Fine Garden Ornaments and Architectural Stonework

Total Page:16

File Type:pdf, Size:1020Kb

Fine Garden Ornaments and Architectural Stonework Fine garden ornaments and architectural stonework Haddonstone Ltd, The Forge House, East Haddon, Northampton NN6 8DB, England. Telephone: 01604 770711 Fax: 01604 770027 [email protected] Haddonstone (USA) Ltd, Telephone: 856 931 7011 Fax: 856 931 0040 [email protected] Haddonstone (USA) Ltd, 32207 United Avenue, Pueblo, CO 81001, USA. Telephone: 719 948 4554 Fax: 719 948 4285 [email protected] www.haddonstone.com Fine garden ornaments and architectural stonework ISBN: 978-0-9563891-2-1 Issue date: January 2015 ARCHITECTURAL STONEWORK COLUMNS & PILASTERS Our range of columns and pilasters are derived from the architectural TS Tech Sheet No. C50 for M1 vocabulary of the ancient world. TS Tech Sheet No. C40 for M2 TS Tech Sheet No. C30 for M3 A column will usually have an entablature of some kind to support, TS Tech Sheet No. C10 for M4 & M5 for example as part of a portico, temple, pavilion or classical facade. TS Tech Sheet No. C20 for M7 & M8 TS Tech Sheet No. C60 for M9 Our columns are designed to be non-structural elements and so are TS CAD1 Column Assembly Details provided with hollow cores. These, if filled with reinforced concrete or used to sleeve a structural steel member, can then be used in structural situations. They are supplied in component form, as indicated, and should be erected on suitable foundations designed TUSCAN by a structural engineer to suit loadings and ground conditions. COLUMN M5 The shaft sections should be lined with polystyrene (Styrofoam) 355kg (781 lb) 5 or similar to act as an isolating medium when column cores are infilled. Core 160mm (6 ⁄16") CAPITAL OPTIONS We strongly recommend that professional advice is taken to ensure that any proposal is designed to be structurally sound. It is most important to refer to Tech Sheet CAD1 to ensure correct installation. M1 Columns with Corinthian Capitals TUSCAN TUSCAN TUSCAN TUSCAN COLUMN PILASTER COLUMN PILASTER TUSCAN TUSCAN M7B M7B M7 M5 TUSCAN TUSCAN COLUMN PILASTER 258kg (568 lb) 101kg (222 lb) 352kg (775 lb) 145kg 5 5 COLUMN PILASTER M7A M7A Core 110 mm (4 ⁄16") Core 110 mm (4 ⁄16") (319 lb) M8 M8 247kg (543 lb) 95kg (209 lb) Half column Square in section 5 136kg (299 lb) 69kg (152 lb) Core 110 mm (4 ⁄16") also available (Shaft has no diminution) 356 (14") 127 (5") 5 Core 110 mm (4 ⁄16") Half column 1 1 362 (14 ⁄4") 133 (5 ⁄4") 402 (1513⁄16") Half column also available 152 (6") 152 (6") also available 1 1 362 (14 ⁄4") 133 (5 ⁄4") 203 (8") 203 (8") 203 (8") 254 (10") 1 292 (11 ⁄2") 120 (43⁄4") 203 (8") 203 (8") 220 114 114 (811⁄16") 1 1 (4 ⁄2") (4 ⁄2") 220 178 (811⁄16") (7") 2121 2121 1 1 7 15 7 (83 ⁄2") (83 ⁄2") 1942 (76 ⁄16") 1930 (75 ⁄16") 1942 (76 ⁄16") 15 1764 (697⁄16") 1752 (68 ⁄16") 3 1 1772 (69 ⁄4") 1760 (69 ⁄4") 63 63 63 1 1 260 1 (2 ⁄2") 260 (2 ⁄2") (2 ⁄2") 260 305 (12") 1 1 1 (10 ⁄4") (10 ⁄4") (10 ⁄4") 76 229 (9") (3") 3 3 BASE 3 BASE 163 136 (5 ⁄8") BASE 5 136 (5 ⁄8") 5 8 136 (5 ⁄8") 163 5 5 193 (7 ⁄8") 193 (7 ⁄ ") 7 117 (4 ⁄8") BASE 117 (4 ⁄8") (67⁄16") BASE (6 ⁄16") 51 (2") PLINTH 51 (2") PLINTH 51 (2") PLINTH 15 15 1 1 150 (5 ⁄16") PEDESTAL 150 (5 ⁄16") 191 (71⁄2") 191 (71⁄2") 191 (7 ⁄2") 191 (7 ⁄2") 1 PEDESTAL PEDESTAL 191 (7 ⁄2") PEDESTAL 300 300 13 (11 ⁄16") PEDESTAL (1113⁄16") 7 98 (3 ⁄8") 1 1 1 1 1 298 (113⁄4") 362 (14 ⁄4") 114 (4 ⁄2") 362 (14 ⁄4") 114 (4 ⁄2") 362 (14 ⁄4") 3 406 (16") 127 (5") 111 (4 ⁄8") 3 1 3 13 3 4 1 4 4 133 (5 ⁄4") 4 1 325 (12 ⁄16") 400 (15 ⁄ ") 133 (5 ⁄ ") 400 (15 ⁄ ") 400 (15 ⁄ ") 432 (17") 140 (5 ⁄2") 13 7 3 173 (6 ⁄16") 225 (87⁄ 8") 225 (8 ⁄ 8") 400 (15 ⁄4") 1 152 Custom-made products are available on request. General note: Column dimensions exclude joints. Allow 6mm ( ⁄4”) for joints. CORINTHIAN COLUMN M1 2361 kg (5194 lb) 13 3 Core 300-400mm (11 ⁄16"-15 ⁄4") CAPITAL OPTIONS 652 (2511⁄16") CORINTHIAN IONIC CAPITAL COLUMN 7 CAPITAL 25kg (55 lb) M9 215 (8 ⁄16") 330 59kg (130 lb) (13") DORIC 350 (133⁄4") TUSCAN 1116kg (2458 lb) 7 CAPITAL CAPITAL Core 200mm (7 ⁄8") 508 (20") 150 TUSCAN COLUMN M3 900 (357⁄16") 29kg (64 lb) 15 200 24kg (53 lb) CAPITAL OPTIONS (5 ⁄16") (77⁄8") 1 1680 kg (3696 lb) 445 (17 ⁄2") ABACUS 382 (151⁄16") 355 Core 225-310mm 450 End elevation 7 3 11 (14") 210 (8 ⁄8"-12 ⁄16") (17 ⁄16") 1 4 150 (8 ⁄ ") 15 625 (5 ⁄16") 5 CAPITAL OPTIONS (24 ⁄8") 3 1000 (39 ⁄8") CAPITALS FOR M2, M4 AND M5 COLUMNS (Interchangeable) 100 ABACUS (315⁄16") CORINTHIAN 175 TUSCAN (67⁄8") COLUMN COLUMN CAPITAL 9 M4 M2 700 (27 ⁄16") 396kg (871 lb) 365kg (887 lb) 255 5 5 1 Core 160mm (6 ⁄16") Core 160mm (6 ⁄16") (10 ⁄16") Half column also available CAPITAL OPTIONS 255 (101⁄16") TUSCAN 655 (253⁄4") CAPITAL OPTIONS 11 COLUMN 500 (19 ⁄16") 255 1 M5 (10 ⁄16") 175 (67⁄8") 355kg (781 lb) 5 Core 160mm (6 ⁄16") TUSCAN 425 (163⁄4") PILASTER 650 (259⁄16") CAPITAL OPTIONS M4 139kg (337 lb) CORINTHIAN PILASTER 1 255 (10 ⁄16") 130 (51⁄8") M2 508 (20") 155kg (341 lb) 3 (Shaft has no 425 (16 ⁄4") diminution) 355 (14") TUSCAN TUSCAN TUSCAN TUSCAN 13 6 (53⁄8") COLUMN PILASTER COLUMN PILASTER 1 3 TUSCAN TUSCAN M7B M7B M7 M5 382 (15 ⁄16") 136 (5 ⁄8") 254 TUSCAN TUSCAN COLUMN PILASTER 258kg (568 lb) 101kg (222 lb) 352kg (775 lb) (10") 150 145kg (515⁄16") 