SHREE SAGHDHANAND DEVELAPERS

To, Dar€: l5/082018

The Principal Secret!ry Stat€ Etrvirdnment Impact Ass€ssment Authority, Mahamshtn, Environment D€psrtment, Msntmlaya, . f;-1s\ra - *d',", Mumbai. Srale: lllshsrashtm. :r1. t ..-..f{ .",, : . S*.i.trC : Rcqu6t for Exprnsion h Ebvim:rm€trtal Clearrnce (Ec) for our Resid€ntirl & .:." -.- Development project rt village K{vesa., Wrghbil Road, Off Chodb$nder \1":. ' Road, , State. MrbanshtrL

R€f€rcnce : Received Eovimtrm€nt Cle.rrnc€ Letter No. SEAC - 201l/CR.573nC.2 dt. 20r January,20ll

Dear Sir.

With reference to the abov€ subject we would like to mention that we have receiv€d environmentat clearance for the above mentioned pmject. Due to the expansion in the proposal as per CR dated 02.05.2016 we would like to seek the expansion in the EC.

W€ yould like to stress bere that the incrcase itr built-up ares in the expsnsion ponion is only by 8% .$sparcd fo rle errlier EC ss per the comparative trble urder mentioned for your r€{dy refer€dce

No Dascription As per EC received dt Proposed Exprnsion in Remerk 20.0t.2011 EC I Total plot 31320.00 Sq. mt 13320.00 Sq. mt No change

2. Permissible 37231.64 Sq. mt 3944q21, W nt ,ProposJd 10. b€ increased Buih-up Area by 2208.57 sq. m1. due to as per FSI increase in permissible FSI as per GR dated 02.02.2016 3. Built'up Area 37108.73 Sq. mt 39412.93 Sq. mt Proposed to be increased as per FSI by 2304.20 sq. mt. due to increase in perm issible FSI Built-up Ares 25654.63 Sq. ml 28559.81 Sq. mt Proposed to be increased as per NON by 2905.18 sq. mt. due to FSi increase in built-up arca as Der FSI 5. Total 62763.36 Sq. rht . 61972.'74Sq.nt Proposed to be increased Constluction by 5209.38 Sq. ml. (N€r BuilluD Ar€a increase bv Eyo) 6. Building Total l0 Nos, of Totrl l0 Nos oI . No Change in nos. of details buildings buildings buildings

TypeA,B&C TypeA,B&C . Proposed to be (Residenlirl with shops): (Residential with shops): increased by 3 nos, of

Site: C -104, PAI,ACIA, N€ar Corsica BuildinS Behind Hiranandani Estate, Opp. S$'astik Regalia, , Thqn€ We8t - 40o 615. 'tel I o22 2s975563. Mobile: 8o82ooooo5. Email : [email protected], shreesachdhanand.devdopers@gm4il com No Descrlpdon As p.r EC r.ceivd dt Propo$ed Erprosion in ReDarks 20.0r.20r r R' C + 17 Fbs each G+mFlrseach flooas

TypeE,F,c,H,l&J TypeE,F,C,H,t&J . No change ,(B!!idcBtir0;q + | 6 Flrs {Rlsid€nthDr C + 16 Flrs . ,!.!{' i-:r:r :r .i:. qtll :.

Typ€ D (Comrrerclsl): Typc D (Conurcrisl): C+2flls G+2flrs

Clob House Club tlous€ 1, . . Flats: 7(X Nos. . Flatsi 707 Nos. . Proposed to be inar€ased by 3 $os. of . Shopsl54 Nos. . Shops:70:l{ot... .' .t. flob . Propos€d to be ' increased by 16 nos. of . 6hoD$

As therg is lllinhtal like also minimal. FORM –1 & 1A

Expansion in Environment Clearance Of “Residential Development”

At

CTS no. S. no. 228, 227/4, 227/3, 227/2B, 227/2C, 226/1, 2, 3, 106 (PT) at village Kavesar, Thane.

