Contractor. No. of Corrections Executive Engineer

Contractor. No. of Corrections Executive Engineer

GOVERNMENT OF MAHARASHTRA PUBLIC WORKS (North) DIVISION, JALGAON E-TENDER NOTICE NO. 4 For 2016 -2017 Sealed E-Tenders in B-1 Form for the following work invited by Executive Engineer, P.W.(North) Division, Jalgaon Phone No. (0257/2239408) From Registered Contractors with Public Works Department in appropriate Class of Government of Maharashtra. E- Name of Work Estimated Earnest Time Limit of Cost of Class of Tender Cost put to Money complition Tender Contract Sr.No. tender Form or 1 ST.BT to Raver Pimprinandu Naygaon 90,13,816/ - 91,000/ - 9 Months 5000/ - Class -IV Dolarkheda Kurha Vadhoda Road (including & above S.H.47 km. 14/00 to 14/500 & 15/00 to Masoon) 18/00 (Section Pimprinandu to MSH-5) (Actual km. 15/900 to 18/660) Tal- Muktainagar. 2 Improvement to Raver Pimprinandu 50,94,128/ - 51,000/ - 9 Months 5000/- Class-IV Naygaon Dolarkheda Kurha Vadhoda (including A & Road S.H.47 km. 55/00 to 57/00 Masoon) above (Section Talkheda to Vadhoda) (Actual km. 55/00 to 56/950) Tal -Muktainagar. 3 Improvement to Purnad Purnad Phata 88,98,736/ - 89,000/ - 9 Months 5000/ - Class -IV Khamkheda Muktainagr Ruikheda (including A & Tighra Road MDR-24 km. 3/500 to Masoon) above 5/500 (Actual km. 4/100 to 6/400) Tal- Muktainagar. 4 Widening and ST.BT to S.H.47 88,63,940/ - 89,000/ - 9 Months 5000/- Class-IV Charthana Jondhankheda Parambhi (including A & Bhota Kurha Dhupeshwar Road MDR- Masoon) above 21 km. 19/00 to 20/500 & 29/00 to 30/00 (Section Parambi to S.H.47 & Pimprala Phata to Dhupeshwar) Tal- Muktainagar. 5 Widening and ST.BT to Jondhankheda 80,36,157/ - 81,000/ - 9 Months 5000/- Class-IV Kurha Rigaon Sule Vadhoda Road (including A & MDR-22 km. 12/500 to 14/500 Masoon) above (Section Kurha Korhale) (Actual km. 13/00 to 14/00 & 16/900 to 17/820) Tal-Muktaingar. 6 Widening and ST.BT to S.H.47 91,00,534/ - 91,100/ - 9 Months 5000/- Class-IV Charthana Jondhankheda Parambi (including & above Bhota Kurha Dhupeshwar Road MDR- Masoon) 21 km. 16/00 to 19/00 (Actual km. 13/055 to 15/902) Tal-Muktainagar. 7 Widening and ST.BT to SH-47 81,75,351/ - 82,000/ - 9 Months 5000/- Class-IV Charthana Jondhanhkeda Parambi (including A & Bhota Kurha Dhupeshwar Road MDR- Masoon) above 21 km. 22/400 to 25/00 (Section Bhota to Kurha) (Actual km. 22/300 to 24/950) Tal-Mukatinagar. 8 ST.BT to Jondhankheda Kurha Rigaon 62,47,520/ - 63,000/ - 9 Months 5000/- Class-IV Sule Vadhoda Road MDR-22 km. 23/00 (including A & to 25/500 (Section Sule to Vadhoda) Masoon) above (Actual km. 23/210 to 25/400) including protection wall Tal -Muktaingar. Contractor. No. of Correc tions Executive Engineer. 9 Construction of Minor bridge in km. 73,57,468/ - 74,000/ - 9 Months 5000/- Class-IV 4/500 Near Kotha Village on MSH-5 to (including A & Karki Belaswadi Anturli Road MDR-20 Masoon) above Tal-Muktainagar. 