Contractor. No. of Corrections Executive Engineer
Total Page:16
File Type:pdf, Size:1020Kb
GOVERNMENT OF MAHARASHTRA PUBLIC WORKS (North) DIVISION, JALGAON E-TENDER NOTICE NO. 4 For 2016 -2017 Sealed E-Tenders in B-1 Form for the following work invited by Executive Engineer, P.W.(North) Division, Jalgaon Phone No. (0257/2239408) From Registered Contractors with Public Works Department in appropriate Class of Government of Maharashtra. E- Name of Work Estimated Earnest Time Limit of Cost of Class of Tender Cost put to Money complition Tender Contract Sr.No. tender Form or 1 ST.BT to Raver Pimprinandu Naygaon 90,13,816/ - 91,000/ - 9 Months 5000/ - Class -IV Dolarkheda Kurha Vadhoda Road (including & above S.H.47 km. 14/00 to 14/500 & 15/00 to Masoon) 18/00 (Section Pimprinandu to MSH-5) (Actual km. 15/900 to 18/660) Tal- Muktainagar. 2 Improvement to Raver Pimprinandu 50,94,128/ - 51,000/ - 9 Months 5000/- Class-IV Naygaon Dolarkheda Kurha Vadhoda (including A & Road S.H.47 km. 55/00 to 57/00 Masoon) above (Section Talkheda to Vadhoda) (Actual km. 55/00 to 56/950) Tal -Muktainagar. 3 Improvement to Purnad Purnad Phata 88,98,736/ - 89,000/ - 9 Months 5000/ - Class -IV Khamkheda Muktainagr Ruikheda (including A & Tighra Road MDR-24 km. 3/500 to Masoon) above 5/500 (Actual km. 4/100 to 6/400) Tal- Muktainagar. 4 Widening and ST.BT to S.H.47 88,63,940/ - 89,000/ - 9 Months 5000/- Class-IV Charthana Jondhankheda Parambhi (including A & Bhota Kurha Dhupeshwar Road MDR- Masoon) above 21 km. 19/00 to 20/500 & 29/00 to 30/00 (Section Parambi to S.H.47 & Pimprala Phata to Dhupeshwar) Tal- Muktainagar. 5 Widening and ST.BT to Jondhankheda 80,36,157/ - 81,000/ - 9 Months 5000/- Class-IV Kurha Rigaon Sule Vadhoda Road (including A & MDR-22 km. 12/500 to 14/500 Masoon) above (Section Kurha Korhale) (Actual km. 13/00 to 14/00 & 16/900 to 17/820) Tal-Muktaingar. 6 Widening and ST.BT to S.H.47 91,00,534/ - 91,100/ - 9 Months 5000/- Class-IV Charthana Jondhankheda Parambi (including & above Bhota Kurha Dhupeshwar Road MDR- Masoon) 21 km. 16/00 to 19/00 (Actual km. 13/055 to 15/902) Tal-Muktainagar. 7 Widening and ST.BT to SH-47 81,75,351/ - 82,000/ - 9 Months 5000/- Class-IV Charthana Jondhanhkeda Parambi (including A & Bhota Kurha Dhupeshwar Road MDR- Masoon) above 21 km. 22/400 to 25/00 (Section Bhota to Kurha) (Actual km. 22/300 to 24/950) Tal-Mukatinagar. 8 ST.BT to Jondhankheda Kurha Rigaon 62,47,520/ - 63,000/ - 9 Months 5000/- Class-IV Sule Vadhoda Road MDR-22 km. 23/00 (including A & to 25/500 (Section Sule to Vadhoda) Masoon) above (Actual km. 23/210 to 25/400) including protection wall Tal -Muktaingar. Contractor. No. of Correc tions Executive Engineer. 9 Construction of Minor bridge in km. 73,57,468/ - 74,000/ - 9 Months 5000/- Class-IV 4/500 Near Kotha Village on MSH-5 to (including A & Karki Belaswadi Anturli Road MDR-20 Masoon) above Tal-Muktainagar. 