STATE DROUGHT RELIEF & FLOOD CONTROL BOARD

[TypeAGENDA a quote from the document or the summary of an interesting point. You can position the text boxTH anywhere in the document. Use the Text Box Tools tab to change the49 formatting of the pull quote text box.] MEETING

CHAIRMANSHIP: HON’BLE CHIEF MINISTER, HARYANA

DATE: 19.03.2018 TIME: 11:30 AM

VENUE:CONFERENCE HALL,HARYANA NIWAS, SECTOR-3,

Irrigation and Water Resources Department, Haryana Sinchai Bhawan, Sector-5,. Ph. No. 0172-2582541,Fax No. 0172- 2567259 Email: [email protected]

Official website: www.hid.gov.in

I N D E X

Sr. Description Agenda Items Page No. No. 1 Notice for 49th meeting of Haryana State 1 Drought Relief & Flood Control Board (HSDR&FCB) 2 List of Members and Special Invitees 2-5 3 Agenda Details 6 4 Minutes of 48th meeting of HSDR & FCB Item No. 1 7-18 5 Action Taken Report of 48th meeting of Item No. 2 19-23 HSDR &FCB 6 Flood Report for the year 2017 Item No. 3 24-31

7 Technical Clearance of New Schemes of Item No. 4 32-51 Irrigation and Water Resources Department 8 Review of on-going schemes of Irrigation Item No. 5 52-91 and Water Resources Department 9 Review of ongoing and new schemes Item No. 6 92-94 under head DEPOSIT 10 Review Position of funds for Irrigation and Item No. 7 95-98 Water Resources Department 11 Schemes and Funds position of Public Item No. 8 99-109 Health Department. 12 Map of Haryana Item No. 9 110

13 Any other item with the permission of chair

Meeting

19.03.2018 at 11:30 AM

No. 475-572/Drainage/14/2018 Dated: 14.03.2018

From Engineer in Chief, Haryana Irrigation and Water Resources Department, Sinchai Bhawan, Sector-5, Panchkula. Phone No. 0172-2582541 Fax No. 0172- 2567259 Email: [email protected] Official Website: www.hid.gov.in To 1. The Members 2. Special Invitees Haryana State Drought Relief & Flood Control Board (HSDR&FCB). (As per list enclosed)

Subject: 49th meeting of Haryana State Drought Relief & Flood Control Board.

In this regard it is informed that the 49th meeting of Haryana State Drought Relief & Flood Control Board (HSDR&FCB) is scheduled to be held on 19.03.2018 at 11:30 AM under the Chairmanship of Hon’ble Chief Minister, Haryana in Conference Hall, Haryana Niwas, Sector-3 Chandigarh. The agenda is enclosed herewith for your kind information please.

It is requested to kindly make it convenient to attend the above said meeting.

-Sd- Engineer in Chief, DA/ Agenda Irrigation and Water Resources Department, Haryana, Panchkula, Cum-Member Secretary, Haryana State Drought Relief &Flood Control Board

1 LIST OF MEMBERS

HARYANA STATE DROUGHT RELIEF &FLOOD CONTROL BOARD

OFFICIAL MEMBERS 1. Hon'ble Chief Minister, Haryana. Chairman 2. Irrigation and Water Resources Minister, Haryana. Vice Chairman 3. Finance Minister, Haryana. Member 4. Agriculture Minister, Haryana. -do- 5. Revenue & Disaster Management Minister, Haryana. -do- 6. Chief Parliamentary Secretary, Development & Panchayats, -do- Haryana 7. Chief Parliamentary Secretary, Revenue and Disaster -do- Management, Haryana 8. Chief Secretary, Govt. of Haryana, Chandigarh. -do- 9. Additional Chief Secretary, Govt. of Haryana, -do- Revenue & Disaster Management Department, Chandigarh. 10. Additional Chief Secretary, Govt. of Haryana, -do- Mines and Geology Department, Chandigarh. 11. Additional Chief Secretary, Govt. of Haryana, -do- Animal Husbandry and Dairying Department, Chandigarh. 12. Additional Chief Secretary, Govt. of Haryana, -do- PW (B&R) Department, Chandigarh. 13. Principal Secretary, Govt. of Haryana, -do- Power Department, Chandigarh. 14. Principal Secretary, , Agriculture -do- Department, Chandigarh. 15. Principal Secretary, Govt. of Haryana, Town and Country Planning Department, Chandigarh. -do- 16. Additional Chief Secretary, Govt. of Haryana, -do- Development and Panchayat Department, Chandigarh. 17. Principal Secretary, Government of Haryana, -do- Irrigation and Water Resources Department, Chandigarh. 18. Additional Chief Secretary, Govt. of Haryana, -do- Finance Department, Chandigarh. 19. Additional Chief Secretary, Govt. of Haryana, -do- Planning Department, Chandigarh. 20. Additional Chief Secretary, Government of Haryana, -do- Public Health Engineering, Department, Chandigarh. 21. Principal Secretary, Govt. of Haryana, -do- Urban Local Bodies Department, Chandigarh. 22. Additional Chief Secretary to Government of Haryana, -do- Forest & Wildlife Department, Chandigarh 23. Commissioner, Division, Ambala. -do-

2 24. Commissioner, Division, Gurgaon. -do- 25. Commissioner, Division, Hisar. -do- 26. Commissioner, Division, Rohtak. -do- 27. Engineer-In-Chief, PW(B&R) Department, -do- Haryana, Sector-33, Chandigarh. 28. Engineer-In-Chief, -do- Public Health Engineering Department, Haryana, Panchkula. 29. Member (RM) Central Water Commission, -do- Room No. 212(S) Sewa Bhawan, R.K.Puram, New . 110066 30. Principal Chief Conservator of Forest, Haryana, Panchkula. -do- 31. Engineer-In-Chief, Member Irrigation and Water Resources Department Haryana, Panchkula. Secretary 32. Chief Engineer/YWS (North) Joint Member Irrigation and Water Resources Department, Haryana, Panchkula. Secretary 33. Chief Engineer/ YWS (South) Member Irrigation and Water Resources Department, Haryana, Delhi. 34. Chief Engineer/BWS, -do- Irrigation and Water Resources Department, Haryana, Panchkula. 35. Chief Engineer/LCU, -do- Irrigation and Water Resources Department, Haryana, Panchkula.

SPECIAL INVITEES 1. Principal Secretary to Chief Minister Haryana, Chandigarh. 2. Additional Principal Secretary-I to Chief Minister, Haryana, Chandigarh. 3. Additional Principal Secretary-II to Chief Minister, Haryana, Chandigarh. 4. Dy. Principal Secretary to Chief Minister, Haryana, Chandigarh 5. Principal Officer on Special Duty to Chief Minister Haryana, Chandigarh. 6. Officer on Special Duty to Chief Minister Haryana, Chandigarh. 7. Chairman & Managing Director, DISCOM (UHBVNL and DHBVNL), Panchkula. 8. Administrator, CADA, Panchkula. 9. Secretary, Revenue & Disaster Management Department, Haryana, Chandigarh. 10. Secretary, Irrigation and Water Resources Department, Haryana, Chandigarh. 11. Director General-cum- Secretary, Information, Public Relations & Cultural affairs, Haryana, Chandigarh. 12. Commander/Headquarter, , Haryana and , Independent Sub Area, Western Command, Ambala Cantt. 13. Representative of National Highway Authority of , New Delhi-110075 14. Representative of Indian Meteorological Department, Regional Office, Chandigarh 15. Representative of Haryana Space Application Centre, Hisar 16. Chief Engineer / Co-ordination, Irrigation and Water Resources Department, Haryana, Panchkula. 17. Chief Engineer/, Irrigation and Water Resources Department, Haryana, Panchkula. 18. Chief Engineer / CADA, Panchkula.

3 19. Deputy Commissioner, Ambala. 20. Deputy Commissioner, . 21. Deputy Commissioner, . 22. Deputy Commissioner, Fatehabad. 23. Deputy Commissioner, Gurgaon. 24. Deputy Commissioner, Hisar. 25. Deputy Commissioner, . 26. Deputy Commissioner, . 27. Deputy Commissioner, . 28. Deputy Commissioner, . 29. Deputy Commissioner, . 30. Deputy Commissioner, Mahendergarh at . 31. Deputy Commissioner, Mewat at Nuh. 32. Deputy Commissioner, . 33. Deputy Commissioner, Panchkula. 34. Deputy Commissioner, . 35. Deputy Commissioner, . 36. Deputy Commissioner, Rohtak. 37. Deputy Commissioner, . 38. Deputy Commissioner, Sonepat. 39. Deputy Commissioner, Nagar. 40. Superintending Engineer, Planning, Irrigation and Water Resources Department, Haryana, Panchkula. 41. Superintending Engineer, HKB Circle, Jagadhari. 42. Superintending Engineer, YWS Circle, Karnal. 43. Superintending Engineer, YWS Circle, Sonepat. 44. Superintending Engineer, YWS Circle, Delhi. 45. Superintending Engineer, YWS Circle, Faridabad. 46. Superintending Engineer, YWS Circle, Jind. 47. Superintending Engineer, SYL W.S. Circle, Ambala. 48. Superintending Engineer, BWS Circle, Kaithal. 49. Superintending Engineer, BWS Circle,Hisar. 50. Superintending Engineer, BWS Circle, Fatehabad. 51. Superintending Engineer, BWS Circle, Sirsa. 52. Superintending Engineer, YWS Circle, Rohtak. 53. Superintending Engineer, Jhajjar W.S. Circle, Jhajjar. 54. Superintending Engineer, YWS Circle, Bhiwani. 55. Superintending Engineer, LWS Circle, Bhiwani. 56. Superintending Engineer, JLN W.S. Circle, Rewari. 57. Superintending Engineer, JLN W.S. Circle, Narnaul. 58. Superintending Engineer, Work Shop Circle, Karnal. 59. Superintending Engineer/CDO, Irrigation and Water Resources Department, Haryana, Panchkula. 4 60. Executive Engineer/CDO-I, Irrigation and Water Resources Department, Haryana, Panchkula. 61. Executive Engineer/Drainage, Irrigation and Water Resources Department, Haryana, Panchkula. 62. Executive Engineer/Nabard, Irrigation and Water Resources Department, Haryana, Panchkula.

------

5 AGENDA DETAILS

HARYANA STATE DROUGHT RELIEF & FLOOD CONTROL BOARD 49thMEETING

MONDAY : 19.0. 2018 TIME: 11:30AM VENUE : CONFERENCE HALL, HARYANA NIWAS, SECTOR-3, CHANDIGARH

CHAIRMAN : HON’BLE CHIEF MINISTER, HARYANA

WELCOME : WELCOME REMARKS BY PRINCIPAL SECRETARY,IRRIGATION NOTE AND WATER RESOURCES DEPARTMENT

INTRODUCTION REMARKS BY ADDITIONAL CHIEF SECRETARY, REVENUE AND DISASTER MANAGEMENT DEPARTMENT

GUIDELINES BY HON’BLE CHIEF MINISTER, HARYANA ITEM NO. 1 : CONFIRMATION OF THE MINUTES OF 48th MEETING OF HSDR &FCB ITEM NO. 2 : ACTION TAKEN REPORT OF 48th MEETINGOF HSDR &FCB ITEM NO. 3 : FLOOD REPORT FOR THE YEAR 2017 ITEM NO. 4 : TECHNICAL CLEARANCE OF NEW SCHEMES OF IRRIGATION AND WATER RESOURCES DEPARTMENT ITEM NO. 5 : REVIEW OF ON-GOING SCHEMES OF IRRIGATION AND WATER RESOURCES DEPARTMENT ITEM NO. 6 : REVIEW OF ONGOING AND NEW SCHEMES UNDER HEAD- DEPOSIT ITEM NO. 7 : REVIEW POSITION OF FUNDS FOR IRRIGATION AND WATER RESOURCES DEPARTMENT ITEM NO. 8 : SCHEMES AND FUNDS POSITION OF PUBLIC HEALTH ENGINEERING DEPARTMENT. ITEM NO. 9 : DRAINAGE MAP OF HARYANA ANY OTHER ITEM WITH THE PERMISSION OF CHAIR

6 ITEM NO. 1:

CONFIRMATION OF THE MINUTES OF 48thMEETING OF HSDR &FCB HELD ON 30.03.2017.

48thmeeting of Haryana State Drought Relief and Flood Control Board was held under the Chairmanship of Hon’ble Chief Minister, Haryana on 30.03.2017. The minutes of meeting were circulated vide letter No. 705-801/Drainage/14/2017 Dated: 20.04.2017 and amendment thereof vide T.O. letter No. 3146-3240/Drainage/14/2017 dated 21.08.2017. No comments have been received from any quarter. It is requested that minutes may kindly be confirmed.

7 Minutes of 48th meeting of Haryana State Drought Relief &Flood Control Board (HSDR&FCB) held on 30.03.2017 under the Chairmanship of Hon’ble Chief Minister, Haryana.

The list of participants is at Annexure A. The Additional Chief Secretary, Revenue & Disaster Management Department, Haryana welcomed the Hon’ble Chief Minister, Hon’ble Finance Minister, Hon’ble Agriculture Minister, and other participants in the meeting. She further apprised the Board about the discussions held in 46th meeting of Haryana State Technical Advisory Committee (HSTAC) on floods held in the forenoon session. The Principal Secretary (Irrigation & Water Resources Department) welcomed the chairman and all the participants and gave a brief account of the flood situation during 2016. The Principal Secretary (Irrigation & Water Resources Department) informed that low floods were experienced in the State with the highest flood discharge of about 1.59 lac cusecs in river Yamuna in the month of August and no loss of life & livestock was reported. He said that Haryana received 31% deficit rainfall during the monsoon 2016. The districts of Sonepat, Panchkula and Kurukshetra received 60-70% deficit rainfall whereas 07 other districts received 30-40% less than the normal rainfall. He further added that some parts of districts like Jhajjar, Rohtak, Bhiwani and Jind were water logged due to accumulation of rain water mainly in the fields due to concentrated rainfall in local catchment. The de-watering through pumps was done efficiently and the problem of water logging was effectively tackled. He also informed that a total of 1951 pumps are available with the Irrigation & Water Resources Department out of which 1544are in working order and 379are under repair, which would be got repaired before the onset of monsoon, 2017. Thereafter, item wise discussions/deliberations on the agenda items were held. The record of discussions and decisions are brought out as under:- Item No. 1: No comments were received from any quarter. The minutes of 47th meeting of HSFCB held on 13.01.2016 were confirmed. Item No.2: Action taken report was noted. As per point no.1 of Action taken report, 100 schemes were yet to start, most of which were due to non-availability of land. The Hon’ble Chief Minister, Haryana stated that the rules under new Land Notification Act would be finalized soon in addition to the already notified Land Purchase Policy. Efforts should be made to purchase land as per the policy. Regarding the dropped agenda pertaining to 8 District Karnal at point no.7, the Deputy Commissioner, Karnal requested to reconsider the scheme by Haryana Urban Development Authority (HUDA). The Chairman agreed and accordingly, HUDA was directed to re-examine the commercial viability of the scheme. Regarding filling up of the dry ponds, the Hon’ble Agriculture Minister directed Public Health Engineering Department (PHED), Development and Panchayat Department and I&WRD to jointly work on the issue so that more water could be provided to the villages for drinking purpose and for livestock. Item No. 3: Flood report of Haryana for the year 2016 was noted. The PS (I&WRD) pointed out that though the state experienced the deficit rain fall during monsoon 2016 but some districts faced problem due to accumulation of rain water in the fields or abadi. The Principal Secretary (Irrigation & Water Resources Department) informed that the de-watering through pumps was done efficiently and the problem of water accumulation was effectively tackled. Also, the Chief Engineer, Lift Unit informed the Board that construction of Underground Pressurised Drains has been proposed in waterlogged areas. On this, the Principal Secretary (Irrigation & Water Resources Department) further informed that though three such projects have been planned but only one such project of Subana Link Drain in district Jhajjar will be taken up this year as a Pilot Project as concept of pressurized pipeline for draining out flood water is new to the department. Regarding water logged areas, the Hon’ble Chief Minister advised to form a committee to tackle the problem of waterlogging. He further advised to excavate some of these areas deeper and explore possibility of using them to develop Lakes, Tourist Spots, Fish Farms etc. It was decided that Agriculture Minister would take a meeting of the Administrative Secretaries of Development and Panchayat Department, Agriculture Department and Irrigation Department to dwell further on the subject. Item No. 4: The Principal Secretary (I&WRD) apprised the house that 117 new schemes costing Rs. 177.21 Crore were discussed in the 46th meeting of HSTAC held during forenoon session under the Chairmanship of Additional Chief Secretary, Revenue & Disaster Management Department. He further informed that 04 new additional schemes were proposed by respective Deputy Commissioners and the same have been included in the supplementary agenda (Annexure-B) and were recommended for approval from the Board. He also informed that after detailed discussions with the Deputy Commissioners,

9 04 schemes were dropped (Annexure-B) out of which 02 schemes related to Underground Pressurised Drains were dropped as the works were on experimental basis and huge expenses were involved. The ACS, Revenue decided that initially one such scheme should be taken upas Pilot Project and the performance of that project be evaluated before proposing similar works. The other 02 Schemes from Distt. were dropped on the recommendation of the Deputy Commissioner. Finally, after detailed deliberations, 117 schemes amounting to Rs. 165.87 Crore were approved by the Board.

Item No.5: The Principal Secretary (I&WRD) apprised the house regarding the status of on-going schemes which were approved during 47th meeting of Haryana State Flood Control Board held on 13.01.2016. It was informed that a total of 141 schemes with balance requirement of funds of Rs.266.68 Crores were discussed in the 46th meeting of HSTAC in the forenoon session and proposed to be carried forward for FY 2017-18 and thereafter. However, 03 schemes, approved in the 47th meeting of Haryana Flood Control Board, are proposed to be dropped on account of unavailability of land and one scheme dropped due to the reason that the scheme has been proposed as a new scheme with change in scope of work. The same were approved by the Board.

Item No.6: The PS (I&WRD) informed that balance amount of Rs 8.80 cr. is pending with Haryana Urban Development Authority (HUDA) for Panipat Drain. Principal Secretary, Town and Country Planning expressed his inability to provide the funds in view of the financial position of the Authority. Therefore, the Chairman directed that since there is a paucity of funds with HUDA, the balance funds requirement of Rs. 8.8 Cr for the Panipat Drain shall be got cleared from the 4711-State Plan Head. As regards Drain, Principal Secretary, Town & Country Planning Department, Haryana informed that the project is to be taken in three phases and work on first two phases is being executed by HUDA at its own level. After execution of the work, Gurgaon City and HUDA area would have no problem during Monsoon, 2017. He assured the house that problem faced during the last year will not be repeated during this year.

10 As regards the third phase i.e. Construction of Barrel after HUDA area, Bund and Pump House on Najafgarhd rain will be taken up by Irrigation & Water Resources Department as a Deposit work of HUDA, after completion of 1st two phases and as per availability of funds with HUDA.

Item No. 7: It was informed by Principal Secretary (I&WRD) that during the FY 2016-17, Finance Department had allocated Rs 115.00 Crore in original budget estimate and out of that, Rs. 108.00Crore has already been spent so far on various flood protection schemes.Further, the total requirement of budget for the financial year 2017-18 is as under:-

Sr. Schemes Amount required during 2017- No. 18(Rs. in Cr.) 1. New schemes (117) 105.18 2. Ongoing schemes (141) 198.46 Total 303.64 Accordingly Additional Chief Secretary (Finance) was requested to allocate additional budget under head 4711-Flood Control & Drainage, so that Department is able to complete the maximum number of schemes on priority basis during the Financial Year 2017-18. The Special Secretary (Finance Department) informed that allocation of budget of Rs. 303.64 Crore during Financial Year 2017-18 is subject to availability of funds. Initially, 10% over and above the budget of 2016-17has been provided for 2017-18. However, she assured that the requirement of additional funds, if any, will be reviewed at the time of supplementary budget. The Principal Secretary (I&WRD) requested that as per the past practice the works approved by the Board, should be exempted from taking administrative approval of individual works. After deliberations, it was decided that departments may start the works as approval of the Board is de facto administrative approval. However, technical sanction of individual works should be taken from the respective competent authorities (Chief

11 Engineers etc.) and report of the same along with copy of the sanctioned estimate should be submitted to Government for information. Item No.8: The Principal Secretary(I&WRD) informed the house that during the forenoon meeting of HSTAC, all the Deputy Commissioners were directed to immediately clear all outstanding liabilities of energy charges (without surcharge) pending due to installation of flood & drainage pumps by Irrigation and Water Resources Department. Item No.9: The Board approved the proposal of Public Health Engineering Department, except the agenda of scheme at Sr. no. 16 for disposal of treated effluent of STP of Karnal Town outfalling in river Yamuna amounting to Rs 2559.00 lac, which was dropped as new scheme at Sr. no. 17 amounting to Rs. 1985.40 lac has been proposed and approved. Item No.10: This item was noted by the Board. Additional Decisions:-

1. The house was informed that there is a forecast regarding heat wave in the state this summer. Therefore, there may be a scarcity of drinking water in the state. Also, the P.S, I&WRD informed that the water level in Bhakra has dropped by 50 ft. as compared to previous year which might further create shortage of water. The Chairman directed that the Public Health Engineering Department should take requisite steps for making necessary arrangements of drinking water. The availability & distribution of drinking water tankers must also be ensured, wherever required.

2. The Hon’ble Chief Minister also directed the Irrigation and Water Resources Department to start the internal clearance and desilting of drains immediately and complete it well in time.

3. The Chairman further directed that the clearing of obstruction at RD54769ofNarwana Branch near Rajpura, Punjab should be well planned and scheduled in a way to avoid very long closure of the canal as that may hit water supply to huge area and people.

12 4. The Hon’ble Chief Minister directed the Director, Panchayat to make a systematic plan for digging of ponds to counter the water shortage during lean season.

5. The Hon’ble Agriculture Minister directed the Irrigation and Water Resources Department to create a separate cell to study the natural flow and to check any undesirable obstructions to the natural flow. He also directed I&WRD to prepare a latest detailed map of the natural drains and direction of flow to further explore the possibilities of reclamation of waterlogged areas.

The meeting ended with a vote of thanks to the Chair. ------ooooo------

13 Annexure-B Recommendation of the 46th meeting of Haryana State Technical Advisory Committee on Drought Relief & Floods held under the Chairpersonship of Addl. Chief Secretary (Revenue & Disaster Management)on dated 30.03.2017at Conference Hall, Haryana Niwas, Sector 03,Chandigarh.

In order to finalize the agenda for the Haryana State Drought Relief & Flood Control Board meeting, the discussions regarding the new flood protection proposals were held with the Concerned Deputy Commissioners and Superintending Engineers; after the detailed deliberation with concerned officers the following schemes are recommended for deletion and addition in 48th meeting of Haryana State Drought Relief & Flood Control Board:- Irrigation and Water Resources Department Table-4A Sr. No. Name of Name of Name of Schemes Short Estimated Requriments of funds (Rs. In Cr.) Constituency Irrigation Medium Cost Circle , Long Term,(S 2017-18 2018-19 2019-20 /M/L) Deleted Schemes Yamuna Water Services (N) Unit District Yamuna Nagar 19 Yamuna HKB Circle Repair of 04 nos. stone studs and 01 Nos. S 45.00 45.00 0.00 0.00 Nagar new stone studs for the protection of village Bibipur from river Yamuna. 21 Yamuna HKB Circle Repair of 04 Nos. stone studs for the S 35.00 35.00 0.00 0.00 Nagar Jagadhri protection of village Bhogpur from river Yamuna. District Jhajjar 112 Badli J.W.S Circle Constructing underground pressurized L 531.00 100.00 300.00 131.00 Jhajjar Chandol Kundrawali Link Drain from KM 0 to 5.640 outfalling at KM 4.300-R of JLN Escape Channel. District Bhiwani 113 Dadri L.W.S Constructing of Dadri Drain. L 957.00 50.00 500.00 407.00 Circle, Bhiwani Total 1568.00 230.00 800.00 538.00 Added Schemes Yamuna Water Services (N) Unit District Jind 1 YWS Circle, Construction of 2 No. on Hadwa M 68.36 68.36 0.00 0.00 Jind Gangoli Link Drain and Padana Drain including 01 no. pump house at tail RD Bhagkhera Link Drain. District Yamuna Nagar 2 Jagadhri HKB Circle Construction of 9 No. Stone Studs for the M 171.32 171.32 0.00 0.00 Jagadhri protection of Village Unheri From River Yamuna Lift Canal Unit District Rohtak 3 Y.W.S Agenda note for construction of V.R. at S 64.09 64.09 0.00 0.00 Circle RD 35000 West jua Drain. Rohtak 4 Bahadurgarh Y.W.S Agenda note for C.C lining in Abadi S 130.56 130.56 0.00 0.00 Circle area of village Asaudha of West jua Drain from Rohtak RD 29500 to 34500. Total 434.33 434.33 0.00 0.00 * Total 117 new schemes of I&WRD amounting to Rs. 165.87 Cr. are proposed for approval from HSDR&FCB. 14

Public Health Engineering Department Supplementary agenda for New and Revised Schemes A) New Schemes (Rs. In lacs)

Sr. Name of estimate Estimated Remarks No. cost 1. Town –Providing storm water 45.00 Construction of drain. drainage for Yati Nagar & surrounding area Hansi town District Hisar. 2. – To clear the pending liabilities of 140.55 To clear the pending liabilities of the of Storm Water Drains estimate of Rs.2172.00 lac approved under NCR 3. Rohtak – Providing storm water drainage 356.60 Construction of drain. system parallel to Sonipat from culvert Sector-3 to Sector-4 4. Rohtak – Rehabilitation for storm water 382.22 Rehabilitation of carrier channel RCC carrier channel Hisar road and connecting to drain No.8.

B) Revised Schemes (Rs. In lacs)

Sr. Name of estimate 7 Original To be Remarks No. estimated revised cost 1. Ambala City Town – Revised estimate for 993.22 1093.62 Due to change of section of construction of nallah along G.T. road from drain to increase its carrying Chowk to Banuri Nakka extension capacity due to additional (RD 205.900 Km. to 211.460 Km.) discharge. 2. Ambala City Town – Revised estimate for 219.00 371.65 Construction of additional Augmentation of existing storm water collecting tank and of rising disposal work at Nasirpur and providing main due to additional storm D.I. rising main from existing disposal to water discharge of 16 Singhawala drain. cusecs.

15 Funds required for the year 2017-18 (Public Health Engineering Department)

(Rs. In lacs) Sr. Name of Work/Adm Approval Date/Likely Estt. cost Exp Upto Funds Exp. Cumulative Funds No Comp. Dt 31/03/2016 During During Exp. required for 16- 17 16- 17 Upto January 2017-18 2017 1. Ambala City – Augmentation of existing Storm 219.00 141.11 57.89 63.44 204.56 20.00 Water disposal works at Nasirpur and providing DI rising main from existing[22/05/2015] - [30/11/2016] 2. Ambala City town- Estimate for construction of 619.30 0.00 86.59 40.51 40.51 300.00 RCC covered storm water drain (Box Type) at Kalka Chowk area along HN-1[26/04/2016] - [30/04/2019] 3. Ambala City - Construction of Nala along G.T. 993.22 429.46 50.00 27.85 457.30 500.00 Road from Kalka chowk to Banuri Nakka extension (RD 205.9 Km to 211.46 Km)[27/05/2016] -[31/03/2017] 4. Ambala Sadar – Improvement of drainage 54.55 8.24 34.48 27.51 35.75 11.83 system of village Kalarheri (extended M.C. limit)[22/05/2015] -[28/02/2017] 5. Bhiwani : Estimate for providing storm water 298.00 0.00 55.00 0.00 0.00 243.00 drainage system including road gullies, intercepting manholes [27/05/2016] - [30/04/2018] 6. Bhiwani - Construction of Box Type Drain and 163.00 0.00 50.00 43.97 43.97 113.00 laying of Rising Main of DI Pipe Storm Water Drain[01/04/2011] -[15/10/2017] 7. Hansi - Est. for acquisition of land already 75.47 0.00 0.00 0.00 0.00 75.47 occupied for SW Disposal road Hansi under RNC-4711 Distt. Hisar[29/05/2016] - [31/03/2017] 8. Hansi- Storm water sewer for Boga Ram 450.00 0.00 210.00 248.12 248.12 200.00 Colony, Multan Colony, Dhobhi Ghat, Subzi Mandi and Teti Nagar area[03/05/2014] - [31/03/2017] 9. Hisar - Estimate for remodelling of existing 280.00 0.00 90.00 4.64 4.64 190.00 storm water drain of old city area and arrangement of DG set at Hisar[27/05/2016] - [30/04/2018] 10. Jhajjar-Laying of Storm Water Sewer from Shiv 9.82 0.00 9.82 0.00 0.00 9.82 Mandir on Badli Road to existing Storm Sewer in Khadi Chowk area[22/07/2016] -[30/04/2017] 11. - Upgradation of storm water system 369.50 0.00 125.00 59.71 59.71 244.50 Pundri Town (under CM announcement No. 10321)[30/11/2015] -[31/10/2017] 12. Kaithal - Remodelling of Katcha Manas Drain 715.00 267.31 52.89 93.12 360.43 300.00 from RD 10075 to RD 19164 passing through Kaithal Town(Deposit Work)[03/05/2014] - [31/12/2017] 13. - Prov. Storm Water Drainage System 170.00 94.03 60.00 20.18 114.21 16.00 from Hinori Chowk to existing disposal[18/05/2010] -[31/01/2017]

16 14. Detailed Estimate for const of Brick Masonry 399.15 0.09 300.00 212.04 212.13 100.00 Storm Water drain in Bagpati (W. No.2)and adjoining area under M.C. Karnal[14/08/2015] - [31/08/2017] 15. Karnal – Construction of Storm Water Drains at 922.40 293.35 300.00 272.66 566.00 300.00 different places[22/05/2015] -[30/04/2018] 16. Connecting Main Drain No. 1 (Chotti Yamuna) 1985.40 0.00 0.00 0.00 0.00 1985.40 to Main Drain No.2 at RD 68500 (CM Announcment Code No. 14896). 17. Narnaul - Est.for prov.,lowering of RCC pipe 209.35 0.00 50.00 0.00 0.00 200.00 class NP3 to drain out the storm water in various mohalla of NNL Town(CM Announcement)[26/04/2016] -[30/04/2018] 18. Palwal-Remodeling of existing storm water 242.50 0.00 45.00 0.00 0.00 200.00 drain and construction of additional RCC box type drain for storm water system(CM Announcement)[22/07/2016] -[31/07/2018] 19. Hodel-Providing storm water drainage system 418.00 0.00 20.00 0.00 0.00 200.00 by constructing RCC drain[03/12/2016] - [31/10/2018] 20. Rewari - To provide storm water drainage 305.82 0.00 78.86 0.00 0.00 250.00 scheme for balance existing drain/ Nallah from Bawal road to Garhi Bolani road[13/01/2016] - [31/01/2018] 21. - Prov. Storm Water Drainage 132.85 72.14 15.00 4.28 76.42 45.00 Scheme[10/05/2011] -[31/08/2017] 22. Ganaur - Providing Storm Water Drainage 1785.00 843.33 5.00 0.88 844.21 300.00 System[24/11/2011] -[31/03/2017] Total 13376.33 2149.06 1726.53 1214.30 3363.35 7304.02

17 Approved and Amended Item no. 9 of 48th Meeting of Haryana State Drought Relief & Flood Control Board.

Item no. 09, Pg. no. 6 of Approved Item no. 09, Pg. no. 6 of Modified Minutes of 48th meeting of Minutes of 48th meeting of HSDR&FCB HSDR&FCB - Amendment 1. Item No.9: The Board approved the Item No.9: The Board approved the proposal of Public Health proposal of Public Health Engineering Department, except the Engineering Department, except the agenda of scheme at sr. no. 16 for agenda of scheme at sr. no. 16 for disposal of treated effluent of STP disposal of treated effluent of STP of Karnal Town outfalling in river of Karnal Town outfalling in river Yamuna amounting to Rs.2559.00 Yamuna amounting to Rs.2559.00 lac, which was dropped as new lac, which was dropped as new scheme at Sr. no.17 amounting to scheme at Sr. no.17 amounting to Rs.1985.40 lac has been proposed Rs.1985.40 lac has been proposed and approved. and approved, and the Irrigation & Water Resources Department to undertake the work of connecting drain no.1 with drain no.2 under CM Announcement.

18 ITEM NO.2

ACTION TAKEN REPORT ON MINUTES OF 48th MEETING OF HSDR & FCB HELD ON 30.03.2017.

Sr. Issue Action Taken No 1. In the 48th meeting of HSDR&FCB, Out of these, 70 new schemes and 18 Ongoing 117 new schemes and 141 ongoing schemes have been completed. The work on 12 new schemes with balance work were schemes and 21 ongoing schemes under progress. approved. The progress of the The total expenditure on new and ongoing schemes ongoing works was reviewed. is Rs. 90.00 Cr. during Financial Year 2017-18 upto 15.03.2018. Apart from this, 89 schemes are proposed to be dropped due to various administrative and technical reasons while work on 48 schemes is yet to start. The district wise status of the ongoing and new schemes is given at Table 2-A & 2-B respectively. However, the overall status of all the schemes is shown in table 2-C. 2. Regarding filling up of the Dry The PHED intimated that the remedial measures to Ponds the Hon’ble Agriculture tackle the paucity of drinking water in summer season Minister directed PHED, D&P and also resolved the issues of shortage of raw water Department and Irrigation to jointly with Irrigation Department. Moreover, the directions work on the issue, so that more were given to the field officers for summer water could be provided as the preparedness and no difficulty due to shortage of villages for drinking purpose and for drinking water occurred during the summer season livestock. 2017.

3. Regarding water logged areas, the In this regard it is informed that the newly created Hon’ble Chief Minister advised to entity i.e. FFDA (Farmer Fish Development Agency) form a committee to tackle the is already being looked after by Agriculture problem of water logging. He further Department. advised to excavate some of the areas deeper and explore possibility of using them to develop lakes, tourist spots, fish farms etc.

.

19 Sr. Issue Action Taken No 4. The Hon’ble Agriculture Minister A dedicated GIS Cell to establish the flood plain directed to create a separate cell to Zones in Haryana has been set up in HIPA, and the study the natural flow and to check work to study the natural flow and water logged areas any undesirable obstructions to the is under process. natural flow. He also directed to prepare a latest detailed map of the natural drains and direction of flow to further explore the possibilities of reclamation of water logged areas.

