1.5Bn of Investment Will Bring the Brightest of Futures for Luton

Total Page:16

File Type:pdf, Size:1020Kb

1.5Bn of Investment Will Bring the Brightest of Futures for Luton NEWS HIGH SPECIFICATION NEW HOMES FROM REDROW ~ A BETTER WAY TO LIVE £1.5BN OF INVESTMENT WILL BRING THE BRIGHTEST OF FUTURES FOR LUTON Luton Borough Council’s 20-year framework The overall scheme will bring 520 new ages including a multi-use games area, ponds will see the town transformed, thanks to a homes, a pedestrian and cycle route and a community centre. £1.5 billion investment programme that linking neighbouring areas to nearby Our history, spanning more than 40 years, will attract new businesses and create Luton Airport Parkway Station, 4,730 square has earned a unique reputation for quality 18,500 quality jobs, as well as offering metres of new woodland, 3,700 square metres and building beautiful homes where people new retail outlets and new quarters for of wildflower meadow and 4,500 square want to live. The interior of a Redrow the arts and culture. metres of public open space. home is always delivered to the highest Luton can reach many major cities by road, Redrow’s three developments in the area are specification. We are committed to be rail and air, making it an ideal place to live, perfectly placed to make the most of all these at the forefront of design and innovation invest and grow. The M1 is less than three new opportunities: which has been recognised by the industry. miles from all Redrow Luton developments Redrow has recently been awarded the Eaton Green Heights offers three and four whilst the M25 South and A1 North are a prestigious Housebuilder of the Year bedroom homes designed with families in short distance away. By train, Luton Station Award 2018 and has twice won ‘Gold,’ in mind, sensitively planned street scenes, open and Luton Airport Parkway to London St Pancras the ‘Best Large Housebuilder’ category at spaces and play areas, and an overall feeling takes just 26 minutes and Blackfriars can the What House? awards. that you’re not connected to a large town. All be reached in 44 minutes. A £110 million with a London commute in under 45 minutes. investment in the UK’s 5th largest airport at Luton is already improving access and Saxon Square provides trendy apartments increasing the destinations available. with secure undercroft parking, set within landscaped parklands and urban squares. Two of our developments, Eaton Green Ideal for first time buyers and investors, with Heights and Saxon Square, form part of starting prices from £190,000 and excellent the Napier Park regeneration scheme. London transport connections. This former car plant site will promote a range of other uses, including retail, Caddington Woods presents executive family offices, industrial/storage, distribution, homes within a backdrop of the surrounding hotel and leisure. woodland. Play areas on site for all different Computer Generated Images are supplied by Capital & Regional. Please note these are indicative only and are subject to change. 1, 2, 3 & 4 BEDROOM HOMES AVAILABLE. VISIT: REDROW.CO.UK/LUTON NEWS CADDINGTON WOODS IS A PERFECT PLACE TO CALL HOME FOR COMMUTERS Our 314 new homes at Caddington Woods well under-way already creating a strong are surrounded by woodland and set just sense of community. outside the village of Caddington. The The development is within easy reach development is being built across three of Ofsted rated ‘Outstanding’ school phases and has been hugely popular offering Challney High Schools for Boys and a real mix of large and small houses. its sister school the ‘Good’ rated Challney High School for Girls, and for HELP TO BUY AVAILABLE ON independent education, Kings House Prep and ALL THREE DEVELOPMENTS* Rabia Boys and Girls schools all come highly recommended as does Beechwood Park School. Selected homes at all three Redrow Despite its rural location Caddington Woods developments are available with the has excellent transport links with the A5 and Government’s Help to Buy scheme. With junction 11 of the M1 a few minutes away. a five-year interest free 20% equity loan Luton and Dunstable are connected by a from the Government, house hunters need guided busway, offering regular services to just a 5% deposit and a 75% mortgage to This is far from a suburban outpost, enjoying both towns. Leagrave Station is just two miles make up the rest of their loan. The scheme a rural position in the small hamlet of Chaul End to the north and Luton station 3 miles away. which, according to recent government data, overlooking vast areas of open countryside For more information on Caddington Woods, has helped over 150,000 people purchase including the local golf course. Appreciating the please register at a property that might have been otherwise wildlife that a development set in woodland www.redrow.co.uk/caddington, call 