10 Widening and ST.BT to Charthana 59,62,643/ - 60,000/ - 9 Months 5000/- Class-IV Jondhankheda Parambi Bhota (including A & Pimprala Dhupeshwar Road MDR-21 Masoon) above Km. 15/00 to 16/810 (Section Parambi to SH-47) (Actual km. 15/902 to 17/330) Tal-Muktainagar. 11 Widening and ST.BT to Charthana 88,43,403/ - 89,000/ - 9 Months 5000/- Class-IV Jondhankheda Hivara Rajura Kakoda (including A & Kurha Rigaon Sule Vadhoda Road Masoon) above MDR-22 km. 4/00 to 6/535 (Section Borkheda to Rajura) (Actual km. 3/00 to 6/900) Tal-Muktainagar. 12 ST.BT to Purand Purnad Phata 1,30,88,455/ - 1,00,000/ - 9 Months 5000/- Class-IV Khamkheda Muktaingar Ruikheda (including & above Road MDR-24 km. 5/600 to 6/400 & Masoon) 8/400 to 9/00 (Section Khamkheda to Muktaingar.) (Actual km. 6/400 to 8/400) Tal-Muktaingar 13 Improvement to Raver Pimprinandu 79,98,513/ - 80,000/ - 9 Months 5000/- Class-IV Naygaon Dolarkheda Kurha Vadhoda (including A & Road S.H.47 (Old road length 1.30 Masoon) above km. along Kurha town) Tal- Muktainagar. 14 Repairs to Govt. Ashram School at 86,25,891/ - 87,000/ - 12 Months 5000/- Class-IV Jondhankheda (Main School Building, (including A & Girls Hostel, Class-III & Class-IV Masoon) above Quarters, Kitchen and Dining Hall) Tal- Muktaingar. 15 ST.BT to NH-6 to Talwel Junonedigar 72,08,865/ - 73,000/ - 9 Months 5000/- Class-IV Amadgaon Ruikheda MDR-25 Km. (including A & 9/900 to 13/00 (Part Jononedigar SH- Masoon) above 46 to Farkande Maroti) Tal-Bodwad. 16 ST.BT to Jamthi Lonwadi Dhonkheda 1,25,84,420/ - 1,00,000/ - 12 Months 5000/- Class-IV Road MDR-29 km. 74/100 to 78/800 (including & above (Section Pimpalgaon Devi Phata to Masoon) Dhondkheda ) including C.D. Works Tal-Bodwad. 17 Widening and Strengthening to NH-6 54,20,267/ - 55,000/ - 9 Months 5000/- Class-IV to Junone Digar Amadgoan Nandgaon (including A & Kolhadi Shirsala Ruikheda Road Masoon) above MDR-25 km. 23/500 to 24/900 (Part Kolhadi to Chinckheda) Tal-Bodwad. 18 Construction of Slab drain on SH-40 to 52,88,246/ - 53,000/ - 9 Months 5000/- Class-IV Sajgaon Kh. Mhaswa Lohara Jamthi (including A & Lonwadi Kolahdi road MDR-29 @ km. Masoon) above 89/435, 90/770, 91/685 & 92/450 (Section Harankheda to Engaon) Tal- Bodwad Contractor. No. of Correc tions Executive Engineer. 19 Construction of Minor bridge on NH-6 54,89,802/ - 55,000/ - 9 Months 5000/- Class-IV to Talwel Junone Digar Amadgaon (including A & Ruikheda Road MDR-25 km. 19/930 & Masoon) above 20/873 Tal-Bodwad. 20 ST.BT to Dongaon Kingaon Itchkheda 54,04,446/ - 55,000/ - 9 Months 5000/- Class-IV Road MDR-11 km. 3/00 to 5/500 Tal- (including A & Yawal Masoon) above 21 ST.BT to Savkheda Parsale 63,24,373/ - 64,000/ - 9 Months 5000/ - Class -IV Dongarkathora Bamnod Viroda (including A & Pimprud Faizpur Road MDR-13 km. Masoon) above 22/00 to 24/500 (Section Bhalod to Bamnod)(Actual km. 22/00 to 24/200) Tal-Yawal 22 ST.BT to Savakheda Parsale 63,10,685/ - 64,000/ - 9 Months 5000/- Class-IV Dongarkathora Bamnod Viroda (including A & Pimprud