By

M/s. Shree Sachdhanand Developers C-104, PALACIA, near Corsica building, behind Hiranandani Estate, opp. Swastik Regalia, Waghbil, Thane West FORM –1

Expansion in Environment Clearance Of “Residential Development”

At

CTS no. S. no. 228, 227/4, 227/3, 227/2B, 227/2C, 226/1, 2, 3, 106 (PT) at village Kavesar, Thane.

By

M/s. Shree Sachdhanand Developers C-104, PALACIA, near Corsica building, behind Hiranandani Estate, opp. Swastik Regalia, Waghbil, Thane West APPENDIX - I (See paragraph - 6) FORM 1

(I) Basic Information No. Item Details 1. Name of the project/s Expansion in Environmental Clearance (EC) for our Residential Development project at village Kavesar, Waghbil Road, Off Ghodbunder Road, Thane, State - 2. S. No. in the schedule 8a (B2) 3. Proposed capacity/ area/ length/ Total Plot Area: 33,320.00 Sq. mt. tonnage to be handled/ command Deductions: 11,330.09 Sq. mt. area/ lease area/ number of wells Net Plot area: 21,989.91 Sq. mt. to be drilled Built-up Area as per FSI: 39,412.93 Sq. mt. Total Construction Built -up Area: 67,972.74 Sq. mt.

Project Proposal: Building number Building Configuration Flats/Shops Type A Gr/ST(PT) + 20 Floors Type B Gr/ST(PT) + 20 Floors Type C Stilt + 20 Floors Type D Ground + 2 Floors Flats: 707 Type E Stilt + 16 Floors Nos. Type F Stilt + 16 Floors Type G Stilt + 16 Floors Shops: 70 Type H Stilt + 16 Floors Nos. Type I Gr/ST(PT) + 16 Floors Type J Gr/ST(PT) + 16 Floors

Club House Ground + 1 Floor -- 4. New/ Expansion/ Expansion in EC Modernization 5. Existing Capacity/ Area etc. • The project has received Environmental Clearance dated 20th January, 2011 • Total constructed work on site till date (FSI + Non FSI): 61,986.30 Sq. mt. 6. Category of project i.e.’ A’ or 8a (B2) ‘B’ 7. Does it attract the general Not Applicable condition? If yes, please specify. 8. Does it attract the specific Not Applicable condition? If yes, please specify. 9. Location Thane Plot/Survey/Khasra No. Plot bearing CTS no. S. no. 228, 227/4, 227/3, 227/2B, 227/2C, 226/1, 2, 3, 106 (PT) Village Kavesar Tehsil Thane State Maharashtra 10. Nearest railway station Thane Railway Station: Within 9.10 km Nearest airport Mumbai Chhatrapati Shivaji Airport: Within 36.20 km 11. Nearest Town, city, District Thane headquarters along with distance in kms.

1 Form 1- Expansion in EC for Residential development by M/s. Shree Sachdhanand Developers No. Item Details 12. Village Panchayats, Zilla Thane Municipal Corporation (T.M.C.) Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant M/s. Shree Sachdhanand Developers 14. Registered Address C-104, PALACIA, near Corsica building, behind Hiranandani Estate, opp. Swastik Regalia, Waghbil, Thane West 15. Address for correspondence C-104, PALACIA, near Corsica building, behind Hiranandani Estate, opp. Swastik Regalia, Waghbil, Thane West Name Mr. Raja G Rochlani Designation (Owner/ Partner/ Partner CEO) Address C-104, PALACIA, near Corsica building, behind Hiranandani Estate, opp. Swastik Regalia, Waghbil, Thane West Pin Code 400602 E-mail [email protected] Mobile number 9870700003 Telephone No. -- Fax No. -- 16. Details of Alternative Sites Not applicable examined, if any. Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects No 18. Whether separate application of Not applicable interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves NOC from Wild Life Board is Not Applicable as per final Notification approval/ clearance under: if yes, reg. ESZ of SGNP published by MOEF & CC u/no. S.O.3645 (E) details of the same and their dated 05/12/2016 as our project site is not affected by the ESZ belt. status to be given (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any No Government Order/ Policy relevant/ relating to the site? 23. Forest land involved (hectares) Not applicable 24. Whether there is any litigation No pending against the project and/ or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project.

