Rescue Force FY Financial year (April-March) GHG Greenhouse gas GoT Government of Tanzania IAS International accounting standards ICMS International construction market survey IFC International Finance Corporation IFRIC International Financial Reporting Interpretations Committee IMC Ilala Municipal Council IRR Internal rate of return KPI Key performance indicators LCC Lifecycle cost LGA Local government authority LGDA Local government district authority LGFA Local Government Finance Act 2 Abbreviation Full-form LTPP Long-term Perspective Plan MIC Municipal investment corporation NEMC National Environment Management Council NPV Net present value O&M Operation and maintenance OP Operational policy OPEX Operational expenditure OSHA Occupational Safety and Health Authority PO-RALG President's Office - Regional Administration and Local Government PPP Public-private partnership Project Co Project company PS Performance standards PV Present value PST Project screening tool QCBS Quality and cost-based selection RFQ Request for qualification RFP Request for proposal SCF Standard conversion factor Sq m Square meter TDFC Tanganyika Development Finance Company TIN Tax identification number TRA Tanzania Revenue Authority TZS Tanzanian shillings USD United States dollar VAT Value added tax VGF Viability gap funding WACC Weighted-average cost of capital WB World Bank 3 Contents 1. Project summary ..................................................................................................................................... 8 2. Background and objective .................................................................................................................... 11 3. Strategic case ........................................................................................................................................ 14 4. Economic case ...................................................................................................................................... 22 5. Commercial case ................................................................................................................................... 28 6. Financial case ........................................................................................................................................ 42 7. Management case .................................................................................................................................. 58 8. Next steps ............................................................................................................................................... 65 9. Annexure 1: Bill of Quantities (BOQ) ................................................................................................. 71 10. Annexure 2: Willingness to pay ........................................................................................................... 74 11. Annexure 3: Demand study .................................................................................................................. 77 12. Annexure 4: Legal due diligence ......................................................................................................... 78 13. Annexure 5: Social and environmental aspects ................................................................................. 82 14. Annexure 6: Revenue Collection ......................................................................................................... 91 15. Annexure 7: City infrastructure assessment ...................................................................................... 92 16. Annexure 8: Municipal finance assessment ....................................................................................... 97 17. Annexure 9: Institutional review of the IMC ...................................................................................... 101 18. Annexure 10: Social due diligence by World Bank ......................................................................... 107 19. Annexure 11: Project screening tool values ..................................................................................... 109 20. Annexure 12: Conceptual drawings of the market .......................................................................... 112 4 List of tables Table 2.1: Main deliverables and the progress ............................................................................................... 12 Table 3.1: Similar markets in IMC ................................................................................................................... 16 Table 4.1: Summary of technical options ........................................................................................................ 24 Table 4.2: Economic indicators ....................................................................................................................... 25 Table 4.3: Sensitivity analysis ......................................................................................................................... 26 Table 4.4: Distributional impact on various stakeholders ................................................................................ 26 Table 5.1: Summary of responsibilities of the ProjectCo and IMC .................................................................. 32 Table 5.2: Risk allocation matrix ...................................................................................................................... 33 Table 5.3: Risk mitigation matrix ..................................................................................................................... 34 Table 5.4: Output specifications of the Project ................................................................................................ 35 Table 5.5: Minimum design specifications of the Project ................................................................................ 37 Table 5.6: Technical components and area statement ................................................................................... 38 Table 6.1: Benchmarking study ....................................................................................................................... 42 Table 6.2: Financial assumptions .................................................................................................................... 44 Table 6.3: Area statement and capex .............................................................................................................. 45 Table 6.4: Opex of the market ......................................................................................................................... 46 Table 6.5: Annual revenue statement .............................................................................................................. 47 Table 6.6: Financial pre-feasibility assessment ............................................................................................... 49 Table 6.7: Capex calculation for roof-top solar ................................................................................................ 49 Table 6.8: Savings in electricity expense and returns from rooftop solar ........................................................ 50 Table 6.9: Sensitivity analysis ......................................................................................................................... 50 Table 6.10: Equity IRR under different scenarios ............................................................................................ 52 Table 6.11: Change in Project cost under this scenario .................................................................................. 52 Table 6.12: Change in Project configuration under this scenario .................................................................... 53 Table 6.13: Occupancy of floors under the scenario ....................................................................................... 53 Table 6.14: Weighted impact on PV ................................................................................................................ 55 Table 6.15: VfM calculation ............................................................................................................................. 56 Table 7.1: Project under the Jurisdiction of IMC ............................................................................................. 58 Table 8.1: Procurement plan ..........................................................................................................................