20 TABLE 2A Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 48th meeting of HSDR & FCB

Head:Flood Protection Works Approved in Meeting :40th,41th,42th,43th,44th,45th,46th,47th (Rs. In Lacs) Sr. Name of District Name of No. of Schemes Estimated Expenditure Requirement of Funds In Prog. Yet to Start Completed Dropp No Circle Cost Incurred ed (S) (M) (L) Total Total 2018-19 2019-20 2020-21 S M L Total S M L Total S M L Total dropp ed YWS(N) 1 BHIWANI YWS CIRCLE 3 1 2 6 3694.13 2971.14 722.99 441.99 281.00 0.00 1 0 0 1 0 0 2 2 2 1 0 3 0 BHIWANI

2 JIND YWS CIRCLE 2 1 2 5 1145.57 797.03 159.48 80.00 79.48 0.00 1 0 0 1 0 0 0 0 1 0 0 1 3 JIND

3 KARNAL YWS CIRCLE 1 0 0 1 175.64 149.00 26.64 26.64 0.00 0.00 0 0 0 0 0 0 0 0 1 0 0 1 0 KARNAL

4 PANIPAT YWS CIRCLE 1 0 0 1 841.00 612.00 231.37 231.37 0.00 0.00 1 0 0 1 0 0 0 0 0 0 0 0 0 KARNAL

Total 7 2 4 13 5856.34 4529.17 1140.48 780.00 360.48 0.00 3 0 0 3 0 0 2 2 4 1 0 5 3 YWS(S) 5 MEWAT YWS CIRCLE 4 0 0 4 813.16 353.75 415.14 415.14 0.00 0.00 1 0 0 1 1 0 0 1 2 0 0 2 0 FARIDABAD

6 PALWAL YWS CIRCLE 1 0 0 1 346.27 180.77 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 1 FARIDABAD

7 SONIPAT YWS CIRCLE 1 1 0 2 234.00 0.00 234.00 134.00 100.00 0.00 0 0 0 0 0 1 0 1 1 0 0 1 0 SONEPAT

Total 6 1 0 7 1393.43 534.52 649.14 549.14 100.00 0.00 1 0 0 1 1 1 0 2 3 0 0 3 1 BWS 8 AMBALA SYL CIRCLE 3 1 5 9 5843.99 975.25 4548.92 467.00 2179.63 1902.29 2 0 0 2 1 1 4 6 0 0 0 0 1 AMBALA 9 FATEHABAD BWS CIRCLE 0 1 0 1 321.14 0.00 321.14 200.00 121.14 0.00 0 0 0 0 0 1 0 1 0 0 0 0 0 FATEHABAD

10 HISAR BWS CIRCLE 0 1 2 3 704.73 0.00 554.73 47.73 300.00 207.00 0 0 0 0 0 1 1 2 0 0 0 0 1 HISAR

11 KAITHAL BWS CIRCLE 0 1 0 1 13.96 0.00 13.96 7.96 6.00 0.00 0 0 0 0 0 0 0 0 0 1 0 1 0 KAITHAL

12 KURUKSHETRA SYL CIRCLE 0 1 0 1 1164.00 1149.28 13.72 13.72 0.00 0.00 0 0 0 0 0 0 0 0 0 1 0 1 0 AMBALA

13 PANCHKULA SYL CIRCLE 0 0 1 1 478.00 0.00 478.00 478.00 0.00 0.00 0 0 0 0 0 0 1 1 0 0 0 0 0 AMBALA

14 SIRSA BWS CIRCLE 0 2 0 2 77.37 7.77 69.60 6.06 63.54 0.00 0 0 0 0 0 1 0 1 0 1 0 1 0 SIRSA

Total 3 7 8 18 8603.19 2132.30 6000.07 1220.47 2670.31 2109.29 2 0 0 2 1 4 6 11 0 3 0 3 2

LCU 15 BHIWANI LWS CIRCLE 0 1 2 3 584.05 460.40 142.05 73.05 69.00 0.00 0 1 0 1 0 0 1 1 0 0 0 0 1 BHIWANI

16 JHAJJAR JWS CIRCLE 3 2 18 23 7193.66 3082.23 1688.71 948.97 341.74 398.00 1 1 3 5 0 1 2 3 2 0 0 2 13 JHAJJAR

17 JHAJJAR YWS CIRCLE 2 0 1 3 616.12 11.25 489.87 189.87 150.00 150.00 1 0 0 1 0 0 0 0 0 0 0 0 2 ROHTAK

18 ROHTAK YWS CIRCLE 2 3 55 60 8417.86 1154.88 4883.87 1751.87 1672.00 1460.00 2 1 1 4 0 0 0 0 0 0 0 0 56 ROHTAK

Total 7 6 76 89 16811.69 4708.76 7204.50 2963.76 2232.74 2008.00 4 3 4 11 0 1 3 4 2 0 0 2 72 PROJECT, ENVIRONMENT AND MATERIAL 19 BHIWANI WORKSHOP 0 1 0 1 377.00 251.57 185.20 100.00 85.20 0.00 0 0 0 0 0 0 0 0 0 1 0 1 0 CIRCLE KARNAL 20 KARNAL WORKSHOP 10 0 3 13 1119.51 354.99 653.52 633.52 20.00 0.00 4 0 0 4 2 0 1 3 4 0 0 4 2 CIRCLE KARNAL Total 10 1 3 14 1496.51 606.56 838.72 733.52 105.20 0.00 4 0 0 4 2 0 1 3 4 1 0 5 2 Grand Total 33 17 91 141 34161.16 12511.31 15832.91 6246.89 5468.73 4117.29 14 3 4 21 4 6 12 22 13 5 0 18 80

21 TABLE 2B Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 48th meeting of HSDR & FCB

Head:Flood Protection Works Approved in Meeting :48th (Rs. In Lacs) Sr. Name of Name of Circle No. of Schemes Estimated Expenditure Requirement of Funds In Prog. Yet to Start Completed Dropp No District Cost Incurred ed (S) (M) (L) Total Total 2018-19 2019-20 2020-21 S M L Total S M L Total S M L Total dropp ed YWS(N) 1 BHIWANI YWS CIRCLE 2 0 1 3 363.19 256.19 107.00 54.00 53.00 0.00 0 0 0 0 0 0 1 1 2 0 0 2 0 BHIWANI 2 JIND YWS CIRCLE 2 4 0 6 560.69 285.13 237.01 237.01 0.00 0.00 2 2 0 4 0 0 0 0 0 1 0 1 1 JIND 3 KARNAL YWS CIRCLE 4 0 0 4 371.04 363.28 6.86 6.86 0.00 0.00 0 0 0 0 0 0 0 0 4 0 0 4 0 KARNAL 4 PANIPAT YWS CIRCLE 2 7 0 9 892.32 357.61 550.69 440.72 109.97 0.00 0 2 0 2 0 4 0 4 2 1 0 3 0 KARNAL 5 YAMUNA HKB CIRCLE 13 3 0 16 2856.59 792.13 1522.36 772.36 750.00 0.00 0 0 0 0 0 1 0 1 11 1 0 12 3 NAGAR JAGADHRI Total 23 14 1 38 5043.83 2054.34 2423.92 1510.95 912.97 0.00 2 4 0 6 0 5 1 6 19 3 0 22 4 YWS(S) 6 FARIDABAD YWS CIRCLE 1 1 0 2 690.25 314.45 375.80 200.00 175.80 0.00 0 0 0 0 0 1 0 1 1 0 0 1 0 FARIDABAD

7 PALWAL YWS CIRCLE 3 0 0 3 271.26 269.07 0.02 0.02 0.00 0.00 0 0 0 0 0 0 0 0 3 0 0 3 0 FARIDABAD

8 SONIPAT YWS CIRCLE 2 0 0 2 128.03 126.95 1.08 1.08 0.00 0.00 0 0 0 0 0 0 0 0 2 0 0 2 0 SONEPAT

Total 6 1 0 7 1089.54 710.47 376.90 201.10 175.80 0.00 0 0 0 0 0 1 0 1 6 0 0 6 0 BWS 9 AMBALA SYL CIRCLE 12 3 3 18 5264.91 195.46 5069.61 765.34 3230.27 1074.00 1 0 0 1 1 3 3 7 10 0 0 10 0 AMBALA 10 FATEHABAD BWS CIRCLE 2 1 0 3 149.06 81.51 5.00 5.00 0.00 0.00 0 0 0 0 0 0 0 0 2 0 0 2 1 FATEHABAD 11 HISAR BWS CIRCLE 3 0 0 3 218.44 151.00 22.00 22.00 0.00 0.00 1 0 0 1 0 0 0 0 2 0 0 2 0 HISAR 12 KAITHAL BWS CIRCLE 5 0 0 5 183.41 160.45 6.23 6.23 0.00 0.00 0 0 0 0 0 0 0 0 5 0 0 5 0 KAITHAL 13 PANCHKULA SYL CIRCLE 15 1 0 16 214.79 179.21 35.57 35.57 0.00 0.00 0 0 0 0 0 1 0 1 15 0 0 15 0 AMBALA 14 SIRSA BWS CIRCLE 2 0 0 2 135.33 64.66 70.67 70.67 0.00 0.00 0 0 0 0 0 0 0 0 2 0 0 2 0 SIRSA

Total 39 5 3 47 6165.94 832.29 5209.08 904.81 3230.27 1074.00 2 0 0 2 1 4 3 8 36 0 0 36 1 LCU 15 JHAJJAR JWS CIRCLE 2 2 4 8 1440.65 201.73 688.19 377.21 180.98 130.00 0 1 0 1 1 0 1 2 1 1 0 2 3 JHAJJAR

16 MAHENDRA JLN WS 1 1 0 2 332.47 220.14 123.29 123.29 0.00 0.00 0 1 0 1 0 0 0 0 1 0 0 1 0 GARH CIRCLE NARNAUL 17 ROHTAK YWS CIRCLE 10 3 0 13 1076.79 58.08 811.74 811.74 0.00 0.00 2 0 0 2 4 3 0 7 3 0 0 3 1 ROHTAK

Total 13 6 4 23 2849.91 479.95 1623.22 1312.24 180.98 130.00 2 2 0 4 5 3 1 9 5 1 0 6 4 PROJECT, ENVIRONMENT 18 KARNAL WORKSHOP 1 1 0 2 248.59 0.00 248.59 148.59 100.00 0.00 0 0 0 0 1 1 0 2 0 0 0 0 0 CIRCLE KARNAL Total 1 1 0 2 248.59 0.00 248.59 148.59 100.00 0.00 0 0 0 0 1 1 0 2 0 0 0 0 0 Grand Total 82 27 8 117 15397.81 4077.05 9881.71 4077.69 4600.02 1204.00 6 6 0 12 7 14 5 26 66 4 0 70 9

22 TABLE 2C Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 48th meeting of HSDR & FCB

Head:Flood Protection Works (Rs. In Lacs) Sr. Name of District Name of No. of Schemes Estimated Expenditure Requirement of Funds In Prog. Yet to Start Completed Dropp No Circle Cost Incurred ed (S) (M) (L) Total Total 2018-19 2019-20 2020-21 S M L Total S M L Total S M L Total dropp ed YWS(N) 1 BHIWANI YWS CIRCLE 5 1 3 9 4057.32 3227.33 829.99 495.99 334.00 0.00 1 0 0 1 0 0 3 3 4 1 0 5 0 BHIWANI

2 JIND YWS CIRCLE 4 5 2 11 1706.26 1082.16 396.49 317.01 79.48 0.00 3 2 0 5 0 0 0 0 1 1 0 2 4 JIND

3 KARNAL YWS CIRCLE 5 0 0 5 546.68 512.28 33.50 33.50 0.00 0.00 0 0 0 0 0 0 0 0 5 0 0 5 0 KARNAL

4 PANIPAT YWS CIRCLE 3 7 0 10 1733.32 969.61 782.06 672.09 109.97 0.00 1 2 0 3 0 4 0 4 2 1 0 3 0 KARNAL

5 YAMUNA HKB CIRCLE 13 3 0 16 2856.59 792.13 1522.36 772.36 750.00 0.00 0 0 0 0 0 1 0 1 11 1 0 12 3 NAGAR JAGADHRI

Total 30 16 5 51 10900.17 6583.51 3564.40 2290.95 1273.45 0.00 5 4 0 9 0 5 3 8 23 4 0 27 7 YWS(S) 6 FARIDABAD YWS CIRCLE 1 1 0 2 690.25 314.45 375.80 200.00 175.80 0.00 0 0 0 0 0 1 0 1 1 0 0 1 0 FARIDABAD

7 MEWAT YWS CIRCLE 4 0 0 4 813.16 353.75 415.14 415.14 0.00 0.00 1 0 0 1 1 0 0 1 2 0 0 2 0 FARIDABAD

8 PALWAL YWS CIRCLE 4 0 0 4 617.53 449.84 0.02 0.02 0.00 0.00 0 0 0 0 0 0 0 0 3 0 0 3 1 FARIDABAD

9 SONIPAT YWS CIRCLE 3 1 0 4 362.03 126.95 235.08 135.08 100.00 0.00 0 0 0 0 0 1 0 1 3 0 0 3 0 SONEPAT

Total 12 2 0 14 2482.97 1244.99 1026.04 750.24 275.80 0.00 1 0 0 1 1 2 0 3 9 0 0 9 1 BWS 10 AMBALA SYL CIRCLE 15 4 8 27 11108.90 1170.71 9618.53 1232.34 5409.90 2976.29 3 0 0 3 2 4 7 13 10 0 0 10 1 AMBALA

11 FATEHABAD BWS CIRCLE 2 2 0 4 470.20 81.51 326.14 205.00 121.14 0.00 0 0 0 0 0 1 0 1 2 0 0 2 1 FATEHABAD

12 HISAR BWS CIRCLE 3 1 2 6 923.17 151.00 576.73 69.73 300.00 207.00 1 0 0 1 0 1 1 2 2 0 0 2 1 HISAR

13 KAITHAL BWS CIRCLE 5 1 0 6 197.37 160.45 20.19 14.19 6.00 0.00 0 0 0 0 0 0 0 0 5 1 0 6 0 KAITHAL

14 KURUKSHETRA SYL CIRCLE 0 1 0 1 1164.00 1149.28 13.72 13.72 0.00 0.00 0 0 0 0 0 0 0 0 0 1 0 1 0 AMBALA

15 PANCHKULA SYL CIRCLE 15 1 1 17 692.79 179.21 513.57 513.57 0.00 0.00 0 0 0 0 0 1 1 2 15 0 0 15 0 AMBALA

16 SIRSA BWS CIRCLE 2 2 0 4 212.70 72.43 140.27 76.73 63.54 0.00 0 0 0 0 0 1 0 1 2 1 0 3 0 SIRSA

Total 42 12 11 65 14769.13 2964.59 11209.15 2125.28 5900.58 3183.29 4 0 0 4 2 8 9 19 36 3 0 39 3 LCU 17 BHIWANI LWS CIRCLE 0 1 2 3 584.05 460.40 142.05 73.05 69.00 0.00 0 1 0 1 0 0 1 1 0 0 0 0 1 BHIWANI

18 JHAJJAR JWS CIRCLE 5 4 22 31 8634.31 3283.96 2376.90 1326.18 522.72 528.00 1 2 3 6 1 1 3 5 3 1 0 4 16 JHAJJAR

19 JHAJJAR YWS CIRCLE 2 0 1 3 616.12 11.25 489.87 189.87 150.00 150.00 1 0 0 1 0 0 0 0 0 0 0 0 2 ROHTAK

20 MAHENDRA JLN WS 1 1 0 2 332.47 220.14 123.29 123.29 0.00 0.00 0 1 0 1 0 0 0 0 1 0 0 1 0 GARH CIRCLE NARNAUL 21 ROHTAK YWS CIRCLE 12 6 55 73 9494.65 1212.96 5695.61 2563.61 1672.00 1460.00 4 1 1 6 4 3 0 7 3 0 0 3 57 ROHTAK

Total 20 12 80 112 19661.60 5188.71 8827.72 4276.00 2413.72 2138.00 6 5 4 15 5 4 4 13 7 1 0 8 76 PROJECT, ENVIRONMENT AND MATERIAL 22 BHIWANI WORKSHOP 0 1 0 1 377.00 251.57 185.20 100.00 85.20 0.00 0 0 0 0 0 0 0 0 0 1 0 1 0 CIRCLE KARNAL 23 KARNAL WORKSHOP 11 1 3 15 1368.10 354.99 902.11 782.11 120.00 0.00 4 0 0 4 3 1 1 5 4 0 0 4 2 CIRCLE KARNAL Total 11 2 3 16 1745.10 606.56 1087.31 882.11 205.20 0.00 4 0 0 4 3 1 1 5 4 1 0 5 2 Grand Total 115 44 99 258 49558.97 16588.36 25714.62 10324.58 10068.75 5321.29 20 9 4 33 11 20 17 48 79 9 0 88 89

23 Table - A

ITEM NO. 3

FLOOD REPORT OF HARYANA FOR THE YEAR 2017

Haryana is a small landlocked state situated in the North West part of India and is bounded by Shivalik range in the North- East and river Yamuna in the East, Aravali range in the South-West and river Ghaggar in the West. River Yamuna form part of the boundary between Haryana & Uttar Pradesh and River Ghaggar between Haryana & Punjab. The total area of the state is 44.2 lac hectares out of which about 39.0 lac hectares is arable. Topographically, from drainage angle the entire state is divided into two parts i.e. area draining into Yamuna Sub Basin of Ganga Basin and area draining into Ghaggar Sub Basin of Indus Basin. Yamuna Sub Basin Drainage area of Yamuna Sub Basin comprises of area of Yamuna Nagar (part), Karnal, Panipat, Sonepat, Rohtak, Jhajjar, Rewari, Gurgaon, Mewat, Mahendergarh, Jind (part), Faridabad and Palwal districts. It covers about 40% area of the state and it drains into river Yamuna. Experiencing high flooding during heavy rainfall, diversion drains were constructed in the northern portion of this catchment out-falling into river Yamuna in the North of Delhi. Ujjina Diversion Drain was constructed to out-fall into river Yamuna in Haryana territory in the South of Delhi to check drainage congestion through Khaluka Regulator in Rajasthan. Due to the construction of a number of bunds in Rajasthan territory in catchment area of river Sahibi, Krishnawati, Dohan and LandohaNalla originating from Aravali hills of Rajasthan, the flood problem in Rewari, Mahendargarh, Jhajjar and Mewat has now reduced considerably. The problem arises only when there is heavy downpour in low lying pockets and in such situation, dewatering is resorted to, on SOS basis. Important drains of Yamuna Sub Basin area are Nallah, Dhanaura Escape, Nissing Drain, Indri Drain, Main Drain No. 2, NaiNallah, Drain No. 8, Diversion Drain No. 8, Out- fall Drain No. 8, , Chhapra Drain, Meham-Lakhanmajra Drain, KCB Drain, Supplementary Drain, Nuh Drain, Ujjina Drain, Ujjina diversion Drain, Gaunchi Main Drain etc.

Ghaggar Sub Basin Remaining 60% area of the state drains into the Ghaggar Sub Basin of Indus Basin comprising of Yamuna Nagar (part), Panchkula, Ambala, Kurukshetra, Kaithal, Jind, Bhiwani,

24 Hisar, Fatehabad and Sirsa districts. This area has a country slope towards river Ghaggar. The river Ghaggar enters Haryana State in district Panchkula from the foothills of Shivalik and flows in South-West direction to Rajasthan through Haryana and Punjab. River Tangri and Markanda merge in the Ghaggar River in . Ghaggar River and its tributaries create serious problems enroute in districts Ambala, Kurukshetra, Kaithal, Fatehabad and Sirsa. The Ghaggar River drains into desert area of Rajasthan. Important drains of Ghaggar Sub Basin are Ganda Nallah, SYL Parallel Drain, Saraswati Drain, Kaithal Drain, Amin Drain, Pundri Drain No. 1, Pundri Drain No. 2, Kasan Drain, Kalwa-Kinana Drain, Padana Drain, Hansi Drain, Rori-Ghaggar Drain, Rangoi Kharif Channel cum Drain, Rangoi Nallah, Rangoi Diversion Drain. The Bass- Hisar-Ghaggar Drain is under implementation which will provide relief to the areas in Hisar, Fatehabad and Sirsa districts. A number of ring/protection bunds and embankments have been constructed with high level approaches and ramps to protect abadi of important towns and villages which otherwise could get marooned as a result of spillover from rivers/nallahs due to their location in flood belt of this basin. Beside this, Ottulake has also been deepened to store Ghaggar flood water to use the same in a number of Kharif channels in district Sirsa. Main drains, their capacity and out-fall source is as under:-

Sr. Name of Drain Capacity Out-fall No. Discharge in Cusec YAMUNA SUB BASIN 1 Main Drain No. 2 6325 River Yamuna 2 NaiNallah 2241 Drain No. 8 3 Diversion Drain NO. 8 7320 River Yamuna

4 West Jua Drain 500 Mangeshpur Drain 5 Drain No. 8 1537 Bhindawas lake/Drain 6 Out-fall Drain No. 8 4000 Dhansa out-fall Drain 7 KCB Drain 692 Mangeshpur Drain 8 Chandeni Drain 425 NuhDrain 9 Nuh Drain 1362 UjinaDrain 10 UjinaDrain 2200 Ujina Diversion Drain 11 Ujina Diversion Drain 2200 Gaunchi Main Drain 12 Gaunchi Main Drain 6655 River Yamuna

GHAGGAR SUB BASIN 1 Saraswati Drain 16660 A tributary of River Ghaggar

25 Sr. Name of Drain Capacity Out-fall No. Discharge in Cusec 2 Kaithal Drain 213 River Ghaggar 3 Rangoi Diversion 4088 River Ghaggar Drain 4 HisarGhaggar 500 River Ghaggar multipurpose channel 5 MirpurChoe Drain 830 River Ghaggar 6 Amin Drain 2250 River Ghaggar 7 HisarGhaggar Drain 750 River Ghaggar 8 Baretta Drain 1380 River Ghaggar 9 SirhindChoe Drain 2454 River Ghaggar 10 RangoiNallah 7000 River Ghaggar

Flood situation in the year 2017 During 2017 Haryana received deficit -28% rainfall and district wise statement of rainfall during the monsoon of 2017, as collected from IMD, Chandigarh is given in Table-3-A. The rainfall received during the months of June, July, August and September 2017 was on the lower side of normal rainfall in all the districts. Although no major flood situation was faced during the flood period of 2017 and the medium discharge received in the rivers was mainly due to rainfall in the local catchments of the rivers. The basin wise status of flood received during 2017 is given below:- Yamuna Sub Basin This year medium flood discharge was recorded in river Yamuna at Barrage with maximum discharge of 147212 cs. on 02.09.2017. This flood in river Yamuna passed safely but eroded some agricultural land along the river edge at location near village Sandhala Apart from this the medium flood discharge were received in the tributaries of River Somb, Pathrala, Sadhura and Markanda which eroded fertile agriculture land near villages Chintpur, Kattarwali, Ramgarh, and Adi Badri.Temporary remedial measures at few critical areas on river Somb and Pathrala to protect village abadi from flood were taken, although no substantial damages were observed. A medium flood discharge was also received in River Pathrala and its tributaries Jaitpur, Darpur, Tibbi Ariyan, Kansli, Bhangari, Bhangera.Temporary measures to protect the village abadi from flood were taken at some sites and no substantial damages were observed.

26 Apart from this, district Karnal and Sonepat experienced no major damage due to the medium flood discharge in River Yamuna. But during the passage of flood water some agriculture land eroded near Shergarh Tapu Complex, Jammu Khala Complex, Dhakwala Complex, Kundakalan Complex, Bega Complex and Rakshera Complex. During monsoon 2017 heavy rainfall occurred on dated 29.06.2017 and 30.06.2017 in the area of Beri and Jhajjar constituencies and flood water accumulated in the depressions of village Beri, Dujana, Seria, Dhor, Wazirpur, Baghpur, M.P Majra, Jhazgarh, Dubaldhan, Mangawas, , Ahkeri Madanpur, Bhurawas, Chandol, Ladain, , Mundsa and Mundhera. The flood water was drained out by installing D.P/E.P sets at various sites. However in the district Rohtak the problem of water accumulation was reported to be much higher than the previous year. The subsurface water accumulated in the low lying area adjacent to minors and distributaries. The dewatering of flood water from villages Gohana, Meham, Kalanaur, Sampla, Rithal, Chiri, Lakhanmajra, Kharkhoda, Baniyani, Bansawa etc. was done during this year and there is no standing flood water in any area falling.

Ghaggar Sub Basin The flood water of river Markanda, Tangri, Patiala Nadi, Merapur Choe Drain and Para river apart from number of creek of Ghaggar and Saraswati belt falls in the Ghaggar river. During 19thJune 2017, maximum 110 mm rainfall was recorded in District Kaithal and 15 no. of villages were badly affected to the furry of floods and the flood water accumulated in the low lying area of villages Peeg, Jawla, Teek, Barat, Harbri, Pilni, Jatri, , Khark Pandar, Batta, Malkheri, Potar, Siwan, Dusain,Kakent. Approx 1665 acre area crops of these villages were affected badly. All excess rain water was dewatered from the fields and the process was completed by 30.09.2017. The medium/ low floods were also recorded in all the rivulets of Ghaggar basin during the monsoon season of 2017 in district Ambala and Kurukshetra.In District Ambala, during the passage of flood water, some agriculture land eroded in Villages Ambli and Rolanheri.However, no damages were reported in Kaithal, Hisarand Sirsa districts during the flood season 2017. During the maximum discharge received in River Markanda at Shahbad, flood waterspread into the adjoining fields of Roopnagar, Dera SahjadpurPalti, Gumti, Malikpur, Katwa, Tanjore, Ajrana and Rohti etc. from the pockets where bunds along with river Markanda does not

27 exist. The flood water was drained out on river Markanda by excavating temporary drains along LMB and by deploying D.P sets. In district Fatehabad rain water was accumulated in low lying area of the fields in the village Dher, Diwana, Shekerpura, DharsulKhurd, Meond Kalan and Dhani Babanpur. The rain water which was about 9’’ to 1.5’ depth and same was diverted/lifted into RangoiNallah by excavating field Drain and clearing of syphons under the . In District Bhiwani, some areas were affected due to overflow in village ponds in village Tigrana, Dinod, Bapora and Kungar. Immediately pumps were deployed and excess water was dewatered. In District Jind, 2 No. Pocketsin about 200 acres area in village Bhambhewa and 300 acres in village Siwana Mal were flooded. However there was no loss to the crops in the area of these villages. All efforts were made to save standing crops with timely drainage of accumulated rainwater before harvesting and sowing season of Rabi crops. The maximum discharge observed in the main rivers during the year was as under:- Sr. River Discharge Site at Maximum Date on which No. Discharge maximum Recorded Discharge in Cusec recorded 1 River Yamuna HathniKund Barrage 147212 02.09.2017 2 River Ghaggar Panchkula Site 4A 18323 19.08.2017 GulhaCheeka 26132 23.08.2017 Khanauri 7100 04.09.2017 Chandpur including 4150 06.09.2017 RangoiNallah and JoyaNallah Downstream Ottu 3060 17.09.2017

3 River Markanda Jhansa 8206 04.09.2017 4 River Tangri Jansui 10317 26.08.2017

Further statement showing Annual Peak Flood Data of various sites since 2002 is given in Table-3-B. In Addition position of pumps for dewatering of flood water from low lying areas is given in Table-3-C.

28 Table-3-A

DISTRICT WISE MONSOON RAINFALL DATA AS RECEIVED FROM IMD, CHANDIGARH FOR THE YEAR 2017 (JULY TO SEPTEMBER) (in millimeters)

DISTRICT Jun-17 Jul-17 Aug-17 Sep-17 TOTAL

ACTUAL NORMAL ACTUAL NORMAL ACTUAL NORMAL ACTUAL NORMAL ACTUAL NORMAL % DEV

AMBALA 138.7 105.2 96 307.8 232.7 326 86.6 177.6 554 916.6 -39.6

BHIWANI 101.3 32.3 70.9 128.2 38.1 132 16.6 56 226.9 348.5 -34.9

FARIDABAD 129.7 42.2 150 201.6 36.6 234.7 261.5 121.7 577.8 600.2 -3.7

PALWAL 76 28.1 53 160.4 30 171.8 125.9 86.6 284.9 446.9 -36.2

FATEHABAD 47.6 31.3 24.7 104.3 22.7 95.9 42.9 51.5 137.9 283 -51.3

GURUGRAM 97.3 38 61.2 169 32.5 185.2 52 80.1 243 472.3 -48.5

MEWAT 152.1 41.3 60.8 167.2 87.4 194 104 99.3 404.3 501.8 -19.4

HISSAR 132.8 35.1 47.6 118.8 43.2 113.8 24.3 57.4 247.9 325.1 -23.7

JHAJJAR 188.7 34.4 122.6 159.3 47.5 151.2 27 72.4 385.8 417.3 -7.5

JIND 150 40.7 42.2 142.3 82.2 147 51.5 85.6 325.9 415.6 -21.6

KAITHAL 110.8 42.2 46.8 128.3 124.9 140.1 93 73.4 375.5 384 -2.2

KARNAL 169.1 60.3 82 197.8 108.4 224.3 197.8 94.6 557.3 577 -3.4

KURUKSHETRA 127.2 66.3 47.1 202.3 104.4 203.3 132 91.1 410.7 563 -27.1

MOHINDERGARH 142.4 43.5 73 154.3 58.9 144.4 35.9 53.2 310.2 395.4 -21.5

PANCHKULA 50 105.6 67 327 193.4 346.6 94.8 171.2 405.2 950.4 -57.4

PANIPAT 90.7 55.1 67.8 176.2 71.6 203.9 81.7 86.5 311.8 521.7 -40.2

REWARI 131.7 33.1 83.2 150.1 111.6 183.5 38 69.1 364.5 435.8 -16.4

ROHTAK 128.2 49.5 30.8 194.1 43.9 195.8 52.1 68.6 255 508 -49.8

SIRSA 79.7 23 13 99.8 15.3 81.7 44.9 37.6 152.9 242.1 -36.8

SONEPAT 134.5 46.2 97.1 194.4 39.2 208.5 109.3 85.2 380.1 534.3 -28.9

YAMUNANAGAR 186.7 117.8 162.7 304.4 264.5 325.4 200.1 144.5 814 892.1 -8.8

AVERAGE 122.2 51.0 71.4 180.4 85.2 190.9 89.1 88.7 367.9 511.0 -28.0

29 Table-3-B

STATEMENT SHOWING ANNUAL FLOOD PEAK DATA AT VARIOUS SITES (Discharge in Cusecs) YEAR YAMUNA MARKANDA TANGRI RIVER GHAGGAR RIVER U/S JHANSA JANSUI 4-A GuhlaChe Khanauri Chandpur D/S Ottu TAJEWALA Panchkula eka 2002 3,11,174 59,000 26,890 17,862 45,096 on 14,900 9,850 5,850 on 14.8.02 On14.8.02 on 15.7.02 On 14.8.02 16.8.02 on 17.8.02 on17.8.02 on 16.9.02 2003 86,411 52,570 11,298 10,818 46,029 14,650 10,500 6,000 on 5.7.03 on 5.9.03 On4.9.03 on 1.7.03 On 5.9.03 on 5.9.03 on On8.9.03 2004 81,929 25,010 47,818 83,684 61,730 17,500 17,0007.9.03 20,700 on 18.8.04 on 17.8.04 On3.8.04 on 3.8.04 on 7.8.04 on 7.8.04 on 11.8.04 on 13.8.04 2005 1,56,000 55,500 23,427 17,862 45,403 14,800 6,850 7,500 on 5.7.05 on 6.7.05 on 5.7.05 On 5.7.05 on 7.7.05 on 8.7.05 on 9.7.05 on 11.7.05 2006 1,56,237 59,000 Leakage 33,822 on 36,440 11,300 4,600 - On23.7.06 on 27.7.06 9.7.06 on 27.7.06 On 29.7.06 on 29.7.06 2007 1,07,346 on 8,545 7,344 49,088 on 43,260 14,450 8,000 4,700 on 13.8.07 on 15.8.07 on 13.8.07 13.8.07 on 16.8.07 On17.8.07 on 18.8.07 18.8.07 2008 4,09,876 8,085 19,998 36,786on 50,454 18,250 13,550 - on 20.9.08 on 22.9.08 on 21.9.08 20.9.08 On22.9.08 On24.9.08 on 22.9.08 2009 4,30,454 9,661 17,560 58,670on 49,174 12,575 12,800 8,050 On11.9.09 On13.9.09 On 13.9.09 12.9.09 On14.9.09 On16.9.09 On16.9.09 On15.9.09 2010 7,44,507 40,000 45,458 58,667 on 63,460on 49,500 38,000 20,500 on 20.9.10 On22.8.10 on 6.7.10 17.7.10 7.7.10 On 10.7.10 on 11.7.10 on 14.7.10 2011 6,41,462 9,322 7,099 11,485 on 33,602 on 8,350 4,350 2,550 on 16.8.11 on 9.7.11 On1.7.11 8.7.11 25.7.11 On26.7.11 On26.7.11 on 28.8.11 2012 88201 7643 4731 7423on 28560 20020 4350 4930 on 4.8.12 On31.7.12 On8.7.12 18.9.12 On20.9.12 On19.9.12 On21.9.12 On3.9.12 2013 8,06,464 9548 2509 22514on 26422 8000 6750 3750 on 17.06.13 On16.9.13 On10.8.13 24.7.13 On18.6.13 On10.8.13 On18.8.13 On14.8.13 2014 128339 8306 110 114872 on 27582 on 6725 14450 on NIL on 16.7.14 on 20.7.14 on 25.7.14 15.8.14 21.7.14 on 21.7.14 9.9.14 2015 101360 on 8529 on 8100 on 11409 on 38441 on 13275 on 10500 on 8850 on 16.08.2015 02.08.2015 14.08.2015 16.07.2015 14.07.2015 15.07.2015 15.07.2015 21.07.2015 2016 159219 on 6887 on Leakage 16090 on 13860 on 3450 on 2750 on 850 on 01.08.2016 02.08.2016 13.08.2016 12.08.2016 13.08.2016 13.08.2016 15.08.2016 2017 147212 on 8206 on 10317 on 18323 on 26132 on 7100 on 4150 on 3060 on 02.09.2017 04.09.2017 26.08.2017 19.08.2017 23.08.2017 04.09.2017 06.09.2017 17.09.201 7

30 Table-3-C

POSITION OF DRAINAGE PUMPS AS ON 31.01.2018

Name of Unit Total No. Capacity in Pumps in Capacity in Pumps of Pumps Cs. working Cs. under order repair

DIESEL MOBILE PUMPS BWS Unit 256 512 198 396 46 YWS Unit (N) 26 52 26 52 0 YWS Unit (S) 122 244 101 202 21 LCU Unit 290 580 210 420 80 TOTAL 694 1388 535 1070 147 ELECTRICAL MOBILE PUMPS BWS Unit 101 312 74 244 17 YWS Unit (N) 43 211 43 211 0 YWS Unit (S) 73 268 68 258 5 LCU Unit 400 1333 271 939 129 TOTAL 617 2124 456 1652 151 PERMANENT PUMPS BWS Unit 328 3030 287 2710 35 YWS Unit (N) 34 180 34 180 0 YWS Unit (S) 71 977 67 957 4 LCU Unit 207 1719 165 1444 42 TOTAL 640 5906 553 5291 81 G.Total (Diesel, 1951 9418 1544 8013 379 Electrical & VT Pumps)

Note: The pumps will be got repaired before 30.06.2018

31 Table - A

ITEM NO.4

Technical Clearance of New Schemes of Irrigation and Water Resources Department proposed for 49th meeting of HSDR&FCB.