01582 unobtainable, has been a great gateway into provides, the RSPB had input into the planting 787678, or visit our sales suite at Chaul End, homeownership for many of our customers in our show home gardens as we are also in Caddington, Bedfordshire LU1 4AX. Prices start across a number of Redrow developments. partnership with The Bumblebee Trust. from £379,950. In fact, almost half of our customers at Aside from homes for people, we also Eaton Green Heights have have hedgehog, bug and bumblebee hotels relied on the Help to Buy throughout the development, as well as bird scheme to either make boxes. The development offers a wide range of it on to the property play areas as well as its own community centre. ladder or move on up to their dream home. Properties here range from three, four and five bedroom executive homes from Redrow’s We will be holding a Help to Buy event in popular Heritage Collection. Occupations are March 2019. Register at any of our three *Help to Buy is a Government backed initiative in partnership with housebuilders. Available on selected plots, subject to status, terms and conditions. developments as listed on the back page Help To Buy cannot be used in conjunction with any other scheme. It is highly advised, for a swift, smooth transaction that an IFA/Solicitor advised by Redrow Homes is used. Offer cannot be used in conjunction with any other Redrow offer. Images typical of Redrow homes. Prices correct at time of this newsletter. of going to press. YOUR HOME MAY BE REPOSSESSED IF YOU DO NOT KEEP UP REPAYMENTS ON A MORTGAGE OR ANY OTHER DEBT SECURED ON IT. CHECK THAT THIS MORTGAGE WILL MEET YOUR NEEDS IF YOU WANT TO MOVE OR SELL YOUR HOME OR YOU WANT YOUR FAMILY TO INHERIT IT. IF YOU ARE IN ANY DOUBT, SEEK INDEPENDENT ADVICE. WINTER 2018 SUCCESS CONTINUES AT EATON GREEN HEIGHTS A real sense of community is starting to Our properties demonstrate Redrow’s In July Eaton Green Heights opened the develop at our 245 family home development Heritage Collection homes, traditionally styled door to its show homes, The Grantham and following our first occupations. With our on the outside, with Arts and Crafts exteriors, The Oxford, giving prospective purchasers the exquisite homes still in high demand but thoroughly modern on the inside. This opportunity to experience our excellent finish prospective purchasers are urged to register Collection is our most popular, offering the and high specification first-hand. on our mailing list. Three and four bedroom charm and character of ‘period’ homes currently released for sale are properties, with all the style available from £369,995, with Help to Buy and convenience of being available, and will be ready to move into brand new. Light and airy open from Winter 2019. plan kitchen/dining areas are well equipped with integrated At Redrow we understand how important top brand appliances, dining education is for families. The development is and family areas are designed close to a selection of Ofsted rated ‘outstanding’ to maximise living space and schools, including Crawley Green Infants, lifestyle needs, and bathrooms Challney High School for Boys and and en-suites offer white Denbigh High School, which is rated in the top suites with quality fixtures 100 non-selective state schools in the country. and fittings. YOUR HOME, YOUR SPACE, YOUR DECISION… The Kensington, our spacious 4 bedroom garage allows easy access from inside your home, offers the best of town house living. home to your stored belongings. The balcony, Three floors of flexibility mean you can live situated off the lounge room, is an added your life your way in your new Redrow touch of luxury designed to help you relax home. Three storey living has no boundaries. and unwind. View further details about It’s ideal for families seeking an extra play The Kensington house type at room, older children craving their own space www.redrow.co.uk/eatongreen or a way to downsize whilst maintaining For more information on Eaton Green Heights, room for guests. please register at www.redrow.co.uk/eatongreen, The Kensington benefits from a stunning open call 01582 788997 or visit our sales centre on plan kitchen/dining room and a feature lounge Kimpton Road, Luton, Bedfordshire LU2 0SX giving you all the space you need to entertain open daily from 10am until 5.30pm. friends and family. The convenient integral NEWS WINTER 2018 CONTEMPORARY ONE & TWO BEDROOM APARTMENTS NOW 61% SOLD AT SAXON SQUARE, LUTON Saxon Square is located in one of the UK’s location for the third year running, investors courts and restaurants in the adjacent best-connected towns, the properties will buying in Luton can benefit from rental yields Napier Park and Stirling Place. of 4.3%, a capital gain of 7.3% and rental benefit from unrivalled links to London, with You are always welcome to visit our helpful growth of 3.7%.