5 5 COLUMN PILASTER M7A M7A 16 16 150 150 Core 110 mm (4 ⁄ ") Core 110 mm (4 ⁄ ") (319 lb) 15 (515⁄16") (5 ⁄16") M8 M8 247kg (543 lb) 95kg (209 lb) Half column Square in section 5 136kg (299 lb) 69kg (152 lb) Core 110 mm (4 ⁄16") also available (Shaft has no diminution) 356 (14") 127 (5") 250 5 (913⁄16") Core 110 mm (4 ⁄16") Half column 1 1 362 (14 ⁄4") 133 (5 ⁄4") 402 (1513⁄16") Half column also available 152 (6") 152 (6") also available 1 1 362 (14 ⁄4") 133 (5 ⁄4") 203 (8") 203 (8") 203 (8") 254 (10") 1 292 (11 ⁄2") 120 (43⁄4") 203 (8") 203 (8") 220 SHAFT 11 114 114 (8 ⁄16") 5200 (2043⁄4") 1 1 (4 ⁄2") (4 ⁄2") 220 4968 5 178 (811⁄16") (195 ⁄8") (7") 2782 (1091⁄2") as shown, or 4491 13 15 16 (176 ⁄16") 2538 (99 ⁄ ") 2538 2388 2388 (9915⁄16") (94") (94") 2121 2121 1 1 7 15 7 (83 ⁄2") (83 ⁄2") 1942 (76 ⁄16") 1930 (75 ⁄16") 1942 (76 ⁄16") 15 1764 (697⁄16") 1752 (68 ⁄16") 3 1 1772 (69 ⁄4") 1760 (69 ⁄4") 63 63 63 1 1 260 1 260 70 74 (2 ⁄2") 260 (2 ⁄2") (2 ⁄2") 305 (12") 13 16 305 (12") 15 1 1 1 300 (11 ⁄ ") 3 (2 ⁄16") (10 ⁄4") (10 ⁄4") (10 ⁄4") 76 (2 ⁄4") 229 (9") (3") 3 3 BASE 5 3 BASE 163 159 136 (5 ⁄8") BASE 5 8 136 (5 ⁄8") 193 (7 ⁄8") 136 (5 ⁄8") 163 190 190 102 (4") BASE 5 5 193 (7 ⁄ ") 7 7 BASE 1 1 117 (4 ⁄8") BASE 117 (4 ⁄8") (6 ⁄16") BASE (6 ⁄16") (71⁄2") (7 ⁄2") (6 ⁄4") 51 (2") PLINTH 51 (2") PLINTH 51 (2") PLINTH 51(2") PLINTH 425 (163⁄4") 5 15 15 1 1 600 (23 ⁄8") 150 (5 ⁄16") PEDESTAL 150 (5 ⁄16") 1 2 1 2 191 (7 ⁄2") 2 1 191 (7 ⁄ ") PEDESTAL 191 (7 ⁄ ") PEDESTAL 191 (7 ⁄ ") 191 (7 ⁄2") PEDESTAL 300 300 300 279 300 13 PEDESTAL 13 279 1 13 13 16 (11 ⁄16") PEDESTAL 155 (6 ⁄8") BASE (11 ⁄16") PEDESTAL (11 ⁄16") (11 ⁄ ") (11") (11") BASE 7 7 1 16 200 (7 ⁄8") 98 (3 ⁄8") 1 1 1 1 1 75 (3") PLINTH 510 (20 ⁄ ") 298 (113⁄4") 362 (14 ⁄4") 114 (4 ⁄2") 362 (14 ⁄4") 114 (4 ⁄2") 362 (14 ⁄4") 3 3 1 11 127 (5") 400 (15 ⁄4") 120 (4 ⁄4") 445 (17 ⁄2") 144 (5 ⁄16") 1 15 3 406 (16") 7 165 (6 ⁄ 2") 10 0 (3 ⁄16") 111 (4 ⁄8") 3 1 3 1 3 570 (22 ⁄16") BASE PLINTH 13 4 4 4 133 (5 ⁄4") 4 1 11 3 15 325 (12 ⁄16") 400 (15 ⁄ ") 133 (5 ⁄ ") 400 (15 ⁄ ") 400 (15 ⁄ ") 432 (17") 140 (5 ⁄2") 424 (16 ⁄16") 132 (5 ⁄16") 457 (18") 150 (5 ⁄16") 13 PLINTH 123 (4 ⁄16") 625 PEDESTAL 5 402 250 500 (24 ⁄8") 13 13 (15 ⁄16") (9 ⁄16") PEDESTAL (1911⁄16") 3 7 13 7 7 3 5 680 (26 ⁄4") 850 (33 ⁄16") 173 (6 ⁄16") 225 (8 ⁄ 8") 225 (8 ⁄ 8") 400 (15 ⁄4") 237 (9 ⁄16") 3 720 (28 ⁄8") 900 (357⁄16") Refer to the Architectural Supplement for specific US designs. Custom-made products are available on request. 153 ARCHITECTURAL STONEWORK PORTICOS In the XIX century, porticos were a frequent feature of houses for both aesthetic and practical reasons.