During the monsoon season 2017, there were low/medium rains in the catchment areas of Yamuna and its tributaries, lying in some part of Uttarakhand and Himachal Pradesh. Maximum discharge of 147212 cusecs was received in river Yamuna at the (HKB) on 2ndSeptember, 2017. In addition to the flood discharge of Yamuna, flood discharge of Rivers Somb and Pathrala were moderate during flood season 2017 and caused minimal damages. Some damages like erosion of land along the river edges, erosion of embankments, spilling of water occurred at a few places in District Yamunanagar but the damages were contained as the flood works executed before the onset of monsoon of 2017performed well and efficiently. As such, preparedness for monsoon season 2018, meeting of State Level Committee under the Chairmanship of Engineer-in-Chief, Irrigation and Water Resources Department was held on 25.01.2018, wherein 154 schemes amounting to ₹157.02 Crore were finalized. The schemes relate to repair of damaged bunds, procurement of pumps, construction of bunds, studs to protect village Abadis, V.R. Bridges on drains. The schemes have been prepared after due consultation / recommendations of respective District Flood Control Committees under the Chairmanship of respective Deputy Commissioners and Chairman, Zila Parishad. The Department has further prioritized the works in such a way that the works proposed to be completed upto 30.06.2018are taken as Short term, the works proposed to be completed upto 30.06.2019 are taken as Medium term and the works proposed to be completed upto 30.06.2020are taken as Long term. The abstract of schemes so worked out is as under:-

32 Table - 4 ₹ in Crore

Sr. Type of No. of Requirement of funds No. Schemes Schemes Estimated

Cost 2018- 2019-20 2020-21 Total 19

1 Short term (S) 92 64.12 63.57 0.55 0.00 64.12 2 Medium term 56 79.90 37.94 39.84 2.12 79.90 (M) 3 Long term (L) 06 13.01 3.51 7.30 2.19 13.01

Total 154 157.02 105.02 47.69 4.31 157.02

The district wise abstract of total schemes along with their requirement of funds is given in Table 4.1. Further details of these schemes are given in Table-4A. Haryana State Drought Relief and Flood Control Board is requested to kindly consider these schemes for approval and schemes will be taken up as per availability of funds during financial year 2018-19 and thereafter. All these schemes shall be taken up under State Plan Head 4711-Flood Control & Drainage.

33 TABLE-4.1 Districtwise Abstract of New Proposed Flood schemes for 49th meeting of HSDR&FCB

Head:Flood Protection Works (Rs. In Lacs) Sr. Name of District Name of Circle No. of Estimate Estimated Funds Required No Cost (S) (M) (L) Total 2018-19 2019-20 2020-21 BWS 1 AMBALA SYL CIRCLE AMBALA 9 5 3 17 1604.7 953.44 531.65 119.61 2 FATEHABAD BWS CIRCLE 0 5 1 6 623.81 425.15 198.66 0 FATEHABAD 3 HISAR BWS CIRCLE HISAR 3 3 0 6 612.59 370.14 242.45 0 4 JIND BWS CIRCLE KAITHAL 3 0 0 3 32.91 32.91 0 0 5 KAITHAL BWS CIRCLE KAITHAL 5 3 0 8 189.87 149.87 40 0 6 KURUKSHETRA SYL CIRCLE AMBALA 5 0 0 5 139.4 139.4 0 0

7 PANCHKULA SYL CIRCLE AMBALA 10 0 0 10 355.44 355.44 0 0 8 SIRSA BWS CIRCLE SIRSA 1 3 0 4 112.43 112.43 0 0 Total 36 19 4 59 3671.15 2538.78 1012.76 119.61 CONSTRUCTION 9 JHAJJAR CONSTRUCTION 1 0 0 1 105 105 0 0 CIRCLE GURGAON 10 ROHTAK YWS CIRCLE ROHTAK 0 2 0 2 192 100 92 0 Total 1 2 0 3 297.00 205 92 0 LCU 11 JHAJJAR JWS CIRCLE JHAJJAR 5 1 0 6 710.4 710.4 0 0 12 MAHENDRAGAR JLN WS CIRCLE 0 1 0 1 88.65 88.65 0 0 H NARNAUL 13 ROHTAK YWS CIRCLE ROHTAK 1 10 0 11 1532.03 379.6 1152.43 0 14 SONIPAT YWS CIRCLE ROHTAK 0 5 0 5 564.77 0 353.15 211.62 Total 6 17 0 23 2895.85 1178.65 1505.58 211.62 YWS(N) 15 BHIWANI YWS CIRCLE BHIWANI 1 0 1 2 186.15 44 142.15 0

16 JIND YWS CIRCLE JIND 0 4 1 5 1435.41 622.79 712.62 100 17 KARNAL YWS CIRCLE KARNAL 5 4 0 9 951 752.5 198.5 0 18 PANIPAT YWS CIRCLE KARNAL 1 6 0 7 1197.5 642.5 555 0 19 YAMUNANAGAR HKB CIRCLE JAGADHRI 22 2 0 24 1206.6 889.6 317 0

Total 29 16 2 47 4976.66 2951.39 1925.27 100 YWS(S) 20 FARIDABAD YWS CIRCLE 3 0 0 3 495.15 495.15 0 0 FARIDABAD 21 MEWAT YWS CIRCLE 10 1 0 11 613.42 570.21 43.21 0 FARIDABAD 22 PALWAL YWS CIRCLE 5 0 0 5 2060.17 2060.17 0 0 FARIDABAD 23 PANIPAT YWS CIRCLE SONEPAT 0 1 0 1 490 300 190 0

24 SONIPAT YWS CIRCLE SONEPAT 2 0 0 2 202.68 202.68 0 0

Total 20 2 0 22 3861.42 3628.21 233.21 0 Grand Total 92 56 6 154 15702.08 10502.03 4768.82 431.23

34 TABLE-4.1 Districtwise Abstract of New Proposed Flood schemes for 49th meeting of HSDR&FCB

Abstract of Short, Medium & Long Term Schemes Proposed for approval of HSDR&FCB (Rs.in Cr.) Sr. Types of No. of Schemes Est. Requirement of Funds No. Schemes Cost 2018-19 2019-20 2020-21 Total 1 Short Term 92 64.12 63.57 0.55 0.00 64.12 2 Medium Term 56 79.90 37.94 39.84 2.12 79.90 3 Long Term 6 13.01 3.51 7.3 2.19 13.00 Total 154 157.03 105.02 47.69 4.31 157.02

35 TABLE-4A Districtwise Details of New Proposed Flood schemes for 49th meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 BWS Dist:- AMBALA 1 AMBALA CITY SYL CIRCLE Scheme for Bringing to design section for AMBALA the temporary protected breach of LMB Tangri D/S GT Road from RD 28800 to 29200 for the protection of agriculture land S 4.74 4.74 0 0 and abadi of village Fazailpur and Durana

2 AMBALA CITY SYL CIRCLE Scheme for bringing to design section of AMBALA right side Ganda Nallah bund from RD 4650 to 9500 to protect the abadi and agriculture S 21.57 21.57 0 0 land of village Naggal

3 MULLANA SYL CIRCLE Scheme for constructing 472 feet long two AMBALA tier stone steining for the protection of bund and abadi of village Tangail from river S 29.72 29.72 0 0 Markanda.

4 MULLANA SYL CIRCLE Scheme for constructing 304 feet long three AMBALA tier stone steining for the protection of abadi and agriculture land of village Rolanheri from S 22.96 22.96 0 0 river Markanda

5 MULLANA SYL CIRCLE Scheme for constructing 200 feet long three AMBALA tier stone steining and 4 nos. three tier stone stud for the protection of abadi and bund of S 39.2 39.2 0 0 village Toka from Roon Nadi.

6 MULLANA SYL CIRCLE Scheme for constructing 80 feet long three AMBALA tier stone steining for the protection of agriculture land of village Naganwana from S 6.65 6.65 0 0 river Begna

7 SYL CIRCLE Scheme for constructing 304 feet long three AMBALA tier stone steining for the protection of agriculture land of village Laha from Laha S 22.99 22.99 0 0 Nadi

8 NARAINGARH SYL CIRCLE SScheme for constructing 600 feet long two AMBALA tier stone steining for the protection of agriculture land of village Manakpur from S 36.23 36.23 0 0 river Begna

9 NARAINGARH SYL CIRCLE Scheme for constructing 256 feet long two AMBALA tier stone steining for the protection of abadi of village Kakkar Kunda from river Markanda S 22.55 22.55 0 0

36 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 Total 206.61 206.61 0 0 10 AMBALA SYL CIRCLE Scheme for constructing open trough from CANTT. AMBALA RD 30000 to Gate at RD 26000 of Mahesh Nagar drain M 526 326 200 0

11 AMBALA SYL CIRCLE Scheme for constructing cause way on field CANTT. AMBALA road from village Ghasitpur to village Dukheri in District Ambala M 120.94 100 20.94 0

12 AMBALA CITY SYL CIRCLE Scheme for strengthening of Ghaggar bund AMBALA by laying stone pitching over crated stone toe wall in reach rd 45620 to 47240 D/S inlet to protect abadi of village Devi M 120.83 100.83 20 0 Nagar/Ambala City from river Ghaggar (Near Drain Portion)

13 AMBALA CITY SYL CIRCLE Scheme for providing stone pitching on right AMBALA side bank of Pilot Channel in 1752 feet length at different Patches (SYL W.S. M 73.91 70 3.91 0 Division Ambala )

14 AMBALA CITY SYL CIRCLE Scheme for providing 2400 feet stone AMBALA pitching on left side bank of Ambala drain in between RD 10000 to 2300 feet including M 150 100 50 0 Remodelling of 1 no. bridges (SYL W.S. DIVN AMBALA)

Total 991.68 696.83 294.85 0 15 AMBALA CITY SYL CIRCLE Scheme for purchase of 1 No. Hydraulic AMBALA Excavator (Long Boom) Model EX-200 LC Super fitted with Super long front END attachment and standard kit for use in SYL L 64.9 50 14.9 0 W.S. Division Ambala

16 MULLANA SYL CIRCLE Scheme for constructing New Gola Goli AMBALA Bund from RD 0 to 4200 on U/S Side of existing bund for the protection of village Gola Goli on river Begna (If farmers provide L 271.9 0 171.9 100 land on collector Rate)

17 NARAINGARH SYL CIRCLE Scheme for constructing new Banaundi AMBALA bund from RD 0 to 1000 on upstream side of existing bund for the protection of village Banaoundi on river begna (If farmers provide L 69.61 0 50 19.61 land on collectors rate)

Total 406.41 50 236.8 119.61 District Total (S+M+L) 1604.7 953.44 531.65 119.61 Dist:- FATEHABAD 18 TOHANA BWS CIRCLE Constructing pipeline drain 0-7100 and FATEHABAD Katcha Drain 7100 to 12130 for dewatering of flood water of village Sadhanwas out falling into Ghaggar escape Near Village M 57.49 57.49 0 0 Sadhanwas Right Side.

37 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 19 TOHANA BWS CIRCLE Construction of 10 Nos bore-wells for FATEHABAD recharging of flood water From the fields of village Sidhani. (May be done on M 15 10 5 0 experimental basis after studying Mansa/Sangrur models)

20 TOHANA BWS CIRCLE Constructing protection wall and pitching on FATEHABAD side slope to provide protection to the bank of Rangoi Nallah at RD 9.35 Km (Construct M 92.66 50 42.66 0 on one side first)

21 TOHANA BWS CIRCLE Providing protection to X-ing River Ghaggar FATEHABAD Syphon RD 64050 Bhakra Main Branch M 112.38 112.38 0 0

22 TOHANA BWS CIRCLE Constricting 10 Nos Outlet/inlet at various FATEHABAD sites of Rangoi Nallah M 44.4 44.4 0 0

Total 321.93 274.27 47.66 0 23 TOHANA BWS CIRCLE Construction of V.R Bridge at RD 1.15 Km FATEHABAD Rangoi Nallah L 301.88 150.88 151 0

Total 301.88 150.88 151 0 District Total (S+M+L) 623.81 425.15 198.66 0 Dist:- HISAR 24 HANSI BWS CIRCLE Protection of Hansi Drain by providing HISAR pitching U/S and D/S of bridges and minor at various points. S 17.05 17.05 0 0

25 HANSI BWS CIRCLE Protection of structure by providing pitching HISAR U/S and D/S of bridges on BMPC drain. (About 20 bridges) S 73.59 73.59 0 0

26 NARNAUND BWS CIRCLE Construction sump wells and chowkidar hut HISAR for VT pumps at various sites in Hansi W/S S/Divn. No. II Hansi. S 21.5 21.5 0 0

Total 112.14 112.14 0 0 27 BARWALA BWS CIRCLE Laying RCC pipe line for Kharkari Drain HISAR from RD 0 to 5800 out-falling at RD 18900- R, Balsamand Branch. M 96.26 50 46.26 0

28 BARWALA BWS CIRCLE Agenda Note for pipe Drain No. 1 from RD 0 HISAR to RD 9000 and Drain No. 2 From RD 0 to RD 2000 for Village Ladwa out falling at RD 170200-L of M 196.19 100 96.19 0 New Siwani Feeder and RD 8114-L of O. P. Jindal Nalwa Disty respectively.

29 NARNAUND BWS CIRCLE Laying of pipe line and installation of HISAR submersible pump set with solar system in village Singhwa behind sugar mill. (Issue M 208 108 100 0 MOU in similar cases)

Total 500.45 258 242.45 0

38 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 District Total (S+M+L) 612.59 370.14 242.45 0 Dist:- JIND 30 BWS CIRCLE Flood agenda for construction of Permanent KAITHAL Pump House at RD 85000-R Dhamtan Disty. S 8.21 8.21 0 0

31 NARWANA BWS CIRCLE Flood agenda for remodelling of D.R bridge KAITHAL at RD 15190 Dubbal Drain. S 12.35 12.35 0 0

32 NARWANA BWS CIRCLE Flood agenda for remodelling of D.R bridge KAITHAL at RD 8150 Koel link Drain. S 12.35 12.35 0 0

Total 32.91 32.91 0 0 District Total (S+M+L) 32.91 32.91 0 0 Dist:- KAITHAL 33 GUHLA BWS CIRCLE Flood agenda for construction of bridge at KAITHAL RD 13500 of Papsar Link Drain. S 11.7 11.7 0 0

34 KAITHAL BWS CIRCLE Flood agenda for construction of bridge at KAITHAL RD 21750 of Mago-Majri Link Drain. S 8.08 8.08 0 0

35 KAITHAL BWS CIRCLE Flood agenda for construction of bridge at KAITHAL RD 10750 of Mago-Majri Link Drain. S 4.74 4.74 0 0

36 KALAYAT BWS CIRCLE Flood agenda for construction of Permanent KAITHAL Pump House at RD 31000-R Kapilmuni Minor. S 7.48 7.48 0 0

37 KALAYAT BWS CIRCLE Flood agenda for construction of Permanent KAITHAL Pump House at RD 278000-R Sirsa Branch. S 9.66 9.66 0 0

Total 41.66 41.66 0 0 38 KAITHAL BWS CIRCLE Flood agenda for construction of Siwan drain KAITHAL by laying RCC pipeline from RD 5000-11000 and construction of open drain from RD 0 to 5000 for dewatering of flood water from the M 93.06 53.06 40 0 field of village Siwan and out falling at RD 19050-L Saraswati Drain.

39 KAITHAL BWS CIRCLE Flood agenda for Procurement of 1 No. KAITHAL TATA Ultra 1518 BS-IV in BWS Mechanical Sub Division Kaithal for the year 2018-19. M 17.1 17.1 0 0

40 KAITHAL BWS CIRCLE Flood agenda for replacement of 20 No. KAITHAL Diesel Pumping sets of 2 Cs. capacity for dewatering of flood water in District Kaithal. M 38.05 38.05 0 0

Total 148.21 108.21 40 0

39 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 District Total (S+M+L) 189.87 149.87 40 0 Dist:- KURUKSHETRA 41 SYL CIRCLE SCHEME FOR CONSTRUCTION OF AMBALA DRAIN ALONG LMB FROM RD 60500 TO RD 62500 AND 1000MM DIA PIPELINE S 26.3 26.3 0 0 OUTFALLING INTO RIVER MARKANDA

42 PEHOWA SYL CIRCLE SCHEME FOR CONSTRUCTION OF AMBALA HUMP/FALL AT RD 300/200 OF JAKHWALA DRAIN TO PROTECT THE AGRICULTURE LAND OF VILLAGE S 16.4 16.4 0 0 JAKHWALA, TEOKAR, TANGOLI, PUNJAB AREA ETC

43 PEHOWA SYL CIRCLE SCHEME FOR STRENGTHENING OF LMB AMBALA AT RD 38900 AND RD 39100 U/S AND D/S OF RIVER MARKANDA BRIDGE FOR S 35.23 35.23 0 0 SAFETY OF VILLAGE TEOKAR, BODHA, BODHNI ETC .

44 PEHOWA SYL CIRCLE SCHEME FOR AMBALA REMODELING/REHABILITATION OF LUKHI DRAIN FROM RD 0 TO RD 35070 AND APPROACH DRAIN FROM RD 0 TO 1350 TO PROTECT THE ABADI AND S 23.98 23.98 0 0 AGRICULTURE LAND OF VILLAGE SURMI AND SAMASPUR ETC. FROM FLOOD WATER.

45 SYL CIRCLE PROCUREMENT OF 30 NOS. DIESEL AMBALA PUMPING SETS HAVING CAPACITY 2 CS EACH (MOVABLE) FOR DEWATERING OF VARIOUS SITES DURING FLOOD S 37.49 37.49 0 0 SEASON IN DISTRICT KURUKSHETRA

Total 139.4 139.4 0 0 District Total (S+M+L) 139.4 139.4 0 0 Dist:- PANCHKULA 46 KALKA SYL CIRCLE Constructing 300ft earthen bundh 600 ft AMBALA three tier steining and 1 No. bed bar for the protection of village abadi of Fatehpur near village Mandlaya from flood water of river S 72.28 72.28 0 0 Begna after flood 2017.

47 KALKA SYL CIRCLE Constructing 216ft double tier steining for AMBALA the protection of village abadi of village Rampur Seori river Jhajjra after flood 2017. S 13.81 13.81 0 0

48 KALKA SYL CIRCLE Constructing 352ft double tier steining for AMBALA the protection of Shamshan Ghat and Agriculture land of village Khokhran from Sarsa river after flood 2017. S 16.9 16.9 0 0

40 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 49 KALKA SYL CIRCLE constructing 488 ft double tier steining for AMBALA the protection of Abadi and Agriculture land of village Laskriwala from river Ponta Wali Nadi after flood 2017. S 26.82 26.82 0 0

50 KALKA SYL CIRCLE Constructing 1000ft Ring Bundh , stone AMBALA pitching on Inner side of Bundh and 512ft double tier steining for the protection of village Shampur from river Ponta wali Nadi S 48.98 48.98 0 0 tributary of river Tangri after flood 2017.

51 PANCHKULA SYL CIRCLE Constructing 448ft four tier steining, 200ft AMBALA four tier steining and 216ft double tier steining for the protection of existing damaged steining near Radha Swami S 99.83 99.83 0 0 Satsang Beas of village Beer Ghaggar from Ghaggar after flood 2017. 52 PANCHKULA SYL CIRCLE Constructing 404 ft (280 plus 124) single tier AMBALA steining for the protection of village path and abadi of village Chowki from Chowki wali nadi tributary of river Ghaggar after flood S 8.16 8.16 0 0 2017.

53 PANCHKULA SYL CIRCLE Constructing 256 ft three tier steining for the AMBALA protection of Bataur bundh and abadi area of village Bataur from Tangri after flood 2017. S 25.34 25.34 0 0

54 PANCHKULA SYL CIRCLE Constructing 512 ft double tier steining for AMBALA the protection of Govt. Park cum Gym, Forest Nursery, Abadi area of village Manaktabra and main road from S 27.41 27.41 0 0 to Trilokpur from river tributary of river Tangri after flood 2017. 55 PANCHKULA SYL CIRCLE Constructing 288 ft double tier steining for AMBALA the protection of Park, and Abadi area of village Naggal from river Tangri after flood 2017. S 15.91 15.91 0 0

Total 355.44 355.44 0 0 District Total (S+M+L) 355.44 355.44 0 0 Dist:- SIRSA 56 ELLENABAD BWS CIRCLE Internal Clearance of hisar ghaggar SIRSA multipurpose Drain, RD 0 to 141000. S 50 50 0 0

Total 50 50 0 0

57 ELLENABAD BWS CIRCLE Agenda note for strengthening of banks of SIRSA hisar Ghaggar multipurpose Drain from RD M 18.23 18.23 0 0 108400 to 111000. 58 KALANWALI BWS CIRCLE Internal clearance of Rori Ghaggar Drain SIRSA from RD 100000 to 130750 tail and its M 34.15 34.15 0 0 subsidiary Drains.

41 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 59 RANIA BWS CIRCLE Internal Clearance of Rania link Drain from SIRSA RD 0 to 13000 tail. M 10.05 10.05 0 0

Total 62.43 62.43 0 0 District Total (S+M+L) 112.43 112.43 0 0 Unit Total 3671.15 2538.78 1012.76 119.61 CONSTRUCTION Dist:- JHAJJAR 60 BAHADUR CONSTRUCT Constructing Ditch Drain from KM 31.915 to GARH ION CIRCLE 46.185 along NCR Channel (Approved with GURGAON condition that the water drained would be S 105 105 0 0 utilized for Irrigation)

Total 105 105 0 0 District Total (S+M+L) 105 105 0 0 Dist:- ROHTAK 61 GARHI YWS CIRCLE Reconstruction of 01 no. V.R. Bridge at RD SAMPLA - ROHTAK 56044 on drain no. 8 M 96 50 46 0 KALOI 62 MEHAM YWS CIRCLE Reconstruction of 01 no. V.R bridge at RD ROHTAK 100000 on drain no. 8 M 96 50 46 0

Total 192 100 92 0 District Total (S+M+L) 192 100 92 0 Unit Total 297 205 92 0 LCU Dist:- JHAJJAR 63 BERI JWS CIRCLE Agenda note for constructing Pump House JHAJJAR Beldar Hut and purchasing new Pumps Motors, Control Panel and allied accessories S 62.5 62.5 0 0 at RD 216-R of JLN Feeder.

64 JHAJJAR JWS CIRCLE Agenda note for constructing Pump House JHAJJAR Beldar Hut rehabilitation of civil structures and fixing of grantings at 11 Nos. of S 92 92 0 0 flood pump houses .

65 JHAJJAR JWS CIRCLE Agenda note for procurement of new earth JHAJJAR moving machine for internal clearance of drains and bank strengthening of Canal and S 180 180 0 0 Drain.

66 JHAJJAR JWS CIRCLE Agenda note for procurement of new 30 JHAJJAR Nos. of Diesel Pumping sets . S 25.2 25.2 0 0

67 JHAJJAR JWS CIRCLE Agenda note for providing Brick Lining on JHAJJAR both banks of JLN Escape Channel KM 0.100 to KM 2.000 S 283.7 283.7 0 0

Total 643.4 643.4 0 0 68 BERI JWS CIRCLE Agenda note for constructing Pump House JHAJJAR Beldar Hut and purchasing new Pumps Motors, Control Panel and allied accessories M 67 67 0 0 at RD 243-R of JLN Feeder. Total 67 67 0 0 District Total (S+M+L) 710.4 710.4 0 0 Dist:- MAHENDRAGARH

42 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 69 NARNAUL JLN WS Agenda note construction D.R Bridge at K.M CIRCLE 2.238 and 2.410 Guide Bund cum Drain. M 88.65 88.65 0 0 NARNAUL Total 88.65 88.65 0 0 District Total (S+M+L) 88.65 88.65 0 0 Dist:- ROHTAK 70 MEHAM YWS CIRCLE Brick Pitching of Bahu Akbarpur Link Drain ROHTAK from RD 3750 to 4850 and inlet of Link Drain at RD 29750. S 24.15 24.15 0 0

Total 24.15 24.15 0 0 71 BAHADURGAR YWS CIRCLE Revised agenda note for constructing of link H ROHTAK drain from Kharhar to village Mandothi side drain from RD 0 to 6200 and RD 0 to 5300 M 174 0 174 0 outfalling at RD 26900-R and 24914-R Mattan Link Drain. 72 BAHADURGAR YWS CIRCLE Flood agenda note for Cement Concreting H ROHTAK lining in Abadi Area of Bahadurgarh Town in West Jua Drain from RD 0 to 6000 M 159.15 0 159.15 0

73 BAHADURGAR YWS CIRCLE Flood agenda for re-construction of V.R. H ROHTAK Bridge at RD 31390 of West Jua Drain M 67.28 0 67.28 0

74 GOHANA YWS CIRCLE Agenda note for construction of Civil ROHTAK structure (pump house) and procurement of New Pumps for flood protection works at M 104 0 104 0 Banwasa Pump House RD 46000-R Chhapra Drain village Banwasa in W.S. Mech. Division, Rohtak. 75 MEHAM YWS CIRCLE Agenda note for constructing tail regulator of ROHTAK Mehem Drain out-falling into Drain No. 8 at RD 177550-Left. M 484 300 184 0

76 MEHAM YWS CIRCLE Agenda note for brick pitching of Bahu ROHTAK Akbarpur Link Drain from RD 2530 to 5350 and inlet of LML Drain at RD 29750. M 24.15 24.15 0 0

77 MEHAM YWS CIRCLE Agenda note for constructing vertical wall on ROHTAK left side in south Behlaba Drain From RD 1110 to 1810. M 31.3 31.3 0 0

78 ROHTAK YWS CIRCLE Agenda note for Procurement of New Pump ROHTAK Sets for flood protection works in W.S. Mech. Division, Rohtak. M 33 0 33 0

79 ROHTAK YWS CIRCLE Agenda note for Procurement of New V.T ROHTAK Pumps for flood protection works in W.S. Mech. Division, Rohtak. M 99 0 99 0

43 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 80 ROHTAK YWS CIRCLE Agenda note for procurement of New Pumps ROHTAK for flood protection works at nine number of Newly constructed pump houses at RD 46000-L Meham Drain, RD 46000-R Meham Drain, RD 47900-L Meham Drain, RD 47900- R Meham Drain, 62000-L Meham Drain, RD M 332 0 332 0 63000-R Meham Drain RD 86000-R Meham Drain, RD 94000-R B.S.B. and RD 43000 Kahanaur Disty. in W.S. Mech. Division, Rohtak.

Total 1507.88 355.45 1152.43 0 District Total (S+M+L) 1532.03 379.6 1152.43 0 Dist:- SONIPAT 81 BARODA YWS CIRCLE Reconstruction of V.R. Bridges at RD 13000, ROHTAK 15780 of Chhapra Drain M 248.52 0 100 148.52

82 BARODA YWS CIRCLE Agenda Note for constructing cross drainage ROHTAK work i.e. aqueduct at RD 8300 on Dubheta Drain M 51.8 0 51.8 0

83 BARODA YWS CIRCLE Agenda note for constructing vertical walls ROHTAK Chhapra drain from RD 46000 to 48500 both sides. M 163.1 0 100 63.1

84 BARODA YWS CIRCLE Agenda note for reconstruction of V.R. ROHTAK Bridges at RD 3050, 8870, 10180, 14100, 12780, 15400 and Bhawar link drain. M 60 0 60 0

85 BARODA YWS CIRCLE Agenda note for reconstruction of V.R. ROHTAK Bridges at RD 4670 and 7130 Wazirpur Khandrai link drain. M 41.35 0 41.35 0

Total 564.77 0 353.15 211.62 District Total (S+M+L) 564.77 0 353.15 211.62 Unit Total 2895.85 1178.65 1505.58 211.62 YWS(N) Dist:- BHIWANI 86 TOSHAM YWS CIRCLE Flood Agenda for Purchase of New BHIWANI Machinery for Flood Protection Works During 2018-19 S 44 44 0 0

Total 44 44 0 0 87 BAWANI YWS CIRCLE Extension of 1-L talu link drain form rd 10198- KHERA BHIWANI 14050 outfalling at rd 26277- L siwana talu link Drain (if shareholders agree to give land L 142.15 0 142.15 0 at collectors rate)

Total 142.15 0 142.15 0 District Total (S+M+L) 186.15 44 142.15 0 Dist:- JIND 88 JULANA YWS CIRCLE Agenda note for Padana Kalwa-Kinana Link JIND Drain from RD 0 to 14700 out falling at RD 81000/R Sunder Sub Branch(Through Lift M 334.41 200 134.41 0 System).

44 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 89 JULANA YWS CIRCLE Bringing to design section of Nandgarh JIND Sirsakheri Drain from RD 0 to RD 9600 falling at RD 18750/R Quilazafargarh Minor. M 94 50 44 0

90 SAFIDON YWS CIRCLE Flood agenda note for construction of Head JIND Regulator at RD 354760/R B.M.L., Hansi Branch , Butana Branch, M.P.L.C. and Inlet M 322.79 122.79 200 0 at RD 61000/R Hansi Branch including bringing to design section of New Nai Nallah 91 SAFIDON YWS CIRCLE Flood agenda note for Reconstruction V.R. JIND bridge at RD 104800 Nai Nallah drain/Indira Canal. M 234.21 100 134.21 0

Total 985.41 472.79 512.62 0 92 JULANA YWS CIRCLE Increasing capacity of Lizwana Pauli Drain JIND from RD 0 to 10000 including extension from RD 24800 to 26800 outfalling at RD 42000/R Bhiwani Sub Branch (Through Lift System) L 450 150 200 100

Total 450 150 200 100 District Total (S+M+L) 1435.41 622.79 712.62 100 Dist:- KARNAL 93 YWS CIRCLE Remodeling of Nai Nallah Drain Near Village KARNAL Padha by providing earthen banks with pitching towards Panch Dev Tirth for S 54 54 0 0 maintaining the Sancity of Panch Dev Tirth

94 ASSANDH YWS CIRCLE Construction of permanent pump house on KARNAL Bhakra Main Line Hansi Butana Canal Near Karnal Assandh Road for disposal of Flood Water of Village Uplana, Thari, Chorkarsa, S 31.5 31.5 0 0 Daachar for the year of 2018-19.

95 GHARAUNDA YWS CIRCLE Agenda for the work of Providing to Jammu KARNAL Khala Complex by repairing 7 No. old damaged stone studs and construction of 627 feet revetment on River Yamuna after S 338 338 0 0 flood 2017 (For safety of bund).

96 GHARAUNDA YWS CIRCLE Agenda for the work of providing protection KARNAL to Kunda Kalan Complex by constructing 1 No. New Stone Stud and repair of 3 Nos. old existing stone studs on River Yamuna after S 84 84 0 0 flood 2017 (For safety of bund).

97 NILOKHERI YWS CIRCLE Replacement of existing pipe culvert at RD KARNAL 35830 and 52050 and desilting from RD 51150 to RD 53150 including replacement of S 114.5 60 54.5 0 outlet at outfall point on Balu Link Drain

Total 622 567.5 54.5 0 98 ASSANDH YWS CIRCLE Replacement of VR Bridge at RD 78600 KARNAL Indri Drain M 86.5 40 46.5 0

45 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 99 ASSANDH YWS CIRCLE Replacement of VR Brdige at RD 39600 KARNAL Indri Drain M 185.5 100 85.5 0

100 ASSANDH YWS CIRCLE Replacement of V.R. Bridge at RD 11010 of KARNAL Sheikhupura Manchuri Drain. M 26 20 6 0

101 ASSANDH YWS CIRCLE Replacement of VR Bridge at RD 0 of KARNAL Assandh Bund Drain. M 31 25 6 0

Total 329 185 144 0 District Total (S+M+L) 951 752.5 198.5 0 Dist:- PANIPAT 102 SAMALKHA YWS CIRCLE Purchase and supply of Special TandP KARNAL Machine i.e. 1 No. Tata Hitachi EX200 Super Fitted Pocklain and 1 No. Tata Hitachi Model TH76 Excavator cum Bachoke Loader fitted with standard attachment and 1 No. Bolero S 87.5 87.5 0 0 Camper (Pick-Up) for use in Panipat Water Services Division, Panipat

Total 87.5 87.5 0 0 103 ISRANA YWS CIRCLE Replacement of Bridges at RD 18156 and KARNAL 28270 on Thirana Drain M 70 50 20 0

104 ISRANA YWS CIRCLE Replacement of Bridges at RD 25300, KARNAL 42320 and 52450 on Try. Drain No. 2. M 110 50 60 0

105 ISRANA YWS CIRCLE Replacing of VR Bridge at RD 21650, 47133 KARNAL and 48200 on Joshi Drain M 160 80 80 0

106 ISRANA YWS CIRCLE Protection of village pond, land and abadi of KARNAL village Waiser from flood and waste contaminated water flowing in Try. Drain No. 1 by providing lining from RD 39700 to M 220 100 120 0 36200 (Water sample be taken before and after execution of scheme).

107 PANIPAT YWS CIRCLE Replacement/construction of Bridges at RD RURAL KARNAL 134800 and 72500 on Main drain No. 2 M 400 200 200 0

108 SAMALKHA YWS CIRCLE Replacement/construction of Bridges at RD KARNAL 3035, 8830 and 68280 on Panipat Drain M 150 75 75 0

Total 1110 555 555 0 District Total (S+M+L) 1197.5 642.5 555 0 Dist:- YAMUNANAGAR 109 JAGADHRI HKB CIRCLE Renovation of 800 ft. bund and stone JAGADHRI pitching for the protection of Village Muzafat Kalan from Khillowali Khol (River Pathrala). S 13 13 0 0

46 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 110 JAGADHRI HKB CIRCLE Construction of 2850 ft. bund with stone JAGADHRI pitching for the protection of Village Daulatpur from Chikken Khol (River S 77 77 0 0 Pathrala).

111 JAGADHRI HKB CIRCLE Construction of 1370 ft. bund and 650 ft. JAGADHRI steining for the protection of Village Darpur from Plasi Khol (River Pathrala). S 34 34 0 0

112 JAGADHRI HKB CIRCLE Construction of 1200 ft. bund and stone JAGADHRI pitching. for the protection of Village Shahzadwala from Chikken Khol (River S 30 30 0 0 Pathrala).

113 JAGADHRI HKB CIRCLE Construction of 450 ft. stone steining for the JAGADHRI protection of Village Baniyawala from Chikken Khol (River Pathrala). S 12 12 0 0

114 JAGADHRI HKB CIRCLE Construction of 1200 ft. bund and stone JAGADHRI pitching for the protection of village Kotra Kahan Singh from River Pathrala. S 31 31 0 0

115 JAGADHRI HKB CIRCLE Renovation of bund in a length of 160 ft. and JAGADHRI stone pitching for the protection of village Bhangera from Khillowali Khil j(River S 5 5 0 0 Pathrala).

116 JAGADHRI HKB CIRCLE Construction of 09 Nos. bed bars for the JAGADHRI protection of Azat Ashram (Gau Shala) from Chikken Khol (River Pathrala). S 31 31 0 0

117 JAGADHRI HKB CIRCLE Construction of 380 ft. stone steining on L/S JAGADHRI and 05 No. bed bars and 410 ft. stone steining for the protection of Village Upper S 39 39 0 0 Chikken from Chikken Khol (River Pathrala).

118 JAGADHRI HKB CIRCLE Constructing 900 ft. stone steining for the JAGADHRI protection of Village Lower Chikken from Chikken Khol (River Pathrala). S 23 23 0 0

119 JAGADHRI HKB CIRCLE Construction of 10 Nos. bed bars for the JAGADHRI protection of agricultral land of Village Khillowali from Khillowali Khol (River S 48 48 0 0 Pathrala).

47 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 120 JAGADHRI HKB CIRCLE Providing 03 Nos. bed bars and 400 ft. stone JAGADHRI steining for the protection of Kabirstan and agricultral land of village Manakpur from S 50 50 0 0 River Pathrala.

121 JAGADHRI HKB CIRCLE Constructing 800 ft. stone steining for the JAGADHRI protection of Village Meghuwala (Bus Stand) and abadi from Chikken Khol (River S 21 21 0 0 Pathrala).

