Nepal: Rural Reconstruction and Rehabilitation Sector Development Program

Total Page:16

File Type:pdf, Size:1020Kb

Nepal: Rural Reconstruction and Rehabilitation Sector Development Program Completion Report Project Number: 40554 Grant Numbers: 0093/0094 August 2014 Nepal: Rural Reconstruction and Rehabilitation Sector Development Program This document is being disclosed to the public in accordance with ADB’s Public Communications Policy 2011. CURRENCY EQUIVALENTS Currency Unit – Nepalese rupee(s) (NRe/NRs) At Appraisal At Program and Project Completion (11 October 2007) (30 June 2013) NRs1.00 = $0.0158 $0.0105 $1.00 = NRs63.20 NRs95.24 ABBREVIATIONS ADB Asian Development Bank DDC district development committee DFID Department for International Development of the United Kingdom DOLIDAR Department of Local Infrastructure Development and Agricultural Roads MFALD Ministry of Federal Affairs and Local Development MOF Ministry of Finance OFID OPEC Fund for International Development PCU project coordination unit SDC Swiss Agency for Development and Cooperation VDC village development committee NOTES (i) The fiscal year (FY) of the Government of Nepal ends on 15 July. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2009 ends on 15 July 2009. (ii) In this report, “$” refers to US dollars. Vice-President W. Zhang, Operations 1 Director General H. Kim, South Asia Department (SARD) Country Director K. Yokoyama, SARD Team leader G. Gewali, Senior Project Officer, SARD Team members R. Bhattarai, Operations Assistant, SARD J. Sharma, Gender Consultant, SARD D. Singh, Senior Environment Officer, SARD B. Sitoula, Project Analyst, SARD L. Subedi, Senior Social Development Officer (Safeguards), SARD In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CONTENTS Page BASIC DATA i I. PROGRAM AND PROJECT DESCRIPTION 1 II. EVALUATION OF DESIGN AND IMPLEMENTATION 1 A. Relevance of Design and Formulation 1 B. Program and Project Outputs 3 C. Program and Project Costs 5 D. Disbursements 6 E. Program and Project Schedules 6 F. Implementation Arrangements 6 G. Conditions and Covenants 7 H. Consultant Recruitment and Procurement 7 I. Performance of Consultants, Contractors, and Suppliers 8 J. Performance of the Recipient and the Executing Agency 8 K. Performance of the Asian Development Bank 9 III. EVALUATION OF PERFORMANCE 9 A. Relevance 9 B. Effectiveness in Achieving Outcome 10 C. Efficiency in Achieving Outcome and Outputs 11 D. Preliminary Assessment of Sustainability 11 E. Institutional Development 12 F. Impact 12 IV. OVERALL ASSESSMENT AND RECOMMENDATIONS 14 A. Overall Assessment 14 B. Lessons 14 C. Recommendations 14 APPENDIXES 1. Program Design and Monitoring Framework 16 2. Policy Matrix 32 3. Project Design and Monitoring Framework 37 4. Program Cost Breakdown by Sources 44 5. Project Cost Breakdown by Sources 45 6. Project Cost Breakdown by Components 46 7. Sourcewise Annual Project Disbursements 47 8. Project Implementation Schedule 48 9. Major Project Covenants and Compliance Status 52 10. Summary of National Competitive Bidding Contracts for Rural Roads 