Recommended publications
  • April 2018 Floods in Dar Es Salaam
    Policy Research Working Paper 8976 Public Disclosure Authorized Wading Out the Storm The Role of Poverty in Exposure, Vulnerability Public Disclosure Authorized and Resilience to Floods in Dar Es Salaam Alvina Erman Mercedeh Tariverdi Marguerite Obolensky Xiaomeng Chen Rose Camille Vincent Silvia Malgioglio Jun Rentschler Public Disclosure Authorized Stephane Hallegatte Nobuo Yoshida Public Disclosure Authorized Global Facility of Disaster Reduction and Recovery August 2019 Policy Research Working Paper 8976 Abstract Dar es Salaam is frequently affected by severe flooding caus- income on average. Surprisingly, poorer households are ing destruction and impeding daily life of its 4.5 million not over-represented among the households that lost the inhabitants. The focus of this paper is on the role of pov- most - even in relation to their income, possibly because 77 erty in the impact of floods on households, focusing on percent of total losses were due to asset losses, with richer both direct (damage to or loss of assets or property) and households having more valuable assets. Although indirect indirect (losses involving health, infrastructure, labor, and losses were relatively small, they had significant well-be- education) impacts using household survey data. Poorer ing effects for the affected households. It is estimated that households are more likely to be affected by floods; directly households’ losses due to the April 2018 flood reached more affected households are more likely female-headed and than US$100 million, representing between 2–4 percent of have more insecure tenure arrangements; and indirectly the gross domestic product of Dar es Salaam. Furthermore, affected households tend to have access to poorer qual- poorer households were less likely to recover from flood ity infrastructure.
    [Show full text]
  • Dar Es Salaam-Ch1.P65
    Chapter One The Emerging Metropolis: A history of Dar es Salaam, circa 1862-2000 James R. Brennan and Andrew Burton This chapter offers an overview history of Dar es Salaam. It proceeds chronologically from the town’s inception in the 1860s to its present-day status as one of the largest cities in Africa. Within this sequential structure are themes that resurface in later chapters. Dar es Salaam is above all a site of juxtaposition between the local, the national, and the cosmopolitan. Local struggles for authority between Shomvi and Zaramo, as well as Shomvi and Zaramo indigenes against upcountry immigrants, stand alongside racialized struggles between Africans and Indians for urban space, global struggles between Germany and Britain for military control, and national struggles between European colonial officials and African nationalists for political control. Not only do local, national, and cosmopolitan contexts reveal the layers of the town’s social cleavages, they also reveal the means and institutions of social and cultural belonging. Culturally Dar es Salaam represents a modern reformulation of the Swahili city. Indeed it might be argued that, partly due to the lack of dominant founding fathers and an established urban society pre- dating its rapid twentieth century growth, this late arrival on the East African coast is the contemporary exemplar of Swahili virtues of cosmopolitanism and cultural exchange. Older coastal cities of Mombasa and Zanzibar struggle to match Dar es Salaam in its diversity and, paradoxically, its high degree of social integration. Linguistically speaking, it is without doubt a Swahili city; one in which this language of nineteenth-century economic incorporation has flourished as a twentieth-century vehicle of social and cultural incorporation for migrants from the African interior as well as from the shores of the western Indian Ocean.