Recommended publications
  • Sustainability Appraisal of the Luton Local Plan
    Sustainability Appraisal of the Luton Local Plan Sustainability Report on the Proposed Submission Local Plan Client: Luton Borough Council Report No.: UE-130 Luton LP SA Report_12_151007 Version: 12 Status: Final Date: October 2015 Author: NP/SP Checked: SP Approved: NP Sustainability Report on the Proposed Submission Luton Local Plan October 2015 UE-130 Luton LP SA Report_12_151007 Contents Non-Technical Summary i About Sustainability Appraisal i About Luton Local Plan i Purpose and Context of the Sustainability Report i The Sustainability Appraisal Scoping Stage ii Appraisal of Strategic Alternatives ii Assessment of Alternative Options iii Likely Significant Effects of the Proposed Submission Local Plan iii Recommendations iii Monitoring iv Next Steps iv Consultation Arrangements iv 1 Introduction 1 1.1 Purpose of this Report 1 1.2 The Luton Local Plan 1 1.3 The Study Area 2 1.4 The Wider Sub-region 5 1.5 Sustainable Development 6 2 Methodology 9 2.1 Integrated Sustainability Appraisal 9 2.2 Habitats Regulations Assessment 10 2.3 Stages of Sustainability Appraisal 10 2.4 Approach to the Assessment 10 2.5 Limitations to the Sustainability Appraisal 14 3 Scoping 17 3.1 Scoping Report 17 3.2 Scoping Consultation and Review 17 3.3 Policy, Plan and Programme Review 18 Sustainability Report on the Proposed Submission Luton Local Plan October 2015 UE-130 Luton LP SA Report_12_151007 3.4 Gathering Baseline Data 18 3.5 Key Sustainability Issues 19 3.6 The Sustainability Appraisal Framework 19 4 Current and Future Characteristics of the Area
    [Show full text]
  • Urban Capacity Report July 2017
    Central Bedfordshire Council www.centralbedfordshire.gov.uk Urban Capacity Report July 2017 - 1 - Central Bedfordshire Urban Capacity Report Central Bedfordshire Urban Capacity Report 1. Introduction 1.1 The Urban Capacity Report sets out the different strands of policy and practice that, as a combined approach, demonstrate the Council are seeking every opportunity across Central Bedfordshire to maximise the use of available land within settlements, before looking to greenfield sites within the countryside in order to accommodate future growth requirements. This will ensure the Local Plan meets the requirements of the NPPF and the emerging direction of future policy as set out in the Housing White Paper. 2. Key Findings 2.1 The Urban Capacity Report discusses the following strands of policy and practice: Luton, Dunstable and Houghton Regis Urban Capacity Potential Study (2016) 2.2 Luton, Dunstable and Houghton Regis have a significant role to play in contributing towards growth within the Luton Housing Market Area (HMA). The Council commissioned Nexus Planning to prepare an Urban Capacity Study to identify the potential for achieving additional capacity from developments within the Luton, Dunstable and Houghton Regis conurbation. The Study conducted a two stage assessment: Stage One – A baseline assessment confirming the sites identified in the SHLAAs and ELRs for Central Bedfordshire and Luton Borough were still suitable for residential development. No new sites were considered. Stage Two – Testing the sites against alternative densities to see whether they could be increased to deliver additional homes. 2.3 The study concluded there may be an opportunity to increase development capacity by 148-496 dwellings within Central Bedfordshire, achieved through increasing density.