2 Form 1- Expansion in EC for Residential development by M/s. Shree Sachdhanand Developers (II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) No. Information/ Checklist confirmation Yes Details thereof (with approximate quantities/ / No rates, wherever possible) with source of information data 1.1 Permanent or temporary change in No The project site is in Residential Zone as per DP Plan land use, land cover or topography attached as Enclosure. including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation No -- and building? 1.3 Creation of new land uses? No The project site is in residential zone. 1.4 Pre-construction investigation e.g. Yes Geotechnical Investigation has been carried out; it is bore houses, soil testing? referred as Enclosure. 1.5 Construction works? Yes Residential development with shops 1.6 Demolition works? No -- 1.7 Temporary sites used for construction No Provision of temporary hutments with facilities like works or housing of construction drinking water, toilets etc. workers? 1.8 Above ground building, structures or Yes Construction waste shall be disposed to authorized earthworks including linear structures, landfill site. cut and fill or excavations 1.9 Underground works including mining No -- or Tunneling? 1.10 Reclamation works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No --

1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes Temporary storage facilities on site to store the materials? construction raw material. 1.15 Facilities for treatment or disposal of Yes • Sewage Treatment Plant (STP) for treatment of solid waste or liquid effluents? sewage. Reuse of treated sewage for flushing (163 KLD), gardening (38 KLD) and Car wash (44 KLD) within the premises. • Disposal of excess treated sewage to proposed municipal sewer line. • Segregation of Solid waste into non-biodegradable and biodegradable. • Treatment of Biodegradable garbage by composting in Organic Waste Converter. • Non-biodegradable: Segregation into Recyclable and Non-recyclable waste o Recyclable: Handed over to Authorized recyclers o Non-recyclable: To T.M.C. • Dried sludge from STP: as manure for gardening. 1.16 Facilities for long term housing of No -- operational workers? 1.17 New road, rail, or sea traffic during No --

3 Form 1- Expansion in EC for Residential development by M/s. Shree Sachdhanand Developers No. Information/ Checklist confirmation Yes Details thereof (with approximate quantities/ / No rates, wherever possible) with source of information data construction or operation? 1.18 New road, rail, air waterborne or other No -- transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No -- transport routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted transmission lines or No -- pipelines? 1.21 Impoundment, damming, culverting, No -- realignment or other change to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No -- 1.23 Abstraction or transfers of water from No -- ground or surface waters? 1.24 Changes in water bodies or the land Yes By considering the runoff prior to development and surface affecting drainage or run-off? runoff after development there is some increment in runoff of storm water. 1.25 Transport of personnel or materials for Yes Precautions are being taken to reduce the impact of construction, operation or the vehicular movement by trying to avoid the decommissioning? vehicular trips during peak hours. 1.26 Long-term dismantling or No -- decommissioning or restoration works? 1.27 Ongoing activity during No -- decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes Influx of ~ 3945 Persons. temporarily or permanently? 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No -- diversity? 1.31 Any other actions? No --

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

No Information/checklist confirmation Yes Details thereof (with approximate quantities / No /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The project land is in developed infrastructure area. agricultural land (ha) 2.2 Water (expected source & competing Yes During Construction Phase – users) unit : KLD For Workers : From T.M.C.: 2 KLD For Construction: From Water tankers: 2 - 5 KLD (Depending upon the activity)