122 HKB CIRCLE Construction of 5 no. stone studs for JAGADHRI protection of village Odri in River Yamuna. S 93.5 93.5 0 0

123 RADAUR HKB CIRCLE Construction of 5 no. stone studs for JAGADHRI protection of village Tapu Majri in River Yamuna. S 86.1 86.1 0 0

124 SADHAURA HKB CIRCLE Providing 750 ft. stone steining to protect JAGADHRI the school, agricultural land and abadi for the protection of village Sangholi and S 38 38 0 0 Chanchak from Sadhaura River/Khol.

125 SADHAURA HKB CIRCLE Providing 400 ft. bund and replenishment of JAGADHRI 1 no. Bed Bar for the protection of village Chintpur from river Somb. S 28 28 0 0

126 SADHAURA HKB CIRCLE Providing 02 Nos. stone studs for Protection JAGADHRI for the protection of Rampur Gainda Bund frorm River Somb. S 20 20 0 0

127 SADHAURA HKB CIRCLE Providing 550 ft. stone steining of village JAGADHRI abadi and agricultural land for the protection of village Peerwali from River Sadhoura S 10 10 0 0 Nadi/Khol.

128 SADHAURA HKB CIRCLE Providing 950 ft. stone steining for the JAGADHRI protectin tower and village abadi and agriculatural of Village Ramgarh Sawai from S 28 28 0 0 River Somb.

129 SADHAURA HKB CIRCLE Providing 02 Nos. bed bars for replinshment JAGADHRI and 01 No. new bed bars and 450 ft. steining for the protection of village abadi S 31 31 0 0 and agricultural land of village Jaitpur from River Pathrala.

48 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 130 SADHAURA HKB CIRCLE Provding 630 ft. stone steingin to protect the JAGADHRI bund protection of agriculatral land of village abadi of village Kattarwali from River Somb. S 21 21 0 0

Total 769.6 769.6 0 0 131 RADAUR HKB CIRCLE Providing gates and gearing for X-regulation JAGADHRI on Bubka Head on Chauntg and Rakshi Nallah. M 37 20 17 0

132 SADHAURA HKB CIRCLE Construction of Bridges on Chautang Nallah JAGADHRI from RD 0 to 136400. M 400 100 300 0

Total 437 120 317 0 District Total (S+M+L) 1206.6 889.6 317 0 Unit Total 4976.66 2951.39 1925.27 100 YWS(S) Dist:- FARIDABAD 133 FARIDABAD YWS CIRCLE Agenda note/scheme provided 680’ edge FARIDABAD protection to protect village and its agriculture land of village abadi Rajpur S 105.13 105.13 0 0 Dungarpur R/C AF 2017.

134 PRITHLA YWS CIRCLE CONSTRUCTION OF8 NO. STONE STUDS FARIDABAD ON CONVENTIONAL PATTERN TO PROTECT PROTECTION TO VILLAGE ABADI and ITS AGRICULTURAL LAND OF S 249.52 249.52 0 0 VILLAGE MOHNA COMPLEXE A/F 2017.

135 TIGAON YWS CIRCLE Providing 700’ edge protection (Revetment) FARIDABAD and 01 no. stone stud on conventional pattern to provide protection to village abadi and its agricultural land of village S 140.5 140.5 0 0 Ghudashan-Bela River Complex AF 2017.

Total 495.15 495.15 0 0 District Total (S+M+L) 495.15 495.15 0 0 Dist:- MEWAT 136 HATHIN YWS CIRCLE Extension to drain out the flood and seepage FARIDABAD water of Gurgaon Canal accumulated in laying area of village Hasanpur, Kanali and S 12.72 12.72 0 0 Kherli-Jeeta outfalling at RD 1300 of Existing Flood Drain. 137 NUH YWS CIRCLE Re-Construction of bridge on Rithat Link FARIDABAD Drain on rasta from vill. Bajhera to vill. Sangelka, S 20 20 0 0

138 NUH YWS CIRCLE Scheme for construction kaccha cunneete to FARIDABAD save agriculture land of vill. Devela Nangli from water logging and outfall in Rithat Drain S 2.9 2.9 0 0 at RD. 6000

49 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 139 NUH YWS CIRCLE Scheme for Tajpur (Ujina) earthen cunnittee FARIDABAD from RD. 0 to 11200 to save agriculture land from water logging. S 5.37 5.37 0 0

140 NUH YWS CIRCLE Scheme for Dhenkli village earthen cunnette FARIDABAD from RD. 0 to 7250 to save agriculture land from water logging. S 11.86 11.86 0 0

141 NUH YWS CIRCLE Scheme for Bibipur and Sultanpur earthen FARIDABAD cunnette from RD. 0 to 10500 to save agriculture land from water logging. S 7.99 7.99 0 0

142 NUH YWS CIRCLE Scheme for Ujina village Pipe lines from FARIDABAD RD.0 to 2905 to save agriculture land from water logging. S 8.72 8.72 0 0

143 PUNHANA YWS CIRCLE RE-PLACEMENT OF 03 NOS. V.R. FARIDABAD BRIDGES AT RD 6250, RD 10750 AND RD 14850 OF MARYAKA DRAIN IN DISTRICT NUH CONNECTING VILLAGES (I) NAI TO SHINGAR (II) JHAROKHARI TO SHINGAR S 87.1 87.1 0 0 (III) MARYAKA TO SHINGAR RESPECTIVELY.

144 PUNHANA YWS CIRCLE Internal Clearance and bringing upto design FARIDABAD section (inner) from RD.22600 to 112600 of Ujina Drain. S 261 261 0 0

145 PUNHANA YWS CIRCLE Scheme for Constructing Earthen Cunnittee FARIDABAD for village Alawalpur to save agriculture land from water logging and outfall through S 2.55 2.55 0 0 Sikrawa Cunnitte at RD. 83000 of Ujina Drain Total 420.21 420.21 0 0 146 HATHIN YWS CIRCLE Utilization of Flood Water by constructing of FARIDABAD Hump and Pump House on Gaunchi Main Drain at RD 97500 to augment the Hathin M 193.21 150 43.21 0 Disty. to feed tail reach villages.

Total 193.21 150 43.21 0 District Total (S+M+L) 613.42 570.21 43.21 0 Dist:- PALWAL 147 HODAL YWS CIRCLE REPLACEMENT OF V.R. BRIDGE AT RD FARIDABAD 82500 OF GAUNCHI MAIN DRAIN (FROM VILLAGE SAVELI TO KHATELA SARAI). S 174.96 174.96 0 0

148 HODAL YWS CIRCLE CONSTRUCTING PUCCA HUMP AT KM FARIDABAD 7.50 OF UDD FOR PROVIDING IRRIGATION FACILITY IN ADJOINING AREA OF VILL-KHIRBI AND RECHARGING S 78.53 78.53 0 0 THEREOF GROUND WATER.

149 HODAL YWS CIRCLE INTERNAL CLEARANCE (DE- FARIDABAD SILTING/DIGGING) FOR BRINGING THE GAUNCHI MAIN DRAIN TO DESIGN S 390.91 390.91 0 0 SECTION FROM RD 43000 ft TO 229500 ft.

50 (Rs. in Lacs)

Sr. Name of Name of Name of Work Short No Constituency Irrigation Medium, Circle Long Est. Cost Requriments of funds Term,(S/ M/L) 2018-19 2019-20 2020-21 150 HODAL YWS CIRCLE CONSTRUCTION OF V.R. BRIDGE AT RD FARIDABAD 105785 OF GAUNCHI MAIN DRAIN (FROM VILLAGE KONDAL TO GHELAB). S 177.51 177.51 0 0

151 PUNHANA YWS CIRCLE RE-PLACEMENT OF 04 NO. V.R. FARIDABAD BRIDGES AT RD KM 12.208, KM 15.080, KM 18.935 AND KM 21.953 OF UJINA DIVERSION DRAIN IN DISTRICT PALWAL AND NUH CONNECTING VILLAGES (I) BHULWANA TO UMRALA (II) HODAL S 1238.26 1238.26 0 0 GARHI PATTI TO LALPUR (III) BICHHOR TO LALPR (IV) BICHHOR TO NUNERA RESPECTIVELY.

Total 2060.17 2060.17 0 0 District Total (S+M+L) 2060.17 2060.17 0 0 Dist:- PANIPAT 152 SAMALKHA YWS CIRCLE Agenda for construction of Bridge at RD SONEPAT 157330 of main Drain No. 2 M 490 300 190 0

Total 490 300 190 0 District Total (S+M+L) 490 300 190 0 Dist:- SONIPAT 153 GANAUR YWS CIRCLE Agenda for Internal Clearance of drain No.6 SONEPAT from RD.50000 to 142000 S 61.68 61.68 0 0

154 KHARKHODA YWS CIRCLE Agenda for internal clearance of east juan SONEPAT drain from RD. 0 to 89500 and providing pitching on sides from RD 49000 to 52000 S 141 141 0 0

Total 202.68 202.68 0 0 District Total (S+M+L) 202.68 202.68 0 0 Unit Total 3861.42 3628.21 233.21 0 Grand Total 15702.08 10502.03 4768.82 431.23

51 Table - A

ITEM No.5

Review of On-Going Schemes of Irrigation and Water Resources Department under head 4711 – Flood Control & Drainage

During the 48th meeting of Haryana State Flood Control Board, 141 On Going Schemes and 117 new schemes under head 4711-Flood Control & Drainage were reviewed and approved. With the best efforts of the department, 88 schemes have been completed during the year (details at Table-5B). Further, 89 schemes (80 ongoing and 09new schemes) approved in the 48th meeting which could not executed due to various administrative and technical reasons are proposed to be dropped from the list of ongoing schemes (details at Table-5C). Apart from this, the department however, intends to continue with remaining 81 schemes (details at Table-5A)actually in progress or yet to start earlier approved and the funds to the tune of ₹202.25crore are required to complete these schemes during the next three financial years as detailed below. Further, these schemes have also been reprioritized and identified as short term, medium term and long term schemes keeping in view their urgency of completion before the flood season. The abstract of schemes so worked out is as under:-

Table no. 5

₹In Crore Sr. Type of No. of Revised Expenditure Requirement of funds No Schemes Schemes Cost 2018-19 2019-20 2020-21 Total 1 Short 31 77.73 47.93 24.89 0.79 0.00 25.68 Term 2 Medium 29 82.45 18.98 41.24 21.10 2.07 64.41 Term 3 Long 21 118.06 6.08 15.88 61.22 35.04 112.15 Term 4 Total 81 278.24 72.99 82.01 83.11 37.11 202.24

The district wise abstract of total schemes along with requirement of funds is given in table 5.1.

Haryana State Drought Relief &Flood Control Board is requested to consider the approval of these schemes. The schemes will be taken up on priority as per availability of funds during 2018-19 and thereafter.

52 TABLE-5.1 Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 48th meeting of HSDR & FCB

Head:Flood Protection Works Status: In Progress,Yet To Start (Rs. In Lacs) Sr. Name of Name of No. of Schemes Estimated Expenditure Requirement of Funds In Prog. Yet to Start Completed Dropp No District Circle Cost Incurred ed (S) (M) (L) Total Total 2018-19 2019-20 2020-21 S M L Total S M L Total S M L Total droppe d YWS(N) 1 BHIWANI YWS CIRCLE 1 0 3 4 991.80 163.81 827.99 493.99 334.00 0.00 1 0 0 1 0 0 3 3 0 0 0 0 0 BHIWANI

2 JIND YWS CIRCLE 3 2 0 5 649.50 338.01 311.49 232.01 79.48 0.00 3 2 0 5 0 0 0 0 0 0 0 0 0 JIND

3 PANIPAT YWS CIRCLE 1 6 0 7 1498.94 740.33 776.96 666.99 109.97 0.00 1 2 0 3 0 4 0 4 0 0 0 0 0 KARNAL

4 YAMUNA HKB CIRCLE 0 1 0 1 1500.00 0.00 1500.00 750.00 750.00 0.00 0 0 0 0 0 1 0 1 0 0 0 0 0 NAGAR JAGADHRI

Total 5 9 3 17 4640.24 1242.15 3416.44 2142.99 1273.45 0.00 5 4 0 9 0 5 3 8 0 0 0 0 0 YWS(S) 5 FARIDABAD YWS CIRCLE 0 1 0 1 595.00 219.20 375.80 200.00 175.80 0.00 0 0 0 0 0 1 0 1 0 0 0 0 0 FARIDABAD

6 MEWAT YWS CIRCLE 2 0 0 2 651.00 235.64 415.12 415.12 0.00 0.00 1 0 0 1 1 0 0 1 0 0 0 0 0 FARIDABAD

7 SONIPAT YWS CIRCLE 0 1 0 1 200.00 0.00 200.00 100.00 100.00 0.00 0 0 0 0 0 1 0 1 0 0 0 0 0 SONEPAT

Total 2 2 0 4 1446.00 454.84 990.92 715.12 275.80 0.00 1 0 0 1 1 2 0 3 0 0 0 0 0 BWS 8 AMBALA SYL CIRCLE 5 4 7 16 10951.56 1032.73 9599.01 1212.82 5409.90 2976.29 3 0 0 3 2 4 7 13 0 0 0 0 0 AMBALA

9 FATEHABAD BWS CIRCLE 0 1 0 1 321.14 0.00 321.14 200.00 121.14 0.00 0 0 0 0 0 1 0 1 0 0 0 0 0 FATEHABAD

10 HISAR BWS CIRCLE 1 1 1 3 747.70 127.46 574.73 67.73 300.00 207.00 1 0 0 1 0 1 1 2 0 0 0 0 0 HISAR

11 PANCHKULA SYL CIRCLE 0 1 1 2 483.44 0.00 483.44 483.44 0.00 0.00 0 0 0 0 0 1 1 2 0 0 0 0 0 AMBALA

12 SIRSA BWS CIRCLE 0 1 0 1 58.54 0.00 58.54 0.00 58.54 0.00 0 0 0 0 0 1 0 1 0 0 0 0 0 SIRSA

Total 6 8 9 23 12562.38 1160.19 11036.86 1963.99 5889.58 3183.29 4 0 0 4 2 8 9 19 0 0 0 0 0

LCU 13 BHIWANI LWS CIRCLE 0 1 1 2 523.05 460.40 142.05 73.05 69.00 0.00 0 1 0 1 0 0 1 1 0 0 0 0 0 BHIWANI

14 JHAJJAR JWS CIRCLE 2 3 6 11 4371.29 2484.80 1903.29 903.55 471.74 528.00 1 2 3 6 1 1 3 5 0 0 0 0 0 JHAJJAR

15 JHAJJAR YWS CIRCLE 1 0 0 1 30.00 11.25 18.75 18.75 0.00 0.00 1 0 0 1 0 0 0 0 0 0 0 0 0 ROHTAK

16 MAHENDRAG JLN WS 0 1 0 1 312.47 208.14 103.29 103.29 0.00 0.00 0 1 0 1 0 0 0 0 0 0 0 0 0 ARH CIRCLE NARNAUL 17 ROHTAK YWS CIRCLE 8 4 1 13 3177.67 1154.88 1851.05 1639.05 212.00 0.00 4 1 1 6 4 3 0 7 0 0 0 0 0 ROHTAK

Total 11 9 8 28 8414.48 4319.47 4018.43 2737.69 752.74 528.00 6 5 4 15 5 4 4 13 0 0 0 0 0 PROJECT, ENVIRONMENT AND MATERIAL 18 KARNAL WORKSHOP 7 1 1 9 761.91 123.04 761.91 641.91 120.00 0.00 4 0 0 4 3 1 1 5 0 0 0 0 0 CIRCLE KARNAL Total 7 1 1 9 761.91 123.04 761.91 641.91 120.00 0.00 4 0 0 4 3 1 1 5 0 0 0 0 0

Grand Total 31 29 21 81 27825.01 7299.69 20224.56 8201.70 8311.57 3711.29 20 9 4 33 11 20 17 48 0 0 0 0 0

53 TABLE-5A Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 48th meeting of HSDR & FCB

Head:Flood Protection Works Status: In Progress,Yet To Start (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 YWS(N) BHIWANI 1 BAWANI YWS CIRCLE Providing pitching in sloughing 47th S 321.90 163.81 70 % 158.09 158.09 0.00 0.00 Work held up due IP KHERA BHIWANI portion of Mundhal Talu Link to standing water drain RD 15000-20000 and and will be 38000-47844 completed upto 30.06.2018. 2 BAWANI YWS CIRCLE Constg. New Mundhal link drain 45th L 276.50 0.00 0 % 276.50 138.50 138.00 0.00 Land paper YTS KHERA BHIWANI from RD 0-9850 (YWS) uploaded on E- bhoomi portal and farmers are yet to upload their consent .

3 BAWANI YWS CIRCLE Constg. Kunger link drain from 45th L 286.40 0.00 0 % 286.40 143.40 143.00 0.00 Land paper YTS KHERA BHIWANI RD 0-9500 (YWS) (in uploaded on E- Supplementary Agenda) bhoomi portal and farmers are yet to upload their consent . 4 TOSHAM YWS CIRCLE 20 No. TV-2 DP set 14 HP to 48th L 107.00 0.00 0 % 107.00 54.00 53.00 0.00 1. DP set YTS BHIWANI 16 HP, 20 no. Sumersible Pump specification under set 20 HP 8 stage, 10 no. V.T finalization, Pump 5 Cs discharge with procurement motor of column height 10`, and process will be 2 no. Bolero Camper (5 seater start after that. 2. cabin). VT pumps finacial bids is to be opend shortly. 3. supply order of bolero camper placed and tentative date of delivery is 15.04.2018. 4. Indent Process of 20 no. submersible pumps is under process.

District Total 991.80 163.81 827.99 493.99 334.00 0.00 JIND 5 JULANA YWS CIRCLE Increasing capacity of 47th S 277.36 187.88 90 % 89.48 10.00 79.48 0.00 In Progress. Work IP JIND Karela Drain from RD 0 to RD will be completed 39700 i/c increasing capacity of upto 30.06.2019. Pump House

6 SAFIDON YWS CIRCLE Bringing to design section of 48th S 25.00 5.00 40 % 20.00 20.00 0.00 0.00 In Progress. Work IP JIND Bank from RD 80700 to RD will be completed 85500 Bhambhewa Drain and upto 30.04.2018. increasing capacity of pump house RD 81500 R Bhambhewa Drain.

7 SAFIDON YWS CIRCLE Bringing to design section of 48th S 26.02 0.00 20 % 26.02 26.02 0.00 0.00 Only work of IP JIND Bhuslana Drain from RD 0 to bringing to design RD 25800 tail and replacing section of drain hume pipe culvert into box type has been Bridges at RD 18800 Buslana completed and Drain construction of bridge is in progress and will be completed upto 30.04.2018.

8 SAFIDON YWS CIRCLE Brick Pitching in side slope and 48th M 275.43 115.00 90 % 160.43 160.43 0.00 0.00 In Progress. Work IP JIND Bed in Head Reach RD 128000 will be completed to RD 129000 and U/S and D/s upto 30.04.2018. of railway x-ing from RD 118100 to RD 119100 and Berm Cutting from RD 116000 to RD 128000 including construction of cattle ghat at RD 128800 of Nai Nallah Drain/ Indri Drain

9 SAFIDON YWS CIRCLE Reconstruction of V.R. Bridge 48th M 45.69 30.13 80 % 15.56 15.56 0.00 0.00 Work is in IP JIND at RD 81060 Bhambhewa drain. progress and will be completed upto 30.04.2018.

54 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 District Total 649.50 338.01 311.49 232.01 79.48 0.00 YAMUNANAGAR 10 JAGADHRI HKB CIRCLE Work of repair of damaged 48th M 1500.00 0.00 0 % 1500.00 750.00 750.00 0.00 As the flood YTS JAGADHRI portion of Hathnikund Barrage. season is off on 30.09.2017 and work will be completed upto 30.06.2019.

District Total 1500.00 0.00 1500.00 750.00 750.00 0.00 PANIPAT 11 PANIPAT YWS CIRCLE Remodeling and lining of Nohra 47th S 841.00 612.00 90 % 231.37 231.37 0.00 0.00 Work in Progress. IP RURAL KARNAL Drain from RD 21000 to 34100 Work will be in Distt. Panipat (CM completed upto Announcement code No. 30.04.2018. 10589) 12 PANIPAT YWS CIRCLE Protection of village pond, 48th M 55.00 0.00 0 % 55.00 55.00 0.00 0.00 The estimate is YTS RURAL KARNAL agriculture land and abadi of under preparation village Mehrana from flood in and there is delay Mehrana Drain at existing because of NOC alignment from RD 0 to 3900 from Panchayat Department as land issue was invoved. Last date of completion is 30.06.2018.

13 ISRANA YWS CIRCLE Protection against errosion of 48th M 39.04 0.00 0 % 39.04 39.04 0.00 0.00 Tenders called but YTS KARNAL agriculture land of Dadlana no agecy village from flood and waste participated. water flowing in Munak Drain by Tenders are called providing lining from RD 27360 again. Last date of to 28950. completion is 30.06.2018.

14 SAMALKHA YWS CIRCLE Protection of village abadi and 48th M 80.88 14.00 25 % 80.88 80.88 0.00 0.00 Work in Progress. IP KARNAL agriculture land by Issue from Mining strengthening weak reaches of Department River Yamuna embankment regarding NOC, between RD 0 to 87150 A/F therefore the work 2016 progress is slow. Last date of completeion 30.06.2018.

15 PANIPAT YWS CIRCLE Replacement of VR bridge at 48th M 182.16 114.33 90 % 69.81 30.00 39.81 0.00 In Progress. Last IP CITY KARNAL RD 27825, 14200, 13300, date of completion 12500 and 10000 on Panipat is 30.04.2019. Drain for safe passes of vehicles and public

16 SAMALKHA YWS CIRCLE Protection of village pond, land 48th M 149.89 0.00 0 % 149.89 89.79 60.10 0.00 Tender rates YTS KARNAL and Abadi of village Balana and approved and work Mandi from flood and waste will be started chemical water flowing in Try. shortly. Last date Drain no.4 by providing lining in of completion is drain in concerened villages 30.06.2019.

17 ISRANA YWS CIRCLE Protection of village pond, land 48th M 150.97 0.00 0 % 150.97 140.91 10.06 0.00 Estimate as per YTS KARNAL and Abadi of village Shodhapur revised concrete from flood and waste water rates (due to flowing in Nohra Drain by change in cement providing lining in village contents in HSR item) has been santioned and tender called. Last date of completion is 30.06.2019.

District Total 1498.94 740.33 776.96 666.99 109.97 0.00 Unit Total 4640.24 1242.15 3416.44 2142.99 1273.45 0.00 YWS(S) SONIPAT 18 RAI YWS CIRCLE Raising and stg. of River 45th M 200.00 0.00 0 % 200.00 100.00 100.00 0.00 AGREEMENT YTS SONEPAT embankment in Mimarpur MADE WITH THE Complex on River Yamuna (in AGENCY BUT Supplementary Agenda) THE AGENCY NOT STARTED.YET IN SPITE OF MANY TIMES REQUEST

District Total 200.00 0.00 200.00 100.00 100.00 0.00 FARIDABAD

55 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 19 TIGAON YWS CIRCLE Construction of Sehatpur Drain 48th M 595.00 219.20 40 % 375.80 200.00 175.80 0.00 WORK STARTED YTS FARIDABAD with Brick lining with M.S Railing AND UNDER to Carry storm water from RD PROCESS 11000 to 19000 and remodeling katcha reach from RD 0 to 11000.

District Total 595.00 219.20 375.80 200.00 175.80 0.00 MEWAT 20 MEHAM YWS CIRCLE Constructing pucca cunnette 47th S 51.00 0.00 0 % 50.76 50.76 0.00 0.00 Tender rates YTS FARIDABAD and pump house to save the approved. Work Agriculture Land from water likely to be logging in village Jainsingpur completed upto and outfalling in to Ujina Disty. 31.07.2018. at RD/6050. 21 PUNHANA YWS CIRCLE Construction of X-regulator in 47th S 600.00 235.64 30 % 364.36 364.36 0.00 0.00 Work of X- IP FARIDABAD Ujina Diversion Drain near regulator village Bichore (With 4 Nos. completed. pump houses). Estimate for pump houses submitted for sanctioned. The work completed upto 31.12.2018.

District Total 651.00 235.64 415.12 415.12 0.00 0.00 Unit Total 1446.00 454.84 990.92 715.12 275.80 0.00 BWS AMBALA 22 AMBALA SYL CIRCLE Scheme for Side lining of 46th S 489.34 427.25 90 % 30.00 30.00 0.00 0.00 Work in Progress. IP CANTT. AMBALA Mahesh Nagar drain RD 15000 Date of to 42000 and constructing V.R. Completion Bridge at RD 21500 for the 30.06.2018. protection of village Boh, Babyal and Dalipgarh

23 AMBALA SYL CIRCLE Constructing retaining wall and 42th S 935.73 548.00 70 % 100.00 100.00 0.00 0.00 Work in progress. IP CITY AMBALA close box type drain on Ambala Date of Drain in reach RD 15200 to Completion 10000 along NH-1.(in 30.06.2018. Supplementary Agenda)

24 THANESAR SYL CIRCLE Procuring 8 no. V.T. Pumps (5 47th S 33.00 0.00 0 % 33.00 33.00 0.00 0.00 Tender approved. YTS AMBALA cs. capacity each) for Only 04 pumps are for there and at tender dewatering. rates amount is 33.00 lacs. Work to start shortly. Date of Completion 30.06.2018.

25 AMBALA SYL CIRCLE Increasing capacity of link drain 48th S 22.04 0.00 0 % 22.04 22.04 0.00 0.00 work in progress. YTS CANTT. AMBALA from RD 0 to 2525 off taking up Date of stream RD 26000 of Mahesh Completion Nagar Drain out falling in rivet 30.06.2018. Tangri opposite RD 10900 of Babyal Bund

26 AMBALA SYL CIRCLE Providing side lining of exiting 48th S 94.89 57.48 80 % 37.41 37.41 0.00 0.00 IN PROGRESS. IP CITY AMBALA Singawala Drain from RD 0 to Date of 5000 for protection of abadi of Completion village Singhawala 30.06.2018.

27 AMBALA SYL CIRCLE Rehabilitation and up gradation 47th M 275.40 0.00 5 % 275.40 250.00 25.40 0.00 In progress. YTS CITY AMBALA of Pump House at RD 0 of Mahesh Nagar Drain to protect the abadi of Ambala Cantt , villages Boh, Babyal and Dalip Ghar etc. from River Tangri

28 AMBALA SYL CIRCLE Upgradation of existing pump 48th M 200.00 0.00 0 % 200.00 180.00 20.00 0.00 Civil work under YTS CANTT. AMBALA house at Babyal by providing process. Tender 2No. VT Pumps of 50 Cuces for mechanical each for the protection of components village abadi of Boh, Babyal opened and are and Dalipgarh of Ambala Cantt under process of approval.

29 AMBALA SYL CIRCLE Purchase of 1 No. Pick up 48th M 6.37 0.00 0 % 6.37 6.37 0.00 0.00 Indent given to YTS CITY AMBALA (TATA –SFC-407 PICK UP- procurement. Date CLB) in place of old pick up No. of completion HR-64-0279 for use in SYL 31.03.2019. Water Services Division Ambala

56 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 30 AMBALA SYL CIRCLE Constructing RCC open Trough 48th M 570.00 0.00 0 % 570.00 500.00 70.00 0.00 Technical YTS CANTT. AMBALA from RD 36000 to 30000 (Sub evaluation reach of Mahesh Nagar drain) approved. Financial approval under process. 31 AMBALA SYL CIRCLE Constructing Bhanokheri 47th L 108.23 0.00 0 % 108.23 54.00 54.23 0.00 ALIGNMENTDate of completion YTS CITY AMBALA Ganda Nalla link Drain from RD APPROVED ON 0 to 3111 out falling in Ganda 28.03.2016 LAND Nalla at RD 31650 DETAIL OF 1.18 ACRE UPLOADED ON E- BHOOMI PORTAL AS PER NEW LAND PURCHASE POLICY.

32 MULLANA SYL CIRCLE Scheme for excavating Kesri 46th L 478.37 0.00 0 % 478.37 0.00 300.00 178.37 ALIGNMENT YTS AMBALA Link Drain from RD 0-6000 APPROVED ON offtakig from existing drain and 06.10.2016 LAND outfalling in existing drain near DETAIL OF 2.20 village Landa Landi. ACRE UPLOADED ON E- BHOOMI PORTAL AS PER NEW LAND PURCHASE POLICY.

33 AMBALA SYL CIRCLE Scheme for constructing 46th L 3226.00 0.00 0 % 3226.00 0.00 1700.00 1526.00 ALIGNMENT YTS CITY AMBALA Panjokhra Ghaggar Link Drain APPROVED ON from RD 0-41000 outfalling in 07.01.2016 LAND River Ghaggar. DETAIL OF 23.03 ACRE UPLOADED ON E- BHOOMI PORTAL AS PER NEW LAND PURCHASE POLICY 34 AMBALA SYL CIRCLE Scheme for extension of Babyal 46th L 297.92 0.00 0 % 297.92 0.00 100.00 197.92 ALIGNMENT YTS CANTT. AMBALA Bund from RD 24350 to 26250 APPROVED ON for protection to village Babyal 17.03.2016 LAND (Ambala Cantt) from River DETAIL OF 2.70 Tangri ACRE UPLOADED ON E- BHOOMI PORTAL AS PER NEW LAND PURCHASE POLICY

35 AMBALA SYL CIRCLE Constructing Machonda Drain 48th L 1707.11 0.00 0 % 1707.11 0.00 957.11 750.00 LAND YTS CANTT. AMBALA from RD 0 to 21050 off take ACQUISITION from pond of village Machonda INVOLVED.ALIGN and outfall in Ganda Nallah. MENT UNDER (Irrigation Department). PROCESS.

36 AMBALA SYL CIRCLE Construction of main nallah 48th L 283.16 0.00 0 % 283.16 0.00 183.16 100.00 FUNDS TO BE YTS CANTT. AMBALA from railway line near village DEPOSITED Nanhera upto nh-1 near WITH MC Shamshan gath in ward no. 16 AMBALA,ACTION ambala cantt (MC Ambala). FOR WHICH IS UNDER PROCESS.SCHE ME IS TO BE EXECUTED BY MC AMBALA

37 AMBALA SYL CIRCLE Constructing Singha Wala- 48th L 2224.00 0.00 0 % 2224.00 0.00 2000.00 224.00 LAND YTS CITY AMBALA Sullar link Drain from RD 0 to ACQUISITION 29000 off take from Singhawala INVOLVED.ALIGN drain at RD 0 and Outfall in MENT UNDER Sullar Drain at RD 20100 PROCESS

District Total 10951.56 1032.73 9599.01 1212.82 5409.90 2976.29 PANCHKULA 38 PANCHKULA SYL CIRCLE Purchase of 2 no. Diesel driven 48th M 5.44 0.00 0 % 5.44 5.44 0.00 0.00 YET TO START. YTS AMBALA Pump Set of 2 Cs capacity for Date of completion W/S Sub Dn Panchkula 31.03.2019.

57 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 39 PANCHKULA SYL CIRCLE Constructon of box RCC drain 47th L 478.00 0.00 0 % 478.00 478.00 0.00 0.00 ALIGNMENT YTS AMBALA for safe passage of flood/waste APPROVED water from Barwala and Bataur CASE FOR (Panchkula) into River Tangri. TAKING CONSULTANCY UNDER PROCESS IN DIVISION OFFICE . District Total 483.44 0.00 483.44 483.44 0.00 0.00 HISAR 40 HISSAR BWS CIRCLE Providing protection on Hisar 48th S 192.97 127.46 95 % 20.00 20.00 0.00 0.00 WORK IN IP HISAR Ghaggar Multipurpose Channel PROGRESS. Date (Drain) from RD 205230 to of completion 269650. 31.03.2018.

41 NARNAUND BWS CIRCLE Agenda Note for Construction 46th M 507.00 0.00 0 % 507.00 0.00 300.00 207.00 ALIGNMENT YTS HISAR of Badala Bhatol Field Link APPROVED ON Drain from RD 0 to 17000 O/F 29.03.2016 LAND at RD 111650/R Bass DETAIL OF 3.86 Multipurpose Channel. ACRE UPLOADED ON E- BHOOMI PORTAL AS PER NEW LAND PURCHASE POLICY

42 HANSI BWS CIRCLE Agenda Noe for constructing 45th L 47.73 0.00 0 % 47.73 47.73 0.00 0.00 ALIGNMENT YTS HISAR Bandaheri (Mundhal)Field Link APPROVED ON Drain from RD 0 to 7700 08.04.2015 LAND outfalling into Puthi Mundhal DETAIL OF 1.60 Link Drain at RD 1650-Right. ACRE (45th) UPLOADED ON E- BHOOMI PORTAL AS PER NEW LAND PURCHASE POLICY

District Total 747.70 127.46 574.73 67.73 300.00 207.00 FATEHABAD 43 FATEHABAD BWS CIRCLE Construction of Khabra Drain 45th M 321.14 0.00 0 % 321.14 200.00 121.14 0.00 Initially the Agenda YTS FATEHABAD from RD 0-19500 outfalling at Note for const. RD 173900-R Hisar Ghaggar open drain was Multipurpose Channel proposed in a length of 23445` @ Rs. 6.16 Cr. Accordingly the alignment was got appproved by the competent authority. It involved an acquisition of 13.06 acres. The farmer did not agree to part away of the land and hence, pipe drain in a length of 19500` @ Rs. 321.14 lacs has been proposed. The alignment is under preparation. The work will be completed by 30.06.2019.

District Total 321.14 0.00 321.14 200.00 121.14 0.00 SIRSA 44 ELLENABAD BWS CIRCLE Excavation of Rupana Field 45th M 58.54 0.00 0 % 58.54 0.00 58.54 0.00 LAND DETAIL OF YTS SIRSA Drain from RD 0 to 5600 2.31 ACRE outfalling at RD 73200-L UPLOADED ON E- HGMPD (43rd). (45th) BHOOMI PORTAL AS PER NEW LAND PURCHASE POLICY. Date of completion 30.06.2019.

District Total 58.54 0.00 58.54 0.00 58.54 0.00 Unit Total 12562.38 1160.19 11036.86 1963.99 5889.58 3183.29 LCU BHIWANI

58 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 45 DADRI LWS CIRCLE Increasing capacity of Jai Shree 42th M 484.05 460.40 40 % 103.05 53.05 50.00 0.00 Work held up due IP BHIWANI Drain from RD 0 to13500 to Court Case outfalling at RD 89000-R Feeder.

46 DADRI LWS CIRCLE Constructing of Achina Tal 42th L 39.00 0.00 0 % 39.00 20.00 19.00 0.00 Land holders are YTS BHIWANI Drain from RD 0 to 3000 being pursuaded outfalling at RD 62015-L Loharu for giving land at Feeder Collector Rates.

District Total 523.05 460.40 142.05 73.05 69.00 0.00 ROHTAK 47 ROHTAK YWS CIRCLE Constructing V.R. Bridge at RD 47th S 480.00 316.22 75 % 163.78 163.78 0.00 0.00 In Progress and IP ROHTAK 7600, RD 23420, RD 24700 will be completed and and RD 40900 of K.C.B. upto 30.06.2018 Drain

48 MEHAM YWS CIRCLE Constructing RCC lining from 46th S 180.00 68.66 40 % 111.34 111.34 0.00 0.00 Work in Progress. IP ROHTAK RD 70000 to 73000 of Meham date of completion Drain. (In Supplementary 30.06.2018 Agenda).