Recommended publications
  • Entablature Refers to the System of Moldings and Bands Which Lie Horizontally Above Columns, Resting on Their Capitals
    An entablature refers to the system of moldings and bands which lie horizontally above columns, resting on their capitals. Considered to be major elements of classical architecture, entablatures are commonly divided into three parts: the architrave, frieze, and cornice. E ntablature by stromberg ARCHITRAVE The architrave is the supporting element, and the lowest of the three main parts of an entablature: the undecorated lintel resting on the columns. FRIEZE The frieze is the plain or decorated horizontal unmolded strip located between the cornice and the architrave. Clay Academy, Dallas, TX Stromberg offers you the freedom to choose. Whether your project requires authentic classical entablature, or a modern look, we will design your entablature to perfectly match your building’s unique style . We have extensive knowledge of all the major classical orders, including Ionic, Doric, and Corinthian, and we can craft columns and entablatures that comply with each order’s specifications. DORIC a continuous sculpted frieze and a The oldest and simplest of these three cornice. CORNICE orders of classical Greek architecture, Its delicate beauty and rich ornamentation typified by heavy, fluted columns with contrast with the stark unembellished The cornice is the upper plain capitals and no base. features of the Doric order. part of an entablature; a decorative molded IONIC CORINTHIAN projection at the top of a This order, considered to be a feminine The most ornate of the three classical wall or window. style, is distinguished by tall slim orders, characterized by a slender fluted columns with flutes resting on molded column having an ornate, bell-shaped bases and crowned by capitals in the capital decorated with acanthus leaves.
    [Show full text]
  • W O R K . Sto R E. Divide. ™
    ™ WORK. STORE. DIVIDE. STORE. WORK. LOCHLYN ON THE COVER LOCHLYN™ SPACE DIVIDER SEPIA WALNUT LAMINATE, BACK PAINTED GLASS INSERT, WALLABY LOCHLYN™ DESK EXTENSION SEPIA WALNUT LAMINATE, WALLABY LOCHLYN™ FLOATING SHELVES SEPIA WALNUT LAMINATE GRIN® STOOL CONCERTEX DRESDEN ASH, POLISHED TOLL FREE 800.482.1717 WEB NATIONALOFFICEFURNITURE.COM A BRAND OF KIMBALL INTERNATIONAL, ©2020 NBRLOC20C 3 LOCHLYN WORK. STORE. DIVIDE. LOCHLYN PROVIDES THE CANVAS. YOU CREATE THE MASTERPIECE. ESTABLISH SPACE DIVISION WHILE DISPLAYING INSPIRATION. Environments today need to address open plan, accommodate private spaces, provide an atmosphere that creates a home-like feeling, and showcase personality. That’s quite an accomplishment, but Lochlyn does it all. This innovative collection provides a variety of solutions. Its metal frame design can be built to be small in stature or grand in size, depending on the users' space division needs. Add a worksurface to create a desk solution or wall mounted storage to further maximize space. Lochlyn offers brilliant work, storage, and space division solutions for commercial areas or home environments. LOCHLYN™ STORAGE AND SHELVING SYSTEM PORTICO, SONOMA, AND CLOUD LAMINATES, BLACK TELLARO® LOUNGE DESIGNTEX ARNE MIST, PORTICO FINISH GRIN® LOUNGE MAHARAM RAAS BY KVADRAT 552 GRIN® STOOL NATIONAL BLISS JADE, PORTICO FINISH 5 LOCHLYN WORK. STORE. DIVIDE. LOCHLYN™ STORAGE PLANKED RAW OAK LAMINATE, SHADOW LOCHLYN™ PET BED CUSHION STINSON SATCHEL COGNAC IDARA™ GUEST ARCHITEX KENSINGTON GREY 7 LOCHLYN WORK. STORE. DIVIDE. RISE TO THE CHALLENGE. BE INSPIRED. SPARK CREATIVITY. Workspaces that harmonize your style and ergonomic needs create refreshing stations where work actually gets done. Lochlyn’s height adjustable desk lets you find the right fit for however you work.