61 11. Summary of National Competitive Bidding Contracts for Motorable Bridges 66 12. Summary of Project Procurement 67 13. Initial Impacts of Rural Roads in Road Influence Area 68 14. Economic Analysis 69 SUPPLEMENTARY APPENDIXES A. Environmental Safeguards Compliance 82 B. Gender Equality and Social Inclusion Action Plan Results 85 C. Social Safeguards Compliance 95 BASIC DATA A. Grant Identification 1. Country Nepal 2. Grant Numbers 0093-NEP, 0094-NEP 3. Program and Project Title Rural Reconstruction and Rehabilitation Sector Development Program 4. Recipient Government of Nepal 5. Executing Agency Ministry of Finance (Program) Ministry of Federal Affairs and Local Development (Project) 6. Amount of ADB Grant $50 million Program; and $50 million (Project) 7. Amount of DFID Grant $20.0 million 8. Amount of OFID Loan $10.0 million 9. Amount of SDC Grant $1.5 million 10. Program and Project Completion Report PCR:NEP 1458 Number B. Grant Data 1. Appraisal – Date Started 2 October 2007 – Date Completed 11 October 2007 2. Loan Negotiations – Date Started 7 November 2007 – Date Completed 8 November 2007 3. Date of Board Approval 12 December 2007 4. Date of Grant Agreement 14 January 2008 5. Date of Grant Effectiveness – In Grant Agreement 13 April 2008 – Actual 1 February 2008 – Number of Extensions 0 6. Closing Date Program Grant – In Grant Agreement 31 December 2011 – Actual 26 January 2012 – Number of Extensions 0 Project Grant – In Loan Agreement 30 June 2012 – Actual 23 June 2014 – Number of Extensions 1 ii 7. Disbursements a. Dates (i) Program Grant Initial Disbursement Final Disbursement Time Interval 15 Feb 2008 4 Mar 2008 0 month Effective Date Original Closing Date Time Interval 1 Feb 2008 31 Dec 2011 47 months (ii) Project Grant Initial Disbursement Final Disbursement Time Interval 18 Sep 2008 13 Nov 2013 61.87 months Effective Date Original Closing Date Time Interval 1 Feb 2008 30 Jun 2012 53 months b. Amount ($ million) (i) Program Grant Tranche Number Amount Disbursed Single Tranche 50.00 iii (ii) Project Grant Last Net Original Revised Amount Amount Amount Undisbursed CAT Category Allocation Allocation Cancelled Available Disbursed Balance 1600 Miscellaneous grant, administration, and support (ADB) 5.63 5.63 3101 Central consulting services (ADB) 2.70 1.60 0.37 1.23 1.23 3102 International consultants (DFID) 0.28 0.20 (0.78) 0.98 0.43 0.55 3103 Domestic consultants (DFID) 0.82 0.59 0.28 0.31 0.23 0.08 3201 Civil work rural roads 18.43 13.38 (1.57) 14.95 13.94 1.01 3202 Civil work supplementary infrastructure 8.76 12.78 (0.24) 13.02 12.80 0.22 3203 Rural roads by communities (DFID) 9.58 6.89 3.06 3.83 3.16 0.67 3204 Rural roads by contractors (DFID) 9.32 6.69 (9.97) 16.66 15.97 0.69 3301 Survey, design, and preparatory works 1.72 2.60 1.57 1.03 0.83 0.20 3601 Land acquisition and resettlement 3.49 5.30 2.78 2.52 2.36 0.16 3602 Vehicles and motorcycles 1.10 0.94 0.01 0.93 0.91 0.02 3603 Equipment 0.76 0.76 (0.32) 1.08 1.06 0.02 3801 Training, studies, and workshops 1.05 1.05 (0.09) 1.14 0.98 0.16 3901 Incremental operating expenses 4.14 3.99 (0.77) 4.76 4.50 0.26 3902 Rural road operation and maintenance 0.48 0.73 (0.09) 0.82 0.67 0.15 4801 District technical services 5.84 5.36 0.99 4.37 4.28 0.09 4901 Unallocated 1.53 1.51 1.36 0.15 0.15 Total 70.00 70.00 2.22 67.78 63.35 4.43 ADB = Asian Development Bank, CAT = Category, DFID = Department for International Development of the United Kingdom. iv 8. Local Costs (Financed) Program Grant - Amount ($ million) 50 - Percent of Local Costs 0 - Percent of Total Cost 60.6 Project Grant - Amount ($ million) 43.56 - Percent of Local Costs 44.88 - Percent of Total Cost 44.88 C. Program and Project Data 1. Program and Project Cost ($ million) Cost Appraisal Estimate Actual (i) Program Grant Local Currency Cost 82.80 82.80 (ii) Project Grant Foreign Exchange Cost Local Currency Cost 78.40 97.05 2. Financing Plan ($ million) Source Appraisal Estimate Actual Program Grant ADB Financed 50.00 50.00 Government of Nepal 32.80 32.80 Total 82.80 82.80 Project Grant ADB Financed 50.00 43.56 OFID Financed 10.00 9.06 DFID Financed 0.00 19.79 SDC Financed 0.00 3.00 Government of Nepal 15.70 18.24 Beneficiary Financed 2.70 3.40 Total 78.40 97.05 ADB = Asian Development Bank, DFID = Department for International Development of the United Kingdom, OFID = OPEC Fund for International Development, SDC = Swiss Agency for Development and Cooperation. 3. Cost Breakdown by Project Component ($ million) Component Appraisal Actual Estimate A. Base Costs Program Grant Enhance poverty reduction and inclusive development 35.50 35.50 Improve inclusive governance and decentralization 11.50 11.50 Support rural infrastructure development 35.80 38.80 Total 82.80 82.80 Project Grant Rural Roads 45.00 63.41 v Supplementary infrastructure 18.00 21.34 Community empowerment 3.20 2.48 Institutional capacity development 0.30 0.50 Project management and services 7.80 9.02 Sub total A 74.30 96.7 5 B. Contingencies 3.80 0.00 C. Interest during Construction 0.30 0.30 Total (A+B+C) 78.40 97.05 4. Project Schedule Item Appraisal Estimate Actual Dates of Contracts with Consultants SKAT Consulting and JV Jul 2008 24 Nov 2008 East Consulting-Sitara-PARD JV Jul 2008 5 Feb 2009 GOEC-Inclusive Consultant JV Jul 2008 8 Feb 2009 CEMACA Consultant Jul 2008 10 Feb 2009 BDA Nepal Jul 2008 12 Feb 2009 GIDA Nepal Jul 2008 16 Feb 2009 CEMACA Consultant Jul 2008 20 Feb 2009 HERD Consultants Jul 2008 22 Feb 2009 East Consulting-BN-Sitara-PARD JV Jul 2008 22 Feb 2009 BDA Nepal Jul 2008 24 Feb 2009 HERD Consultants Jul 2008 25 Feb 2009 GOEC Nepal Jul 2008 27 Feb 2009 RECON Nepal Jul 2008 4 Mar 2009 GIDA Nepal Jul 2008 2 Mar 2009 Masina Engineering Management Consultants Jul 2008 12 May 2009 Everest Eng-Inclusive Consultants JV Jul 2008 28 May 2009 Completion of Engineering Designs Dec 2008 26 Jul 2010 Civil Works Contract Date of Award Sep 2008 22 Sep 2009 Completion of Work Jul 2008 31 Dec 2012 Equipment and Supplies Dates First Procurement Jul 2008 30 Sep 2008 Last Procurement Jul 2009 30 Sep 2011 Other Milestones Extension of Grant Closing Date 31 Dec 2012 Partial Cancellation ($4.0 million) 23 Oct 2013 5.