49 MEHAM YWS CIRCLE Constructing Pump House at 48th S 16.00 0.00 0 % 16.00 16.00 0.00 0.00 Estimate YTS ROHTAK RD 122000/R Meham Drain. Sanctioned. Tender rates approved final notice sent to contractor for start of work. work will be completed upto 30.06.2018

50 MEHAM YWS CIRCLE Constructing Bharan Sub Link 48th S 28.60 0.00 0 % 28.60 28.60 0.00 0.00 L section YTS ROHTAK Drain from RD 0 to 2150 outfall approved,estimate at RD 5800-L Ajaib Bharan Link under preparation Drain. in division office.Work will be completed upto 30.06.2018.

51 GOHANA YWS CIRCLE Providing vertical wall on both 48th S 25.00 0.00 0 % 25.00 25.00 0.00 0.00 work will be started YTS ROHTAK side of Bibilan link drain from shortly and will be RD 1000 to 2000. completed upto 30.06.2018

52 BERI YWS CIRCLE Construction of Link Drain from 48th S 174.74 0.00 0 % 3.00 3.00 0.00 0.00 Revised agenda YTS ROHTAK Kharhar to village Mandothi side accepted in drain. preliminary meeting headed by worthy P.S IandW.R.D On 10.03.2018.work will be completed upto 30.06.2018

53 BAHADUR YWS CIRCLE Construction of V.R. Bridge at 48th S 64.09 0.00 5 % 64.09 64.09 0.00 0.00 In Progress and IP GARH ROHTAK RD 35000 West Jua Drain. will be completed upto 30.06.2018

54 BAHADUR YWS CIRCLE C.C. Concrete lining in Abadi 48th S 130.56 0.00 5 % 130.56 130.56 0.00 0.00 In Progress and IP GARH ROHTAK area of village Asaudha of West will be completed Jua drain from RD 29500 to upto 30.06.2018 34500

55 BARODA YWS CIRCLE Constructing vertical wall of 47th M 782.00 270.00 40 % 512.00 300.00 212.00 0.00 In Progress and IP ROHTAK Chhapra drain RD 37000 to will be completed 40850 (both sides). upto 30.06.2018

56 MEHAM YWS CIRCLE Constructing rectangular RCC 48th M 300.00 0.00 0 % 300.00 300.00 0.00 0.00 Estimate santioned YTS ROHTAK section of Meham Drain from by CE/LCU vide RD 115000 to 117000 letter no. 3074/3LCU/2017 dt. 12.05.2017. Due to technical objection of Vigilance wing, additional quantities have been submitted to head office tender will be re-invited and work will be completed 30.06.2018.

59 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 57 ISRANA YWS CIRCLE Reconstruction of V.R. Bridge 48th M 132.00 0.00 0 % 132.00 132.00 0.00 0.00 Drawing under YTS ROHTAK at RD 40200 Nai Nallah drain. preparation. Work will be completed upto 30.06.2018.

58 GOHANA YWS CIRCLE Reconstructing of Bridges at 48th M 92.13 0.00 0 % 92.13 92.13 0.00 0.00 Work will be YTS ROHTAK RD 29650 of Sinkh Bahadurpur started shortly and drain. will be completed upto 30.06.2018.

59 KALANAUR YWS CIRCLE Increasing capacity of KCB 45th L 772.55 500.00 90 % 272.55 272.55 0.00 0.00 In Progress and IP ROHTAK drain from RD 0 to 139000 will be completed upto 30.06.2018

District Total 3177.67 1154.88 1851.05 1639.05 212.00 0.00 JHAJJAR 60 BADLI YWS CIRCLE Constructing permanent pump 46th S 30.00 11.25 40 % 18.75 18.75 0.00 0.00 `Civil work IP ROHTAK house and sump well at RD compeleted and 22000-L of KCB drain. Mech. Works will be completd upto 30.06.2018. ` 61 JHAJJAR JWS CIRCLE Providing Reinforced Cement 43th S 2200.00 1909.15 95 % 290.85 290.85 0.00 0.00 In Progress. 99% IP JHAJJAR Concrete lining in Beri-Dujana- work completed. Dhaur Link Drain from RD 0 to Date of completion 46600 and Talao link drain RD 30.04.2018. 0 to tail RD 20008 out falling into Outfall Drain No. 8 KM 12.295-L.

62 JHAJJAR JWS CIRCLE Procurement of New Machinery 48th S 44.78 0.00 0 % 44.78 44.78 0.00 0.00 Material received. YTS JHAJJAR (Pick up Vans and DG Sets) for Payment yet to be Flood Protection in W/S made. Mechanical Divn., Jhajjar.

63 BERI JWS CIRCLE Providing RCC Trough Section 47th M 400.00 363.26 95 % 36.74 20.00 16.74 0.00 Work is in IP JHAJJAR of Achhej Link Drain from RD 0 progress.Balance to 8000. work could not be completed due to court case. Hence, work has been finalized.

64 JHAJJAR JWS CIRCLE Cosnt. Of ditch drain along palra 42th M 60.81 0.00 0 % 60.81 60.81 0.00 0.00 Land acquisition YTS JHAJJAR Dubaldhan road RD 0-4500 required, so work outfalling into Dubaldhan Mr. cannot be started. RD 16000-L

65 BERI JWS CIRCLE Constructing RCC trough from 48th M 230.14 104.00 90 % 126.14 126.14 0.00 0.00 90% work IP JHAJJAR RD 15620 to 19465 of Bishan completed. Date of Link Drain including construction completion of Sump at RD 19465. 31.03.2018.

66 BADLI JWS CIRCLE Constructing 2 Nos. Pump 45th L 115.62 43.66 90 % 71.96 21.96 25.00 25.00 Civil work IP JHAJJAR Houses with Sump Well at KM completed. 8.200 Bhindawas Lake Bund Mechanical and KM 3.750 Bhindawas Link Components and Drain. pump will be installed shortly.

67 BERI JWS CIRCLE Constructing Pump House with 45th L 37.37 25.76 90 % 11.61 11.61 0.00 0.00 In Progress, civil IP JHAJJAR Sump Well at KM 71.384-R on work completed. Drain No. 8 out falling point of Mechanical Mangawas link drain. components and pumps will be installed shortly.

68 BERI JWS CIRCLE Constructing Inlet and Pump 45th L 62.00 38.97 90 % 39.83 39.83 0.00 0.00 In progress, civil IP JHAJJAR House at KM 73.950-R on Drain work completed. No. 8. Mechanical components and pumps will be installed shortly.

69 BADLI JWS CIRCLE Constructing of Chandol- 45th L 373.96 0.00 0 % 373.96 100.96 100.00 173.00 Land acquisition. YTS JHAJJAR Kundhrawali Link Drain from RD To purchase land, 0 to 17800 tail out falling at KM uploaded on E- 4.300 JLN Escape Channel. Bhoomi Portal. (42nd)

60 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 70 BADLI JWS CIRCLE Constructing Subana Link Drain 45th L 546.61 0.00 0 % 546.61 146.61 200.00 200.00 Land acquisition YTS JHAJJAR from RD 0 to 26035 out falling as per new act into out falling Drain No. 8 at RD 10400-R. (42nd)

71 BADLI JWS CIRCLE Constructing underground 48th L 300.00 0.00 0 % 300.00 40.00 130.00 130.00 Revised Alignment YTS JHAJJAR pressurized Subana Link Drain approved on from KM 0 to 7.210 out falling at 28.09.2017 project KM 2.300-R of outfall drain no. estimate 8. amounting Rs. 292.45 lac submitted to C/E LCU on 08.11.2017 for technical design.

District Total 4401.29 2496.05 1922.04 922.30 471.74 528.00 MAHENDRAGARH 72 NANGAL JLN WS Constructing of Waste 48th M 312.47 208.14 80 % 103.29 103.29 0.00 0.00 Work in Progress, IP CHOUDHRY CIRCLE weir/spillway at Totaheri Bund spillway NARNAUL on Krishnwati River. completed, Pitching work is under progress. Work will be completed by 30.04.2018

District Total 312.47 208.14 103.29 103.29 0.00 0.00 Unit Total 8414.48 4319.47 4018.43 2737.69 752.74 528.00 PROJECT, ENVIRONMENT KARNAL 73 JIND WORKSHOP Replacement/Renovation of V.T 48th M 233.75 0.00 0 % 233.75 133.75 100.00 0.00 The work has been YTS CIRCLE Pumps divided in two parts KARNAL 1.The tender for the work of supply erection, commissiong of V.T. pump motors and panels etc. at Dhatrath P.H. on Hansi Br. at RD 142000/R, Jammi P.H. on Hansi Br at RD 131000/R, Rittoli P.H. on Hansi Br. at RD 124000/R, Beri Khera P.H. on Hansi Br. at RD 111000/R, Gangoli P.H. on Bhirthana Mr. at RD 4000/R, Mehrana P.H. on Bhiwani at RD 0/R, Lajwana P.H. on Bhiwani Br.at RD 7000/R, Shamlo Kalan P.H. on Sunder Br. at RD 70/R on Karela P.H. on Sunder Br. at RD 105/L (Estimated cost 113.81 lacs) have been invited twice earlier. In the Ist time no

61 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 74 YAMUNA WORKSHOP Procurement and replacement 46th S 33.32 0.00 0 % 33.32 33.32 0.00 0.00 Engineer-in-Chief, YTS NAGAR CIRCLE of 33 no Diesel pumping sets is Irr. and W.R. KARNAL BHP of 2 Cs. caocity in water Deptt. Hry. vide services Division, Jagahdri for letter No. 2023- dewatering of flood water in 28/XEN Works District Yamunanagar dated 27/09/2017 has constituted a committee regarding appropriate specification. The committee has finailzed the specification in first week of Feb/2018. The case has been sent to Govt. on 16/02/2018 for approval of specifications. Further action regarding procurement of pumps will be taken after receipt of approval of Govt.

75 KARNAL WORKSHOP Procurement of EP and DP 45th S 105.00 0.00 0 % 105.00 105.00 0.00 0.00 Engineer-in-Chief, YTS CIRCLE Sets. (i) Karnal, Jind, Panipat - Irr. and W.R. KARNAL 20 EP and 20 DP. (ii) Deptt. Hry. vide Kurukshetra - 15 DP Set and letter No. 2023- (iii) Kaithal 20-EP and 20-DP 28/XEN Works Set. (workshop circle) dated 27/09/2017 has constituted a committee regarding appropriate specification. The committee has finailzed the specification in first week of Feb/2018. The case has been sent to Govt. on 16/02/2018 for approval of specifications. Further action regarding procurement of pumps will be taken after receipt of approval of Govt.

76 KARNAL WORKSHOP Purchase of 1 No. truck in 48th S 14.84 0.00 0 % 14.84 14.84 0.00 0.00 The supply order YTS CIRCLE replacement of condemned for purchase of a KARNAL truck new truck has been placed by XEN/ Proc. and Displ. Division, Panchkula and the delivery of the same will be received probably by end of March, 2018.

62 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 77 KARNAL WORKSHOP Procuring 10 no. V.T. Pumps (5 45th S 80.00 30.38 80 % 80.00 80.00 0.00 0.00 XEN/WS IP CIRCLE cs. capacity each) for Division,Kurukshet KARNAL Kurukshetra District for ra (Sh. Rajesh dewatering. (43rd). (45th) Chopra) has reported on 08/03/2018 that V.T. pump have been purchased but erection of pump is yet to be made at site a sum of Rs. 30.38 lacs incurred against revised estimated cost of Rs. 46.05 lacs.

78 GARHI WORKSHOP Procurement of V.T.Pumps to 46th S 120.00 43.48 95 % 120.00 120.00 0.00 0.00 XEN/WS Mech. IP SAMPLA - CIRCLE be installed at town sampla on Rohtak (Sh. S.K. KALOI KARNAL Delhera disty. RD 55000 and Verma) has New Pumps House RD 170000, reported on JLN Feeder. 08/03/2018 that motor and panel have been received erection/commissi oning also done but the work of delivery pipe/ HOT crain is pending. 95% of physical progress achieved and a sum of Rs. 43.48 lacs incurred against revised estimated cost of Rs. 59.41 lacs and work is likely to be completed by 30/06/2018

79 GARHI WORKSHOP procurement of VTP Pumps in 46th S 96.00 37.21 95 % 96.00 96.00 0.00 0.00 XEN/WS Mech. IP SAMPLA - CIRCLE replacement of pumps installed Rohtak (Sh. S.K. KALOI KARNAL at Rithal Pump House RD Verma) has 93500-L BSB reported on 08/03/2018 that motor and panel have been received erection/commissi oning also done but the work of delivery pipe/ HOT crain is pending. 95% of physical progress achieved and a sum of Rs. 37.21 lacs incurred against revised estimated cost of Rs. 50.51 lacs and work is likely to be completed by 30/06/2018

63 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 80 KALANAUR WORKSHOP Procurement of VT Pumps to be 46th S 40.00 11.97 80 % 40.00 40.00 0.00 0.00 XEN/WS Mech. IP CIRCLE installed at Baland Pump House Rohtak (Sh. S.K. KARNAL Rd 193800 JLN Feeder. Verma) has reported on 08/03/2018 that motor and panel have been received erection/commissi oning also done but the work of delivery pipe/ HOT crain is pending. 80% of physical progress achieved and a sum of Rs. 11.97 lacs incurred against revised estimated cost of Rs. 16.67 lacs and work is likely to be completed by 30/06/2018

81 JHAJJAR WORKSHOP Procurement of new dewatering 45th L 39.00 0.00 0 % 39.00 19.00 20.00 0.00 Engineer-in-Chief, YTS CIRCLE equipment with associated Irr. and W.R. KARNAL fitting for Distt. Jhajjar for the Deptt. Hry. vide year 2014-15. letter No. 2023- 28/XEN Works dated 27/09/2017 has constituted a committee regarding appropriate specification. The committee has finailzed the specification in first week of Feb/2018. The case has been sent to Govt. on 16/02/2018 for approval of specifications. Further action regarding procurement of pumps will be taken after receipt of approval of Govt.

District Total 761.91 123.04 761.91 641.91 120.00 0.00 Unit Total 761.91 123.04 761.91 641.91 120.00 0.00 Grand Total 27825.01 7299.69 20224.56 8201.70 8311.57 3711.29

64 TABLE-5A (SHORT TERM)

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 48th meeting of HSDR & FCB

Related To : Short Term Head:Flood Protection Works Status: In Progress,Yet To Start (Rs. In Lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation Circle in Cost booked Prog. Req. meeting during of year HSFCB 2018-19 2019-20 2020-21 YWS(N) BHIWANI 1 BAWANI YWS CIRCLE Providing pitching in sloughing 47th S 321.90 163.81 70 % 158.09 158.09 0.00 0.00 Work held up due to standing IP KHERA BHIWANI portion of Mundhal Talu Link water and will be completed drain RD 15000-20000 and upto 30.06.2018. 38000-47844

District Total 321.90 163.81 158.09 158.09 0.00 0.00 JIND 2 JULANA YWS CIRCLE Increasing capacity of Gatauli 47th S 277.36 187.88 90 % 89.48 10.00 79.48 0.00 In Progress. Work will be IP JIND Karela Drain from RD 0 to RD completed upto 30.06.2019. 39700 i/c increasing capacity of Pump House

3 SAFIDON YWS CIRCLE Bringing to design section of 48th S 25.00 5.00 40 % 20.00 20.00 0.00 0.00 In Progress. Work will be IP JIND Bank from RD 80700 to RD completed upto 30.04.2018. 85500 Bhambhewa Drain and increasing capacity of pump house RD 81500 R Bhambhewa Drain.

4 SAFIDON YWS CIRCLE Bringing to design section of 48th S 26.02 0.00 20 % 26.02 26.02 0.00 0.00 Only work of bringing to design IP JIND Bhuslana Drain from RD 0 to section of drain has been RD 25800 tail and replacing completed and construction of hume pipe culvert into box bridge is in progress and will type Bridges at RD 18800 be completed upto Buslana Drain 30.04.2018.

District Total 328.38 192.88 135.50 56.02 79.48 0.00 PANIPAT 5 PANIPAT YWS CIRCLE Remodeling and lining of 47th S 841.00 612.00 90 % 231.37 231.37 0.00 0.00 Work in Progress. Work will be IP RURAL KARNAL Nohra Drain from RD 21000 to completed upto 30.04.2018. 34100 in Distt. Panipat (CM Announcement code No. 10589)

District Total 841.00 612.00 231.37 231.37 0.00 0.00 Unit Total 1491.28 968.69 524.96 445.48 79.48 0.00 YWS(S) MEWAT 6 MEHAM YWS CIRCLE Constructing pucca cunnette 47th S 51.00 0.00 0 % 50.76 50.76 0.00 0.00 Tender rates approved. Work YTS FARIDABAD and pump house to save the likely to be completed upto Agriculture Land from water 31.07.2018. logging in village Jainsingpur and outfalling in to Ujina Disty. at RD/6050.

7 PUNHANA YWS CIRCLE Construction of X-regulator in 47th S 600.00 235.64 30 % 364.36 364.36 0.00 0.00 Work of X-regulator IP FARIDABAD Ujina Diversion Drain near completed. Estimate for pump village Bichore (With 4 Nos. houses submitted for pump houses). sanctioned. The work completed upto 31.12.2018.

District Total 651.00 235.64 415.12 415.12 0.00 0.00 Unit Total 651.00 235.64 415.12 415.12 0.00 0.00 BWS AMBALA 8 AMBALA SYL CIRCLE Scheme for Side lining of 46th S 489.34 427.25 90 % 30.00 30.00 0.00 0.00 Work in Progress. Date of IP CANTT. AMBALA Mahesh Nagar drain RD Completion 30.06.2018. 15000 to 42000 and constructing V.R. Bridge at RD 21500 for the protection of village Boh, Babyal and Dalipgarh

9 AMBALA SYL CIRCLE Constructing retaining wall and 42th S 935.73 548.00 70 % 100.00 100.00 0.00 0.00 Work in progress. Date of IP CITY AMBALA close box type drain on Completion 30.06.2018. Ambala Drain in reach RD 15200 to 10000 along NH-1.(in Supplementary Agenda)

65 (Rs. In Lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation Circle in Cost booked Prog. Req. meeting during of year HSFCB 2018-19 2019-20 2020-21 10 THANESAR SYL CIRCLE Procuring 8 no. V.T. Pumps (5 47th S 33.00 0.00 0 % 33.00 33.00 0.00 0.00 Tender approved. Only 04 YTS AMBALA cs. capacity each) for pumps are there and at tender Kurukshetra District for rates amount is 33.00 lacs. dewatering. Work to start shortly. Date of Completion 30.06.2018.

11 AMBALA SYL CIRCLE Increasing capacity of link 48th S 22.04 0.00 0 % 22.04 22.04 0.00 0.00 work in progress. Date of YTS CANTT. AMBALA drain from RD 0 to 2525 off Completion 30.06.2018. taking up stream RD 26000 of Mahesh Nagar Drain out falling in rivet Tangri opposite RD 10900 of Babyal Bund

12 AMBALA SYL CIRCLE Providing side lining of exiting 48th S 94.89 57.48 80 % 37.41 37.41 0.00 0.00 IN PROGRESS. Date of IP CITY AMBALA Singawala Drain from RD 0 to Completion 30.06.2018. 5000 for protection of abadi of village Singhawala

District Total 1575.00 1032.73 222.45 222.45 0.00 0.00 HISAR 13 HISSAR BWS CIRCLE Providing protection on Hisar 48th S 192.97 127.46 95 % 20.00 20.00 0.00 0.00 WORK IN PROGRESS. Date IP HISAR Ghaggar Multipurpose of completion 31.03.2018. Channel (Drain) from RD 205230 to 269650.

District Total 192.97 127.46 20.00 20.00 0.00 0.00 Unit Total 1767.97 1160.19 242.45 242.45 0.00 0.00 LCU ROHTAK 14 ROHTAK YWS CIRCLE Constructing V.R. Bridge at 47th S 480.00 316.22 75 % 163.78 163.78 0.00 0.00 In Progress and will be IP ROHTAK RD 7600, RD 23420, RD completed upto 30.06.2018 24700 and and RD 40900 of K.C.B. Drain

15 MEHAM YWS CIRCLE Constructing RCC lining from 46th S 180.00 68.66 40 % 111.34 111.34 0.00 0.00 Work in Progress. date of IP ROHTAK RD 70000 to 73000 of Meham completion 30.06.2018 Drain. (In Supplementary Agenda).

16 MEHAM YWS CIRCLE Constructing Pump House at 48th S 16.00 0.00 0 % 16.00 16.00 0.00 0.00 Estimate Sanctioned. Tender YTS ROHTAK RD 122000/R Meham Drain. rates approved final notice sent to contractor for start of work. work will be completed upto 30.06.2018

17 MEHAM YWS CIRCLE Constructing Bharan Sub Link 48th S 28.60 0.00 0 % 28.60 28.60 0.00 0.00 L section approved,estimate YTS ROHTAK Drain from RD 0 to 2150 under preparation in division outfall at RD 5800-L Ajaib office.Work will be completed Bharan Link Drain. upto 30.06.2018.

18 GOHANA YWS CIRCLE Providing vertical wall on both 48th S 25.00 0.00 0 % 25.00 25.00 0.00 0.00 work will be started shortly and YTS ROHTAK side of Bibilan link drain from will be completed upto RD 1000 to 2000. 30.06.2018

19 BERI YWS CIRCLE Construction of Link Drain 48th S 174.74 0.00 0 % 3.00 3.00 0.00 0.00 Revised agenda accepted in YTS ROHTAK from Kharhar to village preliminary meeting headed by Mandothi side drain. worthy P.S IandW.R.D On 10.03.2018.work will be completed upto 30.06.2018

20 BAHADURGA YWS CIRCLE Construction of V.R. Bridge at 48th S 64.09 0.00 5 % 64.09 64.09 0.00 0.00 In Progress and will be IP RH ROHTAK RD 35000 West Jua Drain. completed upto 30.06.2018

21 BAHADURGA YWS CIRCLE C.C. Concrete lining in Abadi 48th S 130.56 0.00 5 % 130.56 130.56 0.00 0.00 In Progress and will be IP RH ROHTAK area of village Asaudha of completed upto 30.06.2018 West Jua drain from RD 29500 to 34500

District Total 1098.99 384.88 542.37 542.37 0.00 0.00 JHAJJAR 22 BADLI YWS CIRCLE Constructing permanent pump 46th S 30.00 11.25 40 % 18.75 18.75 0.00 0.00 `Civil work compeleted and IP ROHTAK house and sump well at RD Mech. Works will be completd 22000-L of KCB drain. upto 30.06.2018. ` 23 JHAJJAR JWS CIRCLE Providing Reinforced Cement 43th S 2200.00 1909.15 95 % 290.85 290.85 0.00 0.00 In Progress. 99% work IP JHAJJAR Concrete lining in Beri-Dujana- completed. Date of completion Dhaur Link Drain from RD 0 to 30.04.2018. 46600 and Talao link drain RD 0 to tail RD 20008 out falling into Outfall Drain No. 8 KM 12.295-L.

66 (Rs. In Lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation Circle in Cost booked Prog. Req. meeting during of year HSFCB 2018-19 2019-20 2020-21 24 JHAJJAR JWS CIRCLE Procurement of New 48th S 44.78 0.00 0 % 44.78 44.78 0.00 0.00 Material received. Payment YTS JHAJJAR Machinery (Pick up Vans and yet to be made. DG Sets) for Flood Protection in W/S Mechanical Divn., Jhajjar.

District Total 2274.78 1920.40 354.38 354.38 0.00 0.00 Unit Total 3373.77 2305.28 896.75 896.75 0.00 0.00 PROJECT, ENVIRONMENT KARNAL 25 YAMUNA WORKSHOP Procurement and replacement 46th S 33.32 0.00 0 % 33.32 33.32 0.00 0.00 Engineer-in-Chief, Irr. and YTS NAGAR CIRCLE KARNAL of 33 no Diesel pumping sets W.R. Deptt. Hry. vide letter is BHP of 2 Cs. caocity in No. 2023-28/XEN Works water services Division, dated 27/09/2017 has Jagahdri for dewatering of constituted a committee flood water in District regarding appropriate Yamunanagar specification. The committee has finailzed the specification in first week of Feb/2018. The case has been sent to Govt. on 16/02/2018 for approval of specifications. Further action regarding procurement of pumps will be taken after receipt of approval of Govt.

26 KARNAL WORKSHOP Procurement of EP and DP 45th S 105.00 0.00 0 % 105.00 105.00 0.00 0.00 Engineer-in-Chief, Irr. and YTS CIRCLE KARNAL Sets. (i) Karnal, Jind, Panipat - W.R. Deptt. Hry. vide letter 20 EP and 20 DP. (ii) No. 2023-28/XEN Works Kurukshetra - 15 DP Set and dated 27/09/2017 has (iii) Kaithal 20-EP and 20-DP constituted a committee Set. (workshop circle) regarding appropriate specification. The committee has finailzed the specification in first week of Feb/2018. The case has been sent to Govt. on 16/02/2018 for approval of specifications. Further action regarding procurement of pumps will be taken after receipt of approval of Govt.

27 KARNAL WORKSHOP Purchase of 1 No. truck in 48th S 14.84 0.00 0 % 14.84 14.84 0.00 0.00 The supply order for purchase YTS CIRCLE KARNAL replacement of condemned of a new truck has been truck placed by XEN/ Proc. and Displ. Division, Panchkula and 28 KARNAL WORKSHOP Procuring 10 no. V.T. Pumps 45th S 80.00 30.38 80 % 80.00 80.00 0.00 0.00 theXEN/WS delivery of the same will be IP CIRCLE KARNAL (5 cs. capacity each) for Division,Kurukshetra (Sh. Kurukshetra District for Rajesh Chopra) has reported dewatering. (43rd). (45th) on 08/03/2018 that V.T. pump have been purchased but erection of pump is yet to be made at site a sum of Rs. 30.38 lacs incurred against revised estimated cost of Rs. 46.05 lacs.

67 (Rs. In Lacs)

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation Circle in Cost booked Prog. Req. meeting during of year HSFCB 2018-19 2019-20 2020-21 29 GARHI WORKSHOP Procurement of V.T.Pumps to 46th S 120.00 43.48 95 % 120.00 120.00 0.00 0.00 XEN/WS Mech. Rohtak (Sh. IP SAMPLA - CIRCLE KARNAL be installed at town sampla on S.K. Verma) has reported on KALOI Delhera disty. RD 55000 and 08/03/2018 that motor and New Pumps House RD panel have been received 170000, JLN Feeder. erection/commissioning also done but the work of delivery pipe/ HOT crain is pending. 95% of physical progress achieved and a sum of Rs. 43.48 lacs incurred against revised estimated cost of Rs. 59.41 lacs and work is likely to be completed by 30/06/2018

30 GARHI WORKSHOP procurement of VTP Pumps in 46th S 96.00 37.21 95 % 96.00 96.00 0.00 0.00 XEN/WS Mech. Rohtak (Sh. IP SAMPLA - CIRCLE KARNAL replacement of pumps S.K. Verma) has reported on KALOI installed at Rithal Pump House 08/03/2018 that motor and RD 93500-L BSB panel have been received erection/commissioning also 31 KALANAUR WORKSHOP Procurement of VT Pumps to 46th S 40.00 11.97 80 % 40.00 40.00 0.00 0.00 XEN/WSdone but theMech. work Rohtak of delivery (Sh. IP CIRCLE KARNAL be installed at Baland Pump S.K. Verma) has reported on House Rd 193800 JLN 08/03/2018 that motor and Feeder. panel have been received erection/commissioning also done but the work of delivery pipe/ HOT crain is pending. 80% of physical progress achieved and a sum of Rs. 11.97 lacs incurred against revised estimated cost of Rs. 16.67 lacs and work is likely to be completed by 30/06/2018

District Total 489.16 123.04 489.16 489.16 0.00 0.00 Unit Total 489.16 123.04 489.16 489.16 0.00 0.00 Grand Total 7773.18 4792.84 2568.44 2488.96 79.48 0.00

68 TABLE-5A (MEDIUM TERM) Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 48th meeting of HSDR & FCB

Related To : Medium Term Head:Flood Protection Works Status: In Progress,Yet To Start (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation Circle in booked Prog. Req. meeting during of year HSFCB 2018-19 2019-20 2020-21 YWS(N) JIND 1 SAFIDON YWS CIRCLE Brick Pitching in side slope and 48th M 275.43 115.00 90 % 160.43 160.43 0.00 0.00 In Progress. Work will be IP JIND Bed in Head Reach RD 128000 completed upto to RD 129000 and U/S and D/s 30.04.2018. of railway x-ing from RD 118100 to RD 119100 and Berm Cutting from RD 116000 to RD 128000 including construction of cattle ghat at RD 128800 of Nai Nallah Drain/ Indri Drain

2 SAFIDON YWS CIRCLE Reconstruction of V.R. Bridge at 48th M 45.69 30.13 80 % 15.56 15.56 0.00 0.00 Work is in progress and will IP JIND RD 81060 Bhambhewa drain. be completed upto 30.04.2018.

District Total 321.12 145.13 175.99 175.99 0.00 0.00 YAMUNANAGAR 3 JAGADHRI HKB CIRCLE Work of repair of damaged 48th M 1500.00 0.00 0 % 1500.00 750.00 750.00 0.00 As the flood season is off YTS JAGADHRI portion of Hathnikund Barrage. on 30.09.2017 and work will be completed upto 30.06.2019.

District Total 1500.00 0.00 1500.00 750.00 750.00 0.00 PANIPAT 4 PANIPAT YWS CIRCLE Protection of village pond, 48th M 55.00 0.00 0 % 55.00 55.00 0.00 0.00 The estimate is under YTS RURAL KARNAL agriculture land and abadi of preparation and there is village Mehrana from flood in delay because of NOC Mehrana Drain at existing from Panchayat alignment from RD 0 to 3900 Department as land issue was invoved. Last date of completion is 30.06.2018.

5 ISRANA YWS CIRCLE Protection against errosion of 48th M 39.04 0.00 0 % 39.04 39.04 0.00 0.00 Tenders called but no YTS KARNAL agriculture land of Dadlana agecy participated. village from flood and waste Tenders are called again. water flowing in Munak Drain by Last date of completion is providing lining from RD 27360 30.06.2018. to 28950.

6 SAMALKHA YWS CIRCLE Protection of village abadi and 48th M 80.88 14.00 25 % 80.88 80.88 0.00 0.00 Work in Progress. Issue IP KARNAL agriculture land by from Mining Department strengthening weak reaches of regarding NOC, therefore River Yamuna embankment the work progress is slow. between RD 0 to 87150 A/F Last date of completeion 2016 30.06.2018.

7 PANIPAT YWS CIRCLE Replacement of VR bridge at 48th M 182.16 114.33 90 % 69.81 30.00 39.81 0.00 In Progress. Last date of IP CITY KARNAL RD 27825, 14200, 13300, completion is 30.04.2019. 12500 and 10000 on Panipat Drain for safe passes of vehicles and public

8 SAMALKHA YWS CIRCLE Protection of village pond, land 48th M 149.89 0.00 0 % 149.89 89.79 60.10 0.00 Tender rates approved and YTS KARNAL and Abadi of village Balana and work will be started shortly. Mandi from flood and waste Last date of completion is chemical water flowing in Try. 30.06.2019. Drain no.4 by providing lining in drain in concerened villages

9 ISRANA YWS CIRCLE Protection of village pond, land 48th M 150.97 0.00 0 % 150.97 140.91 10.06 0.00 Estimate as per revised YTS KARNAL and Abadi of village Shodhapur concrete rates (due to from flood and waste water change in cement contents flowing in Nohra Drain by in HSR item) has been providing lining in village santioned and tender called. Last date of completion is 30.06.2019.

District Total 657.94 128.33 545.59 435.62 109.97 0.00 Unit Total 2479.06 273.46 2221.58 1361.61 859.97 0.00 YWS(S) SONIPAT

69 (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation Circle in booked Prog. Req. meeting during of year HSFCB 2018-19 2019-20 2020-21 10 RAI YWS CIRCLE Raising and stg. of River 45th M 200.00 0.00 0 % 200.00 100.00 100.00 0.00 AGREEMENT MADE YTS SONEPAT embankment in Mimarpur WITH THE AGENCY BUT Complex on River Yamuna (in THE AGENCY NOT Supplementary Agenda) STARTED.YET IN SPITE OF MANY TIMES District Total 200.00 0.00 200.00 100.00 100.00 0.00 REQUEST FARIDABAD 11 TIGAON YWS CIRCLE Construction of Sehatpur Drain 48th M 595.00 219.20 40 % 375.80 200.00 175.80 0.00 WORK STARTED AND YTS FARIDABAD with Brick lining with M.S Railing UNDER PROCESS to Carry storm water from RD 11000 to 19000 and remodeling katcha reach from RD 0 to 11000.

District Total 595.00 219.20 375.80 200.00 175.80 0.00 Unit Total 795.00 219.20 575.80 300.00 275.80 0.00 BWS AMBALA 12 AMBALA SYL CIRCLE Rehabilitation and up gradation 47th M 275.40 0.00 5 % 275.40 250.00 25.40 0.00 In progress. YTS CITY AMBALA of Pump House at RD 0 of Mahesh Nagar Drain to protect the abadi of Ambala Cantt , villages Boh, Babyal and Dalip Ghar etc. from River Tangri

13 AMBALA SYL CIRCLE Upgradation of existing pump 48th M 200.00 0.00 0 % 200.00 180.00 20.00 0.00 Civil work under process. YTS CANTT. AMBALA house at Babyal by providing Tender for mechanical 2No. VT Pumps of 50 Cuces components opened and each for the protection of village are under process of abadi of Boh, Babyal and approval. Dalipgarh of Ambala Cantt

14 AMBALA SYL CIRCLE Purchase of 1 No. Pick up 48th M 6.37 0.00 0 % 6.37 6.37 0.00 0.00 Indent given to YTS CITY AMBALA (TATA –SFC-407 PICK UP- procurement. Date of CLB) in place of old pick up No. completion 31.03.2019. HR-64-0279 for use in SYL Water Services Division Ambala

15 AMBALA SYL CIRCLE Constructing RCC open Trough 48th M 570.00 0.00 0 % 570.00 500.00 70.00 0.00 Technical evaluation YTS CANTT. AMBALA from RD 36000 to 30000 (Sub approved. Financial reach of Mahesh Nagar drain) approval under process. Date of completion 30.06.2019. District Total 1051.77 0.00 1051.77 936.37 115.40 0.00 PANCHKULA 16 PANCHKULA SYL CIRCLE Purchase of 2 no. Diesel driven 48th M 5.44 0.00 0 % 5.44 5.44 0.00 0.00 YET TO START. Date of YTS AMBALA Pump Set of 2 Cs capacity for completion 31.03.2019. W/S Sub Dn Panchkula

District Total 5.44 0.00 5.44 5.44 0.00 0.00 HISAR 17 NARNAUND BWS CIRCLE Agenda Note for Construction of 46th M 507.00 0.00 0 % 507.00 0.00 300.00 207.00 ALIGNMENT APPROVED YTS HISAR Badala Bhatol Field Link Drain ON 29.03.2016 LAND from RD 0 to 17000 O/F at RD DETAIL OF 3.86 ACRE 111650/R Bass Multipurpose UPLOADED ON E- Channel. BHOOMI PORTAL AS PER NEW LAND District Total 507.00 0.00 507.00 0.00 300.00 207.00 PURCHASE POLICY FATEHABAD 18 FATEHABAD BWS CIRCLE Construction of Khabra Drain 45th M 321.14 0.00 0 % 321.14 200.00 121.14 0.00 Initially the Agenda Note for YTS FATEHABAD from RD 0-19500 outfalling at const. open drain was RD 173900-R Hisar Ghaggar proposed in a length of Multipurpose Channel 23445` @ Rs. 6.16 Cr. Accordingly the alignment was got appproved by the competent authority. It involved an acquisition of 13.06 acres. The farmer did not agree to part away of the land and hence, pipe drain in a length of 19500` @ Rs. 321.14 lacs has been proposed. The alignment is under preparation. The work will be completed by 30.06.2019.

