PRE-FEASIBILITY REPORT Kurha-Vadhoda Islampur Lift Irrigation Scheme, UPSA Sinchan Yojna with CCA 32372 Ha Village Rigaon, Tehs
Total Page:16
File Type:pdf, Size:1020Kb
Kurha- Vadhoda Islampur Lift Irrigation Scheme, UPSA Sinchan Yojna with CCA 32372 Ha, Village Rigaon, District- Jalgaon, Maharashtra by M/s Tapi Irrigation Development Corporation, Sinchan Bhawan, Akash Wani Chowk, Jalgaon, Maharashtra-425001 Pre Feasibility Report PRE-FEASIBILITY REPORT FOR Kurha-Vadhoda Islampur Lift Irrigation Scheme, UPSA Sinchan Yojna with CCA 32372 Ha At Village Rigaon, Tehsil- Muktainagar, District- Jalgaon, Maharashtra SCHEDULE: 1 (c), CATEGORY: A (Due to presence of Maharashtra- Madhya Pradesh Interstate Boundary at 5.7kms in NNW) PROJECT PROPONENT M/s TAPI IRRIGATION DEVELOPMENT CORPORATION, SINCHAN BHAWAN, AKASH WANI CHOWK, JALGAON, MAHARASHTRA-425001 DOC. No: MCPL/EMD/RVP/2020-2021(PFR) AUGUST , 2021 PREPARED BY MANTEC CONSULTANTS PVT. LTD. (QCI Accredited EIA Consultant at S.No.155 as per List of Accredited consultant Organizations/Rev.12,July, 2021 (NABET Accredited EIA consultant, MoEF & NABL approved Laboratory) Environment Division, D-36, Sector-6, Noida-201 301, U. P., Ph. 0120-4215000, 0120-4215807 Fax. 0120-4215809, E-mail: [email protected] http://www.mantecconsultants.com Prepared By: Mantec Consultants Pvt. Ltd. Page 1 Kurha- Vadhoda Islampur Lift Irrigation Scheme, UPSA Sinchan Yojna with CCA 32372 Ha, Village Rigaon, District- Jalgaon, Maharashtra by M/s Tapi Irrigation Development Corporation, Sinchan Bhawan, Akash Wani Chowk, Jalgaon, Maharashtra-425001 Pre Feasibility Report INDEX Chapter Title Page no Chapter – 1 Executive summary 3-5 Chapter – 2 Introduction of the project 6-12 Chapter – 3 Project description 13-20 Chapter – 4 Site analysis 21-25 Chapter – 5 Planning brief 26-27 Chapter – 6 Proposed Infrastructure 28 Chapter – 7 Rehabilitation & resettlement 29 Chapter – 8 Project schedule & cost estimates 30 Chapter – 9 Analysis of proposal 31 Prepared By: Mantec Consultants Pvt. Ltd. Page 2 Kurha- Vadhoda Islampur Lift Irrigation Scheme, UPSA Sinchan Yojna with CCA 32372 Ha, Village Rigaon, District- Jalgaon, Maharashtra by M/s Tapi Irrigation Development Corporation, Sinchan Bhawan, Akash Wani Chowk, Jalgaon, Maharashtra-425001 Pre Feasibility Report CHAPTER - 1 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY Kurha Vadhoda Islampur lift Irrigation Scheme is in jurisdiction of Tapi Irrigation Development Corporation, Jalgaon. The project is located near Village Rigaon, Taluka- Muktainagar, Dist- Jalgaon. Jalgaon area has no source of irrigation and suffers due to drought for years together. The scheme envisages lifting of flood water in rainy season from Purna river by constructing Intake structure, Jack well overhead Pump house near village Rigaon Taluka- Muktainagar, Dist- Jalgaon, and conveying water to store in a dam near village Islampur. Construction of dam is also included in the scheme. Irrigation from dam is proposed by Gravity pipe line. Gross Command Area under this scheme is 40465 Ha Culturable Command Area is 32372 Ha & Irrigable Command Area is 25898 Ha. Thus, the project will benefits 25898 ha irrigable area. Total 572 ha land is required for this project. Out of which 562 ha is private land, 7.57 ha is Govt. land & remaining 1.98 ha land for rising main is forest land for which final permission from MoEF, Govt. of India is obtained vide letter No. 6- MHB – 030/2012 – BHO/1853 Dated 23.11.2012. Copy for the same is attached as Annexure-I. Land required for submergence is 536 ha. The employment generation potential of the project is approx. 83.84 Lakhs mandays. This lift irrigation project falls under Violation Category as the construction work of the project is more than 50% completed without grant of EC. The Project falls under Category ‘A’ as per EIA notification 2006 & it's amendments, due to presence of Maharashtra- Madhya Pradesh Interstate Boundary at 5.7 kms in NNW from Dam site. Table 1.1: Salient features of the project Project name Kurha-Vadhoda Islampur Lift Irrigation Scheme, UPSA Sinchan Yojna with 32372 Ha, Village Rigaon, Tehsil- Muktainagar, District- Jalgaon, Maharashtra by M/s Tapi Irrigation Development Corporation, Sinchan Bhawan, Akash Wani Chowk, Jalgaon, Maharashtra-425001 Location of project Village- Rigaon, Taluk-Muktainagar, Dist. Jalgaon, Maharashtra. Dam Site at Islampur : Latitude: 21°02'14.99"N Prepared By: Mantec Consultants Pvt. Ltd. Page 3 Kurha- Vadhoda Islampur Lift Irrigation Scheme, UPSA Sinchan Yojna with CCA 32372 Ha, Village Rigaon, District- Jalgaon, Maharashtra by M/s Tapi Irrigation Development Corporation, Sinchan Bhawan, Akash Wani Chowk, Jalgaon, Maharashtra-425001 Pre Feasibility Report Longitude: 76°24'44.99"E Lifting Point at Rigaon Village: Latitude: 20°57'30.00"N Longitude: 76°20'00"E Topo sheet number 55 C/4,55 C/8, 55 C/12, 55 C/16 55 D/1, 55 D/5, 55 D/9, 55 D/13 Land use Total 