4 Form 1- Expansion in EC for Residential development by M/s. Shree Sachdhanand Developers No Information/checklist confirmation Yes Details thereof (with approximate quantities / No /rates, wherever possible) with source of information data During Operational Phase – • Domestic water: 320 KLD (Potable water from T.M.C) • Swimming pool: 03 KLD (from tanker water of Potable quantity) 2.3 Minerals (MT) No --- 2.4 Construction material – stone, Yes Quantity : As per requirement aggregates, and/ soil (expected source – Stone aggregates demand will be met from the clay/ MT) soil generated after excavation and from open market. Sources: The material required for construction activities procured from company’s authorized/ approved vendors only. 2.5 Forests and timber (source – MT) Yes Timber required for doors sourced from local suppliers. 2.6 Energy including electricity and fuels Yes During Construction Phase - (source, competing users) Unit: fuel Sources: MSEDCL (MT), energy (MW) D.G. Sets: As per requirement

During Operational Phase – Source: MSEDCL Details Power Requirement Connected load (KW) 10059 KW Maximum demand (KW) 5487 KW 3 DG sets of 180 D.G sets kVA, 320 kVA and (In case of power failure)

500 kVA capacity 2.7 Any other natural resources (use No -- appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

No. Information/Checklist confirmation Yes / Details thereof (with approximate No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which No -- are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or No -- affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by No -- changing living conditions? 3.4 Vulnerable groups of people who No -- could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No --

5 Form 1- Expansion in EC for Residential development by M/s. Shree Sachdhanand Developers

4. Production of solid wastes during construction or operation or decommissioning (MT/month):

Details thereof (with approximate quantities / Yes / No. Information/Checklist confirmation rates, wherever possible) with source of No information data 4.1 Spoil, overburden or mine wastes No --- 4.2 Municipal waste (domestic and or Yes During Construction phase: commercial wastes) The total quantity of solid waste: 5 Kg/day (Biodegradable and Non-biodegradable)

During Operational phase: The total quantity of solid waste: 1873 Kg /day. (Biodegradable and Non-biodegradable) 4.3 Hazardous wastes (as per Hazardous Yes Storage of waste oil generated from D.G. at separate waste Management Rules) location duly marked and will be sold to the CPCB authorized recyclers. 4.4 Other industrial process wastes No -- 4.5 Surplus product No -- 4.6 Sewage sludge or other sludge from Yes Dried sludge from STP: Use as manure for plants effluent treatment. within the premises. 4.7 Construction or demolition wastes. Yes Construction waste shall be disposed to the authorized landfill site. 4.8 Redundant machinery or equipment. No -- 4.9 Contaminated soils or other materials. No -- 4.10 Agriculture wastes. No -- 4.11 Other solid wastes. No --

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) :

No. Information/Checklist confirmation Yes / Details thereof (with approximate No quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil Yes Use of CPCB approved D.G. Sets during power fuels from stationary or mobile failure. sources 5.2 Emissions from production processes No -- 5.3 Emissions from materials handling Yes Frequent water sprinkling done to minimize the including storage or transport fugitive dust emissions due to handling and loading- unloading activities. 5.4 Emissions from construction activities Yes Precautions taken to reduce dust generation during including plant and equipment construction phase: • Water sprinkling at regular intervals to reduce dust generation 5.5 Dust or odours from handling of Yes Dust generation controlled as described above. materials including construction For odour control: materials, sewage and waste • Proper ventilation around STP and SWM facilities • Proper housekeeping and maintenance 5.6 Emissions from incineration of waste No -- 5.7 Emissions from burning of waste in No -- open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No --

6 Form 1- Expansion in EC for Residential development by M/s. Shree Sachdhanand Developers

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

No. Information/Checklist confirmation Yes / Details thereof (with approximate No quantities/rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. Yes but For control of noise following measures are adopted: engines, ventilation plant, crushers. negligi • Use of Properly maintained equipment with ble mufflers. • High noise generating construction activities would be carried out only during day time. • Provision of ear muffs/ear plugs to the workers working near high noise construction machinery. • Provision of barricades & plantation of trees. 6.2 From industrial or similar processes. No -- 6.3 From construction or demolition. Yes Noise levels may increase due to operation of machinery as well as transportation vehicles. This may cause nuisance to the nearby area. Following precautions are taken to control noise pollution: • High noise generating construction activities would be carried out only during day time • Installation, use and maintenance of mufflers on equipment • Provision of ear muffs/ear plugs to the workers working near high noise construction machinery • Provision of barricades along the periphery of the site • Tree Plantation • Acoustic enclosure for DG sets 6.4 From blasting or piling. No -- 6.5 From construction or operational Yes During Construction phase: traffic. Transport of materials for construction work. Precautions taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours.