Recommended publications
  • Nepal: Rural Reconstruction and Rehabilitation Sector Development Program
    Environmental Assessment Document Initial Environmental Examination Grant Number: 0093 NEP February 2010 Nepal: Rural Reconstruction and Rehabilitation Sector Development Program Sildhunga-Jethal-Tauthali-Tekanpur Road Subproject, Sindhupalchowk District Prepared by the Government of Nepal The Environmental Assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Government of Nepal Ministry of Local Development Department of Local Infrastructure Development and Agricultural Roads Rural Reconstruction and Rehabilitation Sector Development Program [ADBGrant 0093NEP] Initial Environmental Examination (IEE) Report of Sildhunga-Jethal-Tauthali-Tekanpur Road Subproject, Sindhupalchowk District Submitted to: Ministry of Local Development Government of Nepal Proponent: Office of District Development Committee/ District Technical Office Chautara, Sindhupalchowk Prepared by: Frisa-Iteco Joint Venture (in association with SKAT) District Implementation Support Team (DIST) Chautara, Sindhupalchowk, Nepal Telephone No.: 011-620338 Fax No.: 011-620087 February, 2010 TABLE OF CONTENTS Abbreviations ………………………………………………………………………….....i Name and Address of Proponent………………………………………………..……...ii Executive Summary in Nepali………………………………………………………….iii Executive summary in English………………………………………………….…… viii Salient Features of the sub-Project………………………………………..………….xiii 1. Introduction ………………………………………………………………………………… 1 1.1. Background………………………………………………………………...........1
    [Show full text]
  • Evaluation Report
    EVALUATION REPORT Nepal Earthquake Emergency Response Project SEPTEMBER 8, 2017 HURDEC PVT LTD, NEPAL Thasikhel, Lalitpur, Nepal Table of Contents LIST OF ABBREVIATIONS ................................................................................................... 3 Executive Summary .............................................................................................................. 4 A. Evaluation Context and Methodology ........................................................................ 4 B. Project Achievements ................................................................................................ 4 C. Good and Highly Appreciated Practices .................................................................... 6 D. Key Issues and Challenges ....................................................................................... 6 E. Lessons from the Project Experience ........................................................................ 7 F. Major Recommendations ........................................................................................... 7 1. Background and Context ................................................................................................... 9 2. Evaluation Objectives and Methodology .......................................................................... 10 3. Evaluation Findings ......................................................................................................... 11 3.1 Overall Findings ........................................................................................................
    [Show full text]
  • INTRODUCTION Percent of the Global Market (Gon, 2010)
    Shiba Prasad Rijal... IMPACT OF CLIMATE CHANGE ON LARGE CARDAMOM-BASED LIVELIHOODS/33 IMPACT OF CLIMATE CHANGE ON LARGE CARDAMOM-BASED LIVELIHOODS IN PANCHTHAR DISTRICT, NEPAL Shiba Prasad Rijal, PhD Reader, Department of Geography Education T.U., Nepal [email protected] Abstract The paper aims at analyzing the impact of climate change on large cardamom-based livelihoods in Panchthar district by reviewing literature and compiling perceptions of local people. Large cardamom, a newly introduced high-value cash crop grown in 36 hill and mountain districts in Nepal, is cultivated in all 41 Village Development Committees of Panchthar district concentrating largely in its northern and eastern parts at the elevations of roughly between 500 to 2000 meters above sea level. Though area coverage and production of large cardamom is limited compared to other crops, its contribution on people’s livelihood is signifi cant as it has high market value. Production of large cardamom contributes much on people’s livelihoods as it is the main source of household income and provides seasonal employment to thousands of people from farm to the market. Some local cultural producers have also been using bi-products of large cardamom for production of handicrafts such as baskets, tablemats, bags, and window blinders. Besides, it has numerous indirect implications such as reduction in soil erosion and landslides, and increase in biodiversity and carbon’s tock. In recent years, production of large cardamom has been declining as a result of climate change induced factors. The decline adversely affects people’s livelihoods. Key Words: Adaptation, climate sensitive, coping capacity, large cardamom, climate change, livelihood base.