    [Show full text]
  • The Five Orders of Architecture
    BY GìAGOMO F5ARe)ZZji OF 2o ^0 THE FIVE ORDERS OF AECHITECTURE BY GIACOMO BAROZZI OF TIGNOLA TRANSLATED BY TOMMASO JUGLARIS and WARREN LOCKE CorYRIGHT, 1889 GEHY CENTER UK^^i Digitized by the Internet Archive in 2013 http://archive.org/details/fiveordersofarchOOvign A SKETCH OF THE LIFE OF GIACOMO BAEOZZI OF TIGNOLA. Giacomo Barozzi was born on the 1st of October, 1507, in Vignola, near Modena, Italy. He was orphaned at an early age. His mother's family, seeing his talents, sent him to an art school in Bologna, where he distinguished himself in drawing and by the invention of a method of perspective. To perfect himself in his art he went to Eome, studying and measuring all the ancient monuments there. For this achievement he received the honors of the Academy of Architecture in Eome, then under the direction of Marcello Cervini, afterward Pope. In 1537 he went to France with Abbé Primaticcio, who was in the service of Francis I. Barozzi was presented to this magnificent monarch and received a commission to build a palace, which, however, on account of war, was not built. At this time he de- signed the plan and perspective of Fontainebleau castle, a room of which was decorated by Primaticcio. He also reproduced in metal, with his own hands, several antique statues. Called back to Bologna by Count Pepoli, president of St. Petronio, he was given charge of the construction of that cathedral until 1550. During this time he designed many GIACOMO BAROZZr OF VIGNOLA. 3 other buildings, among which we name the palace of Count Isolani in Minerbio, the porch and front of the custom house, and the completion of the locks of the canal to Bologna.
    [Show full text]
  • 30” Built-In Refrigerator Column (Right-Hand Door Swing)
    30” BUILT-IN REFRIGERATOR COLUMN (RIGHT-HAND DOOR SWING) Signature Features JBRFR30IGX OVER 250 TRINITY COOLING REMOTE ACCESS CONFIGURATIONS Revel in the trinity of food Open door. Power outages. Freezer or refrigerator. Left- preservation: three zones, three Filter changes. Connect to WiFi hand or right-hand swing. One, precision sensors, calibrated for real-time notifications and two, three columns in a row. every second. Fortified by an control your columns from Four different widths. With 12 exposed air tower, you can anywhere. Tap and swipe on one-unit options, 75 two-unit conquer humidity levels and both iOS and Android devices. combinations and over 250 three- customize the temperature of <sup>1</sup><br><sup>1 unit combinations, configuration each zone to your deepest Appliance must be set to remote is where bespoke begins. desires. enable. WiFi & app required. Features subject to change. For ECLIPTIC LIGHTING DARING OBSIDIAN details and privacy statement, INTERIOR visit jennair.com/connect.</sup> Live beyond the shadow. Abandoning the dark spots cast Inspired by the beauty of SOLID GLASS AND METAL by dated puck lighting, over 650 volcanic glass, this industry- LEDs frame and fill your exclusive dark finish erupts with All-metal bin and shelf frames. column, coming alive at a touch reflective, high-contrast style. Thick, naturally odor-resistant of the controls. Each zone Reject the unfeeling, lifeless solid glass. A forcefield at the awakens and pulses as you mold vessel of harsh steel. Let fine edge that prevents spillovers. To your column to your desires. foods and beverages emerge hell with cheap plastic in luxury from the interior of your door bins, shelves and liners.