    [Show full text]
  • WORKING PAPER February 2012
    REPORT ON INVESTIGATION OF DAR ES SALAAM’S INSTITUTIONAL ACTIVITIES RELATED TO CLIMATE CHANGE WORKING PAPER February 2012 KASSENGA, Gabriel (ARDHI University) MBULIGWE, Stephen (ARDHI University) The project is co-funded by European Union How to quote: Kassenga Gabriel, Mbuligwe Stephen “Report on Investigation of Dar es Salaam‘s Institutional Activities related to Climate Change” Working Paper, February 2012 Dae es Salaam: Ardhi University. Available at: http://www.planning4adaptation.eu/ This work is licensed under a Creative Commons Attribution-NonCommercial 3.0 Unported License. http://creativecommons.org/licenses/by-nc/3.0/ Table of Contents Figures IV Tables V Annexes VI Acknowledgements VII 1 Introduction 1 1.1 Background and Rationale of the ACC Dar Projectt 1 1.2 Objective and Purpose o the Study 1 1.3 Study Methodology 1 1.4 Scope and Organisation of the Report 2 2 Dar es Salaam City 3 2.1 Introduction 3 2.2 Dar es Salaam City Physical and Social-Economic Characteristics 3 2.3 Survey Findings 5 2.3.1 Names and Details of the Interviews 6 2.3.2 Age Distribution 6 2.3.3 Education Profile 6 2.3.4 Period of Service 7 2.3.5 Competence and Responsibilities 7 2.3.6 Relationship between Institutions 8 2.3.7 Strategies and Programs in PU 8 2.3.8 Specific Policies and Strategies for PU 9 2.3.9 Financial Resources 10 2.3.10 Facility Supply in the PU 10 2.3.11 Development Changes in the PU in Past Years 11 2.3.12 Main Linkage and Interdependencies between City Centre, PU and Rural Areas 11 2.3.13 Informal and Formal Groups, NGOs, CBOs and
    [Show full text]
  • THE UNITED REPUBLIC of TANZANIA PRIME MINISTER’S OFFICE, REGIONAL ADMINISTRATION and LOCAL GOVERNMENTS Public Disclosure Authorized
    THE UNITED REPUBLIC OF TANZANIA PRIME MINISTER’S OFFICE, REGIONAL ADMINISTRATION AND LOCAL GOVERNMENTS Public Disclosure Authorized P.O. Box 1923 P.O. Box 1923, Tel: 255 26 2321607, Fax: 255 26 2322116 DODOMA Public Disclosure Authorized CONTRACT No. ME/022/2012/2013/CR/11 FOR FEASIBILITY STUDY AND DETAILED ENGINEERING DESIGN OF DAR ES SALAAM LOCAL ROADS FOR MUNICIPAL COUNCILS OF KINONDONI, ILALA AND TEMEKE IN SUPPORT OF PREPARATION OF THE PROPOSED DAR ES SALAAM METROPOLITANT DEVELOPMENT PROJECT(DMDP) Public Disclosure Authorized THE ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT (ESIA) OF THE PROPOSED LOCAL ROADS SUBPROJECTS IN ILALA MUNICIPALITY (25.5 KM) DECEMBER 2014 CONSULTANT: Public Disclosure Authorized RUBHERA RAM MATO Crown TECH-Consult Ltd Consulting Engineers, Surveyors & Project Managers P. O. Box 72877, Telephone (022) Tel. 2700078, 0773 737372, Fax 2771293, E-mail: [email protected], [email protected] DAR ES SALAAM, Tanzania ESIA Report for the Proposed Upgrading of the Ilala Local Roads PMO-RALG STUDY TEAM NAME POSITION SIGNATURE Dr. Rubhera RAM Mato Environmentalist and ESIA Team Leader Mr. George J. Kimaro Environmental Engineer Anna S. K. Mwema Sociologist The following experts also participated in this study, Mr. Yoswe Msongwe - Sociologist Ms. Anna Msofe - Sociologist Mr. Aman D. Ancelm - Sociologist i ESIA Report for the Proposed Upgrading of the Ilala Local Roads PMO-RALG EXECUTIVE SUMMARY Environmental and Social Impact Assessment Report for the proposed Local Roads Subproject in Ilala Municipality (25.5 Km) Under the Dar Es Salaam Metropolitan Development Project (DMDP) Proponent: The United Republic of Tanzania, Prime Minister's Office, Regional Administration and Local Governments Proponent’s Contact: P.O.