    [Show full text]
  • Japan International Cooperation Agency (JICA)
    Chapter 3 Project Evaluation and Recommendations 3-1 Project Effect It is appropriate to implement the Project under Japan's Grant Aid Assistance, because the Project will have the following effects: (1) Direct Effects 1) Improvement of Educational Environment By replacing deteriorated classrooms, which are danger in structure, with rainwater leakage, and/or insufficient natural lighting and ventilation, with new ones of better quality, the Project will contribute to improving the education environment, which will be effective for improving internal efficiency. Furthermore, provision of toilets and water-supply facilities will greatly encourage the attendance of female teachers and students. Present(※) After Project Completion Usable classrooms in Target Districts 19,177 classrooms 21,707 classrooms Number of Students accommodated in the 709,410 students 835,820 students usable classrooms ※ Including the classrooms to be constructed under BPEP-II by July 2004 2) Improvement of Teacher Training Environment By constructing exclusive facilities for Resource Centres, the Project will contribute to activating teacher training and information-sharing, which will lead to improved quality of education. (2) Indirect Effects 1) Enhancement of Community Participation to Education Community participation in overall primary school management activities will be enhanced through participation in this construction project and by receiving guidance on various educational matters from the government. 91 3-2 Recommendations For the effective implementation of the project, it is recommended that HMG of Nepal take the following actions: 1) Coordination with other donors As and when necessary for the effective implementation of the Project, the DOE should ensure effective coordination with the CIP donors in terms of the CIP components including the allocation of target districts.
    [Show full text]
  • ZSL National Red List of Nepal's Birds Volume 5
    The Status of Nepal's Birds: The National Red List Series Volume 5 Published by: The Zoological Society of London, Regent’s Park, London, NW1 4RY, UK Copyright: ©Zoological Society of London and Contributors 2016. All Rights reserved. The use and reproduction of any part of this publication is welcomed for non-commercial purposes only, provided that the source is acknowledged. ISBN: 978-0-900881-75-6 Citation: Inskipp C., Baral H. S., Phuyal S., Bhatt T. R., Khatiwada M., Inskipp, T, Khatiwada A., Gurung S., Singh P. B., Murray L., Poudyal L. and Amin R. (2016) The status of Nepal's Birds: The national red list series. Zoological Society of London, UK. Keywords: Nepal, biodiversity, threatened species, conservation, birds, Red List. Front Cover Back Cover Otus bakkamoena Aceros nipalensis A pair of Collared Scops Owls; owls are A pair of Rufous-necked Hornbills; species highly threatened especially by persecution Hodgson first described for science Raj Man Singh / Brian Hodgson and sadly now extinct in Nepal. Raj Man Singh / Brian Hodgson The designation of geographical entities in this book, and the presentation of the material, do not imply the expression of any opinion whatsoever on the part of participating organizations concerning the legal status of any country, territory, or area, or of its authorities, or concerning the delimitation of its frontiers or boundaries. The views expressed in this publication do not necessarily reflect those of any participating organizations. Notes on front and back cover design: The watercolours reproduced on the covers and within this book are taken from the notebooks of Brian Houghton Hodgson (1800-1894).
    [Show full text]
  • 35173-013: Third Small Towns Water Supply and Sanitation Sector Project
    Initial Environmental Examination Project Number: 35173-013 Loan Numbers: 3157 and 8304, Grant Number:0405 July 2020 Nepal: Third Small Towns Water Supply and Sanitation Sector Project - Enhancement Towns Project Prepared by the Government of Nepal for the Asian Development Bank This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Updated Initial Environmental Examination July 2020 NEP: Third Small Towns Water Supply and Sanitation Sector Project – Phidim, Khandbari, Duhabi, Belbari, Birtamod DasarathChanda, Mahendranagar, Adarshnagar-Bhasi, Tikapur, Sittalpati, Bijuwar and Waling Enhancement Town Projects Prepared by Small Towns Water Supply and Sanitation Sector Project, Department of Water Supply and Sewerage Management, Ministry of Water Supply, Government of Nepal for the Asian Development Bank. Updated Initial Environmental Examination (IEE) of 12 Enhancement Small Town Projects Government of Nepal Ministry of Water Supply Asian Development Bank Updated Initial Environmental Examination (IEE) Of Phidim, Khandbari, Duhabi, Belbari, Birtamod, DasarathChanda, Mahendranagar, Adarshnagar-Bhasi, Tikapur, Sittalpati, Bijuwar, and Waling Enhancement Town Projects Submitted in July 2020 PROJECT MANAGEMENT OFFICE (PMO) Third Small Town Water Supply and Sanitation Sector Project Department of Water Supply and Sewerage Management Ministry of Water Supply Updated Initial Environmental Examination (IEE) of 12 Enhancement Small Town Projects Table of Contents ABBREVIATIONS EXECUTIVE SUMMARY 1.