Faizpur Road MDR-13 km. Masoon) above 26/00 to 28/500 (Section Bhalod to Bamnod) Tal-Yawal 23 ST.BT to Savkheda Parsale 63,06,328/ - 64,000/ - 9 Months 5000/ - Class -IV Dongarkathora Bamnod Viroda (including A & Pimprud Faizpur Road MDR-13 km. Masoon) above 19/00 to 22/00 (Section Sangvi to Hingona) Tal-Yawal 24 ST.BT to Chikali Bahlod Hingona 64,06,051/ - 65,000/ - 9 Months 5000/ - Class -IV Road MDR-58 km. 62/500 to 65/500 (including A & (Section Bahlod Hingona) Tal-Yawal Masoon) above 25 ST.BT to Yawal Borawal Takarkheda 63,15,809/ - 64,000/ - 9 Months 5000/- Class-IV Road MDR-18 km. 16/00 to 19/00 Tal- (including A & Yawal Masoon) above 26 ST.BT to Yawal Borawal Takarkheda 62,47,291/ - 63,000/ - 9 Months 5000/- Class-IV Road MDR-18 km. 19/00 to 22/00 Tal- (including A & Yawal Masoon) above 27 ST.BT to Yawal Atrawal Bhalod 65,10,892/ - 66,000/ - 9 Months 5000/ - Class -IV Amoda Road MDR-11 km. 43/00 to (including A & 45/00 (Section Atrawal to Bahlod )Tal- Masoon) above Yawal 28 ST.BT to Patharad Thorgavan Piloda 54,15,,953/ - 55,000/ - 9 Months 5000/- Class-IV Road MDR-8 km. 16/00 to 17/800 (including A & (Section Thorgavan to Piloda) Tal- Masoon) above Yawal 29 ST.BT to Bhalod Amoda Road MDR- 75,06,432/ - 76,000/ - 9 Months 5000/- Class-IV 11 km. 47/00 to 50/00 Tal-Yawal (including A & Masoon) above Contractor. No. of Correc tions Executive Engineer. 30 Widening and ST.BT to SH-42 67,02,078/ - 68,000/ - 9 Months 5000/- Class-IV Naigaon Savkheda Sim Dahigaon (including A & Yawal Bhusawal Khadka Kinhi Masoon) above Varangaon Bhankheda SH-43 Road km. 47/00 to 50/00 Tal-Bhusawal 31 Construction of Sunsgaon Belvay 93,13,805/ - 94,000/ - 9 Months 5000/- Class-IV Varadsim Kurha Khandala Susari (including & above Achegaon Pimpalgaon Road MDR-27 Masoon) Km. 30/00 to 33/00 (Section Velhale to Susari) including C.D.works Tal- Bhusawal 32 Improvement to Kadgaon Sunasgaon 1,22,66,209/ - 1,00,000/ - 9 Months 5000/- Class-IV Belvay Varadsim Kurha Khandala (including & above Susari Achegaon Pimpalgaon Masoon) Oazarkheda Road MDR-27 km. 30/00 to 36/00 including C.D. works Tal- Bhusawal 33 Widening & ST.BT to Suanasgaon 89,36,647/ - 90,000/ - 9 Months 5000/- Class-IV Belvay Varadsim Kurha Khandala (including A & Susari Achegaon Pimplagaon Masoon) above Ozarkheda Road MDR-27 km. 10/300 to 13/300 Tal-Bhusawal 34 Construction of Minor Bridge on 68,59,400/ - 69,000/ - 12 Months 5000/- Class-IV Sunasgaon Belvay Varadsim Kurha (including A & Khandale Susari Achegaon Pipalgaon Masoon) above Ozarkheda road MDR-27 km. 38/00 Near Achegaon Tal-Bhusawal 35 Black Topping on NH-6 to Talvel 50,78,919/ - 51,000/ - 6 Months 5000/- Class-IV Pimpalgaon Road MDR-25 km. 4/800 (including A & to 6/500 including Construction of Masoon) above Retaining Wall & Slab Drain & Tal- Bhusawal 36 Construction of Minor bridge on NH -6 62,46,242/ - 63,000/ - 12 Months 5000/ - Class -IV to Tavel Pimpalgaon Junone Road (including A & MDR-25 @ Ch.