572 ha land is required for this project. Out of which 562 ha is private land, 7.57 ha is Govt. land & 1.98 ha of forest land is involved for rising main pipelines (Permission letter from MoEF&CC is obtained vide letter No. 6- MHB – 030/2012 – BHO/1853 Dated 23.11.2012. Copy for the same is attached as ANNEXURE-I. Total water utilization 3.564 TCM Total Storage capacity of 77.60 Mcum reservoir under the scheme Average Rainfall 670 mm Reserved Machhandar Nath Mandir RF~ 2.6 kms in West from Forest/Protected Forest Dam site. Raipur Reserved Forest~ 2.14kms in NW from dam site. RF ~ 3.25kms in SE. Nearest railway station Biswa Railway Station is at 8.9 Kms from lifting point in South Direction. Khumgaon Railway Station is at 16.7 kms from Dam Site in South direction & 11.8 kms in SE from lifting point. Nearest air port The nearest airport is Aurangabad Airport which is 150 kms in SW from the project site. Seismic zone Zone-III (As per 1893:2002) 1.1 IMPORTANCE OF THE PROJECT The drought prone area will get immensely benefitted due to availability of water for irrigation. The project will benefit 25898 ha irrigable area out of which 8249 ha of Muktainagar Taluka, (Jalgaon District) & 17649 ha is of Jalgaon –Jamod & Sangrampur Taluka of Buldhana District. The assured irrigation would lead to increase in agriculture productivity in grains as well as cash crops and thus boost economic prosperity of the region. Prepared By: Mantec Consultants Pvt. Ltd. Page 4 Kurha- Vadhoda Islampur Lift Irrigation Scheme, UPSA Sinchan Yojna with CCA 32372 Ha, Village Rigaon, District- Jalgaon, Maharashtra by M/s Tapi Irrigation Development Corporation, Sinchan Bhawan, Akash Wani Chowk, Jalgaon, Maharashtra-425001 Pre Feasibility Report The existing value of the produce in the command area is Rs. 7366.14 Lakhs for 25898 Ha. After introduction of irrigation, the estimated value of produce in the command area will increase to Rs. 64787.63 Lakhs for 25898 Ha. (An increase of more than 9 times) Thus there will be immense financial benefits accruing to the population. This increase in agricultural production will also boost the industrial activity especially agro based process industries. These will in turn provide employment opportunities to the locals and benefit the people socially as well as financially. Prepared By: Mantec Consultants Pvt. Ltd. Page 5 Kurha- Vadhoda Islampur Lift Irrigation Scheme, UPSA Sinchan Yojna with CCA 32372 Ha, Village Rigaon, District- Jalgaon, Maharashtra by M/s Tapi Irrigation Development Corporation, Sinchan Bhawan, Akash Wani Chowk, Jalgaon, Maharashtra-425001 Pre Feasibility Report CHAPTER – 02 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION 2.1 IDENTIFICATION OF PROJECT The scheme envisages lifting of flood water in rainy season from Purna river by constructing intake channel, Intake structure, Jack well overhead Pump house near village Rigaon Tal. Muktainagar, Dist - Jalgaon, and a dam near village Islampur for a length of 6845m. The Irrigable command area of Jalgaon Dist. is 8445 ha (32%) and 17453 ha (68%) in Buldhana District, thus total command (ICA) under this scheme is 25898 Ha. Irrigation is proposed from dam by Gravity pipe line. Chronology of EC at MoEF- The proposal was earlier submitted to MoEF&CC for grant of TOR in January 2009, TOR was approved in April 2009. Draft EIA was submitted to SPCB in January, 2010 for conducting Public Hearing. The Public Hearing was held in April, 2010 and January, 2011. The Final EIA was submitted to MoEF&CC for grant of EC. EC was not granted to the project as the case was not pursued further with MoEF&CC, after submission of Final EIA due to non correspondence of earlier consultant with MoEF&CC. However, it may also be noted that almost more than 50% work has been completed but no operation has been started. The detailed chronology is mentioned below: Stages of EC Date FORM I and PFR submission 7/1/2009 TOR Presentation 16/2/2009 TOR granted 16/4/2009 Baseline Data collection Nov.2008-Sep.2009 Draft EIA submission 27/1/2010 Conduction of Public Hearing 16/4/2010 and 12/1/2011 Final EIA report submission 7/4/2011 Progress of Lift Irrigation Project % wise is tabulated below: Sr.No. Project Components Construction done Construction to be done 1 Earthen Dam 60% 40% 2 HR and Spillway 0% 100% 3 Pump House No.1 95% 5% 4 Intake structure 0% 100% 5 Pump House No.2 0% 100% 6 Pump House No.3 85% 15% Prepared By: Mantec Consultants Pvt. Ltd. Page 6 Kurha- Vadhoda Islampur Lift Irrigation Scheme, UPSA Sinchan Yojna with CCA 32372 Ha, Village Rigaon, District- Jalgaon, Maharashtra by M/s Tapi Irrigation Development Corporation, Sinchan Bhawan, Akash Wani Chowk, Jalgaon, Maharashtra-425001 Pre Feasibility Report 7 Machinery Installation At PH 1&2 -0% At PH 1&2 -100% At PH 3-60% At PH 3-40% 8 Rising Main 10.784 km 2.356 km 9 Electric Supply Works 85% 15% 10 Distribution Network 0% 100% Prepared By: Mantec Consultants Pvt.