    [Show full text]
  • Future Luton: Making Best Use of Our Runway
    Future LuToN: Making best use of our runway Surface Access Strategy Report October 2019 Future LuToN: Making best use of our runway Surface Access Strategy Report Contents Page 1 Introduction 5 Context 5 Surface access 5 Importance of surface access to the airport expansion plans 5 Mode choice, demand management and mitigation 6 Existing airport planning permission and current enhancements to transport 7 Recent and on-going airport improvements 7 Purpose of this report 7 Structure of this report 7 2 Overall Surface Access Strategy 10 Overview 10 On-site principles 10 Parking locations and type 10 Forecourt layout 13 Public transport arrangements/ walking and cycling 17 Background committed improvements - Century Park Access Road (CPAR) 19 Background committed improvements - East Luton improvements 21 3 Public transport strategy 23 Existing modal split 23 Existing Airport Surface Access Strategy (2018-2022) 24 Transport policy 25 Modal split trends 26 Existing public transport offer 27 Public transport improvements 28 Forecasting assumptions 38 Rail capacity assessment 39 Comparative analysis with other airports 40 Summary 42 4 Transport modelling approach 44 Modelling framework 44 CBLTM-LTN strategic model 45 CBLTM-LTN model base and time periods 46 CLTM-LTN model coverage 47 CBLTM-LTN key work phases 47 1 Future LuToN: Making best use of our runway Surface Access Strategy Report VISSIM model 48 VISSIM model base and time periods 49 VISSIM model development, calibration and validation 49 VISSIM model forecasting 50 VISSIM outputs 51 5
    [Show full text]
  • Gpeaton Green Park London Luton Airport
    FREEHOLD COMMERCIAL LAND FOR SALE g eaton green park ep london luton airport • Just 1/4 mile from Luton Airport • Substantial main road frontage • Suitable for Various Uses Subject to Planning • 0.25 to 5.39 Acres freehold land for sale LOCATION The site is situated at the junction of Eaton Green Road and Vauxhall M1 J10 Way, bordering the perimeter and within quarter of a mile of Luton CAPABILITY GREEN Airport. The M1 Motorway (Junction 10) is only 2 miles via the A1081 which is currently being upgraded giving direct access to the Airport. Luton Parkway station, with regular services to St Pancras International Station/Eurostar is 1.5 miles. Luton Town Centre is PARKWAY within 2.5 Miles with Luton Retail Park and Leisure facilities close LUTON AIRPORT by. LUTON AIRPORT Luton Airport is London’s third largest with both scheduled and GM MOTORS chartered services to a wide range of International European and Domestic destinations. NAPIER PARK The site is close to Napier Park, a 55 acre site shortly to be the subject of a £400m mixed use redevelopment focussing primarily on housing and employment uses. Further information can be obtained at www.napierpark.co.uk PLANNING The site is within an established employment area and the Local Authority will favourably consider industrial/distribution (B1, B2 and B8 uses), as well as various other uses including motor related, hotel/ conference and drive thru uses. Interested parties should direct their enquiries to Luton Borough Council Planning Department Tel: 01582 546000 GRANT ASSISTANCE The site is located within an assisted area where a company may be eligible for Grants (SFI) for launching a new business, expanding or modernising an existing operation, upgrading or developing a new product or service.