District Total 321.14 0.00 321.14 200.00 121.14 0.00 SIRSA

70 (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation Circle in booked Prog. Req. meeting during of year HSFCB 2018-19 2019-20 2020-21 19 ELLENABAD BWS CIRCLE Excavation of Rupana Field 45th M 58.54 0.00 0 % 58.54 0.00 58.54 0.00 LAND DETAIL OF 2.31 YTS SIRSA Drain from RD 0 to 5600 ACRE UPLOADED ON E- outfalling at RD 73200-L BHOOMI PORTAL AS HGMPD (43rd). (45th) PER NEW LAND PURCHASE POLICY. Date of completion 30.06.2019.

District Total 58.54 0.00 58.54 0.00 58.54 0.00 Unit Total 1943.89 0.00 1943.89 1141.81 595.08 207.00 LCU BHIWANI 20 DADRI LWS CIRCLE Increasing capacity of Jai Shree 42th M 484.05 460.40 40 % 103.05 53.05 50.00 0.00 Work held up due to Court IP BHIWANI Drain from RD 0 to13500 Case outfalling at RD 89000-R Loharu Feeder.

District Total 484.05 460.40 103.05 53.05 50.00 0.00 ROHTAK 21 BARODA YWS CIRCLE Constructing vertical wall of 47th M 782.00 270.00 40 % 512.00 300.00 212.00 0.00 In Progress and will be IP ROHTAK Chhapra drain RD 37000 to completed upto 30.06.2018 40850 (both sides).

22 MEHAM YWS CIRCLE Constructing rectangular RCC 48th M 300.00 0.00 0 % 300.00 300.00 0.00 0.00 Estimate santioned by YTS ROHTAK section of Meham Drain from CE/LCU vide letter no. RD 115000 to 117000 3074/3LCU/2017 dt. 12.05.2017. Due to technical objection of Vigilance wing, additional quantities have been submitted to head office tender will be re-invited and work will be completed 30.06.2018.

23 ISRANA YWS CIRCLE Reconstruction of V.R. Bridge at 48th M 132.00 0.00 0 % 132.00 132.00 0.00 0.00 Drawing under preparation. YTS ROHTAK RD 40200 Nai Nallah drain. Work will be completed upto 30.06.2018.

24 GOHANA YWS CIRCLE Reconstructing of Bridges at RD 48th M 92.13 0.00 0 % 92.13 92.13 0.00 0.00 Work will be started shortly YTS ROHTAK 29650 of Sinkh Bahadurpur and will be completed upto drain. 30.06.2018.

District Total 1306.13 270.00 1036.13 824.13 212.00 0.00 JHAJJAR 25 BERI JWS CIRCLE Providing RCC Trough Section 47th M 400.00 363.26 95 % 36.74 20.00 16.74 0.00 Work is in IP JHAJJAR of Achhej Link Drain from RD 0 progress.Balance work to 8000. could not be completed due to court case. Hence, work has been finalized.

26 JHAJJAR JWS CIRCLE Cosnt. Of ditch drain along palra 42th M 60.81 0.00 0 % 60.81 60.81 0.00 0.00 Land acquisition required, YTS JHAJJAR Dubaldhan road RD 0-4500 so work cannot be started. outfalling into Dubaldhan Mr. RD 16000-L

27 BERI JWS CIRCLE Constructing RCC trough from 48th M 230.14 104.00 90 % 126.14 126.14 0.00 0.00 90% work completed. Date IP JHAJJAR RD 15620 to 19465 of Bishan of completion 31.03.2018. Link Drain including construction of Sump at RD 19465.

District Total 690.95 467.26 223.69 206.95 16.74 0.00 MAHENDRAGARH 28 NANGAL JLN WS CIRCLE Constructing of Waste 48th M 312.47 208.14 80 % 103.29 103.29 0.00 0.00 Work in Progress, spillway IP CHOUDHRY NARNAUL weir/spillway at Totaheri Bund completed, Pitching work is on Krishnwati River. under progress. Work will be completed by 30.04.2018

District Total 312.47 208.14 103.29 103.29 0.00 0.00 Unit Total 2793.60 1405.80 1466.16 1187.42 278.74 0.00 PROJECT, ENVIRONMENT KARNAL

71 (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation Circle in booked Prog. Req. meeting during of year HSFCB 2018-19 2019-20 2020-21 29 JIND WORKSHOP Replacement/Renovation of V.T 48th M 233.75 0.00 0 % 233.75 133.75 100.00 0.00 The work has been divided in two YTS CIRCLE KARNAL Pumps parts 1.The tender for the work of supply erection, commissiong of V.T. pump motors and panels etc. at Dhatrath P.H. on Hansi Br. at RD 142000/R, Jammi P.H. on Hansi Br at RD 131000/R, Rittoli P.H. on Hansi Br. at RD 124000/R, Beri Khera P.H. on Hansi Br. at RD 111000/R, Gangoli P.H. on Bhirthana Mr. at RD 4000/R, Mehrana P.H. on Bhiwani at RD 0/R, Lajwana P.H. on Bhiwani Br.at RD 7000/R, Shamlo Kalan P.H. on Sunder Br. at RD 70/R on Karela P.H. on Sunder Br. at RD 105/L (Estimated cost 113.81 lacs) have been invited twice earlier. In the Ist time no tender was received 2nd time two No. agencies tendered for the work but they did not qualify the technical bid. Now the tender have been received on 07/12/2017. The case has been approved by the Technical Scrutiny Committee under chairmanship of EIC on 06/02/2018. The case is to be submitted to High Powered Purchase Committee. 2. Tender for the work of supply, erection, commissioning and replacement of V.T. Pumps, Motors and starter Panels etc at pump house on Bhambhewa Drain RD- 67260 and at pump house Siwana Mal on RD- 81500/R of Bhambhewa Drain (Estimated cost Rs. 20.49 lacs) have been opened on 25/01/2018 and the case for approval of financial bid has been sent to CE/Project vide SE/Workshop Circle, Karnal U.O. District Total 233.75 0.00 233.75 133.75 100.00 0.00 No. 179 dated 23/02/2018. The Unit Total 233.75 0.00 233.75 133.75 100.00 0.00 Grand Total 8245.30 1898.46 6441.18 4124.59 2109.59 207.00

72 TABLE-5A (LONG TERM) Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 48th meeting of HSDR & FCB

Related To : Long Term Head:Flood Protection Works Status: In Progress,Yet To Start (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation Circle in booked Prog. Req. meeting during of year HSFCB 2018-19 2019-20 2020-21 YWS(N) BHIWANI 1 BAWANI YWS CIRCLE Constg. New Mundhal link 45th L 276.50 0.00 0 % 276.50 138.50 138.00 0.00 Land paper uploaded on E- YTS KHERA BHIWANI drain from RD 0-9850 (YWS) bhoomi portal and farmers are yet to upload their consent .

2 BAWANI YWS CIRCLE Constg. Kunger link drain 45th L 286.40 0.00 0 % 286.40 143.40 143.00 0.00 Land paper uploaded on E- YTS KHERA BHIWANI from RD 0-9500 (YWS) (in bhoomi portal and farmers are Supplementary Agenda) yet to upload their consent .

3 TOSHAM YWS CIRCLE 20 No. TV-2 DP set 14 HP to 48th L 107.00 0.00 0 % 107.00 54.00 53.00 0.00 1. DP set specification under YTS BHIWANI 16 HP, 20 no. Sumersible finalization, procurement Pump set 20 HP 8 stage, 10 process will be start after that. no. V.T Pump 5 Cs 2. VT pumps finacial bids is to discharge with motor of be opend shortly. 3. supply column height 10`, and 2 no. order of bolero camper Bolero Camper (5 seater placed and tentative date of cabin). delivery is 15.04.2018. 4. Indent Process of 20 no. submersible pumps is under process.

District Total 669.90 0.00 669.90 335.90 334.00 0.00 Unit Total 669.90 0.00 669.90 335.90 334.00 0.00 BWS AMBALA 4 AMBALA SYL CIRCLE Constructing Bhanokheri 47th L 108.23 0.00 0 % 108.23 54.00 54.23 0.00 ALIGNMENT APPROVED YTS CITY AMBALA Ganda Nalla link Drain from ON 28.03.2016 LAND RD 0 to 3111 out falling in DETAIL OF 1.18 ACRE Ganda Nalla at RD 31650 UPLOADED ON E-BHOOMI PORTAL AS PER NEW LAND PURCHASE POLICY.

5 MULLANA SYL CIRCLE Scheme for excavating Kesri 46th L 478.37 0.00 0 % 478.37 0.00 300.00 178.37 ALIGNMENT APPROVED YTS AMBALA Link Drain from RD 0-6000 ON 06.10.2016 LAND offtakig from existing drain DETAIL OF 2.20 ACRE and outfalling in existing UPLOADED ON E-BHOOMI drain near village Landa PORTAL AS PER NEW Landi. LAND PURCHASE POLICY.

6 AMBALA SYL CIRCLE Scheme for constructing 46th L 3226.00 0.00 0 % 3226.00 0.00 1700.00 1526.00 ALIGNMENT APPROVED YTS CITY AMBALA Panjokhra Ghaggar Link ON 07.01.2016 LAND Drain from RD 0-41000 DETAIL OF 23.03 ACRE outfalling in River Ghaggar. UPLOADED ON E-BHOOMI PORTAL AS PER NEW LAND PURCHASE POLICY

7 AMBALA SYL CIRCLE Scheme for extension of 46th L 297.92 0.00 0 % 297.92 0.00 100.00 197.92 ALIGNMENT APPROVED YTS CANTT. AMBALA Babyal Bund from RD 24350 ON 17.03.2016 LAND to 26250 for protection to DETAIL OF 2.70 ACRE village Babyal (Ambala UPLOADED ON E-BHOOMI Cantt) from River Tangri PORTAL AS PER NEW LAND PURCHASE POLICY

8 AMBALA SYL CIRCLE Constructing Machonda 48th L 1707.11 0.00 0 % 1707.11 0.00 957.11 750.00 LAND ACQUISITION YTS CANTT. AMBALA Drain from RD 0 to 21050 off INVOLVED.ALIGNMENT take from pond of village UNDER PROCESS. Machonda and outfall in Ganda Nallah. (Irrigation Department).

9 AMBALA SYL CIRCLE Construction of main nallah 48th L 283.16 0.00 0 % 283.16 0.00 183.16 100.00 FUNDS TO BE DEPOSITED YTS CANTT. AMBALA from railway line near village WITH MC AMBALA,ACTION Nanhera upto nh-1 near FOR WHICH IS UNDER Shamshan gath in ward no. PROCESS.SCHEME IS TO 16 ambala cantt (MC BE EXECUTED BY MC Ambala). AMBALA

10 AMBALA SYL CIRCLE Constructing Singha Wala- 48th L 2224.00 0.00 0 % 2224.00 0.00 2000.00 224.00 LAND ACQUISITION YTS CITY AMBALA Sullar link Drain from RD 0 to INVOLVED.ALIGNMENT 29000 off take from UNDER PROCESS Singhawala drain at RD 0 and Outfall in Sullar Drain at RD 20100

District Total 8324.79 0.00 8324.79 54.00 5294.50 2976.29 PANCHKULA 73 (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation Circle in booked Prog. Req. meeting during of year HSFCB 2018-19 2019-20 2020-21 11 PANCHKULA SYL CIRCLE Constructon of box RCC 47th L 478.00 0.00 0 % 478.00 478.00 0.00 0.00 ALIGNMENT APPROVED YTS AMBALA drain for safe passage of CASE FOR TAKING flood/waste water from CONSULTANCY UNDER Barwala and Bataur PROCESS IN DIVISION (Panchkula) into River OFFICE . Tangri.

District Total 478.00 0.00 478.00 478.00 0.00 0.00 HISAR 12 HANSI BWS CIRCLE Agenda Noe for constructing 45th L 47.73 0.00 0 % 47.73 47.73 0.00 0.00 ALIGNMENT APPROVED YTS HISAR Bandaheri (Mundhal)Field ON 08.04.2015 LAND Link Drain from RD 0 to 7700 DETAIL OF 1.60 ACRE outfalling into Puthi Mundhal UPLOADED ON E-BHOOMI Link Drain at RD 1650-Right. PORTAL AS PER NEW (45th) LAND PURCHASE POLICY

District Total 47.73 0.00 47.73 47.73 0.00 0.00 Unit Total 8850.52 0.00 8850.52 579.73 5294.50 2976.29 LCU BHIWANI 13 DADRI LWS CIRCLE Constructing of Achina Tal 42th L 39.00 0.00 0 % 39.00 20.00 19.00 0.00 No flood like situation YTS BHIWANI Drain from RD 0 to 3000 observed after 2013 hence outfalling at RD 62015-L Proposed to be Dropped Loharu Feeder

District Total 39.00 0.00 39.00 20.00 19.00 0.00 ROHTAK 14 KALANAUR YWS CIRCLE Increasing capacity of KCB 45th L 772.55 500.00 90 % 272.55 272.55 0.00 0.00 In Progress and will be IP ROHTAK drain from RD 0 to 139000 completed upto 30.06.2018

District Total 772.55 500.00 272.55 272.55 0.00 0.00 JHAJJAR 15 BADLI JWS CIRCLE Constructing 2 Nos. Pump 45th L 115.62 43.66 90 % 71.96 21.96 25.00 25.00 Civil work completed. IP JHAJJAR Houses with Sump Well at Mechanical Components and KM 8.200 Bhindawas Lake pump will be installed shortly. Bund and KM 3.750 Bhindawas Link Drain.

16 BERI JWS CIRCLE Constructing Pump House 45th L 37.37 25.76 90 % 11.61 11.61 0.00 0.00 In Progress, civil work IP JHAJJAR with Sump Well at KM completed. Mechanical 71.384-R on Drain No. 8 out components and pumps will falling point of Mangawas be installed shortly. link drain.

17 BERI JWS CIRCLE Constructing Inlet and Pump 45th L 62.00 38.97 90 % 39.83 39.83 0.00 0.00 In progress, civil work IP JHAJJAR House at KM 73.950-R on completed. Mechanical Drain No. 8. components and pumps will be installed shortly.

18 BADLI JWS CIRCLE Constructing of Chandol- 45th L 373.96 0.00 0 % 373.96 100.96 100.00 173.00 Land acquisition. To purchase YTS JHAJJAR Kundhrawali Link Drain from land, uploaded on E-Bhoomi RD 0 to 17800 tail out falling Portal. at KM 4.300 JLN Escape Channel. (42nd)

19 BADLI JWS CIRCLE Constructing Subana Link 45th L 546.61 0.00 0 % 546.61 146.61 200.00 200.00 Land acquisition as per new YTS JHAJJAR Drain from RD 0 to 26035 act out falling into out falling Drain No. 8 at RD 10400-R. (42nd)

20 BADLI JWS CIRCLE Constructing underground 48th L 300.00 0.00 0 % 300.00 40.00 130.00 130.00 Revised Alignment approved YTS JHAJJAR pressurized Subana Link on 28.09.2017 project Drain from KM 0 to 7.210 out estimate amounting Rs. falling at KM 2.300-R of 292.45 lac submitted to C/E outfall drain no. 8. LCU on 08.11.2017 for technical design.

District Total 1435.56 108.39 1343.97 360.97 455.00 528.00 Unit Total 2247.11 608.39 1655.52 653.52 474.00 528.00 PROJECT, ENVIRONMENT KARNAL

74 (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation Circle in booked Prog. Req. meeting during of year HSFCB 2018-19 2019-20 2020-21 21 JHAJJAR WORKSHOP Procurement of new 45th L 39.00 0.00 0 % 39.00 19.00 20.00 0.00 Engineer-in-Chief, Irr. and YTS CIRCLE KARNAL dewatering equipment with W.R. Deptt. Hry. vide letter associated fitting for Distt. No. 2023-28/XEN Works Jhajjar for the year 2014-15. dated 27/09/2017 has constituted a committee regarding appropriate specification. The committee has finailzed the specification in first week of Feb/2018. The case has been sent to Govt. on 16/02/2018 for approval of specifications. Further action regarding procurement of pumps will be taken after receipt of approval of Govt.

District Total 39.00 0.00 39.00 19.00 20.00 0.00 Unit Total 39.00 0.00 39.00 19.00 20.00 0.00 Grand Total 11806.53 608.39 11214.94 1588.15 6122.50 3504.29

75 TABLE 5B Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 48th meeting of HSDR & FCB

Head:Flood Protection Works Status: Completed (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 YWS(N) BHIWANI 1 BAWANI YWS CIRCLE Providing pitching in sloughing of 47th S 27.22 27.22 100 0.00 0.00 0.00 0.00 Work Completed KHERA BHIWANI Mithathal Ghuskani link drain % Completed from RD 10450-11450

2 BAWANI YWS CIRCLE i) Extn. Mithathal Ghuskani link 45th S 1175.58 1175.58 100 0.00 0.00 0.00 0.00 Work Completed KHERA BHIWANI drain from RD 50100 to 70600, % Completed New Gujrani drain RD 0-10000, 1- R Gujrani drain RD 0-8000, Prem Nagar drain RD 0-5200 and increasing capacity of M.G. link drain from RD 0-50100 (YWS)

3 BAWANI YWS CIRCLE Constructing permanent pump 48th S 4.32 4.32 100 0.00 0.00 0.00 0.00 Work Completed KHERA BHIWANI well at outlet RD 0 of 1-L Jatai % Completed Link Drain outfalling at RD 77265- L of Saiman Dhanana Link Drain.

4 BAWANI YWS CIRCLE Constg. of Siwara Talu link drain 42th M 1606.53 1604.53 100 2.00 2.00 0.00 0.00 Work Completed KHERA BHIWANI from RD 0-36485 O/F at RD % Completed 42851-R Saiman Dhanana Link drain and 1-L Talu link drain from RD 0-10198 O/F at RD 26277-L Siwara Talu link drain (YWS)

5 BAWANI YWS CIRCLE Increasing capacity from RD 0 to 48th S 251.87 251.87 100 0.00 0.00 0.00 0.00 Work Completed KHERA BHIWANI 28350 including pitching from RD % Completed 0-7000 and only left side pitching from RD 7000-14000 of Bhiwani Ghaggar Drain

District Total 3065.52 3063.52 2.00 2.00 0.00 0.00 JIND 6 JIND YWS CIRCLE Providing reinforced cement 47th S 701.98 609.15 100 70.00 70.00 0.00 0.00 Work Completed JIND concrete truff in Nizampur Bharon % Completed Khera Ramkali Drain from RD 0 to RD 47100 outfalling at RD 8650-L pf Padana drain in sloughing reach RD 4000 to RD 15000, including replacing of pipe culverts into slab culverts.

7 SAFIDON YWS CIRCLE Construction of pucca drain i.e. 48th M 150.86 135.00 100 15.00 15.00 0.00 0.00 Work Completed JIND Safidon Ditch Drain from RD % Completed. 26500 to RD 28500.

District Total 852.84 744.15 85.00 85.00 0.00 0.00 YAMUNANAGAR 8 JAGADHRI HKB CIRCLE Constructing 2500 ft.Bund with 48th S 63.59 63.59 100 0.00 0.00 0.00 0.00 Work Completed JAGADHRI stone pitching for the protection % Completed of village Ledda Khadar from river Pathrala.

9 JAGADHRI HKB CIRCLE Constructing 2500 ft. Bund with 48th S 59.32 59.32 100 0.00 0.00 0.00 0.00 Work Completed JAGADHRI Stone Pitching for the protection % Completed of village Shahzadwala from Chikken Khol.

10 JAGADHRI HKB CIRCLE Constructing 1000 ft. Bund with 48th S 22.89 21.97 100 0.92 0.92 0.00 0.00 Work Completed JAGADHRI stone pitching for the protection % Completed of village Bhangeri from Khillonwali Khol.

11 JAGADHRI HKB CIRCLE Constructing 3000 ft. Bund with 48th S 74.98 74.98 100 0.00 0.00 0.00 0.00 Work Completed JAGADHRI stone pitching for the protection % Completed of village Tibbi Ariyan from Chikken Khol.

76 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 12 SADHAURA HKB CIRCLE Providing 01 No. bed bars and 48th S 9.42 7.68 100 1.74 1.74 0.00 0.00 Work Completed JAGADHRI 300 ft. stone steining for the % Completed protection of village Dyalgarh and Bhagwanpur from Khol.

13 SADHAURA HKB CIRCLE Providing 03 No. bed bars and 48th S 12.76 10.41 100 2.35 2.35 0.00 0.00 Work Completed JAGADHRI 100 ft. steining for the protection % Completed of village plus Field plus Bund for protection of village Bamnauli.

14 SADHAURA HKB CIRCLE Providing 01 No. Stone Stud for 48th S 50.65 41.47 100 9.18 9.18 0.00 0.00 Work Completed JAGADHRI relanishment and 02 Nos. New % Completed Stone Studs and 950 ft. Stone Steining for the protection of village Kathgarh andRampur Gainda from river Somb.

15 SADHAURA HKB CIRCLE Laying of pipe line for disposal of 48th S 14.46 13.26 100 1.20 1.20 0.00 0.00 Work Completed JAGADHRI flood water to protect the Abadi % Completed Village Panjeto as well as protection of school.

16 SADHAURA HKB CIRCLE Constructing 1600 ft. Bund with 48th S 40.87 37.26 100 3.61 3.61 0.00 0.00 Work Completed JAGADHRI stone pitching for the protection % Completed of village Sadhaura from River Sadhaura (Nakti).

17 JAGADHRI HKB CIRCLE Scheme for providing 04 nos. 48th S 98.90 98.08 100 0.82 0.82 0.00 0.00 Work Completed JAGADHRI Stone Studs and 75 mtr. stone % Completed steining for the protection of village : Sandhala and Nagli from River Yamuna after Floods 2016.

18 YAMUNA HKB CIRCLE Construction of 8 No. stone studs 48th S 150.87 149.88 100 0.99 0.99 0.00 0.00 Work Completed NAGAR JAGADHRI for protection of abadi area % Completed /Agriculture Land from flood water of Yamuna River in Village Odri.

19 JAGADHRI HKB CIRCLE Construction of 09 no. Stone 48th M 215.78 214.23 100 1.55 1.55 0.00 0.00 Work Completed JAGADHRI Studs for the protection of village % Completed Unheri from River Yamuna.

District Total 814.49 792.13 22.36 22.36 0.00 0.00 PANIPAT 20 SAMALKHA YWS CIRCLE Agenda Note Protection of bridge 48th S 33.18 29.89 100 3.29 3.29 0.00 0.00 Work Completed KARNAL from scouring U/S and D/S side % Completed at RD 134800, 123187, 118800 and 100010 on Main drain No. 2

21 SAMALKHA YWS CIRCLE Protection of village abadi and 48th S 23.76 21.95 100 1.81 1.81 0.00 0.00 Work Completed KARNAL agriculture land of village % Completed Raslapur providing Stg. of weak bank on Main Drain No. 2 from RD 115400 to 116100

22 ISRANA YWS CIRCLE Protection of village pond, land 48th M 177.44 177.44 100 0.00 0.00 0.00 0.00 Work Completed KARNAL and abadi of village Seenk from % Completed. flood and waste water flowing in Seenk-Bahadurpur Link Drain by providing lining from RD 43600 to 47000

District Total 234.38 229.28 5.10 5.10 0.00 0.00 KARNAL 23 GHARAUNDA YWS CIRCLE Rehabilitation of Gharaunda 47th S 175.64 149.00 100 26.64 26.64 0.00 0.00 Work Completed KARNAL Ganda Nallah from RD 0-41500 % Completed (Including Pucca Structure) to protect the abadhi of Gharaunda Town, Village Malikpur, Sheikhpura , Kohand, Ganjbarh, Barolli and Budanpur, etc

77 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 24 GHARAUNDA YWS CIRCLE Providing Protection to Dakwala 48th S 49.70 49.70 100 0.00 0.00 0.00 0.00 Work Completed KARNAL Complex by repairing 4 Nos. old % Completed stone Studs on river Yamuna after flood 2016

25 GHARAUNDA YWS CIRCLE Providing Protection to Dakwala 48th S 68.48 67.48 100 0.10 0.10 0.00 0.00 Work Completed KARNAL Complex by constructing 600` % Completed revetment by geo-synthetic maerial on river Yamuna after Flood 2016.

26 GHARAUNDA YWS CIRCLE Providing protection to Sadarpur 48th S 205.70 205.70 100 0.00 0.00 0.00 0.00 Work Completed KARNAL Complex by constructing 1 No. % Completed new stone Studs and 600 feet revetment river Yamuna after flood 2016

27 GHARAUNDA YWS CIRCLE Constructing of inlet on Indri 48th S 47.16 40.40 100 6.76 6.76 0.00 0.00 Work Completed KARNAL Drain at RD 6100 (Village Munak) % Completed

District Total 546.68 512.28 33.50 33.50 0.00 0.00 Unit Total 5513.91 5341.36 147.96 147.96 0.00 0.00 YWS(S) SONIPAT 28 RAI YWS CIRCLE Construction of 2 no. permanent 47th S 34.00 0.00 0 % 34.00 34.00 0.00 0.00 WORK Completed SONEPAT pump houses in village Bidhlan COMPLETED

29 GANAUR YWS CIRCLE Providing protection works at 48th S 65.94 64.86 0 % 1.08 1.08 0.00 0.00 WORK Completed SONEPAT Bega Complex on River Yamuna COMPLETED after flood 2016 in Dist. Sonipat. 2 No. new stone studs and 380 ft. stone revetment and repair of 68 ft. stone revetment.

30 SAMALKHA YWS CIRCLE Providing protection works at 48th S 62.09 62.09 0 % 0.00 0.00 0.00 0.00 WORK Completed SONEPAT Raksera Complex on river COMPLETED Yamuna after flood 2016 in Dist. Panipat. 4 No. new stone studs.

District Total 162.03 126.95 35.08 35.08 0.00 0.00 FARIDABAD 31 FARIDABAD YWS CIRCLE Construction of 6 nos. stone 48th S 95.25 95.25 100 0.00 0.00 0.00 0.00 WORK Completed FARIDABAD studs between old existing stud % COMPLETED no. 9 to 15, on conventional pattern at Amipur River Complex to protect village abadi and its agricultural land of village Amipur R/C AF 2016.

District Total 95.25 95.25 0.00 0.00 0.00 0.00 PALWAL 32 PALWAL YWS CIRCLE Construction of 8 no. stone studs 48th S 150.47 148.52 0 % 0.01 0.01 0.00 0.00 WORK Completed FARIDABAD on conventional pattern to protect COMPLETED. agricultural land village Ghori River Complex on R/S of River Yamuna A/F 2016.

33 PALWAL YWS CIRCLE Construction Stone Edge 48th S 88.70 88.70 0 % 0.00 0.00 0.00 0.00 WORK Completed FARIDABAD protection 1000` steining near COMPLETED Sidth Baba Temple to protect village Abadi and its Agricultural land of village Kushak on R/S of River Yamuna A/F 2016.

34 HODAL YWS CIRCLE Construction Stone Edge 48th S 32.09 31.85 100 0.01 0.01 0.00 0.00 WORK Completed FARIDABAD protection 500` steining between % COMPLETED Old existing Studs to protect village Abadi and its Agricultural Land of village Maholi A/F 2016.

District Total 271.26 269.07 0.02 0.02 0.00 0.00 MEWAT 35 MEHAM YWS CIRCLE Cross regulator at R.D 35000 of 47th S 119.00 92.00 100 0.01 0.01 0.00 0.00 Work Completed FARIDABAD Nuh Drain % Completed

78 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 36 HATHIN YWS CIRCLE Constructing link Drain 46th S 43.16 26.11 100 0.01 0.01 0.00 0.00 WORK Completed FARIDABAD connecting low lying area of % COMPLETED. village Hassanpur, Uleta, Kanoli and Kherli-Jeeta alongwith pump house out falling at RD 6000 of outfall channel RD 90000 Gurgaon Canal. ((i). construction of 1 No. Pump house. (ii). Laying of 4’ Ft. dia pipe in 750 Ft. length. (iii). 1000 Ft. length Cement concrete lining and Earth work). ( In supplementary Agenda)

District Total 162.16 118.11 0.02 0.02 0.00 0.00 Unit Total 690.70 609.38 35.12 35.12 0.00 0.00 BWS AMBALA 37 NARAINGARH SYL CIRCLE Constructing 3 No. two tier stone 48th S 8.76 6.83 100 1.93 1.93 0.00 0.00 WORK Completed AMBALA studs for protection of agriculture % COMPLETED land of village Manglour from river Begna

38 NARAINGARH SYL CIRCLE Constructing 4 No. two tier stone 48th S 17.94 11.85 100 6.09 6.09 0.00 0.00 WORK Completed AMBALA studs for protection of agriculture % COMPLETED. land of village Dehar from river Markanda

39 NARAINGARH SYL CIRCLE Constructing 200 feet long two 48th S 10.43 7.74 100 2.69 2.69 0.00 0.00 WORK Completed AMBALA tire stone steining for the % COMPLETED protection of Agricultural land of village Badagarh from river Begna

40 NARAINGARH SYL CIRCLE Constructing 3 No. three tire 48th S 11.25 8.90 100 2.35 2.35 0.00 0.00 WORK Completed AMBALA stone studs for the protection of % COMPLETED Agricultural land of village Ambli from river Markanda.

41 NARAINGARH SYL CIRCLE Constructing 200 feet long two 48th S 10.41 8.11 100 2.30 2.30 0.00 0.00 WORK Completed AMBALA tire stone steining for the % COMPLETED protection of Agricultural land of village Nagawan from river Begna

42 MULLANA SYL CIRCLE Constructing 250 feet long two 48th S 13.34 11.48 100 1.86 1.86 0.00 0.00 WORK Completed AMBALA tire stone steining for the % COMPLETED protection of Agricultural land of village Rolanheri from river Markanda

43 MULLANA SYL CIRCLE 250 feet long two tire stone 48th S 22.00 22.00 100 0.00 0.00 0.00 0.00 WORK Completed AMBALA steining for the protection of % COMPLETED Khera Paplotha bund from river Markanda

44 AMBALA SYL CIRCLE Providing 446 feet two tire stone 48th S 23.32 23.48 100 0.00 0.00 0.00 0.00 WORK Completed CANTT. AMBALA steining along Babyal bund % COMPLETED between RD 3950 to 4398 for the protection of Bund and abadi of residential Colony of Lucky Nagar Mahesh Nagar etc. from river Tangri .

45 NARAINGARH SYL CIRCLE Constg. 216 feet long two tire 48th S 11.23 9.39 100 1.84 1.84 0.00 0.00 WORK Completed AMBALA stone steining near RD 12600 for % COMPLETED the protection of old Gazipur Bund from river Tangri

46 AMBALA CITY SYL CIRCLE Constructing 240 feet long three 48th S 28.66 28.20 100 0.46 0.46 0.00 0.00 WORK Completed AMBALA tire stone stenining for the % COMPLETED protection of LMB Tangri D/S Nr. Br. At RD 30500 to 30740 from river Tangri village Bhunni

District Total 157.34 137.98 19.52 19.52 0.00 0.00 PANCHKULA

79 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 47 KALKA SYL CIRCLE Scheme for constructing 384 ft 48th S 3.77 3.15 100 0.62 0.62 0.00 0.00 WORK Completed AMBALA (288ft plus 96ft) single tier % COMPLETED steining for the protection of village abadi and agriculture land of village Rajjipur river Jhajjra after flood 2016.

48 KALKA SYL CIRCLE Scheme for constructing 248 ft 48th S 10.79 9.85 100 0.94 0.94 0.00 0.00 WORK Completed AMBALA double tier steining for the % COMPLETED protection of Gurudwara Manakpur near village Surajpur from river Jhajjra after flood 2016.

49 KALKA SYL CIRCLE Scheme for constructing 264ft 48th S 11.59 9.63 100 1.96 1.96 0.00 0.00 WORK Completed AMBALA double tier steining for the % COMPLETED protection of village abadi of village Bhairon ki Sair river Jhajjra after flood 2016.

50 KALKA SYL CIRCLE Scheme for constructing 256 ft 48th S 12.91 10.52 100 2.39 2.39 0.00 0.00 WORK Completed AMBALA double tier steining for the % COMPLETED protection of village path between village Kiratpur and village Paploha from river Bargodam after flood 2016.

51 KALKA SYL CIRCLE Scheme for constructing 296ft 48th S 13.01 12.19 100 0.82 0.82 0.00 0.00 WORK Completed AMBALA (192 plus 104) double tier % COMPLETED steining for the protection of village abadi and road of village Ber Ghati from Ber Ghati river after flood 2016.

52 PANCHKULA SYL CIRCLE Scheme for constructing 1544 ft 48th S 14.48 13.13 100 1.35 1.35 0.00 0.00 WORK Completed AMBALA (600 plus 128 plus 120 plus 120 % COMPLETED plus 152 plus 424) single tier steining for the protection of village path of village Chowki from Chowki wali nadi tributary of river Ghaggar after flood 2016.

53 PANCHKULA SYL CIRCLE Scheme for constructing 280ft 48th S 13.12 11.12 100 2.00 2.00 0.00 0.00 WORK Completed AMBALA (120 plus 80 plus 80) double tier % COMPLETED steining for the protection of village abadi of village Bunga and agriculture land from Bunga wali nadi tributary of river Tangri after flood 2016.

54 KALKA SYL CIRCLE Scheme for constructing 192ft 48th S 5.40 4.32 100 1.08 1.08 0.00 0.00 WORK Completed AMBALA (120 plus 72) double tier steining % COMPLETED for the protection of village abadi of village Bharauli from Talan wali nadi tributary of river Tangri after flood 2016.

55 KALKA SYL CIRCLE Scheme for constructing 5 Nos. 48th S 13.53 10.66 100 2.87 2.87 0.00 0.00 WORK Completed AMBALA crated bed bars (Double tier) for % COMPLETED the protection of agriculture land of village Rampur and Gurudwara and School from river Dangri tributary of river Tangri after flood 2016.

56 KALKA SYL CIRCLE Scheme for constructing 256 ft 48th S 21.59 17.00 100 4.59 4.59 0.00 0.00 WORK Completed AMBALA three tier steining for the % COMPLETED protection of Narayanpur Bundh and village abadi of village Narayanpur from Masoompur wali nadi tributary of river Tangri after flood 2016.

80 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 57 KALKA SYL CIRCLE Scheme for constructing 4 Nos. 48th S 13.51 12.88 100 0.62 0.62 0.00 0.00 WORK Completed AMBALA crated bed bars (Double tier) for % COMPLETED the protection of agriculture land, abadi of village Jaspur and main road from Raipur Rani to Ambala from river Tangri after flood 2016.