10 Widening and ST.BT to Charthana 59,62,643/ - 60,000/ - 9 Months 5000/- Class-IV Jondhankheda Parambi Bhota (including A & Pimprala Dhupeshwar Road MDR-21 Masoon) above Km. 15/00 to 16/810 (Section Parambi to SH-47) (Actual km. 15/902 to 17/330) Tal-Muktainagar. 11 Widening and ST.BT to Charthana 88,43,403/ - 89,000/ - 9 Months 5000/- Class-IV Jondhankheda Hivara Rajura Kakoda (including A & Kurha Rigaon Sule Vadhoda Road Masoon) above MDR-22 km. 4/00 to 6/535 (Section Borkheda to Rajura) (Actual km. 3/00 to 6/900) Tal-Muktainagar. 12 ST.BT to Purand Purnad Phata 1,30,88,455/ - 1,00,000/ - 9 Months 5000/- Class-IV Khamkheda Muktaingar Ruikheda (including & above Road MDR-24 km. 5/600 to 6/400 & Masoon) 8/400 to 9/00 (Section Khamkheda to Muktaingar.) (Actual km. 6/400 to 8/400) Tal-Muktaingar 13 Improvement to Raver Pimprinandu 79,98,513/ - 80,000/ - 9 Months 5000/- Class-IV Naygaon Dolarkheda Kurha Vadhoda (including A & Road S.H.47 (Old road length 1.30 Masoon) above km. along Kurha town) Tal- Muktainagar. 14 Repairs to Govt. Ashram School at 86,25,891/ - 87,000/ - 12 Months 5000/- Class-IV Jondhankheda (Main School Building, (including A & Girls Hostel, Class-III & Class-IV Masoon) above Quarters, Kitchen and Dining Hall) Tal- Muktaingar. 15 ST.BT to NH-6 to Talwel Junonedigar 72,08,865/ - 73,000/ - 9 Months 5000/- Class-IV Amadgaon Ruikheda MDR-25 Km. (including A & 9/900 to 13/00 (Part Jononedigar SH- Masoon) above 46 to Farkande Maroti) Tal-Bodwad. 16 ST.BT to Jamthi Lonwadi Dhonkheda 1,25,84,420/ - 1,00,000/ - 12 Months 5000/- Class-IV Road MDR-29 km. 74/100 to 78/800 (including & above (Section Pimpalgaon Devi Phata to Masoon) Dhondkheda ) including C.D. Works Tal-Bodwad. 17 Widening and Strengthening to NH-6 54,20,267/ - 55,000/ - 9 Months 5000/- Class-IV to Junone Digar Amadgoan Nandgaon (including A & Kolhadi Shirsala Ruikheda Road Masoon) above MDR-25 km. 23/500 to 24/900 (Part Kolhadi to Chinckheda) Tal-Bodwad. 18 Construction of Slab drain on SH-40 to 52,88,246/ - 53,000/ - 9 Months 5000/- Class-IV Sajgaon Kh. Mhaswa Lohara Jamthi (including A & Lonwadi Kolahdi road MDR-29 @ km. Masoon) above 89/435, 90/770, 91/685 & 92/450 (Section Harankheda to Engaon) Tal- Bodwad Contractor. No. of Correc tions Executive Engineer. 19 Construction of Minor bridge on NH-6 54,89,802/ - 55,000/ - 9 Months 5000/- Class-IV to Talwel Junone Digar Amadgaon (including A & Ruikheda Road MDR-25 km. 19/930 & Masoon) above 20/873 Tal-Bodwad. 20 ST.BT to Dongaon Kingaon Itchkheda 54,04,446/ - 55,000/ - 9 Months 5000/- Class-IV Road MDR-11 km. 3/00 to 5/500 Tal- (including A & Yawal Masoon) above 21 ST.BT to Savkheda Parsale 63,24,373/ - 64,000/ - 9 Months 5000/ - Class -IV Dongarkathora Bamnod Viroda (including A & Pimprud Faizpur Road MDR-13 km. Masoon) above 22/00 to 24/500 (Section Bhalod to Bamnod)(Actual km. 22/00 to 24/200) Tal-Yawal 22 ST.BT to Savakheda Parsale 63,10,685/ - 64,000/ - 9 Months 5000/- Class-IV Dongarkathora Bamnod Viroda (including A & Pimprud Faizpur Road MDR-13 km. Masoon) above 