    [Show full text]
  • Pushing the Envelope
    HIGHWAYS PUSHING THE ENVELOPE Nuttall has used a mix of embankment construction methods After more than 20 years, a closed rail line in Luton has a new role to play in easing the town’s congestion problem. The route is being widened using innovative solutions to make way for a guided busway. Claire Symes reports. XWRQ $LUSRUW PD\ KDYH SXW WKH GHGLFDWHG EXV URXWH ² RI ZKLFK WKHQ XVH WKH H[LVWLQJ URDG QHWZRUN URXWH WR HQVXUH LW LV ZLGH HQRXJK %HGIRUGVKLUH WRZQ RQ WKH PDS NP ZLOO EH D WZLQWUDFN JXLGHG WROLQNZLWKRWKHUGHVWLQDWLRQVµ IRU WKH WZLQWUDFN EXVZD\EXW DOVR LDV WKH URXWH IRU D IDVW JHWDZD\ EXVZD\ ,W IROORZV WKH URXWH RI D 1XWWDOOVWDUWHGZRUNRQWKHGHVLJQ WR LPSURYH KLJKZD\ FOHDUDQFH WR (XURSH DQG EH\RQG EXW JHWWLQJ UDLOZD\ OLQH WKDW ZDV FORVHG LQ WKH DQGEXLOGFRQWUDFWLQ-XQH7KH RQ WKH QHZ RYHUEULGJHV ´7ZR RI DURXQGWKHWRZQLWVHOILVQRWVRHDV\ PLGV 7KH GHYHORSPHQW ZLOO VFKHPHZDVLQLWLDOO\YDOXHGDW 0 WKH EULGJHV DUH EHLQJ FRPSOHWHO\ ,Q VRPH DUHDV RI /XWRQ FDU DOVRLQFOXGHNPRIGHGLFDWHGF\FOH EXWKDVEHHQUHYLVHGXSWR 0DV UHEXLOWIRXUZLOOIHDWXUHQHZGHFNV RZQHUVKLS LV DV ORZ DV ZD\ DQG NP RI FRPELQHG F\FOH WKHVFRSHRIZRUNKDVFKDQJHGVLQFH RQH[LVWLQJDEXWPHQWVDQGWKUHHDUH PHDQLQJ WKDW PDQ\ SHRSOH UHO\ DQGPDLQWHQDQFHDFFHVVWUDFN WKHFRQWUDFWZDVOHW EHLQJ UHPRYHGµ VD\V 0DUTXDQG RQ EXV VHUYLFHV %XW DW SHDN KRXUV 7KHEXVZD\HVVHQWLDOO\UXQVHDVW ,VVXHV WKH VLWH WHDP KDV KDG WR ´7KH PRVW FRPSOLFDWHG SDUW LV VHYHUH WUDIILF FRQJHVWLRQ PDNHV WRZHVWDQGZLOOSURYLGHJXDUDQWHHG GHDOZLWKLQFOXGHZRUNLQJRQFKDON EHWZHHQ WKH IRRWEDOO FOXE DQG WKH WKHVH VHUYLFHV XQSUHGLFWDEOH DQG D MRXUQH\
    [Show full text]
  • Dallow, Farley and South Area Committee
    SOUTH LUTON AREA COMMITTEE 14th January 2008 at 7.52 p.m. PRESENT: Councillor Farooq (Chair); Councillors Ireland, Raquib, Taylor and Timoney. 1 APOLOGIES FOR ABSENCE (REF: 1) Apologies for absence from the meeting were received on behalf of Councillors Ashraf, Harris and M. Hussain. 2 MINUTES (REF: 2.1) Resolved: That the Minutes of the meeting of the Committee held on 2nd October 2007, be taken as read, approved as a correct record and signed by the Chair. 3 PUBLIC QUESTION TIME (REF: 9) There were no questions raised by members of the public on this occasion. 4 EAST LUTON CORRIDOR SCHEME - UPDATE (REF: 11) Mr. Alan Jones, Public Liaison Officer, Birse Civils Ltd. updated the Committee with regard to the work on the East Luton Corridor as follows: • There had been a considerable delay at the Eaton Green roundabout as during excavation work last summer a large number of services had been located which had not previously been chartered on any service drawings which meant a new survey had been required and a new design for the road layout proposed, no further work had been able to be done whilst awaiting the survey to be undertaken and results provided; • The amount of traffic cones were a cause of concern at the Eaton Green roundabout, but cones were in place to protect the open trenches • Work would re-commence by the end of January 2008 and should be completed by the summer. • Work on the four bridges was 95% complete with minor work such as handrails to be completed.