    [Show full text]
  • Cairo Supper Club Building 4015-4017 N
    Exhibit A LANDMARK DESIGNATION REPORT Cairo Supper Club Building 4015-4017 N. Sheridan Rd. Final Landmark Recommendation adopted by the Commission on Chicago Landmarks, August 7, 2014 CITY OF CHICAGO Rahm Emanuel, Mayor Department of Planning and Development Andrew J. Mooney, Commissioner The Commission on Chicago Landmarks, whose nine members are appointed by the Mayor and City Council, was established in 1968 by city ordinance. The Commission is re- sponsible for recommending to the City Council which individual buildings, sites, objects, or districts should be designated as Chicago Landmarks, which protects them by law. The landmark designation process begins with a staff study and a preliminary summary of information related to the potential designation criteria. The next step is a preliminary vote by the landmarks commission as to whether the proposed landmark is worthy of consideration. This vote not only initiates the formal designation process, but it places the review of city per- mits for the property under the jurisdiction of the Commission until a final landmark recom- mendation is acted on by the City Council. This Landmark Designation Report is subject to possible revision and amendment dur- ing the designation process. Only language contained within a designation ordinance adopted by the City Council should be regarded as final. 2 CAIRO SUPPER CLUB BUILDING (ORIGINALLY WINSTON BUILDING) 4015-4017 N. SHERIDAN RD. BUILT: 1920 ARCHITECT: PAUL GERHARDT, SR. Located in the Uptown community area, the Cairo Supper Club Building is an unusual building de- signed in the Egyptian Revival architectural style, rarely used for Chicago buildings. This one-story commercial building is clad with multi-colored terra cotta, created by the Northwestern Terra Cotta Company and ornamented with a variety of ancient Egyptian motifs, including lotus-decorated col- umns and a concave “cavetto” cornice with a winged-scarab medallion.
    [Show full text]
  • Mike Hamm Bachelor of Landscape Architecture '79
    Mike Hamm bachelor of landscape architecture '79 Hamm steered Portico’s designs, connecting with nature, culture “Portico” not only represents one architecture firm’s name, but their environmental philosophy. The word denotes the gateway or threshold between the interior – the architecture – and the exterior – the landscape environments. Mike Hamm, who spent half his tenure with Portico Group as president and CEO, co- founded the Seattle-based firm in 1984 with the other principal architects and landscape architects. April 2014 marks Hamm’s final involvement with the firm as he steps down. “I’ve been in the practice for 35 years and loved every moment of it, but you realize at a point in time there’s still many things one wants to do and see,” says Hamm, who graduated from Above: Mike Hamm, BArch ’79, CEO, Portico Group. University of Oregon’s School of Architecture and Allied Arts in 1979 with a degree in landscape architecture. Zoos, aquariums, arboretums, museums, visitor centers, and public gardens for city, state, federal, and nonprofit foundations around the world have helped to build the firm’s design reputation. Portico’s work has appeared in five continents, from a zoo in Mumbai, India, to the expansion of the North Capital Campus called Heritage Park in Olympia, Washington, to a recent concept design for an aquarium in Seoul, South Korea. “We’re not schooled in architecture school to know how to run a business,” he says. “It’s not part of the curriculum, so that’s a whole other life story. That’s been rewarding and energizing as a learning experience.” Hamm was raised in St.
    [Show full text]
  • HOME OFFICE SOLUTIONS Hettich Ideas Book Table of Contents
    HOME OFFICE SOLUTIONS Hettich Ideas Book Table of Contents Eight Elements of Home Office Design 11 Home Office Furniture Ideas 15 - 57 Drawer Systems & Hinges 58 - 59 Folding & Sliding Door Systems 60 - 61 Further Products 62 - 63 www.hettich.com 3 How will we work in the future? This is an exciting question what we are working on intensively. The fact is that not only megatrends, but also extraordinary events such as a pandemic are changing the world and influencing us in all areas of life. In the long term, the way we live, act and furnish ourselves will change. The megatrend Work Evolution is being felt much more intensively and quickly. www.hettich.com 5 Work Evolution Goodbye performance society. Artificial intelligence based on innovative machines will relieve us of a lot of work in the future and even do better than we do. But what do we do then? That’s a good question, because it puts us right in the middle of a fundamental change in the world of work. The creative economy is on the advance and with it the potential development of each individual. Instead of a meritocracy, the focus is shifting to an orientation towards the strengths and abilities of the individual. New fields of work require a new, flexible working environment and the work-life balance is becoming more important. www.hettich.com 7 Visualizing a Scenario Imagine, your office chair is your couch and your commute is the length of your hallway. Your snack drawer is your entire pantry. Do you think it’s a dream? No! Since work-from-home is very a reality these days due to the pandemic crisis 2020.