26/00 to 28/500 (Section Bhalod to Bamnod) Tal-Yawal 23 ST.BT to Savkheda Parsale 63,06,328/ - 64,000/ - 9 Months 5000/ - Class -IV Dongarkathora Bamnod Viroda (including A & Pimprud Faizpur Road MDR-13 km. Masoon) above 19/00 to 22/00 (Section Sangvi to Hingona) Tal-Yawal 24 ST.BT to Chikali Bahlod Hingona 64,06,051/ - 65,000/ - 9 Months 5000/ - Class -IV Road MDR-58 km. 62/500 to 65/500 (including A & (Section Bahlod Hingona) Tal-Yawal Masoon) above 25 ST.BT to Yawal Borawal Takarkheda 63,15,809/ - 64,000/ - 9 Months 5000/- Class-IV Road MDR-18 km. 16/00 to 19/00 Tal- (including A & Yawal Masoon) above 26 ST.BT to Yawal Borawal Takarkheda 62,47,291/ - 63,000/ - 9 Months 5000/- Class-IV Road MDR-18 km. 19/00 to 22/00 Tal- (including A & Yawal Masoon) above 27 ST.BT to Yawal Atrawal Bhalod 65,10,892/ - 66,000/ - 9 Months 5000/ - Class -IV Amoda Road MDR-11 km. 43/00 to (including A & 45/00 (Section Atrawal to Bahlod )Tal- Masoon) above Yawal 28 ST.BT to Patharad Thorgavan Piloda 54,15,,953/ - 55,000/ - 9 Months 5000/- Class-IV Road MDR-8 km. 16/00 to 17/800 (including A & (Section Thorgavan to Piloda) Tal- Masoon) above Yawal 29 ST.BT to Bhalod Amoda Road MDR- 75,06,432/ - 76,000/ - 9 Months 5000/- Class-IV 11 km. 47/00 to 50/00 Tal-Yawal (including A & Masoon) above Contractor. No. of Correc tions Executive Engineer. 30 Widening and ST.BT to SH-42 67,02,078/ - 68,000/ - 9 Months 5000/- Class-IV Naigaon Savkheda Sim Dahigaon (including A & Yawal Bhusawal Khadka Kinhi Masoon) above Varangaon Bhankheda SH-43 Road km. 47/00 to 50/00 Tal-Bhusawal 31 Construction of Sunsgaon Belvay 93,13,805/ - 94,000/ - 9 Months 5000/- Class-IV Varadsim Kurha Khandala Susari (including & above Achegaon Pimpalgaon Road MDR-27 Masoon) Km. 30/00 to 33/00 (Section Velhale to Susari) including C.D.works Tal- Bhusawal 32 Improvement to Kadgaon Sunasgaon 1,22,66,209/ - 1,00,000/ - 9 Months 5000/- Class-IV Belvay Varadsim Kurha Khandala (including & above Susari Achegaon Pimpalgaon Masoon) Oazarkheda Road MDR-27 km. 30/00 to 36/00 including C.D. works Tal- Bhusawal 33 Widening & ST.BT to Suanasgaon 89,36,647/ - 90,000/ - 9 Months 5000/- Class-IV Belvay Varadsim Kurha Khandala (including A & Susari Achegaon Pimplagaon Masoon) above Ozarkheda Road MDR-27 km. 10/300 to 13/300 Tal-Bhusawal 34 Construction of Minor Bridge on 68,59,400/ - 69,000/ - 12 Months 5000/- Class-IV Sunasgaon Belvay Varadsim Kurha (including A & Khandale Susari Achegaon Pipalgaon Masoon) above Ozarkheda road MDR-27 km. 38/00 Near Achegaon Tal-Bhusawal 35 Black Topping on NH-6 to Talvel 50,78,919/ - 51,000/ - 6 Months 5000/- Class-IV Pimpalgaon Road MDR-25 km. 4/800 (including A & to 6/500 including Construction of Masoon) above Retaining Wall & Slab Drain & Tal- Bhusawal 36 Construction of Minor bridge on NH -6 62,46,242/ - 63,000/ - 12 Months 5000/ - Class -IV to Tavel Pimpalgaon Junone Road (including A & MDR-25 @ Ch.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us