    [Show full text]
  • NEPAL: Sindhupalchok District - Technical Assistance: Short Training Coverage by VDC (As of 25 April 2017) HRRP
    NEPAL: Sindhupalchok District - Technical Assistance: Short Training Coverage by VDC (as of 25 April 2017) HRRP No. of Trained Masons through DUDBC Curriculum by POs Legend Rasuwa JICA/TCN 1459 NRCS 866 SABAL/UCEP-N 474 District Boundary CARE-N/CSRC 452 VDC/Municipality Boundary SCI/TUKI CHINA 428 ARSOW-ASF 366 No. of masons trained PLAN 239 OXFAM/MANK/Janahit 217 549 CA 192 201 - 400 UNDP 184 101 - 200 MC/CDECF 179 CARITAS-N 160 Upto 100 PWJ/ISAP 121 No masons trained BC/ARSOW 83 HELP/TUKI 66 Gumba INCLUSIVE 51 Helumbu Baruwa Motang 86 LWF/GMSP 30 Total trained masons: 5,567 Remaining planned figure: 235 0 82 89 Gloche 90 Note: Tatopani This map highlights the number of masons trained 28 through short training curriculum in Sindhupalchok district. The figure of masons trained was sourced form Thanpalkot HRRP 4W-R30. Further, the labels in the map (Example Nuwakot 154 :Baramchi - 55) means that 55 masons have been trained in the respective VDC/Municipality. Ichok Kiwool Listikot 0 27 ThampalChhap Sindhupalchok 40 155 Gunsakot 97 Banskharka 55 Pangtang Map Doc Name: Short_T_Sindhupalchok_R30 Palchok Fulpingkatti GLIDE Number: EQ-2015-000048-NPL Mahankal BhoteNamlang 30 0 0 Creation Date: 25 Apr 2017 0 30 Dubachour Lagarche Baramchi 114 59 55 Map Data Source: HRRP 4W-R25 (as of 25 Apr 2017) Thakani Dhuyang Marming Selang Hagam 30 Geo Data Source: DoS, MoFALD; 123 40 Web Resource: www.hrrpnepal.org SipalKavre 0 78 65 SyauleBazar Jalbire Melamchi N.P. Gati Haibung 97 0 Nawalpur 59 81 549 Batase 186 91 Maneswor Karthali Bahrabise Bhotechaur 90 84 Fulpingkot 88 ¯ Ghorthali 60 32 Badegau Kunchok 31 (1 : 250,000) 307 375 Chautara N.P.
    [Show full text]
  • Nepal Electricity Authority (Government of Nepal Undertaking) Distribution and Consumer Services Directorate
    NEPAL ELECTRICITY AUTHORITY (GOVERNMENT OF NEPAL UNDERTAKING) DISTRIBUTION AND CONSUMER SERVICES DIRECTORATE GRID SOLAR AND ENERGY EFFICIENCY PROJECT Environmental and Social screenings Report of 11/0.4kV distribution system expansion in Illam, Panchthar & Taplejung Project: Design, Supply, Installation/Erection, Testing and Commissioning of 11/0.4 kV Distribution System (Illam, Panchthar and Taplejung) GSEEP/W/ICB-08 Submitted by: Grid Solar Energy Efficiency project (GSEEP/W/ICB-08) May, 2021 1 Table of Contents List of Tables: .......................................................................................................................................... ii 1. Background ..................................................................................................................................... 1 2. Objectives ........................................................................................................................................ 1 3. Methodology ................................................................................................................................... 2 3.1 Desk study and Literature review ................................................................................................. 2 3.2 Data requirement, Collection and analysis ................................................................................... 2 3.2.1 Physical Environment .................................................................................................................. 2 3.1.2 Biological