    [Show full text]
  • Strategic Allocations Status List October 2016.Pages
    Planning and Transportation Schedule of Strategic Allocations: Summary of Site Size, Permissions and Ownership November 2016 Planning and Transportation Department of Place and Infrastructure This document sets out the site areas, land ownership and application status (in broad terms) that applies to the eight proposed strategic allocations in the submitted Luton Local Plan 2011-31 Policy Subm Curre Floors Plannin Ownership itted nt pace g Local positi Permis plan on sion? Policy LP5 Land Hecta Hect Squar J South of res ares e o Stockwood Park metre bs Strategic s Allocation & subject to 2.5 2.5 Stadium No 2020 Masterplan Developments (Luton Town 0.7 0.7 Ancillary sports No Football Club) 0.3 0.3 Ancillary enabling No 2 2 P&R No 5.5 5.5 9.5 Business Park gross No (3 ha for landscaping etc.) Sub total 11 11 Tot al 14 15 Developable area (roun ding) 18.62 Gross site area 16/01401/OUTEIA. Outline planning permission, with all matters reserved except for access, for mixed-use development comprising: office floorspace (use class B1(a); retail floorspace (use class A1); food and beverage floorspace (use class A3 - A5); leisure floorspace (use class D2); a hotel (use class C1), car and cycle parking; and associated access, highways, utilities, public realm, landscaping, and associated ancillary works and structures. Awaiting decision. 1 Policy Subm Curre Floors Planni Ownership itted nt pace ng Local positi Permis plan on sion? Policy LP6 London Hect Hecta Squar Jo Luton Airport ares res e bs Strategic metre Allocation s & subject to 42.6 43.13 Century Park 37.9 London Luton Masterplan Airport Ltd Mix B1, B2 and B8 Yes Light industrial and small scale affordable manged B2 units, B8 and airport/aviation related 240.65 London Luton Airport Yes.
    [Show full text]
  • The Saturn Portfolio
    CHRISTCHURCH Retail Park, Christchurch // B&Q Warehouse, St Margaret’s Way, Leicester // Dunstable Road Retail Park, Luton // Cairngorm Retail Park, Winterhill, Milton Keynes // Mountbatten Retail Park, Southampton // B&Q/Halfords, Tonbridge THE SATURN PORTFOLIO A portfolio of institutional retail warehousing located in the southern half of the UK PORTFOLIO OVERVIEW THE SATURN PORTFOLIO PAGE 2 CHRISTCHURCH LEICESTER LUTON M90 MILTON KEYNES SOUTHAMPTON TONBRIDGE M8 EDINBURGH GLASGOW M77 M74 NEWCASTLE UPON TYNE CARLISLE SOUTH SHEILDS M6 A1 (M) HARTLEPOOL DURHAM A66 (M) MIDDLESBROUGH A1 (M) YORK M6 BRADFORD LEEDS BLACKPOOL HULL M65 M62 M62 GRIMSBY LIVERPOOL MANCHESTER M56 SHEFFIELD M1 STOKE-ON-TRENT NOTTINGHAM M6 DERBY CHRISTCHURCH RETAIL PARK, BARRACK ROAD, CHRISTCHURCH BH23 2BN LEICESTER M6 BIRMINGHAM B&Q WAREHOUSE, ST MARGARET’S WAY, LEICESTER LE4 0BG COVENTRY MILTON KEYNES DUNSTABLE ROAD RETAIL PARK, LUTON LU4 8EZ M1 M50 M11 LUTON A1 (M) M5 CAIRNGORM RETAIL PARK, WINTERHILL, MILTON KEYNES MK6 1AZ M40 M4 M4 SWINDON LONDON MOUNTBATTEN RETAIL PARK, WESTERN ESPLANADE, SOUTHAMPTON SO15 1BA CARDIFF BRISTOL M25 M2 M3 B&Q/HALFORDS, CANNON LANE, TONBRIDGE, KENT TN9 1BQ GUILDFORD M20 M23 TONBRIDGE SOUTHAMPTON M5 CHRISTCHURCH BRIGHTON EXETER BOURNEMOUTH CHRISTCHURCH LEICESTER LUTON MILTON KEYNES SOUTHAMPTON TONBRIDGE INVESTMENT HIGHLIGHTS THE SATURN portfolio PAGE 4 INVESTMENT HIGHLIGHTS THE SATURN PORTFOLIO PROVIDES A UNIQUE OPPORTUNITY TO ACQUIRE A SIZEABLE PORTFOLIO OF INSTITUTIONAL QUALITY RETAIL WAREHOUSING LOCATED IN THE SOUTHERN HALF OF THE