    [Show full text]
  • Resettling Displaced Residents from Regularised Informal Settlements in Dar-Es-Salaam, Tanzania: Challenges Faced by House Owners
    Current Urban Studies, 2015, 3, 71-81 Published Online June 2015 in SciRes. http://www.scirp.org/journal/cus http://dx.doi.org/10.4236/cus.2015.32007 Resettling Displaced Residents from Regularised Informal Settlements in Dar-es-Salaam, Tanzania: Challenges Faced by House Owners D. L. Magembe-Mushi, J. M. Lupala Ardhi University, Dar es Salaam, Tanzania Email: [email protected] Received 26 March 2015; accepted 17 May 2015; published 21 May 2015 Copyright © 2015 by authors and Scientific Research Publishing Inc. This work is licensed under the Creative Commons Attribution International License (CC BY). http://creativecommons.org/licenses/by/4.0/ Abstract Regularisation is a process that attempts to restructure informal and unauthorised settlements in terms of physical, legal, official and administrative set ups of land management as well as improv- ing the living condition of its dwellers. In Dar-es-Salaam city about, 80 per cent of its residents live in informal settlements. These settlements lack the basic services of water supply, access roads, waste water management and storm water drainage systems. Regularisation has been practiced in order to provide these basic services. This paper focuses on physical regularisation which was im- plemented through Community Infrastructure Upgrading Project (CIUP) within sixteen settle- ments in Dar-es-Salaam City. Through explorative research using case study strategy, displaced residents were traced. For those who were found an in-depth interview was conducted and narra- tions of their experience before during and after displacement and resettlement were obtained. The paper analyses the process of displacement and resettlement caused by regularisation through the country’s policy and legal frameworks.
    [Show full text]
  • Crime and Policing Issues in Dar Es Salaam Tanzania Focusing On: Community Neighbourhood Watch Groups - “Sungusungu”
    CRIME AND POLICING ISSUES IN DAR ES SALAAM TANZANIA FOCUSING ON: COMMUNITY NEIGHBOURHOOD WATCH GROUPS - “SUNGUSUNGU” PRESENTED AT THE 1st SUB SAHARAN EXECUTIVE POLICING CONFERENCE INTERNATIONAL ASSOCIATION OF CHIEFS OF POLICE (IACP) DURBAN, SOUTH AFRICA: 27 – 30 AUGUST, 2000 Contents PREFACE:.........................................................................................................................................................................................I EXECUTIVE SUMMARY............................................................................................................................................................III 1.0 INTRODUCTION............................................................................................................................................................ 7 DAR ES SALAAM IN BRIEF............................................................................................................................................................. 7 1.1 GEOGRAPHICAL LOCATION:......................................................................................................................................... 7 1.2 HISTORICAL:.................................................................................................................................................................. 7 1.3 SOCIO-ECONOMIC AND ENVIRONMENTAL SETTING:.................................................................................................. 9 1.4 ORGANISATIONAL SETTING:.......................................................................................................................................13
    [Show full text]
  • Final Thesis Report
    INVESTIGATING THE INTRA-URBAN INEQUALITIES AND ENVIRONMENTAL INJUSTICE ON URBAN DEPRIVATION IN DAR ES SALAAM CITY – TANZANIA DEO DAMIAN MSILU March, 2009 Investigating the Intra-Urban Inequalities and Environmental Injustice on Urban Deprivation in Dar Es Salaam City – Tanzania By Deo Damian Msilu Thesis submitted to the International Institute for Geo-information Science and Earth Observation in partial fulfillment of the requirements for the degree of Master of Science in Geo-information Science and Earth Observation, Specialization: (Governance and Spatial Information Management) Thesis Assessment Board Prof. Dr.Ing. P. Y. Georgiadou Chair person Dr. F.J. Coenen External examiner Prof. Dr. Ir. A. Stein Examiner Dr.J.A. Martinez Examiner Drs. Johan de Meijere First supervisor Prof. Dr. Anne van der Veen Second supervisor Ir. M.C. Bronsveld Observer INTERNATIONAL INSTITUTE FOR GEO-INFORMATION SCIENCE AND EARTH OBSERVATION ENSCHEDE, THE NETHERLANDS Investigating the Intra-urban Inequality and Environmental injustices on Urban deprivation in Dar es salaam city - Tanzania Disclaimer This document describes work undertaken as part of a programme of study at the International Institute for Geo-information Science and Earth Observation. All views and opinions expressed therein remain the sole responsibility of the author, and do not necessarily represent those of the institute. Investigating the Intra-urban Inequality and Environmental injustices on Urban deprivation in Dar es salaam city - Tanzania Abstract Spatial indicators of inequality, rather than simply poverty, and environmental injustices are two essential tools for today’s urban policy makers and planners (UNHSP, 2004 pp. 86). Most research on urban deprivation in Sub-Saharan Africa has been based on monetary indicators (income and consumption).