    [Show full text]
  • Table of Province 01, Preliminary Results, Nepal Economic Census 2018
    Number of Number of Persons Engaged District and Local Unit establishments Total Male Female Taplejung District 4,653 13,225 7,337 5,888 10101PHAKTANLUNG RURAL MUNICIPALITY 539 1,178 672 506 10102MIKWAKHOLA RURAL MUNICIPALITY 269 639 419 220 10103MERINGDEN RURAL MUNICIPALITY 397 1,125 623 502 10104MAIWAKHOLA RURAL MUNICIPALITY 310 990 564 426 10105AATHARAI TRIBENI RURAL MUNICIPALITY 433 1,770 837 933 10106PHUNGLING MUNICIPALITY 1,606 4,832 3,033 1,799 10107PATHIBHARA RURAL MUNICIPALITY 398 1,067 475 592 10108SIRIJANGA RURAL MUNICIPALITY 452 1,064 378 686 10109SIDINGBA RURAL MUNICIPALITY 249 560 336 224 Sankhuwasabha District 6,037 18,913 9,996 8,917 10201BHOTKHOLA RURAL MUNICIPALITY 294 989 541 448 10202MAKALU RURAL MUNICIPALITY 437 1,317 666 651 10203SILICHONG RURAL MUNICIPALITY 401 1,255 567 688 10204CHICHILA RURAL MUNICIPALITY 199 586 292 294 10205SABHAPOKHARI RURAL MUNICIPALITY 220 751 417 334 10206KHANDABARI MUNICIPALITY 1,913 6,024 3,281 2,743 10207PANCHAKHAPAN MUNICIPALITY 590 1,732 970 762 10208CHAINAPUR MUNICIPALITY 1,034 3,204 1,742 1,462 10209MADI MUNICIPALITY 421 1,354 596 758 10210DHARMADEVI MUNICIPALITY 528 1,701 924 777 Solukhumbu District 3,506 10,073 5,175 4,898 10301 KHUMBU PASANGLHAMU RURAL MUNICIPALITY 702 1,906 904 1,002 10302MAHAKULUNG RURAL MUNICIPALITY 369 985 464 521 10303SOTANG RURAL MUNICIPALITY 265 787 421 366 10304DHUDHAKOSHI RURAL MUNICIPALITY 263 802 416 386 10305 THULUNG DHUDHA KOSHI RURAL MUNICIPALITY 456 1,286 652 634 10306NECHA SALYAN RURAL MUNICIPALITY 353 1,054 509 545 10307SOLU DHUDHAKUNDA MUNICIPALITY
    [Show full text]
  • Nepal's Birds 2010
    Bird Conservation Nepal (BCN) Established in 1982, Bird Conservation BCN is a membership-based organisation Nepal (BCN) is the leading organisation in with a founding President, patrons, life Nepal, focusing on the conservation of birds, members, friends of BCN and active supporters. their habitats and sites. It seeks to promote Our membership provides strength to the interest in birds among the general public, society and is drawn from people of all walks OF THE STATE encourage research on birds, and identify of life from students, professionals, and major threats to birds’ continued survival. As a conservationists. Our members act collectively result, BCN is the foremost scientific authority to set the organisation’s strategic agenda. providing accurate information on birds and their habitats throughout Nepal. We provide We are committed to showing the value of birds scientific data and expertise on birds for the and their special relationship with people. As Government of Nepal through the Department such, we strongly advocate the need for peoples’ of National Parks and Wildlife Conservation participation as future stewards to attain long- Birds Nepal’s (DNPWC) and work closely in birds and term conservation goals. biodiversity conservation throughout the country. As the Nepalese Partner of BirdLife International, a network of more than 110 organisations around the world, BCN also works on a worldwide agenda to conserve the world’s birds and their habitats. 2010 Indicators for our changing world Indicators THE STATE OF Nepal’s Birds
    [Show full text]
  • Annual Report 2074-075