    [Show full text]
  • Case for Bushwood (Luton West) on Behalf of Luton & Central Bedfordshire Economic and Development Partnership Ltd
    Luton & South Beds Core Strategy: Preferred Options Case for Bushwood (Luton West) on behalf of Luton & Central Bedfordshire Economic and Development Partnership Ltd Prepared by 06.09 Luton & South Beds Core Strategy: Preferred Options Case for Bushwood (Luton West) on behalf of Luton & Central Bedfordshire Economic and Development Partnership Ltd Prepared by 06.09 The Case for Bushwood (Luton West) Luton & South Beds Core Strategy: Preferred Options List of Figures Site Identification Plan 03 Indices of Deprivation 07 Landscape Designations 22 Habitat Map 25 Proposed Bus Routes 29 M1 tunnel link bus link 31 Overhead Electricity Lines 32 Bushwood Masterplan 40 Luton West – Area M 48 Luton North – Area I 49 Luton East – Area L 49 iv The Case for Bushwood (Luton West) Luton & South Beds Core Strategy: Preferred Options Contents 1 Introduction 01 2 Milton Keynes and South Midlands SRS Compliance 05 Meeting the SRS Objectives 05 Strategy for the Luton / Dunstable / Houghton Regis Sub-Area 05 Strategy for the Luton/Dunstable/Houghton Regis Sub-Area 08 General Conformity Matters 09 3 Overview and Objectives of the Bushwood Proposals at Luton West 13 Policy Considerations and Compliance 13 4 Examing the Evidence Base 19 Environmental Considerations 19 Transportation 27 Utilities 33 Sports Facilities 35 Noise 34 Employment 36 Viability and Deliverability 37 5 The Bushwood Masterplan 39 Community Stadium, Hotel and Conference Facilities 41 Dedicated Busway 42 Sports Facilities 43 Strategic Employment Allocation 44 Regeneration Opportunities 45
    [Show full text]
  • ED2 Markides Associates Technical Note on Transportation East of Luton
    Technical Note Local Plan – Transportation– East of Luton Project No. 16079-01 6 September 2017 Client NORTH HERTFORDSHIRE DISTRICT COUNCIL Author Stacey Capewell, Atholl Noon Authorised Atholl Noon 1. INTRODUCTION 1.1 North Hertfordshire District Council (NHDC) has requested Markides Associates (MA) to comment on the likely transport implications of the proposed allocation of 2,100 dwelling units in the NHDC Local Plan in the East of Luton (EoL) area, in the light of the latest information in the Luton Borough Council (LBC) Local Plan, including the Main Modifications. 1.2 LBC’s representations to the NHDC local plan (November 2016) state that: “NHDC Local Plan Policy SP19 (East of Luton) and supporting text are not considered to be justified, effective or positively prepared in relation to transportation provision. NHDC do not appear to have tested the provision of new local/strategic distributor roads linking the A505, development around Cockernhoe and Century Park. The transport model used to test the NHDC Local Plan is an earlier version of the Luton model and is based on the assumption that are in the Pre-Submission Luton Local Plan rather than the increased capacity of the Luton [sic] in its 2016 SHLAA”. 1.3 This technical note briefly describes: • The evidence base presented for the Luton Local Plan in terms of transport; • The proposed Luton main modification that changes the residential dwellings assumed in the Local Plan; • The outline proposals and modelling work undertaken on the East of Luton proposals. • Information provided on current planning applications; and • The relevant sections of the Inspector’s report on the Luton Local Plan.