    [Show full text]
  • Feeding Dar Es Salaam: a Symbiotic Food System Perspective Marc Wegerif C
    You are cordially invited to attend the public defence of the PhD thesis of Marc Wegerif entitled: Feeding Dar es Salaam: Feeding Dar es Salaam Feeding a symbiotic food system perspective Feeding Dar es Salaam: a symbiotic food system perspective Marc C. A. Wegerif Marc Marc C. A. Wegerif On Thursday 22 June 2017 at 11 a.m. in the Aula of Wageningen University, Generaal Foulkesweg 1, Wageningen, the Netherlands A reception at the Aula will follow the ceremony; karibuni Marc C.A. Wegerif [email protected] Paranymphs: Paul van Wijk [email protected] Maya C.X. Wegerif [email protected] Feeding Dar es Salaam: a symbiotic food system perspective Marc C. A. Wegerif Thesis committee Promotor Prof. Dr J.S.C. Wiskerke Professor of Rural Sociology Wageningen University & Research Co-promotor Dr P.G.M. Hebinck Associate professor, Sociology of Development and Change Group Wageningen University & Research Other members Prof. Dr D.F. Bryceson, University of Edinburgh, United Kingdom Prof. Dr M.A. Koelen, Wageningen University & Research Prof. Dr M.R.S Mlozi, Sokoine University of Agriculture, Morogoro, Tanzania Dr J. Battersby-Lennard, University of Cape Town, Rondebosch, South Africa This research was conducted under the auspices of the Wageningen School of Social Sciences (WASS) Feeding Dar es Salaam: a symbiotic food system perspective Marc C. A. Wegerif Thesis submitted in fulfilment of the requirements for the degree of doctor at Wageningen University by the authority of the Rector Magnificus, Prof. Dr A.P.J. Mol, in the presence of the Thesis Committee appointed by the Academic Board to be defended in public on Thursday 22 June 2017 at 11 a.m.
    [Show full text]
  • Citywide Action Plan for Upgrading Unplanned and Unserviced Settlements in Dar Es Salaam
    Citywide Action Plan for Upgrading Unplanned and Unserviced Settlements in Dar es Salaam DAR ES SALAAM LOCAL AUTHORITIES The designations employed and the presentation of the material in this report do not imply the expression of any opinion whatsoever on the part of the United Nations Secretariat concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. Reference to names of firms and commercial products and processes does not imply their endorsement by the United Nations, and a failure to mention a particular firm, commercial product or process is not a sign of disapproval. Excerpts from the text may be reproduced without authorization, on condition that the source is indicated. UN-HABITAT Nairobi, 2010 HS: HS/163/10E ISBN: 978-92-1-132276-7 An electronic version of the final version of this publication will be available for download from the UN-HABITAT web-site at http://www.unhabitat.org /publications UN-HABITAT publications can be obtained from our Regional Offices or directly from: United Nations Human Settlements Programme (UN-HABITAT) P.O. Box 30030, Nairobi 00100, KENYA Tel: 254 20 7623 120 Fax: 254 20 7624 266/7 E-mail: [email protected] Website: http://www.unhabitat.org Photo credits: Rasmus Precht (front cover), Samuel Friesen (back cover) Layout: Godfrey Munanga & Eugene Papa Printing: Publishing Services Section, Nairobi, ISO 14001:2004 - certified. Citywide Action Plan for Upgrading Unplanned and Unserviced Settlements in Dar
    [Show full text]
  • Ment of the World Bank
    Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: PAD1464 INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT IN THE AMOUNT OF SDR 316.2 MILLION (US$425 MILLION EQUIVALENT) Public Disclosure Authorized TO THE UNITED REPUBLIC OF TANZANIA FOR A DAR ES SALAAM URBAN TRANSPORT IMPROVEMENT PROJECT February 14, 2017 Public Disclosure Authorized Public Disclosure Authorized Transport and ICT Global Practice Africa Region This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective December 31, 2016) Currency Unit = Tanzania Shillings (TZS) US$1 = TZS 2,179.98 SDR 1 = US$1.344 FISCAL YEAR January 1 – December 31 ABBREVIATIONS AND ACRONYMS AFCS Automated Fare Collection System AfDB African Development Bank BRT Bus Rapid Transit CAG Controller and Auditor General CAS Country Assistance Strategy CBA Cost-Benefit Analysis CBD Central Business District CTCP2 Second Central Transport Corridor Project DA Designated Account DART Dar Rapid Transit Agency DBS Director of Business Support DCC Dar es Salaam City Council DMDP Dar es Salaam Metropolitan Development Project DUTA Dar es Salaam Urban Transport Authority DUTP Dar es Salaam Urban Transport Improvement Project EIRR Economic Internal Rate of Return ERB Engineers Registration Board ESIA Environmental and Social Impact Assessment ESMF Environmental