    [Show full text]
  • Restoration of a Vintage Limestone Portico with Architectural Precast Concrete
    PROJECT CASE STUDY Restoration of a Vintage Limestone Portico with Architectural Precast Concrete Presents a case study on the use of architectural precast concrete as a cost-effective approach to restore an historic park facility in Chicago, Illinois. The main entrance portico of the facility was originally constructed with an elaborate limestone beam or entablature, carried by massive limestone columns. The carved limestone architrave (soffit), frieze, and cornice (upper projection) pieces of the entablature were attached to backup brickwork and concealed steel lintel beams with metal anchors. After significant stone damage and movements occurred due to long-term corrosion of embedded steel components, several David B. Tigue, P.E., S.E. limestone soffit pieces were removed from the building for safety. Associate, Senior Project Engineer The restoration design utilized architectural precast concrete with a Raths, Raths & Johnson, Inc. Willowbrook, Illinois formed soffit having the identical proportions, texture and color as the damaged architrave stone pieces, and had structural capacity to replace the existing steel lintel beams. The design provided a unique, cost-effective approach for replacing deteriorated and damaged components, while retaining the original, intricate limestone carvings. he Douglas Park Field House stone pillars supporting an elaborate is one of many vintage facili- limestone beam, or entablature, and a Tties managed by the Chicago roof structure over the entry portico Park District in Chicago, Illinois. Con- (see Fig. 1). The limestone entablature structed in the early 1900s, it is cur- construction consisted of traditional rently listed in the National Registry carved limestone architrave (soffit), Kurt R. Hoigard, P.E. of Historic Buildings.
    [Show full text]
  • A Study of the Pantheon Through Time Caitlin Williams
    Union College Union | Digital Works Honors Theses Student Work 6-2018 A Study of the Pantheon Through Time Caitlin Williams Follow this and additional works at: https://digitalworks.union.edu/theses Part of the Ancient History, Greek and Roman through Late Antiquity Commons, and the Classical Archaeology and Art History Commons Recommended Citation Williams, Caitlin, "A Study of the Pantheon Through Time" (2018). Honors Theses. 1689. https://digitalworks.union.edu/theses/1689 This Open Access is brought to you for free and open access by the Student Work at Union | Digital Works. It has been accepted for inclusion in Honors Theses by an authorized administrator of Union | Digital Works. For more information, please contact [email protected]. A Study of the Pantheon Through Time By Caitlin Williams * * * * * * * Submitted in partial fulfillment of the requirements for Honors in the Department of Classics UNION COLLEGE June, 2018 ABSTRACT WILLIAMS, CAITLIN A Study of the Pantheon Through Time. Department of Classics, June, 2018. ADVISOR: Hans-Friedrich Mueller. I analyze the Pantheon, one of the most well-preserVed buildings from antiquity, through time. I start with Agrippa's Pantheon, the original Pantheon that is no longer standing, which was built in 27 or 25 BC. What did it look like originally under Augustus? Why was it built? We then shift to the Pantheon that stands today, Hadrian-Trajan's Pantheon, which was completed around AD 125-128, and represents an example of an architectural reVolution. Was it eVen a temple? We also look at the Pantheon's conversion to a church, which helps explain why it is so well preserVed.
    [Show full text]
  • Mobile Column Lift System Is the Faster and Easier Choice for Your Maintenance Facility
    MobileHEAVY DUTY Column LIFTING SYSTEMS Ergonomic FLEETVersatile Performance Productive Reliable FAST Dependable Mobile Buy America World Best Techs TM Legendary TM Red FireLRemoteE controlledADERHEAVY DUTY Battery Efficient MACHCareer Extender ENVIRONMENTALLY FRIENDLY TM EmployeeWireless Retention Patented Flex Innovative Adjustable www.rotarylift.com A Shown: MCHM419U1A00 / Wireless remote-controlled model N D D E VALIDAT TM WIRELESS CONTROLS FLEXMAX NO CABLES / NO CORDS REMOTE-CONTROLLED LIFTING Unmatched lifting versatility and flexibility with the mobility to monitor and adjust your columns anywhere in your shop. Premium FLEXMAXTM lifts provide wireless, remote-controlled flexibility LIFT UP TO 150,400 LBS. plus added operational controls at each column giving technicians the choice to work in the most comfortable, productive and efficient way possible. Ergonomic, wireless hand-held remote control walks the technician through the system set up. Status lights indicate standby or paired columns. Controller features include: • On/off power button with info screen • 2-speed joystick control with auto resume FLEXMAX419 • Single lower-to-lock button with E-stop control A N D 18,800 lbs. capacity column D TE VALIDA • Remote battery indicator Shown: MCHM419U100 • Press ProtectTM eliminates accidental button presses • Audible warning when operator is out of range TM Rotary FLEXMAX feature column capacities at • 99 system IDs eliminate communication interference 18,800 lbs. and 14,000 lbs. in multiple configurations. • Height and weight digital display gauge displays Service everything from light-duty passenger vehicles to • Software upgrades can be made wirelessly heavy-duty trucks. This electro-hydraulic system with WATCH THE adjustable lifting forks can be operated in both odd and PRODUCT VIDEO See how fast and even groups of columns.