    UNIVERSITY GRANTS COMMISSION ANNUAL REPORT 2074/75 | 17/18 Sanothimi, Bhaktapur, Nepal Website: http://www.ugcnepal.edu.np UN IV ERSITY E-mail: [email protected] UNIV ERSITY GRANTS Post Box: 10796, Kathmandu, Nepal GRANTS Phone: (977-1) 6638548, 6638549, 6638550 COMMISSION Fax: 977-1-6638552 COMMISSION ANNUAL REPORT 2074/75 17/18 UNIVERSITY GRANTS COMMISSION (UGC) Sanothimi, Bhaktapur, Nepal Website: www.ugcnepal.edu.np ACRONYMS AND ABBREVIATIONS BPKISH B.P. Koirala Institute of Health Sciences CEDA Centre for Economic Development and Administration CERID Research Centre for Educational Innovation and Development CNAS Centre for Nepal and Asian Studies DoE Department of Education GoN Government of Nepal HEMIS Higher Education Management Information System EMIS Education Management Information System HSEB Higher Secondary Education Board IAAS Institute of Agriculture and Animal Sciences IDA International Development Association IoE Institute of Engineering IoF Institute of Forestry IoM Institute of Medicine IoST Institute of Science and Technology J&MC Journalism and Mass Communication KU Kathmandu University LBU Lumbini Buddha University NAMS National Academy of Medical Science NPU Nepal Public University NSU Nepal Sanskrit University PAD Project Appraisal Document PAHS Patan Academy of Health Sciences PokU Pokhara University PRT Peer Review Team PU Purbanchal University QAA Quality Assurance and Accreditation QAAC Quality Assurance and Accreditation Committee RBB Rashtriya Banijya Bank RECAST Research Centre for Applied Science and Technology SFAFD Student Financial Assistance Fund Development SFAFDB Student Financial Assistance Fund Development Board SHEP Second Higher Education Project RMC Research Management Cell SSR Self-Study Report TU Tribhuvan University TUCL TU Central Library UGC University Grants Commission CONTENTS SECTION I: UGC, NEPAL: A BRIEF INTRODUCTION .....................................................
    [Show full text]
  • Environmental Education and Perceptions in Eastern Nepal: Analysis of Student Drawings
    ENVIRONMENTAL EDUCATION AND PERCEPTIONS IN EASTERN NEPAL: ANALYSIS OF STUDENT DRAWINGS By Sara D. Keinath Submitted in partial fulfillment of the requirements for the degree of Master of Science in Forestry Michigan Technological University 2004 The project paper: “Environmental Education and Perceptions in Eastern Nepal: Analysis of Student Drawings” is hereby approved in partial fulfillment of the requirement for the Degree of MASTER OF SCIENCE IN FORESTRY. School of Forest Resources and Environmental Science Signatures Advisor: __________________________________ Blair D. Orr Dean: __________________________________ Margaret R. Gale Date: __________________________________ ii TABLE OF CONTENTS LIST OF FIGURES iv ACKNOWLEDGEMENTS vi CHAPTER 1 INTRODUCTION 1 CHAPTER 2 NEPAL Geography and Climate 5 People and Culture 14 Agriculture-based Economy 19 History and Current Situation 22 Education System 26 CHAPTER 3 STUDY AREA: MECHI ZONE 33 CHAPTER 4 ENVIRONMENTAL EDUCATION 45 CHAPTER 5 METHODOLOGY AND DATA Literature Review 49 Study Design 53 CHAPTER 6 RESULTS AND DISCUSSION Description 60 Interpretation 66 CHAPTER 7 CONCLUSIONS AND RECOMMENDATIONS 78 LITERATURE CITED 81 APPENDIX A 89 APPENDIX B 90 iii LIST OF FIGURES Page Figure 1: Class 8 students in Jhapa 1 Figure 2: Reference map of Asia 6 Figure 3: Major geographical regions of Nepal 7 Figure 4: Langtang National Park 8 Figure 5: The middle hills 9 Figure 6: The Terai 10 Figure 7: Royal Chitwan National Park 12 Figure 8: Lumbini, the birthplace of Buddha 13 Figure 9: Road during monsoon
    [Show full text]