58 PANCHKULA SYL CIRCLE Scheme for constructing 752 ft 48th S 35.36 32.87 100 2.49 2.49 0.00 0.00 WORK Completed AMBALA double tier steining for the % COMPLETED protection of village abadi of village Asrewali from Asrewali nadi tributary of river Tangri after flood 2016.

59 KALKA SYL CIRCLE Constructing 304 ft. double tier 48th S 13.36 12.52 100 0.84 0.84 0.00 0.00 WORK Completed AMBALA steining for the protection of % COMPLETED village abadi of village Tibbi (Banjara Basti) from Bhorian wali nadi after flood 2016.

60 PANCHKULA SYL CIRCLE Constructing 05 no. crated bed 48th S 21.66 14.49 100 7.17 7.17 0.00 0.00 WORK Completed AMBALA bars (double tier), 300 ft. single % COMPLETED tier steining and 176 ft. double tier steining for the protectio of Tower line of HVPNL from river Tangri near village Naggal.

61 KALKA SYL CIRCLE Constructing 120 ft. double tier 48th S 5.27 4.88 100 0.39 0.39 0.00 0.00 WORK Completed AMBALA steining for the protection of % COMPLETED village abadi of village Chikkan from Chikkan Choe after flood 2016.

District Total 209.35 179.21 30.13 30.13 0.00 0.00 KURUKSHETRA 62 PEHOWA SYL CIRCLE constructing drain by means of 43th M 1164.00 1149.28 100 13.72 13.72 0.00 0.00 Work Completed AMBALA underground pipeline (1.3 km), % Completed. RCC trough (3 km) and open drain (4 km) for protection of village abadis and agriculture land of villages Ismailabad, Thaska Miranji, Babakpur, Rohti, Nurpur Buchi, Majri, Tabra etc from storm water and floods of River Markanda.

District Total 1164.00 1149.28 13.72 13.72 0.00 0.00 KAITHAL 63 PUNDRI BWS CIRCLE Procurement of requirement of 47th M 13.96 0.00 100 13.96 7.96 6.00 0.00 Tenders Completed KAITHAL Vertical Electric pumps (2 Nos. 5 % approved for Cs. and 1 No. 10 Cs.) and procurement construction of pump house in of pumps and Village Jadola, Teek and Barot inspection of for dewatering of flood water. pumps done 29.09.2017.

64 GUHLA BWS CIRCLE Scheme for providing stone 48th S 85.51 75.98 100 0.01 0.01 0.00 0.00 WORK Completed KAITHAL pitching in left side and right side % COMPLETED. of D/S bridge RD 140000 of Budget Ghaggar River from to available Patiala road for protection of during 2017- bridge and village Tatiana and 18. Khambera in a length of 232 ft. each bank.

65 GUHLA BWS CIRCLE Excavation of siltted earth from 48th S 15.34 5.00 100 0.01 0.01 0.00 0.00 WORK Completed KAITHAL the bed of Para River and % COMPLETED. Saraswati Drain in a length of Budget 3600` near village Chakku. available during 2017- 18.

66 GUHLA BWS CIRCLE Scheme for bringing to design 48th S 57.57 57.57 100 3.12 3.12 0.00 0.00 WORK Completed KAITHAL section of Ghaggar bund from % COMPLETED RD 91900- 110000 for protection of village Bhatian, Hemu Majra, Seon Majra and Daban Kheri.

81 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 67 GUHLA BWS CIRCLE Scheme for bringing to design 48th S 14.25 12.07 100 2.18 2.18 0.00 0.00 WORK Completed KAITHAL section of Ghaggar bund from % COMPLETED RD 112000 to 117000 for protection of village Bhatian, Seon Majra, Daban Kheri, Bubakpur and Lalpura etc.

68 KALAYAT BWS CIRCLE Scheme for re-construction of 48th S 10.74 9.83 100 0.91 0.91 0.00 0.00 WORK Completed KAITHAL D.R. bridge at RD 19050 Dubbal % COMPLETED Drain X-ing Kalayat – Datasinghwala road.

District Total 197.37 160.45 20.19 14.19 6.00 0.00 HISAR 69 HISSAR BWS CIRCLE Construction Sumpwell and 48th S 4.07 2.14 100 0.00 0.00 0.00 0.00 WORK Completed HISAR Chowkidar Hut for VT Pumps at % COMPLETED RD 6100-L Saraud Dy.

70 HISSAR BWS CIRCLE Construction fo sump wells and 48th S 21.40 21.40 100 2.00 2.00 0.00 0.00 WORK Completed HISAR Chowkidar Hut for VT pump at % COMPLETED various sites in Hansi Water Services Division, Hisar.

District Total 25.47 23.54 2.00 2.00 0.00 0.00 FATEHABAD 71 RATIA BWS CIRCLE Providing protection and filling the 48th S 55.35 41.60 100 4.00 4.00 0.00 0.00 Work Completed FATEHABAD scoured bed D/S bridge at RD % Completed 6936 Rangoi Diversion.

72 TOHANA BWS CIRCLE Constructing pipeline drain for 48th S 46.91 39.91 100 1.00 1.00 0.00 0.00 WORK Completed FATEHABAD dewatering of flood water of % COMPLETED. village Shakkerpura, Dher and Khanakhera falling in Rangoi Nallah at RD 6.35 KM right and left side

District Total 102.26 81.51 5.00 5.00 0.00 0.00 SIRSA 73 SIRSA BWS CIRCLE Internal Clearance of Hisar 48th S 103.81 56.74 100 47.07 47.07 0.00 0.00 WORK Completed SIRSA Ghaggar Multipurpose Drain from % COMPLETED RD 0 to 141000

74 SIRSA BWS CIRCLE Internal Clearance of Rori 48th S 31.52 7.92 100 23.60 23.60 0.00 0.00 WORK Completed SIRSA Ghaggar Multipurpose Drain in % COMPLETED reach RD 100000 to 130750 Tail.

75 KALANWALI BWS CIRCLE Draining out the standing rain 45th M 18.83 7.77 100 11.06 6.06 5.00 0.00 WORK Completed SIRSA water of village Kusla (Pb) and % COMPLETED village Surtia (Haryana) disposal in to Rori Ghaggar Drain. (45th)

District Total 154.16 72.43 81.73 76.73 5.00 0.00 Unit Total 2009.95 1804.40 172.29 161.29 11.00 0.00 LCU ROHTAK 76 ROHTAK YWS CIRCLE Constructing Pump House at RD 48th S 16.00 0.00 100 16.00 16.00 0.00 0.00 work Completed ROHTAK 43120/L Kahanaur Disty. of Chiri % completed Pump House Link Drain.

77 GARHI YWS CIRCLE Consttructing of retaining wall of 48th S 50.00 45.65 100 4.35 4.35 0.00 0.00 Work Completed SAMPLA - ROHTAK drain adjoining to Harijhan Basti % completed. KALOI at village Assan.

78 BARODA YWS CIRCLE Construction of bridge on drain 48th S 14.20 12.43 100 0.01 0.01 0.00 0.00 work Completed ROHTAK falling in the way of village % completed. Gangana to Bhambhewa.

District Total 80.20 58.08 20.36 20.36 0.00 0.00 JHAJJAR 79 JHAJJAR JWS CIRCLE Desilting of outfall drain no. 8 47th S 591.54 483.15 100 108.39 108.39 0.00 0.00 Work Completed JHAJJAR from KM 0 to 42.590 and % Completed. construction of humps for reacharging of the area from flood water.

82 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 80 JHAJJAR JWS CIRCLE Desilting of drain no. 8 from RD 47th S 366.23 218.28 100 147.95 147.95 0.00 0.00 Work Completed JHAJJAR 202000 to 209000 and RD % Completed 215500 to RD 275000 and Bhindawas Link Drain from RD 0 to 19945.

81 JHAJJAR JWS CIRCLE Construction of Slab Culvert at 48th S 15.00 4.71 100 10.29 10.29 0.00 0.00 Work Completed JHAJJAR KM 0.200 of Pelpa Link Drain. % Completed.

82 JHAJJAR JWS CIRCLE Constructing of V.R Bridge at KM 48th M 300.00 93.02 100 206.98 156.00 50.98 0.00 WORK Completed JHAJJAR 77.550 pf drain no. 8. % COMPLETED

District Total 1272.77 799.16 473.61 422.63 50.98 0.00 MAHENDRAGARH 83 NANGAL JLN WS Purchase of 2 no. new Pick 48th S 20.00 12.00 100 20.00 20.00 0.00 0.00 Pick up JEEP Completed CHOUDHRY CIRCLE Up/Trucks under JLN Circle, % has been NARNAUL Narnaul. delivered and other vehicle will be delivered by 20.03.2018.

District Total 20.00 12.00 20.00 20.00 0.00 0.00 Unit Total 1372.97 869.24 513.97 462.99 50.98 0.00 PROJECT, ENVIRONMENT BHIWANI 84 DADRI WORKSHOP Purchase of flood dewatering 42th M 377.00 251.57 100 185.20 100.00 85.20 0.00 SE/LWS Completed CIRCLE machinery % Circle, Bhiwani KARNAL has intimated on 08/03/2018 that all the flood pumps with accessories (20 No. 5cs. -_ 23 No. 10Cs. and 08 No. of 20Cs.) have been purchased. A sum of Rs. 251.57 lacs have been incurred. The work is completed now.

District Total 377.00 251.57 185.20 100.00 85.20 0.00 KARNAL 85 NILOKHERI WORKSHOP Purchase of one no.machine 47th S 65.00 54.55 100 65.00 65.00 0.00 0.00 As per copy of Completed CIRCLE chain mounted Poccklain % approved KARNAL estimate collected from office of S.E/YWS Circle, Karnal that estimate for procurement of machinery on actual basis has been approved by C.E/ YWS (N) L. No. 6305/5YWS dated 7/12/2017. A sum of Rs. 54.55 lacs incurred against estimated cost of Rs. 65.00 lacs. Work is completed

83 (Rs. in lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 86 PUNDRI WORKSHOP Procurement of vertical electric 47th S 59.19 58.60 100 4.20 4.20 0.00 0.00 WORK Completed CIRCLE pumps (10 Nos. 10 Cs.) for % COMPLETED KARNAL dewatering of flood water in Habri and a sum of Village at RD. 84000-R Habri Sub Rs. 58.60 lacs Branch in District Kaithal. against budget provision of Rs. 59.19 lacs incurred for the completion of work as reported vide S.E/ BWS Circle, Kaithal L. No. 184/132- WP dated 10/01/2018

87 KAITHAL WORKSHOP Procurement of new tracked 47th S 55.00 53.80 100 55.00 55.00 0.00 0.00 Works Completed CIRCLE excavator for internal clearance % completed and KARNAL of drain in BWS Circle, Kaithal a sum of Rs. 53.80 lacs incurred for procurement of machinery as reported vide S.E/BWS Kaithal L. No/. 184/32-WP dated 10.01.2018

88 ROHTAK WORKSHOP Supply, Erection and 47th S 28.00 16.00 100 16.00 16.00 0.00 0.00 As reported by Completed CIRCLE Commissioning of 2 No. EOT % S.E/ YWS KARNAL cranes of 5 Ton capacity in newly Circle, Rohtak constructed workshop/store at through mail Delhi by pass Rohtak and 1 No. dated Manual jib crane in W.S. Mech. 11/01/2018 Division, Rohtak. that the WORK has been COMPLETED.

District Total 207.19 182.95 140.20 140.20 0.00 0.00 Unit Total 584.19 434.52 325.40 240.20 85.20 0.00 Grand Total 10171.72 9058.90 1194.74 1047.56 147.18 0.00

84 TABLE-5C Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 48th meeting of HSDR & FCB

Head:Flood Protection Works Status: Dropped (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 YWS(N) JIND 1 SAFIDON YWS CIRCLE Constg. Tito Kheri Link Drain 45th M 21.92 0.00 0 % 0.00 0.00 0.00 0.00 Schemes to be Dropped JIND from RD 0 to 2150 O/F into Tito dropped as land Kheri Drain at RD 5000/L. acquisition is involved.

2 SAFIDON YWS CIRCLE Construction of 2 no. bridges on 48th M 37.69 0.00 0 % 0.00 0.00 0.00 0.00 Scheme to be Dropped JIND Hadwa Gangoli Link Drain and dropped due to Padana Drain including 01 no. construction of out of pump house at tail RD norm bridge. Bhagkhera link drain.

3 JULANA YWS CIRCLE Constg. Poli Link Drain from RD 45th L 38.84 0.00 0 % 0.00 0.00 0.00 0.00 No land owner is Dropped JIND 0 to 6500 Tail, out falling at RD ready to give land 46000/R Bhiwani Sub Branch hence scheme is to be dropped.

4 JULANA YWS CIRCLE Constg. Shamlo Link Drain from 45th L 105.47 0.00 0 % 0.00 0.00 0.00 0.00 No land owner is Dropped JIND RD 0 to 6160 Tail out falling at ready to give land RD 9450/L Padana Drain hence scheme is to be dropped.

District Total 203.92 0.00 0.00 0.00 0.00 0.00 YAMUNANAGAR 5 SADHAURA HKB CIRCLE Protection of foot bridge near 48th S 14.75 0.00 0 % 0.00 0.00 0.00 0.00 The scheme is Dropped JAGADHRI Adi Badri Mandir by providing proposed to be Cement Conc. and stone dropped as the boulders with crates. footbridge has been declared unsafe by the NIT Kurukshetra and WAPCOS.

6 SADHAURA HKB CIRCLE Constructing 2000 ft. bund with 48th S 58.35 0.00 0 % 0.00 0.00 0.00 0.00 Scheme to be Dropped JAGADHRI the stone pitching U/S of dropped as Khannuwala bridge R/S for Panchayat protection of village Malikpur Department refused to Bangar. give their land.

7 SADHAURA HKB CIRCLE Construction of 200 mtr 48th M 469.00 0.00 0 % 0.00 0.00 0.00 0.00 The scheme is Dropped JAGADHRI retaining wall for protection of proposed to be Adi Badri Temple and Road dropped as the (Left and Right Side). footbridge has been declared unsafe by the NIT Kurukshetra and WAPCOS.

District Total 542.10 0.00 0.00 0.00 0.00 0.00 Unit Total 746.02 0.00 0.00 0.00 0.00 0.00 YWS(S) PALWAL 8 PALWAL YWS CIRCLE Constructing ring bund for 45th S 346.27 180.77 90 % 0.00 0.00 0.00 0.00 Scheme to be Dropped FARIDABAD providing protection to village dropped due to non Mewalipur connecting to village availability of land. Mustaffabad (Khatka) on the R/Side of river Yamuna

District Total 346.27 180.77 0.00 0.00 0.00 0.00 Unit Total 346.27 180.77 0.00 0.00 0.00 0.00 BWS AMBALA 9 MULLANA SYL CIRCLE Scheme for extension of LMB 46th L 0.00 0.00 0 % 0.00 0.00 0.00 0.00 DROPPED BY Dropped AMBALA Markanda upstream Ambala- GOVT. AS Saharanpur Railway line from SHAREHOLDERS RD 13820 to 21420 for the DEMANDED HUGE protection of village Hema Majri, COMPENSATION. Ghallary, Sohana on river Markanda. (CM announcment)

District Total 0.00 0.00 0.00 0.00 0.00 0.00 HISAR 10 HANSI BWS CIRCLE Constructing Sheikhpura Field 47th L 150.00 0.00 0 % 0.00 0.00 0.00 0.00 ALIGNMENT UNDER Dropped HISAR Link Drain from RD 0 to 6000, PREPARATION.FAR outfall at RD 5000-L, Kumbha MERS HOWEVER Drain. NOT READY TO GIVE LAND.

District Total 150.00 0.00 0.00 0.00 0.00 0.00 FATEHABAD

85 (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 11 FATEHABAD BWS CIRCLE Constructiong/providing 48th M 46.80 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped. New Dropped FATEHABAD underground pipeline in agenda with the Matkana Drain from RD 5100- consent of NPCIL 12100. Authorities will be submitted in next season.

District Total 46.80 0.00 0.00 0.00 0.00 0.00 Unit Total 196.80 0.00 0.00 0.00 0.00 0.00 LCU BHIWANI 12 DADRI LWS CIRCLE Constructing of Khatiwas Drain 42th L 61.00 0.00 0 % 0.00 0.00 0.00 0.00 No flood like situation Dropped BHIWANI RD 0 to 3750 outfalling at RD observed after 2013 81300-L Loharu Feeder. hence Proposed to be Dropped

District Total 61.00 0.00 0.00 0.00 0.00 0.00 ROHTAK 13 GOHANA YWS CIRCLE Restoring the banks of Tributary 48th S 33.47 0.00 0 % 0.00 0.00 0.00 0.00 May be dropped as Dropped ROHTAK drain no. 4 for separating village tenders were invited 4 ponds at various locations. times but no agency quoted the rates.

14 MEHAM YWS CIRCLE Construction Nindana 45th M 76.83 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK Mohamadpur Link Drain No.2 land acquisition. from RD 0 to 6500 outfalling into Meham drain at RD 122000- L

15 MEHAM YWS CIRCLE Renovating of Madina link drain 45th M 28.12 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK RD 0 to 3000 land acquisition.

16 GARHI YWS CIRCLE Constg. Bhaiyapur link drain RD 43th L 174.50 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped SAMPLA - ROHTAK 0 to 14000 land acquisition. KALOI 17 KALANAUR YWS CIRCLE Constg. Sunari pump house link 43th L 88.00 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK drain RD 0 to 3560. land acquisition.

18 BARODA YWS CIRCLE Constg. Chhapra link drain RD 43th L 27.57 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK 0 to 3785 land acquisition.

19 MEHAM YWS CIRCLE Constg. Bhagwati Pur Link 43th L 31.29 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK Drain No 1 RD 0 to 2380). land acquisition.

20 KALANAUR YWS CIRCLE Extension of Baniyani link drain 43th L 148.50 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK from RD 12600 to 19640 and land acquisition. Constg. Baniyani sub link drain No. 1 RD 0 to 48950.

21 KALANAUR YWS CIRCLE Constructing Chuliana link drain 43th L 102.60 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK from RD 0 to 11000 out falling land acquisition. at RD 112500-L KCB Drain

22 KALANAUR YWS CIRCLE Contg. Anwal link drain from RD 44th L 75.00 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK 0 to 8850 outfalling into Meham land acquisition. drain at RD 16500-Left.

23 KALANAUR YWS CIRCLE Constructing Lahli link drain 44th L 64.00 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK from RD 0 to 7000 out falling land acquisition. into Lakhan Majra link drain at RD 6000-Left

24 KALANAUR YWS CIRCLE Constructing Sundana pump 44th L 12.39 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK house link drain from RD 0 to land acquisition. 1200 outfalling into Barra pond of village Sundana.

25 KALANAUR YWS CIRCLE Extension of Karontha link drain 44th L 7.30 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK from RD 16350 to 17186. land acquisition.

26 GOHANA YWS CIRCLE Construction of Jagsi field drain 44th L 22.57 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK RD. 0-2700 O/F at RD. land acquisition. 18200/R Sink Bahadurpur Drain. (44th)

27 GARHI YWS CIRCLE Constg. Polangi link drain RD 0 43th L 60.80 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped SAMPLA - ROHTAK to 5400 (43rd) land acquisition. KALOI 28 GARHI YWS CIRCLE Constructing Kansala link drain 43th L 38.00 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped SAMPLA - ROHTAK from RD 0 to 3250 out falling land acquisition. KALOI into Assan link drain at RD 12500-L (43rd)

86 (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 29 GARHI YWS CIRCLE Constg. Rithal Phogat sub link 43th L 45.50 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped SAMPLA - ROHTAK drain from RD 0 to 3800. (43rd) land acquisition. KALOI

30 MEHAM YWS CIRCLE Consg. Mokhra link drain RD 0 43th L 26.12 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK to 3000 outfalling in to Meham land acquisition. drain at RD 43000-L (43rd)

31 GARHI YWS CIRCLE Constg. Kahni sub link drain No. 44th L 28.20 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped SAMPLA - ROHTAK 3 from RD 0 to 3150 outfalling land acquisition. KALOI at RD 11710-L Kahni link drain

32 GARHI YWS CIRCLE Consg. Mundhak sub link drain 44th L 24.26 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped SAMPLA - ROHTAK No. 2 from RD 0 to 3000 land acquisition. KALOI outfalling in to Rithal kiloi Mundhak link drain at RD 6500- R

33 GARHI YWS CIRCLE Constg. Gorar pump house link 43th L 40.45 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped SAMPLA - ROHTAK drain from RD 0 to 2200 land acquisition. KALOI outfalling into Jasrana minor at RD 40675-R

34 KALANAUR YWS CIRCLE Constg. Baland Pump house 44th L 39.25 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK link drain No. 1 from RD 0 to land acquisition. 4000 outfaling into Balland Pipe link drain at RD 2650-Tail. (44th)

35 KALANAUR YWS CIRCLE Constg. Ismaila link drain 9-B 44th L 76.00 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK RD 0 to 5700 outfaling at RD land acquisition. 20500-R Gandhra drain.

36 GARHI YWS CIRCLE Constg. Pakasma link drain 44th L 22.74 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped SAMPLA - ROHTAK from RD 0 to 2860 outfalling in land acquisition. KALOI to Pakasma drain RD 76650-R (44th)

37 KALANAUR YWS CIRCLE Constg. Baland Pump house 44th L 49.72 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK link drain No. 2 from RD 0 to land acquisition. 2000 outfalling into Jhajjar Sub Branch at RD 38800-L.

38 GARHI YWS CIRCLE Rurkee Sub Link Drain from 45th L 51.00 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped SAMPLA - ROHTAK RD 0 to 4060 outfalling in to land acquisition. KALOI Kiloi Link Drain at RD 18600- Right.

39 GARHI YWS CIRCLE Extension of Atail Link Drain 45th L 88.15 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped SAMPLA - ROHTAK from RD 7600 to 15300 out land acquisition. KALOI falling into Pakasma Link Drain at RD 54760-R.

40 KALANAUR YWS CIRCLE Constructing Gudhan link Drain 45th L 74.00 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK from RD 0 to 8260 out falling land acquisition. into 1-L Katesra Minor at RD 5800-Left.

41 KALANAUR YWS CIRCLE Constructing Extension of 45th L 147.50 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK Kahnaur Link Drain from RD land acquisition. 3000 to 3660 outfalling into Drain No. 8 at RD 181000-L and Constructing Kahnaur Link Drain No. 2 from RD 0 to 7700 outfalling into Drain No. 8 at RD 183300-R

42 KALANAUR YWS CIRCLE Constructing Karontha link 45th L 85.24 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK drain No. 1 from RD 0 to 7000 land acquisition. outfalling into KCB Drain at RD 126500-Right

43 GOHANA YWS CIRCLE Constructing proposed katwal 45th L 63.64 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK link drain from RD 0-4000 land acquisition. outfalling at RD 11900 -R Dubhetta Drain

44 ROHTAK YWS CIRCLE Brick pitching of Kiloi pump 45th L 116.40 0.00 0 % 0.00 0.00 0.00 0.00 Dropping case Dropped ROHTAK House link drain from RD 0- submitted to CE/LCU 3750 vide this office No. 1372 dated 45 KALANAUR YWS CIRCLE Const. Baland Pump House at 45th L 108.47 0.00 0 % 0.00 0.00 0.00 0.00 To26.06.2017 be dropped due to Dropped ROHTAK RD 0 to 6000 outfall Jhajjar Sub land acquisition. Branch 22150-L

87 (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 46 MEHAM YWS CIRCLE Const. Ajaib Baharn diversion 45th L 209.00 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK drain from Rd 0 to 14500 land acquisition. outfalling into Meham Drain at RD 104800-L

47 BARODA YWS CIRCLE Const. Gharwal Sub Link Drain 45th L 170.00 0.00 0 % 170.00 40.00 65.00 65.00 To be dropped due to Dropped ROHTAK from RD 0 to 8000 outfalling Land acquisition into Gharwal Link Drain

48 GARHI YWS CIRCLE Agenda noer for const. Rohad 45th L 108.41 0.00 0 % 108.41 28.41 40.00 40.00 To be dropped due to Dropped SAMPLA - ROHTAK Kharhar Link Drain from RD 0to land acquisition KALOI 8000 outfalling at RD 28150-L Meham Linl Drain

49 BARODA YWS CIRCLE Agenda note for Nuran Khara 45th L 62.96 0.00 0 % 62.96 12.96 25.00 25.00 To be dropped due to Dropped ROHTAK Link Drain from RD 0 to 6500 land acquisition outfalling at RD 65500 charra Drain.

50 MEHAM YWS CIRCLE Agenda note for const. 45th L 45.50 0.00 0 % 45.50 10.50 15.00 20.00 To be dropped due to Dropped ROHTAK Bahuakbarpur link drain pipe land acquisition line from Rd 0 to 990 outfall into Khanaura Disty

51 GARHI YWS CIRCLE Const. Sanghi link drain from 45th L 32.00 0.00 0 % 32.00 12.00 10.00 10.00 To be dropped due to Dropped SAMPLA - ROHTAK Rd 0 to 3000 outfalling into land acquisition KALOI Khidwali Link Drain at Rd 24500- L

52 KALANAUR YWS CIRCLE Const. Sudana Link Drain from 45th L 41.51 0.00 0 % 41.51 11.51 15.00 15.00 To be dropped due to Dropped ROHTAK Rd 0 to 5800 outfalling into land acquisition Drain No. 8 at Rd 203360-L

53 GARHI YWS CIRCLE Constructing Polangi Mungan 44th L 436.00 0.00 0 % 436.00 136.00 150.00 150.00 To be dropped due to Dropped SAMPLA - ROHTAK link drain from RD 0 to 31000 land acquisition KALOI outfalling into West Jua drain at RD 102000-R (44th)

54 KALANAUR YWS CIRCLE Const. Bhali anandpur link drain 42th L 90.09 0.00 0 % 90.09 20.09 35.00 35.00 To be dropped due to Dropped ROHTAK from RD 0 to 10000 outfalling land acquisition into Drain No. 8 RD 128000-R

55 KALANAUR YWS CIRCLE Constg. Sudana link 44th L 216.16 0.00 0 % 216.16 36.16 90.00 90.00 To be dropped due to Dropped ROHTAK drain from RD 0 to 16200 land acquisition outfalling into drain no. 8 at RD 201000-L (44th)

56 KALANAUR YWS CIRCLE Constructing Bhambewa link 44th L 186.85 0.00 0 % 186.85 36.85 75.00 75.00 To be dropped due to Dropped ROHTAK drain from RD 0 to 12200 land acquisition outfalling into KCB Drain at RD 126800-L (44th)

57 GARHI YWS CIRCLE Constg. New Bhalaut link drain 43th L 150.00 0.00 0 % 150.00 30.00 60.00 60.00 To be dropped due to Dropped SAMPLA - ROHTAK RD 0 to 11750 (43rd) land acquisition KALOI 58 BAHADURGA YWS CIRCLE Constructing New Kherman link 43th L 170.00 0.00 0 % 170.00 30.00 70.00 70.00 To be dropped due to Dropped RH ROHTAK drain RD 0 to 12000 (43rd) land acquisition

59 BAHADURGA YWS CIRCLE Constg. Mandothi Sarai 44th L 728.57 0.00 0 % 728.57 128.57 300.00 300.00 To be dropped due to Dropped RH ROHTAK Aurangabad link drain K.M. 0 to land acquisition 6.62 outfalling into Sarai Aurangabad link drain at K.M. 7.01-R. (44th)

60 MEHAM YWS CIRCLE Constructing Madina Gindhran 45th L 146.00 0.00 0 % 146.00 46.00 50.00 50.00 To be dropped due to Dropped ROHTAK Link Drain from RD 0 to 15000 land acquisition out falling into Lakhan Majra Link Drain at RD 32630-Right including P.H. of village Chiri on Chiri at RD 31000- Right of Kahanaur Disty on Chiri Dhanana Pump House Link Drain.

61 GARHI YWS CIRCLE Construction of Rithal link Drain 45th L 22.00 0.00 0 % 22.00 12.00 10.00 0.00 To be dropped due to Dropped SAMPLA - ROHTAK from RD 0 to 2600 out falling at land acquisition KALOI RD 93100-Right Ditch Drain along JLN Feeder adjoining to pump house at RD 93500.

88 (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 62 MEHAM YWS CIRCLE Constructing Pump 45th L 165.50 0.00 0 % 165.50 35.50 65.00 65.00 To be dropped due to Dropped ROHTAK House Link Drain from RD 0 to land acquisition 10000 out falling at RD 11300- Right of Farmana Link Drain.

63 BARODA YWS CIRCLE Constructing Dhanana link drain 45th L 193.55 0.00 0 % 193.55 43.55 75.00 75.00 To be dropped due to Dropped ROHTAK RD 0 to 7100 outfalling at RD land acquisition 28300-L Bhiwani Sub Branch.

64 GOHANA YWS CIRCLE Construction of proposed 45th L 164.30 0.00 0 % 164.30 34.30 65.00 65.00 To be dropped due to Dropped ROHTAK Sikenderpur Majra link drain land acquisition and from RD 0 to 7200 of outfall at dropping case RD 4350-R Ditch Drain along submitted to CE/LCU JLN Feeder. vide this office No. 1473 dated 65 BERI YWS CIRCLE Constructing Dighal Link Drain 45th L 57.50 0.00 0 % 57.50 27.50 30.00 0.00 To07.07.2017. be dropped due to Dropped ROHTAK No. 1 from RD 0 to 2000 land acquisition outfalling into Dighal Link Drain at RD 21400-L

66 BERI YWS CIRCLE Extension of Madana Link Drain 45th L 35.25 0.00 0 % 35.25 15.25 20.00 0.00 To be dropped due to Dropped ROHTAK from RD 17100 to 18926 land acquisition outfalling into Dhandlan Link Drain at RD 15000-R

67 GARHI YWS CIRCLE Extension of Bhalaut linik drain 45th L 31.05 0.00 0 % 31.05 11.05 20.00 0.00 To be dropped due to Dropped SAMPLA - ROHTAK from RD 12500 to 15800 land acquisition KALOI outfalling into Paksma drain at RD 77500

68 MEHAM YWS CIRCLE Agenda Note for const. Madina 45th L 496.00 0.00 0 % 496.00 146.00 175.00 175.00 To be dropped due to Dropped ROHTAK Korsan Link Drian From RD 0 land acquisition to 24000 outfalling into Madina Gindharan link Darin at RD 13200-L and const. Madina Korsan sub link drain (1) from RD 0 to 2420 outfalling Madina Korsan Link drain at RD 22600- R

69 KALANAUR YWS CIRCLE Agenda note for const. Barsan 45th L 201.00 0.00 0 % 75.00 0.00 0.00 75.00 To be dropped due to Dropped ROHTAK Link drain from Rd 0to 15900 land acquisition outfalling into Meham Drain at Rd 40500-R

District Total 6236.78 0.00 3824.20 904.20 1460.00 1460.00 JHAJJAR 70 JHAJJAR YWS CIRCLE Const. of Mattan Link drain from 46th S 115.00 0.00 0 % 0.00 0.00 0.00 0.00 To be dropped due to Dropped ROHTAK RD 0 to 3000 outfall in KCB land acquisition. dran No. 8 at KM 12.295-L (In Supplementary Agenda).

71 JHAJJAR JWS CIRCLE Constructing East Akheri 45th L 75.93 0.00 0 % 0.00 0.00 0.00 0.00 Land acquisition Dropped JHAJJAR Madanpur Link Drain from RD 0 under New LAR Act to 2500 out falling into JLN required. feeder at RD 316700-L.

72 BERI JWS CIRCLE Remodeling of ditch drain along 43th L 435.00 0.00 0 % 0.00 0.00 0.00 0.00 Land acquisition Dropped JHAJJAR right side of JLN Feeder from under New LARR Act RD 255400 to 278600.(43rd) required.

73 BERI JWS CIRCLE Remodeling of ditch drain along 43th L 278.00 0.00 0 % 0.00 0.00 0.00 0.00 Yet to Start, Land Dropped JHAJJAR right side of JLN Feeder from acquisition under New RD 240000 to 255300 (43rd) LARR Act required.

74 BADLI JWS CIRCLE Constructing Khudan Drain from 44th L 125.34 0.00 0 % 0.00 0.00 0.00 0.00 Land acquisition Dropped JHAJJAR RD 0 to 4400 outfall in existing under New LARR Act syphon of Zahidpur Minor at RD required. 17000.(44th)

75 JHAJJAR JWS CIRCLE Reconstructing Jondhi Link 45th L 145.75 0.00 0 % 0.00 0.00 0.00 0.00 Land acquisition Dropped JHAJJAR Drain from RD 0 to 6500 out under new LARR act. falling at RD 7100-R Sikenderpur Minor (By lift)

76 JHAJJAR JWS CIRCLE Recconstructing Birdhana Link 45th L 104.55 0.00 0 % 0.00 0.00 0.00 0.00 Land acquisition Dropped JHAJJAR Drain from RD 0 to 1.550 tail under New LARR Act out falling at RD 7100-L Required. Sikenderpur Minor.

89 (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 77 JHAJJAR JWS CIRCLE Constructing West Akheri- 45th L 157.75 0.00 0 % 0.00 0.00 0.00 0.00 Land acquisition Dropped JHAJJAR Madanpur JLN Link Drain from under New LARR Act RD 0 to 10750 tail out falling at required. RD 320500 JLN Feeder. (44th)

78 JHAJJAR JWS CIRCLE Constructing Birar Link Drain 45th L 347.96 0.00 0 % 0.00 0.00 0.00 0.00 Land acquisition as Dropped JHAJJAR from RD 0 to 14500 tail out per new Act. falling at RD 327200-R JLN feeder (By lift) and Birar Sub Link Drain from RD 0 to 1200 tail out falling at RD 4500-L. (44th)

79 BERI JWS CIRCLE Proposed extension of Godhari 45th L 195.56 0.00 0 % 0.00 0.00 0.00 0.00 Land acquisition as Dropped JHAJJAR link drain from RD 2460 to per new act 10700 tail, outfall at RD 276280- R JLN Feeder (By lift). (42nd)

80 BERI JWS CIRCLE Constructing Achhej Sub Link 45th L 130.95 0.00 0 % 0.00 0.00 0.00 0.00 Land acquisition as Dropped JHAJJAR Drain No. I and II reach RD 0 to per new act 3400 and RD 0 to 1000 out falling into Achhej Link Drain at RD 14500 and 17800.

81 BERI JWS CIRCLE Regrading of Seria-Gochhi Link 45th L 80.17 0.00 0 % 0.00 0.00 0.00 0.00 Land acquisition Dropped JHAJJAR Drain from RD 10459 to 14750 under new LARR act. out falling into Jhajjar Disty. at RD 300-L.

82 BERI JWS CIRCLE Constructing Dharana Link 45th L 212.19 0.00 0 % 0.00 0.00 0.00 0.00 Land acquisition as Dropped JHAJJAR Drain from RD 0 to 7000 out per new act falling into Drain No. 8 at RD 208850-R.