    [Show full text]
  • Dar Report 2 2Full
    Service Provision Governance in the Peri-urban Interface of Metropolitan Areas Research Project WSS PRACTICES AND LIVING CONDITIONS IN THE PERI-URBAN INTERFACE OF METROPOLITAN DAR ES SALAAM: THE CASES OF TUNGI AND STAKISHARI DRAFT FOR DISCUSSION University College of Lands and Architectural Studies (UCLAS) Dar es Salaam, Tanzania For more information, please contact: Peri-urban Research Project Team Development Planning Unit University College London 9 Endsleigh Gardens London WC1H 0ED United Kingdom Tel. +44 (0)20 76791111 Fax: +44 (0)20 76791112 E-mail project: [email protected] Email paper authors: [email protected] PUI website: http://www.ucl.ac.uk/dpu/pui ãThe Development Planning Unit Disclaimer: This document is an output from a project funded by the UK Department for International Development (DFID) for the benefit of developing countries. The views expressed are not necessarily those of DFID. DPU Service Provision Governance in the Peri-urban Interface of Metropolitan Areas ABOUT THE PROJECT This report is one of several outputs from the project Service provision governance in the peri- urban interface of metropolitan areas. This is a three-year project run by the Development Planning Unit, University College London in collaboration with a number of institutions from developing countries and with support from the UK Government’s Department for International Development (DFID). The purpose of the project is to improve guidance on governance and management of water and sanitation in the peri-urban interface (PUI) of metropolitan areas, in order to increase access by the poor and promote environmental sustainability. Presently there is a gap in the operating knowledge of implementing agencies on the specific problems that arise in the PUI.
    [Show full text]
  • Dar Es Salaam Bus Rapid Transit Project Country: Tanzania
    Language: English Original: English PROJECT: DAR ES SALAAM BUS RAPID TRANSIT PROJECT COUNTRY: TANZANIA ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT SUMMARY Date: March 2015 Team Leader: P. Musa, Transport Engineer, TZFO/OITC.2 Team Members: J. Katala, Transport Engineer, OITC.2 J. Nyirubutama, Transport Economist OITC.2 N. Kulemeka, Socio-Economist, SARC/ONEC.3 E. Ndinya, Environmental Specialist, SARC/ONEC.3 Appraisal Team Sector Director: Mr. A. Oumarou, OITC Regional Director: Mr. G. Negatu, EARC Sector Manager: Dr. A. Babalola, OITC.2 Resident Rep: Dr. T. Kandiero, TZFO 0 ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) SUMMARY Project Title: Dar es Salaam Bus Rapid Transit Infrastructure Project Project Number: P-TZ-DB0-021 Country: Tanzania Department: OITC Division: OITC.2 Project Category: Category 1 1. INTRODUCTION The Government of Tanzania intends to establish, operate and manage a Bus Rapid Transit (BRT) system, which is a cost effective sustainable transportation system for Dar es Salaam City to ensure fast and orderly flow of traffic on urban streets and roads. The Dar es Salaam BRT project follows the current land use plan that shows an extension of planned residential areas in the north-west direction along Ali Hassan Mwinyi road, in the south direction along Kilwa road and in Tabata area. The plan also shows an extension of unplanned residential areas in the west along Morogoro road and in the south-west corridor along Nyerere road. There is also an extension of industrial areas north along Ali Hassan Mwinyi road, along Nyerere road and part of Mikocheni Area. These areas constitute Phase 1,2 and 3 of the BRT System.
    [Show full text]