    [Show full text]
  • Luton Council: Proud, Vibrant, Ambitious, Innovative! a Submission for Local Authority of the Year
    Luton Council: Proud, Vibrant, Ambitious, Innovative! A submission for local authority of the Year Summary 2016 was a landmark year for Luton as we moved being taken out of our budget. We’ve secured over into delivery of our ambitious and credible £10m in grants in 2016 to deliver additionally across £1.5billion Investment Framework (LIF). During a wide range of services. 2016 the LIF became the cornerstone of the Our success is a result of close synergies between Council’s entire activity, along with that of schools, forward-thinking Executive Members, ambitious businesses, partners and developers. senior management, passionate partners and a A quick skim through this submission brings our motivated workforce adamant that Luton will fulfil strategic priorities to life and shows what can be its potential. achieved when the Council comes together with The real heroes are those on the front line, whether partners and investors – each with a huge passion it’s our street cleaners, social workers or our for Luton – to drive improvements to health and passenger transport crews, who get up each and wellbeing, create opportunities, raise aspirations and every morning to make Luton a better place for enhance prosperity across the town. those that live and work here. Our town and people are far too important to dwell on continued public spending cuts in which Cllr Hazel Simmons, we were the sixth worst affected Unitary Authority Leader of Luton Council in the country; which is why we changed our focus Trevor Holden, to ensure we can invest in our
    [Show full text]
  • POWER COURT Environmental Statement Volume I Chapter 14 - Cumulative Effects
    2020 Developments (Luton) Ltd POWER COURT Environmental Statement Volume I Chapter 14 - Cumulative Effects MARCH 2021 PUBLIC 2020 Developments (Luton) Ltd POWER COURT Environmental Statement Volume I Chapter 14 - Cumulative Effects (ISSUE 1) PUBLIC PROJECT NO. 70075872 DATE: MARCH 2021 WSP Aldermary House 10-15 Queen Street London WSP.com CONTENTS 14. CUMULATIVE EFFECTS 1 14.1. INTRODUCTION 1 14.2. SCOPE AND METHODOLOGY 1 14.4. ASSESSMENT OF CUMULATIVE EFFECTS 5 14.5. DIFFICULTIES AND UNCERTAINTIES 20 14.6. SUMMARY OF CUMULATIVE EFFECTS 20 14.7. REFERENCES 23 TABLES Table 14-1 - Summary of the interaction between common sensitive receptors 5 Table 14-2 - Intra-Project Receptors and Effects 12 Table 14-3 – Short-list of Committed Developments 13 Table 14-4 - Summary of inter-project cumulative effects (with effects of minor significance or above) 19 POWER COURT WSP Project No.: 70075872 March 2021 2020 Developments (Luton) Ltd 14. CUMULATIVE EFFECTS 14.1. INTRODUCTION 14.1.1. This chapter reports the likely significant cumulative environmental effects (both effect interactions and in-combination effects) associated with the Proposed Development. Cumulative effects comprise the combined effects of reasonably foreseeable human induced changes within a specific geographical area over a certain period of time, which can be both direct and indirect. 14.1.2. For the purposes of this ES, the following types of cumulative effects have been considered in accordance with the EIA Regulations 2017 and best practice guidance: ▪ Intra-project combined effects – the interaction and combination of different environmental effects from within the Proposed Development affecting a receptor; and ▪ Inter-project cumulative effects – the combined effects of the Proposed Development and other projects on a receptor.
    [Show full text]