Operation Phase : • Provision of proper parking arrangement, traffic management plan for smooth flow of a vehicle helps to abate noise pollution due to vehicular traffic. • Tree Plantation of various varieties that shall act as natural noise buffer and also will enhance air quality. 6.6 From lighting or cooling systems. No -- 6.7 From any other sources. No --

7 Form 1- Expansion in EC for Residential development by M/s. Shree Sachdhanand Developers 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea : No. Information/ Checklist confirmation Yes / Details thereof (with approximate No quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage No -- of hazardous materials. 7.2 From discharge of sewage or other No Reuse of treated sewage for flushing and gardening. effluents to water or the land (expected Disposal of excess treated sewage to proposed mode and place of discharge). municipal sewer line. 7.3 By deposition of pollutants emitted to No Dust during construction phase from earthworks and air into the land or into water. movement of vehicles. Provision of dust control measures, including water sprinkling of exposed areas and dust covers for trucks, to minimize any impacts. 7.4 From any other sources. No -- 7.5 Is there a risk of long term build up of No -- pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment: No. Information/Checklist confirmation Yes / Details thereof (with approximate No quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc No -- from storage, handling, use or production of hazardous substances 8.2 From any other causes. No -- 8.3 Could the project be affected by -- Landslides, cyclone, cloudburst are not expected in natural disasters causing the area. environmental damage (e.g. floods, Management plan for flood and earthquake is as earthquakes, landslides, and follows: cloudburst)? Flood: • Minimizing the incremental runoff from the site with the help of rain water harvesting • Provision of internal Storm water drainage system. • Use of screens and silt traps to SWD • Proper maintenance of storm water drainage to avoid choking of drains and flooding on site • External road side and main drain is of adequate capacity Earthquake : The structure of the building is designed as per IS codes for zone III. Detailed Disaster Management plan is attached as Enclosure.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality: No. Information/Checklist confirmation Yes / Details thereof (with approximate quantities/ No rates, wherever possible) with source of information data

8 Form 1- Expansion in EC for Residential development by M/s. Shree Sachdhanand Developers No. Information/Checklist confirmation Yes / Details thereof (with approximate quantities/ No rates, wherever possible) with source of information data 9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: •Supporting infrastructure (roads, No Supporting infrastructure is already in existence. power supply, waste or waste water treatment, etc.) • housing development Yes Residential development with shops • extractive industries • supply industries • other 9.2 Lead to after-use of the site, which No -- could have an impact on the environment 9.3 Set a precedent for later developments Yes Create job opportunity in construction and operation phase with support staff like security, maintenance, household workers, shop keepers etc. and also due to commercial development 9.4 Have cumulative effects due to Yes Impacts on water availability, storm water drainage, proximity to other existing or planned availability of electricity, traffic congestion etc. projects with similar effects

