Commissionerate of Municipal Administraon Municipal Corporaon

Tiruppur Proposal

23 January 2014 Outline

• City demographics • Orientaon • Exisng condions of the transport system • Transport vision – Desired mode share changes over next 5 years • Five-year implementaon plan – – Walking & cycling – demand management • First year projects & budget CITY OVERVIEW

Demographics

2013 2018 Urban agglomeration 1,001,886 1,106,164* Average personal trips/ 1.68** 1.73** day/capita Average trips per day 1,683,169 1,913,663

* 2018 population calculated at 2% annual growth rate

** Base year trip generation rate based on data from No pedestrian facilies on major roads • Old with high floors, narrow doors • Insufficient fleet size to cater to demand • Limited depot/terminal space No shelters at most stops Unorganized parking Exisng public transport system Total bus fleet size (city buses TNSTC fleet: 281 only) Private bus fleet: 85 Bus passenger trips per day 152,192 Bus terminal capacity Kamaraj road: 40 bus bays road: 50 bus bays fleet Total auto fleet: 1,133 Share auto fleet: 770

Bus + share auto demand Peak direcon passenger volume

Avinashi Rd 4,050 pphpd PN Rd 1,938 pphpd

College Rd 458 pphpd Rd 1,083 pphpd Mangalam Rd 1,790 pphpd

Palladam Rd 1,649 pphpd Rd 1,312 pphpd pphpd = persons per hour per direcon How residents travel (2013)

Walk 28%

2Ws + cars 46%

Cycle 10%

Paratransit Bus 4% 12%

Based on 2013 TNSTC ridership, vehicle registration, and frequency-occupancy counts. Paratransit includes share autos and private autos. Transport vision

Mode shares 2018: 2018: 2013 Status quo Goal Walk 28 % 26 % 28 % Cycle 10 % 8 % 10 % Bus 12 % 10% 17 % Paratransit 4 % 3 % 1 % Private vehicles 46 % 52 % 44 % TRANSPORT PROPOSALS: FIVE-YEAR PLAN BRT network

New Bus Stand

Old Bus Stand

Chinnakarai Amman Kovil

21 km BRT network

BRT network Thirumuruganpoondi

New Bus Stand Phase 1: Rd 9.7 km

Old Bus Stand

Chinnakarai Amman Kovil

21 km BRT network TERMINAL/DEPOT New terminals Thirumuruganpoondi & depots

TERMINAL • New depot and New Bus Stand terminal space urgently required to resolve space

crunch and make TERMINAL room for new Old Bus Stand buses

TERMINAL/DEPOT TERMINAL/DEPOT Chinnakarai Amman Kovil Cycle sharing

17 sq km system Public transport improvement summary

• BRT: 21 km • 250 new city buses • Addional support infrastructure – 5 new terminals – 3 new depots – ITS & customer informaon • Cycle sharing system Footpaths and pedestrian zones

58 km footpaths 2.1 km pedestrian zone Eswaran Koil St: exisng Eswaran Koil St: proposed Greenways

11 km greenways Sabari Odai: exisng Sabari Odai: proposed Parking management

16 km parking management Five-year investment requirements

Project Investment (Crore Rs)

Public Transport 510

Non-Motorised Transport 109

Travel demand management 4

Total cost of projects 623 YEAR 1 IMPLEMENTATION PLAN Project 1: Footpaths

Velampalayam Rd 0.8 km

Gandhi Nagar 60 Ft Rd Kannagi Main Rd – Kongu Main Rd- Om 0.5 km Sakthi Koil- Nagar 6.2 km

College Rd 2.9 km Court St - Kumaran Rd 0.5 km

Rayapuram – Nanjappa School - Thaadikaran Dharapuram – Kangeyam - 2.0 km Rakkiapalayam 13.0 km Project 2: Greenways

Noyal River 6.8 km

Sabari Odai 4.1 km Project 3: Parking Management

Major streets in central Tirupur 19.6 km Project 4: Pedestrian zone

Flower Market – Eswaran Koil – KSC School 2.1 km Project 5: New bus depot at Amman Kovil

TERMINAL/DEPOT Amman Kovil Year 1 project costs

Year 1 cost Design Construcon Project Details (crore Rs) (crore Rs) Project 1: Footpaths 25.9 km 2.1 25.9 Project 3: greenways 10.9 km 0.9 21.8 Project 3: parking - 0.1 3.5 management Project 4: Pedestrian zone 2.1 km 0.2 2.7

Total, NMT - 3.3 53.9

Project 5: New bus depot At Amman Kovil 0.3 10

Project 6: BRT feasibility, - 2.3 - DPR, detailed designs (50%)

Total, public transport - 2.6 10