83 BERI JWS CIRCLE Constructing Majra Dubldan 45th L 150.37 0.00 0 % 0.00 0.00 0.00 0.00 Yet to Start, Land Dropped JHAJJAR Link drain RD 0-6000 outfalling acquisition as per new into Loharu feeder at RD 29600 act -R

84 BAHADURGA YWS CIRCLE Agenda Note for const. 45th L 471.12 0.00 0 % 471.12 171.12 150.00 150.00 Dropped Dropped RH ROHTAK proposed Mahandi Pur Daboda Link Drain from Rd 0 to 16500 outfalling KCB drain at RD 19000 inlcuding extension of Sarai Aurangabad Link Drain from RD 37560 to 38500

85 JHAJJAR JWS CIRCLE Revised agenda note for 48th L 98.47 0.00 0 % 0.00 0.00 0.00 0.00 Land acquisition Dropped JHAJJAR Constructing Khatiwas Link required. To purchase Drain from RD 0 to 3500. land, uploaded on E- Bhoomi Portal on 22.06.2017. No outcome till now.

86 JHAJJAR JWS CIRCLE Proposed Gudha Link Drain 48th L 221.05 0.00 0 % 0.00 0.00 0.00 0.00 yet to start,Land Dropped JHAJJAR from RD 0 to 7000 outfall at KM acquisition required. 2.235-L Dhaur Link Drain. To purchase land, uploaded on E- BHoomi portal on 22.06.2017 No outcome till now.

87 BERI JWS CIRCLE Revised agenda note for 48th L 231.21 0.00 0 % 0.00 0.00 0.00 0.00 Land acquisition Dropped JHAJJAR proposed extension of Godhari required under New Link Drain from RD 1595 to LARR Act required. 11482 tail, outfalling at RD 1595 Godhari Link Drain for village Safipur.

District Total 3576.37 0.00 471.12 171.12 150.00 150.00 Unit Total 9874.15 0.00 4295.32 1075.32 1610.00 1610.00 PROJECT, ENVIRONMENT KARNAL 88 ROHTAK WORKSHOP Procurement of new earth 44th L 149.00 49.00 0 % 0.00 0.00 0.00 0.00 XEN/WS Mech. Dropped CIRCLE moving machinery for i/c of Rohtak (Sh. S.K. KARNAL drains in YWS Circle, Rohtak Verma) has reported specially for dist. Rohtak, part of on 08/03/2018 that dist. Jhajjar and part of Distt. specification of trolly is Sonepat for use in W.S. Mech, to be approved and Dn. Rohtak work is likely to be completed by 30/06/2018

90 (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation in booked Prog. Req. Circle meeting during of year HSFCB 2018-19 2019-20 2020-21 89 JHAJJAR WORKSHOP Purchasing 1 floating type 45th L 250.00 0.00 0 % 0.00 0.00 0.00 0.00 The machinery is not Dropped CIRCLE excavator machine (Chain type - required by the KARNAL 140) department as reported vide S.E/ JWS Circle, Jhajjar L. No. 8214/193-W/M dated 13/07/2017. Scheme is proposed to be dropped.

District Total 399.00 49.00 0.00 0.00 0.00 0.00 Unit Total 399.00 49.00 0.00 0.00 0.00 0.00 Grand Total 11562.24 229.77 4295.32 1075.32 1610.00 1610.00

91 Table - A

ITEM No. 6

Review of On-Going and New Schemes of Irrigation and Water Resources Department under head-Deposit

During 48th meeting of HSDR & FCB, 01 scheme under head-Deposit work by PHED was approved. The status of all the schemes is given in Table-6(A) and Table-6(B). This is for the kind information of the Board.

92 TABLE 6A

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 48th meeting of HSDR & FCB

Head:8443-Irrigation Department Deposit Works (Rs. In Lacs) Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constituency Irrigation Circle in booked Prog. Req. meeting during of year HSFCB 2018-19 2019-20 2020-21 YWS(N) PANIPAT 1 PANIPAT YWS CIRCLE Providing lining and railing of 45th S 3780.00 2900.00 100 880.00 880.00 0.00 0.00 DEPOSIT WORK OF IP RURAL KARNAL panipat drain from RD % HUDA. HUDA HAS 55673-27000. total cost of NOT DEPOSITED the scheme RS. 44.08 crore FUND FOR fund is to be provided by EXECUTION. HUDA.

2 PANIPAT YWS CIRCLE Remodelling of panipat drain 46th S 1355.00 0.00 0 % 1355.00 1355.00 0.00 0.00 deposite work of MC YTS RURAL KARNAL by providing lining and panipat/ULB.MC/PANI replacing of pucca structure PAThas not deposited from RD 55673 to 64400 the required amount to (phase-2 costing rs. 13.55 execute the work. crore).

District Total 5135.00 2900.00 2235.00 2235.00 0.00 0.00 KARNAL 3 KARNAL YWS CIRCLE Agenda for connecting Main 48th M 1985.00 0.00 0 % 1985.00 1985.00 0.00 0.00 Land aquisition YTS KARNAL Drain no.1(Choti Yamuna) to required and alternate Main drain no.2 at RD 68000 purposals are being (CM Announcement code explored. no.148960

District Total 1985.00 0.00 1985.00 1985.00 0.00 0.00 Unit Total 7120.00 2900.00 4220.00 4220.00 0.00 0.00 YWS(S) FARIDABAD 4 BALABGARH YWS CIRCLE Construction of gaunchi 47th S 240.00 200.00 95 % 40.00 40.00 0.00 0.00 DEPOSIT WORK OF IP FARIDABAD drain with RCC lining with MC. RS. 200.00 LACS M.S RAILING TO CARRY RECEIVED FROM STORM WATER FROM rd ULB and Rs. 40.00 15584 TO 18554. lacs pending from MC- Faridabad.

5 BALABGARH YWS CIRCLE PROVIDING LINING OF 45th S 1420.00 1325.00 100 95.00 95.00 0.00 0.00 IP FARIDABAD GAUNCHI DRAIN FROM % THE BALANCED RD 0-15534. TOTAL COST AMOUNT TO THE OF THE PROJECT RS. TUNE OF RS. 95.00 1510.0 LACS BEING LACS IS PENDING. SHARED BY HUDA PERCANTAGE MUNICIPAL CORP. SHARE HUDA-250.00 FARIDABADD,URBAN , MCF-70.00 LACS, LOCAL BODIES, ULB- 755.00 LACS, IRRIGATION IandWRD- 250.00 DEPARTMENT . AMOUNT LACS. SHARED BY VARIOUS DEPARTMENTS. HUDA 250.00 LACS, MCF-255.00 LACS, IRRIGATION-250.00.

District Total 1660.00 1525.00 135.00 135.00 0.00 0.00 Unit Total 1660.00 1525.00 135.00 135.00 0.00 0.00 BWS KURUKSHETRA 6 THANESAR SYL CIRCLE Constg. of RCC rectangular 45th L 4070.00 3978.21 95 % 91.79 91.79 0.00 0.00 construction work in IP AMBALA open drain of size Railway Portion is 5.50`X2.75` parallel to under process. The Saraswati Creak for desired amount has sewerage water disposal already been deposited work Sector-13, U.E. to Railway Department. Kurukshetra and 7` X3.50` However HUDA needs from Public Health STP to deposit 91.79 lacs point to siphon Narwana Branch,. Funds are to be provided by HUDA and PHED. District Total 4070.00 3978.21 91.79 91.79 0.00 0.00 HISAR 7 HISSAR BWS CIRCLE CONSTRUCTION OF 46th M 983.05 568.00 80 % 415.05 415.05 0.00 0.00 The funds to be IP HISAR SATROD MIRKA DRAIN deposited by HUDA. RD 0 TO 6450 AND DABRA LINK DRAIN RD 0 TO 7525(DEPOSITE WORK OF HUDA).

District Total 983.05 568.00 415.05 415.05 0.00 0.00 Unit Total 5053.05 4546.21 506.84 506.84 0.00 0.00 LCU ROHTAK

93 TABLE 6A

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 48th meeting of HSDR & FCB 8 BAHADUR YWS CIRCLE Increasing capacity of Sarai 47th M 404.18 0.00 0 % 404.18 404.18 0.00 0.00 Deposit work of HUDA YTS GARH ROHTAK Aurangabad Kassar Link and HSIDC. L-section Drain from RD 0 to 34052 approved. HUDA need out falling into KCB Drain at to deposited 146.98 RD 8103-L including its lacs and HSIDC needs extension and Sump Well to deposited 257.20 Pump House lacs. Estimate under process.

District Total 404.18 0.00 404.18 404.18 0.00 0.00 Unit Total 404.18 0.00 404.18 404.18 0.00 0.00 CONSTRUCTION GURGAON 9 BADSHAPUR CONSTRUCTIO Construction of RCC open 47th M 4837.00 0.00 0 % 4837.00 4837.00 0.00 0.00 Deposit work of HUDA. YTS N CIRCLE Trough for channelisation of Funds from HUDA still GURGAON Badshahpur Drain K to L awaited. The work is (Dhankot road to Njafgarh yet to start. Drain)

District Total 4837.00 0.00 4837.00 4837.00 0.00 0.00 Unit Total 4837.00 0.00 4837.00 4837.00 0.00 0.00 Grand Total 19074.23 8971.21 10103.02 10103.02 0.00 0.00

94 Table - A

ITEM NO. 7 Review Position of Funds for Irrigation and Water Resources Department under head 4711- Flood Control & Drainage

As per details given in Item No. 4 and 5, Irrigation and Water Resources Department has proposed 154 new schemes and intends to continue 81 ongoing costing ₹157.02crore (Table 4)and ₹202.25crore (amount required for balance work) (Table 5) respectively under head 4711-Flood Control & Drainage. Now the department has made an exercise by prioritizing the schemes by identifying the period of completion i.e. the works proposed to be completed by 30.06.2018 are taken as short term, the works proposed to be completed by 30.06.2019 are taken as medium term; the works proposed to be completed by 30.06.2020 are taken as long term. Accordingly, requirement of funds for these schemes has been worked out is as under:-

Table-I: Requirement of fund (₹in lacs)

Type of No. of Estimated Requirement of funds Schemes Expenditure Schemes Schemes Cost Total 2018-19 2019-20 2020-21 Short 31 7773.18 4792.84 2568.44 2488.96 79.48 0.00

Ongoing term (S) 5

- (In Medium Progress 29 8245.30 1898.46 6441.18 4124.59 2109.59 207.00 term (M) & Yet To Table Long be Start) 21 11806.53 608.39 11214.94 1588.15 6122.50 3504.29 term (L) Total 81 27825.01 7299.69 20224.56 8201.70 8311.57 3711.29 Short 92 6412.02 0.00 6412.02 6357.52 54.50 0.00

term (S) 4 - New Medium 56 7989.62 0.00 7989.62 3793.63 3984.37 211.62 Schemes term (M) Table Long 06 1300.44 0.00 1300.44 350.88 729.95 219.61 term (L) Total 154 15702.08 0.00 15702.08 10502.03 4768.82 431.23 Short 123 14185.20 4792.84 8980.46 8846.48 133.98 0 term (S) Grand Medium 85 16234.92 1898.46 14430.80 7918.22 6093.96 418.62 Total term (M) Long 27 13106.97 608.39 12515.38 1939.03 6852.45 3723.90 term (L) Total 235 43650.09 7299.69 35926.64 18703.73 13080.39 4142.52

95

During the FY 2017-18, Finance Department has allocated only Rs 125.00 Cr. in original budget estimate and about 90.00 Cr. has already been utilized upto 15.03.2018 for completion of various flood schemes. The work on some ongoing schemes is in progress and the remaining are yet to be taken up. Accordingly, budget position so worked out is as under:-

Table-II: Budget Position (₹in crore)

Financial Total Expenditure Balance Requirement Remarks Year budget made upto budget of funds allocated 28.02.2018 available 2017-18 125.00 90.00 35.00 36.00

2018-19 135.00 - 135.00 187.04 Additional budget shall be demanded from Planning/ Finance Department under 1st& 2nd supplementary after observing the pace of actual execution of work and the expenditure incurred during the FY 2018-19.

Besides this, the position of funds under head Deposit Work for various Ongoing Schemes is as on next page:-

96 Details of funds under Head-Deposit

Table-III: Schemes in Progress (₹ in crore)

Sr. Name of Agency No. of Total Already Balance Remarks OG/New No. Schem Funds Received Scheme Est. Fund Bal. es cost Received Due 1 HUDA 4 82.35 66.84 15.51 Panipat 37.8 29.00 8.80 OG dr. Saraswati 35.6 34.68 0.91 OG Creak (Common with PHED). Gaunchi 2.50 2.50 0.00 OG dr. (Common with ULB, MCF and IWRD) SatrodMi 9.83 6.00 3.83 OG rka Drain 2 PHED 1 5.1 5.1 0 Saraswati Creak at Kurukshetra OG Common with HUDA 3 Director ULB 1 7.55 7.55 0 Gaunchi Drain at Faridabad OG Common with HUDA, MCF and IWRD 4 MC-Faridabad 1 2.55 0.7 1.85 Gaunchi Drain at Faridabad OG Common with ULB, HUDA and IWRD 5 MC, Faridabad 1 4 2 2 Gaunchi Drain at Faridabad OG 6 MC, Panipat 1 13.55 0 13.55 Remodeling of Panipat Drain (Phase-II) OG Total 6 115.1 82.19 32.91 OG

Table-IV: Schemes Yet to Start/Dropped (₹ in crore) Sr. Name of Agency No. of Total Already Balance Remarks YTS/ No. Schemes Funds Received Scheme Est. Fund Bal. Drop cost Received Due 1. HUDA 3 71.00 0.00 50.39 Main Drain 20.61 NIL NIL Drop no. 1 Kassar Link 2.02 0.00 2.02 Yet to Drain, Start Rohtak (in sharing with HSIIDC) Badshapur 48.37 0.00 48.37 Yet to Drain Start 2. HSIIDC common 1 2.02 0 2.02 Kassar link OG with HUDA drain, Rohtak ( in sharing with HUDA) 3. MC, Jhajjar 1 18.17 0.00 0.00 Jhajjar Link drain Drop Total 4 91.19 0.0 52.41

97 It is brought out that HUDA is not releasing the funds for ongoing deposit works taken by department on behalf of HUDA. During the last meeting it was decided that Irrigation & Water Resources Department may clear the liability of contractors to avoid litigation. Accordingly, department had cleared the liability of funds from its own resources after approval from Hon’ble Chief Minister, Haryana. However, HUDA may also be asked to release the balance funds as per details above to settle the accounts of the department.

98 Table - A

ITEM NO. 8 Agenda of PUBLIC HEALTH ENGINEERING DEPARTMENT for the Haryana State Drought Relief & Flood Control Board.

Agenda for the Flood Control Board Meeting

A) Status of Schemes :

Description No. of schemes Total No. of approved schemes 29

No. of completed schemes 5 Annexure-A

No. of ongoing schemes 24 Annexure-B

B) Funds required for the financial year 2018-19 – Rs.30.00 crore (at Annexure –B).

C) Scheme approved by the Chairman flood Control board for confirmation and approval of Flood Control Board is attached (as Annexure-C).

D) Physical Progress of the ongoing schemes is attached (at Annexure-D).

99 Annexure-A

Completed Schemes

Rs. In lacs Sr. No. Name of work/Adm. Approval Date Approved cost 1 Radaur Town - Covering of existing open Nallah with 34.75 R.C.C. slab and raising of nallah at some places with brick work(CM Announcement) [13/01/2016]

2 Jind- Providing and laying of Storm Water Drainage 37.70 system at Vidya Peeth Marg from Pishori Lal Dharamsala to Arjun Stadium (22/05/2015)

3 Kurukshetra- Providing SWD from near Old Bus Stand 61.00 to Existing Main SWD 6th Patshahi Gurudwara (18/04/2013)

4 Jhajjar- Laying of Storm Water Sewer from Shiv 9.82 Mandir on Badli Road to existing Storm Water Sewer in Khadi Chowk area (22/07/2016)

5 Rewari- Providing common Outfall Storm Water 636.76 Channel and Disposal etc. (08/06/2009)

100 Annexure-B Funds required for the year 2018-19 Rs. In lacs Sr. Name of Work/Adm Approval Estimated Exp Upto Funds Exp. Cumulative Funds No Date/Likely Comp. Dt cost 31/03/2017 During During Exp. required for 17- 18 17- 18 Upto 2018-19 November 2017 1 Ambala City – Augmentation of existing 371.65 205.15 75.00 92.03 297.18 50.00 Storm Water disposal works at Nasirpur and providing DI rising main from existing [22/05/2015] -[31/03/2018] 2 Ambala City town- Estimate for 619.30 95.90 100.00 338.05 433.95 125.00 construction of RCC covered storm water drain (Box Type) at Kalka Chowk area along HN-1(Vidhan Sabha Matter) [26/04/2016] -[30/04/2019] 3 Ambala City - Construction of Nala along 1093.62 453.74 215.00 168.81 622.55 300.00 G.T. Road from Kalka chowk to Banuri Nakka extension (RD 205.9 Km to 211.46 Km)[21/03/2012] -[31/12/2018] 4 Bhiwani : Estimate for providing storm 298.00 0.00 50.00 0.39 0.39 175.00 water drainage system including road gullies, intercepting manholes [27/05/2016] -[30/04/2018] 5 Bhiwani - Construction of Box Type Drain 163.00 44.47 25.00 3.82 48.29 50.00 and laying of Rising Main of DI Pipe Storm Water Drain[01/04/2011] -[30/10/2018] 6 Bhiwani - Est. for providing 5 No. 693.90 0.00 50.00 0.00 0.00 500.00 subsidiary pumping station for disposal of storm of various low lying area[30/06/2017] -[30/06/2020] 7 Hansi - Est. for acquisition of land already 75.47 0.00 0.00 0.00 0.00 60.00 occupied for SW Disposal Tosham road Hansi under RNC-4711 Distt. Hisar[20/07/2017] -[30/09/2017] 8 Hansi- Storm water sewer for Boga Ram 450.00 252.29 100.00 127.91 380.20 40.00 Colony, Multan Colony, Dhobhi Ghat, Subzi Mandi and Teti Nagar area[03/05/2014] -[31/12/2017] 9 Hansi - Rough Cost Estimate for providing 45.00 0.00 19.12 14.00 14.00 20.00 storm water drainage for Yati Nagar and surrounding area Hansi town[27/04/2017] - [30/04/2018] 10 Hisar - Estimate for remodelling of existing 280.00 4.64 169.66 159.97 164.61 90.00 storm water drain of old city area and arrangement of DG set at Hisar [27/05/2016] -[30/04/2018]

11 Pundri - Upgradation of storm water system 369.50 61.68 50.00 45.55 107.23 150.00 Pundri Town (under CM announcement No.

101 Sr. Name of Work/Adm Approval Estimated Exp Upto Funds Exp. Cumulative Funds No Date/Likely Comp. Dt cost 31/03/2017 During During Exp. required for 17- 18 17- 18 Upto 2018-19 November 2017 10321) (CM Announcement) [30/11/2015] - [31/12/2017]

12 Kaithal - Remodelling of Katcha Manas 715.00 360.43 50.00 0.00 360.43 250.00 Drain from RD 10075 to RD 19164 passing through Kaithal Town(Deposit Work)[03/05/2014] -[31/12/2017] 13 Kurukshetra - Estimate for construction of 134.31 0.00 20.00 0.00 0.00 20.00 RCC Box type drain from Jai Bharti School onward at Kurukshetra town.[27/04/2017] - [30/04/2019] 14 Ladwa- Prov. Storm Water Drainage 170.00 117.43 25.00 14.04 131.47 75.00 System from Hinori Chowk to existing disposal[18/05/2010] -[31/03/2018] 15 Karnal – Construction of Storm Water 922.40 634.93 150.00 149.28 784.21 75.00 Drains at different places[22/05/2015] - [31/12/2018] 16 Karnal – Construction of scheme for 2559.00 120.42 0.00 13.17 133.59 20.00 Disposal of treated effluent of STP of Karnal Town outfalling in river Yamuna reach[20/01/2016] -[31/03/2019] 17 Narnaul - Est.for prov.,lowering of RCC 209.35 0.00 40.00 17.27 17.27 100.00 pipe class NP3 to drain out the storm water in various mohalla of NNL Town(CM Announcement)[26/04/2016] -[30/04/2018] 18 Nuh - Construction of Box type drain and 95.00 80.86 14.14 6.09 86.94 10.00 laying of Rising main of DI Pipe Storm Water Drain [01/04/2011] -[31/12/2017] 19 Palwal - Remodeling of existing storm 242.50 8.36 57.46 17.05 25.41 100.00 water drain and construction of additional RCC box type drain for storm water system (CM Announcement) [22/07/2016] - [31/07/2018] 20 Hodel - Providing storm water drainage 418.00 0.00 50.00 105.71 105.71 100.00 system by constructing RCC drain[03/12/2016] -[31/10/2018] 21 Rewari - To provide storm water drainage 305.82 36.29 150.00 54.78 91.07 100.00 scheme for balance existing drain/ Nallah from Bawal road to Garhi Bolani road(CM Announcement)[13/01/2016] -[31/05/2018] 22 Rohtak – Providing storm water drainage 356.60 0.00 10.00 0.00 0.00 190.00 system parallel to Sonipat road from culvert Sector-3 to Sector-4 [27/04/2017] - [30/04/2019] 23 Rohtak – Rehabilitation for storm water 382.22 0.00 10.00 0.00 0.00 200.00

102 Sr. Name of Work/Adm Approval Estimated Exp Upto Funds Exp. Cumulative Funds No Date/Likely Comp. Dt cost 31/03/2017 During During Exp. required for 17- 18 17- 18 Upto 2018-19 November 2017 RCC carrier channel Hisar road and connecting to drain No.8.[27/04/2017] - [30/04/2019] 24 Ganaur - Providing Storm Water Drainage 1785.00 844.21 322.38 318.36 1162.57 200.00 System[24/11/2011] -[30/03/2018]

Total 12754.64 3320.8 1752.76 1646.28 4967.07 3000.00

103 Annexure-C

Schemes approved by Chairman Flood Control Board For confirmation and approval of Flood Control Board

(Rs. In lacs) Sr. Name of estimate Estimated Remarks No. cost 1 Bhiwani - Est. for providing 5 No. 693.90 Estimate approved by Chairman subsidiary pumping station for Flood Control Board on file on disposal of storm of various low 30.06.2017 lying area. [30/06/2017] -[30/06/2020] 2 Hansi - Est. for acquisition of land 75.47 Estimate approved by Chairman already occupied for SW Disposal Flood Control Board on file on Tosham road Hansi under RNC-4711 20.07.2017 Distt. Hisar. [20/07/2017] -[30/09/2017] 3 Hansi - Rough Cost Estimate for 45.00 Estimate approved by President, providing storm water drainage for WSSB in the meeting held on Yati Nagar and surrounding area 27.04.2017 Hansi town. [27/04/2017] -[30/04/2018] 4 Kurukshetra - Estimate for 134.31 Estimate approved by President, construction of RCC Box type drain WSSB in the meeting held on from Jai Bharti School onward at 27.04.2017 Kurukshetra town. [27/04/2017] -[30/04/2019] Revised estimate 5 Ambala City - Construction of Nala 993.22 Estimate approved by Chairman along G.T. Road from Kalka chowk 1093.62 Flood Control Board on file on to Banuri Nakka extension (RD 205.9 30.06.2017 Km to 211.46 Km) [21/03/2012] -[31/12/2018] 6 Ambala City – Augmentation of 219.00 Estimate approved by Chairman existing Storm Water disposal works 371.65 Flood Control Board on file on at Nasirpur and providing DI rising 30.06.2017 main from existing [22/05/2015] -[31/03/2018]

104 PHYSICAL PROGRESS OF ONGOING WORKS FOR FLOOD WORKS (Rs. In lacs) Sr. Name of Work/Adm Approval Date Estt. Cost Upto date Physical scope of work as per estimate Latest Status Likely date No expend. of completion 1 Ambala City – Augmentation of existing 371.65 297.18 R/main DI pipe (600mm) 1075 M  Work completed. 31.03.2018 Storm Water disposal works at Nasirpur and providing DI rising main from R/main DI pipe (500mm) 1100 M  Work completed existing[22/05/2015] Const. of RCC tank, S/C & PC 2 No  90% work completed Pumping Machinery 6 Nos.  Installed DG Set (300 KVA) 1 No.  Installed Ambala2 City- construction of RCC covered storm 619.30 433.95  RCC Storm Water Drain 800 mtr.  400 mtr. Laid 30.04.2019 water drain (Box type) at Kalka Chowk area along Size 2’-0” x 2’-0” HN-1  600 mm DI pipe alongwith 95 mtr.  Work completed. 900mm M.S. pipe 12 mm thick  RCC Storm Water Drain 1000 mtr.  Work completed 2’ – 6” x 1’-6” –  Const. of sump well of size 2.00 Mtr. 2 No.  Work completed. X 2.00 Mtr.  700mm i/d RCC pipe drain 905 mtr.  1110 Mtr. RCC pipe drain laid

 1000mm i/d RCC pipe drain 600 mtr.  400 Mtr. Pipe laid.

 Construction of RCC Circular 1 No.  75% work completed collecting tank of 8.50 mtr. Dia  Construction of screening chamber of 1 No.  75% work completed size 2.50x1.80x2.65 mtr.  Const. of pump chamber of size 1 No.  75% work completed 10’x12’  Const. of boundary wall and laying of 1 No.  75% work completed distribution system 3 Ambala City - Construction of Nala along 1093.62 622.55 Phase-I Const. of drain 1400 mtr.  Work completed. 31.12.2018 G.T. Road from Kalka chowk to Banuri  RCC pipe 2000 mtr.  Work completed Nakka extension (RD 205.9 Km to 211.46 Km) Phase- II  Construction of Drain  Work not started due to non 8’x4’ 1065 mtr. permission of forest department. 8’x4’ 1100 mtr. Permission still awaited.

105 Sr. Name of Work/Adm Approval Date Estt. Cost Upto date Physical scope of work as per estimate Latest Status Likely date No expend. of completion 4 Bhiwani : Estimate for providing storm 298.00 0.39  Const. of Box type drains 3200 mtr. 15% work completed 30.06.2018 water drainage system including road  230 mtr. gullies, intercepting manholes 10% work completed  RCC NP-3 pipe 600 mm [27/05/2016] -[30/04/2018] 5 Bhiwani - Construction of Box Type Drain 163.00 48.29  0.76 m x 0.61 m RCC channel 420 m  70% work completed 31.03.2018 and laying of Rising Main of DI Pipe  600 mm i/d RCC NP3 300 m Storm Water Drain[01/04/2011]  50% work completed and permission received from railway authority  600 mm i/d DI pipe 470 m  15% work completed Bhiwani- Estimate for providing 5 No.  Pumping station for disposal 5 No. Work started on 06.12.2017 6 subsidiary pumping station for disposal of 693.90 0.00 30.09.2018 strom of various low lying area  RCC box type drain 0.76 M x 0.16 M 150 mtr.  RCC tank 18’ dia 1 No.  Pumping machinery 2 No.  RCC box type drain 0.76 M x 0.16 M 300 mtr.  RCC tank 18’ dia 1 No.  Pumping machinery 2 No.  RCC box type drain 0.76 M x 0.16 M 350 mtr.  RCC tank 18’ dia 1 No.  Pumping machinery 2 No.  RCC box type drain 0.76 M x 0.16 M 100 mtr.  RCC tank 18’ dia 1 No.  Pumping machinery 2 No.  RCC box type drain 0.76 M x 0.16 M 92 mtr.  RCC tank 24’ dia 1 No.  Pumping machinery 2 No. 7 Hansi – Est. for acquisition of land already 75.47 0.00  Cost of land for storm water disposal  Case pending in High Court for 31.03.2018 occupied for SW Disposal Tosham road additional cost of land of the Hansi under RNC-4711 Distt. Hisar consumers [29/05/2016] –[31/03/2017] 8 Hansi- Storm water sewer for Boga Ram 450.00 380.20  250 mm D/I rising main 1750 mtr.  Work completed. 31.03.2018 Colony, Multan Colony, Dhobhi Ghat,  300 mm, 400 mm, 600 mm RCC NP3 3600 mtr.  90% work completed Subzi Mandi and Teti Nagar

106 Sr. Name of Work/Adm Approval Date Estt. Cost Upto date Physical scope of work as per estimate Latest Status Likely date No expend. of completion area[03/05/2014] pipe

9 Hansi – Rough cost estimate for Providing  Open brick masonary channel 2 No.  Work completed, liabilities 31.03.2018 storm water drainage for Yati nagar and 45.00 14.00 pending surrounding area Hansi town 1.00’ x1.00’ 402 mtr.  Work completed. 1.00’x 1.50’ 381 mtr.  Work completed. RCC tank 15’ dia 1 No.  Work completed. Pumping machinery 2 No.  Work completed. DI rising main 6” i/d 1310 mtr.  Work completed. 10 Hisar - Estimate for remodelling of 280.00 164.61  Repair of open drains 1000 mtr.  Work completed. 30.04.2018 existing storm water drain of old city area  SS screens 2 No.  Installed. and arrangement of DG set at 3 No.  DG set  Installed. Hisar[27/05/2016] -[30/04/2018] 1 No.  Pumping machinery 1 No.  Installed  Raising of collecting tank  Not required.  Construction of pucca drain 2000 mtr.  Work in progress 11 Pundri - Upgradation of storm water 369.50 107.23 Brick drains 30.06.2018 system Pundri Town (under CM  2’ x 2’ 1465 mtr.  80% work done by B&R. announcement No. 10321) [20/10/2016] -  RCC pipe 36” 305 mtr.  Work yet to be started. [31/10/2017] 1 No.  Pumping Station  Work yet to be started 800 mtr.  DI rising main 24” 1600 mtr.  Work completed.  RCC pipe 40” 1 No.  Work yet to be started.  RCC sump well  Work yet to be started 12 Kaithal - Remodelling of Katcha Manas 715.00 360.43 RCC drains 30.06.2018 Drain from RD 10075 to RD 19164  1 .14 m x 2.28 mtr. 1298 mtr.  98% work completed. passing through Kaithal Town(Deposit  1 .14 m x 2.74 mtr. 2275 mtr.  40% work completed. Work) [03/05/2014] 13 Ladwa- Prov. Storm Water Drainage 170.00 131.47  Disposal work 1 No.  Work Completed, pending 31.03.2018 System from Hinori Chowk to existing liabilities to be cleared disposal [18/05/2010]  Pumping Machinery 10 cusec 4 Nos. RCC box type drain  122 mtr. x 152 mtr. 515 mtr. 14 Kurukshetra- Construction of RCC box 134.31 0 RCC box type drain 3 mtr. X 3 mtr. Work 30.09.2018 type drain from Jai Bharti to onwards at 420 mtr. allotted,

Kurukshetra town work will be

107 Sr. Name of Work/Adm Approval Date Estt. Cost Upto date Physical scope of work as per estimate Latest Status Likely date No expend. of completion started shortly 15 Karnal – Construction of Storm Water 922.40 784.21 Cost of RCC Drain  Work completed and pending 31.03.2018 Drains at different places[22/05/2015] liabilities to be cleared.  0.91x1.21 M 1450 mtr. 0.61 mtr. X 1.21 M 5810 M 0.38 mtr. X 0.76 M 825 M Renovation of existing Drains  72” i/d 550 Mtr. 16 Karnal – Construction of scheme for 2559.00 133.59  Land acquisition 19 acre The Hon’ble CM Haryana made Disposal of treated effluent of STP of an announcement on dated -  Const. of P/C 1 No. Karnal Town out falling in river Yamuna 07.10.2016 at village Kutail reach [22/05/2015]  VT Pump 1 No. (Gharaunda constituency) for  DG Set 1 No. connecting main drain No. 1 to  Erection of Gate 1 No. main No. 2. Accordingly, Irrigation Deptt. Conducted a  Const. of Bridge/ cause way 5 Nos. survey and declared the scheme  Bandh 1000 ft. more feasible. The Irrigation Deptt. Has framed an estimate amounting to Rs.1985.40 lacs which involves 6 KM land acquisition (Approx. 23 Acres) amounting to Rs.1142.50 lacs and balance amount to Rs.842.00 lacs for Civil works. Now the Irrigation Deptt. Had declared the new scheme is more feasible in place of scheme already approved amounting to Rs.2559.00 lacs. The new scheme amounting to Rs.1985.00 lacs has been approved in the 48th meeting of HSFCB. 17 Narnaul - Est.for prov.,lowering of RCC 209.35 17.27 (i) Storm water RCC pipe = 4.6 Km (i) Storm water RCC pipe pipe class NP3 to drain out the storm water  350 mm – 550 mtr.  350 mm – Nil in various mohalla of NNL Town(CM  600 mm – 4050 mtr.  600 mm–2300 mtr 30.04.2018 Announcement)[26/04/2016] -[30/04/2018] (ii) Road cutting = 350 mtr. (iii) Forest Department (L.S.) 18 Nuh - Construction of Box type drain and 95.00 86.94 (i) SW Drain box type3’.0”x 1.5”=1500 Storm water box type drain = 1500 31.03.2018

108 Sr. Name of Work/Adm Approval Date Estt. Cost Upto date Physical scope of work as per estimate Latest Status Likely date No expend. of completion laying of Rising main of DI Pipe Storm m. mtr. Water Drain [01/04/2011] -[31/12/2017] (ii) R/main = 200 mm-1000 m. Rising main = 1000 M.

19 Palwal - Remodeling of existing storm 242.50 25.41 (i) New RCC box Drain. water drain and construction of additional Size 0.90 M x 0.90 M=2300 M Drain Size 0.90 M x 0.90 M=500 RCC box type drain for storm water system (ii) Raising of Drain = 1900 mtr. M 31.03.2019 (CM Announcement) [22/07/2016] - (ii) Raising of Drain = 700 mtr. [31/07/2018] 20 Hodel - Providing storm water drainage 418.00 105.71 RCC box type drain=3100 mtr. RCC box type drain = 1500 mtr. system by constructing RCC 31.08.2018 drain[03/12/2016] -[31/10/2018] 21 Rewari - To provide storm water drainage 305.82 91.07 (i) RCC box type drain 10’x3’ = 1400 825 mtr. drain constructed scheme for balance existing drain/ Nallah mtr. 31.03.2018 from Bawal road to Garhi Bolani road(CM Announcement)[13/01/2016] -[30/06/2018] 22 Rohtak – Providing storm water drainage 356.60 0.00 (i) RCC collecting tank= 1 No. As till date process of land transfer system parallel to Sonipat road from culvert (ii) P/Machinery = 3 No. is under process however, Sector-3 to Sector-4 [27/04/2017] - (iii) R/main 450 mm-582 mtr. Executive Engineer was told to 30.04.2019 [30/04/2019] (iv) Inlet channel = 1226 mtr. prepare the DNIT & submitted to Head office as soon as land will be transferred to HUDA Department. 23 Rohtak – Rehabilitation for storm water 382.22 0.00 (i) RCC collecting tank The consent letter of land from the RCC carrier channel Hisar road and (ii) P/Machinery HSIIDC received recently. DNIT connecting to drain No.8.[27/04/2017] - (iii) R/main 300 mm – 1030 mtr. approved on 29.11.2017 and tender 30.04.2019 [30/04/2019] (iv) Inlet channel = 248 mtr called. (v) Remodeling of I/channel=3500 mtr. (vi) Road cut 24 Ganaur - Providing Storm Water Drainage 1785.00 1162.57 (i) RCC box type drain = 10 No. System[24/11/2011] -[30/06/2018] (ii) RCC collecting tank = 2 No. (iii) P/Machinery = 4 No. All work completed except railway 31.03.2018 (iv) R/main 900 mm – 1500 mtr. crossing and rising main (v) L/Acquisition = 1 acre (vi) R/crossing = L.S Total 12754.64 4967.07

109 110