(III) Environmental Sensitivity Sr. Areas Name/ Aerial distance (within 15 No. Identity km.) from Proposed project location boundary 1 Areas protected under Sanjay Gandhi National Park Approx. 1.00 km international conventions, Tungareshwar National Park Approx. 5.00 km national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or Vasai Creek Approx. 2.00 km sensitive for ecological reasons - Thane Creek Approx. 6.00 km Wetlands, watercourses or other Tulsi Lake Approx.9.00 km water bodies, coastal zone, Vihar Lake Approx.12.50 km biospheres, mountains, forests Yeoor Lake Approx. 5.00 km Upvan Lake Approx.5.00 km Rewale Lake Approx.5.00 km Ambe Ghosale Lake Approx.6.00 km Bramhala Lake Approx.6.50 km Siddheshwar Lake Approx.7.00 km Makhamali Lake Approx.7.00 km Jail Lake Approx.7.00 km Kachrali Lake Approx.7.00 km Masunda Lake Approx.8.00 km Raila Devi Lake Approx.8.00 km Hariyali Lake Approx.8.00 km Varaladevi Lake Approx.8.00 km Digha Lake Approx.10.00 km Mogliche Lake Approx.10.00 km

9 Form 1- Expansion in EC for Residential development by M/s. Shree Sachdhanand Developers Sr. Areas Name/ Aerial distance (within 15 No. Identity km.) from Proposed project location boundary Kausa Lake Approx.12.00 km Khardigaon Lake Approx.12.50 km 3 Areas used by protected, Sanjay Gandhi National Park Approx. 1.00 km important or sensitive species of Tungareshwar National Park Approx. 5.00 km flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or Vasai Creek Approx. 2.00 km underground waters Thane Creek Approx. 6.00 km Tulsi Lake Approx.9.00 km Vihar Lake Approx.12.50 km Yeoor Lake Approx. 5.00 km Upvan Lake Approx.5.00 km Rewale Lake Approx.5.00 km Ambe Ghosale Lake Approx.6.00 km Bramhala Lake Approx.6.50 km Siddheshwar Lake Approx.7.00 km Makhamali Lake Approx.7.00 km Jail Lake Approx.7.00 km Kachrali Lake Approx.7.00 km Masunda Lake Approx.8.00 km Raila Devi Lake Approx.8.00 km Hariyali Lake Approx.8.00 km Varaladevi Lake Approx.8.00 km Digha Lake Approx.10.00 km Mogliche Lake Approx.10.00 km Kausa Lake Approx.12.00 km Khardigaon Lake Approx.12.50 km 5 State, National boundaries None -- 6 Routes or facilities used by the public for access to recreation Ghodbandar Road Approx. 0.94 km or other tourist, pilgrim areas 7 Defence installations No -- 8 Densely populated or built-up Thane City -- area 9 Areas occupied by sensitive man- Thane City -- made land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high No -- quality or scarce resources (Ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to No -- pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural No -- hazard which could cause the

10 Form 1- Expansion in EC for Residential development by M/s. Shree Sachdhanand Developers Sr. Areas Name/ Aerial distance (within 15 No. Identity km.) from Proposed project location boundary project to present environmental problems (Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

(IV) Proposed Terms of Reference for EIA studies: Not applicable

11 Form 1- Expansion in EC for Residential development by M/s. Shree Sachdhanand Developers SHREE SACHDHANANM DEVELOPERS

rhat the data and informarion given "lj:y ry: T9"t*,."e in the applicatron and il.:i":'i'itrJffi ii*.,nil i*3iHil,",xe;.:*,:*ltl"l;* :ln *:l * t*"0 and cteamnce given. ifanS to rhe projecl $ilt ru.r l;ll.,l. be revoked aiour risk and

Date: 10.9.2018

Place: Thane

For SHR-EE S3CHDHANA NrD DEVELoPERS ror shr6e Sacfidhamnd DevEtorJers

signature fu Raja c. Rochlani PALACIA phas€ -II , C-104. Opp: Swaslik Regalja, Near Bhoomi Ac.es, Off: Su€j Water pafk, ChorbunderRoad, waghbit, Thane (w) 4006t5.

pALAC,A, Site: C -t04, Nedr Corsi(a BuiJdins. Behind Hiranandani Errare, r.r , o!2 OpO. r**,,* *.r",""[**u." 25e7s563. Mobile : 8o82ooo0o5. *o .li u,, ErD: : pala.,".-rar,*"r,r*;,og.ji.;.;. ;;.:;;""_" "[email protected]