    [Show full text]
  • A Comprehensive Market Report for the Homebuilding and Land Development Industries in Southwest Florida
    © LSI MARKET TRENDS 4TH QUARTER 2019 A COMPREHENSIVE MARKET REPORT FOR THE HOMEBUILDING AND LAND DEVELOPMENT INDUSTRIES IN SOUTHWEST FLORIDA PRESENTED BY NELSON TAYLOR, MRICS, MSRE 6810 International Center Blvd. Fort Myers, FL 33912 www.LSIcompanies.com 239.489.4066 Need a Custom Report or Specific Project Evaluation? LSI Companies, Inc., has one of the most comprehensive and effectively staffed research departments in the region. We provide the most extensive property and market strategy reports available. Whether you need data to support a decision, or an expert evaluation from some of the most experienced land and commercial brokers in the market, you’ll see why LSI Companies is more than just dirt. Contact us to learn more: [email protected] | 239-489-4066 www.LSIcompanies.com | [email protected] | 239.489.4066 © 2020 LSI Companies, Inc. All Rights Reserved. Duplication of this report is prohibited. 2 Table of Contents Executive Summary 4 Socioeconomic Overview 5 Population 5 Airport Traffic 10 Age Distribution 13 School Enrollments 15 FGCU Enrollment 17 Household Income 18 Employment 21 Migration 26 Housing Overview Collier County Permits 30 Lee County Permits 35 Charlotte County Permits 52 Total Combined Permits 56 MLS Sales Trends 57 Mortgage Trends 63 Cape Coral and Lehigh Acres Lot Sales Trends 69 Notable Transactions 70 Construction Material Costs 76 General Limiting Conditions 78 www.LSIcompanies.com | [email protected] | 239.489.4066 © 2020 LSI Companies, Inc. All Rights Reserved. Duplication of this report is prohibited. 3 Executive Summary “You are neither right nor wrong because the crowd disagrees with you. You are right because your data and reasoning are right.” – Benjamin Graham As we close out 2019 and focus on expectations in 2020, our past gives little credibility to where we are heading.
    [Show full text]
  • National Register of Historic Places Inventory — Nomination Form Date Entered 1. Name 2. Location 3. Classification 4. Owner O
    NPS Form 10-900 OMB No. 1024-0018 (3-82) Expires 10-31-87 United States Department of the Interior National Park Service For NPS use only National Register of Historic Places Inventory — Nomination Form date entered See instructions in How to Complete National Register Forms Type all entries — complete applicable sections 1. Name historic Dubuque County Jail ______________ and or common 2. Location street & number 36 East 8th Street not for publication city, town Dubuque vicinity of Congressional District: Second state Iowa code IA county Dubuque code 061 3. Classification Category Ownership Status Present Use district X public X occupied agriculture museum X building(s) private unoccupied commercial park structure both work in progress X educational private residence site Public Acquisition Accessible entertainment religious object in process X yes: restricted X government scientific being considered - yes: unrestricted industrial transportation no military __ other: 4. Owner of Property name Dubuque County (Contact: Donna Smith, Chairman, Cmmt-y Board of Supervisors') street & number 720 Central AVenue city, town Dubuque vicinity of state Ibwa 5. Location of Legal Description courthouse, registry of deeds, etc. Dubuque County Courthouse street & number 720 Central Avenue city, town state 6. Representation in Existing Surveys __________ Historic American Buildings Survey; Iowa Windshield Survey; Dubuque Historic Sites Field Survey; National Register of Historic has this property been determined eligible? —— yes —— no Places date 1967, 1977; 1974; 1973. 1972 L federal X_ state __ county X_ local Library of Congress; State Historical Society of Iowa; depository for survey records National Park Service ________ Districtof Columbia; Iowa city, town ; T)p..«=i Mm'TIPS; Waghingtrm state^District of Columbia 7.
    [Show full text]